You are on page 1of 3

CONFINED SPACE ENTRY PLAN BEST PRACTICE

FACILITY: YRD-ARAMCO CSEP WILL NOT EXCEED 30 DAYS


EQUIPMENT: V35-V1, DRUM FLARE KNOCKOUT HORIZONTAL START DATE: 06-Mar-19 END DATE: 04-Apr-19
DIVISION: Maintenance Division ENTITY EXECUTING THE JOB FOREMAN
UNIT: 2019 Turnaround Coordination Unit NUMBER OF EMPLOYEES
SCOPE OF THE
T&I works.
WORK
□Locked switch/breaker Blinding Note: attach drawing showing each isolation
ISOLATION METHOD
Disconnect point as well as blind list.
□ Purging □ Cleaning □ Flushing
ELIMINATING O2 CO H2S LEL□ Other:
□ Steaming-out □ Natural Ventilation ATMOSPEHRIC GAS TESTING TYPES
ATMOSPHERIC
AND FRECUENCY ………………………….
HAZARDS BY: Mechanical Ventilation □N2/CO2
□ Frequency: ………………….
inerting
TYPES OF Self-contained breathing apparatus  Air REQUIRED TYPES OF PPE
EQUIPMENT (IN ADDITION TO Hard Hat; Clear Safety Glasses and Safety Shoes)
movers  Rescue equipment Lighting
REQUIRED FOR
CONFINED SPACE equipment Communication equipment Personal H2S Monitor Detector  FRC  Goggles/face shield
ENTRY: Fire extinguisher  Chemical suit/coverall  Gloves (Specify):
Ladder required External scaffold …………………………………….………
required Internal scaffold required   Respiratory Protection (Specify):
ACCESS AND
EGRESS Fall Protection required □ Platform ……………….…..………………………………………………………..……………..….
modification required □ Other: □ Other:…………………………………………………..…….….
……………………………………………………………………….
Edge Protection Caution
MEANS OF Within eye sightLine signalsRadios
PROTECTION OF tape Hard barricade □
COMMUNICATION □Other:…………………………….. Signals were discussed
SURROUNDING AREAS Warning lights
WITH ENTRANTS with personnel before entry
 Warning Signs□ Flagman
PREVENTION OF  Posting a Sign(Do Not Enter) Closing the entry point Standby manSealing the entry point by
UNAUTHORIZED
ENTRY
warning tape□ Other …………………………………………………………………..

Saudi Aramco: Company General Use


LPD – Confined Space Entry Plan CSEP - Best Practices – 2017 – Format
CONFINED SPACE ENTRY PLAN BEST PRACTICE

EMERGENCY
RESPONSE AND Local FrPD has been formally notified about this activityWorkers shall wear harness and Life-line at
RESCUE all-time Rescue equipment must be in place before work starts  Personnel trained for confined
space rescue are available on site Portable Air Horn

DRAWING

The drawing of the Confined Space must showALLIsolation, Entry and Ventilation points

Name Position Badge # Signature Date  Additional documents


required before
Prepared by
initiating CSE activities:
Reviewed by Compliance Group □CSE Work Permit
Approved by Area Foreman □Gas Testing Log Sheet
Acknowledged by Local FrPD □CS Entry Log Sheet

Saudi Aramco: Company General Use


LPD – Confined Space Entry Plan CSEP - Best Practices – 2017 – Format
CONFINED SPACE ENTRY PLAN BEST PRACTICE

Accepted by Maint. T&I Group □Job Safety Analysis


Notes:
1. CSEP WILL NOT EXCEED 30 DAYS. If additional time is needed, a new CSEP will have to be prepared and approved.
2. Copy of both sides of thisApproved CSEP must be posted at the entrance of the Confined Space in clear plastic envelopes.
3. Initial confined space entry into pits, sumps, vessels, tanks, drums, or other process equipment that may have previously contained
flammable, combustible, or toxic materials will require additional approvals by proponent management prior to work commencing.

Saudi Aramco: Company General Use


LPD – Confined Space Entry Plan CSEP - Best Practices – 2017 – Format

You might also like