Hazard Risk Persons affected Pb Sv RPN Remedial Action Pb Sv RPN bility
By Date
Ensure that full pre commissioning
Hoval
checks including dry run tests have
Risk of severe bodily Commissioning Ltd
been carried out.
injury engineer
20 Ensure that all work is carried out by 5
1 Fire/Explosion Possible fatality Other persons 4 5
fully qualified and highly trained
1 5
Building/equipment local to the plant On
High engineers. Low
damage room going
Ensure that leak detection equipment
is used.
Commissioning Ensure that the ventilation and flue are Hoval
engineer 15 checked / tested for the presence of 5
Asphyxiation from Ltd
2 carbon monoxide Possible fatality Other persons 3 5 carbon monoxide within the installation 1 5
Low
localised to the before commencing work. On
High
plant room going
Hoval
Ensure that access to and from site is
Ltd
16 gained via designated routes as
advised in site induction. 8
Slips, Trips and Possible severe Commissioning
3 Falls bodily injury engineer
4 4 Ensure that spillages are treated 2 4
immediately and cleaned up. Med On
High
Ensure that all engineers wear suitable going
safety footwear at all times.
Respons
Hazard Risk Persons affected Pb Sv RPN Remedial Action Pb Sv RPN abilty By
Date
Probability Severity
1 Improbable – Unlikely X 1 Negligible – remote possibility of harm 1-6 = Low priority
2 Remote – May occur X 2 Marginal – first aid injury possible 8-12 = Medium priority
3 Possible – Likely to occur X 3 Slightly dangerous – minor injury possible 15-25 = High priority
4 Probable – Very likely to occur X 4 Dangerous – major injury
5 Very probable – very likely to occur soon X 5 Very dangerous – could cause death © MJL Page 1 of 4 Issue 3 – 06/09 – HS5b
Client Name: Hoval Ltd Risk Assessment Type: Boiler Service
Risk Assessment Ref: 003/ January 2012 Scope: Service Division
Possible Hoval
fatality/severe bodily Commissioning Ensure that correct steps are used and Ltd
5 Working at height 3 5 15 2 3 6
injury due to falling engineer inspection sheet is readily available.
On
from height High Low
going
Hoval
Possible Ensure correct use of PPE including
15 9 Ltd
fatality/severe bodily Commissioning hard hat at all times of risk
6 Falling objects injury due to falling engineer
3 5
Ensure others working in area are
3 3
High Med On
from height aware of your presence
going
Possible Hoval
Ensure correct use of PPE.
Dust and Fibres inhalation/skin 8 Ltd
Commissioning COSHH assessments have been 4
7 from “Insulfrax S” irritation from Blast
engineer
4 2
completed and are available with
2 2
Low
packing material tube insulation Med On
relevant Material Safety Data Sheet.
packing material going
Respons
Hazard Risk Persons affected Pb Sv RPN Remedial Action Pb Sv RPN abilty By
Date
Probability Severity
1 Improbable – Unlikely X 1 Negligible – remote possibility of harm 1-6 = Low priority
2 Remote – May occur X 2 Marginal – first aid injury possible 8-12 = Medium priority
3 Possible – Likely to occur X 3 Slightly dangerous – minor injury possible 15-25 = High priority
4 Probable – Very likely to occur X 4 Dangerous – major injury
5 Very probable – very likely to occur soon X 5 Very dangerous – could cause death © MJL Page 2 of 4 Issue 3 – 06/09 – HS5b
Client Name: Hoval Ltd Risk Assessment Type: Boiler Service
Risk Assessment Ref: 003/ January 2012 Scope: Service Division
Possible severe
bodily injury due to Hoval
Ensure correct of PPE for task. Ltd
Hot surfaces burns to skin or Commissioning 8
4 4 16 Ensure that all joints are checked for 2 4
8 /Substances scalding from ill fitting engineer
leaks before starting work.
joints, hot surfaces On
High Med going
and substances
Probability Severity
1 Improbable – Unlikely X 1 Negligible – remote possibility of harm 1-6 = Low priority
2 Remote – May occur X 2 Marginal – first aid injury possible 8-12 = Medium priority
3 Possible – Likely to occur X 3 Slightly dangerous – minor injury possible 15-25 = High priority
4 Probable – Very likely to occur X 4 Dangerous – major injury
5 Very probable – very likely to occur soon X 5 Very dangerous – could cause death © MJL Page 3 of 4 Issue 3 – 06/09 – HS5b
Client Name: Hoval Ltd Risk Assessment Type: Boiler Service
Risk Assessment Ref: 003/ January 2012 Scope: Service Division
Date of Review
Probability Severity
1 Improbable – Unlikely X 1 Negligible – remote possibility of harm 1-6 = Low priority
2 Remote – May occur X 2 Marginal – first aid injury possible 8-12 = Medium priority
3 Possible – Likely to occur X 3 Slightly dangerous – minor injury possible 15-25 = High priority
4 Probable – Very likely to occur X 4 Dangerous – major injury
5 Very probable – very likely to occur soon X 5 Very dangerous – could cause death © MJL Page 4 of 4 Issue 3 – 06/09 – HS5b