Professional Documents
Culture Documents
ITEM QTY UNIT UNIT COST SUB TOTAL ITEM NO. RATE DAILY WAGE
SCRAPPED B.I. PIPE (2M LENGTH) 291.00 PCS. N/A ASSUME 10% CONTRACTORS PROFIT:
1.10 * 140 = PHP 154.00 / SPAN
STEEL GATE WORKS
2.00 2.00 3.00 PCS. PHP 450.00 PHP 1,350.00 TOTAL LABOR COST :
PLAIN G.I. SHEET
1.00 BOX PHP 240.00
WELDING ROD
1 GATE DETAIL
0.30
0.30
1.50
0.50
1.50 1.50
3.00
0.50
3.00
PROJECT LOCATION :
PRC No : DATE ISSUED :
PTR No : PLACE :
TIN No :