PROTECTION RELAYS OF GENERATOR AND OVER VOLTAGE RELAY TEST OF UNIT 1

GENERATOR IN PANGLIMA BESAR SOEDIRMAN HYDROELECTRIC POWER PLANT

Kurniawan Prasetya Nugroho (18014005)


Division of Electrical Maintenance
The period of June 1, 2017 - July 31, 2017
PT Indonesia Power UP Mrica, Banjarnegara

Abstract protection system used. To provide good reliability


and quality in the distribution of electric power,
Generator is the main equipment used to produce electricity. In
electric power system should have a good security
maintaining the continuity and reliability of the process of
system to protect from disturbances both internal
generation and distribution of electrical energy needed a good
and external. Especially for vital equipment such as
protection system. Protection system serves to protect equipment
generators and transformers.
from damage in the event of disturbances and isolate
disturbances from spreading. With their good protection system, In a power generation system, the generator has a
the unwanted loss can be avoided. major role in the production process. Therefore, the
generator has a special protection system that did
One of the tools used to protect the generator from disturbance
not experience the damage during disturbances.
is the protection relays. Relay is a tool that works automatically
Disturbances that often occur on the generator
to adjust or enter an electrical circuit (trip or alarm circuit) due
includes disorders of the stator, rotor system
to changes in conditions in the area of protection. One relay
(excitation), engine driving, and back up generator
which serves to protect the generator is over voltage relay. This
installation outside. To cope with such abnormal
relay is located on the generator terminal and has a function to
conditions, we need tools that serves to protect the
protect the generator from overvoltage disturbances. It works by
generator from the distractions that may occur. A
comparing the relay setting value with measurement of phase to
tool usually used to treat disorders or abnormalities
phase voltage.
of the generator are relays.
Relay which has worked in the long term is possible to
The results of observations at the time of practical
experience wear and change the setting value. Therefore, the over
voltage relay of Unit 1 PB Sudirman Hydroelectric Power work in PT Indonesia UP Mrica, PB Soedirman
Plant generator needs to be re-tested in the context of routine Hydroelectric Power Plant has three units of
maintenance. The testing was conducted on the testing of pick- generator and each generator comes with relays as
up value, reset value, and the time lag. part of the protection system. The longer the time
the use of a relay may affect the sensitivity,
Keywords: generator, protection system, relay, testing, reliability, selectivity, and speed relay. Therefore it
over voltage. is necessary to do the testing and maintenance of
the relay. One of the relay there on hydropower
1. INTRODUCTION generators in PBS is over voltage relay. The
function of this relay is as protection from the
1.1 BACKGROUND overvoltage generator incurred exceeds the voltage
Human need for electrical energy from day to day should be. Therefore, the work practices outlined in
increasing due to advances in technology and this report will discuss the shape of the voltage
science to produce technology products that relay testing more on hydropower generator PB
require energy supply quality to maximize Sudirman.
performance. This increase of demand for
electricity, or often referred to as the required load 1.2 AIM
then the electric power supply system must be The purpose of writing this paper is to understand
increase too. Electric power supply is good to have the type and workings of relay protection of
three main criteria that is able to meet the total generator in PB Soedirman Hydroelectric Power
power requirements (adequacy), has a good quality Plant and to understand how to test the over
(quality), and components used in good and safe voltage relay.
condition (security). Therefore, the development of
the power plant is needed to support the increasing 1.3 SCOPE OF PROBLEM
burden that will be borne.
In the implementation of practical work in PB
Reliability and the ability of an electricity system to Soedirman Hydroelectric Power Plant in order to
serve customers highly dependent on the be able to effectively and deeply understand then
Practice Reports – Electrical Power Engineering - STEI ITB 1
the problems observed are protection relay of b. Selectivity
generator and over voltage relay test.
Rele protection must be able to detect any
disturbance in the security area and isolating
2. LITERATURE REVIEW
disorder.
2.1 PROTECTION SYSTEM c. Fast
The protection system is a safety on the equipment Protection relay must work quickly so that
installed in the power system against disorders or interference does not extend and minimize the
abnormal conditions occurring in the power system. damage caused by interference.
The abnormal conditions that may occur can be
d. Sensitive
short circuit, overload, over voltage, over
frequency, synchronous off, and so on. Said protection relay sensitive or sensitive if it
can work with the input range of the detected
2.2 PROTECTION RELAY magnitude is small.
Protection relay is a device that can sense or
2.5 OVER VOLTAGE RELAY
measure to a disturbance in the system, and to open
the circuit breaker to separate the equipment from Over voltage relay serves to detect the voltage
the disturbed system. In general, protection relay exceeds the setting by comparing the setting value
has three main elements, there are : with measurement of phase to phase voltage. Rele
overvoltage working on the secondary circuit a
Sensing element
potential transformer (PT) in which the secondary
This element serves to sense electrical quantities terminal has a nominal voltage of 100 volts or 110
such as current, voltage, frequency, and so volts. For comparison ratio, primary mounted on
dependent relay used. In this section the amount of the side of a 13.8 kV generator terminal. Over
incoming signal will felt its situation. Then these voltage relays work with the principle of
signal delivered to the comparison element. measuring the amount of voltage that is detected by
Comparising element a secondary coil voltage transformer. The
magnitude of the detected voltage is compared
This element functions accept the magnitude of the with the value of relay settings. If the amount of
sensing element to be compared with the value of voltage is detected beyond the limits of the setting
the relay settings. value then it will willingly send the signal to the
Measuring element timer to start counting time according to the time
delay. After the expiration of the delay, relay will
This element serves to hold a rapid change in the send the trip signal to CB to isolating the
measuring scale and will soon give the cue to open disturbance.
the PMT.
3. METHODOLOGY
2.3 FUNCTION OF PROTECTION RELAY
3.1 Tools and Components
The function of protection relay is for:
a. Overvoltage relay RXEG 21 ASEA.
a. Sense, measure, and determine which parts of b. Universal Relay Test Set and Commissioning
the compromised system and ordered a CB to Tool CMC 356 OMICRON.
separate the disorder as soon as possible. c. Software from OMICRON CMC 356.
b. Reduce further damage due to interference. d. Wires.
c. Preventing the spread of disorder. e. Laptop.
d. Minimize the danger to humans due to f. Data cable - straight cable.
potential interference. g. Fiber Optic.
h. 1 set of tools, such as screwdrivers, pliers, and
2.4 CRITERIA PROTECTION RELAY others.
Protection relay must have certain criteria in order 3.2 Testing Procedure
to function in accordance with the needs. The
criteria include: 3.2.1 Preparation

a. Reliable Before conducting tests on relays, it is necessary to


prepare for the relay to be tested with the following
Rele protection must not fail to work in procedure:
overcoming the disorder. a. Connecting relays with wire in accordance with
the provisions contained in the instruction.
Practice Reports – Electrical Power Engineering - STEI ITB 2
b. Connecting the DC Supply to relays. DC Supply d. Choose [(1) Switch]
(+) mounted to the A16 and the DC Supply (-) On the menu "(1) Switch" there are some settings
mounted to the A17. menu options for setting relay through the relay.
c. Preparing the relay setting that has been
calculated according to the provisions. 4) Doing Pick Up Test
d. Recorded data and information on the test sheet. Pick up current is a current in which the relay
start working. Test pick up an individual test on
3.2.2 Testing Process
each relay to test the sensitivity or accuracy in
1) Doing checking communication between test detecting the disorder rele both internally and
equipment (Relay Test Setting) with laptop (Test externally.
Associater). The steps of checking as follows:
a. Open the Start Page OMICRON. 4. PROTECTION RELAY OF GENERATOR AND
b. Select "Test Set Association" in the Setup OVER VOLTAGE RELAY TEST
menu.
5.1 Hydroelectric Generator Protection Relay
c. Click "Search" on the toolbar if the hardware
PB Sudirman Unit 1
has not been detected.
d. Select test set that will be associated with the a. Reverse Power Relay
laptop. Then click "Associate" on the toolbar. Reverse power relay used to detect the presence of
e. After the "Associate CMC 356 (DJ5086)"
active power flow of the system towards the
appears, then press the "Associate" in the
generator stator. The change of active power flow
back of the CMC 356. to the generator can result in labor turned into a
f. Click "OK" in the menu that appears.
motor generator. This change is due to the effect of
g. Test Set will be associated with the PC and lower energy input received by the first mover
ready for use.
generator. In a hydropower could, this condition
h. Close the window "Test Set Association and occurs when the amount of flow of water flowing
Configuration" and continue to use the Test
into the turbine is too small. If the input power to
Set. the prime movers (turbines) can not overcome the
loss of existing generators, the power shortage is
2) Connecting AUX DC at OMICRON.
obtained by absorbing the active power of the
Before AUX DC associated with OMICRON system that serves as a motor generator. Therefore
need to know the terms of which must be was
generator works as a motor,
infested, namely:
- The voltage on the state of the laboratory test Technical data rele Hydroelectric power back on
110 V. PBS, among others:
- Voltage at GITET 0 V. Type : RXPE 40
The steps to connect the AUX DC with
OMICRON are as follows. Type : Static
a. Open the Start Page OMICRON. Artificial : ASEA Generation, Sweden
b. Select the "Aux DC" on the menu "Test Tool".
c. Select the voltage to be used. Current range : 30-120 mA
d. Click "Set". Time range : 6-60 seconds
e. Another way to determine the value of the
voltage used is to select "Other" and fill in the b. Loss of Excitation Relay
desired voltage, then click "Set". Loss of excitation relay serves to secure the loss of
f. By selecting the option "Default" then rotor field. The loss of rotor field can impact the
directly when CMC 356 is turned on and rotor rotation exceeds the synchronous rotation
energized, inputs that go directly issued by and rotating generator as an induction motor in
the power that has become the default which the rotor-voltage AC so could damage the
regardless of the PC is connected or not. rotor excitation system and insulation. This relay
will detect the loss of the magnetic field amplifier
3) Check relay with a computer connection and in case the acceleration of the generator rotor
testing tools rotation. The generator will take reactive power
Measures to be taken if the relay there were from the system and the induced current in the
indications "COM1 Fail" is setting up the relay rotor winding overload. This relay also limit the
with the following steps: amount of reactive power drawn from the system
a. Reset (button on the relay) by the value of its tuning. If the relay fails, it can
b. Enter (button on the relay) cause damage to the stator due to an excessive
c. Choose [(5) Test] heating on the stator.
Practice Reports – Electrical Power Engineering - STEI ITB 3
Technical data loss of excitation relay on the the relay should be sensitive to very small fault
hydropower PBS, among others: currents.
Type : RAGPC Technical data on a hydropower PBS differential
relay is as follows.
Type : Static
Type : RADHA
Artificial : ASEA Generation, Sweden
Type : Static
Current range : 1.2 A - 5 A
Artificial : ASEA Generation, Sweden
tension : 100 V - 120 V
Working voltage : 40-50 V
Time range : 0.2 to 2 seconds
Operating current : 16 mA
Frequency : 50 Hz - 60 Hz
Frequency : 50 Hz
c. Breaker Failure Relay
Working time : 10-20 ms
Breaker failure relay work to detect overcurrent trip
relay generator and command. If the perceived or e. Under Impedance Relay
regarded CB / PMT generator failed to open / trip
Under impedance relay is a backup of the main
then this relay will open the CB / PMT in front of
generator relays that are overall differential relay
him so that CB / PMT that failed and disturbed
and differential relay. For a generator with static
equipment free of voltage.
excitation system of stepdown transformer is
The working principle is based on the magnitude of connected directly to the generator terminals,
the current relay through the relay coil. If the short-circuit current depends on inter-phase
detected current exceeds the relay settings have generator terminal voltage will be low (drop) and
been determined then the relay will provide a logic therefore the fault current will be under nominal
1 to the circuit input AND gate of two inputs. If the load current. Rele impedance less if feel impedance
primary PMT contacts in a closed condition it will decreases below normal impedance then relays this
provide one input to the AND gate logic. Thus the will work.
AND gate will provide the output signal to the
Technical data relay less on hydropower PBS
timer to work out the time. If the appropriate time
impedance is as follows.
setting is exceeded then the breaker failure relay
ordered PMT which is behind the main PMT in this Type : RAKZA
case the PMT high voltage of 150 kV in the
Type : Static
substation.
Relay’s impedance in :5A
Technical data relay breaker failure PBS
hydropower, among others: d : 1-6
Type : RAICA Q : 21-29
Type : Static Time setting : 1.2 seconds
Current range :1A-5A f. Negative Phase Sequence Relay
Time range : 0.02 to 99 seconds Load which are not balanced (unbalanced) in the
three-phase generator can cause overheating in the
Frequency : 50 Hz
generator rotor. Besides the unbalanced load will
Voltage power supply : 110 VDC cause overheating of the generator. Therefore,
before the damage is fatal then the relay will work.
d. Differential Relay
Technical data rele negative phase sequence on PBS
Differential relay serves to protect the generator
hydropower, among others:
from a good distraction short circuit between
phases or between phase short circuit to ground. Type : RABIB
Differential relays used in PB Soedirman
Type : Static
Hydroelectric Power Plant is circulating current
and high impedance relay for generator grounding Nominal current : 1.2 A or 5 A
system using resistance grounding system with a
Time setting : (0.7 to 1.1) x In
resistance of 848 Ω so that current flows will be
relatively small. Therefore generator neutral Frequency : 50 Hz
grounding system side with high resistance then Comparison reset : + 87%

Practice Reports – Electrical Power Engineering - STEI ITB 4


Auxiliary voltage : 24, 46, 55, 110, 125, 220, Over frequency rela serves to secure the generator
and 250 V of frequencies over which the limit of 52.5 Hz and
with a time delay of 60 seconds in the event of
g. Ground Fault Relay
release or reduction of the burden suddenly and
Ground fault relays detect the neutral shift of 13.8 equipment governor failed to work automatically
kV generator CB in open position (open) and there to normalize generator frequency to 50 Hz in the
is no fault current. This relay is supplied from a 13.8 interval 60 sec. 60 seconds is the time that is given
kV voltage side of the transformer with open delta to the governor to normalize the frequency to 50 Hz.
system and as a backup or a backup of statro earth
Technical data relay more on hydropower PBS
fault relay.
frequency is as follows.
Technical data rele neutral shifting soil disturbance
Type : RFXE 4
on hydropower PBS namely:
Type : Static
Type : RXEG 21
Frequency identification: 50Hz
Working voltage : 10-30 V
The range of frequencies: 50-60 Hz
Time - lag relay type : RXKE 1
Reach time lag relay : 20 ms - 99 s
Time - lag relay scale : 1 ms - 99 s
Time delay setting : 60 s
h. Under Frecuency Relay
j. Stator Earth Fault Relay
Under frequency relay fitted to the coordination
with the system so that if the interconnection of a Stator ground fault relay is used to detect a ground
sudden there are plants that trip and the resulting circuit faults in the stator windings. The working
decline in the frequency of the load will be released principle of this relay detects changes in the basic
by the Load Control Center while the plant is wave form 50Hz and 150 Hz harmonic wave forms
operating is not expected to experience the trip in of voltage transformer mounted on output phase
advance. This lower frequency relay serves to stator and generator stator neutral point. If the
secure a generator of over-fluxing on condition relay is detect tampering stator winding between
frekeuensi less than 50 Hz is too long. This relay is 95% - 100% then the relay will give a signal to the
set at 47 Hz with a 1 second delay time. computer and alarm indication, whereas when the
stator windings interference between 0-95%, then
Under frequency relay take input from a voltage
the relay will trip signal generator unit and PMT.
transformer (PT) mounted on the generator at
nominal voltage frequency to be read and Technical data on the stator ground fault relay
compared to a predetermined frequency settings. If hydropower PBS:
the frequency is read less than a predetermined
Type : RAGEA
frequency setting then this relay will provide input
logic 1 on two-input AND gate sedangkat other Type : Static
input AND gate to logic 1 if PMT generator in a
Basic voltage range : 5-16 V
closed condition. Output of the AND gate will give
a signal to the timer to start bekejra thus achieved Range 3rd harmonic voltage : 0.4 to 1.2 V
time and timer settings provide trip signal to lock
Working time : 50-55 seconds
out relay B which is then forwarded to the PMT
generator and trip units. Time range : 20 ms - 99 s
Technical data rele frequencies less on hydropower k. Overall Differential Relay
PBS: Overalls differential relay mounted in PBS
Type : RFXE hydropower unit has 3 input current from the
generator, the generator transformers and
Type : Static
transformer own use. This relay securing current
Artificial : ASEA Generation, Sweden balance of walkin side and equipped with
differential refractive percentage that has harmonic
Frecuency range : 44-50 Hz
restrain. Harmonic bias function to limit inrush
Setting time delay :1s current during the energize transformer.
Frequency setting : 47 Hz l. Rotor Ground Fault Relay
i. Over Frecuency Relay Rotor ground fault relay is used to detect the rotor
disturbance to the ground. This relay can be used

Practice Reports – Electrical Power Engineering - STEI ITB 5


on a unidirectional circuit. When no interference Reset the time on the voltage instantaneously
occurs then the direction of the motor circuit is changed to 0 from 1.1 x (1,3x) value set : 55 ms
open while the rotor if there is interference on the
Consistency of the operations of the highest setting:
circuit relay will close so that the relay will work.
± 1% or ± 3%
Technical data on the rotor ground fault relay PBS
Voltage changes operation : 3%
Hydropower is as follows.
On the change in frequency (the frequency range
Type : RXNB 4
45-50 Hz)
Type : Static
Changes per ºC temperature : <-0.17%
Field Voltage: 300 V / 900 V and 220-240 V
Allowable ambient temperature : -25 to + 55ºC
Frequency : 50 Hz
Voltage range : 80-240 V
Voltage variation: -20% to 10%
Range time : 20 ms - 99 s
m. Over Voltage Relay
Artificial: ASEA Generation, Sweden
Overvoltage relay used to detect the voltage that
5.2 Over Voltage Relay Test Results
exceeds its settings by comparing the value of the
setting with the voltage measurement of the phase Test of over voltage relay regularly held once a year.
to phase. Rele overvoltage working on the It aims to determine the feasibility of the relay.
secondary circuit a voltage transformer which Relay adjustment is done by injecting a voltage of
secondary terminal has a nominal voltage of 100 V 115 V. The overvoltage relay test results are as
or 110 V. For comparison ratio, primary mounted follows.
on the side of a 13.8 kV generator terminal. Over
Setting requested.
voltage relay also anticipate the possibility of
malfunction AVR (Automatic Voltage Regulator) of Operating value, voltage : 115 V
the generator itself.
Time Delay : 2.0 S
Over voltage relays work with the principle of Table 4. 1 Test Result of Voltage Operation
measuring the amount of voltage that is detected by
a secondary coil voltage transformer. The OPERATING VALUE (V)
magnitude of the detected voltage is compared SCALE
with the relay’s setting value. If the amount of PICK-UP RESET
VALUE
voltage is detected beyond the limits of the setting (V)
value then relay the signal to start the timer starts ± 3% of scale
≥ 97% pick-up
to count time according to the time delay. After value
exceeding a certain delay time the relay will send a
signal to the PMT to isolate the generator from 115 115.3 (100.26%) 112.8 (97.83%)
disturbance. If the overvoltage protection failed to
anticipate the generator will occur stator winding *) Scale value: 115 V = 111.55 to 118.45
insulation damage. Table 4. 2 Test Result of Time Delay
Technical data relay more on hydropower PBS is as OPERATION VALUE (s)
follows. SCALE VALUE
(S)
Type : RXEG 21 ± 0.3% sett. Value +17 ms. *)

Type Time Lag Relay : RXKE 1 2.0 1,988


Type : Static
*) Scale value: 2.0 s = 1.977 to 2.023
Total Range Scale : 5-480 V
Note: Time Delay Operation = Operation time-lag
Indicator : Target relay / Operation time voltage relay
Operating time on instantaneous voltage changed The value of over voltage relay operation in PBS
from 0 to hydropower RXEG 21 is ± 3% of the value of the
1.1 x (1,3x) value set : 30 ms setting. Pick up a range of values for the setting 115
V are :
2.5x (3x) value set : 2 ms
115 V ± (3% x 115 V) or V 111.55 - 118.45 V
reset ratio :> 97%

Practice Reports – Electrical Power Engineering - STEI ITB 6


So the pick up value of over voltage relay is in the d. Over voltage relay will work if there is over
range 111.55 - 118.45 V. voltage that crosses a boundary caused by a
failure on the AVR and governor of work
While calculating the reset value is ≥ 97% x (the
failure in arranging a turbine wheel.
value of the pick-up):
e. The results of over voltage relay test shows
• 97% x 111.55 V = 108.2035 V
that the relay is still functioning properly.
• 97% x 118.45 V = 114.8965 V
5.2 Suggestion
So the reset value of the over voltage relay on PBS
hydropower is in the range of 108.20 V - 114.90 V. a. A test result should have accurate data. This
can be achieved by multiplying the data
From the test results rele has been done, the data
retrieval.
obtained as follows:
b. Extra members can improve the effectiveness
• Pick up value = 115.3 V
and efficiency of work for relay testing
• Reset value = 112.8 V because of using a series of fairly complicated
A percentage of the pick up value = wiring.
115,3−115
𝑥100% = 0,26% (< 3%)
115 REFERENCE
112,8
Percentage reset value = 𝑥100% = 97,83% (≥ [1] Anonymous. 1985. ASEA Relay Buyer's
115,3
97%) Guide. ASEA, Sweden.
From the test results, pickup value and reset value [2] Sutrisno. 2000. The Electric Power System
are within a predetermined operating standards. Protection.Bandung: Bandung Institute of
Thus, it can be concluded that the relay is in good Technology.
condition.
[3] Marsudi, Djiteng. 2005. Generating
Rated operating time delay with a time lag relay Electrical Energy.Jakarta: Erland.
RXKE type 1 by standard ASEA is ± 0.3% setting
[4] [Online].
value + 17 ms. Values for scale operation time 2.0 s
Available:http://www.indonesiapower.co
value is in the range of 1.977 s - 2.023 s. From the
.id
results of tests performed by the scale value
obtained operating time 2.0 s 1,988. It can be [5] [Online].
concluded that the time lag relay is still in good Available:https://www.omicronenergy.co
shape. m/en/products/cmc-356/

5. SUMMARY
5.1 Conclusion
a. Protection is certain safeguards to reduce the
component due to disturbance by separating
the disturbance parts of parts of other systems
so that disturbance does not extend.
b. Protection system is needed in a power plant
in order to avoid the risk of equipment
damage due to disturbance or abnormal
conditions.
c. Generators in PB Soedirman Hydroelectric
Power Plant equipped with a variety of relay
protection: Reverse Power Relay, Loss of
Excitation Relay, Breaker Failure Relay,
Differential Relay, overalls Differential Relay,
Under Impedance Relay, Negative Phase
Sequence Relay, Under frecuency Relay, Over
frecuency Relay, Stator Earth Fault Relay,
Rotor Ground Fault Relay, and Over Voltage
Relay.

Practice Reports – Electrical Power Engineering - STEI ITB 7