You are on page 1of 3
sitero1g Ria Hydropower Development Company Limited ¥ 2A Rolo, 18 Mar feet arégtarae aarrtee wmeyety fer, 2019 Ridi Hydropower Development Co. Ltd. 02:40:21 , o2:¥o:28 (http:/ndihydro.com.n@/ip://ridinydro.com.np/) Salient Features of Butwal Solar PV Project 8.5 MW 1. Project Location Development Region Zone District Project Site Geographical Co-ordinate Latitude Longitude 2. Gen Average Annual insolation Data Average Annual Temperature Humidity Wind Speed Installed Capacity Average Annual Energy 3. Generation Make Rated output Capacity per Panel Area of each Panel Total area of Panel Total No of Panel Voltage (DC) Module Efficiency Total Contract Energy 4. Inverter Make Capacity of each Inverter Rated output Voltage AC Power Factor ‘iinydeo.com.npinomelpagesDisprouwal-solar-pv-project Western Lumbini Rupandehi Tilottama Municipality 27°37'42" N to 27938'08"N 83°27'05" E to 83°27'23"E 4.9 kWim2/day 25.1006 62% 0.7 mis (annual average) 8500 kW 1, 45, 10,584 kWh JINKO/ TRINA, 330 W 1.940 m* 63333 m2 32640 1134 17.01% 14,510,584 kWh ABB/TMEIC 2125 kW- 4 Nos. 630 V Unity Power Factor 1 ai82019 Frequency Total Harmonic Distortion Efficiency 5. Transformer Type ONAN Rated Capacity Voltage Ratio No of Units Vector Group Efficiency 6. Transmission Line Voltage Level Length From To 7. Project Cost Estimate Total Project Cost 8. Construction Period ‘iinydeo.com.npinomelpagesDisprouwal-solar-pv-project Ria Hydropower Development Company Limited 50 Hz less than 3% 98.70% INVERTER DUTY TRANSFORMER, 8500KVA 630/33000V 4 (One) No. YNat1d11d11411 98.5% 33 kV 5.6 km Project Site (Tilottama) Butwal Substation NRs. 65.5 Crores 10 months from the date of PPA Latest News + AGM Notice Download this file Our associates (http:www.aru 20 snarzora = Ria yeropomer Development Company Limited Valley Hydropower Development (http://www. rair Hydropower Development ~_ Probhu Ban! > fa Oliz Store | Apple Store/Shop in, THAPATHALI 4 Quick Links + Home (httpu/rdihydro.com.np!) * Board Of Directors (hitp:!ridihydro.com.np/home/pagesDisp/board-of-directors) * Projects (projects.ntml) + Gallery (gallery htm) + Career (careerhimi) + Contact Us (contact.html) Contact Us Email Address: ridihydro@wiink.com.np (mailtoidinydro@wink.com.np) ‘Address: 5th floor Trade Tower , Thapathali, Kathmandu , Nepal, GPO Box: 21839 Telephone: +977-01-5111015/5111016 Fax: +977-1-6111016 Copyright © 2018 Ridi Hydropower Development Company Limited. Powered By Nepdroid Innovations (http:/inepdroid.com/) ‘iinydeo.com.npinomelpagesDisprouwalsolar-pv-projoct aa

You might also like