ABDULAH AL-BARRAK & SONS COMANY

DATE:________ _ OBSERVATION FOAM AREA:________

SR#. OBSERVATION LOCATION CORECTIVE ACTION STATUS


1 Crane operation for offloading bundle but the sewer line V09-E3-A/B/C Informed to supervisor Closed
was not covered.

2 Pipe kept at job site from last which block the scaffold V-11-E6 Informed to supervisor and permit receiver open
ladder

3 Hydro test activity was in progress but the Valve in the V14-E-8 Informed to job supervisor and permit Closed
manifold for PSV was closed (by passing safety device) receiver

4 Spanner drop from employee hands D-157 Informed to permit receiver

5 Air compressor BE-901 TUV expired on March 12-2019 Area -4 Informed to permit receiver & supervisor Open
and still is being used at job site

OBSERVED BY:__________________