You are on page 1of 11

Project No: A28P09

TECHNICAL QUERY
Unit: 200
TANKS & AGITATORS
Query #: 3
A28P09-200-CTQ-021E
Date: Aug 12, 2018

Client: International Pharmaceuticals Inc. Site: Cebu, Philippines


Project: IPI Manufacturing Plant Vendor: Gemsun
Tag Number: Tank T1-2007 QtyReq’d: 1
Type: Tank P&ID No: A28P09-200-PID-03
Model: - Manufacturer:

Please provide response/s under TQ #: 3

QUERY ITEM 1
TQ1: General Arrangement Drawing Query Date: July 4, 2018
1. Please provide general arrangement drawing for each tank so we
can properly evaluate the proposal. Kindly provide the following
on the drawing:
a. Tank Elevation View
b. Tank Nozzle Orientation View
We would like to confirm if the nozzle location on
your quotation is based on our requirement.
c. Hinge cover opening location

Hygienic Cover
2. Please fabricate hygienic hinged type cover instead of the
common hinged cover design as requested by IPI. See sample
drawing below for the suggested design. This is to prevent the
accumulation of dust from entering the tank. Please confirm if
you can comply.

Agitator Drawing
3. Is the agitator from the drawing the suitable type given the
mixing application indicated in the datasheet? Please check
agitator type.
a. If the agitator is changed, please provide complete
dimensions.
b. Take note that the impeller quantity on the drawing is
representation only, please provide also the suitable
REVISION LOG
ISSUE Prep CHK APPD CHK
REV DATE REV ISSUE STATUS DATE PREP BY APPD BY CLIENT
STATUS By BY BY BY
0 Query #1 07-June-18 HBG KLC RCJ
1 Query #2 04-July-18 HBG SRT RCJ
2 Query #3 12-Aug-18 HBG SRT RCJ

Notice: This document contains confidential and proprietary information not to be published, disclosed to others, reproduced or used for any purpose
other than the purpose for which it is furnished without the prior written permission from PTI.
Project No: A28P09
TECHNICAL QUERY
Unit: 200
TANKS & AGITATORS
Query #: 3
A28P09-200-CTQ-021E
Date: Aug 12, 2018

impeller quantity. Please specify the distance in


between impeller (if applicable).
c. Please specify the distance in between tangent line
and lower impeller.
d. Please provide material for each: impeller, shaft and
coating

4. For the motor details:

Motor Power (kW) Motor Speed (rpm)

Required Quoted Required Quoted

12.17 kW 15 kW 230rpm 242rpm

a. Is the motor enclosure Totally Enclosed Fan Cooled


(TEFC)?
b. 242 rpm is not acceptable. Please provide motor
equipped with frequency controller with range that
meets the required speed. Kindly indicate it in the
drawing.

5. Please give motor and support part drawing details. This is to


evaluate the pipe routing so as not to be obstructed by the
motor part.
6. Please provide agitator and motor weight.

Nozzle Table
7. Confirm if all nozzle connection follows ASME standard
8. Please provide complete nozzle specification on the drawing.

Design Details
9. Design Data Table (refer to the revised updated drawing and
provide the same set of details)

Leg Support
10. Indicate material and thickness of the following components in
the equipment drawing:
a. Support leg reinforcement plate
b. Support leg baseplate
c. Support leg size
d. Support leg total height
e. Support leg orientation
11. Please fabricate the top portion of the leg support (the one
attached to the tank) with a slope angle of 15° as per sample
picture below.

REVISION LOG
ISSUE Prep CHK APPD CHK
REV DATE REV ISSUE STATUS DATE PREP BY APPD BY CLIENT
STATUS By BY BY BY
0 Query #1 07-June-18 HBG KLC RCJ
1 Query #2 04-July-18 HBG SRT RCJ
2 Query #3 12-Aug-18 HBG SRT RCJ

Notice: This document contains confidential and proprietary information not to be published, disclosed to others, reproduced or used for any purpose
other than the purpose for which it is furnished without the prior written permission from PTI.
Project No: A28P09
TECHNICAL QUERY
Unit: 200
TANKS & AGITATORS
Query #: 3
A28P09-200-CTQ-021E
Date: Aug 12, 2018

12. Please provide Tank Bottom Valve specifications.

13. Please provide the Sampling Valve specifications.

14. Load cell is not part of the vendor scope. Please remove it on the
parts list.

15. Spray ball is not part of the vendor scope. Please remove it on
the parts list.

16. For this tank, nozzles are categorized into pipe/tube type. Please
confirm that the nozzles specified on the drawing were based on
this material preferences table.

Response 1: the respond to TQ (06072018) already been shown Response Date: Jul.17,2018
on the general drawings R0 20180625;

QUERY ITEM 2
TQ2: Tank bottom diaphragm valve Query July
Date: 4,
1. Please provide catalog/s or drawing with complete specification and details for the Tank bottom
valve. 2018
REVISION LOG
ISSUE Prep CHK APPD CHK
REV DATE REV ISSUE STATUS DATE PREP BY APPD BY CLIENT
STATUS By BY BY BY
0 Query #1 07-June-18 HBG KLC RCJ
1 Query #2 04-July-18 HBG SRT RCJ
2 Query #3 12-Aug-18 HBG SRT RCJ

Notice: This document contains confidential and proprietary information not to be published, disclosed to others, reproduced or used for any purpose
other than the purpose for which it is furnished without the prior written permission from PTI.
Project No: A28P09
TECHNICAL QUERY
Unit: 200
TANKS & AGITATORS
Query #: 3
A28P09-200-CTQ-021E
Date: Aug 12, 2018

2. Please clarify if the tank bottom valve is shipped together with the package.
a. Please clarify the mounting type of the tank bottom valve
Please take note that we require Flush mounted type to assure zero dead leg

3. Please clarify the use of the additional nozzle marked in the image below.

Sampling Valve

1. Please provide catalog/s or drawing with complete specification and details for the Sampling
valve.

2. Please clarify if the sampling valve is shipped together with the package.
a. Please clarify the mounting type of the sampling valve
Please take note that we require zero dead leg to avoid contamination.

b. Please make sure that the handwheel plunger expands up to the internal wall of the tank
body.

Agitator

1. Diameter of Propeller Blades are too large. Maximum Propeller diameter to Tank diameter
ratio is 0.6. Please redesign

REVISION LOG
ISSUE Prep CHK APPD CHK
REV DATE REV ISSUE STATUS DATE PREP BY APPD BY CLIENT
STATUS By BY BY BY
0 Query #1 07-June-18 HBG KLC RCJ
1 Query #2 04-July-18 HBG SRT RCJ
2 Query #3 12-Aug-18 HBG SRT RCJ

Notice: This document contains confidential and proprietary information not to be published, disclosed to others, reproduced or used for any purpose
other than the purpose for which it is furnished without the prior written permission from PTI.
Project No: A28P09
TECHNICAL QUERY
Unit: 200
TANKS & AGITATORS
Query #: 3
A28P09-200-CTQ-021E
Date: Aug 12, 2018

An impeller too big will cut off the flow to the top of the tank

2. Are the propeller blades angled?

a. if so, please specify the degree angle of the propeller blades.


b. specify the reason how you come up with that angle. (if applicable)
c. please provide detailed drawing for the propeller.

Sight Glass
1. Please provide Straight Sight Glass complete connection details and specifications.

2. Please confirm that the sight glass to be provided is used for hygienic tanks.

Response Tank bottom valve Response Jul.


1: 1. the tank bottom valve details as following: Date: 17,
2018

REVISION LOG
ISSUE Prep CHK APPD CHK
REV DATE REV ISSUE STATUS DATE PREP BY APPD BY CLIENT
STATUS By BY BY BY
0 Query #1 07-June-18 HBG KLC RCJ
1 Query #2 04-July-18 HBG SRT RCJ
2 Query #3 12-Aug-18 HBG SRT RCJ

Notice: This document contains confidential and proprietary information not to be published, disclosed to others, reproduced or used for any purpose
other than the purpose for which it is furnished without the prior written permission from PTI.
Project No: A28P09
TECHNICAL QUERY
Unit: 200
TANKS & AGITATORS
Query #: 3
A28P09-200-CTQ-021E
Date: Aug 12, 2018

2. yes, the tank bottom is flush mounted type.


3. the additional nozzle is for sampling,, which is customized. this image is only
for reference, the standard valve is no this nozzle

Sampling valve
1. see below details

2. a. yes, no zero dead leg


b. yes, meet your requirement

Agitator
1. the impeller size have already been changed, see attached tank
drawing R1 20180717;
2. a- in general, 0°~30°;
b- for fully stirring;
c. see attached tank drawing

Sight glass
1. see attached sight glass details
2. this sight glass is suitable for hygienic tanks;

QUERY ITEM 2
TQ2: Tank bottom diaphragm valve Query July 4,
Date: 2018
1. Please provide catalog/s or drawing with complete specification and details for the
Tank bottom valve.

2. Please clarify if the tank bottom valve is shipped together with the package.
REVISION LOG
ISSUE Prep CHK APPD CHK
REV DATE REV ISSUE STATUS DATE PREP BY APPD BY CLIENT
STATUS By BY BY BY
0 Query #1 07-June-18 HBG KLC RCJ
1 Query #2 04-July-18 HBG SRT RCJ
2 Query #3 12-Aug-18 HBG SRT RCJ

Notice: This document contains confidential and proprietary information not to be published, disclosed to others, reproduced or used for any purpose
other than the purpose for which it is furnished without the prior written permission from PTI.
Project No: A28P09
TECHNICAL QUERY
Unit: 200
TANKS & AGITATORS
Query #: 3
A28P09-200-CTQ-021E
Date: Aug 12, 2018

a. Please clarify the mounting type of the tank bottom valve


Please take note that we require Flush mounted type to assure zero dead leg

3. Please clarify the use of the additional nozzle marked in the image below.

Sampling Valve

1. Please provide catalog/s or drawing with complete specification and details for the
Sampling valve.

2. Please clarify if the sampling valve is shipped together with the package.
a. Please clarify the mounting type of the sampling valve
Please take note that we require zero dead leg to avoid contamination.

b. Please make sure that the plunger expands up to the internal wall of the tank body.

Agitator

1. Diameter of Propeller Blades are too large. Maximum Propeller diameter to Tank
diameter ratio is 0.6. Please redesign

REVISION LOG
ISSUE Prep CHK APPD CHK
REV DATE REV ISSUE STATUS DATE PREP BY APPD BY CLIENT
STATUS By BY BY BY
0 Query #1 07-June-18 HBG KLC RCJ
1 Query #2 04-July-18 HBG SRT RCJ
2 Query #3 12-Aug-18 HBG SRT RCJ

Notice: This document contains confidential and proprietary information not to be published, disclosed to others, reproduced or used for any purpose
other than the purpose for which it is furnished without the prior written permission from PTI.
Project No: A28P09
TECHNICAL QUERY
Unit: 200
TANKS & AGITATORS
Query #: 3
A28P09-200-CTQ-021E
Date: Aug 12, 2018

An impeller too big will cut off the flow to the top of the tank

2. Are the propeller blades angled?

a. if so, please specify the degree angle of the propeller blades.


b. specify the reason how you come up with that angle. (if applicable)
c. please provide detailed drawing for the propeller.

Sight Glass
1. Please provide Straight Sight Glass complete connection details and specifications.

2. Please confirm that the sight glass to be provided is used for hygienic tanks.

`Response Tank bottom valve Response Jul.17,2018


1: 1. the tank bottom valve details as following: Date:

REVISION LOG
ISSUE Prep CHK APPD CHK
REV DATE REV ISSUE STATUS DATE PREP BY APPD BY CLIENT
STATUS By BY BY BY
0 Query #1 07-June-18 HBG KLC RCJ
1 Query #2 04-July-18 HBG SRT RCJ
2 Query #3 12-Aug-18 HBG SRT RCJ

Notice: This document contains confidential and proprietary information not to be published, disclosed to others, reproduced or used for any purpose
other than the purpose for which it is furnished without the prior written permission from PTI.
Project No: A28P09
TECHNICAL QUERY
Unit: 200
TANKS & AGITATORS
Query #: 3
A28P09-200-CTQ-021E
Date: Aug 12, 2018

2. yes, the tank bottom is flush mounted type.


3. the additional nozzle is for sampling,, which is customized. this image is only
for reference, the standard valve is no this nozzle

Sampling valve
1. see below details

2. a. yes, no zero dead leg


b. yes, meet your requirement

Agitator
1. the impeller size have already been changed, see attached tank
drawing R1 20180717;
2. a- in general, 0°~30°;
b- for fully stirring;
c. see attached tank drawing

Sight glass
1. see attached sight glass details
2. this sight glass is suitable for hygienic tanks;

QUERY ITEM 3
TQ3: Nozzle Table Query Date: Aug-09-
1. Please revised the nozzle table for Nozzle (N1) the piping will be 2018
connected to the bottom valve through hygienic ferrule not flanged.
Please revise the drawing.

REVISION LOG
ISSUE Prep CHK APPD CHK
REV DATE REV ISSUE STATUS DATE PREP BY APPD BY CLIENT
STATUS By BY BY BY
0 Query #1 07-June-18 HBG KLC RCJ
1 Query #2 04-July-18 HBG SRT RCJ
2 Query #3 12-Aug-18 HBG SRT RCJ

Notice: This document contains confidential and proprietary information not to be published, disclosed to others, reproduced or used for any purpose
other than the purpose for which it is furnished without the prior written permission from PTI.
Project No: A28P09
TECHNICAL QUERY
Unit: 200
TANKS & AGITATORS
Query #: 3
A28P09-200-CTQ-021E
Date: Aug 12, 2018

Tank bottom valve


1. Is the tank bottom valve shipped together with the package? if not
please provide complete welding details for our references.

Sampling Valve
1. Is the sampling valve shipped together with the package? if not please
provide complete welding details for our references.

Response NOZZLE TABLE AUG.16,2018


1: 1. already revised, please see the attached updated drawing R2 20180816;
TANK BOTTOM VALVE
1. yes, the tank bottom valve will be shipped together with the package, also
attach several sample pictures of tank bottom valve for your reference.
SAMPLING VALVE
1. yes, the sampling valve will be shipped together with the package.
TANK THICKNESS
1. the tank thickness has been updated, please check and confirm.

OTHER INFORMATION
Prepared Haries B. Garcia Response by:
by:
Company: Process Technologies, Inc. Company: Gemsun
Attachment # 1 A28P09-200-GAD-T12007-01.pdf Attachment A
2 B
3 C
4 D
5 E
6 F
7 G
8 H
9 I
10 J
REVISION LOG
ISSUE Prep CHK APPD CHK
REV DATE REV ISSUE STATUS DATE PREP BY APPD BY CLIENT
STATUS By BY BY BY
0 Query #1 07-June-18 HBG KLC RCJ
1 Query #2 04-July-18 HBG SRT RCJ
2 Query #3 12-Aug-18 HBG SRT RCJ

Notice: This document contains confidential and proprietary information not to be published, disclosed to others, reproduced or used for any purpose
other than the purpose for which it is furnished without the prior written permission from PTI.
Project No: A28P09
TECHNICAL QUERY
Unit: 200
TANKS & AGITATORS
Query #: 3
A28P09-200-CTQ-021E
Date: Aug 12, 2018

11 K
12 L
13 M
14

REVISION LOG
ISSUE Prep CHK APPD CHK
REV DATE REV ISSUE STATUS DATE PREP BY APPD BY CLIENT
STATUS By BY BY BY
0 Query #1 07-June-18 HBG KLC RCJ
1 Query #2 04-July-18 HBG SRT RCJ
2 Query #3 12-Aug-18 HBG SRT RCJ

Notice: This document contains confidential and proprietary information not to be published, disclosed to others, reproduced or used for any purpose
other than the purpose for which it is furnished without the prior written permission from PTI.

You might also like