Description of Work:
Providing and installation of project signboards with size of 1.8 x 1.2 m as per specification and instruction of engineer. 1 nos
Spec. cl. No: 110
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Description of Work:
Providing and establishing camp with mobilization and demobilization for contractor's Labour and staff and demolishing after completion of works as per the specifications and instruction of the Engineer. 1 job
Spec. cl. No: 111
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
1.4 As per site condition
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Relocation of services / minor infrastructures, as per specifications and instruction of the Engineer. 1 job
Spec. cl. No: 111
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
1.5 As per site condition
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Supply of Project Record as per specifications and instruction of the Engineer. 1 set
Spec. cl. No: 116
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Reinstatement of quarry sites at the completion of works as instructed by the engineers. 1
Spec. cl. No: 111
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Clearing and Grubbing Road Land ., Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials
Description of Work: 10000
and stacking of serviceable Material to be used or auctioned, up to a lead of 30 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness., By Manual Means:-, In area of light jungle (less than 15 number per 100
sqm
Spec. cl. No: 201 sqm)
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.1.I.i.A Unskilled day 200 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Clearing and Grubbing Road Land ., Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials
Description of Work: 10000
and stacking of serviceable Material to be used or auctioned, up to a lead of 30 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness., By Manual Means:-, In area of thorny jungle ( more than 15 numbers per
sqm
Spec. cl. No: 201 100 sqm)
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.1.I.i.B Unskilled day 300 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of
20 cum
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Dismantling Brick / Tile work, Dry brick pitching or brick soling
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.4.ii.D Unskilled day 12 0 0 Tractor-trolley hour 6 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Clearing and Grubbing Road Land ., Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials
and stacking of serviceable Material to be used or auctioned, up to a lead of 30 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness., By Manual Means:-, Felling and uprooting of bamboo clearing the area, 100 cum
Spec. cl. No: 201 stacking of bamboo and disposing of wastes
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.1.I.i.C Unskilled day 200 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Clearing and Grubbing Road Land ., Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials
Description of Work: 10000
and stacking of serviceable Material to be used or auctioned, up to a lead of 30 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness., By Mechanical Means, In area of light jungle (less than 15 number per 100
sqm
Spec. cl. No: 201 sqm )
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.1.I.ii.A Unskilled day 6 0 0 Dozer/ Excavator hour 12 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Clearing and Grubbing Road Land ., Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials
Description of Work: 10000
and stacking of serviceable Material to be used or auctioned, up to a lead of 30 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness., By Mechanical Means, In area of thorny jungle ( more than 15 numbers per
sqm
Spec. cl. No: 201 100 sqm)
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.1.I.ii.B Unskilled day 9 0 0 Dozer/ Excavator hour 12 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Clearing and Grubbing Road Land ., Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials
and stacking of serviceable Material to be used or auctioned, up to a lead of 30 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness., By Mechanical Means, Felling and uprooting of bamboo clearing the area, 100 cum
Spec. cl. No: 201 stacking of bamboo and disposing of wastes
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.1.I.ii.C Unskilled day 20 0 0 Dozer/ Excavator hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Clearing and Grubbing Road Land ., Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials
Description of Work: 10000
and stacking of serviceable Material to be used or auctioned, up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness., By Manual Means:-, In area of light jungle (less than 15 number per 100
sqm
Spec. cl. No: 201 sqm)
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.1.II.i.
Unskilled day 225 0 0 Tractor-trolley hour 12 0 0
A
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Clearing and Grubbing Road Land ., Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials 10000
and stacking of serviceable Material to be used or auctioned, up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness., In area of thorny jungle ( more than 15 numbers per 100 sqm) sqm
Spec. cl. No: 201
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.1.II.i.B Unskilled day 325 0 0 Tractor-trolley hour 12 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Clearing and Grubbing Road Land ., Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials
and stacking of serviceable Material to be used or auctioned, up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness., Felling and uprooting of bamboo clearing the area, stacking of bamboo 100 cum
Spec. cl. No: 201 and disposing of wastes
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.1.II.i.
Unskilled day 225 0 0 Tractor-trolley hour 12 0 0
C
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Clearing and Grubbing Road Land ., Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials
Description of Work: 10000
and stacking of serviceable Material to be used or auctioned, up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness., By Mechanical Means, In area of light jungle (less than 15 number per
sqm
Spec. cl. No: 201 100 sqm )
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.1.II.ii.
Unskilled day 8 0 0 Tractor-trolley hour 12 0 0
A
Dozer/ Excavator hour 12 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Clearing and Grubbing Road Land ., Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials
Description of Work: 10000
and stacking of serviceable Material to be used or auctioned, up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness., By Mechanical Means, In area of thorny jungle ( more than 15 numbers
sqm
Spec. cl. No: 201 per 100 sqm)
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.1.II.ii.
Unskilled day 12 0 0 Tractor-trolley hour 12 0 0
B
Dozer/ Excavator hour 12 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Clearing and Grubbing Road Land ., Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials
and stacking of serviceable Material to be used or auctioned, up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness., By Mechanical Means, Felling and uprooting of bamboo clearing the area, 100 cum
stacking of bamboo and disposing of wastes
Clearing and Grubbing Road Land ., Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials
and stacking of serviceable Material to be used or auctioned, up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness., By Mechanical Means, Felling and uprooting of bamboo clearing the area, 100 cum
Spec. cl. No: 201 stacking of bamboo and disposing of wastes
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.1.II.ii.
Unskilled day 15 0 0 Tractor-trolley hour 12 0 0
C
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Cutting of Trees, including cutting of Trunks, Branches and Removal, Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable Material with all lifts and up to a lead of 1000 meters and earth filling 30
in the depression/pit., Girth from 300 mm to 600 mm number
Spec. cl. No: 201
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.2.i Unskilled day 25 0 0 Tractor-trolley hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Cutting of Trees, including cutting of Trunks, Branches and Removal, Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable Material with all lifts and up to a lead of 1000 meters and earth filling 10
in the depression/pit., Girth from 600 mm to 900 mm number
Spec. cl. No: 201
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.2.ii Unskilled day 25 0 0 Tractor-trolley hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Cutting of Trees, including cutting of Trunks, Branches and Removal, Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable Material with all lifts and up to a lead of 1000 meters and earth filling
1 number
in the depression/pit., Girth from 900 mm to 1800 mm
Spec. cl. No: 201
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.2.iii Unskilled day 35 0 0 Tractor-trolley hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Cutting of Trees, including cutting of Trunks, Branches and Removal, Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable Material with all lifts and up to a lead of 1000 meters and earth filling
2 number
in the depression/pit., Girth from 1800 - 2500 mm
Spec. cl. No: 201
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.2.iv Unskilled day 32 0 0 Tractor-trolley hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Cutting of Trees, including cutting of Trunks, Branches and Removal, Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable Material with all lifts and up to a lead of 1000 meters and earth filling
1 number
in the depression/pit., Girth above 2500 mm
Spec. cl. No: 201
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.2.v Unskilled day 50 0 0 Tractor-trolley hour 12 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Clearing Grass and Removal of Rubbish and Dressing and
levelling the construction surface
Description of Work: 10000
Clearing grass/ top soil and removal up to a distance of 50
sqm
Spec. cl. No: 201 meters outside the periphery of the area , including cutting and
Norms filling of small
Labour (A) undulation., By Manual Means Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.3 Unskilled day 100 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: 50
Dismantling of kilometer stone including cutting of earth, foundation and disposal of dismantled Material with all lifts and lead upto 1000 m and back filling of pit., Five KM stone
number
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.10.A Unskilled day 5 0 0 Tractor-trolley hour 6 0 0
Quantity of concrete =
0.2 cum per post
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of
20 cum
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Lime /Cement Concrete, By Manual Means, Lime Concrete, cement concrete grade M-10 and below
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.4.i.I.A Unskilled day 24 0 0 Tractor-trolley hour 6 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of
20 cum
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Lime /Cement Concrete, By Manual Means, Cement Concrete Grade M-15 & M-20
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.4.i.I.B Unskilled day 30 0 0 Tractor-trolley hour 6 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of
10 cum
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Lime /Cement Concrete, By Manual Means, Pre-stressed / Reinforced cement concrete grade M-20 & above
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.4.i.I.C Unskilled day 30 0 0 Tractor-trolley hour 6 0 0
Skilled day 3 0 0
Technician day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of
10 cum
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Lime /Cement Concrete, By Mechanical Means, Cement Concrete Grade M-15 & M-20
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.4.i.II.
Unskilled day 6 0 0 Tractor-trolley hour 6 0 0
A
Drilling machine with
Skilled day 1 0 0 hour 6 0 0
bit and accessories
Air Compressor hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of
10 cum
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Lime /Cement Concrete, By Mechanical Means, Prestressed / reinforced cement concrete grade M-20 & above
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.4.i.II.B Unskilled day 10 0 0 Tractor-trolley hour 6 0 0
Drilling machine with
Skilled day 2 0 0 hour 6 0 0
bit and accessories
Air Compressor hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of
20 cum
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Dismantling Brick / Tile work, In lime mortar
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.4.ii.A Unskilled day 12 0 0 Tractor-trolley hour 6 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of
10 cum
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Dismantling Brick / Tile work, In cement mortar
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.4.ii.B Unskilled day 10 0 0 Tractor-trolley hour 6 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of
20 cum
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Dismantling Brick / Tile work, In mud mortar
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.4.ii.C Unskilled day 10 0 0 Tractor-trolley hour 6 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: 50
Dismantling of kilometer stone including cutting of earth, foundation and disposal of dismantled Material with all lifts and lead upto 1000 m and back filling of pit., One KM Stone
number
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.10.B Unskilled day 4 0 0 Tractor-trolley hour 3 0 0
Quantity of concrete =
0.1 cum per post
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of
20 cum
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Dismantling Stone Masonry, Rubble stone masonry in lime mortar
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.4.iii.A Unskilled day 15 0 0 Tractor-trolley hour 6 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of
10 cum
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Dismantling Stone Masonry, Rubble stone masonry in cement mortar.
Description of Work: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of
10 cum
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Dismantling Stone Masonry, Rubble stone masonry in cement mortar.
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.4.iii.B Unskilled day 10 0 0 Tractor-trolley hour 6 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of
20 cum
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Dismantling Stone Masonry, Rubble Stone Masonry in mud mortar.
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.4.iii.C Unskilled day 12 0 0 Tractor-trolley hour 6 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of
20 cum
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Dismantling Stone Masonry, Dry rubble masonry
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.4.iii.D Unskilled day 10 0 0 Tractor-trolley hour 6 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of
20 cum
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Dismantling Stone Masonry, Dismantling stone pitching/ dry stone spalls.
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.4.iii.E Unskilled day 8 0 0 Tractor-trolley hour 6 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of
20 cum
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Dismantling Stone Masonry, Dismantling boulders laid in wire crates including opening of crates and stacking dismantled Material.
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.4.iii.F Unskilled day 15 0 0 Tractor-trolley hour 6 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of
10 cum
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Wood Work wrought framed and fixed in frames of trusses upto a height of 5 m above plinth level
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.4.iv Unskilled day 10 0 0 Tractor-trolley hour 6 0 0
Skilled
day 1 0 0
(Carpenter )
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of
5 tonne
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Steel Work in all types of sections upto a height of 5 m above plinth level excluding cutting of rivet., Including dismembering
Description of Work: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of
5 tonne
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Steel Work in all types of sections upto a height of 5 m above plinth level excluding cutting of rivet., Including dismembering
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For gas cutting,
2.4.v.A ropes, pulleys Tractor-trolley hour 6 0 0
etc. 0
Unskilled day 20 0 0
Skilled day 5 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of
5 tonne
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Steel Work in all types of sections upto a height of 5 m above plinth level excluding cutting of rivet., Excluding dismembering.
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For gas cutting,
2.4.v.B ropes, pulleys Tractor-trolley hour 6 0 0
etc. 0
Skilled day 4 0 0
Unskilled day 16 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of
Description of Work: 50
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Steel Work in all types of sections upto a height of 5 m above plinth level excluding cutting of rivet., Extra over item No( v ) A and( v ) B for cutting
number
Spec. cl. No: 202 rivets.
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.4.v.C Unskilled day 1 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of 200
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Scraping of Bricks Dismantled from Brick Work including Stacking., In lime/Cement mortar number
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.4.vi.A Unskilled day 8 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of 200
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Scraping of Bricks Dismantled from Brick Work including Stacking., In mud mortar number
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.4.vi.B Unskilled day 5 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of
10 cum
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Scraping of Stone from Dismantled Stone Masonry, In cement and lime mortar
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.4.vii.A Unskilled day 14 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of
10 cum
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Scraping of Stone from Dismantled Stone Masonry, In Mud mortar
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.4.vii.B Unskilled day 5 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of
200 sqm
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Scarping Plaster in Lime or Cement Mortar from Brick/ Stone Masonry
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.4.viii Unskilled day 10 0 0 Tractor-trolley hour 6 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Dismantling of barbed wire fencing/ wire mesh fencing including posts, foundation concrete, back filling of pit by manual means including disposal of dismantled Material with all lifts and up to a lead of 1000 metres, stacking serviceable Material and
100 meter
unserviceable Material separately.
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.11 Skilled day 2 0 0 Tractor-trolley hour 6 0 0
Unskilled day 12 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Removing all type of Hume Pipes and Stacking within a lead of 50 metres including Earthwork and Dismantling of Masonry Works., Up to 600 mm 10 meter
Spec. cl. No: 202 dia
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.4.v.ix.
Unskilled day 5 0 0
A
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Removing all type of Hume Pipes and Stacking within a lead of 50 metres including Earthwork and Dismantling of Masonry Works., Above 600 mm to 10 meter
Spec. cl. No: 202 900 mm dia
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.4.v.ix.
Unskilled day 8 0 0
B
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of
10 meter
unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Removing all type of Hume Pipes and Stacking within a lead of 50 metres including Earthwork and Dismantling of Masonry Works., Above 900 mm
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.4.v.ix.
Unskilled day 12 0 0
C
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Dismantling of Flexible Pavements, Dismantling of flexible pavements and disposal of dismantled Material up to a lead of 1000 metres, stacking serviceable and unserviceable Material separately, By Manual Means, Bituminous courses 10 cum
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.5.I.A Unskilled day 15 0 0 Tractor-trolley hour 6 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Dismantling of Flexible Pavements, Dismantling of flexible pavements and disposal of dismantled Material up to a lead of 1000 metres, stacking serviceable and unserviceable Material separately, By Manual Means, Granular courses 10 cum
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.5.I.B Unskilled day 12 0 0 Tractor-trolley hour 6 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Dismantling of Flexible Pavements, Dismantling of flexible pavements and disposal of dismantled Material up to a lead of 1000 metres, stacking serviceable and unserviceable Material separately, By Mechanical Means, Bituminous course 20 cum
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.5.II.A Unskilled day 9 0 0 Tractor with ripper hour 6 0 0
Skilled day 1 0 0 Tractor-trolley hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled Material up to a lead of 1000 metres,
10 cum
stacking serviceable and unserviceable Material separately
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.6 Unskilled day 8 0 0 Joint Cutting Machine hour 6 0 0
Semi skilled day 8 0 0 Tractor-trolley hour 6 0 0
Skilled day 1 0 0 Air compressor hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Dismantling guard rails by manual means and disposal of dismantled Material with all lifts and up to a lead of 1000 metres, stacking serviceable Material and unserviceable Material separately. 100 meter
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.7 Unskilled day 20 0 0 Tractor-trolley hour 6 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Dismantling Kerb stone by manual means and disposal of dismantled Material with all lifts and up to a lead of 1000 meter 100 meter
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No.
Norms
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.8 Unskilled day 3 0 0 Tractor-trolley hour 6 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Dismantling Kerb stone channel by manual means and disposal of dismantled Material with all lifts and up to a lead of 1000 meter 100 meter
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.9 Unskilled day 5 0 0 Tractor-trolley hour 6 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Dismantling of CI water pipe line upto 600 mm dia including disposal with all lifts and lead upto 1000 metres and stacking of serviceable Material and unserviceable Material separately . 100 meter
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Skilled
2.12 day 2 0 0 Crane hour 6 0 0
(Plumber)
Unskilled day 25 0 0 Truck hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Removal of cement concrete pipe of sewer gutter 1500 mm dia including disposal with all lifts and up to a lead of 1000 metres and stacking of serviceable and unserviceable Material separately but excluding earth excavation and dismantling of
100 meter
masonry works.
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
2.13 Unskilled day 30 0 0 Truck flat body hour 6 0 0
Crane hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Removal of telephone / Electric poles including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and up to a lead of 1000 metres and stacking the serviceable and
30 nos
unserviceable Material separately
Spec. cl. No: 202
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Skilled
2.14 (Electrician/Line day 3 0 0 Tractor-trolley hour 6 0 0
man)
Unskilled day 15 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Reinforced Soil wall Structure with Tera Mesh System (TMS) Facing:, Providing and fixing Flexible Geogrids ( e.g. Paralink) as primary reinforcement for composite soil reinforcement system, made of polyester core with polyethylene coating
1000 sqm
including secondary reinforcement of Terramesh system (TMS) as per Specifications Clause 2402 with Zinc +PVC coated as Facing material, laying of Geo textile, drainage gallery filling with boulder all complete as per Specifications
Spec. cl. No: 301
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Structural filling behind the TMS facia with granular material
compacted up to Modified Proctors density at layers not
3.1 Unskilled day 1398 0 0 cum 10200.0 #NAME? Tractor - trolley hour 24 0 0
exceeding 15 cm all complete with compaction by using
machines #NAME?
Perforated pipe (PVC/HDPE)160 mm dia behind the structure
in longitudinal direction ( 100 m) and in Transverse direction,
Skilled day 346 0 0 m 199.0 #NAME?
from rare end to front end plus 1 m @ 10 m c/c, 99 m,
including all joints and fixings as required. #NAME?
Geo textile ( at interface of boulder in the TMS structural fill
sqm 4290.0 #NAME?
and around the drainage gallery #NAME?
Stone/Boulder ( for TMS drainage gallery) cum 1826.0 #NAME? #NAME?
Size: 3 m * 2 m * 1 m nos 250.00 #NAME? #NAME?
Size: 3 m * 2 m * 0.5 m nos 500.00 #NAME? #NAME?
Terra Mesh System (TMS)( 3 m * 2 m * 0.5 m ) made of
mechanically woven Zn +PVC coated
High Strength Flexible Geogrids ( made of polyester core with
polyethylene coating) with Strength as per design ( at least sqm 9000.0 #NAME?
200 KN/ m) #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Reinforced Soil wall Structure with Green Terra Mesh (GTM) Facing:, Providing and fixing Flexible Geogrids ( e.g. Paralink) as primary reinforcement for composite soil reinforcement system, made of polyester core with polyethylene coating with
design life >100 years including secondary reinforcement of Green Terramesh system (GTM) as per Specifications Clause 2402 with Zn+PVC coated with Bio-Mat, Steel Greed made of MS bar (10 mm dia and grid size 160 mm x 160 mm), 3 nos of 1000 sqm
Spec. cl. No: 301 anchor bars of 10 mm dia to maintain the slope of GTM, laying of Geo textile, drainage gallery filling with boulder etc. all complete as per Specifications.
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
3.2 Unskilled day 545.0 0 0 Seeding for vegetation sqm 998.4 #NAME? #NAME?
Structural filling behind the GTM facia with granular material
compacted up to Modified Proctors density at layers not
Skilled day 140.0 0 0 cum 7987.2 #NAME?
exceeding 15 cm all complete with compaction by using
machines #NAME?
Filling with fertile soil immediately behind the GTM facia for
a thickness of 0.30 m with compaction at layers not exceeding cum 299.5 #NAME?
15 cm all complete #NAME?
Tractor-trolley hour 24.0 #NAME? #NAME?
(c) Equipment
perforated pipe (PVC/HDPE)160 mm dia including all joints
m 199.0 #NAME?
and fixings as required. #NAME?
Geo textile ( at interface of boulder and TMS sqm 2196.0 #NAME? #NAME?
stone/boulder ( for drainage gallery 0.6 m width volume
cum 725.0 #NAME?
658.94 cum) #NAME?
Size: 3 m * * 0.6 nos 416.0 #NAME? #NAME?
Size: 3 m * 2 m * 0.8 nos 312.0 #NAME? #NAME?
Green Terra Mesh (GTM) made of mechanically woven Zn
+PVC coated with bio mat, steel grid made of MS bar, ( 10
mm dia and grid size 160 mm * 160 mm, 3 nos of anchor bars
of 10 mm dia to provided to maintain the designed slope
High Strength Flexible Geogrids ( made of polyester core with
polyethylene coating) with Strength as per design ( at least sqm 7987.0 #NAME?
200 KN/ m) #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Reinforced Soil wall Structure with Concrete Facing:, Providing and fixing Flexible Geogrids ( e.g. Paralink) as primary reinforcement for composite soil reinforcement system, made of polyester core with polyethylene coating with design life >100
Description of Work: years including secondary reinforcement of Green Terramesh system (GTM) as per Specifications Clause 2402 with Zn+PVC coated with Bio-Mat, Steel Greed made of MS bar (10 mm dia and grid size 160 mm x 160 mm), 3 nos of anchor bars of
1000 sqm
10 mm dia to maintain the slope of GTM, laying of Geo textile, drainage gallery filling with boulder etc. all complete as per Specifications., High Strength Flexible Geogrids ( made of polyester core with polyethylene coating) with Strength as per
Spec. cl. No: 301 design ( at least 200 KN/ m)
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Structural filling behind the GTM facia with granular material
compacted up to Modified Proctors density at layers not
3.3 Unskilled day 160.0 0 0 cum 10852.0 #NAME?
exceeding 15 cm all complete with compaction by using
machines #NAME?
Skilled day 80.0 0 0 Tractor-trolley hour 72.0 #NAME? #NAME?
(c) Equipment
perforated pipe (PVC/HDPE)160 mm dia behind the structure
in longitudinal direction ( 104 m) and in Transverse direction,
m 199.0 #NAME?
from rare end to front end plus @ c/c, 99 m, including all
joints and fixings as required. #NAME?
Geo textile ( at interface of boulder and TMS sqm 2196.0 #NAME? #NAME?
stone/boulder ( for drainage gallery 0.6 m width volume
cum 725.0 #NAME?
658.94 cum) #NAME?
coarse drained material at the facing of Concrete Panel cum 300.0 #NAME? #NAME?
precast concrete panel of M 25 grade concrete ( 2 m * 0.8 m
cum 219.7 #NAME?
slope 6 deg #NAME?
High Strength Flexible Geogrids ( made of polyester core with
polyethylene coating) with Strength as per design ( at least sqm 19968.0 #NAME?
200 KN/ m) #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Reinforced Soil wall Structure with Concrete Facing:, Providing and fixing Flexible Geogrids ( e.g. Paralink) as primary reinforcement for composite soil reinforcement system, made of polyester core with polyethylene coating with design life >100
years including secondary reinforcement of Green Terramesh system (GTM) as per Specifications Clause 2402 with Zn+PVC coated with Bio-Mat, Steel Greed made of MS bar (10 mm dia and grid size 160 mm x 160 mm), 3 nos of anchor bars of 1000 sqm
Spec. cl. No: 301 10 mm dia to maintain the slope of GTM, laying of Geo textile, drainage gallery filling with boulder etc. all complete as per Specifications., Para web 50 KN and 100 ken each
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Structural filling behind the GTM facia with granular material
compacted up to Modified Proctors density at layers not
3.3_a Unskilled day 160.0 0 0 cum 10852.0 #NAME?
exceeding 15 cm all complete with compaction by using
machines #NAME?
Skilled day 80.0 0 0 Tractor-trolley hour 72.0 #NAME? #NAME?
(c) Equipment
perforated pipe (PVC/HDPE)160 mm dia behind the structure
in longitudinal direction ( 104 m) and in Transverse direction,
m 199.0 #NAME?
from rare end to front end plus @ c/c, 99 m, including all
joints and fixings as required. #NAME?
Geo textile ( at interface of boulder and TMS sqm 2196.0 #NAME? #NAME?
stone/boulder ( for drainage gallery 0.6 m width volume
cum 725.0 #NAME?
658.94 cum) #NAME?
coarse drained material at the facing of Concrete Panel cum 300.0 #NAME? #NAME?
precast concrete panel of M 25 grade concrete ( 2 m * 0.8 m
cum 219.7 #NAME?
slope 6 deg #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Boundary pillar, Providing and fixing of Reinforced cement concrete M 15 grade boundary pillars of standard design Drawing ( top 150 mm dia, bottom 200 mm dia having 1.05 m height, 300 mm above ground and 750 mm below ground with 6
57 nos
mm dia bar two main bar having 1.84 m length each and 5 stirrups fixed in position including finishing and lettering but excluding painting as per Drawing and Technical Specifications.
Spec. cl. No: 403
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
letter-
4.1 Unskilled day 20.00 0 0 Lettering, each 10 cm high cm 2280.00 #NAME? Tractor-trolley hour 6.00 0 0
high #NAME?
Skilled
day 0.57 0 0 Excavation in soil cum 1.35 #NAME?
(Blacksmith)
Steel reinforcement kg 79.80 #NAME? #NAME?
M-15 grade of the concrete cum 1.25 #NAME?
Stone spall cum 11.97 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
3 meters center to center founded in M 15 grade cement
Description of Work:
concrete, 0.6 meter below ground level, every 15th post, last but
one end post and corner post shall be strutted on both sides and 30 meter
Spec. cl. No: 404 end post on one side only and provided with 12 horizontal lines
Norms andLabour
2 diagonals
(A) interwoven with horizontal wires, fixed with GI Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Painting (Applying two coats of painting including primer coat
4.2.A Unskilled day 3.00 0 0 sqm 8.14 #NAME?
on exposed surface of RCC posts)
Steel reinforcement (10 mm dia HYSD bars for posts (13 x 4
Skilled x 1.7 = 88.4 m @ 0.62 kg/m = 54.81 kg), 6 mm dia HYSD
day 0.25 0 0 kg 75.06 #NAME?
(Blacksmith) bars for strirrups@ 150 mm C/c (13 x 12 x 0.59 = 92.04 m @
0. 22 kg/m = 20.25 kg) #NAME?
M-15 grade of the concrete (RCC. Post 150 mm x 150 mm x
cum 0.53 #NAME?
1.80 m, 13 Nos)
Add for GI staple binding wire, drilling holes, etc. @ 5 per
0
cent of the cost of binding wire
Barbed wire kg 31.42 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
GI Barbed Wire Fencing 1.8 Meter High with RCC post, Providing and fixing 1.8 m high GI barbed wire fencing with 2.4 m RCC M 15 grade 150 mm x 150 mm concrete post placed every 3 m center-to-center founded in M 15 grade cement concrete,
0.6 m below ground level, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with 9 horizontal lines and 2 diagonals interwoven with horizontal wires, fixed with GI staples, 30 meter
Spec. cl. No: 404 turn buckles etc. complete as per Drawing and Technical Specifications.
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
4.2.B Unskilled day 3.50 0 0 Painting sqm 12.10 #NAME? #NAME?
Skilled
day 0.50 0 0 Steel reinforcement kg 101.15 #NAME?
(Blacksmith) #NAME?
M-15 grade of the concrete cum 0.70 #NAME?
Add for GI staple binding wire, drilling holes, etc. @ 5 per
0
cent of the cost of binding wire
Barbed wire kg 40.15 0 0
Transportation and fixing
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
GI Barbed Wire Fencing 1.2 Meter High on Angle Iron, Providing and fixing 1.2 meters high GI barbed wire fencing with 1.8 m angle iron posts 40 mm x 40 mm x 6 mm placed every 3 meters center to center founded in M 15 grade cement concrete,
0.6 meter below ground level, every 15th post, end post and corner post shall be strutted on both sides and end post on one side only and provided with 9 horizontal lines and 2 diagonals interwoven with horizontal wires, fixed with GI staples, turn 30 meter
Spec. cl. No: 404 buckles etc. complete as per Drawing and Technical Specifications.
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
4.2.C Unskilled day 2.00 0 0 MS angle iron 40 mm x 40 mm x 6 mm, kg 80.50 0 0
Skilled
day 0.25 0 0 Applying two coats of painting sqm 2.11 #NAME?
(Blacksmith) #NAME?
Add for GI staple binding wire, drilling holes etc. @ 2 per
#NAME?
cent of the cost of material
Barbed wire kg 31.42 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
3 meters center to center founded in M 15 grade cement
Description of Work:
concrete, 0.6 meter below ground level, every 15th post, last but
one end post and corner post shall be strutted on both sides and 30 meter
Spec. cl. No: 404 end post on one side only and provided with 12 horizontal lines
Norms andLabour
2 diagonals
(A) interwoven with horizontal wires, fixed with GI Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
4.2.D Unskilled day 3.00 0 0 Applying two coats of painting sqm 3.96 #NAME? #NAME?
Skilled Add for GI staple, binding wire, drilling holes etc. @ 2 per
day 0.40 0 0 #NAME?
(Blacksmith) cent of the cost of material
MS angle iron 50 mm x 50 mm x 6 mm, kg 152.00 0 0
Barbed wire kg 40.15 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Field Test, Carryout Pile Load Test up to 200 tones including all consumable and accessories as per test procedure mentioned in the Technical Specifications. 7 nos/day
Spec. cl. No: 500
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 5 % of Labour
cost for traffic control
5.4.10 Unskilled day 49.00 0 0 Add 25 % of Labour cost for other consumable items 0
sign, pressure gauge
0 and other T&P
semiskilled day 21.00 0 0 I beams 4 Nos 3 m long ( 25-30 kg/m), 200 times used meter 12.00 0 Jeep/ pickup hour 56.00 0 0
0
Skilled day 7.00 0 0 12 Nos of back pipes, 30 times used meter 36.00 0 Dial gauge 4 Nos day 7.00 0 0
0
Wooden planks, 12 times used cum. 0.50 0 0 Spirit Level day 7.00 0 0
Masonry wall cum. 0 0
Jute Bag nos 2500.00 0 0
Description of Work:
Laboratory Setup including supply of electricity, water, gas and heating etc. 1 set
Spec. cl. No: 504
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing, installing and maintaining Quality control laboratory with equipment as specified in the Technical Specifications. 1 set
Spec. cl. No: 504
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Semiskilled day 2.00 0 0 Flag ( red cloth) meter 2.00 0 weigh bridge hour 16.00 0 0
0
Skilled day 1.00 0 0 Jeep hour 8.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: 50 no of
Field Test, Carryout Benkelman Beam Deflection Test including all consumables and accessories.
reading
Spec. cl. No: 500
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No.
Norms
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For traffic control
sign, traffic cone,
5.4.2 Unskilled day 10.00 0 0 For Gloves, masks and other consumable items 0
Brush, umbrella, clip
0 board and other T&P
Semiskilled day 4.00 0 0 For Loading weighing, air pressure of tire etc. 0 Benkelman Beam hour 8.00 0 0
Skilled day 2.00 0 0 Flag ( red cloth) meter 2.00 0 Heavy Truck hour 8.00 0 0
0
Glycerin Lit 0.50 0 0 Jeep/ pickup hour 8.00 0 0
Enamel paint Lit 0.50 0 0
Boulder ( 11 ton, ) ( ten times used) cum 8.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Field Test, Carryout Field Density test of sub grade/ sub base/ base test by Sand replacement Method as per procedure mentioned in the Technical Specifications. 50 nos
Spec. cl. No: 505
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For traffic control
sign, traffic cone,
5.4.3 Unskilled day 4.00 0 0 For Gloves, masks and other consumable items 0
Brush, umbrella, clip
0 board and other T&P
semiskilled day 2.00 0 0 Standard Sand ( 50 % reusable) kg 300.00 0 0 Jeep/ pickup hour 8.00 0 0
Skilled day 1.00 0 0 Measuring Cylinder day 1.00 0 0
Can day 5.00 0 0
Air tight Bottle day 5.00 0 0
Oven/Rapid Moisture day 1 0 0
Balance(20 kg) day 1.00 0 0
Baseplate day 1.00 0 0
Field Density Jar day 1.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Field Test, Sampling from Subgrade, Sub base, base and Wearing Course 50 nos
Spec. cl. No: 505
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For traffic control
Add 3 % Labour cost for Gloves, masks and other consumable sign, traffic cone,
5.4.4 Unskilled day 4.00 0 0 0
items Brush, umbrella, clip
0 board and other T&P
Semiskilled day 2.00 0 0 Flag/ Clothes meter 4.00 0 Jeep/ pickup hour 8.00 0 0
0
Skilled day 1.00 0 0 Jute Bag nos 60.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Field Test, Carryout Rapid Determination of CBR by dynamic core penetrometer as per test procedure mentioned in the Technical Specifications. 50 point
Spec. cl. No: 505
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For traffic control
Add 3 % Labour cost for Gloves, masks and other consumable sign, traffic cone,
5.4.5 Unskilled day 2.00 0 0 0
items Brush, umbrella, clip
0 board and other T&P
semiskilled day 1.00 0 0 Flag/ Clothes meter 2.00 0 Jeep/ pickup hour 8.00 0 0
0
Dynamic cone
Skilled day 1.00 0 0 day 1.00 0 0
penetrometer
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Field Test, Carryout Measurement of Pavement Thickness including all consumable and accessories as per test procedure mentioned in the Technical Specifications. 60 point
Spec. cl. No: 505
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For traffic control
Add 3 % Labour cost for Gloves, masks and other consumable sign, traffic cone,
5.4.6 Unskilled day 4.00 0 0 0
items Brush, umbrella, clip
0 board and other T&P
semiskilled day 2.00 0 0 Flag/ Clothes meter 2.00 0 Jeep/ pickup hour 8.00 0 0
0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Laboratory Test, Carryout Shear test of disturbed sample including all consumable and accessories as per test procedure mentioned in the Technical Specifications. 4 nos
Spec. cl. No: 505-508
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 3 % Labour cost for Gloves, masks and other consumable
5.5.13 Unskilled day 1 0 0 Mould hour 4 0 0
items 0
semiskilled day 1 0 0 Balance (0.1 gm.) hour 1 0 0
Skilled day 0.75 0 0 Tray (75*75 cm) hour 4 0 0
Engineer day 0.1 0 0 Can 6 Nos hour 144 0 0
Oven hour 24 0 0
Shear test equipment hour 4 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: 30
Field Test, Coring of asphalt concrete Sample from pavement including all consumable and accessories as per test procedure mentioned in the Technical Specifications.
nos/day
Spec. cl. No: 500,-1300
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 5 % of Labour
cost for traffic control
Add 3 % Labour cost for Gloves, masks and other consumable
5.4.11 Unskilled day 2.00 0 0 sign, traffic cone, rope, 0
items
hammer, wrench, clip
board and other T&P
0
semiskilled day 2.00 0 0 Flag/ Clothes meter 2.00 0 Jeep/ pickup hour 8.00 0 0
0
Core Cutting Machine
Skilled day 1.00 0 0 Jute Bag/ Plythene bag nos 30.00 0 with Bit and day 1 0 0
0 accessories
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Field Test, Carryout Schmidt Hammer Test including all consumable and accessories as per test procedure mentioned in the Technical Specifications. 1000 no
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 5 % of Labour
cost for traffic control
Add 3 % Labour cost for Gloves, masks and other consumable
5.4.12 semiskilled day 2.00 0 0 sign, traffic cone, 0
items
hammer, clip board
0 and other T&P
Skilled day 1.00 0 0 Jeep/ pickup hour 8.00 0 0
Schmidt Hammer day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Field Test, Carryout Bridge Load test (Load testing of one or more spans of bridge as selected by the Engineer as per approved load test procedure following relevant IS/IRC codes including deflection measuring instruments, loading materials,
1 nos
recoding and analyzing the load testing results cleaning of girder after load test, etc.)
Spec. cl. No: "500,2000"
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 3 % of Labour
cost for Deflection
Add 3 % Labour cost for Gloves, masks and other consumable measurement
5.4.13 Unskilled day 200.00 0 0 0
items instrument, traffic
control sign, traffic
cone, and other T&P
0
Add 5 per cent of cost of material for anchorage reinforcement,
semiskilled day 7.00 0 0 0
welding and other incidentals.
Hire charges of Kent ledges / Cost of Filled up bags including
Skilled day 7.00 0 0 nos 7000 #NAME?
material as sand or earth #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Laboratory Test, Sample preparation for inappropriate sample by crushing for LAA, ACV, AIV test including all consumable and accessories as per test procedure mentioned in the Technical Specifications. 30 nos
Spec. cl. No: 505-508
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 3 % Labour cost for Gloves, masks and other consumable
5.5.1 Unskilled day 1.00 0 0 Tray hour 8.00 0 0
items 0
Laboratory Crusher
semiskilled day 0.50 0 0 hour 4 0 0
Machine
Skilled day 0.10 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Laboratory Test, Carry out Grain size Analysis including all consumable and accessories as per test procedure mentioned in the Technical Specifications. 8 nos
Spec. cl. No: 505-508
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 3 % Labour cost for Gloves, masks and other consumable
5.5.2 Unskilled day 2.00 0 0 Balance (1 Kg) hour 4.00 0 0
items 0
semiskilled day 0.50 0 0 Balance (20 kg) hour
4.00 0 0
Skilled day 0.25 0 0 Rubber Mallet hour
4.00 0 0
Engineer day 0.10 0 0 Tray hour
12.00 0 0
Can hour
48.00 0 0
Oven hour
48.00 0 0
Sieve Shaker hour
4.00 0 0
Sieves set hour
4.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing, jointing and laying HDPE pipes with or without collar etc. complete in place as per Drawing and Technical Specifications., a) 110 mm/125 mm outer dia. 50 meter
Spec. cl. No: 701
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
7.1.A Unskilled day 3 0 0 HDPE pipe / HDPE pipe with collars meter 50 #NAME? other T&P 0
#NAME?
Skilled day 3 0 0 Electric heating plate hour 6 0 0
screw Jack hour 6 0 0
Generator hour 6 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and laying concrete channeling as per Drawing and Technical Specifications., Cast in situ
Description of Work:
Providing and laying concrete channeling as per Drawing and Technical Specifications., Cast in situ
Spec. cl. No: 702
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying concrete channeling as per Drawing and Technical Specifications., Pre cast
Spec. cl. No: 702
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Laying (Joining) of Precast concrete panel 12 meter
Spec. cl. No: 702
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 3 % of Labour
cost for bellies, crow
7.4.C Unskilled day 3 0 0 Concrete channel nos. #NAME? 0
bars, chain pulley and
#NAME? other T&P
Skilled day 0.5 0 0 Cement tonne 0.03 #NAME? #NAME?
Sand cum 0.04 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Earthwork Excavation in Cutting., Roadway Excavation in all types of Soil by Manual Means ., Roadway Excavation in all types of soil as per drawing and technical specification, including removal of stumps and other deleterious matter, with all lifts
12 cum
and lead as per Drawing and instruction of the Engineer.
Spec. cl. No: 905
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.1.I.A Unskilled day 8 0 0 Doko , Thunse etc. 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Earthwork Excavation in Cutting., Roadway Excavation in all types of Soil by Mechanical Means ., Road way Excavation in all types of soil as per Drawing and technical specifications including removal of stumps and other deleterious matter, all
360 cum
lifts and lead as per Drawing and instruction of the Engineer.
Spec. cl. No: 905
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.1.I.B Unskilled day 3 0 0 Hydraulic excavator hour 6 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Earthwork Excavation in Cutting., Roadway Excavation in ordinary rock by Manual Means ., Roadway Excavation in ordinary rock as per Drawing and Technical specification, including all lift and lead as per Drawing and instruction of the
60 cum
Engineer.
Spec. cl. No: 905
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.1.II.A Unskilled day 50 0 0 Doko , Thunse etc.t 0
Skilled day 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Earthwork Excavation in Cutting., Roadway Excavation in ordinary rock by Mechanical Means ., Roadway Excavation in ordinary rock as per Drawing and Technical specification, including all lift and lead as per Drawing and instruction of the
120 cum
Engineer.
Earthwork Excavation in Cutting., Roadway Excavation in ordinary rock by Mechanical Means ., Roadway Excavation in ordinary rock as per Drawing and Technical specification, including all lift and lead as per Drawing and instruction of the
120 cum
Engineer.
Spec. cl. No: 905
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.1.II.B Unskilled day 3 0 0 Hydraulic excavator hour 6 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Earthwork Excavation in Cutting., Roadway Excavation in Hard Rock, mechanical Drilling, Roadway Excavation in hard rock with mechanical drilling, including blasting and breaking, and disposal of cut road within all lifts and leads as per
90 cum
Drawing and instruction of the Engineer.
Spec. cl. No: 905
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Credit for excavated rock for use @ 50 per cent of excavated Jack hammer /Rock
9.1.III.A Blaster day 1 0 0 cum -45 #NAME? hour 30 0 0
( if available rock is used) #NAME? drill
Description of Work:
Earthwork Excavation in Cutting., Excavation in Hard Rock, manual Drilling, Roadway excavation in hard rock with manual drilling, blasting, breaking, lifts and leads all complete as per Drawing and instruction of the Engineer. 90 cum
Spec. cl. No: 905
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Credit for excavated rock for use @ 50 per cent of excavated Crow bar and other T
9.1.III.B Blaster day 1 0 0 cum -45 #NAME? 0
( if available rock is used) #NAME? & P
Description of Work: Earthwork Excavation in Cutting., Excavation in Hard Rock (blasting prohibited), Roadway Excavation in hard rock with rock breakers, including breaking rock, lifts and lead for disposal as per Drawing and Technical Specifications,
16 cum
Mechanical method, lead upto 30 m
Spec. cl. No: 905
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Hydraulic excavator
Skilled day 1 0 0 with rock breaker hour 6 0 0
attachment
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Earthwork Excavation in Cutting., Excavation in Hard Rock (blasting prohibited), Roadway Excavation in hard rock manually chiseling including breaking rock, lifts and lead for disposal as per Drawing and Technical Specifications , 16 cum
Spec. cl. No: 905
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Description of Work: Earthwork Excavation in Cutting., Excavation in Hard Rock (blasting prohibited), Roadway Excavation in hard rock manually with use of chemical, including breaking rock, disposal within all lifts and lead as per Drawing and Technical
16 cum
Specifications
Spec. cl. No: 905
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Credit for excavated rock for use @ 50 per cent of excavated Crow bar and other T
9.1.IV.C Unskilled day 16 0 0 cum -8 #NAME? 0
( if available rock is used) #NAME? & P
Skilled day 2 0 0 Chemical kg 80 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Earthwork Excavation in Cutting., Excavation in Marshy Soil, Roadway Excavation in marshy soil as per Drawing and Technical Specifications 300 cum
Spec. cl. No: 905
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.1.V Unskilled day 4 0 0 Tipper hour 18 0 0
skilled day 1 0 0 Hydraulic excavator hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Removal of Unserviceable Soil with Disposal upto 1000 meters, Removal of unserviceable soil including excavation, loading and disposal upto 1000 meters lead 360 cum
Spec. cl. No: 900
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.2 Unskilled day 4 0 0 Tipper hour 18 0 0
Skilled day 1 0 0 Excavator hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Trimming/ Rock Excavation Slopes, Carrying out excavation in hard rock to achieve a specified slope of the rock face by controlled use of explosives and blasting accessories in properly aligned and spaced drill holes, collection of the excavated rock
400 sqm
by machine, with all lifts and lead as per Drawing and instruction of the Engineer.
Spec. cl. No: 907
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.3 Unskilled day 22 0 0 Electric Detonator nos. 672 0 0 Loader hour 6 0 0
Skilled day 1 0 0 Gelatin kg 42 0 0 Dozer hour 6 0 0
Jack hammer /Rock
hour 30 0 0
drill
Air compressor hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Excavation for Structures Foundation, Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and
10 cum
Technical Specifications., Ordinary soil by Manual Means, Depth upto 3 m
Spec. cl. No: 907
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.4.I.A.i Unskilled day 8 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Excavation for Structures Foundation, Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and
10 cum
Technical Specifications., Ordinary soil by Manual Means, Depth 3 m to 6 m
Spec. cl. No: 907
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.4.I.A.ii Unskilled day 12 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Excavation for Structures Foundation, Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and
10 cum
Technical Specifications., Ordinary soil by Manual Means, Depth above 6 m
Spec. cl. No: 907
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.4.I.A.ii
Unskilled day 18 0 0
i
Skilled day 2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Excavation for Structures Foundation, Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and
10 cum
Technical Specifications., Ordinary soil by Mechanical Means, Depth upto 3 m
Spec. cl. No: 907
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.4.I.B.i Unskilled day 3 0 0 Hydraulic excavator hour 6 0 0
Skilled day 1 0 0
Unit = cum (for
240 cum)
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Excavation for Structures Foundation, Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and
10 cum
Technical Specifications., Ordinary soil by Mechanical Means, Depth 3 m to 6 m
Spec. cl. No: 907
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.4.I.B.ii Unskilled day 3 0 0 Hydraulic excavator hour 6 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Excavation for Structures Foundation, Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and
10 cum
Technical Specifications., Ordinary soil by Mechanical Means, Depth above 6 m
Spec. cl. No: 907
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.4.I.B.ii
Unskilled day 4 0 0 Hydraulic excavator hour 6 0 0
i
Skilled day 2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Excavation for Structures Foundation, Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and
10 cum
Technical Specifications., Ordinary Rock (not requiring blasting) by Manual Means, Depth upto 3 m
Spec. cl. No: 907
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.4.II.A.
Unskilled day 10 0 0
i
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Excavation for Structures Foundation, Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and
90 cum
Technical Specifications., Ordinary Rock (not requiring blasting) by Mechanical Means, Depth upto 3 m
Spec. cl. No: 907
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.4.II.B Unskilled day 3 0 0 Hydraulic excavator hour 6 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Excavation for Structures Foundation, Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and
10 cum
Technical Specifications., Hard Rock ( requiring blasting ) by Manual Means
Spec. cl. No: 907
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Jack hammer /Rock
9.4.III.A Unskilled day 12 0 0 fuse wire m 20 0 hour 3 0 0
0 drill
Blaster day 0.25 0 0 Electric Detonator nos 14 0 0 Air Compressor hour 1 0 0
Driller day 0.5 0 0 Gelatin kg 3.5 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Excavation for Structures Foundation, Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and
10 cum
Technical Specifications., Hard Rock ( blasting prohibited ) by Mechanical Means
Spec. cl. No: 907
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Jack hammer /Rock
9.4.IV.A Unskilled day 10 0 0 hour 3 0 0
drill
Skilled day 1 0 0 Air Compressor hour 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Excavation for Structures Foundation, Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and
10 cum
Technical Specifications., Marshy Soil by Manual Means, Depth upto 3 m
Spec. cl. No: 907
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Tractor-trolley for
9.4.V.A Unskilled day 15 0 0 hour 6 0 0
removal.
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Excavation for Structures Foundation, Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and
10 cum
Technical Specifications., Marshy Soil by Mechanical Means
Spec. cl. No: 907
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.4.V.B Unskilled day 4 0 0 Tipper hour 1 0 0
Skilled day 0.08 0 0 Hydraulic excavator hour 0.3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Excavation for Structures Foundation, Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and
18 cum
Technical Specifications., Back Filling in Marshy Foundation Pits
Description of Work: Excavation for Structures Foundation, Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and
18 cum
Technical Specifications., Back Filling in Marshy Foundation Pits
Spec. cl. No: 907
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Tractor-trolley for
9.4.VI Unskilled day 12 0 0 hour 6 0 0
transportation
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Stripping and Storing Top Soil, Stripping, storing of top soil by road side at 15 m internal and re-application on embankment slopes, cut slopes and other areas in localities where the available embankment Material is not conducive to plant growth as
300 cum
per Drawing and Technical Specifications.
Spec. cl. No: 905
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.5 Unskilled day 10 0 0 Dozer hour 6 0 0
Skilled day 2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Stripping, Storing and Re-laying Top Soil from Borrow Areas in Agriculture Fields., Stripping of top soil from borrow areas located in agriculture fields, storing at a suitable place, spreading and re-laying after taking the borrow earth to maintain
150 cum
fertility of the agricultural field, finishing it to the required levels to the satisfaction of the farmer as per Drawing and Technical Specifications.
Spec. cl. No: 909
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.6 Unskilled day 15 0 0 Dozer hour 6 0 0
Skilled day 2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Preparation and Surface Treatment of Formation., Preparation and surface treatment of Formation by removing mud and slurry, watering to the extent needed to maintain desired moisture content , compacting all complete as per Drawing and
3500 sqm
Technical Specifications.
Spec. cl. No: 909,910
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.7 Unskilled day 10 0 0 Water KL 18 0 0 Water tanker hour 6 0 0
Skilled day 1 0 0 Roller hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Construction of Embankment with Material obtained from Borrow pits, Providing, laying, spreading and compacting embankment with borrow material as per Drawing and Technical Specifications. 300 cum
Spec. cl. No: 909,910
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.8 Unskilled day 4 0 0 Borrowpit material cum 360 0 0 Vibratory roller hour 6 0 0
Skilled day 1 0 0 Cost of water KL 72 0 0 Water tanker hour 6 0 0
Motor grader hour 3 0 0
Dozer hour 3 0 0
Tractor with rotavator hour 12 0 0
Hydraulic Excavator hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Construction of Embankment with Material Deposited from Roadway Cutting, Providing, laying, spreading and compacting embankment with roadway cutting material and compact to the required density as per Drawing and Technical
100 cum
Specifications.( Manually)
Spec. cl. No: 909,910
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.9.A Unskilled day 50 0 0 Cost of water KL 24 0 0 Vibratory roller hour 6 0 0
Skilled day 2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Construction of Embankment with Material Deposited from Roadway Cutting, Providing, laying, spreading and compacting embankment with roadway cutting material and compact to the required density as per Drawing and Technical
300 cum
Specifications. (With machine)
Spec. cl. No: 909,910
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.9.B Unskilled day 10 0 0 Cost of water KL 72 0 0 Vibratory roller hour 6 0 0
Skilled day 1 0 0 Water tanker hour 12 0 0
Motor grader hour 6 0 0
Dozer hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Construction of Rock fill Embankment, Providing and laying of rock fill embankment with broken hard rock fragments of size not exceeding 300 mm laid in layers not exceeding 500 mm thick including filling of surface voids with stone spalls,
150 cum
blinding top layer with granular Material, rolled to required density all complete as per Drawing and Technical Specifications.
Spec. cl. No: 909,910
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.10' Unskilled day 10 0 0 Cost of water KL 12 0 0 Water tanker hour 6 0 0
Skilled day 1 0 0 Vibratory road roller hour 6 0 0
Dozer hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing suitable material and Back filling behind abutment, wing wall and return wall complete as per Drawing and Technical Specifications., Granular Material 10 cum
Spec. cl. No: 908
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Plate compactor/power
9.11.A Unskilled day 5 0 0 Cost of water KL 1 0 hour 2.5 0 0
rammer
0
Skilled day 0.2 0 0 Granular Material cum 11 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing suitable material and Back filling behind abutment, wing wall and return wall complete as per Drawing and Technical Specifications., Sandy Material 10 cum
Spec. cl. No: 908
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Plate compactor/power
9.11.B Unskilled day 5 0 0 Cost of water KL 1 0 hour 2.5 0 0
rammer
0
Skilled day 0.2 0 0 Sand cum 12 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing suitable material and Back filling behind abutment, wing wall and return wall complete as per Drawing and Technical Specifications., Locally available Material including compaction by tamping rod ( without watering) 10 cum
Spec. cl. No: 908
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.11.C Unskilled day 5 0 0 Cost of water KL 1 0 0 Tamping 0
Skilled day 0.2 0 0 compensation for Locally available Material cum 12 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing suitable material and Back filling behind abutment, wing wall and return wall complete as per Drawing and Technical Specifications., Locally available Material, with out watering and compaction by tamping rod 10 cum
Spec. cl. No: 908
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.11.D Unskilled day 4 0 0 Locally available Material cum 12 0 0 Tamping 0
Skilled day 0.2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing and laying of Filter media with granular Material/stone crushed aggregates to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment,
10 cum
wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
Spec. cl. No: 909,910
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.12 Unskilled day 10 0 0 Cost of water KL 1 0 0
Skilled day 1 0 0 Filter media cum 12 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Scarifying Existing road Surface to a depth of 50 mm by Mechanical Means, Scarifying the existing road surface to a depth of 50 mm and disposal of scarified Material with in all lifts and lead as per Drawing and Technical Specifications. 600 sqm
Spec. cl. No: 1003
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
10.2.A Unskilled day 6 0 0 Tractor with ripper hour 6 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Scarifying Existing road Surface to a depth of 50 mm by Mechanical Means, Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified Material with in all lifts and lead as per Drawing and Technical Specifications. 3000 sqm
Spec. cl. No: 1003
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
10.2.B Unskilled day 6 0 0 Tipper hour 6 0 0
Skilled day 1 0 0 Loader hour 6 0 0
Tractor with ripper hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Construction of Subgrade and Earthen Shoulders with approved Material ( capping layer), Providing and laying sub-grade and earthen shoulders with approved Material obtained from borrow pits with all lifts & leads as per Drawing and Technical
600 sqm
Specifications.
Spec. cl. No: 1004
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
10.3.A Unskilled day 6 0 0 Capping Layer Material cum 750 0 0 Vibratory roller hour 6 0 0
Skilled day 1 0 0 Cost of water KL 72 0 0 Motor Grader hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Compacting Original Ground, Compacting original ground supporting sub-grade, Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers as per Drawing and Technical Specifications. 600 sqm
Spec. cl. No: 1003, 1005
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
10.4.I_a Unskilled day 5 0 0 Cost of water KL 24 0 0 Vibratory roller hour 12 0 0
Skilled day 1 0 0 Motor grader hour 6 0 0
Tractor with ripper hour 12 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Compacting Original Ground, Compacting original ground supporting embankment, Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm,
600 sqm
mixed with water at OMC and then compacted by rolling so as to achieve dry density as per Drawing and Technical Specifications.
Spec. cl. No: 1003, 1005
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
10.4.II_a Unskilled day 4 0 0 Cost of water KL 24 0 Vibratory roller hour 12 0 0
0
Skilled day 1 0 0 Tractor with ripper hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Lime Stabilization for Improving Sub-grade, Providing , laying and spreading available soil with 3 per cent slaked lime having minimum content of 70 per cent of CaO, mixing, grading and compacting at OMC to the desired density to form a layer of
600 sqm
sub grade as per Drawing and Technical Specifications., By Mechanical Means
Spec. cl. No: 1006
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
10.5.A Unskilled day 12 0 0 Cost of water KL 72 0 0 Vibratory roller hour 6 0 0
Skilled day 2 0 0 Lime tonne 15.75 0 0 Motor Grader hour 6 0 0
Tractor with ripper and
hour 12 0 0
rotator
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Lime Stabilization for Improving Sub-grade, Providing , laying and spreading available soil with 3 per cent slaked lime having minimum content of 70 per cent of CaO, mixing, grading and compacting at OMC to the desired density to form a layer of
150 sqm
sub grade as per Drawing and Technical Specifications., By Manual Means
Spec. cl. No: 1006
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
10.5.B Unskilled day 50 0 0 Cost of water KL 36 0 0 Motor Grader hour 6 0 0
Skilled day 3 0 0 Lime tonne 8 0 0 Vibratory roller hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying granular sub-base on prepared surface, mixing at OMC, and compacting to achieve the desired density, complete as per Drawing and Technical Specifications., By Mechanical means 300 cum
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
12.1.A Unskilled day 12 0 0 Cost of water KL 18 0 0 Tractor /Loader hour 12 0 0
Skilled day 2 0 0 Sub-base Material S1 type or S2 type cum 384 0 0 Vibratory roller hour 12 0 0
Motor Grader hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying granular sub-base on prepared surface, mixing at OMC, and compacting to achieve the desired density, complete as per Drawing and Technical Specifications., By manual Means 300 cum
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
12.1.B Unskilled day 60 0 0 Cost of water KL 23 0 0 Vibratory roller hour 6 0 0
Skilled day 2 0 0 Sub-base Material S1 type or S2 type cum 256 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing, laying and spreading soil on a prepared sub grade, pulverizing, adding the designed quantity of cement to the spread soil, mixing in place , grading and compacting at OMC to achieve the desired unconfined compressive strength and to
300 cum
form a layer of sub-base/base as per Drawing and Technical Specifications., For 4 per cent quantity of cement by weight of soil
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
12.2 Unskilled day 15 0 0 Cost of water KL 72 0 0 Tractor with rotavator hour 12 0 0
Skilled day 3 0 0 Cement tonne 21 0 0 Vibratory roller hour 6 0 0
soil/ borrowpit material cum 384 0 0 Motor Grader hour 6 0 0
Excavator hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing, laying and spreading Material on a prepared sub grade, adding the designed quantity of cement to the spread Material, mixing in place , grading and compacting at OMC to achieve the desired unconfined compressive strength and to
300 cum
form a layer of sub-base/base as per Drawing and Technical Specifications.
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
12.3 Unskilled day 15 0 0 Cost of water KL 72 0 0 Tractor / Loader hour 12 0 0
Material for sub-base course/ base course as per grading
Skilled day 3 0 0 cum 384 0 Vibratory roller hour 6 0 0
requirement 0
Cement tonne 24 0 0 Motor Grader hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Making 50 mm x 50 mm furrows, 50 mm deep, 450 to the center line of the road and at one meter interval in the existing thin bituminous wearing coarse including sweeping and disposal of excavated Material ., 25 mm deep furrow cutting 630 sqm
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
12.4 Unskilled day 8 0 0 Tractor-trolley hour 6 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing, laying, spreading and compacting screening / coarse sand of specified grade in uniform layer on a prepared surface and compacting to form a inverted Choke as per Drawing and Technical Specifications. 600 cum
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
12.5 Unskilled day 21 0 0 Cost of water KL 108 0 0 Vibratory roller hour 6 0 0
Skilled day 3 0 0 Screening / coarse sand cum 720 0 0 Motor Grader hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing, laying, spreading and compacting Water bound macadam including brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Drawing and
360 cum
Technical Specifications., By Manual Means, By using stone screening 13.2mm and Vibratory roller
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No.
Norms
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
12.6.A_a Unskilled day 375 0 0 Cost of water KL 144 0 Vibratory roller hour 12 0 0
0
Skilled day 10 0 0 Stone Screening for 13.2 mm cum 57.6 0 0
Aggregate (Grading as per specification) cum 435.6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing, laying, spreading and compacting Water bound macadam including brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Drawing and
360 cum
Technical Specifications., By Manual Means, By using stone screening 13.2mm and Smooth 3 wheeled steel roller
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Smooth 3 wheeled
12.6.A_b Unskilled day 375 0 0 Cost of water KL 144 0 hour 12 0 0
0 steel roller
Skilled day 10 0 0 Stone Screening for 13.2 mm cum 57.6 0 0
Aggregate (Grading as per specification) cum 435.6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing, laying, spreading and compacting Water bound macadam including brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Drawing and
360 cum
Technical Specifications., By Manual Means, By using stone screening 11.2 mm for grading-II and Vibratory roller
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
12.6.A_c Unskilled day 375 0 0 Cost of water KL 144 0 Vibratory roller hour 12 0 0
0
Skilled day 10 0 0 Stone Screening for 11.2 mm for grading-II cum 86.4 0 0
Aggregate (Grading as per specification) cum 435.6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing, laying, spreading and compacting Water bound macadam including brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Drawing and
360 cum
Technical Specifications., By Manual Means, By using stone screening 11.2 mm for grading-II and Smooth 3 wheeled
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Smooth 3 wheeled
12.6.A_d Unskilled day 375 0 0 Cost of water KL 144 0 hour 12 0 0
0 steel roller
Skilled day 10 0 0 Stone Screening for 11.2 mm for grading-II cum 86.4 0 0
Aggregate (Grading as per specification) cum 435.6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing, laying, spreading and compacting Water bound macadam including brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Drawing and
360 cum
Technical Specifications., By Mechanical Means:, By using stone screening 13.2 mm for grading-II and vibratory roller
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
12.6.B_a Unskilled day 15 0 0 Cost of water KL 144 0 Vibratory roller hour 6 0 0
0
Skilled day 3 0 0 Stone screening for 13.2 mm for grading-I cum 57.6 0 0 Motor grader hour 6 0 0
Aggregate (Grading as per specification) cum 435.6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing, laying, spreading and compacting Water bound macadam including brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Drawing and
360 cum
Technical Specifications., By Mechanical Means:, By using stone screening 13.2 mm for grading-II and Smooth 3 wheeled steel roller
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Smooth 3 wheeled
12.6.B_b Unskilled day 15 0 0 Cost of water KL 144 0 hour 12 0 0
0 steel roller
Skilled day 3 0 0 Stone screening for 13.2 mm for grading-I cum 57.6 0 0 Motor grader hour 6 0 0
Aggregate (Grading as per specification) cum 435.6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing, laying, spreading and compacting Water bound macadam including brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Drawing and
360 cum
Technical Specifications., By Mechanical Means:, By using stone screening 11.2 mm for grading-II and Smooth 3 vibratory roller
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
12.6.B_c Unskilled day 15 0 0 Cost of water KL 144 0 0 Vibratory roller hour 6 0 0
Skilled day 3 0 0 Stone screening for 11.2 mm for grading-II cum 86.4 0 0 Motor grader hour 6 0 0
Aggregate (Grading as per specification) cum 435.6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing, laying, spreading and compacting Water bound macadam including brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Drawing and
360 cum
Technical Specifications., By Mechanical Means:, By using stone screening 11.2 mm for grading-II and Smooth 3 wheeled steel roller
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Smooth 3 wheeled
12.6.B_d Unskilled day 15 0 0 Cost of water KL 144 0 hour 12 0 0
0 steel roller
Skilled day 3 0 0 Stone screening for11.2 mm for grading-II cum 86.4 0 0 Motor grader hour 6 0 0
Aggregate (Grading as per specification) cum 435.6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Crusher Run Macadam on a prepared surface, spreading and mixing , watering and compacting to form a layer of sub-base/Base course as per Drawing and Technical Specifications., By Mix in Place Method 360 cum
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
12.7_a Unskilled day 14 0 0 Cost of water KL 36 0 0
Skilled day 3 0 0 Below 5.6 mm cum 166.68 0 0
22.5 mm to 5.6 mm cum 151.06 0 0
63 mm to 45 mm cum 157.46 0 0
i) For 53 mm maximum size
Aggregate at site
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Crusher Run Macadam on a prepared surface, spreading and mixing , watering and compacting to form a layer of sub-base/Base course as per Drawing and Technical Specifications., By Mix in Place Method 360 cum
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
12.7_b Unskilled day 14 0 0 Cost of water KL 36 0 0 Vibratory roller hour 6 0 0
Skilled day 3 0 0 Below 5.6 mm cum 213.48 0 0 Motor grader hour 6 0 0
22.4 mm to 5.6 mm cum 237.6 0 0
45 mm to 22.5 mm cum 24.12 0 0
ii) For 45 mm maximum size
Aggregate at site
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Median and Island above road level with approved Material deposited including compacted as per Drawing and Specifications. ( using material from Roadway excavation). 21 cum
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
12.8 Unskilled day 9 0 0 Cost of water KL 6 0 0 Plate compactor hour 9 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Median and Island above road level with approved Material deposited including compacted as per Drawing and Specifications. ( using material from borrow area). 21 cum
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
12.9 Unskilled day 6 0 0 Cost of water KL 6 0 0 Plate Compactor hour 9 0 0
Skilled day 1 0 0 Soil/ borrowpit material cum 27 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
"12.10"
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing and making footpath/separator of 150 mm compacted granular sub base and 25 mm thick cement concrete grade M 15, over laid with pre-cast concrete tiles in cement mortar 1:3 including provision of all drainage arrangements but
300 cum
excluding Kerb channel as per Drawing and Technical Specifications.
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
12.11 Unskilled day 45 0 0 Tiles size 300 x 300 mm and 25 mm thick each 3300 0 0 Concrete mixer hour 9 0 0
Skilled day 8 0 0 vi) Cost of water KL 12 0 0 Vibratory Roller hour 1.25 0 0
PVC Pipes 200 mm dia meter 22.5 0
0
pipes for drainage
Pre-cast cement concrete tiles
Cement tonne 1.83 0 0
Sand cum 3.84 0 0
For cement plaster 1:3
Cement tonne 1.88 0 0
Sand cum 3.38 0 0
Aggregate 12 mm cum 6.75 0 0
For cement concrete grade M 15, ( 7.5 cum)
2.36 mm below cum 11.88 0 0
26.5 mm to 4.75 mm cum 26.73 0 0
53 mm to 26.5 mm cum 20.79 0 0
For Granular sub base Material
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing laying, spreading watering, levelling and compaction of Telford base ( Block pitching) as per Drawing and Technical Specifications. 50 cum
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
12.12 Unskilled day 120 0 0 Cost of water KL 12 0 0 Vibratory Roller hour 6 0 0
Skill day 60 0 0 dust cum 16 0 0
Block stone cum 55 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing, laying, spreading and compacting stone aggregates of specific sizes to dry bound macadam including spreading in uniform thickness, hand packing, rolling and brooming requisite type of screening/ binding Materials to fill up the
180 cum
interstices of coarse aggregate, and compacting to the required density as per Drawing and Technical Specifications., By Manual Means, Grading-I
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
12.13.A.i Unskilled day 180 0 0 Cost of water KL 72 0
0
Skilled day 3 0 0 Binding Material cum 14.4 0 0
Crushable type such as Moorum or Gravel for grading I &II cum 105.59 #NAME? #NAME?
Stone Screening
Grading-I 63 mm to 45 mm /Grading-II 53 mm to 22.4 mm cum 217.8 #NAME? #NAME?
Aggregate
Grading-I
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Providing, laying, spreading and compacting stone aggregates of specific sizes to dry bound macadam including spreading in uniform thickness, hand packing, rolling and brooming requisite type of screening/ binding Materials to fill up the
180 cum
interstices of coarse aggregate, and compacting to the required density as per Drawing and Technical Specifications., By Manual Means, Grading-II
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
12.13.A.i
Unskilled day 180 0 0 Cost of water KL 72 0 Vibratory roller hour 6 0 0
i 0
Skilled day 3 0 0 Binding Material cum 14.4 0 0
Crushable type such as Moorum or Gravel for grading I &II cum 52.8 #NAME? #NAME?
Stone Screening
Grading-II 53 mm to 22.4 mm cum 217.8 #NAME? #NAME?
Aggregate
Grading-II
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC laying in uniform layers in sub- base / base course on well prepared surface and
225 cum
compacting to achieve required density as per Drawing and Technical Specifications., Base course with B1 material
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
12.14.A Unskilled day 10 0 0 Cost of water KL 18 #NAME? #NAME? Vibratory roller hour 6 0 0
Skilled day 3 0 0 2.36 mm to 75 micron cum 89.1 #NAME? #NAME? Paver finisher hour 6 0 0
22.4 mm to 2.36 mm cum 118.8 #NAME? #NAME? Electric generator hour 6 0 0
Wet mix plant / other
45 mm to 22.4 mm cum 89.1 #NAME? hour 9 0 0
#NAME? similar equipment
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC laying in uniform layers in sub- base / base course on well prepared surface and
225 cum
compacting to achieve required density as per Drawing and Technical Specifications., Base course with B2 material
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
12.14.B Unskilled day 10 0 0 Cost of water KL 18 0 0 Vibratory roller hour 6 0 0
Skilled day 3 0 0 2.36 mm to 75 micron cum 89.1 #NAME? #NAME? Paver finisher hour 6 0 0
22.4 mm to 2.36 mm cum 118.8 #NAME? #NAME? Electric generator hour 6 0 0
Wet mix plant / other
45 mm to 22.4 mm cum 89.1 #NAME? hour 9 0 0
#NAME? similar equipment
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC laying in uniform layers in sub- base / base course on well prepared surface and
225 cum
compacting to achieve required density as per Drawing and Technical Specifications., Sub Base course with S1 material
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No.
Norms
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
12.14.C Unskilled day 15 0 0 Cost of water KL 18 0 0 Vibratory roller hour 6 0 0
Skilled day 3 0 0 2.36 mm to 75 micron cum 89.1 #NAME? #NAME? Paver finisher hour 6 0 0
22.4 mm to 2.36 mm cum 118.8 #NAME? #NAME? Electric generator hour 6 0 0
Wet mix plant / other
45 mm to 22.4 mm cum 89.1 #NAME? hour 9 0 0
#NAME? similar equipment
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC laying in uniform layers in sub- base / base course on well prepared surface and
225 cum
compacting to achieve required density as per Drawing and Technical Specifications., Sub Base course with S2 material
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
12.14.D Unskilled day 15 0 0 Cost of water KL 18 0 0 Vibratory roller hour 6 0 0
Skilled day 3 0 0 2.36 mm to 75 micron cum 89.1 #NAME? #NAME? Paver finisher hour 6 0 0
22.4 mm to 2.36 mm cum 118.8 #NAME? #NAME? Electric generator hour 6 0 0
Wet mix plant / other
45 mm to 22.4 mm cum 89.1 #NAME? hour 9 0 0
#NAME? similar equipment
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Prime Coat, Prime Coat, with MC 30 / 70 by Mechanical Means, Providing and applying prime coat with Hot Bitumen ( including cutter) on prepared surface of granular base including cleaning of road surface and spraying by mechanical means as
lit
per Technical Specification ., Bitumen ( cutback) MC 30 ( for WBM)
Spec. cl. No: 1302
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.1.A Unskilled day 50 0 0 Cost of water KL 10 0 0 Generator hour 8 0 0
Skilled day 3 0 0 Bitumen ( cutback) MC 30 ( for WBM) tonne 5.25 0 0 Boiler hour 8 0 0
Bitumen distributor hour 6 0 0
Air compressor hour 8 0 0
Mechanical broom hour 8 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Prime Coat, Prime Coat, with MC 30 / 70 by Mechanical Means, Providing and applying prime coat with Hot Bitumen ( including cutter) on prepared surface of granular base including cleaning of road surface and spraying by mechanical means as
lit
per Technical Specification ., Bitumen ( cutback) MC 30 ( for stabilized soil base/ crusher run macadam)
Spec. cl. No: 1302
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.1.A_b Unskilled day 50 0 0 Cost of water KL 10 0 Generator hour 8 0 0
0
Bitumen (cut back )MC 70 ( for stabilized soil base/ crusher
Skilled day 3 0 0 tonne 5.25 0 Boiler hour 8 0 0
run macadam) 0
Bitumen distributor hour 6 0 0
Air compressor hour 8 0 0
Mechanical broom hour 8 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: , Prime Coat, with MC 30 / 70 by Bitumen , by manual means, Providing and applying prime coat with Hot Bitumen(including cutter) on prepared surface of granular base including cleaning of road surface and spraying at specified rate by
lit
manual means as per Technical Specification . , Bitumen ( cutback) MC 30 ( for WBM)
Spec. cl. No: 1302
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.1.B Unskilled day 100 0 0 Cost of water KL 10 0 0 Generator hour 8 0 0
Skilled day 3 0 0 Bitumen ( cutback) MC 30 ( for WBM) tonne 1.1 0 0 Boiler hour 8 0 0
Bitumen sprayer hour 6 0 0
Tractor hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: , Prime Coat, with MC 30 / 70 by Bitumen , by manual means, Providing and applying prime coat with Hot Bitumen(including cutter) on prepared surface of granular base including cleaning of road surface and spraying at specified rate by
lit
manual means as per Technical Specification . , Bitumen (cut back )MC 70 ( for stabilized soil base/ crusher run macadam)
Spec. cl. No: 1302
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.1.B_b Unskilled day 100 0 0 Cost of water KL 10 0 Generator hour 8 0 0
0
Bitumen (cut back )MC 70 ( for stabilized soil base/ crusher
Skilled day 3 0 0 tonne 1.1 0 Boiler hour 8 0 0
run macadam) 0
Bitumen sprayer hour 6 0 0
Tractor hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: , Prime Coat, with Emulsion by Mechanical Means, Providing and applying primer coat with Bitumen emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at specified rate using mechanical means
lit
as per Technical Specification .
Spec. cl. No: 1302
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.1.C Unskilled day 40 0 0 Cost of water KL 10 0 0 Emulsion distributor hour 6 0 0
Skilled day 3 0 0 Bitumen emulsion tonne 5.25 0 0 Air compressor hour 8 0 0
Mechanical broom hour 8 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
, Prime Coat with emulsion, for manual works, Providing and applying primer coat with Bitumen emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at specified rate as per Technical Specification. lit
Spec. cl. No: 1302
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.1.D Unskilled day 80 0 0 Cost of water KL 10 0 0 Emulsion sprayer hour 6 0 0
Skilled day 3 0 0 Bitumen emulsion tonne 1.1 0 0 Tractor trolley hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Tack Coat, Tack coat with Bitumen By Mechanical Means, Providing and applying tack coat with hot Bitumen at specified rate on the prepared non-bituminous surfaces including cleaning as per Technical Speciation . lit
Spec. cl. No: 1302
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.2.A Unskilled day 20 0 0 Bitumen (paving grade) tonne 5.25 0 0 Generator hour 6 0 0
Skilled day 3 0 0 Boiler hour 6 0 0
Bitumen distributor hour 6 0 0
Air compressor hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
, Tack coat with Bitumen by Manual Means, Providing and applying tack coat with hot Bitumen at the specified rate the prepared surfaces including cleaning as per Technical Speciation . lit
Spec. cl. No: 1302
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.2.B Unskilled day 40 0 0 Bitumen (paving grade) tonne 1.1 0 0 Generator hour 8 0 0
Skilled day 3 0 0 Boiler hour 8 0 0
Bitumen sprayer hour 6 0 0
Tractor hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
, Tack coat with Emulsion By Mechanical Means, Providing and applying tack coat with Bitumen emulsion at specified rate on the prepared non-bituminous surfaces including cleaning as per Technical Speciation . lit
Description of Work:
, Tack coat with Emulsion By Mechanical Means, Providing and applying tack coat with Bitumen emulsion at specified rate on the prepared non-bituminous surfaces including cleaning as per Technical Speciation . lit
Spec. cl. No: 1302
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.2.C Unskilled day 20 0 0 Bitumen emulsion tonne 5.25 0 0 Generator hour 6 0 0
Emulsion pressure
Foreman day 2 0 0 hour 6 0 0
distributor
Air compressor hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
, Tack coat with Emulsion By Manual Means, Providing and applying tack coat with Bitumen emulsion at the specified rate the prepared surfaces including cleaning as per Technical Speciation . lit
Spec. cl. No: 1302
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.2.D Unskilled day 20 0 0 Cost of water KL 1 0 0 Hand sprayer hour 6 0 0
Skilled day 2 0 0 Bitumen emulsion tonne 1.1 0 0 Boiler hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Bituminous Macadam, Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per specification premixed with bituminous binder, laid over a previously prepared surface as per Drawing and
cum
Technical Specifications. , Grading I ( 40 mm nominal size )
Spec. cl. No: 1307
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.3 Unskilled day 14 0 0 Grading I ( 40 mm nominal size ) Pneumatic Roller hour 6 0 0
Skilled day 7 0 0 Bitumen tonne 7.43 0 0 Generator hour 6 0 0
Paver finisher hour 6 0 0
Air compressor hour 6 0 0
Batch mix HEMP hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
freshly laid tack coat
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Bituminous Macadam, Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per specification premixed with bituminous binder, laid over a previously prepared surface as per Drawing and
cum
Technical Specifications. , Grading II(19 mm nominal size)
Spec. cl. No: 1307
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.3_a Unskilled day 14 0 0 Grading II(19 mm nominal size) Pneumatic Roller hour 6 0 0
Skilled day 7 0 0 Bitumen tonne 7.43 0 0 Generator hour 6 0 0
Paver finisher hour 6 0 0
Air compressor hour 6 0 0
Batch mix HEMP hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
freshly laid tack coat
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Bituminous Penetration Macadam, Providing and laying penetration macadam over prepared Base by providing a layer of compacted crushed coarse aggregate with applications of bituminous binder and key aggregates as per Drawing and Technical
sqm
Specifications., 50 mm thick
Spec. cl. No: 1304
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.4.A Skilled day 3 0 0 Key aggregates ( 22.4 - 2.8 mm) cum 67.5 #NAME? #NAME? Vibratory roller hour 6 0 0
Unskilled day 9 0 0 Coarse aggregate ( 45 - 2.8 mm) cum 270 #NAME? #NAME? Bitumen Distributor hour 6 0 0
Chips Spreader ( with
Bitumen tonne 15.3 0 hour 6 0 0
0 truck)
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = 0
Description of Work: Bituminous Penetration Macadam, Providing and laying penetration macadam over prepared Base by providing a layer of compacted crushed coarse aggregate with applications of bituminous binder and key aggregates as per Drawing and
sqm
Technical Specifications., 75 mm thick
Spec. cl. No: 1304
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.4.B Skilled day 3 0 0 Key aggregates ( 26.5 - 2.8 mm) cum 81 #NAME? #NAME? Vibratory roller hour 12 0 0
Unskilled day 12 0 0 Coarse aggregate (63- 2.8 mm) cum 405 #NAME? #NAME? Bitumen distributor hour 6 0 0
Chips Spreader ( with
Bitumen tonne 22.7 0 hour 6 0 0
0 truck)
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = 0
Description of Work: Dense Graded Bituminous Macadam, Providing and laying dense bituminous macadam using crushed aggregates of specified grading, premixed with bituminous binder and filler as per Drawing and Technical Specifications., Grading - I 40 mm
cum
(Nominal Size)
Spec. cl. No: 1308
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
smooth wheeled
13.5 Skilled day 5 0 0 Filler tonne 4.31 #NAME? hour 6 0 0
#NAME? tandem roller.
Unskilled day 16 0 0 Grading - I 40 mm (Nominal Size) Vibratory roller hour 6 0 0
Aggregate Pneumatic Roller hour 6 0 0
Bitumen tonne 9.56 0 0 Generator hour 6 0 0
Paver finisher hour 6 0 0
Batch mix HMP hour 6 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = 0
Description of Work:
freshly laid tack coat
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Dense Graded Bituminous Macadam, Providing and laying dense bituminous macadam using crushed aggregates of specified grading, premixed with bituminous binder and filler as per Drawing and Technical Specifications., Grading - II 19 mm
cum
(Nominal Size)
Spec. cl. No: 1308
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
smooth wheeled
13.5_a Skilled day 5 0 0 Filler tonne 4.31 0 hour 6 0 0
0 tandem roller.
Unskilled day 16 0 0 Grading - II 19 mm (Nominal Size) Vibratory roller hour 6 0 0
Aggregate Pneumatic Roller hour 6 0 0
Bitumen tonne 9.56 0 0 Generator hour 6 0 0
Paver finisher hour 6 0 0
Batch mix HMP hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
freshly laid tack coat
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Bituminous Concrete / Asphalt Concrete, Providing and laying Bituminous concrete/ Asphalt concrete using crushed aggregates of specified grading, premixed with bituminous binder and filler as per Drawing and Technical Specifications, Grading
cum
- I-19 mm (Nominal Size)
Spec. cl. No: 1309
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.6 Skilled day 5 0 0 Filler tonne 2.83 #NAME? #NAME? Pneumatic Roller hour 6 0 0
Unskilled day 15 0 0 * Grading - I-19 mm (Nominal Size) Smooth wheeled roller hour 12 0 0
ii) Aggregate Generator hour 6 0 0
i) Bitumen tonne 12.94 #NAME? #NAME? Paver finisher hour 6 0 0
Batch mix HMP hour 6 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = 0
Description of Work:
freshly laid tack coat
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Bituminous Concrete / Asphalt Concrete, Providing and laying Bituminous concrete/ Asphalt concrete using crushed aggregates of specified grading, premixed with bituminous binder and filler as per Drawing and Technical Specifications, Grading
cum
- II-13 mm (Nominal Size)
Spec. cl. No: 1309
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.6_a Skilled day 5 0 0 Filler tonne 2.83 0 0 Pneumatic Roller hour 6 0 0
Unskilled day 15 0 0 Grading - II-13 mm (Nominal Size) Smooth wheeled roller hour 12 0 0
ii) Aggregate Generator hour 6 0 0
i) Bitumen tonne 12.94 0 0 Paver finisher hour 6 0 0
Batch mix HMP hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
freshly laid tack coat
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Surface Dressing, Providing and laying surface dressing as wearing course in single coat using gravel of specified size on a recently applied layer of bituminous binder on prepared surface as per Drawing and Technical Specifications.,
sqm
MECHANICAL MEANS, 19 mm nominal chipping size
Spec. cl. No: 1303
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.7.A.I Skilled day 3 0 0 Chips, 19 mm nominal size cum 102 0 0 Roller (pneumatic) hour 12 0 0
Unskilled day 12 0 0 Chip spreader hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Surface Dressing, Providing and laying surface dressing as wearing course in single coat using gravel of specified size on a recently applied layer of bituminous binder on prepared surface as per Drawing and Technical Specifications.,
sqm
MECHANICAL MEANS, 13 mm nominal size chipping
Spec. cl. No: 1303
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.7.A.II Skilled day 3 0 0 Crushed stone chipping, 13 mm nominal size cum 87 0 Roller (pneumatic) hour 12 0 0
0
Unskilled day 12 0 0 Chip spreader hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Surface Dressing, Providing and laying surface dressing as wearing course in single coat using gravel of specified size on a recently applied layer of bituminous binder on prepared surface as per Drawing and Technical Specifications.,
sqm
MECHANICAL MEANS, 10 mm nominal size chipping
Spec. cl. No: 1303
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.7.A.II
Skilled day 3 0 0 Crushed stone chipping, 10 mm nominal size cum 80.3 0 Roller (pneumatic) hour 12 0 0
I 0
Unskilled day 12 0 0 Chip spreader hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Surface Dressing, Providing and laying surface dressing as wearing course in single coat using gravel of specified size on a recently applied layer of bituminous binder on prepared surface as per Drawing and Technical Specifications.,
sqm
MECHANICAL MEANS, 6.0 mm nominal size chipping
Spec. cl. No: 1303
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.7.A.I
Skilled day 3 0 0 Crushed stone chippings 6 mm nominal size cum 48.2 0 Roller (pneumatic) hour 12 0 0
V 0
Unskilled day 12 0 0 chip spreader hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Surface Dressing, Providing and laying surface dressing as wearing course in single coat using gravel of specified size on a recently applied layer of bituminous binder on prepared surface as per Drawing and Technical Specifications., MANUAL
sqm
MEANS, 19 mm nominal size chipping
Spec. cl. No: 1303
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add: 0.5 percent of
13.7.B.I Skilled day 3 0 0 Crushed stone chipping 19 mm nominal size cum 10.2 0 0
0 Labour for T&P
Unskilled day 12 0 0 Roller (pneumatic) hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Surface Dressing, Providing and laying surface dressing as wearing course in single coat using gravel of specified size on a recently applied layer of bituminous binder on prepared surface as per Drawing and Technical Specifications., MANUAL
sqm
MEANS, 13 mm nominal size chipping
Spec. cl. No: 1303
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add: 0.5 per cent of
13.7.B.II Skilled day 3 0 0 Crushed stone chipping, 13 mm nominal size cum 10.4 0 0
0 (a) Labour for T&P
Unskilled day 12 0 0 Roller (pneumatic) hour 2.25 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Surface Dressing, Providing and laying surface dressing as wearing course in single coat using gravel of specified size on a recently applied layer of bituminous binder on prepared surface as per Drawing and Technical Specifications., MANUAL
sqm
MEANS, 10 mm nominal size chipping
Spec. cl. No: 1303
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No.
Norms
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.7.B.II Add: 0.5 per cent of
Skilled day 3 0 0 Crushed stone chipping, 13 mm nominal size cum 10.4 0 0
I 0 (a) Labour for T&P
Unskilled day 12 0 0 Roller (pneumatic) hour 2.25 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Pre-coating Chips, Pre-coating of chips with 1 per cent of paving bitumen by weight of chips in a suitable mixer duly heated to 160 degree C as per Technical Specification cum
Spec. cl. No: N/A
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.8 Unskilled day 24 0 0 Bitumen tonne 0.48 0 0 Mixture machine hour 6 0 0
Skilled day 0.5 0 0 Bitumen boiler hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: 20 mm thick Open-Graded Premix Carpet using Bituminous (Paving bitumen / Modified bitumen) Binder, Providing and laying open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates as wearing course on a
sqm
previously prepared base as per drawing and Technical Specifications ., By Manual Means
Spec. cl. No: 1311
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Roller (Smooth
13.9.A Skilled day 8 0 0 Crushed stone chipping, 13.2 mm to 5.6 mm cum 13.5 0 hour 2 0 0
0 wheeled)
Bitumen boiler oil
Unskilled day 21 0 0 Paving bitumen or other as per Design tonne 0.73 0 hour 4 0 0
0 fired
Mixer hour 4 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: 20 mm thick Open-Graded Premix Carpet using Bituminous (Paving bitumen / Modified bitumen) Binder, By Mechanical Means, Providing and laying open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates as
sqm
wearing course on a previously prepared base as per drawing and Technical Specifications ., Mechanical method using Hot Mix Plant
Spec. cl. No: 1311
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Smooth wheeled/
13.9.B.i Skilled day 5 0 0 Crushed stone chipping, 13.2 mm to 5.6 mm cum 108 0 hour 6 0 0
0 Tandem roller
Unskilled day 16 0 0 Bitumen tonne 5.84 0 0 Paver hour 6 0 0
Generator hour 6 0 0
Hot mixed plant hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: 20 mm thick Open-Graded Premix Carpet using Bituminous (Paving bitumen / Modified bitumen) Binder, By Mechanical Means, Providing and laying open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates as
sqm
wearing course on a previously prepared base as per drawing and Technical Specifications ., Open-Graded Premix Surfacing using cationic Bitumen Emulsion
Spec. cl. No: 1311
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Smooth wheeled steel
13.9.B.ii Skilled day 3 0 0 Crushed stone aggregates 13.2 mm to 5.6 mm cum 24.3 0 hour 6 0 0
0 roller
Unskilled day 18 0 0 Cationic Bitumen Emulsion tonne 1.94 0 0 Concrete mixer hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Close Graded Premix Surfacing/Mixed Seal Surfacing , Mechanical means using HMP of appropriate capacity ,, Providing and laying close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm or 13.2 mm to 0.09
sqm
mm aggregates using bitumen as wearing course on a previously prepared base, including mixing in a suitable plant as per Drawing and Technical Specifications., Type - A
Spec. cl. No: 1310
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.10_a Skilled day 6 0 0 Stone crushed aggregates 11.2 mm to 0.09 cum 276.75 0 0 Smooth wheeled hour 6 0 0
Unskilled day 16 0 0 * Bitumen tonne 22.5 0 0 Paver finisher hour 6 0 0
Loader hour 6 0 0
Generator hour 6 0 0
HMP hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Close Graded Premix Surfacing/Mixed Seal Surfacing , Mechanical means using HMP of appropriate capacity ,, Providing and laying close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm or 13.2 mm to 0.09
sqm
mm aggregates using bitumen as wearing course on a previously prepared base, including mixing in a suitable plant as per Drawing and Technical Specifications., Type - B
Spec. cl. No: 1310
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.10_b Skilled day 6 0 0 Stone crushed aggregates 13.2 mm to 0.09 mm cum 276.75 0 0 Smooth wheeled hour 6 0 0
Unskilled day 16 0 0 Bitumen tonne 19.48 0 0 Paver finisher hour 6 0 0
Type - B Loader hour 6 0 0
Generator hour 6 0 0
HMP hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Seal Surfacing, Providing and laying seal coat sealing the voids in a bituminous surface as per Drawing and Technical Specifications. sqm
Spec. cl. No: 1310
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.11 Unskilled day 6 0 0 Crushed stone chipping cum 47.16 #NAME? #NAME? Roller hour 6 0 0
Skilled day 1 0 0 Bitumen tonne 5.34 0 0 Paver finisher hour 6 0 0
Generator hour 3 0 0
HMP hour 3 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = 0
Description of Work: Slurry Seal, Providing and laying slurry seal consisting of a mixture of fine aggregates, Portland cement filler, bituminous emulsion and water on a road surface including cleaning of surface, mixing of slurry seal in a suitable mobile plant, laying and
sqm
compacting to provide even riding surface as per Drawing and Technical Specifications., 5 mm thickness
Spec. cl. No: 1310
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.12.i Unskilled day 8 0 0 Cost of water KL 12 0 0 Pneumatic tired roller hour 6 0 0
Mobile slurry seal
Skilled day 1 0 0 Filler tonne 3.52 0 hour 6 0 0
0 equipment
Fine aggregate 4.75 mm cum 102.08 0 0 Air compressor hour 6 0 0
Binder tonne 19.36 0 0 Mechanical broom hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Slurry Seal, Providing and laying slurry seal consisting of a mixture of fine aggregates, Portland cement filler, bituminous emulsion and water on a road surface including cleaning of surface, mixing of slurry seal in a suitable mobile plant, laying and
sqm
compacting to provide even riding surface as per Drawing and Technical Specifications., 3 mm thickness
Spec. cl. No: 1310
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Mobile slurry seal
13.12.ii Unskilled day 7 0 0 Cost of water KL 12 0 hour 6 0 0
0 equipment
Skilled day 1 0 0 Filler tonne 2.64 0 0 Air compressor hour 6 0 0
Fine aggregate 3 mm and below cum 74.8 0 0 Mechanical broom hour 6 0 0
Binder tonne 17.16 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Slurry Seal, Providing and laying slurry seal consisting of a mixture of fine aggregates, Portland cement filler, bituminous emulsion and water on a road surface including cleaning of surface, mixing of slurry seal in a suitable mobile plant, laying and
sqm
compacting to provide even riding surface as per Drawing and Technical Specifications., 1.5 mm thickness
Spec. cl. No: 1310
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No.
Norms
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Mobile slurry seal
13.12.iii Unskilled day 7 0 0 Cost of water KL 12 0 hour 6 0 0
0 equipment
Skilled day 1 0 0 Filler tonne 1.58 0 0 Air compressor hour 6 0 0
Fine aggregate 2.36 mm cum 43.3 0 0 Mechanical broom hour 6 0 0
Binder tonne 12.67 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Fog Spray, Providing and applying low viscosity bitumen emulsion for sealing cracks less than 3 mm wide or incipient fretting or disintegration in an existing bituminous surfacing as per Drawing and Technical Specifications. sqm
Spec. cl. No: 1310
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Bitumen emulsion
13.13 Unskilled day 4 0 0 Bitumen emulsion tonne 7.88 0 tonne 6 0 0
0 pressure distributor
Skilled day 1 0 0 Air compressor hour 6 0 0
Mechanical broom hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Fog Spray, Providing and applying low viscosity bitumen emulsion for sealing cracks less than 3 mm wide or incipient fretting or disintegration in an existing bituminous surfacing as per Drawing and Technical Specifications., Blind the fog spray sqm
Spec. cl. No: 1310
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Bitumen emulsion
13.13_a Unskilled day 10 0 0 Bitumen emulsion tonne 8.67 0 tonne 6 0 0
0 pressure distributor
Skilled day 2 0 0 Crushed stone grit 3 mm cum 26.25 0 0 Air compressor hour 6 0 0
Mechanical broom hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Bituminous Cold Mix ( Including Gravel Emulsion), Providing, laying and rolling of bituminous cold mix on prepared base consisting of a mixture of unheated mineral aggregate and emulsified or cutback bitumen, including mixing in a plant of
cum
suitable type as per Drawing and Technical Specifications., Using bitumen emulsion and 9.5 mm or 13.2 mm size aggregate
Spec. cl. No: 1313
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Smooth wheeled steel
13.14.i Skilled day 6 0 0 Aggregates size 6 to 0.075 mm cum 108 0 hour 6 0 0
0 tandem roller
Unskilled day 16 0 0 Aggregates size 9.5 to 6 mm cum 87 0 0 Pneumatic tired roller hour 6 0 0
Aggregates size 19 to 9.5 mm cum 75 0 0 Paver finisher hour 6 0 0
Filler (lime) tonne 9 0 0 Generator hour 6 0 0
Bitumen emulsion tonne 36 0 0 Drum mix plant hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Bituminous Cold Mix ( Including Gravel Emulsion), Providing, laying and rolling of bituminous cold mix on prepared base consisting of a mixture of unheated mineral aggregate and emulsified or cutback bitumen, including mixing in a plant of
cum
suitable type as per Drawing and Technical Specifications., Using bitumen emulsion and 19 mm or 26.5 mm nominal size aggregate
Spec. cl. No: 1313
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Smooth wheeled steel
13.14.ii Skilled day 6 0 0 Aggregates size 6 to 0.075 mm cum 105 0 hour 6 0 0
0 tandem roller
Unskilled day 16 0 0 Aggregates size 19 to 6 mm cum 90 0 0 Pneumatic tired roller hour 6 0 0
Aggregates size 37.5 to 19 mm cum 75 0 0 Paver finisher hour 6 0 0
Filler (lime) tonne 9 0 0 Generator hour 6 0 0
Drum mix plant for
Bitumen emulsion tonne 36 0 hour 6 0 0
0 cold mixes
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Bituminous Cold Mix ( Including Gravel Emulsion), Providing, laying and rolling of bituminous cold mix on prepared base consisting of a mixture of unheated mineral aggregate and emulsified or cutback bitumen, including mixing in a plant of
cum
suitable type as per Drawing and Technical Specifications., Using cutback bitumen and 9.5 mm or 13.2 mm nominal size aggregate
Spec. cl. No: 1313
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Smooth wheeled steel
13.14.iii Skilled day 6 0 0 Aggregates size 6 to 0.075 mm cum 108 0 hour 6 0 0
0 tandem roller
Unskilled day 16 0 0 Aggregates size 9.5 to 6 mm cum 93 0 0 Pneumatic tired roller hour 6 0 0
Aggregates size 19 to 9.5 mm cum 78 0 0 Paver finisher hour 6 0 0
Filler (lime) tonne 9 0 0 Generator hour 6 0 0
Drum mix plant for
Cutback bitumen tonne 22.5 0 hour 6 0 0
0 cold mixes
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Bituminous Cold Mix ( Including Gravel Emulsion), Providing, laying and rolling of bituminous cold mix on prepared base consisting of a mixture of unheated mineral aggregate and emulsified or cutback bitumen, including mixing in a plant of
cum
suitable type as per Drawing and Technical Specifications., Using cutback bitumen and 19 mm or 26.5 mm nominal size aggregate
Spec. cl. No: 1313
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Smooth wheeled steel
13.14.iv Skilled day 6 0 0 Aggregates size 6 to 0.075 mm cum 114 0 hour 6 0 0
0 tandem roller
Unskilled day 16 0 0 Aggregates size 19 to 6 mm cum 90 0 0 Pneumatic tired roller hour 6 0 0
Aggregates size 37.5 to 19 mm cum 75 0 0 Paver finisher hour 6 0 0
Filler (lime) tonne 9 0 0 Generator hour 6 0 0
Drum mix plant for
Cutback bitumen tonne 22.5 0 hour 6 0 0
0 cold mixes
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Sand Asphalt Base Course, Providing, laying and rolling sand-asphalt base course composed of sand, mineral filler and bituminous binder on a prepared sub-grade or sub-base as per Drawing and Technical Specifications. cum
Spec. cl. No: 1312
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.15. Skilled day 6 0 0 Sand of size 4.75 to 0.075 mm cum 288.62 0 0 Vibratory roller hour 6 0 0
Unskilled day 16 0 0 Filler (lime) tonne 9 0 0 smooth wheeled roller hour 12 0 0
Bitumen tonne 22.5 0 0 Paver finisher hour 6 0 0
Generator hour 6 0 0
Hot Mix Plant hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Anti- Stripping agent, Providing and mixing of Anti stripping agent as per Design/ direction of Engineer kg
Spec. cl. No: 1300
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 3 percent of
13.16 Unskilled day 1 0 0 Additive material kg 210 0 Labour component for 0
0 T&P
Skilled day 0.01 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Bitumen Cutter, Providing and mixing of Bitumen cutter as per design / direction of Engineer lit
Spec. cl. No: 1300
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 3 percent of
13.17 Unskilled day 1 0 0 Kerosene/ Diesel cutter Lit 210 0 Labour component for 0
0 T&P
Skilled day 0.01 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Modified Binder, Supply of modified binder (produced by mixing bitumen with modifier such as natural rubber or crumb rubber or any other polymer found compatible with bitumen) as per Specifications and direction of the Engineer. tonne
Spec. cl. No: 1300
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.18 Modified binder tonne 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Otta seal, Providing and laying Otta seal surface as wearing course in single coat using river bed shingles /aggregates of specified size ( 0- 16 mm) laid on prepared surface as per Drawing and Technical Specifications. sqm
Spec. cl. No: 1315
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.19 Skilled day 2 0 0 Crushed stone chipping, 0-16 mm size cum 67.2 0 0 Smooth wheeled roller hour 24 0 0
Unskilled day 18 0 0 Bitumen tonne 6.43 0 0 Bitumen Sprayer hour 6 0 0
Hydraulic self
propelled chip hour 6 0 0
spreader
Air compressor hour 6 0 0
Bitumen Boiler hour 4.2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Recipe Cold Mix, Providing and laying of premix of crushed stone aggregates and emulsion binder, mixed in a batch type cold mixing plant, laid over prepared surface, by paver finisher, rolled with a pneumatic tired roller initially and finished with a
cum
smooth steel wheel roller, all as per specifications., 75 mm thickness
Spec. cl. No: 1313
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Smooth wheeled steel
13.20.i Skilled day 6 0 0 Cost of water KL 6 0 hour 6 0 0
0 roller
Unskilled day 12 0 0 Crushed stone aggregates 40 mm nominal size cum 297 0 0 Pneumatic tired roller hour 6 0 0
Bitumen emulsion tonne 20.25 0 0 Paver finisher hour 6 0 0
Generator hour 6 0 0
Cold mix plant hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Recipe Cold Mix, Providing and laying of premix of crushed stone aggregates and emulsion binder, mixed in a batch type cold mixing plant, laid over prepared surface, by paver finisher, rolled with a pneumatic tired roller initially and finished with a
cum
smooth steel wheel roller, all as per specifications., 40 mm thickness
Spec. cl. No: 1313
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Smooth wheeled steel
13.20.ii Skilled day 6 0 0 Cost of water KL 6 0 hour 6 0 0
0 roller
Unskilled day 12 0 0 Crushed stone aggregates 14 mm nominal size cum 287 0 0 Pneumatic tired roller hour 6 0 0
Bitumen emulsion tonne 31.5 0 0 Paver finisher hour 6 0 0
Generator hour 6 0 0
Cold mix plant hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Recipe Cold Mix, Providing and laying of premix of crushed stone aggregates and emulsion binder, mixed in a batch type cold mixing plant, laid over prepared surface, by paver finisher, rolled with a pneumatic tired roller initially and finished with a
cum
smooth steel wheel roller, all as per specifications., 25 mm thickness
Recipe Cold Mix, Providing and laying of premix of crushed stone aggregates and emulsion binder, mixed in a batch type cold mixing plant, laid over prepared surface, by paver finisher, rolled with a pneumatic tired roller initially and finished with a
cum
smooth steel wheel roller, all as per specifications., 25 mm thickness
Spec. cl. No: 1313
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Smooth wheeled steel
13.20.iii Skilled day 6 0 0 Cost of water KL 6 #NAME? hour 6 0 0
#NAME? roller
Unskilled day 12 0 0 Crushed stone aggregates 6 mm nominal size cum 270 0 0 Pneumatic tired roller hour 6 0 0
Bitumen emulsion tonne 38.25 0 0 Paver finisher hour 6 0 0
Generator hour 6 0 0
Cold mix plant hour 6 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = 0
Description of Work: Mastic Asphalt, Providing and laying 25 mm thick mastic asphalt wearing course excluding prime coat with paving grade bitumen including providing antiskid surface with bitumen pre-coated fine grained hard stone chipping at an spacing of 10
sqm
cm center to center in both directions all complete as per Drawing and Technical specifications.
Spec. cl. No: 1300
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
13.21 Skilled day 4 0 0 Bitumen for coating of chips @ 2 % by weight kg 2.2 0 0 Tractor hour 1 0 0
Pre-coated stone chips of 13 mm nominal size @ 0.005 cum
Unskilled day 40 0 0 cum 0.08 0 Bitumen boiler hour 6 0 0
per 10 sqm 0
Coarse aggregates 6.3 mm to 13.2 mm size @ 40 % cum 2.42 0 0 Mastic cooker hour 6 0 0
Lime stone dust @ 17.92 % tonne 1.58 0 0 Air compressor hour 1 0 0
Crusher stone dust @ 31.9 % cum 1.72 0 0 Mechanical broom hour 1 0 0
Bitumen @ 10.2 % by weight of mix tonne 0.86 0 0
Proportion of Material required for mastic asphalt with coarse
aggregates
Coarse aggregate(3.35 mm to 9.5 mm size) = 40 per cent .
Base mastic (without coarse aggregates) = 60 per cent
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Brick work for footpath, Providing and laying flat brick over 60 mm thick sand bed in footpath including excavation sand bedding all complete as per specification. 20 sqm
Spec. cl. No: 1403
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
14.5.B Unskilled day 4.00 0 0 sand cum 1.40 0 0
Skilled day 1.50 0 0 Brick nos 750.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Precast Cement Concrete M 20 Kerb , Providing and laying of /20 precast cement concrete Kerb 38 cm * 20 cm * 25 cm ( H*B*L) with 12 mm thick 1:3 cement sand mortar bedding and joints including foundation excavation levelling but excluding
400 meter
foundation concrete for foundation or sand gravel material, all complete as per Drawing and Technical Specifications.
Spec. cl. No: 1401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
14.1 Unskilled day 16.00 0 0 Cost of water KL 0.20 0 0 Concrete Mixer hour 12.00 0 0
Skilled day 3.00 0 0 Cement tonne 0.52 0 0 Kerb Casting Machine hour 6.00 0 0
Coarse sand 30 per cent cum 1.20 0 0
Precast / cast in situ concrete block of /20 Concrete ( 0.38 m *
nos 1600.00 #NAME?
0.20 m * 0.25 m (H*B*L)) #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Cast in Situ Cement Concrete or natural stone block for footpath, Providing and laying of precast / cast in situ 50 mm thick cement concrete slab footpath on 12 mm thick 1: 3 cement sand mortar over the prepared base, all complete as per
10 sqm
Drawing and Technical Specifications.
Spec. cl. No: 1401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
14.2.A Unskilled day 4.00 0 0 Cost of water KL 0.02 0 0
Skilled day 1.50 0 0 Cement tonne 0.07 0 0
Coarse sand cum 0.13 0 0
Precast / cast in situ concrete block of M 20/20 ( 50 mm CC
sqm 11.00 #NAME?
Block) #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
, Providing and laying 25 mm thick Natural stone slab footpath on 12 mm thick 1: 3 cement sand mortar over the prepared base, all complete as per specification. 10 sqm
Spec. cl. No: 1401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
14.2.B Unskilled day 3.00 0 0 Cost of water KL 0.02 0 0
Skilled day 2.00 0 0 Cement tonne 0.07 0 0
sand cum 0.13 0 0
50 mm thick natural stone slab sqm 11.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Cast in Situ Cement Concrete Kerb , Providing and laying cement concrete Kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm
360 meter
projection beyond Kerb stone, Kerb stone laid with Kerb laying machine, foundation concrete laid manually, all complete as per Drawing and Technical Specifications.
Spec. cl. No: 1401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
14.3 Unskilled day 60.00 0 0 Cost of water KL 30.00 0 0 Concrete mixer hour 8.00 0 0
Skilled day 6.00 0 0 Cement tonne 7.53 0 0 Kerb casting machine hour 8.00 0 0
Coarse sand cum 10.90 0 0
Crushed stone aggregate 20 mm cum 21.80 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Cast in Situ Cement Concrete M 20 Kerb with Channel, Providing and laying cement concrete Kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on grade foundation 150 mm thick, Kerb
300 meter
channel 300 mm wide, 50 mm thick in PCC grade, sloped towards the Kerb, Kerb stone with channel laid with Kerb laying machine, foundation concrete laid manually, all complete as specification.
Spec. cl. No: 1401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
14.4 Unskilled day 70.00 0 0 Cost of water KL 36.00 0 0 Water tanker hour 18.00 0 0
Skilled day 6.00 0 0 Cement tonne 11.34 0 0 Concrete mixer hour 18.00 0 0
Coarse sand cum 18.30 0 0 Kerb casting machine hour 18.00 0 0
Crushed stone aggregate 20 mm cum 36.59 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Brick work for footpath, Providing and laying brick on edge over 60 mm thick sand bed in footpath including excavation sand bedding all complete as per Drawing and Technical Specifications. 10 sqm
Spec. cl. No: 1403
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
14.5.A Unskilled day 3.00 0 0 Coarse sand cum 0.70 0 0
Skilled day 1.00 0 0 Brick nos 725.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Kilometer Stone, Providing and Fixing Reinforced cement concrete M 15 grade kilometer Post including painting and printing as per Standard Drawing-2070 and Technical Specifications. position, One kilometer post (precast) 14 no
Spec. cl. No: 1506
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
15.11.ii Unskilled day 7 0 0 Transportation and fixing at site Tractor-trolley hour 3 0 0
cm -
Skilled day 2 0 0 Lettering on km post 1680 #NAME?
letter #NAME?
Painting two coats on concrete surface sqm 11.9 #NAME? #NAME?
Excavation in soil for foundation cum 2.38 0 0
Steel reinforcement as per standard drawing kg 82.88 #NAME? #NAME?
M-10 grade of concrete cum 2.38 #NAME?
M-15 grade of concrete cum 1.4 #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Non Reflective Traffic Signs, Providing and fixing of Non reflective warning, mandatory and informatory sign board of 2 mm thick MS Sheet with back support frame fixed on heavy 50 mm tube or Channel section
4 no
of 75 mm X 40 mm firmly fixed to the ground by means of properly designed foundation with M 10/40 grade cement concrete 300 mm x 300 mm x 300 mm, l as per drawings and Technical Specification/ DOR Publication.
Spec. cl. No: 1501
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
15.1 Unskilled day 2 0 0 90 cm height equilateral triangle sqm 1 #NAME? #NAME? Tractor-trolley hour 3 0 0
Add 2 per cent of cost of angle iron towards cost of drilling
Skilled day 1 0 0 0
holes, nuts, bolts etc.
Angle iron 50 x 50 x 6 mm for hold fast including 5%
kg 4.24 #NAME?
wastage #NAME?
Painting angle iron post two coats sqm 3.51 #NAME? #NAME?
Cement concrete M 10 grade cum 0.11 #NAME?
Excavation for foundation cum 0.21 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Retro-Reflectorized Traffic Signs, Providing and fixing of retro- reflectorized warning, Regulatory and informatory sign as per specification clause 1501 made of high intensity grade sheeting , fixed over aluminum sheeting, 1.5 mm thick supported on
a 50 mm internal dia steel tube or mild steel angle iron post 75 mm x 40 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M 10/40 grade cement concrete 30 cm x 30 cm , 30 cm below ground level or as per 10 no
Spec. cl. No: 1501 Drawing and Technical Specifications.
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
15.2 Unskilled day 3 0 0 90 cm height equilateral triangle sqm 2.4 #NAME? #NAME? Tractor-trolley hour 3 0 0
Add 2 per cent of cost of angle iron towards cost of drilling
Skilled day 1 0 0 0
holes, nuts, bolts etc.
Aluminum sheeting fixed with encapsulated lens type
reflective sheeting of size including lettering and signs as
applicable
Mild steel angle iron 75 x 40 x 6 mm, 3. m long @ 6.8 kg/m kg 204 #NAME? #NAME?
Painting angle iron post two coats sqm 8.78 #NAME? #NAME?
Cement concrete M 10 grade cum 0.27 #NAME?
Excavation for foundation cum 0.54 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Overhead Signs, Providing and erecting overhead signs with a corrosion resistant 2 mm thick aluminum alloy sheet reflectorized with micro prismatic retro-reflective type with vertical and lateral clearance as per drawing and installed as per
1 tonne
Specification over a designed support system of aluminum alloy or galvanized steel trusses of sections and type as per structural design requirements , Drawing and Technical Specifications., Truss and Vertical Support
Spec. cl. No: 1502
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 15 per cent on cost of Material for fabrication of trusses
15.3.A Unskilled day 6 0 0 0 Truck hour 6 0 0
as per approved design
Skilled / Add 1 per cent on cost of Material for nuts, bolts and drilling
day 1 0 0 0 Crane hour 6 0 0
Blacksmith and welding consumables
Aluminum alloy/galvanized steel including 5 per cent wastage tonne 1.05 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Overhead Signs, Providing and erecting overhead signs with a corrosion resistant 2 mm thick aluminum alloy sheet reflectorized with micro prismatic retro-reflective type with vertical and lateral clearance as per drawing and installed as per
10 sqm
Specification over a designed support system of aluminum alloy or galvanized steel trusses of sections and type as per structural design requirements , Drawing and Technical Specifications., Aluminum Alloy Plate for Over Head Sign
Spec. cl. No: 1502
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 1 per cent of cost of Labour for lifting arrangement, like
15.3.B Unskilled day 3 0 0
ladders, pulleys, ropes etc. 0
Skilled/
day 2 0 0 Miscellaneous
Blacksmith
Aluminum alloy plate, 2 mm thick, fixed with Retro reflective
sqm 11 #NAME?
sheeting #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Painting Two Coats on Concrete Surfaces, Providing and Painting two coats after filling the surface with synthetic enamel paint in all shades on concrete / plaster surfaces as per Drawing and Technical Specifications. 10 sqm
Spec. cl. No: 1501
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add @ 5 per cent cost of Labour and Materials to prepare the
15.4 Unskilled day 2 0 0 surface by filling minutes roughness on the surface and 0
priming the surface before laying 2 coats of painting.
Add for scaffolding @ 1 per cent of Labour cost where
Skilled /Painter day 3 0 0
required 0
Paint liter 6 #NAME? #NAME?
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Painting on Steel Surfaces, Providing and applying two coats of ready mix paint of approved brand on steel surface after through cleaning of surface to give an even shade as per Drawing and Technical Specifications. 20 sqm
Spec. cl. No: 1501
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add @ 5 per cent cost of Labour and Materials to prepare the
15.5 Unskilled day 1 0 0 surface by filling minutes roughness on the surface and 0
priming the surface before laying 2 coats of painting.
Skilled/ Painter day 1 0 0 Add @ 1 per cent on cost of Material for scaffolding 0
Paint liter 2.5 #NAME? #NAME?
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Painting on Wood Surfaces, Providing and applying two coats of ready mix paint of approved brand on wood surface after thorough cleaning of surface to give an even shade as per Drawing and Technical Specifications. 15 sqm
Spec. cl. No: 1509
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add @ 5 per cent cost of Labour and Materials to prepare the
15.6 Unskilled day 1 0 0 surface by filling minutes roughness on the surface and 0
priming the surface before laying 2 coats of painting.
Skilled / Painter day 1 0 0 Add @ 1 per cent on cost of Material for scaffolding 0
Paint liter 2.25 #NAME? #NAME?
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Painting Lines, Dashes, Arrows etc. on Roads in Two Coats, Providing required material and Painting lines, dashes, arrows etc. on roads in two coats on new work with ready mixed road marking paint conforming to NS 408/ IS 164 on bituminous
10 sqm
surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per Drawing and Technical Specifications., Over 10 cm in width
Spec. cl. No: 1503
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
15.7.i Unskilled day 2 0 0 Road marking Paint as per NS 408/ IS :164 liter 1.48 #NAME? #NAME?
Skilled/ Painter day 1 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Painting Lines, Dashes, Arrows etc. on Roads in Two Coats, Providing required material and Painting lines, dashes, arrows etc. on roads in two coats on new work with ready mixed road marking paint conforming to NS 408/ IS 164 on bituminous
10 sqm
surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per Drawing and Technical Specifications., Up to 10 cm in width
Spec. cl. No: 1503
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
15.7.ii Unskilled day 2 0 0 Road marking paint liter 1.48 #NAME? #NAME?
Skilled / Painter day 1 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Painting Lines, Dashes, Arrows etc. on Roads in Two Coats on Old Work, Providing required materials and Painting lines, dashes, arrows etc. on roads in two coats on old work with ready mixed road marking paint conforming to NS 408/ IS: 164 on
10 sqm
bituminous surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per Drawing and Technical Specifications., over 10 cm in width
Spec. cl. No: 1503
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
15.8.i Unskilled day 2 0 0 Road marking paint liter 0.9 #NAME? #NAME?
Skilled / Painter day 1 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Painting Lines, Dashes, Arrows etc. on Roads in Two Coats on Old Work, Providing required materials and Painting lines, dashes, arrows etc. on roads in two coats on old work with ready mixed road marking paint conforming to NS 408/ IS: 164 on
10 sqm
bituminous surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per Drawing and Technical Specifications., Up to 10 cm in width
Spec. cl. No: 1503
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
15.8.ii Unskilled day 2 0 0 Road marking Paint liter 0.9 #NAME? #NAME?
Skilled / Painter day 1 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Road Marking with Hot Applied Thermoplastic Compound with Reflectorizing Glass Beads on Bituminous Surface, On smooth surface (similar to Asphalt concrete and rigid pavement), Providing and laying of hot applied thermoplastic compound at
400 sqm
least 2 mm thick including reflectorizing glass beads as per DOR Traffic sign manual/ Specifications .The finished surface to be level, uniform and free from streaks and holes.
Spec. cl. No: 1504
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
15.9.i Unskilled day 4 0 0 Reflectorizing glass beads kg 100 #NAME? #NAME? Tractor-trolley hour 10 0 0
Road marking
machine ( boiler +
Skilled / Painter day 2 0 0 Hot applied thermoplastic compound liter 930 #NAME? hour 10 0 0
Applicator +
#NAME? Template)
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Road Marking with Hot Applied Thermoplastic Compound with Reflectorizing Glass Beads on Bituminous Surface, On rough surface ( similar to surface dressing), Providing and laying of hot applied thermoplastic compound at least 2 mm thick
300 sqm
including reflectorizing glass beads as per DOR Traffic sign manual/ Specifications .The finished surface to be level, uniform and free from streaks and holes.
Spec. cl. No: 1504
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
15.9.ii Unskilled day 4 0 0 Reflectorizing glass beads kg 150 #NAME? #NAME? Tractor-trolley hour 10 0 0
Road marking
machine ( boiler +
Skilled / Painter day 2 0 0 Hot applied thermoplastic compound liter 1200 #NAME? hour 10 0 0
Applicator +
#NAME? Template)
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and fixing of road stud 100x 100 mm, die-cast in aluminum, resistant to corrosive effect of salt and grit, fitted with lenses reflectors, installed in concrete or asphaltic surface by drilling hole 30 mm upto a depth of 60 mm and bedded in a
suitable bituminous grout or epoxy mortar, all as per Specification clause 1505., Providing and fixing of road stud 100 x 100 mm, die-cast in aluminum, resistant to corrosive effect of salt and grit, fitted with lenses reflectors, installed in concrete or 50 no
Spec. cl. No: 1505 asphaltic surface by drilling hole 30 mm upto a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per Drawing and Technical Specifications.
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
15.10' Unskilled day 2 0 0 Add 10 per cent of cost of Material for fixing and installation 0
Skilled day 1 0 0 Aluminum studs 100 x 100 mm fitted with lenses reflectors nos. 50 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Kilometer Stone, Providing and Fixing Reinforced cement concrete M 15 grade kilometer Post including painting and printing as per Standard Drawing-2070 and Technical Specifications. position, Five kilometer Post (precast) 6 no
Spec. cl. No: 1506
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
15.11.i Unskilled day 6 0 0 Transportation and fixing at site Tractor-trolley hour 3 0 0
cm-
Skilled day 1 0 0 Lettering on km post 1800 #NAME?
letter #NAME?
Painting two coats on concrete surface sqm 10.2 #NAME? #NAME?
Excavation in soil for foundation cum 1.2 0 0
Steel reinforcement kg 63.6 #NAME? #NAME?
M-10 grade of concrete cum 1.2 #NAME?
M-15 grade of concrete cum 1.2 #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Road Delineators Post, Providing and installation of 150 mm * 150 mm 1. 5 m long delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 20 cm wide strips, buried or
30 no
pressed into the ground and conforming to the drawings and Technical Specifications.
Spec. cl. No: 1507
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
15.12 Unskilled day 7 0 0 Transportation and fixing Tractor-trolley hour 3 0 0
Skilled (Mason) day 1 0 0 Painting two coats on concrete surface sqm 14.4 #NAME? #NAME?
Excavation in soil for foundation cum 0.47 0 0
Steel reinforcement as per standard drawing ( 4 Nos 8 mm dia
kg 112.8 #NAME?
and 11 Nos 6 mm dia stirrups) #NAME?
M-15 grade of concrete cum 1.01 #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Reinforced Cement Concrete Crash Barrier, Providing and Fixing Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-20 grade concrete with HYSD reinforcement and
10 meter
dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-molded asphalt filler board, keyed to the structure on which it is built and installed as per design, Drawing and Technical Specifications.
Spec. cl. No: 1508
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
15.13.i Unskilled day 2 0 0 Excavation and backfilling : 25 % of Labour component
Skilled day 1 0 0 Pre-molded asphalt filler board sqm 0.32 #NAME? #NAME?
HYSD steel reinforcement including dowel bars ( providing
tonne 0.28 #NAME?
and laying all complete) #NAME?
M 20 grade concrete cum 3 #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Metal Beam Crash Barrier, Type - A, "W" : Metal Beam Crash Barrier, Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series
channel vertical post, 150 x 75 x 5 mm spaced 2 m center to center, 1.8 m high, 1.1 m below ground/road level metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per Drawing and 40 meter
Spec. cl. No: 1509 Technical Specifications.
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 25 per cent of the cost of Material for fabrication, nuts,
15.14.A Unskilled day 10 0 0 0 Tractor-trolley hour 3 0 0
bolts and washers etc.)
Skilled
day 1 0 0 E/W excavation for post cum 0.99 #NAME?
(Blacksmith) #NAME?
M 20 grade concrete cum 0.99 #NAME?
Hot dip galvanized Spacer Channel 150 x 75 x 5 mm kg 127.51 #NAME? #NAME?
Hot dip galvanized Channel post 150 x 75 x 5 mm, kg 695.52 #NAME? #NAME?
Hot dip galvanized Corrugated W beam sheet 3 mm thick kg 563.61 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Metal Beam Crash Barrier, Type - B, "THRIE" : Metal Beam Crash Barrier, Providing and erecting a "Thrie" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 85 cm above road/ground level, fixed on ISMC
series channel vertical post, 150 x 75 x 5 mm spaced 2 m center to center, 2.1 m high with 1.3 m below ground level, metal beam rail to be fixed on the vertical post with a space of channel section 150 x 75 x 5 mm, 546 mm long complete as per Drawing 40 meter
Spec. cl. No: 1509 and Technical specifications.
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 25 per cent of the cost of Material for fabrication, nuts,
15.14.B Unskilled day 12 0 0 0 Tractor-trolley hour 3 0 0
bolts and washers etc.)
Skilled(Blacksmi
day 1 0 0 E/W excavation for post cum 1.13 #NAME?
th) #NAME?
M 20 grade concrete cum 1.13 #NAME?
Hot dip galvanized Spacer Channel 150 x 75 x 5 mm , kg 137.64 #NAME? #NAME?
Hot dip galvanized Channel post 150 x 75 , 5 mm kg 811.44 #NAME? #NAME?
Hot dip galvanized Corrugated thrie beam sheet 3 mm thick kg 913.19 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Metal Beam Crash Barrier, Flexible Crash Barrier, Wire Rope Safety Barrier, Providing and erecting a wire rope safety barrier with vertical posts of medium weight RS Joist (ISMB series) 100 mm x 75 mm (11.50 kg/m), 1.50 m long 0.85 m above
Description of Work: ground and 0.65 m below ground level, split at the bottom for better grip, embedded in M 15 grade cement concrete 450 x 450 x 450 mm, 1.50 m center to center and with 4 horizontal steel wire rope 40 mm dia and anchored at terminal posts 15 m
15 meter
apart. Terminal post to be embedded in M 15 grade cement concrete foundation 2400 x 450 x 900 mm (depth), strengthened by a strut of RS joist 100 x 75 mm, 2 m long at 450 inclination and a tie 100 x 8 mm, 1.50 m long at the bottom, all embedded
Spec. cl. No: 1509
in foundation concrete as per design , Drawing and Technical Specifications.
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Skilled
15.14.C day 2 0 0 Applying 2 coats of painting on exposed surface sqm 16.5 #NAME? Tractor-trolley hour 3 0 0
(Blacksmith) #NAME?
Unskilled day 4 0 0 Painting
Add 5 per cent of cost of Material for drilling, gripping, fixing,
#NAME?
fabrication and welding consumables
E/W excavation for post cum 1.13 #NAME? #NAME?
M 20 grade concrete cum 1.13 #NAME?
Steel wire rope 40 mm, kg 65 #NAME? #NAME?
Tie 2 Nos. of 8 mm steel plate, 1.5 sqm each for terminal posts kg 188.4 #NAME?
#NAME?
Struts - 2 Nos. for terminal posts, 2 m long each 2 x 2 x 11.50 kg 46 #NAME? #NAME?
RS Joist 100 x 75 mm - 16.5 m kg 190 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Anti-Glare Devices in Median, Plantation, Providing and Plantation of shrubs and plants of approved species in the median. apart from cutting off glare from vehicle coming from opposite direction,
Spec. cl. No: 2800/1500
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Anti-Glare Devices in Median, Anti-glare screen with 25 mm steel pipe framework fixed with circular and rectangular vans, Providing and erecting an anti - glare screen with 25 mm dia vertical pipes fabricated and framed in the form of panels of one
meter length and 1.75 meter height fixed with circular vane 250 mm dia at top and rectangular vane 600 x 300 mm at the middle, made out of steel sheet of 3 mm thickness, end vertical pipes of the panel made larger for embedding in foundation 10 meter
Spec. cl. No: 2800/1500 concrete, applying 2 coats of paint on all exposed surfaces, all as per design , drawings and Technical Specifications.
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 5 per cent cost of Material for fabrication, welding, Applying 2 coats of painting on
15.15.B Unskilled day 2 0 0 0 sqm 18.3 0 0
bending, nuts, bolts etc. exposed surface
Skilled day 1 0 0 MS sheet for 250 mm dia circular vane 3 mm thick, 4 numbers kg 48 #NAME?
#NAME?
MS sheet for 600 x 300 x 3 mm rectangular vane, kg 43.2 #NAME? #NAME?
25 mm steel pipe meter 160 #NAME?
#NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Anti-Glare Devices in Median, Anti-glare screen with rectangular vane of MS sheet, Providing and erecting anti - glare screen with rectangular vanes of size 750 x 500 mm made from MS sheet, 3 mm thick and fixed on MS angle 50 x 50 x 6 mm at an
angle of 450 to the direction of flow of traffic, 1.5 m center to center, top edge of the screen 1.75 m above ground level, vertical post firmly embedded in M-15 cement concrete foundation 0.60 m below ground level, applying 2 coats of paint on exposed 15 meter
Spec. cl. No: 2800/1500 faces, all complete as per design , Drawing and Technical Specifications.
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
15.15.C Unskilled day 2 0 0 Applying 2 coats of painting sqm 8.5 #NAME? #NAME? Tractor-trolley hour 3 0 0
Skilled day 1 0 0 Painting
Add 5 per cent of cost of Material for fabrication, nuts, bolts
#NAME?
etc.
MS sheet 3 mm thick @ 24 kg/sqm kg 90 #NAME? #NAME?
Angle iron post, 50 x 50 x 6 mm, length 2.35 m kg 106 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Street Lighting, Providing and erecting street light mounted on a steel circular hollow pole of standard specifications for street lighting, 9 m high spaced 40 m apart, 1.8 m overhang on both sides if fixed in the median and on one side if fixed on the
1 no
footpath, fitted with sodium vapor lamp and fixed firmly in concrete foundation as per design , Drawing and Technical Specifications..
Spec. cl. No: missing
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Skilled Providing two coats of aluminum paint over steel circular
15.16 day 1 0 0 sqm 4.63 #NAME?
(Electrician) hollow pipe with overhang on one side #NAME?
Unskilled day 1 0 0 For fixing in Footpath
Providing two coats of aluminum paint over steel circular
sqm 5.75 #NAME?
hollow pipe with overhang on both sides #NAME?
For Fixing in Median
Painting
Add 5 per cent of cost of Material for holder, electric cable,
#NAME?
insulation, ladder, scaffolding etc.
Sodium vapor lamp nos 1 #NAME? #NAME?
Steel circular hollow pole of standard specification for street
nos 1 #NAME?
lighting to mount light at 9 m height above road level #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Rumble Strips, Providing and making of Rumble strips with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint.,
100 sqm
Provision of 15 Nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint.
Spec. cl. No: 1300
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
The rate per sqm of premix carpet and road marking may be
15.17 adopted from chapter 13 & 15 respectively for the quantities
calculated from approved drawings
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing, Boring and installing bored cast-in-situ RCC Pile excluding Reinforcement and Concrete in all types of soil including Bentonite and other consumable and removal of excavated earth with necessary lifts and lead all complete as per
5 meter
Drawing and Technical Specifications., Pile diameter-750 mm
Providing, Boring and installing bored cast-in-situ RCC Pile excluding Reinforcement and Concrete in all types of soil including Bentonite and other consumable and removal of excavated earth with necessary lifts and lead all complete as per
5 meter
Drawing and Technical Specifications., Pile diameter-750 mm
Spec. cl. No: 1612
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
16.1.C Unskilled day 15.00 0 0 Bentonite kg 150.00 0 0 Bentonite pump hour 4.50 0 0
Skilled day 2.00 0 0 Crane hour 4.50 0 0
Piling rig ( with all
hour 4.50 0 0
accessories)
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing, Boring and installing bored cast-in-situ RCC Pile excluding Reinforcement and Concrete in all types of soil including Bentonite and other consumable and removal of excavated earth with necessary lifts and lead all complete as per
5 meter
Drawing and Technical Specifications., Pile diameter-500 mm
Spec. cl. No: 1612
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
16.1.A Unskilled day 7.00 0 0 Bentonite kg 75.00 0 0 Bentonite pump hour 2.50 0 0
Skilled day 1.00 0 0 Crane hour 2.50 0 0
piling rig with all
hour 2.50 0 0
accessories
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing, Boring and installing bored cast-in-situ RCC Pile excluding Reinforcement and Concrete in all types of soil including Bentonite and other consumable and removal of excavated earth with necessary lifts and lead all complete as per
5 meter
Drawing and Technical Specifications., Pile diameter-600 mm
Spec. cl. No: 1612
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
16.1.B Unskilled day 10.00 0 0 Bentonite kg 100.00 0 0 Bentonite pump hour 3.00 0 0
Skilled day 1.00 0 0 Crane hour 3.00 0 0
piling rig ( with all
hour 3.00 0 0
accessories)
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing, Boring and installing bored cast-in-situ RCC Pile excluding Reinforcement and Concrete in all types of soil including Bentonite and other consumable and removal of excavated earth with necessary lifts and lead all complete as per
5 meter
Drawing and Technical Specifications., Pile diameter-1000 mm
Spec. cl. No: 1612
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
16.1.D Unskilled day 20.00 0 0 Bentonite kg 220.00 0 0 Bentonite pump hour 6.00 0 0
Skilled day 2.00 0 0 Crane hour 6.00 0 0
piling rig ( with all
hour 6.00 0 0
accessories)
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing, Boring and installing bored cast-in-situ RCC Pile excluding Reinforcement and Concrete in all types of soil including Bentonite and other consumable and removal of excavated earth with necessary lifts and lead all complete as per
5 meter
Drawing and Technical Specifications., Pile diameter-1200 mm
Spec. cl. No: 1612
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
16.1.E Unskilled day 25.00 0 0 Bentonite kg 320.00 0 0 Bentonite pump hour 7.50 0 0
Skilled day 3.00 0 0 Crane hour 7.50 0 0
piling rig ( with all
hour 7.50 0 0
accessories)
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing, Boring and installing bored cast-in-situ RCC Pile excluding Reinforcement and Concrete in all types of Rock including Bentonite and other consumable and removal of excavated material with necessary lifts and lead all complete as per
5 meter
Drawing and Technical Specifications ., Pile diameter-300 mm
Spec. cl. No: 1612
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
16.2.A Unskilled day 15 0 0 Bentonite kg 25 0 0 Bentonite pump hour 3 0 0
Skilled day 2 0 0 Crane hour 3 0 0
piling rig ( with all
hour 3 0 0
accessories)
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing, Boring and installing bored cast-in-situ RCC Pile excluding Reinforcement and Concrete in all types of Rock including Bentonite and other consumable and removal of excavated material with necessary lifts and lead all complete as per
5 meter
Drawing and Technical Specifications ., Pile diameter-500 mm
Spec. cl. No: 1612
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
16.2.B Unskilled day 20 0 0 Bentonite kg 50 0 0 Bentonite pump hour 4 0 0
Skilled day 2 0 0 Crane hour 4 0 0
Piling rig ( with all
hour 4 0 0
accessories)
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing, Boring and installing bored cast-in-situ RCC Pile excluding Reinforcement and Concrete in all types of Rock including Bentonite and other consumable and removal of excavated material with necessary lifts and lead all complete as per
5 meter
Drawing and Technical Specifications ., Pile diameter-600 mm
Spec. cl. No: 1612
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
16.2.C Unskilled day 30 0 0 Bentonite kg 100 0 0 Bentonite pump hour 5 0 0
Skilled day 3 0 0 Crane hour 5 0 0
Piling rig ( with all
hour 5 0 0
accessories)
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing, Boring and installing bored cast-in-situ RCC Pile excluding Reinforcement and Concrete in all types of Rock including Bentonite and other consumable and removal of excavated material with necessary lifts and lead all complete as per
5 meter
Drawing and Technical Specifications ., Pile diameter-750 mm
Spec. cl. No: 1612
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
16.2.D Unskilled day 30 0 0 Bentonite kg 50 0 0 Bentonite pump hour 6 0 0
Skilled day 3 0 0 Crane hour 6 0 0
Piling rig ( with all
hour 6 0 0
accessories)
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing, Boring and installing bored cast-in-situ RCC Pile excluding Reinforcement and Concrete in all types of Rock including Bentonite and other consumable and removal of excavated material with necessary lifts and lead all complete as per
5 meter
Drawing and Technical Specifications ., Pile diameter-1000 mm
Spec. cl. No: 1612
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
16.2.E Unskilled day 50 0 0 Bentonite kg 75.00 0 0 Bentonite pump hour 9.00 0 0
Skilled day 5 0 0 Crane hour 9.00 0 0
Piling rig ( with all
hour 9.00 0 0
accessories)
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
25
Providing, driving and installing precast RCC. pile of specified size and quality complete as per drawing and & Technical Specification, Pile diameter -300 mm Running
Spec. cl. No: 1613 meter
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No.
Norms
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
16.3.A Unskilled day 5.00 0 0 Casing ( As per design / 0.5 % of cost of concrete) 0 Crane hour 3 0 0
Steel helmet and cushion block on top of casing head during Piling rig ( with all
Skilled day 1.00 0 0 Kg 4.5 0 hour 6 0 0
driving 0 accessories)
M.S. clamps for shoe Kg 6.3 0 0
C.I. shoes for the pile Kg 14.4 0 0
Materials Pile shoes
Reinforcement (as per design or 2.5 % of concrete) kg 378.86 #NAME? 0
RCC Grade M 35 or other as per Design cum 1.94 #NAME?
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
20
Providing, driving and installing precast RCC. pile of specified size and quality complete as per drawing and & Technical Specification, Pile diameter -500 mm Running
Spec. cl. No: 1613 meter
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
16.3.B Unskilled day 5 0 0 Casing ( As per design / 0.5 % of cost of concrete) 0 Crane hour 3 0 0
Steel helmet and cushion block on top of casing head during Piling rig ( with all
Skilled day 1 0 0 Kg 12.5 0 hour 6 0 0
driving 0 accessories)
M.S. clamps for shoe Kg 17.5 0 0
C.I. shoes for the pile Kg 40 0 0
Materials Pile shoes
Reinforcement (as per design or 2.5 % of concrete) kg 841.91 #NAME? 0
Rate for concrete may be adopted same as for bottom plug
RCC Grade M 35 or other as per Design cum 4.32 #NAME?
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: 10
Providing, driving and installing precast RCC. pile of specified size and quality complete as per drawing and & Technical Specification, Pile diameter - 600 mm Running
Spec. cl. No: 1613 meter
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
16.3.C Unskilled day 5 0 0 Casing ( As per design / 0.5 % of cost of concrete) 0 Crane hour 3 0 0
Steel helmet and cushion block on top of casing head during Piling rig ( with all
Skilled day 1 0 0 Kg 18 0 hour 6 0 0
driving 0 accessories)
M.S. clamps for shoe @ 35 Kg per pile of 15 m Kg 25.2 0 0
C.I. shoes for the pile Kg 57.6 0 0
Materials Pile shoes
Reinforcement (as per design or 2.5 % of concrete) kg 606.18 #NAME? 0
RCC Grade M 35 or other as per Design cum 3.11 #NAME?
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
, or providing steel helmet on top of pile head during driving, stacking of piles at site
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Driving Vertical Steel Piles / Sheet piles excluding cost of steel complete as per Drawing and & Technical Specification 2.5 tonne
Spec. cl. No: 1613
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Piling rig ( with all
16.4 Unskilled day 5 0 0 Structural steel/ Sheet pile tonne 0 hour 6 0 0
0 accessories)
Skilled day 1 0 0 Crane hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Plain/Reinforced Cement Concrete excluding reinforcement in Well Foundation all complete as per Drawing and Technical Specifications., Top plug, Grade M 15 PCC 15 cum
Spec. cl. No: 1700, 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
17.3.E.i Skilled day 3 0 0 Cement tonne 4.13 0 0 Concrete mixer hour 6 0 0
Unskilled day 30 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
40 mm Aggregate cum 8.1 0 0
20 mm Aggregate cum 4.05 0 0
10 mm Aggregate cum 1.35 0 0
Cost of water KL 2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Plain/Reinforced Cement Concrete excluding reinforcement in Well Foundation all complete as per Drawing and Technical Specifications., Intermediate plug, Grade M 25 PCC cum
Spec. cl. No: 1700, 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
17.3.D.ii Unskilled day 20 0 0 Admixture Kg 21.6 0 0 Crane hour 6 0 0
Skilled (Mason ) day 3 0 0 10 mm Aggregate cum 2.7 0 0 Generator hour 6 0 0
20 mm Aggregate cum 5.4 0 0 Concrete mixer hour 6 0 0
40 mm Aggregate cum 5.4 0 0
Coarse sand cum 6.75 0 0
Cement tonne 5.99 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing and Constructing of temporary Island for well sinking as per Drawing and instruction of the Engineer., Assuming depth of water 1.0 m and height of island to be 1.25 m. and island 16 m diameter for Construction of Well Foundation for 8
1 no
m dia. Well.
Spec. cl. No: 1700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Consumables @ 2.5
17.1.A Unskilled day 22.00 0 0 Sand bags Nos 750.00 0 per cent of equipment 0
0 cost
Skilled day 0.40 0 0 Earth (compacted) cum 251.20 0 0 Crane hour 20.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Plain/Reinforced Cement Concrete excluding reinforcement in Well Foundation all complete as per Drawing and Technical Specifications., Intermediate plug, Grade M 20 PCC cum
Spec. cl. No: 1700, 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
17.3.D.i Unskilled day 20.00 0 0 Admixture Kg 18.60 0 0 Crane hour 6.00 0 0
Skilled (Mason ) day 3.00 0 0 10 mm Aggregate cum 2.70 0 0 Generator hour 6.00 0 0
20 mm Aggregate cum 5.40 0 0 Concrete mixer hour 6.00 0 0
40 mm Aggregate cum 5.40 0 0
Coarse sand cum 6.75 0 0
Cement tonne 5.55 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Plain/Reinforced Cement Concrete excluding reinforcement in Well Foundation all complete as per Drawing and Technical Specifications., Well cap, RCC Grade M 20 15 cum
Spec. cl. No: 1700, 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
17.3.F.i Unskilled day 20 0 0 10 mm Aggregate cum 5.4 0 0 Generator hour 6 0 0 d) Form Work 0
Skilled (Mason) day 3 0 0 20 mm Aggregate cum 8.1 0 0 Concrete mixer hour 6 0 0
Coarse sand cum 6.75 0 0
Cement tonne 5.12 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and constructing one span service road to reach island location from one pier location to another pier location as per Drawing and instruction of the Engineer., Assuming span length 30 m, width of service road 10 m and depth of water 1 m 30 meter
Spec. cl. No: 1700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
17.1.B Unskilled day 9.00 0 0 Sand bags Nos 300.00 0 0 Tipper hour 24.00 0 0
Skilled day 0.36 0 0 Earth cum 450.00 0 0 Loader hour 24.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and Laying Cutting Edge of Mild Steel for Well Foundation complete as per Drawing and Technical Specification. 1 tonne
Spec. cl. No: 1700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Electrodes, cutting gas and other consumables @ 10 per cent
17.2 Unskilled day 21.00 0 0
of cost of (a) above 0
Skilled (Fitter +
Black smith + day 21.00 0 0 Nuts & bolts Kg 20.00 0
Welder) 0
(for cutting,
bending, making
holes, joining,
Structural steel tonne 1.05 0
welding and
erecting in
position) 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Plain/Reinforced Cement Concrete excluding reinforcement in Well Foundation all complete as per Drawing and Technical Specifications., Well curb, RCC M 20 Grade 15 cum
Spec. cl. No: 1700, 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
d) formwork @ 20 per cent of the cost
17.3.A.i Skilled day 3 0 0 Cement tonne 5.21 0 Concrete mixer hour 6 0 0 0
0 of concrete
Unskilled day 30 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 2.5 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Plain/Reinforced Cement Concrete excluding reinforcement in Well Foundation all complete as per Drawing and Technical Specifications., Well curb, RCC M 25 Grade 15 cum
Spec. cl. No: 1703, 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
d) formwork @ 20 per cent of the
17.3.A.ii Skilled day 3 0 0 Cement tonne 6.05 0 Concrete mixer hour 6 0 0 0
0 cost of concrete
Unskilled day 30 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 24.2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Plain/Reinforced Cement Concrete excluding reinforcement in Well Foundation all complete as per Drawing and Technical Specifications., Well curb, RCC M 30 Grade 15 cum
Spec. cl. No: 1703, 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
17.3.A.ii d) formwork @ 20 per cent of the
Skilled day 3 0 0 Cement tonne 6.05 0 Concrete mixer hour 6 0 0 0
i 0 cost of concrete
Unskilled day 30 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 24.2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Plain/Reinforced Cement Concrete excluding reinforcement in Well Foundation all complete as per Drawing and Technical Specifications., Well Steining, PCC M 20 Grade 15 cum
Spec. cl. No: 1704, 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
d) formwork @ 10 per cent of the
17.3.B.i Skilled day 3 0 0 Cement tonne 5.16 0 Concrete mixer hour 6 0 0 0
0 cost of concrete
Unskilled day 30 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
40 mm Aggregate cum 5.4 0 0
20 mm Aggregate cum 5.4 0 0
10 mm Aggregate cum 2.7 0 0
Cost of water KL 2.5 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Plain/Reinforced Cement Concrete excluding reinforcement in Well Foundation all complete as per Drawing and Technical Specifications., Well Steining, RCC M 20 Grade 15 cum
Spec. cl. No: 1704, 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
d) formwork @ 10 per cent of the
17.3.B.ii Skilled day 3 0 0 Cement tonne 5.21 0 Concrete mixer hour 6 0 0 0
0 cost of concrete
Unskilled day 30 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 2.5 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Plain/Reinforced Cement Concrete excluding reinforcement in Well Foundation all complete as per Drawing and Technical Specifications., Well Steining, RCC M 25 Grade 15 cum
Spec. cl. No: 1704, 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
d) formwork @ 10 per cent of the
17.3.B.iii Skilled day 3 0 0 Cement tonne 6.05 0 Concrete mixer hour 6 0 0 0
0 cost of concrete
Unskilled day 30 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 24.2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Plain/Reinforced Cement Concrete excluding reinforcement in Well Foundation all complete as per Drawing and Technical Specifications., Well Steining, RCC M 30 Grade 15 cum
Spec. cl. No: 1704, 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
d) formwork @ 10 per cent of the
17.3.B.iv Skilled day 3 0 0 Cement tonne 6.1 0 Concrete mixer hour 6 0 0 0
0 cost of concrete
Unskilled day 30 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 24.4 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Plain/Reinforced Cement Concrete excluding reinforcement in Well Foundation all complete as per Drawing and Technical Specifications., Bottom Plug (Concrete to be placed using tremie pipe), PCC Grade M 20 15 cum
Spec. cl. No: 1706
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Description of Work: Providing and laying Plain/Reinforced Cement Concrete excluding reinforcement in Well Foundation all complete as per Drawing and Technical Specifications., Bottom Plug (Concrete to be placed using tremie pipe), PCC Grade M 20, Where
15 cum
underwater concreting in involved
Spec. cl. No: 1706
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Description of Work: Providing and laying Plain/Reinforced Cement Concrete excluding reinforcement in Well Foundation all complete as per Drawing and Technical Specifications., Bottom Plug (Concrete to be placed using tremie pipe), PCC Grade M 25, Where
15 cum
underwater concreting in involved
Description of Work: Providing and laying Plain/Reinforced Cement Concrete excluding reinforcement in Well Foundation all complete as per Drawing and Technical Specifications., Bottom Plug (Concrete to be placed using tremie pipe), PCC Grade M 25, Where
15 cum
underwater concreting in involved
Spec. cl. No: 1706
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Description of Work:
Providing and laying Plain/Reinforced Cement Concrete excluding reinforcement in Well Foundation all complete as per Drawing and Technical Specifications., Bottom Plug (Concrete to be placed using tremie pipe), PCC Grade M 25 15 cum
Spec. cl. No: 1706
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Description of Work:
Providing and laying Plain/Reinforced Cement Concrete excluding reinforcement in Well Foundation all complete as per Drawing and Technical Specifications., Well cap, RCC Grade M 25 15 cum
Spec. cl. No: 1700, 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
17.3.F.ii Unskilled day 20 0 0 10 mm Aggregate cum 5.4 0 0 Generator hour 6 0 0 d) Form Work 0
Skilled (Mason ) day 3 0 0 20 mm Aggregate cum 8.1 0 0 Concrete mixer hour 6 0 0
Coarse sand cum 6.75 0 0
Cement tonne 6.05 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Plain/Reinforced Cement Concrete excluding reinforcement in Well Foundation all complete as per Drawing and Technical Specifications., Well cap, RCC Grade M 30 15 cum
Spec. cl. No: 1700, 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
10 mm
17.3.F.iii cum 5.4 0 0 Unskilled day 20 #NAME? Generator hour 6 0 0 d) Form Work #NAME?
Aggregate #NAME?
20 mm
cum 8.1 0 0 Skilled (Mason ) day 3 #NAME? Concrete mixer hour 6 0 0
Aggregate #NAME?
Coarse sand cum 6.75 0 0
Cement tonne 6.1 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = #NAME?
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and laying Plain/Reinforced Cement Concrete excluding reinforcement in Well Foundation all complete as per Drawing and Technical Specifications., Well cap, RCC Grade M 35 15 cum
Spec. cl. No: 1700, 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
17.3.F.iv Unskilled day 20 0 0 10 mm Aggregate cum 5.4 0 0 Generator hour 6 0 0 d) Form Work 0
Skilled (Mason) day 3 0 0 20 mm Aggregate cum 8.1 0 0 Concrete mixer hour 6 0 0
Coarse sand cum 6.75 0 0
Cement tonne 6.33 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 6 m., Sandy Soil, Depth below
1 meter
bed level upto 3.0 M
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
semi-skilled Consumables in
17.4.A.i day 2 0 0 0
(Sinking helper) sinking
Description of Work: Providing accessories and Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 6 m., Sandy Soil, Beyond 3 m
1 meter
upto 10 m depth
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
semi-skilled Consumables in
17.4.A.ii day 3 0 0 0
(Sinking helper) sinking
Description of Work: Providing accessories and Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 6 m., Sandy Soil, Beyond 10 m
1 meter
upto 20 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 6 m., Sandy Soil, Beyond 20 m
1 meter
upto 30 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 6 m., Sandy Soil, Beyond 20 m
1 meter
upto 30 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 6 m., Clayey Soil, Depth below
1 meter
bed level upto 3.0 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Semi-skilled Consumables in
17.4.B.i day 3 0 0 0
(Sinking helper) sinking
Description of Work: Providing accessories and Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 6 m., Clayey Soil, Beyond 3 m
1 meter
upto 10 m depth
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Semi-skilled Consumables in
17.4.B.ii day 5 0 0 0
(Sinking helper ) sinking
Air compressor with
Skilled (Sinker) day 3 0 0 hour 6 0 0
pneumatic chisel .
Description of Work: Providing accessories and Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 6 m., Clayey Soil, Beyond 10 m
1 meter
upto 20 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 6 m., Clayey Soil, Beyond 10 m
1 meter
upto 20 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 6 m., Clayey Soil, Beyond 20 m
1 meter
upto 30 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 6 m., Clayey Soil, Beyond 20 m
1 meter
upto 30 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 6 m., Clayey Soil, Beyond 20 m
1 meter
upto 30 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing accessories and Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 6 m., Soft Rock 1 meter
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add for dewatering, if
17.4.C Diver day 1 0 0 0
required
Semi-skilled Consumables in
day 24 0 0 0
(Sinking helper ) sinking
Air compressor with
Skilled (Sinker ) day 4 0 0 hour 6 0 0
pneumatic breakers
Description of Work:
Providing accessories and Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 6 m., Hard Rock 1 meter
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Dewatering, if
17.4.D Skilled day 5 0 0 Electric Detonators each 18 0 0
0 required.
Consumables in
Unskilled day 12 0 0 Gelatin 80 per cent Kg 4 0 0
0 sinking
compressor with
Blaster day 1 0 0 pneumatic hour 6 0 0
breaker/Jack hammer
Description of Work: Providing accessories and Sinking of 7 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 7 m., Sandy Soil, Depth below
1 meter
bed level upto 3.0 M
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Consumables in
Semi-skilled
17.5.A.i day 3 0 0 sinking @10 per cent
(Sinking helper)
of (b)
Description of Work: Providing accessories and Sinking of 7 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 7 m., Sandy Soil, Beyond 3 m
1 meter
upto 10 m depth
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Consumables in
Semi-skilled
17.5.A.ii day 3 0 0 sinking @10 per cent
(Sinking helper )
of (b)
Description of Work: Providing accessories and Sinking of 7 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 7 m., Sandy Soil, Beyond 10 m
1 meter
upto 20 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 7 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 7 m., Sandy Soil, Beyond 20 m
1 meter
upto 30 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 7 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 7 m., Sandy Soil, Beyond 30 m
1 meter
upto 40 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 7 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 7 m., Clayey Soil, Depth below
1 meter
bed level upto 3.0 M
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Semi-skilled Consumables in
17.5.B.i day 3 0 0 0
(Sinking helper ) sinking
Description of Work: Providing accessories and Sinking of 7 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 7 m., Clayey Soil, Beyond 3 m
1 meter
upto 10 m depth
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Semi-skilled Consumables in
17.5.B.ii day 4 0 0 0
(Sinking helper ) sinking
Description of Work: Providing accessories and Sinking of 7 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 7 m., Clayey Soil, Beyond 10 m
1 meter
upto 20 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 7 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 7 m., Clayey Soil, Beyond 10 m
1 meter
upto 20 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 7 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 7 m., Clayey Soil, Beyond 20 m
1 meter
upto 30 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 7 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 7 m., Clayey Soil, Beyond 20 m
1 meter
upto 30 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 7 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 7 m., Clayey Soil, Beyond 20 m
1 meter
upto 30 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 7 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 7 m., Clayey Soil, Beyond 30 m
1 meter
upto 40 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 7 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 7 m., Clayey Soil, Beyond 30 m
1 meter
upto 40 m
Description of Work: Providing accessories and Sinking of 7 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 7 m., Clayey Soil, Beyond 30 m
1 meter
upto 40 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 7 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 7 m., Clayey Soil, Beyond 30 m
1 meter
upto 40 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 7 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 7 m., Soft Rock, Depth in soft
1 meter
rock strata upto 3 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add for dewatering, if
17.5.C Diver day 1 0 0 0
required
Semi-skilled Consumables in
day 10 0 0 0
(Sinking helper ) sinking
Description of Work: Providing accessories and Sinking of 7 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 7 m., Hard Rock, Depth in Hard
1 meter
rock strata up to 3 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Dewatering, if
17.5.D Diver day 10.5 0 0 Electric Detonators nos 30 0 0
0 required.
Consumables in
Unskilled day 18 0 0 Gelatin Kg 7 0 0
0 sinking
compressor with
Blaster day 0.25 0 0 pneumatic hour 6 0 0
breaker/Jack hammer
Description of Work: Providing accessories and Sinking of 8 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 8 m., Clayey Soil, Beyond 20 m
1 meter
upto 30 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 8 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 8 m., Sandy Soil, Depth below
1 meter
bed level upto 3.0 M
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Semi-skilled Consumables in
17.6.A.i day 3 0 0 0
(Sinking helper ) sinking
Description of Work: Providing accessories and Sinking of 8 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 8 m., Sandy Soil, Beyond 3 m
1 meter
upto 10 m depth
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Semi-skilled Consumables in
17.6.A.ii day 4 0 0 0
(Sinking helper ) sinking
Description of Work: Providing accessories and Sinking of 8 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 8 m., Sandy Soil, Beyond 10 m
1 meter
upto 20 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 8 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 8 m., Sandy Soil, Beyond 20 m
1 meter
upto 30 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 8 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 8 m., Sandy Soil, Beyond 20 m
1 meter
upto 30 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 8 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 8 m., Sandy Soil, Beyond 30 m
1 meter
upto 40 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 8 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 8 m., Sandy Soil, Beyond 30 m
1 meter
upto 40 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 8 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 8 m., Clayey Soil, Depth from
1 meter
bed level upto 3.0 M
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Semi-skilled Consumables in
17.6.B.i day 4 0 0 0
(Sinking helper ) sinking
Description of Work: Providing accessories and Sinking of 8 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 8 m., Clayey Soil, Beyond 3 m
1 meter
upto 10 m depth
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Semi-skilled Consumables in
17.6.B.ii day 6 0 0 0
(Sinking helper ) sinking
Description of Work: Providing accessories and Sinking of 8 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 8 m., Clayey Soil, Beyond 10 m
1 meter
upto 20 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 8 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 8 m., Clayey Soil, Beyond 10 m
1 meter
upto 20 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 8 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 8 m., Clayey Soil, Beyond 20 m
1 meter
upto 30 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 8 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 8 m., Clayey Soil, Beyond 20 m
1 meter
upto 30 m
Description of Work: Providing accessories and Sinking of 8 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 8 m., Clayey Soil, Beyond 20 m
1 meter
upto 30 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 8 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 8 m., Clayey Soil, Beyond upto
1 meter
40 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 8 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 8 m., Clayey Soil, Beyond upto
1 meter
40 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 8 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 8 m., Clayey Soil, Beyond upto
1 meter
40 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 8 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 8 m., Soft Rock, Depth in soft
1 meter
rock strata upto 3 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add for dewatering, if
17.6.C Diver day 1 0 0 0
required
Semi-skilled Consumables in
day 12 0 0 0
(Sinking helper ) sinking
Description of Work: Providing accessories and Sinking of 8 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 8 m., Hard Rock, Depth in hard
1 meter
rock strata upto 3 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Consumables in
17.6.D Unskilled day 20 0 0 Electric Detonators Nos 32 0 0
0 sinking.
Dewatering, if
Blaster day 1 0 0 Gelatin Kg 8 0 0
0 required.
compressor with
Driller day 3 0 0 pneumatic hour 6 0 0
breaker/Jack hammer
Skilled day 6 0 0 crane with grab bucket hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 10 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 10 m., Sandy Soil, Depth below
1 meter
bed level upto 3.0 M
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Semi-skilled Consumables in
17.7.A.i day 5 0 0 0
(Sinking helper ) sinking
Description of Work: Providing accessories and Sinking of 10 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 10 m., Sandy Soil, Beyond upto
1 meter
10 m depth
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Semi-skilled Consumables in
17.7.A.ii day 6 0 0 0
(Sinking helper ) sinking
Description of Work:
Providing accessories and Sinking of 10 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 10 m., Sandy Soil, Beyond upto 1 meter
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 10 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 10 m., Sandy Soil, Beyond upto
1 meter
30 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 10 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 10 m., Sandy Soil, Beyond upto
1 meter
30 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 10 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 10 m., Sandy Soil, Beyond upto
1 meter
40 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 10 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 10 m., Sandy Soil, Beyond upto
1 meter
40 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 10 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 10 m., Clayey Soil, Depth below
1 meter
bed level upto 3.0 M
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Semi-skilled Consumables in
17.7.B.i day 6 0 0 0
(Sinking helper ) sinking
Description of Work: Providing accessories and Sinking of 10 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 10 m., Clayey Soil, Beyond 3m
1 meter
upto 10m depth
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Semi-skilled Consumables in
17.7.B.ii day 6 0 0 0
(Sinking helper ) sinking
Description of Work: Providing accessories and Sinking of 10 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 10 m., Clayey Soil, Beyond 10
1 meter
m upto 20 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 10 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 10 m., Clayey Soil, Beyond 10
1 meter
m upto 20 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 10 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 10 m., Clayey Soil, Beyond
1 meter
upto 30 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 10 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 10 m., Clayey Soil, Beyond
1 meter
upto 30 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 10 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 10 m., Clayey Soil, Beyond
1 meter
upto 30 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 10 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 10 m., Clayey Soil, Beyond
1 meter
upto 40 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 10 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 10 m., Clayey Soil, Beyond
1 meter
upto 40 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 10 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 10 m., Clayey Soil, Beyond
1 meter
upto 40 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 10 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 10 m., Soft Rock ( dia well ),
1 meter
Depth in soft rock strata upto
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add for dewatering @
17.7.C Diver day 2 0 0 5 per cent of cost, if
required
Consumables in
Semi-skilled
day 20 0 0 sinking @ 10 per cent 0
(Sinking helper )
of (b)
Air compressor with
Skilled (Sinker) day 6 0 0 hour 12 0 0
pneumatic breakers
Description of Work: Providing accessories and Sinking of 10 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 10 m., Hard Rock ( dia well ),
1 meter
Depth in hard rock strata upto 3 m
Description of Work: Providing accessories and Sinking of 10 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 10 m., Hard Rock ( dia well ),
1 meter
Depth in hard rock strata upto 3 m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Consumables in
17.7.D Unskilled day 32 0 0 Electric Detonators Nos 44 0 0
0 sinking
Dewatering, if
Blaster day 2 0 0 Gelatin Kg 11 0 0
0 required.
compressor with
Driller day 2 0 0 pneumatic hour 12 0 0
breaker/Jack hammer
Description of Work: Providing accessories and Sinking of 12 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 12 m., Sandy Soil, Depth below 0.25
bed level upto 3.0 M meter
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Semi-skilled Consumables in
17.8.A.i day 4 0 0 0
(Sinking helper ) sinking
Description of Work: Providing accessories and Sinking of 12 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 12 m., Sandy Soil, Beyond upto 0.25
depth meter
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Semi-skilled Consumables in
17.8.A.ii day 6 0 0 0
(Sinking helper ) sinking
Description of Work: Providing accessories and Sinking of 12 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 12 m., Sandy Soil, Beyond upto 0.25
30 m meter
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 12 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 12 m., Sandy Soil, Beyond upto 0.25
30 m meter
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 12 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 12 m., Clayey Soil, Depth below 0.25
bed level upto 3.0 M meter
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Consumables in
Semi-skilled
17.8.B.i day 8 0 0 sinking @ 10 per cent
(Sinking helper )
of (b)
Description of Work:
Providing accessories and Sinking of Twin D type well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Sandy Soil, Beyond upto 40 m 1 meter
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 12 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 12 m., Clayey Soil, Beyond 3m 0.25
upto 10m depth meter
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Semi-skilled Consumables in
17.8.B.ii day 9 0 0 0
(Sinking helper ) sinking
Description of Work: Providing accessories and Sinking of 12 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 12 m., Clayey Soil, Beyond 10 0.25
m upto 20 m meter
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 12 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 12 m., Clayey Soil, Beyond 10 0.25
m upto 20 m meter
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 12 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 12 m., Clayey Soil, Beyond 0.25
upto 30 m meter
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No.
Norms
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 12 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 12 m., Clayey Soil, Beyond 0.25
upto 30 m meter
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of 12 m external diameter well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Diameter of well - 12 m., Clayey Soil, Beyond 0.25
upto 30 m meter
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing accessories and Sinking of Twin D type well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Sandy Soil, Depth from bed level upto 3.0 M 1 meter
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Semi-skilled Consumables in
17.9.A.i day 4 0 0 0
(Sinking helper ) sinking
Description of Work:
Providing accessories and Sinking of Twin D type well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Sandy Soil, 3m Beyond 10m upto depth 1 meter
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Semi-skilled Consumables in
17.9.A.ii day 6 0 0 0
(Sinking helper ) sinking
Description of Work:
Providing accessories and Sinking of Twin D type well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Sandy Soil, Beyond upto 1 meter
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing accessories and Sinking of Twin D type well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Sandy Soil, Beyond upto 30 m 1 meter
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing accessories and Sinking of Twin D type well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Sandy Soil, Beyond upto 30 m 1 meter
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing accessories and Sinking of Twin D type well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Sandy Soil, Beyond upto 40 m 1 meter
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of Twin D type well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Clayey Soil (Twin D Type Well ), Depth below bed level upto
1 meter
3.0 M
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Semi-skilled Consumables in
17.9.B.i day 10 0 0 0
(Sinking helper ) sinking
Description of Work:
Providing accessories and Sinking of Twin D type well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Clayey Soil (Twin D Type Well ), 3m Beyond 10 upto depth 1 meter
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Semi-skilled Consumables in
17.9.B.ii day 12 0 0 0
(Sinking helper ) sinking
Description of Work:
Providing accessories and Sinking of Twin D type well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Clayey Soil (Twin D Type Well ), Beyond 10 m upto 20 m 1 meter
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing accessories and Sinking of Twin D type well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Clayey Soil (Twin D Type Well ), Beyond 10 m upto 20 m 1 meter
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing accessories and Sinking of Twin D type well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Clayey Soil (Twin D Type Well ), Beyond upto 30 m 1 meter
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing accessories and Sinking of Twin D type well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Clayey Soil (Twin D Type Well ), Beyond upto 30 m 1 meter
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing accessories and Sinking of Twin D type well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Clayey Soil (Twin D Type Well ), Beyond upto 30 m 1 meter
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing accessories and Sinking of Twin D type well (other than pneumatic method of sinking) through all types soil/rock of strata complete as per Drawing and Technical specifications., Soft Rock (Twin D Type Well ), Depth in soft rock strata upto
1 meter
20m
Spec. cl. No: 1705
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add for dewatering @
17.9.C Diver day 2 0 0 0
5 per cent, if required
Consumables in
Semi-skilled
day 18 0 0 sinking @ 10 per cent 0
(Sinking helper )
of (b)
Air compressor with
Skilled (Sinker) day 6 0 0 hour 12 0 0
pneumatic breakers
Description of Work:
Providing and Filling sand in Wells complete as per Drawing and Technical Specifications. 10 cum
Spec. cl. No: 1207
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
"17.10" Unskilled day 4 0 0 Sand (assuming 20 per cent voids ) cum 12 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing Steel Liner 10 mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and Setting out as per Drawing and Technical Specifications. 1 tonne
Spec. cl. No: 1703
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Electrodes,
cutting gas and
17.11 Structural steel tonne 1.05 0
other
consumables 0 0
Unskilled day 20 0 0
Skilled
(Fitter+Blacksmi day 20 0 0
th +Welder)
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for foundation and footings., (Class F1 Finish), Using timber (soft wood ) 1 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.1.a Unskilled day 2 0 0 Nails, spikes, etc. kg 1 0 0
Skilled day 1.5 0 0 struts, ballies, etc. cum 0.18 0 0
Planks 38 mm thick. cum 0.42 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for foundation and footings., (Class F1 Finish), Using steel 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.1.b Unskilled day 2.5 0 0 MS pipes dia. 40 mm m 36 0 0
Skilled day 1.5 0 0 Nuts & bolts 6 mm dia. ( @approx. 2 kg per 100 nos) nos. 178 0 0
Clamps nos. 21 0 0
MS sheet 14 gauge & angle stiffners kg 530 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), vertical plain surface, Using timber (soft wood ), Height upto 3 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.2.A.i Unskilled day 2.2 0 0 Nails, spikes, etc. kg 2.5 0 0
Skilled day 2.2 0 0 struts, ballies, etc. cum 0.4 0 0
Ply wood 9 mm thick. sqm 11 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), vertical plain surface, Using timber (soft wood ), Height above 3 m to 6 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.2.A.ii Unskilled day 2.8 0 0 Nails, spikes, etc. kg 3.5 0 0
Skilled day 2.6 0 0 struts, ballies, etc. cum 0.5 0 0
Ply wood 9 mm thick. sqm 11 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), vertical plain surface, Using timber (soft wood ), Height above 6 m to 9 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.2.A.ii
Unskilled day 4 0 0 Nails, spikes, etc. kg 4.5 0
i 0
Skilled day 3.2 0 0 struts, ballies, etc. cum 0.6 0 0
Ply wood 9 mm thick. sqm 11 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), vertical plain surface, Using timber (soft wood ), Height above 9 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Increase the rate by 10 % for every additional meter height to
18.2.A.iv
the rate for previous height
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), vertical plain surface, Using steel, Height upto 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.2.B.i Unskilled day 2.2 0 0 MS pipes dia. 40 mm m 70 0 0
Skilled day 1.6 0 0 Nuts & bolts 6 mm dia. ( @approx. 2 kg per 100 nos) nos. 178 0 0
Clamps nos. 40 0 0
MS sheet 14 gauge & angle stiffners kg 530 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), vertical plain surface, Using steel, Height above 3 m to 6 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.2.B.ii Unskilled day 2.8 0 0 Nuts & bolts 6 mm dia. ( @approx. 2 kg per 100 nos) nos 178 0 0
Skilled day 1.9 0 0 Clamps nos 50 0 0
MS pipes dia. 40 mm m 88 0 0
MS sheet 14 gauge & angle stiffners kg 530 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), vertical plain surface, Using steel, Height above 6 m to 9 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.2.B.iii Unskilled day 4 0 0 Nuts & bolts 6 mm dia. ( @approx. 2 kg per 100 nos) nos. 178 0
0
Skilled day 2.3 0 0 Clamps nos. 64 0 0
MS pipes dia. 40 mm m 112 0 0
MS sheet 14 gauge & angle stiffners kg 530 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), vertical plain surface, Using steel, Height above 9 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Increase the rate by 10 % for every additional meter height to
18.2.B.iv
the rate for previous height
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), Vertical curve surface, using timber, Height upto 3 m 10 sqm
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), Vertical curve surface, using timber, Height upto 3 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.3.A.i Unskilled day 3 0 0 Nails, spikes, etc. kg 4 0 0
Skilled day 3 0 0 Timber cum 0.6 0 0
Ply wood 9 mm thick. sqm 11 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), Vertical curve surface, using timber, Height above 3m to 6 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.3.A.ii Unskilled day 3.8 0 0 Nails, spikes, etc. kg 5 0 0
Skilled day 3.5 0 0 Timber cum 0.72 0 0
Ply wood 9 mm thick. sqm 11 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), Vertical curve surface, using timber, Height above 6 m to 9 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.3.A.ii
Unskilled day 5.4 0 0 Nails, spikes, etc. kg 6 0
i 0
Skilled day 4.3 0 0 Timber cum 0.9 0 0
Ply wood 9 mm thick. sqm 11 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), Vertical curve surface, using timber, Height above 9 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Increase the rate by 10 % for every additional meter height to
18.3.A.iv
the rate for previous height
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), Vertical curve surface, using steel, Height upto 3 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.3.B.i Unskilled day 3 0 0 Nuts & bolts 6 mm dia. ( @approx. 2 kg per 100 nos) nos 178 0 0
Skilled day 2 0 0 Clamps nos 60 0 0
MS pipes dia. 40 mm m 105 0 0
MS sheet 14 gauge & angle stiffners kg 530 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), Vertical curve surface, using steel, Height above 3 m to 6 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.3.B.ii Unskilled day 3.8 0 0 Nuts & bolts 6 mm dia. ( @approx. 2 kg per 100 nos) nos 178 0 0
Skilled day 2.4 0 0 Clamps nos 72 0 0
MS pipes dia. 40 mm m 126 0 0
MS sheet 14 gauge & angle stiffners kg 530 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), Vertical curve surface, using steel, Height above 6 m to 9 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.3.B.iii Unskilled day 5.4 0 0 Nuts & bolts 6 mm dia. ( @approx. 2 kg per 100 nos) nos 178 0
0
Skilled day 3 0 0 Clamps nos 91 0 0
MS pipes dia. 40 mm m 160 0 0
MS sheet 14 gauge & angle stiffners kg 530 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), Vertical curve surface, using steel, Height more than above 9 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Increase the rate by 10 % for every additional meter height to
18.3.B.iv
the rate for previous height
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Square / Rectangular surface, Using timber, Height upto 3 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.4.A.i Unskilled day 2.4 0 0 Nails, spikes, etc. kg 3 0 0
Skilled day 2.75 0 0 Timber cum 0.5 0 0
Ply wood 9 mm thick. sqm 11 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Square / Rectangular surface, Using timber, Height upto 3 m to 6m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.4.A.ii Unskilled day 3.2 0 0 Nails, spikes, etc. kg 4 0 0
Skilled day 3.2 0 0 Timber cum 0.6 0 0
Ply wood 9 mm thick. sqm 11 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Square / Rectangular surface, Using timber, Height upto 6 m to 9m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.4.A.ii
Unskilled day 4.4 0 0 Nails, spikes, etc. kg 5 0
i 0
Skilled day 4 0 0 Timber cum 0.75 0 0
Ply wood 9 mm thick. sqm 11 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Square / Rectangular surface, Using timber, Above 9 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Increase the rate by 10 % for every additional meter height to
18.4.A.iv
the rate for previous height
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Square / Rectangular surface, Using steel, Height upto 3 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.4.B.i Unskilled day 2.4 0 0 MS pipes dia. 40 mm m 90 0 0
Skilled day 2 0 0 Nuts & bolts 6 mm dia. ( @approx. 2 kg per 100 nos) nos 178 0 0
Clamps nos 51 0 0
MS sheet 14 gauge & angle stiffners kg 530 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Square / Rectangular surface, Using steel, Height upto 3 m to 6m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.4.B.ii Unskilled day 3.1 0 0 Nuts & bolts 6 mm dia. ( @approx. 2 kg per 100 nos) nos 178 0 0
Skilled day 2.3 0 0 Clamps nos 62 0 0
MS pipes dia. 40 mm m 108 0 0
MS sheet 14 gauge & angle stiffners kg 530 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Square / Rectangular surface, Using steel, Height upto 6 m to 9m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.4.B.iii Unskilled day 4.4 0 0 Nuts & bolts 6 mm dia. ( @approx. 2 kg per 100 nos) nos 178 0
0
Skilled day 2.9 0 0 Clamps nos 78 0 0
MS pipes dia. 40 mm m 137 0 0
MS sheet 14 gauge & angle stiffners kg 530 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Square / Rectangular surface, Using steel, Above 9 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Increase the rate by 10 % for every additional meter height to
18.4.B.iv
the rate for previous height
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Circular surface, Using timber, Height upto 3 m 10 sqm
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Circular surface, Using timber, Height upto 3 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.5.A.i Unskilled day 3.3 0 0 Nails, spikes, etc. kg 5 0 0
Skilled day 3.6 0 0 Timber cum 0.75 0 0
Ply wood 9 mm thick. sqm 11 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Circular surface, Using timber, Height upto 3 m to 6m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.5.A.ii Unskilled day 4.2 0 0 Nails, spikes, etc. kg 6.5 0 0
Skilled day 4.2 0 0 Timber cum 1 0 0
Ply wood 9 mm thick. sqm 11 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Circular surface, Using timber, Height upto 6 m to 9m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.5.A.ii
Unskilled day 5.9 0 0 Nails, spikes, etc. kg 8 0
i 0
Skilled day 5.2 0 0 Timber cum 1.2 0 0
Ply wood 9 mm thick. sqm 11 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Circular surface, Using timber, Above 9 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Increase the rate by 10 % for every additional meter height to
18.5.A.iv
the rate for previous height
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Circular surface, Using steel, Height upto 3 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.5.B.i Unskilled day 3.3 0 0 Nuts & bolts 6mm dia. ( @approx. 2 kg per 100 nos) nos 178 0 0
Skilled day 2.4 0 0 Clamps nos 77 0 0
MS pipes dia. 40 mm m 135 0 0
MS sheet 14 gauge & angle stiffners kg 530 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Circular surface, Using steel, Height upto 3 m to 6m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.5.B.ii Unskilled day 4.2 0 0 Nuts & bolts 6 mm dia. ( @approx. 2 kg per 100 nos) nos 178 0 0
Skilled day 2.9 0 0 Clamps nos 93 0 0
MS pipes dia. 40 mm m 162 0 0
MS sheet 14 gauge & angle stiffners kg 530 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Circular surface, Using steel, Height upto 6 m to 9m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.5.B.iii Unskilled day 2.9 0 0 Nuts & bolts 6 mm dia. ( @approx. 2 kg per 100 nos) nos 178 0
0
Skilled day 3.6 0 0 Clamps nos 118 0 0
MS pipes dia. 40 mm m 206 0 0
MS sheet 14 gauge & angle stiffners kg 530 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Circular surface, Using steel, Above 9 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Increase the rate by 10 % for every additional meter height to
18.5.B.iv
the rate for previous height
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for slab structure., Class F2 Finish, False work not included, Using timber 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.6.A Unskilled day 2.5 0 0 Nails, spikes, etc. kg 2.5 0 0
Skilled day 1.8 0 0 Planks 38 mm thick. & rafters, beam, battens etc. cum 0.54 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for slab structure., Class F2 Finish, False work not included, Using steel 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.6.B Unskilled day 2.5 0 0 Nuts & bolts 6 mm dia. ( @approx. 2 kg per 100 nos) nos 178 0 0
Skilled day 1.25 0 0 MS sheet 14 gauge & angle stiffners kg 530 0 0
Unit =sqm (For 10 sqm)
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for slab structure., Class F2 Finish, False work not included, Using shuttering Ply 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.6.C Unskilled day 2.5 0 0 Rafter, beam, battens etc. cum 0.1 0 0
Skilled day 1.5 0 0 Nails, spikes, etc. kg 2 0 0
Ply wood 12 mm thick. sqm 11 0 0
Unit =sqm (For 10 sqm)
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for slab & beam structure., Class F2 Finish, False work not included, Using timber 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.7.A Unskilled day 3 0 0 Nails, spikes, etc. kg 4 0 0
Skilled day 3 0 0 Planks 38 mm thick. & rafters, beam, battens etc. cum 0.82 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for slab & beam structure., Class F2 Finish, False work not included, Using steel 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.7.B Unskilled day 3 0 0 Nuts & bolts 6 mm dia. ( @approx. 2 kg per 100 nos) nos 178 0 0
Skilled day 2 0 0 Clamps nos 18 0 0
MS pipes dia. 40 mm m 32 0 0
MS sheet 14 gauge & angle stiffners kg 530 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for slab & beam structure., Class F2 Finish, False work not included, Using shuttering Ply 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.7.C Unskilled day 3 0 0 Nails, spikes, etc. kg 3 0 0
Skilled day 2.5 0 0 Rafter, strut, battens etc. cum 0.32 0 0
Ply wood 12 mm thick. sqm 11 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for arch structure., Class F2 Finish, False work not included, Using timber 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.8.A Unskilled day 3 0 0 Nails, spikes, etc. kg 4 0 0
Skilled day 3.5 0 0 Rafters, beam, battens etc. cum 0.3 0 0
Ply wood 12 mm thick. sqm 11 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for arch structure., Class F2 Finish, False work not included, Using steel 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.8.B Unskilled day 3 0 0 Nuts & bolts 6 mm dia. ( @approx. 2 kg per 100 nos) nos 178 0 0
Skilled day 2.5 0 0 Clamps nos 18 0 0
MS pipes dia. 40 mm m 32 0 0
MS sheet 14 gauge & angle stiffners kg 530 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for precast element., Class F3 Finish, Square / Rectangular section, Using timber 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No.
Norms
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.9.I.a Unskilled day 2 0 0 Nails, spikes, etc. kg 2 0 0
Skilled day 2.5 0 0 Timber cum 0.2 0 0
Ply wood 9 mm thick. sqm 11 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for precast element., Class F3 Finish, Square / Rectangular section, Using steel 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.9.I.b Unskilled day 2 0 0 Nuts & bolts dia. ( @approx. 2 kg per 100 nos) nos 178 0 0
Skilled day 2 0 0 Clamps nos 18 0 0
MS pipes dia. 40 mm m 32 0 0
MS sheet 14 gauge & angle stiffners kg 530 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification, for RCC Arch Bridge, Using steel, Height above 9 m
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for precast element., Class F3 Finish, Circular section, Using timber 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.9.II.a Unskilled day 2.5 0 0 Nails, spikes, etc. kg 3 0 0
Skilled day 3 0 0 Timber cum 0.2 0 0
Ply wood 9 mm thick. sqm 11 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for precast element., Class F3 Finish, Circular section, Using steel 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.9.II.b Unskilled day 2 0 0 Nuts & bolts 6 mm dia. ( @approx. 2 kg per 100 nos) nos 178 0 0
Skilled day 2.5 0 0 Clamps nos 24 0 0
MS pipes dia. 40 mm m 42 0 0
MS sheet 14 gauge & angle stiffners kg 530 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification For Slab and Box culverts, Using timber, Height upto 2 m 10 sqm
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.10.A.i Unskilled day 8 0 0 Nails, spikes, etc. kg 2.5 0
0
Skilled day 8 0 0 Timber cum 0.8 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification For Slab and Box culverts, Using timber, Height above 2 m to 4 m 10 sqm
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.10.A.i
Unskilled day 18 0 0 Nails, spikes, etc. kg 4 0
i 0
Skilled day 16 0 0 Timber cum 1.4 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification For Slab and Box culverts, Using timber, Height above 4 m to 6 m 10 sqm
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.10.A.i
Unskilled day 28 0 0 Nails, spikes, etc. kg 5.5 0
ii 0
Skilled day 24 0 0 Timber cum 1.9 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification For Slab and Box culverts, Using timber, For Height above 6 m
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification For Slab and Box culverts, Using steel, Height upto 2 m 10 sqm
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.10.B.i Unskilled day 6 0 0 MS pipes dia. 40 - 50 mm m 240 0
0
Skilled day 4 0 0 Nuts & bolts 6 mm dia. ( @approx. 2 kg per 100 nos) nos 178 0 0
Clamps nos 137 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification For Slab and Box culverts, Using steel, Height above 2 m to 4 m 10 sqm
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.10.B.i
Unskilled day 14 0 0 Nuts & bolts 6 mm dia. ( @approx. 2 kg per 100 nos) nos 178 0
i 0
Skilled day 8 0 0 Clamps nos 24 0 0
MS pipes dia. 40 mm m 42 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification For Slab and Box culverts, Using steel, Height above 4 m to 6 m 10 sqm
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.10.B.i
Unskilled day 20 0 0 Nuts & bolts 6 mm dia. ( @approx. 2 kg per 100 nos) nos 178 0
ii 0
Skilled day 12 0 0 Clamps nos 325 0 0
MS pipes dia. 40 mm m 570 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification For Slab and Box culverts, Using steel, Height above 6 m 10 sqm
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Increase the rate by 10% for every additional meter height to
18.10.B.i
the rate for the previous height or Design as a special case and
v
derive Norms
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification, for RCC Beam Bridge, Using timber, Height upto 3 m 10 sqm
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.11.a.i Unskilled day 14 0 0 Nails, spikes, etc. kg 6 #NAME? #NAME?
Skilled day 14 0 0 Timber cum 2 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification, for RCC Beam Bridge, Using timber, Height above 3 m to 6 m 10 sqm
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.11.a.ii Unskilled day 32 0 0 Nails, spikes, etc. kg 12 #NAME?
#NAME?
Skilled day 28 0 0 Timber cum 4 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification, for RCC Beam Bridge, Using timber, Height above 6 m to 9 m 10 sqm
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.11.a.ii
Unskilled day 50 0 0 Nails, spikes, etc. kg 21 #NAME?
i #NAME?
Skilled day 40 0 0 Timber cum 7 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
, Height above 9 m Increase the rate by 10% for every additional meter height to the rate for the previous height or Design as a special case and derive Norms
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification, for RCC Beam Bridge, Using steel, Height upto 3 m 10 sqm
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.11.b.i Unskilled day 11 0 0 Nuts & bolts 6 mm dia. ( @approx. 2 kg per 100 nos) nos 178 #NAME? #NAME?
Skilled day 7 0 0 Clamps nos 171 #NAME? #NAME?
MS pipes dia. 40 - 50 mm m 300 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification, for RCC Beam Bridge, Using steel, Height above 3 m to 6m 10 sqm
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.11.b.i
Unskilled day 25 0 0 Nuts & bolts 6 mm dia. ( @approx. 2 kg per 100 nos) nos 178 #NAME?
i #NAME?
Skilled day 14 0 0 Clamps nos 342 #NAME? #NAME?
MS pipes dia. 40 mm m 600 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification, for RCC Beam Bridge, Using steel, Height above 3 m to 6m 10 sqm
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.11.b.i
Unskilled day 40 0 0 Nuts & bolts 6 mm dia. ( @approx. 2 kg per 100 nos) nos 178 #NAME?
ii #NAME?
Skilled day 20 0 0 Clamps nos 560 #NAME? #NAME?
MS pipes dia. 40 mm m 980 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
, Height above 9 m Increase the rate by 10% for every additional meter height to the rate for the previous height or Design as a special case and derive Norms
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification, for RCC Arch Bridge, Using timber, Height upto 3 m 10 sqm
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.12.A.i Unskilled day 16 0 0 Nails, spikes, etc. kg 3.5 0
0
Skilled day 18 0 0 Timber cum 1.2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification, for RCC Arch Bridge, Using timber, Height above 3m to 6 m 10 sqm
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.12.A.i
Unskilled day 36 0 0 Nails, spikes, etc. kg 7 0
i 0
Skilled day 36 0 0 Timber cum 2.4 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification, for RCC Arch Bridge, Using timber, Height above 6 m to 9 m 10 sqm
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification, for RCC Arch Bridge, Using timber, Height above 6 m to 9 m 10 sqm
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.12.A.i
Unskilled day 57 0 0 Nails, spikes, etc. kg 12 0
ii 0
Skilled day 50 0 0 Timber cum 4.2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification, for RCC Arch Bridge, Using timber, Height above 9 m
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification, for RCC Arch Bridge, Using steel, Height upto 3 m 10 sqm
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.12.B.i Unskilled day 12 0 0 MS pipes dia. 40 - 50 mm m 360 0
0
Skilled day 8 0 0 Nuts & bolts 6 mm dia. ( @approx. 2 kg per 100 nos) nos 178 0 0
Clamps nos 205 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification, for RCC Arch Bridge, Using steel, Height above 3 m to 6 m 10 sqm
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.12.B.i
Unskilled day 25 0 0 Nuts & bolts 6 mm dia. ( @approx. 2 kg per 100 nos) nos 178 0
i 0
Skilled day 16 0 0 Clamps nos 410 0 0
MS pipes dia. 40 mm m 720 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification, for RCC Arch Bridge, Using steel, Height above 6 m to 9 m 10 sqm
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.12.B.i
Unskilled day 46 0 0 Nuts & bolts 6 mm dia. ( @approx. 2 kg per 100 nos) nos 178 0
ii 0
Skilled day 25 0 0 Clamps nos 674 0 0
MS pipes dia. 40 mm m 1180 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Supplying, fitting and fixing in position true to line and level cast steel rocker bearing including all accessories as per Drawing and Technical Specifications. 250 tonne
Spec. cl. No: 1902
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 1 per cent of cost of bearing assembly for foundation
19.1 Unskilled day 2.00 0 0 anchorage bolts, lifting arrangements, grease and other 0
consumables.
Cast steel rocker bearing assembly of 250 tonne design load
Skilled day 1.00 0 0 capacity duly painted complete with all its components as per nos 1.00 #NAME?
drawing and specifications #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Supplying, fitting and fixing in position true to line and level forged steel roller bearing including all accessories as per Drawing and Technical Specifications. 250 tonne
Spec. cl. No: 1902
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 1 per cent of cost of bearing assembly for foundation
19.2 Skilled day 1.00 0 0 anchorage bolts, lifting arrangements, grease and other 0
consumables.
Forged steel roller bearing of 250 tonne design load capacity
Unskilled day 1.00 0 0 duly painted complete with all its components as per drawing nos. 1.00 #NAME?
and specifications #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Supplying, fitting and fixing in position true to line and level sliding plate bearing with PTFE surface sliding on stainless steel including all accessories as per Drawing and Technical Specifications ( BS: 5400, section 9.1 & 9.2 for PTFE) ). 80 tonne
Spec. cl. No: 1902
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 1 per cent for foundation anchorage bolts and
19.3 Skilled day 1.00 0 0 0
consumables.
PTFE sliding plate bearing assembly of 80 tonnes design load
Unskilled day 1.00 0 0 capacity duly painted complete with all its components as per nos 1.00 #NAME?
drawing and Technical Specifications #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Supplying, fitting and fixing in position true to line and level sliding plate bearing with stainless steel plate sliding on stainless steel plate with mild steel matrix including all accessories as per Drawing and Technical Specifications. 80 tonne
Spec. cl. No: 1902
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 1 per cent of cost of bearing assembly for foundation
19.5 Skilled day 1.00 0 0 0
anchorage bolts and consumables.
Supply of sliding plate bearing of 80 tonne design capacity
Unskilled day 1.00 0 0 nos 1.00 #NAME?
complete as per drawings and Technical Specifications. #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against
250 tonne
stainless steel mating surface, complete assembly to be of cast steel/fabricated structural steel, metal and elastomer elements as per Drawing and Technical Specifications.
Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against
250 tonne
stainless steel mating surface, complete assembly to be of cast steel/fabricated structural steel, metal and elastomer elements as per Drawing and Technical Specifications.
Spec. cl. No: 1902
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 1 per cent of cost of bearing assembly for foundation
19.6 Skilled day 1.00 0 0 0
anchorage bolts and consumables.
Pot type bearing assembly consisting of a metal piston
supported by a disc, PTFE pads providing sliding surfaces
against stainless steel mating together with cast steel
Unskilled day 2.00 0 0 nos 1.00 #NAME?
assemblies/fabricated structural steel assemblies duly painted
with all components as per clause 2006 and complete as per
drawings and Technical Specifications. #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Buried Joint, Providing and laying a buried expansion joint, expansion gap being 20 mm, covered with 12 mm thick, 200 mm wide galvanized wieldable structural steel plate as per IS: 2062, placed symmetrical to center line of the joint, resting freely
12 meter
over the top surface of the deck concrete, welding of 8 mm dia. 100 mm long galvanized nails spaced 300 mm c/c along the center line of the plate as per Drawing and Specifications.
Spec. cl. No: 1901
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 1 per cent of cost of steel plate cutting, welding
19.7 Skilled day 1.00 0 0 0
consumables and galvanized nails.
Galvanized MS. plate 200 mm wide, 12 mm thick @ 94.20
Unskilled day 1.00 0 0 kg 237.50 #NAME?
kg/sqm including 5 per cent wastage #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Elastomeric Slab Steel Expansion Joint, Providing and laying of an elastomeric slab steel expansion joint, catering to right or skew (less than 20 deg., moderately curved with maximum horizontal movement upto 50 mm, complete as per Drawings
12 meter
and Technical specifications
Spec. cl. No: 1901
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 5 per cent of cost of material for anchorage
19.8 Skilled day 1.00 0 0 0
reinforcement, welding and other incidentals.
Supply of elastomeric slab seal expansion joint assembly
manufactured by using chloroprene, elastomer for elastomeric
Unskilled day 1.00 0 0 meter 12.00 #NAME?
slab unit conforming to approved drawings and standard
specification #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Compression Seal Joint, Providing and laying of compression seal joint consisting of steel armored nosing at two edges of the joint gap suitably anchored to the deck concrete and a preformed chloroprene elastomer or closed cell foam joint sealer
12 meter
compressed and fixed into the joint gap with special adhesive binder to cater for a horizontal movement and vertical movement all complete as per Drawing and Technical Specifications.
Spec. cl. No: 1901
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 1 per cent of cost of sealing element for lubricant-cum-
19.9 Skilled day 1.00 0 0 0
adhesive and other consumables.
Preformed continuous chloroprene elastomer or closed cell
foam sealing element with high tear strength, vulcanized in a
Unskilled day 1.00 0 0 meter 12.00 #NAME?
single operation for the full length of a joint to ensure water
tightness. #NAME?
Add 5 per cent of cost of above for structural steel for
0
anchorage, welding and other incidentals.
Galvanized angle sections 100 mm x 100 mm of 12 mm
kg 446.00 #NAME?
thickness wieldable structural steel a #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Strip Seal Expansion Joint, Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved Drawings and Technical specifications. 12 meter
Spec. cl. No: 1901
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No.
Norms
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 5 per cent of cost of material for anchorage
19.10 Skilled day 1.00 0 0
reinforcement, welding and other incidentals.
Supply of complete assembly of strip seal expansion joint
comprising of edge beams, anchorage, strip seal element and
Unskilled day 1.00 0 0 meter 12.00 #NAME?
complete accessories as per approved specifications and
drawings. #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Modular Strip / Box Seal Joint, Providing and laying of a modular strip Box seal expansion joint including anchorage catering to a horizontal movement beyond 70 mm and upto 140 mm, complete as per Drawings and Technical Specifications .
Spec. cl. No: 1901
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Supply of a modular strip/box seal joint assembly comprising
of edge beams, central beam, 2 modules chloroprene seal,
19.11 Skilled day 1.00 0 0 anchorage elements, support and control system, all steel meter 12.00 #NAME?
sections protected against corrosion and installed by the
manufacturer or his authorized representative. #NAME?
Unskilled day 1.00 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = 0
Description of Work:
Modular Strip / Box Seal Joint, Providing and laying of a modular strip box seal expansion joint catering to a horizontal movement beyond 140 mm and upto 210 mm, complete as per Drawings and Technical specifications. 12 meter
Spec. cl. No: 1901
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Supply of a modular box/box seal joint assembly containing 3
modules/cells and comprising of edge beams, two central
beams, chloroprene seal, anchorage elements, support and
19.12 Skilled day 1.00 0 0 meter 12.00 #NAME?
control system, all steel sections protected against corrosion
and installed by the manufacturer or his authorized
representative. #NAME?
Unskilled day 1.00 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation complete as per Drawing and Technical Specifications. 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.1 Unskilled day 22 0 0 Cost of water KL 2 0 0 Generator hour 6 0 0
Skilled day 2 0 0 cement tonne 3.45 0 0 Concrete mixer hour 6 0 0
coarse Sand cum 6.75 0 0
40 mm Aggregate cum 13.5 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation complete as per Drawing and Technical Specifications., Manual Mixing 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.1.b Unskilled day 33 0 0 Cost of water KL 2 0 0
Skilled day 3 0 0 cement tonne 3.45 0 0
coarse Sand cum 6.75 0 0
40 mm Aggregate cum 13.5 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Plain/Reinforced Cement Concrete in Foundation complete as per Drawing and Technical Specifications, PCC Grade M 15 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Description of Work:
Providing and laying of Plain/Reinforced Cement Concrete in Foundation complete as per Drawing and Technical Specifications, PCC Grade M 15, Manual Mixing 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Description of Work:
Providing and laying of Plain/Reinforced Cement Concrete in Foundation complete as per Drawing and Technical Specifications, PCC Grade M 20 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Description of Work:
Providing and laying of Plain/Reinforced Cement Concrete in Foundation complete as per Drawing and Technical Specifications., RCC Grade M 20 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.2.C Unskilled day 30 0 0 Cost of water KL 2.5 0 0 Generator hour 6 0 0 @ 4 per cent on (a+b+c) 0
Skilled day 3 0 0 10 mm Aggregate cum 5.4 0 0 Concrete mixer hour 6 0 0
20 mm Aggregate cum 8.1 0 0
Coarse sand cum 6.75 0 0
Cement tonne 5.21 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Plain/Reinforced Cement Concrete in Foundation complete as per Drawing and Technical Specifications., PCC Grade M 25 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.2.D Unskilled day 30 0 0 Admixture Kg 23.96 0 0 Generator hour 6 0 0 @ 3.75 per cent on (a+b+c) 0
Skilled day 3 0 0 Cost of water KL 3 0 0 Concrete mixer hour 6 0 0
10 mm Aggregate cum 2.7 0 0
20 mm Aggregate cum 5.4 0 0
40 mm Aggregate cum 5.4 0 0
Coarse sand cum 6.75 0 0
Cement tonne 5.99 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Plain/Reinforced Cement Concrete in Foundation complete as per Drawing and Technical Specifications., RCC Grade M 25 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.2.E Unskilled day 30 0 0 Admixture kg 24.2 0 0 Generator hour 6 0 0 @ 3.75 per cent of (a+b+c). 0
Skilled day 3 0 0 Cost of water KL 3 0 0 Concrete mixer hour 6 0 0
10 mm Aggregate cum 5.4 0 0
20 mm Aggregate cum 8.1 0 0
Coarse sand cum 6.75 0 0
Cement tonne 6.05 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Plain/Reinforced Cement Concrete in Foundation complete as per Drawing and Technical Specifications., PCC Grade M 30 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Description of Work:
Providing and laying of Plain/Reinforced Cement Concrete in Foundation complete as per Drawing and Technical Specifications., RCC Grade M30 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Description of Work:
Providing and laying , fitting and placing un-coated Mild steel / HYSD reinforcement complete in foundation as per drawing and technical specification 1 tonne
Spec. cl. No: 2014
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.3 Unskilled day 9 0 0 Binding wire Kg 8 0 0
Skilled /
day 4 0 0 MS bars tonne 1.1 0
Blacksmith 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications, PCC Grade M 15, Height upto 5 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Per Cum Basic Cost of Labour, Material & Equipment (a+b+c) Add 10 % of cost of Material, Labour
20.4.A Skilled day 3 0 0 Concrete mixer hour 6 0 0 0
of Item 20.2 (A) and Equipment (a+b+c) for Formwork
Unskilled day 30 0 0 Cement tonne 4.13 0 0 Generator hour 6 0 0
Coarse sand cum 6.75 0 0
40 mm Aggregate cum 8.1 0 0
20 mm Aggregate cum 4.05 0 0
10 mm Aggregate cum 1.35 0 0
Cost of water KL 2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications, PCC Grade M20, Height upto 5 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 10 % of cost of Material, Labour
20.4.B Skilled day 3 0 0 Cement tonne 5.16 0 Concrete mixer hour 6 0 0 0
0 and Equipment (a+b+c) for Formwork
Unskilled day 30 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0 d) formwork 0
Basic Cost of Labour, Material &
40 mm Aggregate cum 5.4 0 0
0 Equipment (a+b+c) of Item 20.2 (B)
20 mm Aggregate cum 5.4 0 0
10 mm Aggregate cum 2.7 0 0
Cost of water KL 2.5 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications, PCC Grade M 25, Height upto 5 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No.
Norms
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 10 % of cost of Material, Labour
20.4.C.p Skilled day 3 0 0 Cement tonne 5.99 0 Concrete mixer hour 6 0 0 0
0 and Equipment (a+b+c) for Formwork
Basic Cost of Labour, Material &
Unskilled day 30 0 0 Coarse sand cum 6.75 0 Generator hour 6 0 0 0
0 Equipment (a+b+c) of item 20.2(D)
40 mm Aggregate cum 5.4 0 0
20 mm Aggregate cum 5.4 0 0
10 mm Aggregate cum 2.7 0 0
Cost of water KL 3 0 0
Admixture Kg 23.96 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications, PCC Grade M 25, Height above 5 m to 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 2 % of cost of Material, Labour
20.4.C.q Skilled day 3 0 0 Cement tonne 5.99 0 Concrete mixer hour 6 0 0 and Equipment excluding formwork to 0
0 cater for extra lift
Add 12 % of cost of Material, Labour
Unskilled day 30 0 0 Coarse sand cum 6.75 0 Generator hour 6 0 0 0
0 and Equipment (a+b+c) for Formwork
Basic Cost of Labour, Material &
40 mm Aggregate cum 5.4 0 0
0 Equipment (a+b+c) of Item 20.2 (D)
20 mm Aggregate cum 5.4 0 0
10 mm Aggregate cum 2.7 0 0
Cost of water KL 3 0 0
Admixture Kg 23.96 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications, PCC Grade M 25, Height above 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 4 % of cost of Material, Labour
20.4.C.r Skilled day 3 0 0 Cement tonne 5.99 0 Concrete mixer hour 6 0 0 and Equipment excluding formwork to 0
0 cater for extra lift
Add 15 % of cost of Material, Labour
Unskilled day 30 0 0 Coarse sand cum 6.75 0 Generator hour 6 0 0 0
0 and Equipment (a+b+c) for Formwork
Basic Cost of Labour, Material &
40 mm Aggregate cum 5.4 0 0
0 Equipment (a+b+c) of Item 20.2 (D)
20 mm Aggregate cum 5.4 0 0
10 mm Aggregate cum 2.7 0 0
Cost of water KL 3 0 0
Admixture Kg 23.96 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications, PCC Grade M 30, Height upto 5 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 10 % of cost of Material, Labour
20.4.D.p Skilled day 3 0 0 Cement tonne 6.08 0 Concrete mixer hour 6 0 0 0
0 and Equipment (a+b+c) for Formwork
Basic Cost of Labour, Material &
Unskilled day 30 0 0 Coarse sand cum 6.75 0 Generator hour 6 0 0 0
0 Equipment (a+b+c) of Item 20.2 (F)
40 mm Aggregate cum 5.4 0 0
20 mm Aggregate cum 5.4 0 0
10 mm Aggregate cum 2.7 0 0
Cost of water KL 3 0 0
Admixture kg 243.2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications, PCC Grade M 30, Height above 5 m to 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 2 % of cost of Material, Labour
20.4.D.q Skilled day 3 0 0 Cement tonne 6.08 0 Concrete mixer hour 6 0 0 and Equipment excluding formwork to 0
0 cater for extra lift
Add 12 % of cost of Material, Labour
Unskilled day 30 0 0 Coarse sand cum 6.75 0 Generator hour 6 0 0 0
0 and Equipment (a+b+c) for Formwork
Basic Cost of Labour, Material &
40 mm Aggregate cum 5.4 0 0
0 Equipment (a+b+c) of Item 20.2 (F)
20 mm Aggregate cum 5.4 0 0
10 mm Aggregate cum 2.7 0 0
Cost of water KL 3 0 0
Admixture kg 243.2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications, PCC Grade M 30, Height above 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 4 % of cost of Material, Labour
20.4.D.r Skilled day 3 0 0 Cement tonne 6.08 0 Concrete mixer hour 6 0 0 and Equipment excluding formwork to 0
0 cater for extra lift
Add 15 % of cost of Material, Labour
Unskilled day 30 0 0 Coarse sand cum 6.75 0 Generator hour 6 0 0 0
0 and Equipment (a+b+c) for Formwork
Basic Cost of Labour, Material &
40 mm Aggregate cum 5.4 0 0
0 Equipment (a+b+c) of Item 20.2 (F)
20 mm Aggregate cum 5.4 0 0
10 mm Aggregate cum 2.7 0 0
Cost of water KL 3 0 0
Admixture kg 243.2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications, RCC Grade M 20, Height upto 5 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 10 % of cost of Material, Labour
20.4.E.p Skilled day 3 0 0 Cement tonne 5.21 0 Concrete mixer hour 6 0 0 0
0 and Equipment (a+b+c) for Formwork
Basic Cost of Labour, Material &
Unskilled day 30 0 0 Coarse sand cum 6.75 0 Generator hour 6 0 0 0
0 Equipment (a+b+c) of Item 20.2 (C)
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 2.5 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications, RCC Grade M 20, Height above 5 m to 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 2 % of cost of Material, Labour
20.4.E.q Skilled day 3 0 0 Cement tonne 5.21 0 Concrete mixer hour 6 0 0 and Equipment excluding formwork to 0
0 cater for extra lift
Add 12 % of cost of Material, Labour
Unskilled day 30 0 0 Coarse sand cum 6.75 0 Generator hour 6 0 0 0
0 and Equipment (a+b+c) for Formwork
Basic Cost of Labour, Material &
20 mm Aggregate cum 8.1 0 0
0 Equipment (a+b+c) of Item 20.2 (C)
10 mm Aggregate cum 5.4 0 0
Cost of water KL 2.5 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications, RCC Grade M 20, Height above 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 4 % of cost of Material, Labour
20.4.E.r Skilled day 3 0 0 Cement tonne 5.21 0 Concrete mixer hour 6 0 0 and Equipment excluding formwork to 0
0 cater for extra lift
Add 15 % of cost of Material, Labour
Unskilled day 30 0 0 Coarse sand cum 6.75 0 Generator hour 6 0 0 0
0 and Equipment (a+b+c) for Formwork
Basic Cost of Labour, Material &
20 mm Aggregate cum 8.1 0 0
0 Equipment (a+b+c) of Item 20.2 (C)
10 mm Aggregate cum 5.4 0 0
Cost of water KL 2.5 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications, RCC Grade M 25, Height upto 5 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 10 % of cost of Material, Labour
20.4.F.p Skilled day 3 0 0 Cement tonne 6.05 0 Concrete mixer hour 6 0 0 0
0 and Equipment (a+b+c) for Formwork
Basic Cost of Labour, Material &
Unskilled day 30 0 0 Coarse sand cum 6.75 0 Generator hour 6 0 0 0
0 Equipment (a+b+c) of Item 20.2 (E)
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 24.2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications, RCC Grade M 25, Height above 5 m to 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 2 % of cost of Material, Labour
20.4.F.q Skilled day 3 0 0 Cement tonne 6.05 0 Concrete mixer hour 6 0 0 and Equipment excluding formwork to 0
0 cater for extra lift
Add 12 % of cost of Material, Labour
Unskilled day 30 0 0 Coarse sand cum 6.75 0 Generator hour 6 0 0 0
0 and Equipment (a+b+c) for Formwork
Basic Cost of Labour, Material &
20 mm Aggregate cum 8.1 0 0
0 Equipment (a+b+c) of Item 20.2 (E)
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 24.2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications, RCC Grade M 25, Height above 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 4 % of cost of Material, Labour
20.4.F.r Skilled day 3 0 0 Cement tonne 6.05 0 Concrete mixer hour 6 0 0 and Equipment excluding formwork to 0
0 cater for extra lift
Add 15 % of cost of Material, Labour
Unskilled day 30 0 0 Coarse sand cum 6.75 0 Generator hour 6 0 0 0
0 and Equipment (a+b+c) for Formwork
Basic Cost of Labour, Material &
20 mm Aggregate cum 8.1 0 0
0 Equipment (a+b+c) of Item 20.2 (E)
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 24.2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications, RCC Grade M 30, Height upto 5 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 10 % of cost of Material, Labour
20.4.G.p Skilled day 3 0 0 Cement tonne 6.1 0 Concrete mixer hour 6 0 0 0
0 and Equipment (a+b+c) for Formwork
Basic Cost of Labour, Material &
Unskilled day 30 0 0 Coarse sand cum 6.75 0 Generator hour 6 0 0 0
0 Equipment (a+b+c) of Item 20.2 (G)
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 24.4 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications, RCC Grade M 30, Height above 5 m to 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 2 % of cost of Material, Labour
20.4.G.q Skilled day 3 0 0 Cement tonne 6.1 0 Concrete mixer hour 6 0 0 and Equipment excluding formwork to 0
0 cater for extra lift
Add 12 % of cost of Material, Labour
Unskilled day 30 0 0 Coarse sand cum 6.75 0 Generator hour 6 0 0 0
0 and Equipment (a+b+c) for Formwork
Basic Cost of Labour, Material &
20 mm Aggregate cum 8.1 0 0
0 Equipment (a+b+c) of Item 20.2 (G)
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 24.4 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications, RCC Grade M 30, Height above 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 4 % of cost of Material, Labour
20.4.G.r Skilled day 3 0 0 Cement tonne 6.1 0 Concrete mixer hour 6 0 0 and Equipment excluding formwork to 0
0 cater for extra lift
Add 15 % of cost of Material, Labour
Unskilled day 30 0 0 Coarse sand cum 6.75 0 Generator hour 6 0 0 0
0 and Equipment (a+b+c) for Formwork
Basic Cost of Labour, Material &
20 mm Aggregate cum 8.1 0 0
0 Equipment (a+b+c) of Item 20.2 (G)
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 24.4 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications, RCC Grade M 35, Height upto 5 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 10 % of cost of Material, Labour
20.4.H.p Skilled day 3 0 0 Cement tonne 6.33 0 Concrete mixer hour 6 0 0 0
0 and Equipment (a+b+c) for Formwork
Basic Cost of Labour, Material &
Unskilled day 30 0 0 Coarse sand cum 6.75 0 Generator hour 6 0 0 0
0 Equipment (a+b+c) of Item 20.2 (H)
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 25.32 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications, RCC Grade M 35, Height above 5 m to 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 2 % of cost of Material, Labour
20.4.H.q Skilled day 3 0 0 Cement tonne 6.33 0 Concrete mixer hour 6 0 0 and Equipment excluding formwork to 0
0 cater for extra lift
Add 12 % of cost of Material, Labour
Unskilled day 30 0 0 Coarse sand cum 6.75 0 Generator hour 6 0 0 0
0 and Equipment (a+b+c) for Formwork
Description of Work:
Providing and laying of Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications, RCC Grade M 35, Height above 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 4 % of cost of Material, Labour
20.4.H.r Skilled day 3 0 0 Cement tonne 6.33 0 Concrete mixer hour 6 0 0 and Equipment excluding formwork to 0
0 cater for extra lift
Add 15 % of cost of Material, Labour
Unskilled day 30 0 0 Coarse sand cum 6.75 0 Generator hour 6 0 0 0
0 and Equipment (a+b+c) for Formwork
Basic Cost of Labour, Material &
20 mm Aggregate cum 8.1 0 0
0 Equipment (a+b+c) of Item 20.2 (H)
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 25.32 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure complete as per Drawing and Technical Specifications 1 tonne
Spec. cl. No: 2014
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.5 Unskilled day 9 0 0 Binding wire kg 8 0 0
Skilled
day 4 0 0 HYSD bars tonne 1.1 #NAME?
( Blacksmith) #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and laying ,fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and Technical Specification 1 tonne
Spec. cl. No: 2014
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.6 Unskilled day 10 0 0 Binding wire kg 9 0 0
Skilled
day 4 0 0 MS bars tonne 1.15 0
(Blacksmith) 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing and laying weep holes in Brick dry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 110 mm dia HDPE pipe, extending through the full width of the structure with slope of 1V :20H towards drawing face Complete as per
30 meter
Drawing and Technical Specifications.
Spec. cl. No: 3109
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.7 Unskilled day 1 0 0 Cement mortar 1:3 tonne 0.0255 0 0
Skilled day 1 0 0 sand cum 0.0525 0 0
collar for AC pipe nos. 10 0 0
MS clamp nos. 30 0 0
Description of Work: Providing and laying weep holes in Stone Masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 150mm dia HDPE pipe, extending through the full width of the structure with slope of 1V :20H towards drawing face Complete as
30 meter
per Drawing and Technical Specifications.
Spec. cl. No: 3109
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.7_a Unskilled day 1 0 0 sand cum 0.0525 0 0
Skilled day 1 0 0 Cement mortar 1:3 tonne 0.0255 0 0
collar for AC pipe nos. 10 0 0
MS clamp nos. 30 0 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in super-structure as per drawing and Technical Specification, RCC Grade M 20 30 meter
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.A Unskilled day 30 0 0 Cost of water KL 3 0 0 Generator hour 6 0 0
Skilled day 3 0 0 10 mm Aggregate cum 5.4 0 0 Concrete mixer hour 6 0 0
20 mm Aggregate cum 8.1 0 0
Coarse sand cum 6.75 0 0
Cement tonne 5.12 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in solid slab super-structure as per drawing and Technical Specification, RCC Grade M 20, Height upto 5 m 30 meter
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.A.i. d) Formwork and staging 20 % of
Skilled day 3 0 0 Cement tonne 5.12 0 Concrete mixer hour 6 0 0 0
p 0 (a+b+c)
Unskilled day 30 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in solid slab super-structure as per drawing and Technical Specification, RCC Grade M 20, Height above 5 m to 10 m 30 meter
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.A.i. d) Formwork and staging 25 % of
Skilled day 3 0 0 Cement tonne 5.12 0 Concrete mixer hour 6 0 0 0
q 0 (a+b+c)
Unskilled day 30 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in solid slab super-structure as per drawing and Technical Specification, RCC Grade M 20, Height above 10 m 30 meter
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.A.i. d) Formwork and staging 30 % of
Skilled day 3 0 0 Cement tonne 5.12 0 Concrete mixer hour 6 0 0 0
r 0 (a+b+c)
Unskilled day 30 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in T-beam and slab super-structure as per drawing and Technical Specification, RCC Grade M 20, Height upto 5 m 30 meter
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.A.ii d) Formwork and staging 25 % of
Skilled day 3 0 0 Cement tonne 5.12 0 Concrete mixer hour 6 0 0 0
.p 0 (a+b+c)
Unskilled day 30 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in T-beam and slab super-structure as per drawing and Technical Specification, RCC Grade M 20, Height above 5 m to 10 m 30 meter
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.A.ii d) Formwork and staging 30 % of
Skilled day 3 0 0 Cement tonne 5.12 0 Concrete mixer hour 6 0 0 0
.q 0 (a+b+c)
Unskilled day 30 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in T-beam and slab super-structure as per drawing and Technical Specification, RCC Grade M 20, Height above 10 m 30 meter
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.A.ii d) Formwork and staging 35 % of
Skilled day 3 0 0 Cement tonne 5.12 0 Concrete mixer hour 6 0 0 0
.r 0 (a+b+c)
Unskilled day 30 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in super-structure as per drawing and Technical Specification, RCC Grade M 25 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.B Unskilled day 30 0 0 Admixture kg 23.96 0 0 Generator hour 6 0 0
Skilled day 3 0 0 Cost of water KL 3 0 0 Concrete mixer hour 6 0 0
10 mm Aggregate cum 5.4 0 0
20 mm Aggregate cum 8.1 0 0
Coarse sand cum 6.75 0 0
Cement tonne 5.99 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in solid slab super-structure as per drawing and Technical Specification, RCC Grade M 25, Height upto 5 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.B.i. d) Formwork and staging 20 % of
Skilled day 3 0 0 Cement tonne 5.99 0 Concrete mixer hour 6 0 0 0
p 0 (a+b+c)
Unskilled day 30 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 23.96 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in solid slab super-structure as per drawing and Technical Specification, RCC Grade M 25, Height above 5 m to 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.B.i. d) Formwork and staging 25 % of
Skilled day 3 0 0 Cement tonne 5.99 0 Concrete mixer hour 6 0 0 0
q 0 (a+b+c)
Unskilled day 30 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 23.96 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in solid slab super-structure as per drawing and Technical Specification, RCC Grade M 25, Height above 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.B.i. d) Formwork and staging 30 % of
Skilled day 3 0 0 Cement tonne 5.99 0 Concrete mixer hour 6 0 0 0
r 0 (a+b+c)
Unskilled day 30 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 23.96 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in T-beam and slab super-structure as per drawing and Technical Specification, RCC Grade M 25, Height upto 5 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.B.ii. d) Formwork and staging 25 % of
Skilled day 3 0 0 Cement tonne 5.99 0 Concrete mixer hour 6 0 0 0
p 0 (a+b+c)
Unskilled day 30 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 23.96 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in T-beam and slab super-structure as per drawing and Technical Specification, RCC Grade M 25, Height above 5 m to 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.B.ii. d) Formwork and staging 30 % of
Skilled day 3 0 0 Cement tonne 5.99 0 Concrete mixer hour 6 0 0 0
q 0 (a+b+c)
Unskilled day 30 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 23.96 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in T-beam and slab super-structure as per drawing and Technical Specification, RCC Grade M 25, Height above 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.B.ii. d) Formwork and staging 35 % of
Skilled day 3 0 0 Cement tonne 5.99 0 Concrete mixer hour 6 0 0 0
r 0 (a+b+c)
Unskilled day 30 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 23.96 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in super-structure as per drawing and Technical Specification, RCC Grade M 30 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.C Unskilled day 32 0 0 Admixture kg 24.4 0 0 Generator hour 6 0 0
Skilled day 3 0 0 Cost of water KL 3 0 0 Concrete mixer hour 6 0 0
10 mm Aggregate cum 5.4 0 0
20 mm Aggregate cum 8.1 0 0
Coarse sand cum 6.75 0 0
Cement tonne 6.1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in solid slab super-structure as per drawing and Technical Specification, RCC Grade M 30, Height upto 5 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.C.i. d) Formwork and staging 20 % of
Skilled day 3 0 0 Cement tonne 6.1 0 Concrete mixer hour 6 0 0 0
p 0 (a+b+c)
Unskilled day 32 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 24.4 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in solid slab super-structure as per drawing and Technical Specification, RCC Grade M 30, Height above 5 m to 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.C.i.
Skilled day 3 0 0 Cement tonne 6.1 0 Concrete mixer hour 6 0 0 Formwork and staging 25 % of (a+b+c) 0
q 0
Unskilled day 32 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 24.4 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in solid slab super-structure as per drawing and Technical Specification, RCC Grade M 30, Height above 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.C.i. d) Formwork and staging 30 % of
Skilled day 3 0 0 Cement tonne 6.1 0 Concrete mixer hour 6 0 0 0
r 0 (a+b+c)
Unskilled day 32 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 24.4 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in T-beam and slab super-structure as per drawing and Technical Specification, RCC Grade M 30, Height upto 5 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.C.ii d) Formwork and staging 25 % of
Skilled day 3 0 0 Cement tonne 6.1 0 Concrete mixer hour 6 0 0 0
.p 0 (a+b+c)
Unskilled day 32 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 24.4 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in T-beam and slab super-structure as per drawing and Technical Specification, RCC Grade M 30, Height above 5 m to 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.C.ii d) Formwork and staging 30 % of
Skilled day 3 0 0 Cement tonne 6.1 0 Concrete mixer hour 6 0 0 0
.q 0 (a+b+c)
Unskilled day 32 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 24.4 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in T-beam and slab super-structure as per drawing and Technical Specification, RCC Grade M 30, Height above 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.C.ii d) Formwork and staging 35 % of
Skilled day 3 0 0 Cement tonne 6.1 0 Concrete mixer hour 6 0 0 0
.r 0 (a+b+c)
Unskilled day 32 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 24.4 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in super-structure as per drawing and Technical Specification, RCC/PSC Grade M 35 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.D Unskilled day 32 0 0 Admixture kg 25.32 0 0 Generator hour 6 0 0
Skilled day 3 0 0 Cost of water KL 3 0 0 Concrete mixer hour 6 0 0
10 mm Aggregate cum 5.4 0 0
20 mm Aggregate cum 8.1 0 0
Coarse sand cum 6.75 0 0
Cement tonne 6.33 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in solid slab super-structure as per drawing and Technical Specification, RCC/PSC Grade M 35, Height upto 5 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.D.i. d) Formwork and staging 18 % per cent
Skilled day 3 0 0 Cement tonne 6.33 0 Concrete mixer hour 6 0 0 0
p 0 of (a+b+c)
Unskilled day 32 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 25.32 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in solid slab super-structure as per drawing and Technical Specification, RCC/PSC Grade M 35, Height above 5 m to 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.D.i. d) Formwork and staging 23 % per cent
Skilled day 3 0 0 Cement tonne 6.33 0 Concrete mixer hour 6 0 0 0
q 0 of (a+b+c)
Unskilled day 32 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 25.32 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in solid slab super-structure as per drawing and Technical Specification, RCC/PSC Grade M 35, Height above 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.D.i. d) Formwork and staging 28 % per cent
Skilled day 3 0 0 Cement tonne 6.33 0 Concrete mixer hour 6 0 0 0
r 0 of (a+b+c)
Unskilled day 32 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 25.32 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in T-beam and slab super-structure as per drawing and Technical Specification, RCC/PSC Grade M 35, Height upto 5 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.D.ii d) Formwork and staging 23 % per cent
Skilled day 3 0 0 Cement tonne 6.33 0 Concrete mixer hour 6 0 0 0
.p 0 of (a+b+c)
Unskilled day 32 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 25.32 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in T-beam and slab super-structure as per drawing and Technical Specification, RCC/PSC Grade M 35, Height above 5 m to 10 m 15 cum
Providing and laying of Reinforced/ Pre-stressed cement concrete in T-beam and slab super-structure as per drawing and Technical Specification, RCC/PSC Grade M 35, Height above 5 m to 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.D.ii d) Formwork and staging 28 % per cent
Skilled day 3 0 0 Cement tonne 6.33 0 Concrete mixer hour 6 0 0 0
.q 0 of (a+b+c)
Unskilled day 32 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 25.32 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in T-beam and slab super-structure as per drawing and Technical Specification, RCC/PSC Grade M 35, Height above 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.D.ii d) Formwork and staging 33 % per cent
Skilled day 3 0 0 Cement tonne 6.33 0 Concrete mixer hour 6 0 0 0
.r 0 of (a+b+c)
Unskilled day 32 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 25.32 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in box girder and balanced cantilever super-structure as per drawing and Technical Specification, RCC/PSC Grade M 35, Height upto 5 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.D.ii d) Formwork and staging 38 % per cent
Skilled day 3 0 0 Cement tonne 6.33 0 Concrete mixer hour 6 0 0 0
i.p 0 of (a+b+c)
Unskilled day 32 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 25.32 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in box girder and balanced cantilever super-structure as per drawing and Technical Specification, RCC/PSC Grade M 35, Height above 5 m to 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.D.ii d) Formwork and staging 48 % per cent
Skilled day 3 0 0 Cement tonne 6.33 0 Concrete mixer hour 6 0 0 0
i.q 0 of (a+b+c)
Unskilled day 32 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 25.32 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in box girder and balanced cantilever super-structure as per drawing and Technical Specification, RCC/PSC Grade M 35, Height above 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No.
Norms
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.D.ii d) Formwork and staging 58 % per cent
Skilled day 3 0 0 Cement tonne 6.33 0 Concrete mixer hour 6 0 0 0
i.r 0 of (a+b+c)
Unskilled day 32 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Cost of water KL 3 0 0
Admixture kg 25.32 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in super-structure as per drawing and Technical Specification, PSC Grade M-40 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.E Unskilled day 33 0 0 Cost of water KL 3 0 0 Generator hour 6 0 0
Skilled day 4 0 0 Admixture kg 25.8 0 0 Concrete mixer hour 6 0 0
10 mm Aggregate cum 5.4 0 0
20 mm Aggregate cum 8.1 0 0
Coarse sand cum 6.75 0 0
Cement tonne 6.45 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in sollid slab super-structure as per drawing and Technical Specification, PSC Grade M-40, Height upto 5 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.E.i. d) Formwork and staging 20 % per cent
Skilled day 4 0 0 Cement tonne 6.45 0 Concrete mixer hour 6 0 0 0
p 0 of (a+b+c)
Unskilled day 33 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Admixture kg 25.8 0 0
Cost of water KL 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in sollid slab super-structure as per drawing and Technical Specification, PSC Grade M-40, Height above 5 m to 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.E.i. d) Formwork and staging 25 % per cent
Skilled day 4 0 0 Cement tonne 6.45 0 Concrete mixer hour 6 0 0 0
q 0 of (a+b+c)
Unskilled day 33 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Admixture kg 25.8 0 0
Cost of water KL 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in sollid slab super-structure as per drawing and Technical Specification, PSC Grade M-40, Height above 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.E.i. d) Formwork and staging 30 % per cent
Skilled day 4 0 0 Cement tonne 6.45 0 Concrete mixer hour 6 0 0 0
r 0 of (a+b+c)
Unskilled day 33 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Admixture kg 25.8 0 0
Cost of water KL 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in T-beam and slab super-structure as per drawing and Technical Specification, PSC Grade M-40, Height upto 5 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.E.ii. d) Formwork and staging 25 % per cent
Skilled day 4 0 0 Cement tonne 6.45 0 Concrete mixer hour 6 0 0 0
p 0 of (a+b+c)
Unskilled day 33 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Admixture kg 25.8 0 0
Cost of water KL 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in T-beam and slab super-structure as per drawing and Technical Specification, PSC Grade M-40, Height above 5 m to 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.E.ii. d) Formwork and staging 30 % per cent
Skilled day 4 0 0 Cement tonne 6.45 0 Concrete mixer hour 6 0 0 0
q 0 of (a+b+c)
Unskilled day 33 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Admixture kg 25.8 0 0
Cost of water KL 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in T-beam and slab super-structure as per drawing and Technical Specification, PSC Grade M-40, Height above 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.E.ii. d) Formwork and staging 35 % per cent
Skilled day 4 0 0 Cement tonne 6.45 0 Concrete mixer hour 6 0 0 0
r 0 of (a+b+c)
Unskilled day 33 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Admixture kg 25.8 0 0
Cost of water KL 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in super-structure as per drawing and Technical Specification, PSC Grade M-45 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.F Unskilled day 33 0 0 Cost of water KL 3 0 0 Generator hour 6 0 0
Skilled day 4 0 0 Admixture kg 27.9 0 0 Concrete mixer hour 6 0 0
10 mm Aggregate cum 5.4 0 0
20 mm Aggregate cum 8.1 0 0
Coarse sand cum 6.75 0 0
Cement tonne 6.975 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in solid slab super-structure as per drawing and Technical Specification, PSC Grade M-45, Height upto 5 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.F.i. d) Formwork and staging 20 % per cent
Skilled day 4 0 0 Cement tonne 6.975 0 Concrete mixer hour 6 0 0 0
p 0 of (a+b+c)
Unskilled day 33 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Admixture kg 27.9 0 0
Cost of water KL 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in solid slab super-structure as per drawing and Technical Specification, PSC Grade M-45, Height above 5 m to 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.F.i. d) Formwork and staging 25 % per cent
Skilled day 4 0 0 Cement tonne 6.975 0 Concrete mixer hour 6 0 0 0
q 0 of (a+b+c)
Unskilled day 33 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Admixture kg 27.9 0 0
Cost of water KL 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in solid slab super-structure as per drawing and Technical Specification, PSC Grade M-45, Height above 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
d) Formwork and staging 30 % per cent
20.8.F.i.r Skilled day 4 0 0 Cement tonne 6.975 0 Concrete mixer hour 6 0 0 0
0 of (a+b+c)
Unskilled day 33 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Admixture kg 27.9 0 0
Cost of water KL 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in T-beam and slab super-structure as per drawing and Technical Specification, PSC Grade M-45, Height upto 5 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.F.ii. d) Formwork and staging 25 % per cent
Skilled day 4 0 0 Cement tonne 6.975 0 Concrete mixer hour 6 0 0 0
p 0 of (a+b+c)
Unskilled day 33 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Admixture kg 27.9 0 0
Cost of water KL 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in super-structure as per drawing and Technical Specification, PSC Grade M-45, Height above 5 m to 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.F.ii. d) Formwork and staging 30 % per cent
Skilled day 4 0 0 Cement tonne 6.975 0 Concrete mixer hour 6 0 0 0
q 0 of (a+b+c)
Unskilled day 33 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Admixture kg 27.9 0 0
Cost of water KL 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in super-structure as per drawing and Technical Specification, PSC Grade M-45, Height above 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.F.ii. d) Formwork and staging 35 % per cent
Skilled day 4 0 0 Cement tonne 6.975 0 Concrete mixer hour 6 0 0 0
r 0 of (a+b+c)
Unskilled day 33 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Admixture kg 27.9 0 0
Cost of water KL 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in super-structure as per drawing and Technical Specification, PSC Grade M-50 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.G Unskilled day 30 0 0 Cost of water KL 3 0 0 Generator hour 6 0 0
Skilled day 5 0 0 Admixture kg 29.4 0 0 Concrete mixer hour 6 0 0
10 mm Aggregate cum 5.4 0 0
20 mm Aggregate cum 8.1 0 0
Coarse sand cum 6.75 0 0
Cement tonne 7.35 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in solid slab super-structure as per drawing and Technical Specification, PSC Grade M-50, Height upto 5 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.G.i. d) Formwork and staging 20 % per cent
Skilled day 5 0 0 Cement tonne 7.35 0 Concrete mixer hour 6 0 0 0
p 0 of (a+b+c)
Unskilled day 30 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Admixture kg 29.4 0 0
Cost of water KL 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in solid slab super-structure as per drawing and Technical Specification, PSC Grade M-50, Height above 5 m to 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.G.i. d) Formwork and staging 25 % per cent
Skilled day 5 0 0 Cement tonne 7.35 0 Concrete mixer hour 6 0 0 0
q 0 of (a+b+c)
Unskilled day 30 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Admixture kg 29.4 0 0
Cost of water KL 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in solid slab super-structure as per drawing and Technical Specification, PSC Grade M-50, Height above 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.G.i. d) Formwork and staging 30 % per cent
Skilled day 5 0 0 Cement tonne 7.35 0 Concrete mixer hour 6 0 0 0
r 0 of (a+b+c)
Unskilled day 30 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Admixture kg 29.4 0 0
Cost of water KL 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in T-beam and slab super-structure as per drawing and Technical Specification, PSC Grade M-50, Height upto 5 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.G.ii d) Formwork and staging 25 % per cent
Skilled day 5 0 0 Cement tonne 7.35 0 Concrete mixer hour 6 0 0 0
.p 0 of (a+b+c)
Unskilled day 30 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Admixture kg 29.4 0 0
Cost of water KL 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in T-beam and slab super-structure as per drawing and Technical Specification, PSC Grade M-50, Height above 5 m to 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.G.ii d) Formwork and staging 30 % per cent
Skilled day 5 0 0 Cement tonne 7.35 0 Concrete mixer hour 6 0 0 0
.q 0 of (a+b+c)
Unskilled day 30 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Admixture kg 29.4 0 0
Cost of water KL 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in T-beam and slab super-structure as per drawing and Technical Specification, PSC Grade M-50, Height above 10 m 15 cum
Description of Work:
Providing and laying of Reinforced/ Pre-stressed cement concrete in T-beam and slab super-structure as per drawing and Technical Specification, PSC Grade M-50, Height above 10 m 15 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.8.G.ii d) Formwork and staging 35 % per cent
Skilled day 5 0 0 Cement tonne 7.35 0 Concrete mixer hour 6 0 0 0
.r 0 of (a+b+c)
Unskilled day 30 0 0 Coarse sand cum 6.75 0 0 Generator hour 6 0 0
20 mm Aggregate cum 8.1 0 0
10 mm Aggregate cum 5.4 0 0
Admixture kg 29.4 0 0
Cost of water KL 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying , fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications 1 tonne
Spec. cl. No: 2014
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.9 Unskilled day 12 0 0 Binding wire Kg 8 0 0
Skilled
day 4 0 0 HYSD bars tonne 1.1 #NAME?
(Blacksmith) #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and laying of PCC M 15 Grade leveling course below approach slab complete as per drawing and Technical specification 15 cum
Spec. cl. No: no number
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
"20.10" Unskilled day 30 0 0 Cost of water KL 2 0 0 Generator hour 6 0 0
Skilled day 3 0 0 10 mm Aggregate cum 1.35 0 0 Concrete mixer hour 6 0 0
20 mm Aggregate cum 4.05 0 0
40 mm Aggregate cum 8.1 0 0
Coarse sand cum 6.75 0 0
Cement tonne 4.13 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification 1 cum
Spec. cl. No: 2014
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.11 HYSD bar reinforcement Rate tonne 0.05 #NAME? #NAME?
( Refer relevant item of concrete in item except that form work
may be added at the rate of 2 per cent of cost against 3.5 per
cent provided in the foundation concrete.
Cement concrete Grade ( excluding formwork i.e. per cum
cum 1 0
basic cost (a+b+c) ) 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications 1 cum
Spec. cl. No: 2000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
20.12 Unskilled day 2 0 0 HYSD bar reinforcementRate as per item no 20.9 tonne 0.08 #NAME? #NAME?
Skilled day 2 0 0 Concrete, Rate as per item No. 20.2 (G) excluding formworks cum #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Precast - pre-tensioned Girders, Providing, pre-casting, transportation and placing in position precast pre-tensioned concrete girders as per drawing and technical specifications, Grade of concrete - M 40 10 cum
Spec. cl. No: 2000, 2100
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Cost of formwork, steam curing
Add consumables such as binding wire, foam, packing tape,
arrangement, pre-tensioning
21.2 Unskilled day 3 0 0 shuttering oil, HDPE pipe for unbonding of strand, bolt & nuts 0 Crane hour 2 0 0 #NAME?
arrangement etc. @ 5 per cent of cost
etc. @ 1 per cent of material cost
material, Labour and Equipment
ii) For transportation
Skilled day 1 0 0 LDO for steam curing Liter 370 0
0 and placement at site
(vii) Placement
of girders in
position over
pier caps
including HT strand tonne 0.6 0 Loader hour 1 0 0
placement of
sand jacks,
channel,
levelling etc.
0
Unskilled day 3 0 0 HYSD steel . tonne 1 #NAME? #NAME? Trailer hour 2 0 0
Skilled day 1 0 0 Admixture @ 0.4 per cent of cement Kg 18.8 0 0 Crane hour 2 0 0
(vi) Handling of
precast girder,
stacking in Concrete Pump
10 mm Aggregate cum 3.6 0 hour 1 0 0
stockyard and stationary
again loading in
trailer 0
Unskilled day 4 0 0 20 mm Aggregate cum 5.4 0 0 Transit Mixer hour 2 0 0
Skilled day 1 0 0 Coarse sand cum 4.5 0 0 Batching Plant hour 1 0 0
(v) Steam curing
and manual Cement tonne 4.7 0 Generator hour 6 0 0
curing 0
Unskilled day 12 0 0 i) At casting yard
Skilled day 1 0 0
(iv) Concreting
by Batching
plant or concrete
mixture and
stationary
concrete pump
Unskilled day 20 0 0
Skilled day 10 0 0
Technician day 1 0 0
Taking shuttering
area 10 sqm/cum
of concrete
Unskilled day 16 0 0
Skilled day 4 0 0
Taking quantity
of steel 100
Kg/cum of
concrete
including laps
and wastage
(i) Cutting,
bending, making
reinforcement
cage, placing in
position, binding
etc. complete
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = #NAME?
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and fixing Helical pipes in voided concrete slabs as per Drawing and Technical Specifications. 10 meter
Spec. cl. No: 2000, 2100
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Consumables for sealing joints etc.@ 5 per cent of cost of
21.3 Unskilled day 3 0 0 0
material
Skilled ( Fitter) day 1 0 0 Tie rods 20 mm diameter nos 10 0 0
Description of Work: Providing , Fabricating , assembling and erecting structural steel components / elements including nut, bolt, gusset plate, including shop drawings, facilities for inspection & testing and trial assembling all complete as per specification., RS Joist,
1 tonne
Heavy Zinc Coating
Spec. cl. No: 2200
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 5.0 per cent cost
Add 5.0 per cent cost of structural steel for consumables ( gas
of steel for cutting,
22.1.A Unskilled day 4 0 0 electrodes drill bits etc.)material for Spacers, Insulation tape 0 0
drilling, grinding
and miscellaneous items
welding et
Semiskilled day 4 0 0 Add 12% of cost of material for heavy zinc coating 0 Crane hour 1 0 0
Skilled
day 2 0 0 Add 3 % cost of of structural steel for Nut , bolt/ Rivet etc. 0
(Blacksmith)
Technician day 1 0 0 Structural Steel tonne 1.1 0 0
ii) for Erecting
Unskilled day 2 0 0
Semiskilled day 2 0 0
Skilled
day 2 0 0
(Blacksmith)
Technician day 1 0 0
i) for
Fabricating/
assembling
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing , Fabricating , assembling and erecting structural steel components / elements including nut, bolt, gusset plate, including shop drawings, facilities for inspection & testing and trial assembling all complete as per specification., RS Joist,
1 tonne
painting one shop coat with red oxide primer and two coats of synthetic enamel
Spec. cl. No: 2200
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 5.0 per cent cost
Add 5.0 per cent cost of structural steel for consumables ( gas
of steel for cutting,
22.1.A_a Unskilled day 4 0 0 electrodes drill bits etc.)material for Spacers, Insulation tape 0 0
drilling, grinding
and miscellaneous items
welding et
Add 5% of cost of material for painting one shop coat with red
Semiskilled day 4 0 0 0 Crane hour 1 0 0
oxide primer and two coats of synthetic enamel .
Skilled
day 2 0 0 Add 3 % cost of of structural steel for Nut , bolt/ Rivet etc. 0
(Blacksmith)
Technician day 1 0 0 Structural Steel tonne 1.1 0 0
ii) for Erecting
Unskilled day 2 0 0
Semiskilled day 2 0 0
Skilled
day 2 0 0
(Blacksmith)
Technician day 1 0 0
i) for
Fabricating/
assembling
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing , Fabricating , assembling and erecting structural steel components / elements including nut, bolt, gusset plate, including shop drawings, facilities for inspection & testing and trial assembling all complete as per specification., RS Joist,
1 tonne
Height upto 5 m
Spec. cl. No: 2200
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
i) for
d) Formwork and staging "&F31&" per
22.1.A.P Fabricating/ Structural Steel tonne 1.1 0 Crane hour 1 0 0 0
cent of (a+b+c)
assembling 0
Add 5.0 per cent cost
of steel for cutting, d) Formwork and staging "&F31&" per
Technician day 1 0 0 Add 3 % cost of of structural steel for Nut , bolt/ Rivet etc. 0 0 0
drilling, grinding cent of (a+b+c)
welding et
Skilled
day 2 0 0 Add 12% of cost of material for heavy zinc coating 0
(Blacksmith)
Add 5.0 per cent cost of structural steel for consumables ( gas
Semiskilled day 2 0 0 electrodes drill bits etc.)material for Spacers, Insulation tape 0
and miscellaneous items
Unskilled day 2 0 0
ii) for Erecting
Technician day 1 0 0
Skilled
day 2 0 0
(Blacksmith)
Semiskilled day 4 0 0
Unskilled day 4 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing , Fabricating , assembling and erecting structural steel components / elements including nut, bolt, gusset plate, including shop drawings, facilities for inspection & testing and trial assembling all complete as per specification., RS Joist,
1 tonne
Height above 10 m
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
i) for
d) Formwork and staging "&F31&" per
22.1.A.R Fabricating/ Structural Steel tonne 1.1 0 Crane hour 1 0 0 0
cent of (a+b+c)
assembling 0
Add 5.0 per cent cost
of steel for cutting,
Technician day 1 0 0 Add 3 % cost of of structural steel for Nut , bolt/ Rivet etc. 0 0
drilling, grinding
welding et
Skilled
day 2 0 0 Add 12% of cost of material for heavy zinc coating 0
(Blacksmith)
Add 5.0 per cent cost of structural steel for consumables ( gas
Semiskilled day 2 0 0 electrodes drill bits etc.)material for Spacers, Insulation tape 0
and miscellaneous items
Unskilled day 2 0 0
ii) for Erecting
Technician day 1 0 0
Skilled
day 2 0 0
(Blacksmith)
Semiskilled day 4 0 0
Unskilled day 4 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing , Fabricating , assembling and erecting structural steel components / elements including nut, bolt, gusset plate, including shop drawings, facilities for inspection & testing and trial assembling all complete as per specification., Built up beam,
1 tonne
Plate Girder etc.
Spec. cl. No: 2200
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 5.0 per cent cost
Add 5.0 per cent cost of steel for consumables ( gas electrodes
of steel for cutting,
22.1.B Unskilled day 6 0 0 drill bits etc.)material for Spacers, Insulation tape and 0 0
drilling, grinding
miscellaneous items
welding et
Semiskilled day 6 0 0 Add 12% of cost of material for heavy zinc coating 0 crane hour 6 0 0
Skilled
day 3 0 0 Add 3 % cost of of structural steel for Nut , bolt/ Rivet etc. 0
(Blacksmith)
Technician day 1 0 0 Structural Steel tonne 1.1 0 0
ii) for Erecting
Unskilled day 5 0 0
Semiskilled day 5 0 0
Skilled
day 3 0 0
(Blacksmith)
Technician day 1 0 0
i) for
Fabricating/
assembling
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing , Fabricating , assembling and erecting structural steel components / elements including nut, bolt, gusset plate, including shop drawings, facilities for inspection & testing and trial assembling all complete as per specification., Built up beam,
1 tonne
Plate Girder etc.
Spec. cl. No: 2200
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 5.0 per cent cost
Add 5.0 per cent cost of steel for consumables ( gas electrodes
of steel for cutting,
22.1.B_a Unskilled day 6 0 0 drill bits etc.)material for Spacers, Insulation tape and 0 0
drilling, grinding
miscellaneous items
welding et
Add 5% of cost of material for painting one shop coat with red
Semiskilled day 6 0 0 0 crane hour 6 0 0
oxide primer and two coats of synthetic enamel .
Skilled
day 3 0 0 Add 3 % cost of of structural steel for Nut , bolt/ Rivet etc. 0
(Blacksmith)
Technician day 1 0 0 Structural Steel tonne 1.1 0 0
ii) for Erecting
Unskilled day 5 0 0
Semiskilled day 5 0 0
Skilled
day 3 0 0
(Blacksmith)
Technician day 1 0 0
i) for
Fabricating/
assembling
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing , Fabricating , assembling and erecting structural steel components / elements including nut, bolt, gusset plate, including shop drawings, facilities for inspection & testing and trial assembling all complete as per specification., Built up beam,
1 tonne
Plate Girder etc., Height upto 5 m
Spec. cl. No: 2200
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
i) for
d) Formwork and staging 25 % of
22.1.B.p Fabricating/ Structural Steel tonne 1.1 0 crane hour 6 0 0 0
(a+b+c)
assembling 0
Add 5.0 per cent cost
of steel for cutting,
Technician day 1 0 0 Add 3 % cost of of structural steel for Nut , bolt/ Rivet etc. 0 0
drilling, grinding
welding et
Skilled
day 3 0 0 Add 12% of cost of material for heavy zinc coating 0
(Blacksmith)
Add 5.0 per cent cost of steel for consumables ( gas electrodes
Semiskilled day 5 0 0 drill bits etc.)material for Spacers, Insulation tape and 0
miscellaneous items
Unskilled day 5 0 0
ii) for Erecting
Technician day 1 0 0
Skilled
day 3 0 0
(Blacksmith)
Semiskilled day 6 0 0
Unskilled day 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing , Fabricating , assembling and erecting structural steel components / elements including nut, bolt, gusset plate, including shop drawings, facilities for inspection & testing and trial assembling all complete as per specification., Built up beam,
1 tonne
Plate Girder etc., Height 5 m to 10 m
Spec. cl. No: 2200
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
i) for
d) Formwork and staging 30 % of
22.1.B.q Fabricating/ Structural Steel tonne 1.1 0 crane hour 6 0 0 0
(a+b+c)
assembling 0
Add 5.0 per cent cost
of steel for cutting,
Technician day 1 0 0 Add 3 % cost of of structural steel for Nut , bolt/ Rivet etc. 0 0
drilling, grinding
welding et
Skilled
day 3 0 0 Add 12% of cost of material for heavy zinc coating 0
(Blacksmith)
Add 5.0 per cent cost of steel for consumables ( gas electrodes
Semiskilled day 5 0 0 drill bits etc.)material for Spacers, Insulation tape and 0
miscellaneous items
Unskilled day 5 0 0
ii) for Erecting
Technician day 1 0 0
Skilled
day 3 0 0
(Blacksmith)
Semiskilled day 6 0 0
Unskilled day 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing , Fabricating , assembling and erecting structural steel components / elements including nut, bolt, gusset plate, including shop drawings, facilities for inspection & testing and trial assembling all complete as per specification., Built up beam,
1 tonne
Plate Girder etc., Height above 10 m
Spec. cl. No: 2200
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
i) for
d) Formwork and staging 35 % of
22.1.B.r Fabricating/ Structural Steel tonne 1.1 0 crane hour 6 0 0 0
(a+b+c)
assembling 0
Add 5.0 per cent cost
of steel for cutting,
Technician day 1 0 0 Add 3 % cost of of structural steel for Nut , bolt/ Rivet etc. 0 0
drilling, grinding
welding et
Skilled
day 3 0 0 Add 12% of cost of material for heavy zinc coating 0
(Blacksmith)
Add 5.0 per cent cost of steel for consumables ( gas electrodes
Semiskilled day 5 0 0 drill bits etc.)material for Spacers, Insulation tape and 0
miscellaneous items
Unskilled day 5 0 0
ii) for Erecting
Technician day 1 0 0
Skilled
day 3 0 0
(Blacksmith)
Semiskilled day 6 0 0
Unskilled day 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Fabricating , assembling and erecting structural steel components / elements including nut, bolt, gusset plate, including shop drawings, facilities for inspection & testing and trial assembling all complete as per specification., Truss 1 tonne
Spec. cl. No: 2200
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 5.0 per cent cost
Add 5.0 per cent cost of steel for consumables ( gas electrodes
of steel for cutting,
22.1.C Unskilled day 8 0 0 drill bits etc.) material for Spacers, Insulation tape and 0 0
drilling, grinding
miscellaneous items
welding etc.
Semiskilled day 8 0 0 Add 12% of cost of material for heavy zinc coating. 0 Crane hour 6 0 0
Skilled
day 4 0 0 Add 3 % cost of of structural steel for Nut , bolt/ Rivet etc. 0
/Blacksmith
Technician day 2 0 0 Structural Steel tonne 1.1 0 0
ii) for Erecting
Unskilled day 6 0 0
Semiskilled day 6 0 0
Skilled
day 4 0 0
(Blacksmith)
Technician day 2 0 0
i) for
Fabricating/
assembling
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
22.1.C_a 1 tonne
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 5.0 per cent cost
Add 5.0 per cent cost of steel for consumables ( gas electrodes
of steel for cutting,
22.1.C_a Unskilled day 8 0 0 drill bits etc.) material for Spacers, Insulation tape and 0 0
drilling, grinding
miscellaneous items
welding etc.
Add 5% of cost of material for painting one shop coat with red
Semiskilled day 8 0 0 0 Crane hour 6 0 0
oxide primer and two coats of synthetic enamel
Skilled
day 4 0 0 Add 3 % cost of of structural steel for Nut , bolt/ Rivet etc. 0
/Blacksmith
Technician day 2 0 0 Structural Steel tonne 1.1 0 0
ii) for Erecting
Unskilled day 6 0 0
Semiskilled day 6 0 0
Skilled
day 4 0 0
(Blacksmith)
Technician day 2 0 0
i) for
Fabricating/
assembling
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing , Fabricating , assembling and erecting structural steel components / elements including nut, bolt, gusset plate, including shop drawings, facilities for inspection & testing and trial assembling all complete as per specification., Truss, Height
1 tonne
upto 5 m
Spec. cl. No: 2200
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
i) for
d) Formwork and staging 30 % of
22.1.C.p Fabricating/ Structural Steel tonne 1.1 0 Crane hour 6 0 0 0
(a+b+c)
assembling 0
Add 5.0 per cent cost
of steel for cutting,
Technician day 2 0 0 Add 3 % cost of of structural steel for Nut , bolt/ Rivet etc. 0 0
drilling, grinding
welding etc.
Skilled
day 4 0 0 Add 12% of cost of material for heavy zinc coating. 0
(Blacksmith)
Add 5.0 per cent cost of steel for consumables ( gas electrodes
Semiskilled day 6 0 0 drill bits etc.) material for Spacers, Insulation tape and 0
miscellaneous items
Unskilled day 6 0 0
ii) for Erecting
Technician day 2 0 0
Skilled
day 4 0 0
/Blacksmith
Semiskilled day 8 0 0
Unskilled day 8 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing , Fabricating , assembling and erecting structural steel components / elements including nut, bolt, gusset plate, including shop drawings, facilities for inspection & testing and trial assembling all complete as per specification., Truss, Height 5
1 tonne
m to 10 m
Spec. cl. No: 2200
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
i) for
d) Formwork and staging 35 % of
22.1.C.q Fabricating/ Structural Steel tonne 1.1 0 Crane hour 6 0 0 0
(a+b+c)
assembling 0
Add 5.0 per cent cost
of steel for cutting,
Technician day 2 0 0 Add 3 % cost of of structural steel for Nut , bolt/ Rivet etc. 0 0
drilling, grinding
welding etc.
Skilled
day 4 0 0 Add 12% of cost of material for heavy zinc coating. 0
(Blacksmith)
Add 5.0 per cent cost of steel for consumables ( gas electrodes
Semiskilled day 6 0 0 drill bits etc.) material for Spacers, Insulation tape and 0
miscellaneous items
Unskilled day 6 0 0
ii) for Erecting
Technician day 2 0 0
Skilled
day 4 0 0
/Blacksmith
Semiskilled day 8 0 0
Unskilled day 8 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing , Fabricating , assembling and erecting structural steel components / elements including nut, bolt, gusset plate, including shop drawings, facilities for inspection & testing and trial assembling all complete as per specification., Truss, Height
1 tonne
above 10 m
Spec. cl. No: 2200
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
i) for
d) Formwork and staging 40 % of
22.1.C.r Fabricating/ Structural Steel tonne 1.1 0 Crane hour 6 0 0 0
(a+b+c)
assembling 0
Add 5.0 per cent cost
of steel for cutting,
Technician day 2 0 0 Add 3 % cost of of structural steel for Nut , bolt/ Rivet etc. 0 0
drilling, grinding
welding etc.
Skilled
day 4 0 0 Add 12% of cost of material for heavy zinc coating. 0
(Blacksmith)
Add 5.0 per cent cost of steel for consumables ( gas electrodes
Semiskilled day 6 0 0 drill bits etc.) material for Spacers, Insulation tape and 0
miscellaneous items
Unskilled day 6 0 0
ii) for Erecting
Technician day 2 0 0
Skilled
day 4 0 0
/Blacksmith
Semiskilled day 8 0 0
Unskilled day 8 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Fabricating , assembling and erecting Timber super structures including necessary hardware, Truss structure, Height upto 4 m 1 cum
Spec. cl. No: 2300
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
i) for Add 1.0 per cent cost
d) Formwork and staging 20% of
23.1.B.p Fabricating/asse Sal wood cum 1.1 0 of Timber for cutting, 0 0
(a+b+c)
mbling 0 drilling, etc.
Skilled(Carpente
day 6 0 0 Add 5.0 per cent cost of timber for hardware/consumables 0
r)
Unskilled day 6 0 0
ii) for Erecting
Skilled(Carpente
day 7 0 0
r)
Unskilled day 14 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Fabricating , assembling and erecting Timber super structures including necessary hardware, Truss structure, Height upto 4 m to 6 m 1 cum
Spec. cl. No: 2300
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
i) for Add 1.0 per cent cost
d) Formwork and staging 25% of
23.1.B.q Fabricating/asse Sal wood cum 1.1 0 of Timber for cutting, 0 0
(a+b+c)
mbling 0 drilling, etc.
Skilled(Carpente
day 6 0 0 Add 5.0 per cent cost of timber for hardware/consumables 0
r)
Unskilled day 6 0 0
ii) for Erecting
Skilled(Carpente
day 7 0 0
r)
Unskilled day 14 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Fabricating , assembling and erecting Timber super structures including necessary hardware, Beam structure 1 cum
Spec. cl. No: 2300
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 1.0 per cent cost
23.1.A Unskilled day 10 0 0 Add 5.0 per cent cost of timber for hardware/consumables 0 of Timber for cutting, 0
drilling, etc.
Skilled(Carpente
day 5 0 0 Sal wood cum 1.1 0
r) 0
ii) for Erecting
Unskilled day 5 0 0
Skilled(Carpente
day 5 0 0
r)
i) for
Fabricating/asse
mbling
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Fabricating , assembling and erecting Timber super structures including necessary hardware, Beam structure, Height upto 4 m 1 cum
Spec. cl. No: 2300
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
i) for Add 1.0 per cent cost
23.1.A.p Fabricating/asse Sal wood cum 1.1 0 of Timber for cutting, 0 d) For staging 15% of (a+b+c) 0
mbling 0 drilling, etc.
Skilled(Carpente
day 5 0 0 Add 5.0 per cent cost of timber for hardware/consumables 0
r)
Unskilled day 5 0 0
ii) for Erecting
Skilled(Carpente
day 5 0 0
r)
Unskilled day 10 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Fabricating , assembling and erecting Timber super structures including necessary hardware, Beam structure, Height upto 4 m to 6 m 1 cum
Spec. cl. No: 2300
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
i) for Add 1.0 per cent cost
23.1.A.q Fabricating/asse Sal wood cum 1.1 0 of Timber for cutting, 0 d) For staging 20% of (a+b+c) 0
mbling 0 drilling, etc.
Skilled(Carpente
day 5 0 0 Add 5.0 per cent cost of timber for hardware/consumables 0
r)
Unskilled day 5 0 0
ii) for Erecting
Skilled(Carpente
day 5 0 0
r)
Unskilled day 10 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Fabricating , assembling and erecting Timber super structures including necessary hardware, Beam structure, Height above 6 m 1 cum
Spec. cl. No: 2300
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
i) for Add 1.0 per cent cost
23.1.A.r Fabricating/asse Sal wood cum 1.1 0 of Timber for cutting, 0 d) For staging 25% of (a+b+c) 0
mbling 0 drilling, etc.
Skilled(Carpente
day 5 0 0 Add 5.0 per cent cost of timber for hardware/consumables 0
r)
Unskilled day 5 0 0
ii) for Erecting
Skilled(Carpente
day 5 0 0
r)
Unskilled day 10 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Fabricating , assembling and erecting Timber super structures including necessary hardware, Truss structure 1 cum
Spec. cl. No: 2300
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 1.0 per cent cost
23.1.B Unskilled day 14 0 0 Add 5.0 per cent cost of timber for hardware/consumables 0 of Timber for cutting, 0
drilling, etc.
Skilled(Carpente
day 7 0 0 Sal wood cum 1.1 0
r) 0
ii) for Erecting
Unskilled day 6 0 0
Skilled(Carpente
day 6 0 0
r)
i) for
Fabricating/asse
mbling
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing , Fabricating , assembling and erecting Timber super structures including necessary hardware, Truss structure, Height above 6 m 1 cum
Spec. cl. No: 2300
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
i) for Add 1.0 per cent cost
d) Formwork and staging 30% of
23.1.B.r Fabricating/asse Sal wood cum 1.1 0 of Timber for cutting, 0 0
(a+b+c)
mbling 0 drilling, etc.
Skilled(Carpente
day 6 0 0 Add 5.0 per cent cost of timber for hardware/consumables 0
r)
Unskilled day 6 0 0
ii) for Erecting
Skilled(Carpente
day 7 0 0
r)
Unskilled day 14 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Gabion Structure for Retaining Earth, Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( /m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 80 mm X 100 mm,, Box size 3 X 1 X 1 m ( 16 sqm) 6 cum
Spec. cl. No: 2401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.1.B.i Skilled day 3 0 0 Boulder / Stone cum 6.6 #NAME? #NAME?
Unskilled day 8 0 0 Binding wire kg 4.12 #NAME? #NAME?
Selvedge Wire kg 7.82 #NAME? #NAME?
Mesh wire kg 82.6 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Gabion Structure for Retaining Earth, Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( /m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 80 mm X 100 mm,, Box size 2 X 1 X 1 m ( 11 sqm) 6 cum
Spec. cl. No: 2401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.1.B.ii Skilled day 3 0 0 Boulder / Stone cum 6.6 #NAME? #NAME?
Unskilled day 8 0 0 Binding wire kg 4.38 #NAME? #NAME?
Selvedge Wire kg 8.87 #NAME? #NAME?
Mesh wire kg 85.2 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and laying Plum concrete ( Boulder mixed concrete) as per Drawing and Specifications, 70% M 15 concrete and 30% boulders/stones, Manual means 10 cum
Spec. cl. No: 2421
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.21.B.
Unskilled day 4 0 0 Boulder stones cum 0.33 #NAME?
II #NAME?
Skilled day 1 0 0 sand cum 0.345 #NAME? #NAME?
5-10 mm cum 0.082 #NAME? #NAME?
10-20 mm cum 0.18 #NAME? #NAME?
20-40 mm cum 0.398 #NAME? #NAME?
Aggregates
Cement tonne 0.214 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Gabion Structure for Retaining Earth, Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057 kg/m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 100 mm X 120 mm,, Box size 3 X 1 X 1 m ( 16 sqm) 6 cum
Spec. cl. No: 2401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.1.A.i Skilled day 3 0 0 Boulder / Stone cum 6.6 #NAME? #NAME?
Unskilled day 7 0 0 Binding wire kg 3.62 #NAME? #NAME?
Selvedge Wire kg 7.82 #NAME? #NAME?
Mesh wire kg 70.2 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Gabion Structure for Retaining Earth, Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057 kg/m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 100 mm X 120 mm,, Box size 2 X 1 X 1 m ( 11 sqm) 6 cum
Spec. cl. No: 2401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.1.A.ii Skilled day 3 0 0 Boulder / Stone cum 6.6 #NAME? #NAME?
Unskilled day 7 0 0 Binding wire kg 3.9 #NAME? #NAME?
Selvedge Wire kg 8.88 #NAME? #NAME?
Mesh wire kg 72.45 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Gabion Structure for Retaining Earth, Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057 kg/m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 100 mm X 120 mm,, Box size 1.5 X 1 X 1 m ( 9 sqm ) 6 cum
Spec. cl. No: 2401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.1.A.ii
Skilled day 3 0 0 Boulder / Stone cum 6.6 #NAME?
i #NAME?
Unskilled day 8 0 0 Binding wire kg 5 #NAME? #NAME?
Selvedge Wire kg 10.8 #NAME? #NAME?
Mesh wire kg 79 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Gabion Structure for Retaining Earth, Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057 kg/m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 100 mm X 120 mm,, Box size 1.0 X 1 X 1 m ( 6 sqm) 6 cum
Spec. cl. No: 2401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.1.A.iv Skilled day 3 0 0 Boulder / Stone cum 6.6 #NAME?
#NAME?
Unskilled day 8 0 0 Binding wire kg 4.56 #NAME? #NAME?
Selvedge Wire kg 12.06 #NAME? #NAME?
Mesh wire kg 78.96 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Gabion Structure for Retaining Earth, Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057 kg/m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 100 mm X 120 mm,, Box size 3.0 X 1 X 0 .75 m ( 13.5 sqm) 4.5 cum
Spec. cl. No: 2401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.1.A.v Skilled day 2 0 0 Boulder / Stone cum 4.95 #NAME? #NAME?
Unskilled day 6 0 0 Binding wire kg 3.34 #NAME? #NAME?
Selvedge Wire kg 7.18 #NAME? #NAME?
Mesh wire kg 59.24 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Gabion Structure for Retaining Earth, Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057 kg/m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 100 mm X 120 mm,, Box size 2.0 X 1 X 0 .75 m ( 9. 25 sqm) 6 cum
Spec. cl. No: 2401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.1.A.vi Skilled day 3 0 0 Boulder / Stone cum 6.6 #NAME?
#NAME?
Unskilled day 8 0 0 Binding wire kg 4.72 #NAME? #NAME?
Selvedge Wire kg 10.8 #NAME? #NAME?
Mesh wire kg 81.16 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Gabion Structure for Retaining Earth, Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057 kg/m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 100 mm X 120 mm,, Box size 1.0 X 1 X 0 .75 m ( 5 sqm m) 6 cum
Spec. cl. No: 2401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.1.A.vi
Skilled day 3 0 0 Boulder / Stone cum 6.6 #NAME?
i #NAME?
Unskilled day 8 0 0 Binding wire kg 5.92 #NAME? #NAME?
Selvedge Wire kg 14.4 #NAME? #NAME?
Mesh wire kg 87.76 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Gabion Structure for Retaining Earth, Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057 kg/m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 100 mm X 120 mm,, Box size 3.0 X 1 X 0 .5 m ( 11 sqm) 6 cum
Spec. cl. No: 2401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.1.A.vi
Skilled day 3 0 0 Boulder / Stone cum 6.6 #NAME?
ii #NAME?
Unskilled day 8 0 0 Binding wire kg 4.76 #NAME? #NAME?
Selvedge Wire kg 13.12 #NAME? #NAME?
Mesh wire kg 96.6 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Gabion Structure for Retaining Earth, Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057 kg/m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 100 mm X 120 mm,, Box size 2.0 X 1 X 0 .5 m ( 7.5 sqm m) 6 cum
Spec. cl. No: 2401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.1.A.ix Skilled day 3 0 0 Boulder / Stone cum 6.6 #NAME?
#NAME?
Unskilled day 9 0 0 Binding wire kg 5.1 #NAME? #NAME?
Selvedge Wire kg 14.57 #NAME? #NAME?
Mesh wire kg 98.7 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Gabion Structure for Retaining Earth, Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057 kg/m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 100 mm X 120 mm,, Box size 1 X 1 X 0 .5 m (4 sqm) 6 cum
Spec. cl. No: 2401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No.
Norms
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.1.A.ix Skilled day 4 0 0 Boulder / Stone cum 6.6 #NAME?
#NAME?
Unskilled day 9 0 0 Binding wire kg 6.24 #NAME? #NAME?
Selvedge Wire kg 19.08 #NAME? #NAME?
Mesh wire kg 105.36 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Gabion Structure for Retaining Earth, Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057 kg/m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 100 mm X 120 mm,, Box size 1 X 1 X 0 .5 m (4 sqm) 6 cum
Spec. cl. No: 2401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.1.A.x Skilled day 4 0 0 Boulder / Stone cum 6.6 #NAME? #NAME?
Unskilled day 9 0 0 Binding wire kg 6.24 #NAME? #NAME?
Selvedge Wire kg 19.08 #NAME? #NAME?
Mesh wire kg 105.36 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Gabion Structure for Retaining Earth, Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057 kg/m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 100 mm X 120 mm,, Box size 3 X 1 X 0 .3 m ( 9 sqm) 6.3 cum
Spec. cl. No: 2401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.1.A.xi Skilled day 4 0 0 Boulder / Stone cum 6.93 #NAME?
#NAME?
Unskilled day 10 0 0 Binding wire kg 5.53 #NAME? #NAME?
Selvedge Wire kg 21.18 #NAME? #NAME?
Mesh wire kg 138.25 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Gabion Structure for Retaining Earth, Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057 kg/m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 100 mm X 120 mm,, Box size 2 X 1 X 0 .3 m ( 6.1 sqm) 6 cum
Spec. cl. No: 2401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.1.A.xi
Skilled day 3 0 0 Boulder / Stone cum 6.6 #NAME?
i #NAME?
Unskilled day 9 0 0 Binding wire kg 5.8 #NAME? #NAME?
Selvedge Wire kg 22.2 #NAME? #NAME?
Mesh wire kg 134 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Gabion Structure for Retaining Earth, Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057 kg/m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 100 mm X 120 mm,, Box size 1 X 1 X 0 .3 m ( 2.2 sqm) 6 cum
Spec. cl. No: 2401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.1.A.xi
Skilled day 3 0 0 Boulder / Stone cum 6.6 #NAME?
ii #NAME?
Unskilled day 9 0 0 Binding wire kg 7.2 #NAME? #NAME?
Selvedge Wire kg 28.27 #NAME? #NAME?
Mesh wire kg 96.6 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Gabion Structure for Retaining Earth, Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( /m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 80 mm X 100 mm,, Box size 1.5 X 1 X 1 m ( 9 sqm) 6 cum
Description of Work:
Gabion Structure for Retaining Earth, Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( /m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 80 mm X 100 mm,, Box size 1.5 X 1 X 1 m ( 9 sqm) 6 cum
Spec. cl. No: 2401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.1.B.iii Skilled day 3 0 0 Boulder / Stone cum 6.6 #NAME?
#NAME?
Unskilled day 8 0 0 Binding wire kg 5.68 #NAME? #NAME?
Selvedge Wire kg 10.75 #NAME? #NAME?
Mesh wire kg 93 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Gabion Structure for Retaining Earth, Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( /m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 80 mm X 100 mm,, Box size 1 X 1 X 1 m (6 sqm) 6 cum
Spec. cl. No: 2401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.1.B.iv Skilled day 3 0 0 Boulder / Stone cum 6.6 #NAME?
#NAME?
Unskilled day 8 0 0 Binding wire kg 5.22 #NAME? #NAME?
Selvedge Wire kg 12.07 #NAME? #NAME?
Mesh wire kg 92.94 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Gabion Structure for Retaining Earth, Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( /m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 80 mm X 100 mm,, Box size 3.0 X 1 X 0 .75 m (13.5 sqm) 4.5 cum
Spec. cl. No: 2401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.1.B.v Skilled day 3 0 0 Boulder / Stone cum 4.95 #NAME? #NAME?
Unskilled day 8 0 0 Binding wire kg 3.8 #NAME? #NAME?
Selvedge Wire kg 7.18 #NAME? #NAME?
Mesh wire kg 69.7 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Gabion Structure for Retaining Earth, Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( /m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 80 mm X 100 mm,, Box size 2.0 X 1 X 0 .75 m ( 9.25 sqm) 6 cum
Spec. cl. No: 2401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.1.B.vi Skilled day 3 0 0 Boulder / Stone cum 6.6 #NAME?
#NAME?
Unskilled day 8 0 0 Binding wire kg 5.4 #NAME? #NAME?
Selvedge Wire kg 10.79 #NAME? #NAME?
Mesh wire kg 95.52 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Gabion Structure for Retaining Earth, Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( /m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 80 mm X 100 mm,, Box size 1.0 X 1 X 0 .75 m ( 5 sqm) 6 cum
Spec. cl. No: 2401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.1.B.vi
Skilled day 3 0 0 Boulder / Stone cum 6.6 #NAME?
i #NAME?
Unskilled day 9 0 0 Binding wire kg 6.4 #NAME? #NAME?
Selvedge Wire kg 14.36 #NAME? #NAME?
Mesh wire kg 103.28 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Gabion Structure for Retaining Earth, Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( /m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 80 mm X 100 mm,, Box size 3.0 X 1 X 0 .5 m ( 11 sqm) 6 cum
Spec. cl. No: 2401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.1.B.vi
Skilled day 3 0 0 Boulder / Stone cum 6.6 #NAME?
ii #NAME?
Unskilled day 9 0 0 Binding wire kg 5.44 #NAME? #NAME?
Selvedge Wire kg 13.11 #NAME? #NAME?
Mesh wire kg 113.6 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Gabion Structure for Retaining Earth, Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( /m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 80 mm X 100 mm,, Box size 2.0 X 1 X 0 .5 m ( 7.5 sqm) 6 cum
Spec. cl. No: 2401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.1.B.ix Skilled day 3 0 0 Boulder / Stone cum 6.6 #NAME?
#NAME?
Unskilled day 9 0 0 Binding wire kg 6.18 #NAME? #NAME?
Selvedge Wire kg 14.57 #NAME? #NAME?
Mesh wire kg 116.4 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Gabion Structure for Retaining Earth, Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( /m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 80 mm X 100 mm,, Box size 1 X 1 X 0 .5 m ( 4 sqm) 1 cum
Spec. cl. No: 2401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.1.B.x Skilled day 3 0 0 Boulder / Stone cum 6.6 #NAME? #NAME?
Unskilled day 10 0 0 Binding wire kg 7.56 #NAME? #NAME?
Selvedge Wire kg 19.04 #NAME? #NAME?
Mesh wire kg 123.96 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Gabion Structure for Retaining Earth, Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( /m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 80 mm X 100 mm,, Box size 3 X 1 X 0 .3 m ( 9 sqm) 6.3 cum
Spec. cl. No: 2401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.1.B.xi Skilled day 4 0 0 Boulder / Stone cum 6.93 #NAME?
#NAME?
Unskilled day 11 0 0 Binding wire kg 6.93 #NAME? #NAME?
Selvedge Wire kg 21.18 #NAME? #NAME?
Mesh wire kg 162.75 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Gabion Structure for Retaining Earth, Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( /m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 80 mm X 100 mm,, Box size 2 X 1 X 0 .3 m ( 6.1 sqm) 6 cum
Spec. cl. No: 2401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.1.B.xi
Skilled day 4 0 0 Boulder / Stone cum 6.6 #NAME?
i #NAME?
Unskilled day 11 0 0 Binding wire kg 7.2 #NAME? #NAME?
Selvedge Wire kg 22.2 #NAME? #NAME?
Mesh wire kg 157.5 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Gabion Structure for Retaining Earth, Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( /m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 80 mm X 100 mm,, Box size 1 X 1 X 0 .3 m ( 2.2 sqm) 6 cum
Spec. cl. No: 2401
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.1.B.xi
Skilled day 3 0 0 Boulder / Stone cum 6.6 #NAME?
ii #NAME?
Unskilled day 11 0 0 Binding wire kg 9 #NAME? #NAME?
Selvedge Wire kg 28.27 #NAME? #NAME?
Mesh wire kg 113.6 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Providing mechanically woven double twisted crates / mattress including rolling, cutting and with lacing wire and binding wire as per specification.
1 sqm
, Hexagonal mesh type 100 mm x 120 mm, mesh wire 3 mm, selvage wire 3.9 mm, lacing wire 2.4 mm
Spec. cl. No: 2402
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Heavy zinc coated Hexagonal mesh type 100 mm x 120 mm,
24.2.A sqm 1 #NAME?
mesh wire 3 mm, selvage wire 3.9 mm, lacing wire 2.4 mm #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Providing mechanically woven double twisted crates / mattress including rolling, cutting and with lacing wire and binding wire as per specification.
1 sqm
, Hexagonal mesh type 100 mm x 120 mm, mesh wire 2.7 mm, selvage wire 3.4 mm, lacing wire 2.2 mm
Spec. cl. No: 2402
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Heavy zinc coated Hexagonal mesh type 100 mm x 120 mm,
24.2.B sqm 1 #NAME?
mesh wire 2.7 mm, selvage wire 3.4 mm, lacing wire 2.2 mm #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel mat for slope protection and erosion control, Filling the installed 3-D galvanized steel profile with gravel size 32-63 mm, manually, In slopes (>45 degrees slope angle) 120 sqm
Spec. cl. No: 2411
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.12.B2
Unskilled day 7 0 0 Angular gravel 32-63 mm cum 6 #NAME?
.ii #NAME?
Skilled day 2 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Providing mechanically woven double twisted crates / mattress including rolling, cutting and with lacing wire and binding wire as per specification.
1 sqm
, Hexagonal mesh type 80 mm x 100 mm, mesh wire 3 mm, selvage wire 3.9 mm, lacing wire 2.4 mm
Spec. cl. No: 2402
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing mechanically woven double twisted crates / mattress including rolling, cutting and with lacing wire and binding wire as per specification.
1 sqm
, Hexagonal mesh type 80 mm x 100 mm, mesh wire 2.7 mm, selvage wire 3.4 mm, lacing wire 2.2 mm
Spec. cl. No: 2402
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Heavy zinc coated Hexagonal mesh type 80 mm x 100 mm,
24.2.D sqm 1 #NAME?
mesh wire 2.7 mm, selvage wire 3.4 mm, lacing wire 2.2 mm #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Providing mechanically woven double twisted crates / mattress including rolling, cutting and with lacing wire and binding wire as per specification.
1 sqm
, Hexagonal mesh type 60 mm x 80 mm, mesh wire 2.7 mm, selvage wire 3.4 mm, lacing wire 2.2 mm
Spec. cl. No: 2402
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Heavy zinc coated Hexagonal mesh type 60 mm x 80 mm,
24.2.E sqm 1 #NAME?
mesh wire 2.7 mm, selvage wire 3.4 mm, lacing wire 2.2 mm #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Providing mechanically woven double twisted crates / mattress including rolling, cutting and with lacing wire and binding wire as per specification.
, Zinc + PVC coated Hexagonal mesh type 100 mm x 120 mm, mesh wire 2.7 mm/3.7 mm, selvage wire 3.4 mm/4.4 mm, lacing wire 2.2 mm/3.2 mm with Pac coating 1 sqm
Spec. cl. No: 2402 thickness nominal 0.5 mm ( minimum 0.38 mm)
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Zinc + PVC coated Hexagonal mesh type 100 mm x 120 mm,
mesh wire 2.7 mm/3.7 mm, selvage wire 3.4 mm/4.4 mm,
24.2.F sqm 1 #NAME?
lacing wire 2.2 mm/3.2 mm with Pac coating thickness
nominal 0.5 mm ( minimum 0.38 mm) #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing mechanically woven double twisted crates / mattress including rolling, cutting and with lacing wire and binding wire as per specification.
, Zinc + PVC coated Hexagonal mesh type 80 mm x 100 mm, mesh wire 2.2 mm/3.2 mm, selvage wire 2.7 mm/3.7 mm, lacing wire 2.2 mm/3.2 mm with Pac coating 1 sqm
Spec. cl. No: 2402 thickness nominal 0.5 mm ( minimum 0.38 mm)
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Zinc + PVC coated Hexagonal mesh type 80 mm x 100 mm,
mesh wire 2.2 mm/3.2 mm, selvage wire 2.7 mm/3.7 mm,
24.2.G sqm 1 #NAME?
lacing wire 2.2 mm/3.2 mm with Pac coating thickness
nominal 0.5 mm ( minimum 0.38 mm) #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Assembling mechanical woven Gabion boxes /mattresses, placing in position including stretching; forming compartments; tying the sides and diaphragms with binding wire in each mesh; tying with bracing wires and tie wires; and tying down the lid
160 sqm
complete as per specification (stone filling not included
Spec. cl. No: 2402
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.3 Unskilled day 10 0 0
Skilled day 2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and filling stone/boulder in gabion boxes/mattress etc.. Including dressing, bedding, bonding all complete as per Drawing and Technical Specifications. 10 cum
Spec. cl. No: 2402
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.4 Unskilled day 8 0 0 Boulder / Stone cum 11 #NAME? #NAME?
Skilled day 2 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Laying and fixing of Geo-Textile all complete as per specification., Providing and laying of a geotextile filter between pitching and embankment slopes as per Drawing and Technical Specifications. 300 sqm
Description of Work:
Laying and fixing of Geo-Textile all complete as per specification., Providing and laying of a geotextile filter between pitching and embankment slopes as per Drawing and Technical Specifications. 300 sqm
Spec. cl. No: 2404
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.5 Unskilled day 2 0 0 Geotextile sqm 360 #NAME? #NAME?
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Laying and fixing of Geo-Textile all complete as per specification., Providing and laying and fixing of Geo-membrane all complete as per specification. 300 sqm
Spec. cl. No: 2404
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.06 Unskilled day 2 0 0 Geotextile sqm 360 #NAME? #NAME?
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel mat for slope protection and erosion control, Spraying of humus on the on the top of gravel (on the top surface of 3-D profile) using humus spraying machine, In shallow
150 sqm
slopes (< 45 degrees slope angle)
Spec. cl. No: 2411
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.12.C1 Humus spraying
Unskilled day 1 0 0 Humus material cum 8.2 #NAME? hour 6 0 0
.i #NAME? machine
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: GEOSYNTHETIC AND REINFORCED EARTH, Sub-Surface Drain with Geotextiles, Providing and laying sub surface drain 200 mm dia using geotextiles treated with carbon black to a stable network and a planar geo-composite structure, joints
10 meter
wrapped with geotextile to prevent ingress of soil, including excavation and backfilling as per Drawing and Technical Specifications.
Spec. cl. No: 2404
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 2 per cent cost of Material for miscellaneous items like
24.7 Unskilled day 10 0 0 0
synthetic cord
Skilled day 2 0 0 Geotextile sqm 22 #NAME? #NAME?
Geomembrane sqm 11 #NAME? #NAME?
Geonets sqm 11 #NAME? #NAME?
Geonets, geomembrane and geotextile to make planar
geocomposite stable network for sub surface drain including
wrapping of joints with 160 mm over lapping with geotextile .
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Narrow Filter Sub-Surface Drain, Providing and making narrow filter sub- surface drain consisting of porous or perforated pipe laid in narrow trench surrounded by a geotextile filter fabric, with a minimum of 450 mm overlap of fabric and
10 meter
installed including excavation and backfilling
Spec. cl. No: 2404
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 2 per cent cost of Material for miscellaneous item like
24.8 Unskilled day 10 0 0 0
synthetic cord
Skilled day 2 0 0 Geotextile filter fabric sqm 12.5 #NAME? #NAME?
Perforated geosynthetic pipe 150 mm dia meter 11 #NAME?
#NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Laying Paving Fabric Beneath a Pavement Overlay, Providing and laying paving fabric over a tack coat of paving grade Bitumen, laid at the rate of 1 kg per sqm over thoroughly cleaned and repaired surface to provide a water resistant membrane
2800 sqm
and crack retarding layer as per Drawing and Technical Specifications.
Laying Paving Fabric Beneath a Pavement Overlay, Providing and laying paving fabric over a tack coat of paving grade Bitumen, laid at the rate of 1 kg per sqm over thoroughly cleaned and repaired surface to provide a water resistant membrane
2800 sqm
and crack retarding layer as per Drawing and Technical Specifications.
Spec. cl. No: 2410
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Bitumen pressure
24.9 Unskilled day 30 0 0 Paving Bitumen tonne 2.8 #NAME? hour 6 0 0
#NAME? distributor
Skilled day 1 0 0 Paving Fabric sqm 2940 #NAME? #NAME? Pneumatic roller hour 6 0 0
Road sweeper hour 6 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Laying Boulder Apron in Crates of Synthetic Geogrids, Providing and laying of Geogrids crated apron 1 m x 5 m, 600 mm thick with baffles at 1 meter interval, made with Geogrids as per Design, Drawing and Technical specifications. design. 3 cum
Spec. cl. No: 2400
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.10' Unskilled day 2 0 0 Stones spall for filling voids cum 0.45 #NAME? #NAME?
skilled day 1 0 0 Stones with minimum size of 200 mm cum 3.45 #NAME? #NAME?
Polymer braids meter 20 #NAME?
#NAME?
Connectors/ Staples nos. 50 #NAME? #NAME?
Geo grids sqm 21 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Reinforced Earth Structures, Assembling, joining and laying of reinforcing elements., Providing, laying and joining reinforcing elements With reinforcing element of steel / Aluminum strips / polymeric strips. 450 meter
Spec. cl. No: 2405, 2406,
2407
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 10 per cent of the cost of reinforcing strip towards
accessories like tie-strips, nuts and bolts and loops/lugs for
24.11.i.A Skilled day 3 0 0 0
joining reinforcing elements with the facia panels, overlaps,
heat bonding or extension.
Glass reinforced polymer/fiber reinforced polymer/polymeric
Unskilled day 9 0 0 meter 495 #NAME?
strips #NAME?
or
Stainless steel strips meter 495 #NAME?
#NAME?
or
Aluminum Strips meter 495 #NAME?
#NAME?
or
Copper Strips meter 495 #NAME?
#NAME?
or
Galvanized carbon steel strips meter 495 #NAME?
#NAME?
Reinforcement strips 60 mm wide 5 mm thick as per
specification
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Reinforced Earth Structures, Assembling, joining and laying of reinforcing elements., Providing, laying and joining reinforcing elements with reinforcing elements of synthetic Geogrids 300 sqm
Spec. cl. No: 2405, 2406,
2407
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 10 per cent of the cost of reinforcing elements (synthetic
Geogrids) for accessories like tie-strips, nuts and bolts and
24.11.i.B Skilled day 4 0 0 loops/lugs for joining reinforcing elements with the facia 0
panels, overlaps and other protective elements for synthetic
Geogrids.
Unskilled day 9 0 0 Synthetic Geogrids as per approved design and specifications. sqm 330 #NAME?
#NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Reinforced Earth Structures, Providing and lying facing elements of RCC 75 sqm
Spec. cl. No: 2405, 2406,
2407
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 2 per cent of cost of facia panels, for all necessary
24.11.ii Skilled day 2 0 0 temporary form work, scaffolding and provision of loops/lugs 0 Crane hour 6 0 0
for lifting of panels and joining the reinforcing elements.
Unskilled day 5 0 0 HYSD steel @ 5 kg / sqm tonne 0.38 #NAME? #NAME?
Pre-cast RCC M-35 facing elements of size as per design and
cum 13.5 #NAME?
18 cm thick for 75 sqm. #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel mat for slope protection and erosion control, Providing 3-D galvanized steel panels from the palette, cutting them if necessary, joining the panels to longer rows by
40 sqm
overlapping and binding as necessary and putting on the slope, insertion of distribution bars or steel ropes , fixing with clamps and marking holes for T-nails or static nails (bored nails)
Spec. cl. No: 2411
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.12.A Unskilled day 2 0 0 Connecting elements for steel ropes for GEWI Nails * nos. 24 #NAME? #NAME?
12 mm dia. Steel rope in case of bored cement grouted GEWI
Skilled day 1 0 0 kg 45.024 #NAME?
nails * #NAME?
Binding wire loops nos. 200 #NAME? #NAME?
Clamps nos. 16 #NAME? #NAME?
12 mm bars (in case of T-nails) kg 59.808 #NAME? #NAME?
3-D galvanized steel Profile kg 138 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel mat for slope protection and erosion control, Providing and filling the installed 3-D galvanized steel profile with angular material of size 32-63 mm using equipment such
150 sqm
as excavator, dredger crane or loader, In shallow slopes (< 45 degrees slope angle)
Spec. cl. No: 2411
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Description of Work: Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel mat for slope protection and erosion control, Providing and filling the installed 3-D galvanized steel profile with angular material of size 32-63 mm using equipment such
120 sqm
as excavator, dredger crane or loader, In slopes (>45 degrees slope angle)
Spec. cl. No: 2411
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.12.B1
Unskilled day 1 0 0 Angular gravel 32-63 mm cum 6 #NAME? Dredger crane,/ loader hour 6 0 0
.ii #NAME?
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel mat for slope protection and erosion control, Filling the installed 3-D galvanized steel profile with gravel size 32-63 mm, manually, In shallow slopes (< 45 degrees slope
150 sqm
angle)
Spec. cl. No: 2411
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.12.B2
Unskilled day 6 0 0 Angular gravel 32-63 mm cum 7.5 #NAME?
.i #NAME?
Skilled day 2 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and laying Plum concrete ( Boulder mixed concrete) as per Drawing and Specifications, 70% M 15 concrete and 30% boulders/stones, Using Mechanical Aids 10 cum
Spec. cl. No: 2421
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.21.B.
Unskilled day 30 0 0 Boulder stones cum 3.3 #NAME? concrete vibrator hour 6 0 0
I #NAME?
Skilled day 4 0 0 sand cum 3.45 #NAME? #NAME? concrete mixer hour 6 0 0
5-10 mm cum 0.8 #NAME? #NAME?
10-20 mm cum 1.8 #NAME? #NAME?
20-40 mm cum 4 #NAME? #NAME?
Aggregates
Cement tonne 1.95 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel mat for slope protection and erosion control, Spraying of humus on the on the top of gravel (on the top surface of 3-D profile) using humus spraying machine, In slopes
120 sqm
(>45 degrees slope angle)
Spec. cl. No: 2411
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.12.C1 Humus spraying
Unskilled day 1 0 0 Humus material cum 7.2 #NAME? hour 6 0 0
.ii #NAME? machine,
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel mat for slope protection and erosion control, Spraying of humus on the on the top of gravel (on the top surface of 3-D profile) manually, In shallow slopes (< 45 degrees
150 sqm
slope angle)
Spec. cl. No: 2411
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.12.C2
Unskilled day 20 0 0 Humus material cum 6.75 #NAME?
.i #NAME?
Skilled day 2 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel mat for slope protection and erosion control, Spraying of humus on the on the top of gravel (on the top surface of 3-D profile) manually, In slopes (>45 degrees slope
120 sqm
angle)
Spec. cl. No: 2411
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.12.C2
Unskilled day 30 0 0 Humus material cum 6 #NAME?
.ii #NAME?
Skilled day 4 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel mat for slope protection and erosion control, Providing and driving the equal angle T-section galvanized steel nails with curved head (16 mm dia steel hook) and tapered
Description of Work: at tail (size between T-25 x 25 x 3 mm to T-40 X 40 X 5 mm, (equivalent to Indian Steel ISA 2525, 3030,3535 or 4040) by using handheld or pneumatic hammer (nail length between 0.6 m -3.5 m), first drilling a hole of diameter 28-43 mm (size of T-
100 meter
section+ 3 mm) and filling with cement mortar and then driving the nails to fix the semi-flexible 3-D galvanized steel panel on the slopes or embankments, max spacing of nails is 1.5 m., Driving T-nails in soft soil using small dia. pre-bored holes
Spec. cl. No: 2411
without using cement mortar, For flat surface and shallow slopes < 45°
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Air compressor with
24.12.D.i
Unskilled day 3 0 0 35 X 35 X 4 mm kg 236 #NAME? pneumatic chisel hour 12 0 0
.p
#NAME? attachment
Description of Work:
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel mat for slope protection and erosion control, In slopes (>45 degrees slope angle) 100 meter
Spec. cl. No: 2411
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Air compressor with
24.12.D.i
Unskilled day 4 0 0 35 X 35 X 4 mm kg 236 #NAME? pneumatic chisel hour 12 0 0
.q
#NAME? attachment
Description of Work: Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel mat for slope protection and erosion control, Providing and driving of 28 mm dia GEWI (Threaded) steel nails by drilling holes of 90 mm dia using cement grouting for
100 meter
fixing of semi-flexible 3-D steel mats upto a length of 4 to 8 m on slopes, On soft soils
Spec. cl. No: 2411
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
OR excavator
mounted Boring
24.12.E.i Unskilled day 4 0 0 Cement kg 800 #NAME? hour 12 0 0
Lafitte (horizontal
#NAME? drilling machine)
Air compressor with
Skilled day 4 0 0 28 mm dia GEWI-steel bar kg 483 #NAME? pneumatic chisel hour 12 0 0
#NAME? attachment
Description of Work: Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel mat for slope protection and erosion control, Providing and driving of 28 mm dia GEWI (Threaded) steel nails by drilling holes of 90 mm dia using cement grouting for
100 meter
fixing of semi-flexible 3-D steel mats upto a length of 4 to 8 m on slopes, On rocky soils (4-8 m)
Spec. cl. No: 2411
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
OR excavator mounted
24.12.E.i Boring Lafitte
Unskilled day 5 0 0 Cement kg 600 #NAME? hour 12 0 0
i (horizontal drilling
#NAME? machine)
Air compressor with
Skilled day 5 0 0 28 mm dia GEWI-steel bar kg 483 #NAME? pneumatic chisel hour 12 0 0
#NAME? attachment
Description of Work: Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel mat for slope protection and erosion control, Providing and driving of 28 mm dia GEWI (Threaded) steel nails by drilling holes of 90 mm dia using cement grouting for
100 meter
fixing of semi-flexible 3-D steel mats upto a length >8 m on slopes, On soft soils
Spec. cl. No: 2411
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
OR excavator mounted
Boring Lafitte
24.12.F.i Unskilled day 6 0 0 Cement kg 800 #NAME? hour 18 0 0
(horizontal drilling
#NAME? machine)
Air compressor with
Skilled day 6 0 0 28 mm dia GEWI-steel bar kg 483 #NAME? pneumatic chisel hour 18 0 0
#NAME? attachment
Bore drill bits of
different diameters,
extension rods, cement
slurry pump, special
hammer head for T-
nails, handheld or
safety cables, stairs, 0
temporary scaffolding
and other materials
such as sand and
cement admixtures
accessories as
necessary
Description of Work: Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel mat for slope protection and erosion control, Providing and driving of 28 mm dia GEWI (Threaded) steel nails by drilling holes of 90 mm dia using cement grouting for
100 meter
fixing of semi-flexible 3-D steel mats upto a length >8 m on slopes, On rocky soils
Spec. cl. No: 2411
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
excavator mounted
24.12.F.i Boring Lafitte
Unskilled day 8 0 0 Cement kg 600 #NAME? hour 24 0 0
i (horizontal drilling
#NAME? machine)
Skilled day 8 0 0 28 mm dia GEWI-steel bar kg 483 #NAME? #NAME? OR
Air compressor with
pneumatic chisel hour 24 0 0
attachment
Description of Work:
Providing and laying boulders apron on river bed for protection against scour with Boulder / Stones weighing not less than 40 kg each complete as per drawing and Technical specification., Manual Means 1 cum
Spec. cl. No: 2416
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.13.A Unskilled day 3 0 0 Stone Spalls cum 0.2 #NAME? #NAME?
Skilled day 1 0 0 Stone cum 1 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and laying boulders apron on river bed for protection against scour with Boulder / Stones weighing not less than 40 kg each complete as per drawing and Technical specification., Mechanical means 100 cum
Spec. cl. No: 2416
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.13.B Unskilled day 4 0 0 Stone spalls of minimum 25 mm size cum 20 #NAME? #NAME? Hydraulic excavator hour 6 0 0
Skilled day 2 0 0 Stone weighing not less than 40 kg cum 100 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and laying boulders apron on river bed for protection against scour with Boulder / Stones weighing not less than 40 kg each complete as per drawing and Technical specification., Mechanical means for Bigger boulder 100 cum
Spec. cl. No: 2416
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.13.C Unskilled day 6 0 0 Stone spalls cum 20 #NAME? #NAME? Crane 15 t capacity hour 12 0 0
Skilled day 2 0 0 Stone weighing not less than 200 kg cum 100 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and laying of apron with cement concrete blocks of size 0.5 x 0.5 x 0.5 m cast in-situ and made with nominal mix of M-15 grade cement concrete with a minimum cement content of 250 kg/cum ., Manual means 1 cum
Spec. cl. No: 2416
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.14.A Unskilled day 3 0 0 Concrete Grade M 15 cum 1.1 #NAME? #NAME?
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and laying of apron with cement concrete blocks of size 0.5 x 0.5 x 0.5 m cast in-situ and made with nominal mix of M-15 grade cement concrete with a minimum cement content of 250 kg/cum ., Mechanical means 100 cum
Spec. cl. No: 2416
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.14.B Unskilled day 4 0 0 Concrete Grade M 15 cum 110 0 0 Hydraulic excavator hour 6 0 0
Skilled day 2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications, Stone/Boulder 1 cum
Spec. cl. No: 2416
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.15.A Unskilled day 3 0 0 Stone spalls ( minimum 25 mm size) cum 0.2 #NAME? #NAME?
Skilled day 1 0 0 Stone weighing > 40 kg cum 1 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications, Cement Concrete Blocks of size 0.3 x 0.3 x 0.3 m cast in
1 cum
cement concrete of Grade M 15, Manual Means
Spec. cl. No: 2416
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.15.B Unskilled day 3 0 0 Concrete Grade M 15 cum 1.1 #NAME? #NAME?
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification 1 cum
Spec. cl. No: 2414
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.16 Unskilled day 3 0 0 Graded stone aggregate of required size cum 1.2 #NAME? #NAME?
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and laying Grouted Stone Pitching in protection work, with stone size not less than 0.01 cum and cement: sand mortar (1:3) all complete as per Drawing and Technical Specifications. 1 cum
Spec. cl. No: 2416
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.17 Unskilled day 3 0 0 Sand cum 0.42 #NAME? #NAME?
Skilled day 1 0 0 Cement cum 0.194 #NAME? #NAME?
Stone cum 1.1 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Providing and laying 20 mm dia tor steel dowel bar including drilling 35 mm dia bore hole in rock necessary bending, hooking tying reinforcement in position and grouting etc. complete as per Drawing and Technical specifications., Without using
10 meter
Mechanical aid
Spec. cl. No: 2413
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.18.A Unskilled day 15 0 0 Grouting material 0
Skilled day 2 0 0 Dowel Bar 20 mm dia or as specified Grouting Materials meter 11 #NAME?
#NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Providing and laying 20 mm dia tor steel dowel bar including drilling 35 mm dia bore hole in rock necessary bending, hooking tying reinforcement in position and grouting etc. complete as per Drawing and Technical specifications., Using
40 meter
Mechanical Aid
Spec. cl. No: 2413
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Air Compressor with
24.18.B Unskilled day 8 0 0 Grouting material 0 jack hammer/ Portable hour 6 0 0
rock driller
Skilled day 1 0 0 Dowel Bar 20 mm dia or as specified Grouting Materials meter 44 #NAME?
#NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Providing and fixing of 25 mm – dia steel rock bolts with mechanical/ wedge type anchorage including drilling 35 mm dia hole providing 150 mm long 20 mm thick steel tapered wedge 10 mm thick 200 mm X 200 mm plate washer and nuts, tighten
10 meter
bolt by torque wrench all complete
Spec. cl. No: 2413
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
5%
of
24.19 Unskilled day 20 0 0 Admixture ( @ 5 % of cement) kg 0.5 #NAME? Pull out test of Anchor Labo 5_a 0 #VALUE!
ur
#NAME? cost
Grout Injection
Skilled day 2 0 0 cement kg 10 #NAME? hour 6 0 0
#NAME? Equipment
Jack Hammer
Anchor plate with hexagonal nut nos. 0.7 #NAME? including Casing pipe hour 6 0 0
#NAME? and accessories
Hexagonal Anchor Coupling nos. 3.3 #NAME? #NAME? Air Compressor hour 6 0 0
Rock Dowel rod ( 25 mm) m 10 #NAME? #NAME?
Drill bit nos. 1 #NAME? #NAME?
20 %
of
Drilling platform 20_a #NAME?
Labo
ur #VALUE!
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = #VALUE! Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and laying HDPE pipes with perforations including joining, series II, HDPE pipe 250 mm dia 100 meter
Spec. cl. No: 2414
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.20.A Unskilled day 10 0 0 HDPE pipes 250 mm meter 110 #NAME? Electric hand driller hour 12 0 0
#NAME?
Skilled day 3 0 0 Electric heating Plate hour 18 0 0
Semi Skilled day 2 0 0 screw jack hour 18 0 0
Generator hour 24 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and laying HDPE pipes with perforations including joining, series II, HDPE pipe 160 mm dia 1 meter
Spec. cl. No: 2414
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.20.B Unskilled day 10 0 0 HDPE pipe meter 110 #NAME? Electric hand driller hour 12 0 0
#NAME?
Skilled day 3 0 0 Electric heating Plate hour 18 0 0
Semi Skilled day 2 0 0 screw jack hour 18 0 0
Generator hour 24 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and laying Plum concrete ( Boulder mixed concrete) as per Drawing and Specifications, 60% M 15 concrete and 40% boulders/stones, using Mechanical Aids 10 cum
Spec. cl. No: 2421
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.21.A.
Unskilled day 30 0 0 Boulder stones cum 4.4 #NAME? concrete vibrator hour 6 0 0
I #NAME?
Skilled day 3 0 0 sand cum 3 #NAME? #NAME? concrete mixer hour 6 0 0
5-10 mm cum 0.72 #NAME? #NAME?
10-20 mm cum 1.56 #NAME? #NAME?
20-40 mm cum 3.45 #NAME? #NAME?
Aggregates
Cement tonne 1.7 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and laying Plum concrete ( Boulder mixed concrete) as per Drawing and Specifications, 60% M 15 concrete and 40% boulders/stones, Manual means 1 cum
Spec. cl. No: 2421
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.21.A.
Unskilled day 4 0 0 Boulder stones cum 0.44 #NAME?
I #NAME?
Skilled day 1 0 0 sand cum 0.299 #NAME? #NAME?
5-10 mm cum 0.299 #NAME? #NAME?
10-20 mm cum 0.072 #NAME? #NAME?
20-40 mm cum 0.156 #NAME? #NAME?
Aggregates
Cement tonne 0.185 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Sub-Surface Drains with Perforated Pipe, Providing and laying subsurface drain with perforated pipe of 100 mm internal diameter of metal/ asbestos cement/ cement concrete/PVC, closely jointed, perforations ranging from 3 mm to 6 mm depending
10 meter
upon size of material surrounding the pipe, with 150 mm bedding below the pipe and 300 mm cushion above the pipe,. as per Drawing and Specifications.
Description of Work: Sub-Surface Drains with Perforated Pipe, Providing and laying subsurface drain with perforated pipe of 100 mm internal diameter of metal/ asbestos cement/ cement concrete/PVC, closely jointed, perforations ranging from 3 mm to 6 mm depending
10 meter
upon size of material surrounding the pipe, with 150 mm bedding below the pipe and 300 mm cushion above the pipe,. as per Drawing and Specifications.
Spec. cl. No: 2414
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.22 Unskilled day 3 0 0 Crushed stone as per specification cum 2.4 #NAME? #NAME?
Skilled day 1 0 0 Perforated pipe of cement concrete, internal dia 100 mm meter 11 #NAME?
#NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Aggregate Sub-Surface Drains, Providing and laying aggregate sub surface drain 300 mm x 450 mm with aggregates conforming to table 300-4, excavated material to be utilized in roadway. 10 meter
Spec. cl. No: 2414
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.23 Unskilled day 3 0 0 Crushed stone cum 1.35 #NAME? #NAME?
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Underground Drain at Edge of Pavement, Providing and laying an underground drain 1 m x 1 m (inside dimensions) lined with RCC-20 cm thick and covered with RCC slab 10 cm in thickness on urban roads. 1 meter
Spec. cl. No: 2414
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
24.24 Reinforcement work @ 3 % of concrete volume kg 117 #NAME? #NAME?
RCC work M-20 cum 0.495 0 0
Earthwork in soil cum 1.5 #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and laying Brick Masonry Work in Cement mortar in Foundation / structure complete excluding Pointing and Plastering, as per Drawing and Technical Specifications., Cement sand mortar (1:2) 5 cum
Spec. cl. No: 2500
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
25.1.A Unskilled day 12.00 0 0 Cost of water KL 0.10 0 0
Skilled day 6.00 0 0 Sand cum 1.12 0 0
Cement tonne 0.80 0 0
Bricks Ist class nos 2800.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Brick Masonry Work in Cement mortar in Foundation / structure complete excluding Pointing and Plastering, as per Drawing and Technical Specifications., Cement sand mortar (1:2), Using Concrete Mixer 5 cum
Spec. cl. No: 2500
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
25.1.A_a Unskilled day 9.00 0 0 Cost of water KL 0.10 0
0
Skilled day 6.00 0 0 Sand cum 1.12 0 0
Cement tonne 0.80 0 0
Bricks Ist class nos 2800.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Brick Masonry Work in Cement mortar in Foundation / structure complete excluding Pointing and Plastering, as per Drawing and Technical Specifications., Cement sand mortar (1:3) 5 cum
Spec. cl. No: 2500
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
25.1.B Unskilled day 12.00 0 0 Cost of water KL 0.10 0 0
Skilled day 6.00 0 0 Sand cum 1.26 0 0
Cement tonne 0.61 0 0
Bricks Ist class nos 2800.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Brick Masonry Work in Cement mortar in Foundation / structure complete excluding Pointing and Plastering, as per Drawing and Technical Specifications., Cement sand mortar (1:3), Using Concrete Mixer 5 cum
Spec. cl. No: 2500
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
25.1.B_a Unskilled day 9.00 0 0 Cost of water KL 0.10 0 Concrete Mixer hr 0.75 0 0
0
Skilled day 6.00 0 0 Sand cum 1.26 0 0
Cement tonne 0.61 0 0
Bricks Ist class nos 2800.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Brick Masonry Work in Cement mortar in Foundation / structure complete excluding Pointing and Plastering, as per Drawing and Technical Specifications., Cement sand mortar (1:4) 5 cum
Spec. cl. No: 2500
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
25.1.C Unskilled day 12.00 0 0 Cost of water KL 0.10 0 0
Skilled day 6.00 0 0 Sand cum 1.35 0 0
Cement tonne 0.48 0 0
Bricks Ist class nos 2800.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Brick Masonry Work in Cement mortar in Foundation / structure complete excluding Pointing and Plastering, as per Drawing and Technical Specifications., Cement sand mortar (1:4), Using Concrete Mixer 5 cum
Spec. cl. No: 2500
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
25.1.C_a Unskilled day 9.00 0 0 Cost of water KL 0.10 0 Concrete Mixer hr 0.75 0 0
0
Skilled day 6.00 0 0 Sand cum 1.35 0 0
Cement tonne 0.48 0 0
Bricks Ist class nos 2800.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Brick Masonry Work in Cement mortar in Foundation / structure complete excluding Pointing and Plastering, as per Drawing and Technical Specifications., Cement sand mortar (1:6) 5 cum
Spec. cl. No: 2500
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
25.1.D Unskilled day 12.00 0 0 Cost of water KL 0.10 0 0
Skilled day 6.00 0 0 Sand cum 1.45 0 0
Cement tonne 0.35 0 0
Bricks Ist class nos 2800.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Brick Masonry Work in Cement mortar in Foundation / structure complete excluding Pointing and Plastering, as per Drawing and Technical Specifications., Cement sand mortar (1:6), Using Concrete Mixer 5 cum
Spec. cl. No: 2500
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No.
Norms
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
25.1.D_a Unskilled day 9.00 0 0 Cost of water KL 0.10 0 Concrete Mixer hr 0.75 0 0
0
Skilled day 6.00 0 0 Sand cum 1.45 0 0
Cement tonne 0.35 0 0
Bricks Ist class nos 2800.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Brick masonry work in superstructure/ sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications, Cement Mortar 1:2 (1 cement : 2 sand) 5 cum
Spec. cl. No: 2500
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 5 per cent of cost of Labour and material for
25.2.A Unskilled day 12.00 0 0 0
scaffolding
Skilled day 6.00 0 0 Cost of water KL 0.10 0 0
Sand cum 1.26 0 0
Cement tonne 0.61 0 0
Bricks Ist class nos 2800.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Brick masonry work in superstructure/ sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications, Cement Mortar 1:2 (1 cement : 2 sand), Using Concrete Mixer 5 cum
Spec. cl. No: 2500
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 5 per cent of cost of Labour and material for
25.2.A_a Unskilled day 9.00 0 0 0 Concrete Mixer hr 0.75 0 0
scaffolding
Skilled day 6.00 0 0 Cost of water KL 0.10 0 0
Sand cum 1.26 0 0
Cement tonne 0.61 0 0
Bricks Ist class nos 2800.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Brick masonry work in superstructure/ sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications, Cement Mortar 1:3 (1 cement : 3 sand) 5 cum
Spec. cl. No: 2500
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 5 per cent of cost of Labour and material for
25.2.B 0
scaffolding
Cost of water KL 0.10 0 0
Sand cum 1.26 0 0
Cement tonne 0.61 0 0
Bricks Ist class nos 2800.00 0 0
Unskilled day 14.00 #NAME? #NAME?
Skilled day 7.00 #NAME? #NAME?
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Brick masonry work in superstructure/ sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications, Cement Mortar 1:3 (1 cement : 3 sand), Using Concrete Mixer 5 cum
Spec. cl. No: 2500
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 5 per cent of cost of Labour and material for
25.2.B_a Unskilled day 11.00 0 0 0 Concrete Mixer hr 0.75 0 0
scaffolding
Skilled day 7.00 0 0 Cost of water KL 0.10 0 0
Sand cum 1.26 0 0
Cement tonne 0.61 0 0
Bricks Ist class nos 2800.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Brick masonry work in superstructure/ sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications, Cement Mortar 1:4 (1 cement : 4 sand) 5 cum
Spec. cl. No: 2500
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 5 per cent of cost of Labour and material for
25.2.C Unskilled day 14.00 0 0 0
scaffolding
Skilled day 7.00 0 0 Cost of water KL 0.10 0 0
Sand cum 1.35 0 0
Cement tonne 0.48 0 0
Bricks Ist class nos 2800.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Brick masonry work in superstructure/ sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications, Cement Mortar 1:4 (1 cement : 4 sand), Using Concrete Mixer 5 cum
Spec. cl. No: 2500
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 5 per cent of cost of Labour and material for
25.2.C_a Unskilled day 11.00 0 0 0 Concrete Mixer hr 0.75 0 0
scaffolding
Skilled day 7.00 0 0 Cost of water KL 0.10 0 0
Sand cum 1.35 0 0
Cement tonne 0.48 0 0
Bricks Ist class nos 2800.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Brick masonry work in superstructure/ sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications, Cement Mortar 1:6 (1 cement : 6 sand) 5 cum
Spec. cl. No: 2500
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 5 per cent of cost of Labour and material for
25.2.D Unskilled day 14.00 0 0 0
scaffolding
Skilled day 7.00 0 0 Cost of water KL 0.10 0 0
Sand cum 1.45 0 0
Cement tonne 0.35 0 0
Bricks Ist class nos 2800.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Brick masonry work in superstructure/ sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications, Cement Mortar 1:6 (1 cement : 6 sand), Using Concrete Mixer 5 cum
Spec. cl. No: 2500
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 5 per cent of cost of Labour and material for
25.2.D_a Unskilled day 14.00 0 0 0 Concrete Mixer hr 0.75 0 0
scaffolding
Skilled day 7.00 0 0 Cost of water KL 0.10 0 0
Sand cum 1.45 0 0
Cement tonne 0.35 0 0
Bricks Ist class nos 2800.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing, and applying Pointing with cement mortar (1:3 ) on brick work in structure as per Technical Specifications . 100 sqm
Spec. cl. No: 2500
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
25.3 Unskilled day 12.00 0 0 Cost of water KL 1.00 0 0
Skilled day 10.00 0 0 Sand cum 0.32 0 0
Cement tonne 0.15 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and applying 12.5 mm thick Plaster with cement mortar on brick work structure as per Technical Specifications , Cement Mortar 1:2 (1 cement : 2 sand) 10 sqm
Spec. cl. No: 2500
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
25.4.A Unskilled day 12.00 0 0 Cost of water KL 0.30 0 0
Skilled day 10.00 0 0 Sand cum 1.38 0 0
Cement tonne 0.96 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and applying 12.5 mm thick Plaster with cement mortar on brick work structure as per Technical Specifications , Cement Mortar 1:2 (1 cement : 2 sand), Using Concrete Mixer 10 sqm
Spec. cl. No: 2500
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
25.4.A_a Unskilled day 10.00 0 0 Cost of water KL 0.30 0 Concrete Mixer hr 0.75 0 0
0
Skilled day 10.00 0 0 Sand cum 1.38 0 0
Cement tonne 0.96 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and applying 12.5 mm thick Plaster with cement mortar on brick work structure as per Technical Specifications , Cement Mortar 1:3 (1 cement : 3 sand) 10 sqm
Spec. cl. No: 2500
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
25.4.B Unskilled day 12.00 0 0 Cost of water KL 0.20 0 0
Skilled day 10.00 0 0 Sand cum 1.50 0 0
Cement tonne 0.72 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and applying 12.5 mm thick Plaster with cement mortar on brick work structure as per Technical Specifications , Cement Mortar 1:3 (1 cement : 3 sand), Using Concrete Mixer 10 sqm
Spec. cl. No: 2500
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
25.4.B_a Unskilled day 10.00 0 0 Cost of water KL 0.20 0 Concrete Mixer hr 0.75 0 0
0
Skilled day 10.00 0 0 Sand cum 1.50 0 0
Cement tonne 0.72 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and applying 12.5 mm thick Plaster with cement mortar on brick work structure as per Technical Specifications , Cement Mortar 1:4 (1 cement : 4 sand) 10 sqm
Spec. cl. No: 2500
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
25.4.C Unskilled day 12.00 0 0 Cost of water KL 0.17 0 0
Skilled day 10.00 0 0 Sand cum 1.60 0 0
Cement tonne 0.58 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and applying 12.5 mm thick Plaster with cement mortar on brick work structure as per Technical Specifications , Cement Mortar 1:4 (1 cement : 4 sand), Using Concrete Mixer 10 sqm
Spec. cl. No: 2500
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
25.4.C_a Unskilled day 10.00 0 0 Cost of water KL 0.17 0 Concrete Mixer hr 0.75 0 0
0
Skilled day 10.00 0 0 Sand cum 1.60 0 0
Cement tonne 0.58 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying weep holes in Brick works / Masonry/ Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia HDPE pipe as per Drawing and Technical Specifications. 30 meter
Spec. cl. No: 2500
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
25.5 Unskilled day 1.00 0 0 Sand cum 0.06 0 0
Skilled day 1.00 0 0 Cement tonne 0.02 0 0
collar for AC pipe (average) taking 10% of above pipe rate nos 10.00 0 0
MS clamp nos 30.00 #NAME? #NAME?
AC pipe 100 mm dia. (including wastage @ 5 per cent ) meter 31.50 0
0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and laying of dry Stone Masonry Work as per Drawing and Technical Specifications cum
Spec. cl. No: 2602, 2603,
2608
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
26.1 Unskilled day 8 0 0 Stone cum 5.75 0 0
Skilled day 4 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying of Random rubble stone Masonry in mud Mortar as per Drawing and Technical Specifications. cum
Spec. cl. No: 2602, 2603,
2608
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
26.2 Unskilled day 12 0 0 Cost of water KL 1 0 0
Skilled day 6 0 0 Mud (clay) cum 2 0 0
Stone cum 5.75 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Random Rubble Masonry, Providing and laying of Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications. cum
Spec. cl. No: 2602, 2603,
2607
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
26.3.A Unskilled day 14 0 0 Cost of water KL 1 0 0
Skilled day 7 0 0 Sand cum 1.63 0 0
Cement tonne 0.79 0 0
Stone cum 5.75 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Random Rubble Masonry, Providing and laying of Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications., Using Concrete Mixer cum
Spec. cl. No: 2602, 2603,
2607
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
26.3.A_a Unskilled day 9 0 0 Cost of water KL 1 0 Concrete mixer hr 0.75 0 0
0
Skilled day 7 0 0 Sand cum 1.63 0 0
Cement tonne 0.79 0 0
Stone cum 5.75 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Random Rubble Masonry, Providing and laying of Stone Masonry Work in Cement Mortar 1:4 in Foundation complete as per Drawing and Technical Specifications. cum
Spec. cl. No: 2602, 2603,
2607
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
26.3.B Unskilled day 14 0 0 Cost of water KL 1 0 0 Concrete mixer 0
Skilled day 7 0 0 Sand cum 1.74 0 0
Cement tonne 0.62 0 0
Stone cum 5.75 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Random Rubble Masonry, Providing and laying of Stone Masonry Work in Cement Mortar 1:4 in Foundation complete as per Drawing and Technical Specifications., Using Concrete Mixer cum
Spec. cl. No: 2602, 2603,
2607
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
26.3.B_a Unskilled day 9 0 0 Cost of water KL 1 0 Concrete mixer hr 0.75 0 0
0
Skilled day 7 0 0 Sand cum 1.74 0 0
Cement tonne 0.62 0 0
Stone cum 5.75 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Random Rubble Masonry, Providing and laying of Stone Masonry Work in Cement Mortar 1:6 in Foundation complete as per Drawing and Technical Specifications. cum
Spec. cl. No: 2602, 2603,
2607
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
26.3.C Unskilled day 14 0 0 Cost of water KL 1 0 0
Skilled day 7 0 0 Sand cum 2.08 0 0
Cement tonne 0.45 0 0
Stone cum 5.75 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Random Rubble Masonry, Providing and laying of Stone Masonry Work in Cement Mortar 1:6 in Foundation complete as per Drawing and Technical Specifications., Using Concrete Mixer cum
Spec. cl. No: 2602, 2603,
2607
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
26.3.C_a Unskilled day 9 0 0 Cost of water KL 1 0 Concrete mixer hr 0.75 0 0
0
Skilled day 7 0 0 Sand cum 2.08 0 0
Cement tonne 0.45 0 0
Stone cum 5.75 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Stone Masonry work in cement mortar 1:3 in structure complete as per drawing and Technical Specifications, Random Rubble Masonry cum
Spec. cl. No: 2607
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
26.4.A Unskilled day 20 0 0 @ 5 per cent of cost of Labour and material for scaffolding 0
Skilled day 7 0 0 Cost of water KL 1 0 0
Sand cum 1.73 0 0
Cement tonne 0.84 0 0
Stone cum 5.75 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Stone Masonry work in cement mortar 1:3 in structure complete as per drawing and Technical Specifications, Random Rubble Masonry, Using Concrete Mixer cum
Spec. cl. No: 2607
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
26.4.A_a Unskilled day 15 0 0 @ 5 per cent of cost of Labour and material for scaffolding 0 Concrete mixer hr 0.75 0 0
Skilled day 7 0 0 Cost of water KL 1 0 0
Sand cum 1.73 0 0
Cement tonne 0.84 0 0
Stone cum 5.75 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Stone Masonry work in cement mortar 1:3 in structure complete as per drawing and Technical Specifications, Coursed rubble Masonry (first sort ) cum
Spec. cl. No: 2606
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
26.4.B Unskilled day 22 0 0 @ 5 per cent of cost of Labour and material for scaffolding 0
Skilled day 8 0 0 Cost of water KL 1 0 0
Sand cum 1.58 0 0
Cement tonne 0.77 0 0
Stone cum 5.75 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Stone Masonry work in cement mortar 1:3 in structure complete as per drawing and Technical Specifications, Coursed rubble Masonry (first sort ), Using Concrete Mixer cum
Spec. cl. No: 2606
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
26.4.B_a Unskilled day 17 0 0 @ 5 per cent of cost of Labour and material for scaffolding 0 Concrete mixer hr 0.75 0 0
Skilled day 8 0 0 Cost of water KL 1 0 0
Sand cum 1.58 0 0
Cement tonne 0.77 0 0
Stone cum 5.75 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Stone Masonry work in cement mortar 1:4 in structure complete as per Drawing and Technical, Random Rubble Masonry cum
Description of Work:
Providing and laying Stone Masonry work in cement mortar 1:4 in structure complete as per Drawing and Technical, Random Rubble Masonry cum
Spec. cl. No: 2607
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
26.5.A Unskilled day 20 0 0 @ 5 per cent of cost of Labour and material for scaffolding 0
Skilled day 7 0 0 Cost of water KL 1 0 0
Sand cum 1.85 0 0
Cement tonne 0.66 0 0
Stone cum 5.75 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Stone Masonry work in cement mortar 1:4 in structure complete as per Drawing and Technical, Random Rubble Masonry, Using Concrete Mixer cum
Spec. cl. No: 2607
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
26.5.A_a Unskilled day 20 0 0 @ 5 per cent of cost of Labour and material for scaffolding 0 Concrete mixer hr 0.75 0 0
Skilled day 7 0 0 Cost of water KL 1 0 0
Sand cum 1.85 0 0
Cement tonne 0.66 0 0
Stone cum 5.75 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Stone Masonry work in cement mortar 1:4 in structure complete as per Drawing and Technical, Coursed rubble Masonry (first sort ) cum
Spec. cl. No: 2606
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
26.5.B Unskilled day 22 0 0 @ 5 per cent of cost of Labour and material for scaffolding 0
Skilled day 8 0 0 Cost of water KL 1 0 0
Sand cum 1.68 0 0
Cement tonne 0.6 0 0
Stone cum 5.75 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Stone Masonry work in cement mortar 1:4 in structure complete as per Drawing and Technical, Coursed rubble Masonry (first sort ), Using Concrete Mixer cum
Spec. cl. No: 2606
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
26.5.B_a Unskilled day 17 0 0 @ 5 per cent of cost of Labour and material for scaffolding 0 Concrete mixer hr 0.75 0 0
Skilled day 8 0 0 Cost of water KL 1 0 0
Sand cum 1.68 0 0
Cement tonne 0.6 0 0
Stone cum 5.75 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Stone Masonry work in cement mortar 1:6 in structure complete as per Drawing and Technical Specifications, Random Rubble Masonry (coursed/uncoursed) cum
Spec. cl. No: 2607
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
26.6.A Unskilled day 20 0 0 @ 5 per cent of cost of Labour and material for scaffolding 0
Skilled day 7 0 0 Cost of water KL 1 0 0
Sand cum 1.98 0 0
Cement tonne 0.48 0 0
Stone cum 5.75 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Stone Masonry work in cement mortar 1:6 in structure complete as per Drawing and Technical, Random Rubble Masonry, Using Concrete Mixer cum
Spec. cl. No: 2607
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
26.6.A_a Unskilled day 15 0 0 @ 5 per cent of cost of Labour and material for scaffolding 0 Concrete mixer hr 0.75 0 0
Skilled day 7 0 0 Cost of water KL 1 0 0
Sand cum 1.98 0 0
Cement tonne 0.48 0 0
Stone cum 5.75 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Stone Masonry work in cement mortar 1:6 in structure complete as per Drawing and Technical Specifications, Coursed rubble Masonry (first sort ) cum
Spec. cl. No: 2606
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
26.6.B Unskilled day 22 0 0 @ 5 per cent of cost of Labour and material for scaffolding 0
Skilled day 8 0 0 Cost of water KL 1 0 0
Sand cum 1.8 0 0
Cement tonne 0.44 0 0
Stone cum 5.75 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and laying Stone Masonry work in cement mortar 1:4 in structure complete as per Drawing and Technical, Coursed rubble Masonry (first sort ), Using Concrete Mixer cum
Spec. cl. No: 2606
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
26.6.B_a Unskilled day 17 0 0 @ 5 per cent of cost of Labour and material for scaffolding 0 Concrete mixer hr 0.75 0 0
Skilled day 8 0 0 Cost of water KL 1 0 0
Sand cum 1.8 0 0
Cement tonne 0.44 0 0
Stone cum 5.75 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and Pointing with cement mortar on masonry work in structure as per Technical Specifications, cement mortar (1:3 ) sqm
Spec. cl. No: 2600
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
26.7.A Unskilled day 9 0 0 Cost of water KL 0.05 0 0
Skilled day 9 0 0 Sand cum 0.63 0 0
Cement tonne 0.31 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and Pointing with cement mortar on masonry work in structure as per Technical Specifications, cement mortar (1:3 ), Using Concrete Mixer sqm
Spec. cl. No: 2600
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
26.7.A_a Unskilled day 8 0 0 Cost of water KL 0.05 0 Concrete mixer hr 0.75 0 0
0
Skilled day 9 0 0 Sand cum 0.63 0 0
Cement tonne 0.31 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and Pointing with cement mortar on masonry work in structure as per Technical Specifications, cement mortar (1:2 ) sqm
Spec. cl. No: 2600
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
26.7.B Unskilled day 9 0 0 Cost of water KL 0.07 0 0
Skilled day 9 0 0 Sand cum 0.56 0 0
Cement tonne 0.4 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and Pointing with cement mortar on masonry work in structure as per Technical Specifications, cement mortar (1:2 ), Using Concrete Mixer sqm
Spec. cl. No: 2600
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
26.7.B_a Unskilled day 8 0 0 Cost of water KL 0.07 0 Concrete mixer hr 0.75 0 0
0
Skilled day 9 0 0 Sand cum 0.56 0 0
Cement tonne 0.4 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and Pointing with cement mortar on masonry work in structure as per Technical Specifications, cement mortar (1:1) sqm
Spec. cl. No: 2600
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
26.7.C Unskilled day 9 0 0 Cost of water KL 0.1 0 0
Skilled day 9 0 0 Sand cum 0.42 0 0
Cement tonne 0.61 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and Pointing with cement mortar on masonry work in structure as per Technical Specifications, cement mortar (1:1), Using Concrete Mixer sqm
Spec. cl. No: 2600
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
26.7.C_a Unskilled day 8 0 0 Cost of water KL 0.1 0 Concrete mixer hr 0.75 0 0
0
Skilled day 9 0 0 Sand cum 0.42 0 0
Cement tonne 0.61 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = 0
Description of Work: Removal of existing cement concrete wearing coat including its disposal complete, Removal of existing cement concrete wearing coat including its disposal without causing any detrimental effect to any part of the bridge structure and removal of
100 sqm
dismantled material complete as per Technical Specification
Spec. cl. No: 2712
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.1.A Unskilled day 12 0 0 Drilling machine with bit and accessories hour 6 0 0
Skilled day 1 0 0 Tractor-trolley. hour 6 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Removal of existing cement concrete wearing coat including its disposal complete, Removal of existing cement concrete wearing coat including its disposal without causing any detrimental effect to any part of the bridge structure and removal of
10 cum
dismantled material with all lifts and lead complete as per Technical Specifications
Spec. cl. No: 2712
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.1.B Unskilled day 60 0 0 Drilling machine with bit and accessories hour 36 0 0
Skilled day 6 0 0 Tractor-trolley. hour 36 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Removal of existing cement concrete wearing coat including its disposal complete, Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concert laid over 12 mm thick mastic asphalt including disposal with all lift and lead
10 sqm
complete as per Technical Specification and Direction of the Engineer.
Spec. cl. No: 2712
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.1.C Unskilled day 10 0 0 Tractor-trolley. hour 6 0 0
Skilled day 1 0 0 Drilling machine with bit and accessories hour 6 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Providing and application of gunite/shortcrete to repare of damaged concrete section/ concrete covers on slab , girder ,beam etc with high early strength , low rebound sprayable thixotropic repair mortar mixed by machine, lead 30m (including
10 sqm
25% loss) average thickness of application-35 mm .
Spec. cl. No: 2710
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.2 Unskilled day 20 0 0 Consumables items. 0 Concrete mixer hour 6 0 0
Shotcreteing
Skilled day 2 0 0 water KL 2 0 hour 6 0 0
0 equipment
Ready to use sprayable thixotropic repair mortar kg 3720 0 0 Air Compressor hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and application of Gunite/ Shotcreate concrete surface with cement mortar applied with compressor after cleaning surface and spraying with epoxy complete as per Technical Specifications., Mix 1:3 ( Cement and Coarse sand) 30 sqm
Spec. cl. No: 2710
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Shotcreteing
27.3.A Unskilled day 6 0 0 Wire fabric ( mesh 50 mm x 50 mm size of 3 mm wire) kg 60 0 hour 6 0 0
0 equipment
Compressor with
For tied of welded wire fabric, consumables like nozzles, wire
Skilled day 2 0 0 0 Guniting equipment hour 6 0 0
brush, clamping wire mesh etc.
along with accessories
Accelerator compound for Guniting @ 2 per cent of weight of
kg 13.26 0
cement 0
water KL 1 0 0
Graded sand cum 1.41 0 0
Cement tonne 0.66 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and application of Gunite/ Shotcreate concrete surface with cement mortar applied with compressor after cleaning surface and spraying with epoxy complete as per Technical Specifications., Mix 1:1:2 ( Cement :sand: aggregate) 30 sqm
Spec. cl. No: 2710
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Shotcreteing
27.3.B Unskilled day 6 0 0 Wire fabric ( mesh 50 mm x 50 mm size of 3 mm wire) kg 60 0 hour 6 0 0
0 equipment
Compressor with
For tied of welded wire fabric, consumables like nozzles, wire
Skilled day 2 0 0 0 Guniting equipment hour 6 0 0
brush, clamping wire mesh etc.
along with accessories
Accelerator compound for Guniting @ 2 per cent of weight of
kg 13.26 0
cement 0
Aggregate ( 5 - 10 mm) cum 0.94 0 0
water KL 1 0 0
Graded sand cum 0.47 0 0
Cement tonne 0.66 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with
1
Cement/Epoxy
Spec. cl. No: 2709
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 10 per cent
of Labour cost Cement, fixing compound and consumables @ 15 per cent of
27.4 0
for drilling holes cost of nipple
etc. 0
Unskilled day 0.04 0 0 Nipples nos. 1 0 0
Skilled day 0.2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and Sealing of cracks/porous concrete by injection process through nipples/Grouting complete as per Technical Specification., Cement Grout 50 kg
Spec. cl. No: 2709
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Admixtures (anti shrinkage compound) @ 20 per cent of cost
27.5.A Unskilled day 5 0 0 0 Generator hour 6 0 0
of cement
Grout pump with
Skilled day 5 0 0 Cement kg 55 0 agitator and hour 6 0 0
0 accessories
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and Sealing of cracks/porous concrete by injection process through nipples/Grouting complete as per Technical Specification., Cement Mortar (1:1) Grouting 50 kg
Spec. cl. No: 2709
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Admixtures (anti shrinkage compound) @ 20 per cent of
27.5.B Unskilled day 10 0 0 0 Generator hour 6 0 0
cost of cement
Grout pump with
Skilled day 5 0 0 Sand kg 27.5 0 agitator and hour 6 0 0
0 accessories
Cement kg 27.5 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and Sealing of cracks/porous concrete by injection process through nipples/Grouting complete as per Technical Specification., Low viscosity epoxy injection resin 50 liter
Spec. cl. No: 2709
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.5.C Unskilled day 10 0 0 Joint Sealant Compound ( Epoxy Adhesive) kg 55 0 0 Generator hour 6 0 0
Grout pump with
Skilled day 5 0 0 Epoxy primer kg 1 0 agitator and hour 6 0 0
0 accessories
Low viscosity Injection Epoxy Grout Lit 55 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and replacement of Crash Barrier as per Drawing, Technical Specifications and instruction of the Engineer. 30 meter
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.16 Unskilled day 20 0 0 Tractor-trolley hour 6 0 0
Skilled day 1 0 0
Labour for
dismantling old
railing and
disposal of
dismantled
material.
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Patching of damaged concrete surface with polymer concrete/ micro concrete and curing compounds, Providing and applying polymer concrete and curing compounds on damaged concrete surface as per instructions of manufacturer and approval of
10 sqm
the Engineer.
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Pre-packed polymer concrete based on epoxy system complete
27.6.A Unskilled day 3 0 0 kg 770 0 Generator hour 6 0 0
with curing compound, initiator and promoter 0
Grout pump with
Skilled day 1 0 0 agitator and hour 6 0 0
accessories
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Patching of damaged concrete surface with polymer concrete/ micro concrete and curing compounds, Providing and applying Micro concreting on damaged concrete (slab/beam/abutment section of the bridges )with ready to use high early high
1 cum
strength , free flow , non shrink self compacting Micro concrete ( M 60 & above)With adding 20% local aggregates of 10 mm down) as per instructions of manufacturer and approval of the Engineer.
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.6.B Unskilled day 18 0 0 water KL 1 0 0 Generator hour 1 0 0
Skilled day 12 0 0 Epoxy Bonding Agent kg 12 0 0 Concrete mixer hour 1 0 0
Local aggregates 10 mm down in size cum 0.2 0 0
Non shrink self compacting micro concrete kg 1936 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Patching of damaged concrete surface with polymer concrete/ micro concrete and curing compounds, Providing and applying Micro concreting on damaged concrete ( slab /beam/ abutment section of the bridges )with ready to use high early high
1 cum
strength , free flow , non shrink self compacting Micro concrete ( M 60 & above) as per instructions of manufacturer and approval of the Engineer.
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.6.C Unskilled day 18 0 0 water KL 1 #NAME? #NAME? Generator hour 6 0 0
Skilled day 12 0 0 Epoxy metal primer kg 4 0 0 Concrete mixer hour 6 0 0
Epoxy Bonding Agent kg 12 0 0
Non shrink self compacting micro concrete kg 2285 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and applying Epoxy adhesive and Sealing of crack / porous concrete with Epoxy Grout by injection with nipples complete as per direction of the Engineer. 10 kg
Spec. cl. No: 2706
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No.
Norms
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.7 Unskilled day 2 0 0 Epoxy Adhesive kg 11 0 0 Generator hour 6 0 0
Skilled day 1 0 0 Epoxy Injection gun hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement complete as per Technical Specification 100 sqm
Spec. cl. No: 2707
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.8 Unskilled day 8 0 0 For other consumables like acetone etc. to cover wastage. 0 Mortar mixer hour 6 0 0
Skilled day 5 0 0 Epoxy resin -hardener mix for seal coat. kg 20 0 0 Air Compressor hour 6 0 0
Epoxy mortar ( @ 22kg / sqm) kg 2200 0 0
Epoxy bonding agent ( @ 0.87 kg /sqm) kg 87 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and applying the Shotcreate mixture mechanically with compressed air under pressure, sprayable less rebound ( rebou and quick setting comnd 25 %) as per Technical specifications and direction of the Engineer. 10 sqm
Spec. cl. No: 2710
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.9 Unskilled day 0.1 0 0 Epoxy bonding agent kg 8.7 0 0 Generator hour 6 0 0
Shotcreteing
Skilled day 0.1 0 0 Thixotropic repair mortar ( Sprayable) kg 850 0 hour 1 0 0
0 equipment
Air compressor hour 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and applying pre-packed cement based polymer mortar for replacement of spalled concrete 10 sqm
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.10' Unskilled day 2 0 0 polymer mortar M-45 kg 550 0 0 Compressor hour 6 0 0
Skilled day 2 0 0 Epoxy bonding agent kg 8.7 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and applying Epoxy bonding of new concrete to old concrete as per technical Specifications and direction of the Engineer. 10 sqm
Spec. cl. No: 2708
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.11 Unskilled day 1 0 0 Epoxy resin kg 8.4 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and replacement of Bearings complete as per Technical Specification and direction of the Engineer. 3 nos
Spec. cl. No: 2711
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Hydraulic Jack ( 40
27.12 Unskilled day 12 0 0 Wooden packing cum 0.15 0 hour 72 0 0
0 tonne capacity)
Skilled day 5 0 0 Bearing of required type and capacity no 3 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing required parts and rectification of Bearings as per Technical Specifications and direction of the Engineer. 3 nos
Spec. cl. No: 2711
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Hydraulic Jack
27.13 Unskilled day 12 0 0 Wooden packing cum 0.15 0 ( required capacity hour 72 0 0
0 normally 200 tonne)
As
per
Skilled day 5 0 0 Parts of Bearing of required type and capacity requir #NAME?
emen
t #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and replacement of Expansion Joints complete as per drawings, Technical specifications and direction of the Engineer. 12 meter
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
expansion joint ( Elastomeric Slab Steel Expansion Joint /
27.14 Unskilled day 9 0 0 meter 12 0
compression seal/ strip / modular strip. etc.) 0
Skilled day 1 0 0 Replacement of joint
For removal of
old expansion
joint including
breaking of
concrete, cutting additional reinforcement kg 100 #NAME?
of lugs and
shifting of
broken material
etc.
#NAME?
Epoxy @ 0.8 kg/sqm kg 9.6 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and replacement of Damaged Concrete Railing as per Drawing, Technical Specifications and direction of the Engineer,. 30 meter
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Tractor-trolley for
27.15 Unskilled day 12 0 0 disposal of dismantled hour 6 0 0
material
Skilled day 1 0 0
Labour for
dismantling old
railing and
disposal of
dismantled
material.
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and replacement of Damaged mild steel railing as per Drawing, Technical Specifications and direction of the Engineer. 30 meter
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.17 Unskilled day 12 0 0 Tractor-trolley hour 5 0 0
Skilled day 1 0 0
Labour for
dismantling old
railing and
disposal of
dismantled
material.
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Repair of Crash Barrier, Providing and repair of concrete crash barrier with cement concrete M-30 grade by cutting and trimming the damaged portion to a regular shape, cleaning the area to be repaired thoroughly, applying cement concert after
30 meter
erection of proper form work.
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.18 Unskilled day 3 0 0 M-30 grade cement concrete cum 1 #NAME? #NAME?
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Providing and repair of RCC railing to bring it to the original shape as per Drawing, Technical Specifications and instruction of the Engineer., Repair of RCC Railing 30 meter
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.19 Unskilled day 2 0 0 HYSD bar reinforcement tonne 0.03 #NAME? #NAME?
Skilled day 1 0 0 M-30 grade cement concrete cum 0.3 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Repair of Steel Railing, Providing and repair of steel railing to bring it to the original shape as per Drawing, Technical Specifications and direction of the Engineer. 30 meter
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.20' Unskilled day 2 0 0 For painting. 0
Skilled day 1 0 0 MS Bolt and nuts kg 30 0 0
Flat iron kg 30 0 0
Mild steel ISMC series kg 87 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Painting of Steel Bridge, Providing and painting steel bridge including removal of old paints by sand blasting cleaning and repairing of metal surfaces for the application of new paints as per specification and direction of the Engineer. 20 sqm
Spec. cl. No: 2713
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.21 Unskilled day 7 0 0 sand ( 1.7 mm - 600 micron) cum 0.8 0 0 Blasting Machine hour 6 0 0
Skilled day 1 0 0 Air compressor hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and Painting of steel bridges with one coat of primer, one coat of epoxy and 2 coats of acrylic polyurethane as per specification. 20 sqm
Spec. cl. No: 2713
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Unskilled Paint sprayer machine
27.22 day 4 0 0 2 Pack high built polyur - ethane ( 2 coat) lit 8 0 hour 6 0 0
(1+1+1+1=4) 0 with compressor
Skilled
( 0.25+0.25+0.25 day 1 0 0 2 Pack high built epoxy lit 5.5 0
=1) 0
Epoxy Red Zinc Oxide Phosphate Primer lit 5.5 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and painting of steel bridges with one coat of primer, one coat of epoxy and 2 coats of acrylic polyurethane, without sprayer machine as per specification 1 sqm
Spec. cl. No: 2713
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.23 Unskilled day 0.6 0 0 iii) 2 Pack high built polyur - ethane lit 0.35 0 0
Skilled day 0.6 0 0 ii) 2 Pack high built epoxy lit 0.25 0 0
i) Epoxy Red Zinc Oxide Phosphate Primer lit 0.25 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Repair of Joint Grooves with Epoxy Mortar, Providing and repair of spalled joint grooves of contraction joints, longitudinal joints and expansion joints in concrete pavements using epoxy mortar or epoxy concrete as per Technical Specifications and
10 meter
direction of the Engineer.
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.24 Unskilled day 1.5 0 0 Epoxy compound with accessories for preparing epoxy mortar kg 10 0 Air compressor hour 0.1 0 0
0
Skilled day 1.5 0 0 Epoxy primer kg 2.5 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Repair of old Joints Sealant, Providing and repair of old joints including removal of existing sealant and re sealing of contraction, longitudinal or expansion joints in concrete pavement with fresh sealant material as per Drawing and Technical
10 meter
Specifications.
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.25 Unskilled day 1.5 0 0 Sealant kg 1 0 0 Air compressor hour 0.1 0 0
Skilled day 0.15 0 0 Primer kg 0.25 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Concrete Jacketing, Preparation, hacking and cleaning of existing surface for concrete jacketing as per direction of the Engineer. 100 sqm
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.26.A Unskilled day 30 0 0 Generator hour 6 0 0
Skilled day 3 0 0 Hacking Machine hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Concrete Jacketing, Drilling Holes on existing concrete surface of 16 mm diameter and 300 mm depth 100 nos
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.26.B Skilled day 1 0 0 Generator hour 6 0 0
Jack hammer /Rock
hour 6 0 0
drill
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Concrete Jacketing, Providing and fixing Anchor bar 1 kg
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No.
Norms
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Refer Rate analysis of
27.26.C
Reinforcement
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Concrete Jacketing, Providing and Filling drill hole with Epoxy Grout
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Refer Rate analysis of
27.26.D
Epoxy grout
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Concrete Jacketing, Providing and applying Micro silica/ silica fume concreting for concrete jacketing works ( slab /beam/ abutment section of the bridges ) as per instructions of manufacturer and as approved by the Engineer. 1 cum
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.26.E Unskilled day 18 0 0 water KL 1 0 0 Generator hour 1 0 0
Skilled day 12 0 0 Pozzoplus kg 100 0 0 Concrete mixer hour 1 0 0
PC based Super plasticizer kg 7.5 0 0
Micro silica/ Silica Fume kg 50 0 0
aggregate cum 0.7 0 0
sand cum 0.47 0 0
Cement kg 500 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Corrosion Treatment of Rebar's, Providing accessories and removal of rust from exposed rebar area as per direction of the Engineer. 100 sqm
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.27.A Unskilled day 30 0 0 Wire brush, chisel, axe etc. , 0
Skilled day 2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Corrosion Treatment of Rebar's, Providing and Application of Rust Cleaning & passivating agent as per manufacturer' s guidelines and instruction of the Engineer. 100 sqm
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.27.B Unskilled day 6 0 0 Rust clean agent kg 10 0 0 Mechanical sprayer 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Corrosion Treatment of Rebar's, Providing and Application of Alkaline, polymeric, elastomeric formulation designed to protect steel from corrosion as per manufacturer' s guidelines and instruction of the Engineer. 100 sqm
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.27.C Unskilled day 6 0 0 Cement kg 10 #NAME? #NAME? Mechanical sprayer 0
Skilled day 1 0 0 Alkaline, polymeric, elastomeric primer agent kg 12.5 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Corrosion Treatment of Rebar's, Providing and Application of Acrylic Based bond coat for reinforcement as per manufacturer' s guidelines and instruction of the Engineer. 100 sqm
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.27.D Unskilled day 8 0 0 Cement kg 50 0 0 Mechanical sprayer 0
Skilled day 2 0 0 Acrylic based bonding agent kg 50 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Corrosion Treatment of Rebar's, Providing and Application of Pre-packed polymer modified mortar as per manufacturer' s guidelines and instruction of the Engineer.
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Corrosion Treatment of Rebar's, Providing and Application of concrete penetrating corrosion inhibitor as per manufacturer' s guidelines and instruction of the Engineer. 100 sqm
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.27.F Unskilled day 8 0 0 concrete penetrating corrosion inhibitor kg 25 0 0 Mechanical sprayer 0
Skilled day 2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and Application of 3 coat of high build micro porous anti carbonation coating on concrete surface as per manufacturer' s guidelines and instruction of the Engineer. 100 sqm
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.28 Unskilled day 20 0 0 high build micro porous anti carbonation coat kg 50 0 0 Mechanical sprayer 0
Skilled day 2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Fiber Reinforced Polymer works, Providing and Application of Fiber reinforced polymer ( carbon fiber) as per manufacturer' s guidelines and instruction of the Engineer. 100 sqm
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.29.A Unskilled day 8 0 0 Epoxy bonding agent kg 100 0 0
Skilled day 2 0 0 Carbon fiber sqm 110 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Fiber Reinforced Polymer works, Providing and Application of carbon laminated ( 50 mm wide 1.4 mm thick) system as per manufacturer' s guidelines and instruction of the Engineer. 100 meter
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.29.B Unskilled day 8 0 0 Laminate adhesive agent ( thixotropic) kg 20 0 0
Skilled day 2 0 0 Carbon laminated sheet sqm 110 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Fiber Reinforced Polymer works, Providing and Application of 3 coat of two component aliphatic Polyurethane Coating on concrete surface as per manufacturer' s guidelines and instruction of the Engineer. 100 sqm
Fiber Reinforced Polymer works, Providing and Application of 3 coat of two component aliphatic Polyurethane Coating on concrete surface as per manufacturer' s guidelines and instruction of the Engineer. 100 sqm
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.29.C Unskilled day 4 0 0 Two component aliphatic Polyurethane coat kg 75 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Repair of Gabion wall, Providing and repair of spalled gabion box/ mattress including dressing bedding, bonding tying all as per Technical Specification direction of the Engineer. 10 cum
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.30' Unskilled day 16 0 0 Binding wire kg 10 0 0
Skilled day 4 0 0 Boulder cum 12 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Repair of masonry wall / side drain, Providing and repair of spalled masonry wall/ side drain of random rubble masonry in cement mortar 1:4 as per Technical Specifications and direction of the Engineer. 5 cum
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
27.31 Unskilled day 20 0 0 For scaffolding 0
Skilled day 10 0 0 water KL 2 0 0
Sand cum 2.61 0 0
Cement tonne 0.93 0 0
Stone cum 7.5 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Inspection and Re-tightening of Nut bolt and other accessories, Inspection and Re-tightening of Nut bolt and other accessories of Cables/ Structural parts/Steel truss/ steel girder as per Technical Specifications and direction of the Engineer. 500 nos
Spec. cl. No: 2700
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For all Repair /
maintenance items add
cost for traffic
27.32 Unskilled day 10 0 0 Dori kg 8 0 accommodation /
diversion , if required,
provide as a separate
item in contract.
0
Description of Work:
Collection and preparation of seeds, Collection of grass seeds from sources within 1 km of the road, including separating and preparing seed for storage, and drying seed in the sun. 1 kg
Spec. cl. No: 2802
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Khukuri and other
28.1.A Unskilled day 1.5 0 0 Sealed bag nos 1 #NAME? 0
#NAME? T&P
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Collection and preparation of seeds, Collection of medium-sized shrub seeds (e.g. Keraukose) from sources within 1 km of the road, including seed preparation for storage after drying. 1 kg
Spec. cl. No: 2802
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
28.1.B Unskilled day 0.45 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Collection and preparation of seeds, Collection of medium-sized shrub seeds (e.g. Keraukose) from sources within 1 km of the road, including seed preparation for storage after drying. 1 kg
Spec. cl. No: 2802
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
28.1.C Unskilled day 0.75 0 0 Sealed bag nos 1 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Collection and preparation of seeds, Collection of medium-sized shrub and tree seeds (e.g. areli, khayer, ghobre and rani salla, sisau) from sources within 1 km of the road, including seed preparation for storage after drying. 1 kg
Spec. cl. No: 2802
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Nanglo and other
28.1.D Unskilled day 0.95 0 0 Sealed bag nos 1 #NAME? 0
#NAME? T&P
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Collection and preparation of seeds, Collection of small shrub and tree seeds (e.g. Dhanyero, dhusun, tilka, utis) from the sources within 1 km of the of the road, including seed preparation for storage after drying. 1 kg
Spec. cl. No: 2802
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Nanglo and other
28.1.E Unskilled day 2.5 0 0 Sealed bag nos 1 #NAME? 0
#NAME? T&P
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Collection of grass and hardwood cuttings for vegetative propagation, Collection of grass clumps (e.g. amliso, kans, khar)from sources within 1 km of the road to make slips for multiplication in the nursery. 100 slips
Spec. cl. No: 2803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Kodalo and other
28.2.A Unskilled day 1.5 0 0 Hessian jute sqm 5 #NAME? 0
#NAME? T&P
Adequate supply of appropriate clumps
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Collection of grass and hardwood cuttings for vegetative propagation, Collection of cuttings of small bamboos (e.g. padang bans, tite nigalo bans), suitable for traditional planting, from the sources within of the road. Material minimum 10 cm of
100 slips
the rooted rhizome and 90 cm of culm.
Spec. cl. No: 2803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Kodalo , Khukuri
28.2.B Unskilled day 3 0 0 Hessian jute sqm 10 #NAME? 0
#NAME? and other T&P
Adequate supply of appropriate clumps
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Collection of grass and hardwood cuttings for vegetative propagation, Collection of hardwood cuttings (e.g. assuro, basin, kanda phul, namdi phul, saruwa, simali) , from the sources within of the road of the road. Material minimum 30 cm in
100 slips
length and 2 cm in dia.
Spec. cl. No: 2803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Khukuri and other
28.2.C Unskilled day 0.85 0 0 Hessian jute sqm 5 #NAME? 0
#NAME? T&P
Adequate supply of appropriate clumps
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Nursery operation and management (bed preparation), Construction of seed beds for tree seedlings, including Materials for beds and shades. Bed is 1 m wide x 17 cm high and made up of 5 cm of washed gravel, 5 cm of unsieved forest soil, 5 cm of
5 sqm
1:3 mix of sieved forest soil, and washed sand, 2 cm of washed, sieved and sterilized sand. [Add 5% to the number of bricks to allow for normal wastage].
Spec. cl. No: 2804
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Khanti, Shovel,
28.3.A Unskilled day 0.85 0 0 Binding wire kg 3 #NAME? Pick axe, Screen, mesh 0
#NAME? and other T&P
Description of Work: Nursery operation and management (bed preparation), Construction of stand out beds for tree seedling in polypots, including Material for beds and shades.Bed is 100 cm wide x 15 cm high, with a layer of gravel placed above the compacted ground.
5 sqm
[Add 5% to the number of bricks to allow for normal wastages.]
Spec. cl. No: 2804
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Khanti, Shovel,
28.3.B Unskilled day 6 0 0 Binding wire kg 3 #NAME? Pick axe and other 0
#NAME? T&P
Description of Work: Nursery operation and management (bed preparation), Construction of beds for grass seeds, grass slips (i.e. vegetative propagation ) and tree cuttings, including Materials and hessian cover. Bed is 100 cm wide x 25 cm high and made up of of
5 sqm
washed gravel placed above the ground, of 1:1 mix of sieved soil and compost, and topped with 15 cm of 3:1 mix of sieved forest topsoil and washed sand.
Spec. cl. No: 2804
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 3 % of Labour
28.3.C Unskilled day 1.5 0 0 Hessian Jute sqm 10 #NAME? cost for Shovel, Pick 0
#NAME? axe and other T&P
Skilled day 1 0 0 Washed sand cum 6 #NAME? #NAME?
Compost cum 0.38 #NAME? #NAME?
Forest soil cum 1.46 #NAME? #NAME?
Gravel cum 0.38 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Nursery operation and management (bed preparation), Construction of beds for propagation of bamboo culm cuttings, including Materials and hessian cover. Bed is 100 cm wide x 30 cm high. The ground below the bed is dug to a depth of 30 cm.
5 sqm
Bed is made with 10 cm unsieved soil and 20 cm high is formed around the edge.
Spec. cl. No: 2804
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 3 % of Labour
28.3.D Skilled day 2 0 0 Hessian Jute sqm 10 #NAME? cost for Shovel, Pick 0
#NAME? axe and other T&P
Washed sand cum 6 #NAME? #NAME?
Compost cum 0.38 #NAME? #NAME?
Forest soil cum 1.46 #NAME? #NAME?
Gravel cum 0.38 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Nursery operation and management (seed sowing and transplanting; planting hardwood cuttings), Tree seed sowing @ 10 gram per sqm. (medium sized seeds ) or 2 gram per sqm (very fine seeds) into seed beds including pre-sowing treatment. 5 sqm
Spec. cl. No: 2804
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Bowl, Trowel and
28.4.A Unskilled day 0.04 0 0 Seed cum 0.38 #NAME? 0
#NAME? other T&P
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Nursery operation and management (seed sowing and transplanting; planting hardwood cuttings), Preparing potting mix and filling polypots, including all Materials for container seedlings. [Note. 1 kg of 200 gauge polypots (4" x 7" laid flat)= 464
1000 nos
bags; 200 gauge black polythene is preferred]
Spec. cl. No: 2804
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Wooden peg and
28.4.B Unskilled day 10 0 0 Compost cum 0.23 #NAME? 0
#NAME? other T&P
Soil cum 0.7 #NAME? #NAME?
Sand cum 0.46 #NAME? #NAME?
Polypots nos 1050 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Nursery operation and management (seed sowing and transplanting; planting hardwood cuttings), Direct sowing of tree seeds into polypots including seed treatment, by sowing one seed in half the pots and two seeds in the other half. 1000 nos
Spec. cl. No: 2804
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Sieve, Shovel and
28.4.C Unskilled day 0.62 0 0 Wooden peg nos 1 #NAME? 0
#NAME? other T&P
Seed nos 1500 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Nursery operation and management (seed sowing and transplanting; planting hardwood cuttings), Pricking out young seedling and transplanting into polypots. 1000 nos
Nursery operation and management (seed sowing and transplanting; planting hardwood cuttings), Pricking out young seedling and transplanting into polypots. 1000 nos
Spec. cl. No: 2804
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Tray and other
28.4.D Unskilled day 0.18 0 0 Wooden peg nos 1 #NAME? 0
#NAME? T&P
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Nursery operation and management (seed sowing and transplanting; planting hardwood cuttings), Pricking out young seedling and transplanting into beds. 1000 nos
Spec. cl. No: 2804
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Tray and other
28.4.E Unskilled day 0.12 0 0 Wooden peg nos 1 #NAME? 0
#NAME? T&P
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Nursery operation and management (seed sowing and transplanting; planting hardwood cuttings), Transplanting grass slips into beds, from clumps. Slips are planted at 10 cm centers in row 25 cm apart. 1 sqm
Spec. cl. No: 2804
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Khukuri , Shovel
28.4.F Unskilled day 0.12 0 0 Hessian Jute sqm 0.3 #NAME? 0
#NAME? and other T&P
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Nursery operation and management (seed sowing and transplanting; planting hardwood cuttings), Planting of hardwood cuttings of minimum length to 20 cm depth into prepared beds. Cutting spaced at centers within rows, with 20 cm between
1000 nos
rows.
Spec. cl. No: 2804
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Khanti and other
28.4.G Unskilled day 0.6 0 0 Hard wood cuttings nos 1000 #NAME? 0
#NAME? T&P
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Preparation of raised Materials for extraction from the nursery, Grass culm cutting production from nursery stock: single or double node (e.g. napier) 1000 nos
Spec. cl. No: 2805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Khukuri and other
28.5.A Unskilled day 0.7 0 0 Hessian Jute sqm 2.7 #NAME? 0
#NAME? T&P
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Preparation of raised Materials for extraction from the nursery, Uprooting and preparing grass slips ready for site planting from nursery seedling. 1000 nos
Spec. cl. No: 2805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Fork, Pick axe
28.5.B Unskilled day 0.63 0 0 Hessian Jute sqm 1.35 #NAME? Khukuri and other 0
#NAME? T&P
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Preparation of raised Materials for extraction from the nursery, Uprooting and preparing grass slips ready for site planting from nursery grass clumps raised from slips by vegetative propagation. 1000 nos
Preparation of raised Materials for extraction from the nursery, Uprooting and preparing grass slips ready for site planting from nursery grass clumps raised from slips by vegetative propagation. 1000 nos
Spec. cl. No: 2805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Shovel and other
28.5.C Unskilled day 0.33 0 0 Hessian Jute sqm 4.2 #NAME? 0
#NAME? T&P
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Compost and mulch production, Mulch production by collection and cutting of weeds and other vegetation such as tite pati, banmara etc., within 1 km of the road, and stacking along roadside. 1 cum
Spec. cl. No: 2805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Hansia, Doko and
28.6.A Unskilled day 0.12 0 0 0
other T & P
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Compost and mulch production, Compost production by collection and cutting of weeds and other vegetation such as tite pati, banmara etc., within 1 km of the road, including fine cutting and filling compost pit. 1 cum
Spec. cl. No: 2805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Hansia, Doko and
28.6.B Unskilled day 0.12 0 0 0
other T & P
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Compost and mulch production, Turning compost once per month. 1 cum
Spec. cl. No: 2805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Shovel and other
28.6.C Unskilled day 0.1 0 0 0
T&P
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Direct seedling on site, Broadcasting grass seeds on slopes <40o; seedling rate 25 g per sqm. 100 sqm
Spec. cl. No: 2807
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
28.7.A Unskilled day 0.17 0 0 Seed kg 2.5 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Direct seedling on site, Broadcasting grass seeds on slopes <40o ;including cover with long mulch, seedling rate 25 g per sqm. 100 sqm
Spec. cl. No: 2807
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
28.7.B Unskilled day 5 0 0 Mulch cum 5 #NAME? #NAME?
Seed kg 2.5 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Direct seedling on site, Broadcasting grass seeds on slopes <40-45* including cover with long mulch, and jute netting of mesh size 300 mm * 500 mm. Seedling @25 g per sqm. Operation includes pegging with suitable live pegs or hardwood cutting
100 sqm
(e.g. Simali) 1 m spacing, jute net of 6.75 m* size.
Spec. cl. No: 2807
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No.
Norms
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Khukuri, Mallet
28.7.C Unskilled day 6.25 0 0 Live pegs cum 128 #NAME? 0
#NAME? and other T & P
Jute net cum 105 #NAME? #NAME?
Mulch cum 5 #NAME? #NAME?
Seed kg 2.5 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Direct seedling on site, Sowing shrub or tree seeds on all slopes at 25 cm intervals, including digging planting holes to 5 cm depth and covering with soil. Two seeds per planting hole. 100 sqm
Spec. cl. No: 2807
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For MS rod of 50 cm
28.7.D Unskilled day 1 0 0 Seed nos 3200 #NAME? length and other T & 0
#NAME? P
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Planting grass on site, Planting single node culm cutting of grass (e.g. napier) on fill slopes<45 and embankment slopes in plain areas. Approx. length 15-, including digging planting hole 10 - 20 cm depth using a metal rod or hardwood peg. 100 nos
Spec. cl. No: 2807
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Ms rod or hard
28.8.A Unskilled day 0.2 0 0 Hessian Jute sqm 0.27 #NAME? wood peg and other 0
#NAME? T&P
Grass Cuttings nos 100 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Planting grass on site, Planting single node culm cutting of grass (e.g. napier) on fill slopes >45o Approx. length 15-, including digging planting hole 10- depth using a metal rod or hardwood peg. 100 nos
Spec. cl. No: 2807
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Ms rod or hard
28.8.B Unskilled day 0.35 0 0 Hessian Jute sqm 0.27 #NAME? wood peg and other 0
#NAME? T&P
Grass Cuttings nos 100 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Planting grass on site, Planting single node culm cutting of grass (e.g. napier) on fill slopes >45o Approx. length 15-, including digging planting hole 10- depth using a metal rod or hardwood peg. 100 nos
Spec. cl. No: 2807
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Ms rod or hard
28.8.C Unskilled day 0.5 0 0 Hessian Jute sqm 0.27 #NAME? wood peg and other 0
#NAME? T&P
Grass Cuttings nos 100 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Planting grass on site, Planting rooted grass slips on embankment slopes in plain areas, at spacing within the row. The first row is 0.75 m from the edge of the pavement and subsequent rows are spaced at intervals down the embankment. 1 meter
Spec. cl. No: 2807
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Ms rod or hard
28.8.D Unskilled day 0.02 0 0 Line string m 1 #NAME? wood peg and other 0
#NAME? T&P
Hessian Jute sqm 0.27 #NAME? #NAME?
Grass slips/ no of drills Cuttings nos 11 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Planting grass on site, Planting rooted grass slips on the slopes <45o including preparation of slips on site. a max of 5 cm depth with metal rod or Operation includes digging planting hole to hard-wood peg, depending on the nature of the soil. The
1 sqm
planting drills should be space
Spec. cl. No: 2807
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Ms rod or hard
28.8.E Unskilled day 0.2 0 0 Hessian Jute sqm 0.27 #NAME? wood peg and other 0
#NAME? T&P
Grass slips/ no of drills Cuttings nos 100 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Planting grass on site, Planting rooted grass slips on the slopes 45o - 60o including preparation of slips on site. a max of 5 cm depth with metal rod or Operation includes digging planting hole to hard-wood peg, depending on the nature of the soil. The
1 sqm
planting drills should be space
Spec. cl. No: 2807
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Ms rod or hard
28.8.F Unskilled day 0.3 0 0 Hessian Jute sqm 0.27 #NAME? wood peg and other 0
#NAME? T&P
Grass slips/ no of drills Cuttings nos 100 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Planting grass on site, Planting rooted grass slips on the slopes > 60o including preparation of slips on site. a max of 5 cm depth with metal rod or Operation includes digging planting hole to hard-wood peg, depending on the nature of the soil. The
1 sqm
planting drills should be space
Spec. cl. No: 2807
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Ms rod or hard
28.8.G Unskilled day 0.4 0 0 Hessian Jute sqm 0.27 #NAME? wood peg and other 0
#NAME? T&P
Grass slips/ no of drills Cuttings nos 100 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Planting shrub and tree seedling and cutting on site, Planting containerized tree and shrub seedlings, including pitting, transplanting, composting and placing tree guards, on toe of embankment slopes in plain areas, not less than 8 m from the road
10 nos
center line. Pit size 30 cm diameter x depth. Compost volume 1/4 of the volume of the pit, mixed with original soil.
Spec. cl. No: 2807
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Khanti Mallet and
28.9.A Unskilled day 0.25 0 0 Green mulch cum 0.04 #NAME? 0
#NAME? other T&P
Tree guard nos 10 #NAME? #NAME?
Compost cum 0.05 #NAME? #NAME?
Seedling nos 10 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Planting shrub and tree seedling and cutting on site, Planting containerized tree and shrub seedlings, including pitting, transplanting, composting and mulching, on slopes < 30o . Pit size 30 cm diameter x depth mix Compost with soil and back fill
10 nos
into pit to 1/4 of the pit volume
Spec. cl. No: 2807
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No.
Norms
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Khanti Doko and
28.9.B Unskilled day 0.33 0 0 Green mulch cum 0.04 #NAME? 0
#NAME? other T&P
Compost cum 0.05 #NAME? #NAME?
Seedling nos 10 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Planting shrub and tree seedling and cutting on site, Planting containerized tree and shrub seedlings, including pitting, transplanting, composting and mulching, on slopes 30o . - 400 Pit size 30 cm diameter x depth mix Compost with soil and
10 nos
back fill into pit to 1/4 of the pit volume
Spec. cl. No: 2807
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Khanti Doko and
28.9.C Unskilled day 0.4 0 0 Green mulch cum 0.04 #NAME? 0
#NAME? other T&P
Compost cum 0.05 #NAME? #NAME?
Seedling nos 10 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Planting shrub and tree seedling and cutting on site, Planting rooted tree stump cutting and bare root seedlings, including pitting, transplanting, composting and mulching on slopes <300. Pit size 10 cm diameter x depth. Compost volume 1/4 of
10 nos
volume of the pit mix with original soil.
Spec. cl. No: 2807
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Khanti Doko and
28.9.D Unskilled day 0.17 0 0 Green mulch cum 0.04 #NAME? 0
#NAME? other T&P
Compost cum 0.03 #NAME? #NAME?
Seedling nos 10 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Planting shrub and tree seedling and cutting on site, Planting rooted tree stump cutting and bare root seedlings, including pitting, transplanting, composting and mulching on slopes <300 - 45o Pit size 10 cm diameter x depth. Compost volume 1/4 of
10 nos
volume of the pit mix with original soil.
Spec. cl. No: 2807
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Khanti Doko and
28.9.E Unskilled day 0.25 0 0 Green mulch cum 0.04 #NAME? 0
#NAME? other T&P
Compost cum 0.03 #NAME? #NAME?
Seedling nos 10 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Planting shrub and tree seedling and cutting on site, Planting rooted tree stump cutting and bare root seedlings, including pitting, transplanting, composting and mulching on slopes > 45o Pit size 10 cm diameter x depth. Compost volume 1/4 of
10 nos
volume of the pit mix with original soil.
Spec. cl. No: 2807
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Khanti Doko and
28.9.F Unskilled day 0.33 0 0 Green mulch cum 0.04 #NAME? 0
#NAME? other T&P
Compost cum 0.03 #NAME? #NAME?
Seedling nos 10 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Vegetative palisade construction, brush layering and fascines, Collection of hardwood for cuttings for planting Material (e.g. assuro, namdi phul, simali)from the sources within of the road. Material to be approx. 1 km in length and minimum 5 cm
1000 nos
in diameter.
Spec. cl. No: 2897
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Khukuri and
28.10.A Unskilled day 0.85 0 0 Adequate supply of bushes 0
other T&P
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Vegetative palisade construction, brush layering and fascines, Preparation and planting of live pegs selected species(e.g. assuro, namdi phul, simali)of minimum length to 0.5 m depth into hard ground. Pegs spaced at centers within rows, and
1 meter
interwoven with vegetation.
Spec. cl. No: 2897
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Crowbar and
28.10.B Unskilled day 0.17 0 0 Live peg nos 20 #NAME? 0
#NAME? other T&P
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Vegetative palisade construction, brush layering and fascines, Preparation and planting of live pegs selected species(e.g. assuro, namdi phul, simali)of minimum length to 0.5 m depth into soft debris. Pegs spaced at 5- centers within rows, and
1 meter
interwoven with vegetation.
Spec. cl. No: 2897
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Crowbar and
28.10.C Unskilled day 0.12 0 0 Live peg nos 20 #NAME? 0
#NAME? other T&P
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Vegetative palisade construction, brush layering and fascines, Site preparation for fascine laying: earth works in excavation of trench to 20 cm depth 1 meter
Spec. cl. No: 2897
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Pick Axe, Shovel
28.10.D Unskilled day 0.06 0 0 Crowbar and other 0
T&P
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Vegetative palisade construction, brush layering and fascines, Laying of live fascines, using live hardwood cuttings of selected species(e.g. assuro, namdi phul, simali) of minimum length placed in bundles to give 4 running meters of cutting per meter
1 meter
of fascine, including backfilling of trench and careful compaction.
Spec. cl. No: 2897
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Crowbar and
28.10.E Unskilled day 0.17 0 0 Hard wood cutting of at least 1 m length m 8 #NAME? 0
#NAME? other T&P
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Jute netting works, Standard jute netting for bare slopes and under planting with slips. Spinning raw jute from 100% jute fiber into yarn and weaving the yarn into netting. Hand spun yarn 5 to 8 mm in diameter, width of net 1.20 meters warp
1 sqm
strands 27 no per , mesh size 30-40 mm sq. and 1.25 kg/m weight at 1.20 m width.[Note A Toro is the weaving shuttle, bamboo culm.]normally made from a split large
Spec. cl. No: 2808
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For bamboo 10 no
28.11.A Unskilled day 0.36 0 0 Raw Jute kg 0.25 #NAME? sticks, Khukuri and 0
#NAME? other T&P
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Jute netting works, Wide mesh jute netting for holding mulch on slopes. Spinning raw jute from 100% jute fiber into yarn and weaving the yarn into netting. Hand spun yarn 3 to 5 mm in diameter 1.20 m side and 11.2 m long. Mesh size 150 mm x
1 sqm
500 mm rectangular mesh and 0.25 kg/m at 1.20 m width. [Note A torso is the weaving shuttle, normally made from a split large bamboo culm.]
Spec. cl. No: 2808
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No.
Norms
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For bamboo 10 no
28.11.B Unskilled day 0.15 0 0 Raw Jute kg 0.25 #NAME? sticks, Khukuri and 0
#NAME? other T&P
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Jute netting works, Placing 30-40 mm square mesh jute netting on bare slopes (for later under planting with grass slips), including pegging with live hardwood cutting or split bamboo pegs and loosening tension so that the net hugs the slope
1 sqm
throughout.
Spec. cl. No: 2808
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Ms rod, Mallet
28.11.C Unskilled day 0.15 0 0 Hardwood Cuttings or split bamboo pegs nos 5 #NAME? 0
#NAME? and other T&P
Woven Jute sqm 0.25 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Jute netting works, Placing 150 x 500 mm mesh jute netting to hold mulch on slopes, including application of mulch and pegging with live hardwood cutting or split bamboo pegs and loosening tension so that the net hugs the slope throughout. 1 sqm
Spec. cl. No: 2808
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Ms rod, Mallet
28.11.D Unskilled day 0.1 0 0 cut mulch cum 0.05 #NAME? 0
#NAME? and other T&P
Woven Jute sqm 1 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Gabion bolster cylinders, Providing and laying 60 cm dia gabion bolsters panels: 70 x 100 mm hexagonal mesh wire (10 swg frame and 12 Swg mesh) including Earthwork excavation filling with boulder, back filling all complete as per Drawing and
1 meter
Technical Specifications.
Spec. cl. No: 2809
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Pick Axe, Shovel
28.12.A Unskilled day 0.82 0 0 Black Polythene sqm 0.8 #NAME? 0
#NAME? and other T&P
GI wire Kg 4 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Gabion bolster cylinders, Providing and laying 30 cm dia gabion bolsters panels: 70 x 100mm hexagonal mesh wire (10 swg frame and 12 Swg mesh) including Earthwork excavation filling with boulder, back filling all complete as per Drawing and
1 meter
Technical Specifications.
Spec. cl. No: 2809
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Gabion frame and
28.12.B Skilled day 0.55 0 0 Black Polythene sqm 0.4 #NAME? 0
#NAME? other T&P
Boulder/ Stone cum 0.09 #NAME? #NAME?
GI wire Kg 2 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Gabion bolster cylinders, Anchoring bolster: 12 mm dia MS re-bar cut into 2 m lengths for anchorage and placed at intervals 1 meter
Spec. cl. No: 2809
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Sledge hammer
28.12.C Unskilled day 0.36 0 0 MS rod m 2 #NAME? 0
#NAME? and other T&P
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Gabion bolster cylinders, Providing and laying of terram paper (geotextile) 1 meter
Spec. cl. No: 2809
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Sledge hammer
28.12.D Unskilled day 0.36 0 0 Terram paper sqm 1.15 #NAME? 0
#NAME? and other T&P
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Bamboo tree guards, Providing and weaving bamboo tree guards using bamboo poles as uprights: 1.60 m in height ; and weaving split bamboo with the outer wall intact around the posts. Dimension of the guard are 0.60 m diameter x 1.30 high. 1 meter
Spec. cl. No: 2810
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Sledge hammer
28.13.A Unskilled day 0.36 0 0 Bamboo meter 2.2 #NAME? 0
#NAME? and other T&P
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Turfing, Grass sodding works including sod cutting , transporting , placing in position and water sprinkling (Lead upto 10 m). 1 sqm
Spec. cl. No: 2812
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
For Sledge hammer
28.14.A Unskilled day 0.05 0 0 0
and other T&P
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Turfing, Providing and Spreading manure on the grass turf. 100 sqm
Spec. cl. No: 2812
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 3 % of Labour
cost for Sledge
28.14.B Unskilled day 0.04 0 0 Chemical manures kg 7 #NAME? 0
hammer and other
#NAME? T&P
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Turfing, Turfing with Sods, Providing, furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the engineer including preparation of ground,
10 sqm
fetching of sods and watering.
Spec. cl. No: 2812
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
28.14.C Unskilled day 3 0 0 Cost of water KL 12 #NAME? #NAME? Tractor-trolley hour 1 0 0
Skilled day 0.12 0 0 Farm yard manure cum 0.18 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Turfing, Seeding and Mulching, Providing required material, Preparation of seed bed on previously laid top soil, furnishing and placing of seeds, fertilizer, mulching material, applying bituminous emulsion at the rate of 0.23 liters per sqm and laying
240 sqm
and fixing jute netting, including watering for 3 months all as per specification
Spec. cl. No: 2812
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
28.14.D Unskilled day 10 0 0 Cost of water for 3 months KL 84 #NAME? #NAME? Tractor-trolley hour 2.4 0 0
Skilled day 1 0 0 Jute netting, open weave, 2.5 cm square opening sqm 264 #NAME? #NAME?
Bitumen Emulsion liter 55.2 #NAME? #NAME?
Sludge/Farm yard manure cum 0.43 #NAME? #NAME?
Seeds kg 3.6 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Spreading of Sludge Farm Yard Manure or/and good Earth, Providing and Spreading of sludge farm yard manure or/ and good earth in required thickness (cost of sludge, farm yard manure or/and good earth to be paid for separately) 15 cum
Spec. cl. No: 2812
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
25.15 Unskilled day 1 0 0
Skilled day 0.04 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Grassing with ' Doobs' Grass, Providing and grassing with 'Doobs' grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn free from weeds and fit for moving including supplying good earth if
500 sqm
needed, In rows 15 cm apart in either direction
Spec. cl. No: 2812
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
28.16.i Unskilled day 10 0 0 Doob grass kg 500 #NAME? #NAME?
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Grassing with ' Doobs' Grass, In rows 7.5 cm apart in either direction 500 sqm
Spec. cl. No: 2812
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
28.16.ii Unskilled day 14 0 0 Doob grass kg 1000 #NAME? #NAME? Water tanker hour 6 0 0
Skilled day 2 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Making Lawns including Ploughing and Dragging, Providing and making lawns including ploughing and breaking of clod, removal of rubbish, dressing and supplying Doobs grass roots and planting at 15 cm apart, including supplying and spreading
1000 sqm
of farm yard manure at rate of 0.18 cum per 100 sqm
Spec. cl. No: 2812
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
28.17 Unskilled day 15 0 0 Fine grass kg 1000 #NAME? #NAME? Tractor with tiller hour 6 0 0
Skilled day 2 0 0 manure cum 1.8 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Maintenance of Lawns or Turfing of Slopes, Regular Maintenance of lawns or Turfing of slopes (rough grassing) for a period of one year including watering etc. 100 sqm
Spec. cl. No: 2811
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
28.18 Unskilled (Mali) day 10 0 0 Cost of water KL 90 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Turfing Lawns with Fine Grassing including Ploughing, Dressing, Providing and Turfing lawns with fine grassing including ploughing, dressing including breaking of clods, removal of rubbish, dressing and supplying Doobs grass roots at 10 cm
1000 sqm
apart, including supplying and spreading of farm yard manure at rate of 0.6 cum per 100 sqm
Spec. cl. No: 2812
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
28.19 Unskilled day 30 0 0 Fine grass kg 1000 #NAME? #NAME? Tractor with tiller hour 6 0 0
Skilled day 3 0 0 Manure cum 6 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Maintenance of Lawns with Fine Grassing for the First Year, Regular Maintenance of lawns with fine grassing for the first year including watering etc. 100 sqm
Spec. cl. No: 2811
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
28.20' Unskilled (Mali) day 10 0 0 Cost of water KL 60 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Planting and Maintaining of Permanent Hedges, Providing and Planting permanent hedges including digging of trenches, 60 cm wide and 45 cm deep, refilling the excavated earth mixed with farmyard manure, supplied at the rate of 4.65 cum per 100
100 meter
metres and supplying and planting hedge plants at 30 cm apart
Spec. cl. No: 2807
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
28.21.a Unskilled day 14 0 0 Cost of water KL 3 #NAME? #NAME?
Skilled day 1 0 0 Pesticide kg 0.25 #NAME? #NAME?
Manure cum 4.67 #NAME? #NAME?
Hedge plants nos 2x340 #NAME? #VALUE!
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Planting and Maintaining of Permanent Hedges, Maintenance of hedge for one year 100 meter
Spec. cl. No: 2807
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
28.21.b Unskilled day 30 0 0 Hedge plants nos 68 #NAME? #NAME?
Skilled day 3 0 0 Cost of water KL 30 #NAME? #NAME?
Pesticide kg 0.5 #NAME? #NAME?
Manure cum 2 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Planting and Maintaining of Flowering Plants and Shrubs, Providing and Maintenance of flowering plants and shrubs in central verge for one year 1 km
Spec. cl. No: 2807
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
28.22.b Unskilled day 365 0 0 Pesticides kg 1.5 #NAME? #NAME?
Skilled day 36 0 0 Shrubs nos 80 #NAME? #NAME?
Plants nos 20 #NAME? #NAME?
Replacement of casualties @ 10 per cent
Cost of water KL 180 #NAME? #NAME?
Manure Sludge / farm yard manure at site cum 10 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Planting of Trees and their Maintenance for one Year, Providing and Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure, planting the saplings,
10 nos
backfilling the trench, watering, fixing the tree guard and maintaining the plants for one year
Spec. cl. No: 2807
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
28.23 Unskilled day 17 0 0 Cost of water KL 12 #NAME? #NAME?
Skilled day 2 0 0 Pesticide kg 0.5 #NAME? #NAME?
Farm yard manure cum 0.94 #NAME? #NAME?
Sapling 2 m high 25 mm dia nos 10 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Renovation Lawns including, Weeding, Forking the Ground, Top Dressing with Forked Soil, Renovation lawns including, weeding, forking the ground, top dressing with forked soil, watering and maintenance the lawns, for 30 days or more, till the
500 sqm
grass forms a thick lawn, free from weeds, and fit for moving and disposal of rubbish as directed, including supplying good earth, if needed but excluding the cost of well decayed farm yard manure
Spec. cl. No: 2811
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
28.24 Unskilled day 15 0 0 Cost of water KL 15 #NAME? #NAME?
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Half Brick Circular Tree Guard, in 2nd Class Brick, internal diametre 1.25 metres, and height 1.2 metres, above ground and 0.20 metre below ground, Providing and laying half brick circular tree guard, in 2nd class brick, internal diametre 1.25
metres, and height 1.2 metres, above ground and 0.20 metre below ground, bottom two courses laid dry, and top three courses in cement mortar 1:6 (1 cement 6 sand) and the intermediate courses being in dry honey comb masonry, as per design 10 nos
Spec. cl. No: 2811 complete
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
28.25 Unskilled day 6 0 0 Sand cum 0.3 #NAME? #NAME?
Skilled day 3 0 0 Cement tonne 0.1 #NAME? #NAME?
Brick nos 2300 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Making Tree Guard 53 cm dia and 1.3 meter height as per Design from empty bitumen drums, Providing and making tree guard 53 cm dia and 1.3 m high as per design from empty bitumen drum, slit suitably to permit sun and air, (supplied by the
5 nos
department at stock issue rate) including providing and fixing 2 nos MS sheet rings 50 x 0.5 mm with rivets, complete in all respect
Spec. cl. No: 2811
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
28.27 Unskilled day 1 0 0 Rivets 6 mm dia and 10 mm in length nos 110 #NAME? #NAME?
Skilled
day 1 0 0 MS sheet 50 x 0.5 mm kg 2 #NAME?
(Blacksmith) #NAME?
Empty bitumen drum nos 5 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Making Tree Guard 53 cm dia and 2 meter height as per Design from empty bitumen drums, Providing and making tree guard 53 cm dia and 2 metres high as per design from empty bitumen drums, slit suitably to permit sun and air, ( supplied by the
5 nos
department at stock issue rate) including providing and fixing four legs 40 cm long of 30 x 3 mm MS riveted to tree guard and providing and fixing 2 nos MS sheet rings 50 x 0.5 mm with rivets complete in all respects
Spec. cl. No: 2811
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No.
Norms
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
28.28 Unskilled day 1 0 0 MS plate 30 x 3 mm kg 6.5 #NAME? #NAME?
Skilled
day 1 0 0 Rivets 6 mm dia and 10 mm in length nos 250 #NAME?
(Blacksmith) #NAME?
MS sheet 50 x 0.5 mm kg 2 #NAME? #NAME?
Empty bitumen drum nos 5 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Wrought Iron and Mild Steel Welded Work, Providing Wrought iron and mild steel welded work (using angles, square bars, tees and channel grills, grating frames, gates and tree guards of any size and design etc. including cost of screens and welding
100 kg
rods or bolts and nuts complete fixed in position but without the cost of excavation and concrete for fixing which will be paid separately
Spec. cl. No: 2811
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
28.29 Unskilled day 3 0 0 For welding rods and other welding accessories 0
Skilled
(Blacksmith/ day 3 0 0 Angle, tees, channels etc. kg 105 #NAME?
welder) #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Tree Guard with MS Iron, Providing and fixing MS iron tree guard 60 cm dia and 2 meter high above ground level formed of 4 Nos (25 x 6 mm) and 8 Nos (25 x 3 mm) vertical MS riveted to 3 Nos (25 x 6 mm) iron rings in two halves, bolted together
10 nos
with 8 mm dia and 30 mm long bolts including painting two coats with paint of approved brand over a coat of priming, complete in all respects.
Spec. cl. No: 2811
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
28.30' Unskilled day 3 0 0 For riveting, bolting and welding accessories 0 Tractor-trolley hour 6 0 0 Painting two coats including priming sqm 17.7 0 0
Skilled
day 3 0 0 MS iron 25 x 3 mm kg 96 #NAME?
(Blacksmith) #NAME?
MS iron 25 x 6 mm kg 192 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Tree Guard with MS Angle Iron and Steel Wire, Providing and fixing tree guard 0.60 meter square, 2.00 meter high fabricated with MS angle iron 30 x 30 x 3 mm, MS iron 25 x 3 mm and steel wire 3 mm dia welded and fabricated as per design in two
10 nos
halves bolted together
Spec. cl. No: 2800
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 5 per cent of cost of Material for riveting, bolting and
28.31 Unskilled day 8 0 0 0 Tractor-trolley hour 6 0 0 Painting two coats including priming sqm 1.5 0 0
welding accessories
Skilled
(Blacksmith/ day 8 0 0 Steel wire 3 mm dia kg 60 #NAME?
welder) #NAME?
MS iron 25 x 3 mm kg 180 #NAME? #NAME?
MS angle 30 x 30 x 3 mm kg 135 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Compensatory Afforestation, Planting trees as compensatory afforestation at the rate of 290 trees per hectare at a spacing of 6 m by grubbing and leveling the ground upto a depth of 150 mm, digging holes 0.9 m dia, 1 m deep, mixing farm 10000
yard/sludge manure with soil, planting of sapling 2 m high with 25 cm dia stem, backfilling the hole and watering sqm
Spec. cl. No: 2807
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
28.32 Unskilled day 50 0 0 Cost of water KL 18 #NAME? #NAME? Dozer hour 12 0 0
Skilled day 5 0 0 Pesticides for maintenance kg 1.5 #NAME? #NAME?
For Maintenance
Pesticides for planting kg 0.5 #NAME?
for one year
#NAME?
Unskilled day 25 0 0 Decayed farm yard/sludge manure (maintenance) cum 4 #NAME? #NAME?
Skilled day 3 0 0 Decayed farm yard/sludge manure (planting) cum 60.9 #NAME? #NAME?
Planting Sapling 1 to 1.5 m high 2 cm dia stem nos 319 #NAME? #NAME?
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Fog Spray, Providing and applying low viscosity bitumen emulsion for sealing cracks less than 3 mm wide or incipient fretting or disintegration in an existing bituminous surfacing. 5000 sqm
Spec. cl. No: 2903
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Bitumen emulsion
29.15 Unskilled day 5.00 0 0 Emulsion tonne 4.00 #NAME? tonne 6.00 0 0
#NAME? pressure distributor
Skilled day 1.00 0 0 Air compressor hour 6.00 0 0
Mechanical broom hour 6.00 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Fog Spray, Providing and applying low viscosity bitumen emulsion for sealing cracks less than 3 mm wide or incipient fretting or disintegration in an existing bituminous surfacing., In case it is decided by the engineer to blind the fog spray. 5000 sqm
Spec. cl. No: 2903
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Bitumen emulsion
29.15_a Unskilled day 9.00 0 0 Crushed stone grit 3 mm cum 13.00 0 tonne 6.00 0 0
0 pressure distributor
Skilled day 2.00 0 0 Emulsion tonne 4.40 0 0 Air compressor hour 6.00 0 0
Mechanical broom hour 6.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Hill Side Drain Clearance, Removal of earth from the choked hill side drain and disposing it on the valley side manually 10 meter
Spec. cl. No: 2900, 900
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Assuming muck causing choking of drain to be 0.2 cum per
29.18 Unskilled day 1.00 0 0
meter, quantity of earth to be removed for 10 metres = 2 cum
Skilled day 1.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: 1 Km -
Maintenance,Carryout Routine ( regular maintenance) of Black top/ Gravel road in plain area ( Terai) as per Technical Specifications and direction of the Engineer,
day
Spec. cl. No: 2902
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
29.1.A Unskilled day 0.2 0 0 First aid 0 Maintenance of tools 0
Skilled day 0.05 0 0 Insurance 0 Tools and plants 0
Training ARMP 0
fuel 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: 1 Km -
Maintenance, Carryout Routine ( regular maintenance) of Black top/ Gravel road in Hilly area as per Technical Specifications and direction of the Engineer,
day
Spec. cl. No: 2902
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
29.1.B Unskilled day 0.33 0 0 First aid 0 Maintenance of tools 0
Skilled day 0.05 0 0 Insurance 0 Tools and plants 0
Training ARMP 0
fuel 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: 20 20 km
Maintenance, Carryout Routine ( regular maintenance) of Black top/ Gravel road in Hilly area as per Technical Specifications and direction of the Engineer,
per year
Spec. cl. No: 2900
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
as per
site
as per
Bitumen emulsion for tack coat including vertical sides of pot condition
29.3 Unskilled day 3285 0 0 tonne 0 Smooth wheeled roller hour requirem 0 #VALUE!
hole. /
ents
requirem
ents
#VALUE!
as per
site
as per
condition
Skilled day 365 0 0 Bitumen VG 10 or similar tonne 0 Tipper hour requirem 0 #VALUE!
/
ents
requirem
ents #VALUE!
as per
site
as per
condition
Crushed stone aggregates nominal size 11.2 mm cum #NAME? Hot mix plant hour requirem 0 #VALUE!
/
ents
requirem
ents
#VALUE!
as per
site
as per
condition
Crushed stone aggregates nominal size 13.2 mm cum 0 Air compressor hour requirem 0 #VALUE!
/
ents
requirem
ents #VALUE!
Tools and plants
0
maintenance etc.
Sub total of A = 0 Sub total of B = #VALUE! Sub total of C = #VALUE! Sub total of D = 0
Sub total of A +B + C = #VALUE! Sub total of A + B + C + D= #VALUE! Contractor's overhead expenses 15% = #VALUE! Norms Rate = #VALUE!
Unit Rate = #VALUE!
Description of Work:
Restoration of Rain Cuts. Providing and restoration of rain cuts in embankment slopes as per specification and direction of the Engineer. 1 cum
Spec. cl. No: 2909
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
29.4 Unskilled day 0.75 0 0
Skilled day 0.1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing and restoration of rain cuts with surrounding material benching for 300 mm width, laying fresh Material in layers not exceeding 250 mm and compacting to restore the original alignment, levels and slopes as per Technical Specification and
10 cum
direction of the Engineer.Manual means
Spec. cl. No: 2909
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
29.5 Unskilled day 6.24 0 0 Compensation for earth Taken from private land cum 7.5 0 0 Plate compactor hour 3 0 0
Skilled day 0.04 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing and restoration of rain cuts benching for 300 mm width, laying fresh material in layers not exceeding 250 mm and compacting to restore the original alignment, levels and slopes as per Specification and direction of the Engineer.,
50
Mechanical Means including conveyance of earth from other surrounding area with lead
Spec. cl. No: 2909
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
29.6 Unskilled day 15 0 0 Compensation for earth Taken from private land cum 37.5 0 0 Plate compactor hour 15 0 0
1.4*
Skilled day 1 0 0 Tipper hour 0 #VALUE!
L+2.1
Excavator hour 2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = #VALUE! Sub total of D = 0
Sub total of A +B + C = #VALUE! Sub total of A + B + C + D= #VALUE! Contractor's overhead expenses 15% = #VALUE! Norms Rate = #VALUE!
Unit Rate = #VALUE!
Description of Work: Maintenance of Earthen Shoulder (filling with fresh soil), Providing and making up loss of Material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting as per Technical Specification and direction of the
1000
Engineer.
Spec. cl. No: 2906
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
29.7 Unskilled day 30 0 0 Compensation for earth Taken from private land cum 192 0 0 Plate compactor hour 24 0 0
Skilled day 2 0 0 Tipper hour 6 0 0
Excavator hour 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Maintenance of Earth Shoulder (stripping excess soil), Stripping excess soil from the shoulder surface to achieve the approved level and compacting as per Technical Specifications and direction of the Engineer. 100 sqm
Spec. cl. No: 2906
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
29.8 Unskilled day 4.00 0 0 Plate compactor hour 6.00 0 0
Skilled day 0.10 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing, laying and restoration of rain cuts with gravel or river bed Material , benching for 300 mm width, laying fresh Material in layers not exceeding 250 mm and compacting to restore the original alignment, levels and slopes as per Technical
50 cum
specifications and direction of the Engineer., Mechanical Means including conveyance of river bed gravel with lead
Spec. cl. No: 2904
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
29.9 Unskilled day 15.00 0 0 Compensation for Gravel cum 57.60 0 0 Plate compactor hour 15.00 0 0
Skilled day 1.00 0 0 Tipper hour 3.00 0 0
Excavator hour 0.75 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Maintenance of bituminous surface road with Emulsion, Providing required material and repair to pot holes including removal of failed material, trimming the sides to vertical , leveling the bottom, cleaning, filled with 75 mm Bituminous macadam
14.06 cum
applying bitumen /emulsion prime coat and tack coat as per Technical Specifications and direction of the Engineer.
Spec. cl. No: 2903
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
29.10.i Unskilled day 20.00 0 0 5 mm and below 15% cum 2.99 0 0 Smooth wheeled roller hour 6.00 0 0
Skilled day 1.00 0 0 10 - 5 mm 25% cum 4.98 0 0 Mixture machine hour 6.00 0 0
Emulsion pressure
25 - 10 mm 45% cum 8.96 0 hour 6.00 0 0
0 distributor
37.5 - 25 mm 15% cum 2.99 0 0 Compressor hour 6.00 0 0
Grading (1) (40 mm nominal size)
Volume of aggregate 29.86 / 1.5 = 19.90 cum
Bitumen for BM @ 3.5% by weight of mix = 30.94 x 3.5 / 100
tonne 1.08 0
= 1.082 0
Total = 215.77
Sides = 28.27
Bottom = 187.5
Emulsion ( Tack coat @ 0.6 lit/sqm) tonne 0.13 0 0
Emulsion ( for primer @ 1 lit /sqm including side slope) tonne 0.22 0 0
Assume 5% area need to repair
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Maintenance of bituminous surface road with Emulsion, Providing required material and repair pot holes including removal of loose material, trimming of sides, cleaning of surface applying tack coat , 20 mm thick pre-mix carpet and seal coat with
200
bitumen emulsion as per Technical Specifications and direction of the Engineer.
Maintenance of bituminous surface road with Emulsion, Providing required material and repair pot holes including removal of loose material, trimming of sides, cleaning of surface applying tack coat , 20 mm thick pre-mix carpet and seal coat with
200
bitumen emulsion as per Technical Specifications and direction of the Engineer.
Spec. cl. No: 2903
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
29.10.ii Unskilled day 18.00 0 0 Crushed sand passing 2.36 mm cum 1.20 0 0 Smooth wheeled roller hour 6.00 0 0
Emulsion pressure
Skilled day 2.00 0 0 Crushed stone aggregate 13.2 mm to 5.6 mm cum 5.40 0 hour 6.00 0 0
0 distributor
Emulsion tonne 0.70 0 0 Air compressor hour 6.00 0 0
Concrete mixer /
hour 6.00 0 0
mixing plant
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Filling Pot-holes and Patch Repairs with open-Graded Premix surfacing, 20 mm., Providing required material and repair the the pot holes including removal of failed material, trimming and finishing the surface applying tack coat on the sides and
600 sqm
base of excavation , backfilling with hot bituminous Material and compaction as per Technical Specification and instruction of the Engineer.
Spec. cl. No: 2903
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
29.11.A Skilled day 1.00 0 0 Bitumen or emulsion ( for prime and tack coat) tonne 0.36 0 0 Smooth wheeled roller hour 6.00 0 0
Unskilled day 6.00 0 0 Bitumen tonne 1.08 0 0 Tipper /tractor hour 6.00 0 0
Crushed stone aggregates nominal size 5 mm cum 6.48 #NAME? #NAME? Hot mix plant hour 1.00 0 0
Crushed stone aggregates nominal size 13.2 mm cum 12.96 0 0 Air compressor hour 6.00 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Filling Pot-holes and Patch Repairs with Bituminous concrete, 40 mm., Providing required material and repair the pot holes including removal of failed material, trimming and finishing the surface applying tack coat on the sides and base of
excavation , backfilling with hot bituminous Material and compaction as per Technical Specification and instruction of the Engineer., Grading I - 19 mm(Nominal size)
Spec. cl. No: 2903
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
29.11.B_
Skilled day 1.00 0 0 5 mm and below 40 per cent cum 9.30 #NAME? Smooth wheeled roller hour 6.00 0 0
a #NAME?
Unskilled day 8.00 0 0 10-5 mm 23 per cent cum 5.35 #NAME? #NAME? Tipper hour 6.00 0 0
20-10 mm 35 per cent cum 8.14 #NAME? #NAME? Hot mix plant hour 1.00 0 0
Grading I - 19 mm(Nominal size) Air compressor hour 6.00 0 0
Aggregates
emulsion for tack coat tonne 0.25 0 0
Bitumen tonne 1.83 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = 0
Description of Work: Filling Pot-holes and Patch Repairs with Bituminous concrete, 40 mm., Providing required material and repair the pot holes including removal of failed material, trimming and finishing the surface applying tack coat on the sides and base of
excavation , backfilling with hot bituminous Material and compaction as per Technical Specification and instruction of the Engineer., Grading-II 13 mm (Nominal size)
Spec. cl. No: 2903
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
29.11.B_
Skilled day 1.00 0 0 5 mm and Below 43 per cent cum 10.00 #NAME? Smooth wheeled roller hour 6.00 0 0
b #NAME?
Unskilled day 8.00 0 0 10-5 mm 25 per cent cum 5.82 #NAME? #NAME? Tipper hour 6.00 0 0
13.2-10 mm 30 per cent cum 6.98 #NAME? #NAME? Hot mix plant hour 1.00 0 0
Grading-II 13 mm (Nominal size) Air compressor hour 6.00 0 0
Aggregates
emulsion for tack coat tonne 0.25 0 0
Bitumen tonne 1.83 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = 0
Description of Work:
Dusting, Providing and applying crusher dust to areas of road where bleeding of excess bitumen has occurred as per Technical Specifications and direction of the Engineer. 3500 sqm
Spec. cl. No: 2903
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
29.13 Unskilled day 5.00 0 0 Stone crusher dust finer than 3 mm cum 9.00 0 0
Skilled day 1.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Slurry Seal, Providing and laying slurry seal consisting of a mixture of fine aggregates, Portland cement filler, bituminous emulsion and water on a road surface including cleaning of surface, mixing of slurry seal in a suitable mobile plant, laying
3500 sqm
and compacting to provide even riding surface, 5 mm thickness
Spec. cl. No: 2903
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
29.14.I Unskilled day 6.00 0 0 Cost of water KL 6.00 0 0 Pneumatic roller hour 6.00 0 0
Skilled day 1.00 0 0 Filler ( @ 2 %) tonne 1.75 0 0 Tipper hour 6.00 0 0
Fine aggregate 4.75 mm and below ( @ 87 %) cum 51.00 0 0 Loader hour 6.00 0 0
Mobile slurry seal
Emulsion ( @ 11 % of mix , i.e. 40* 0.11*2.2) tonne 9.52 0 hour 6.00 0 0
0 equipment
Air compressor hour 6.00 0 0
Mechanical broom hour 6.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Slurry Seal, Providing and laying slurry seal consisting of a mixture of fine aggregates, Portland cement filler, bituminous emulsion and water on a road surface including cleaning of surface, mixing of slurry seal in a suitable mobile plant, laying
100 sqm
and compacting to provide even riding surface, 3 mm thickness
Spec. cl. No: 2903
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
29.14.II Unskilled day 8.00 0 0 Cost of water KL 6.00 0 0 Tipper hour 6.00 0 0
Skilled day 1.00 0 0 Filler ( @ 2%) tonne 1.40 0 0 Loader hour 6.00 0 0
Mobile slurry seal
Fine aggregate 3 mm and below ( @ 85 %) cum 37.50 0 hour 6.00 0 0
0 equipment
Emulsion ( @ 13 %) tonne 8.20 0 0 Air compressor hour 6.00 0 0
Mechanical broom hour 6.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Slurry Seal, Providing and laying slurry seal consisting of a mixture of fine aggregates, Portland cement filler, bituminous emulsion and water on a road surface including cleaning of surface, mixing of slurry seal in a suitable mobile plant, laying
1200 sqm
and compacting to provide even riding surface, 1.5 mm thickness
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
29.14.III Unskilled day 6.00 0 0 Cost of water KL 6.00 #NAME? #NAME? Tipper hour 6.00 0 0
Skilled day 1.00 0 0 Filler ( @ 2 %) tonne 0.80 #NAME? #NAME? Loader hour 6.00 0 0
Mobile slurry seal
Fine aggregate 2.36 mm and below (@82 % cum 22.00 #NAME? hour 6.00 0 0
#NAME? equipment
Emulsion ( @ 16 %) tonne 6.40 #NAME? #NAME? Air compressor hour 6.00 0 0
Mechanical broom hour 6.00 0 0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work:
Crack Prevention Courses, Stress Absorbing Membrane (SAM) crack width less than 6 mm, Providing and laying of a stress absorbing membrane over a cracked road surface, with crack width below 6 mm after cleaning with a mechanical broom,
using modified binder , sprayed at the rate of 9 kg per 10 sqm and spreading 5.6 mm crushed stone aggregates @ 0.11 cum per 10 sqm with hydraulic chip spreader, sweeping the surface for uniform spread of aggregates as per Drawing and 5000 sqm
Spec. cl. No: 2903 Technical Specifications.
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No.
Norms
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Smooth wheeled road
29.16.I Unskilled day 6.00 0 0 Crushed stone aggregates 5.6 mm size cum 53.00 0 hour 6.00 0 0
0 roller
Hydraulic Chip
Skilled day 1.00 0 0 Modified binder tonne 4.80 0 hour 6.00 0 0
0 spreader
Bitumen pressure
hour 6.00 0 0
distributor
Air compressor hour 6.00 0 0
Mechanical broom hour 6.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Crack Prevention Courses, Stress Absorbing Membrane (SAM) with crack width 6 mm to 9 mm, Providing and laying of a stress absorbing membrane over a cracked road surface, with crack width 6 to 9 mm after cleaning with a mechanical broom,
using modified binder complying , sprayed at the rate of 11 kg per 10 sqm and spreading 11.2 mm crushed stone aggregates @ 0.12 cum per 10 sqm, sweeping the surface for uniform spread of aggregates as per Drawing and Technical 5000 sqm
Spec. cl. No: 2903 specifications.
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Smooth wheeled road
29.16.II Unskilled day 6.00 0 0 Crushed stone chipping 11.2 mm size cum 53.00 0 hour 6.00 0 0
0 roller
Hydraulic Chip
Skilled day 1.00 0 0 Modified binder tonne 6.00 0 hour 6.00 0 0
0 spreader
Bitumen pressure
hour 6.00 0 0
distributor
Air compressor hour 6.00 0 0
Mechanical broom hour 6.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Crack Prevention Courses, Stress Absorbing Membrane (SAM) crack width above 9 mm and cracked area above 50 %, Providing and laying a single coat of a stress absorbing membrane over a cracked road surface, with crack width above 9 mm
and cracked area above 50 % after cleaning with a mechanical broom, using modified binder , sprayed at the rate of 15 kg per 10 sqm and spreading 11.2 mm crushed stone aggregates @ 0.12 cum per 10 sqm, sweeping the surface for uniform 5000 sqm
Spec. cl. No: 2903 spread of aggregates and surface finished as per Drawing and Technical specifications.
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Smooth wheeled road
29.16.III Skilled day 2.00 0 0 Crushed stone aggregates 11.2 mm size cum 63.00 0 hour 6.00 0 0
0 roller
Hydraulic Chip
Unskilled day 6.00 0 0 Modified binder tonne 8.00 0 hour 6.00 0 0
0 spreader
Bitumen pressure
hour 6.00 0 0
distributor
Air compressor hour 6.00 0 0
Mechanical broom hour 6.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Crack Prevention Courses, Bitumen Impregnated Geotextile, Providing and laying a bitumen impregnated geotextile layer after cleaning the road surface, geotextile conforming to requirements of section 2400, laid over a tack coat with 1.05 kg per
3500 sqm
sqm of paving grade bitumen and constructed as per Drawing and Technical specifications.
Spec. cl. No: 2903
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
29.16.IV Skilled day 5.00 0 0 Geotextile sqm 3850.00 0 0 Pneumatic roller hour 6.00 0 0
Bitumen pressure
Unskilled day 20.00 0 0 Bitumen tonne 4.42 0 tonne 6.00 0 0
0 distributor
Air compressor hour 6.00 0 0
Mechanical broom hour 6.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Surface Dressing for maintenance works., Providing and laying surfacing dressing as wearing course in single coat using gravel of specified size for maintenance / repair works as per Technical Specification and instruction of the Engineer., :-19 mm
500 sqm
nominal chipping size
Spec. cl. No: 2903
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add: 0.5 per cent of
29.17.I Skilled day 11.00 0 0 Crushed stone chipping 19 mm nominal size cum 7.50 0 0
0 (a) Labour for T&P
Unskilled day 87.00 0 0 Bitumen tonne 0.60 0 0 Vibratory roller hour 6.00 0 0
Bitumen boiler hour 6.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Surface Dressing for maintenance works., Providing and laying surfacing dressing as wearing course in single coat using gravel of specified size for maintenance / repair works as per Technical Specification and instruction of the Engineer., 13 mm
750 sqm
nominal size chipping
Spec. cl. No: 2903
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add: 0.5 per cent of
29.17.II Skilled day 10.00 0 0 Crushed stone chipping 13 mm nominal size cum 7.50 0 0
0 (a) Labour for T&P
Unskilled day 58.00 0 0 Bitumen tonne 0.75 0 0 Vibratory roller hour 6.00 0 0
Bitumen boiler hour 6.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Surface Dressing for maintenance works., Providing and laying surfacing dressing as wearing course in single coat using gravel of specified size for maintenance / repair works as per Technical Specification and instruction of the Engineer., 9.5 mm
850 sqm
nominal size chipping
Spec. cl. No: 2903
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add: 0.5 per cent of
29.17.III Skilled day 10.00 0 0 Crushed stone chipping, 9.5 mm nominal size cum 6.80 0 . 5_a 0 #VALUE!
0 (a) Labour for T&P
Unskilled day 58.00 0 0 Bitumen tonne 0.77 0 0 Vibratory roller hour 6.00 0 0
Bitumen boiler oil
hour 6.00 0 0
fired
Sub total of A = 0 Sub total of B = 0 Sub total of C = #VALUE! Sub total of D = 0
Sub total of A +B + C = #VALUE! Sub total of A + B + C + D= #VALUE! Contractor's overhead expenses 15% = #VALUE! Norms Rate = #VALUE!
Unit Rate = #VALUE!
Description of Work: Surface Dressing for maintenance works., Providing and laying surfacing dressing as wearing course in single coat using gravel of specified size for maintenance / repair works as per Technical Specification and instruction of the Engineer., 6 mm
850 sqm
nominal size chipping
Spec. cl. No: 2903
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add: 0.5 per cent of
29.17.IV Skilled day 10.00 0 0 Crushed stone chippings 6 mm nominal size cum 3.40 0 0
0 (a) Labour for T&P
Unskilled day 58.00 0 0 Bitumen tonne 0.64 0 0 Vibratory roller hour 6.00 0 0
Bitumen boiler oil
hour 6.00 0 0
fired
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Land Slide Clearance in soil, Clearance of land slides in soil and ordinary rock by a bull-dozer and disposal of the same on the valley side 500 cum
Spec. cl. No: 2900 ,900
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
29.19.A Unskilled day 3.00 0 0 Dozer hour 6.00 0 0
Skilled day 1.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Land Slide Clearance in soil, Clearance of land slides in soil and ordinary rock by a Loader and disposal of the same on the valley side or loaded to a truck. 300 cum
Spec. cl. No: 2900 ,900
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
29.19.B Unskilled day 1.00 0 0 Loader hour 6.00 0 0
Skilled day 1.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Landslide Clearance in Hard Rock Requiring Blasting, Clearing of land slide in hard rock requiring blasting for 50 per cent of the boulders and disposal of the same on the valley side. 100 cum
Spec. cl. No: N/A
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
29.20" Unskilled day 2.00 0 0 Electric Detonators nos 70.00 0 0
Skilled
day 1.00 0 0 Galantine kg 17.50 0 0
( Driller/Blaster)
Air compressor hour 6.00 0 0
Dozer hour 6.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Snow Clearance on Roads with Dozer, Snow clearance from road surface by a machine and disposing it on the valley side 1500 cum
Spec. cl. No: N/A
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
29.21.A Unskilled day 2.00 0 0 Dozer / Loader hour 6.00 0 0
Skilled day 1.00 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Carryout Routine using Labour based method for Local road as per direction of the Engineer,, District Road , Rural road class "A" 1 km
Spec. cl. No: N/A
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
29.22.A Unskilled day 72.00 0 0 Maintenance of tools 0
Supervisor day 2.88 0 0 Tools and plants 0
Description of Work:
Carryout Routine using Labour based method for Local road as per direction of the Engineer,, Village Road , Rural road class "B" 1 km
Spec. cl. No: N/A
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
29.22.B Unskilled day 36.00 0 0 Maintenance of tools 0
Supervisor day 1.44 0 0 Tools and plants 0
Description of Work:
Carryout Routine using Labour based method for Local road as per direction of the Engineer,, Main Trail , Rural road Class "C" 1
Spec. cl. No: N/A
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
29.22.C Unskilled day 18.00 0 0 Maintenance of tools 0
Supervisor day 0.72 0 0 Tools and plants 0
Description of Work:
Carryout Routine using Labour based method for Local road as per direction of the Engineer,, Village Trail , Rural road Class "D" 1
Spec. cl. No: N/A
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
29.22.C Unskilled day 9.00 0 0 Maintenance of tools 0
Supervisor day 0.36 0 0 Tools and plants 0
Description of Work:
Excavation of pits/trenches for sub-surface Geo-technical investigation in mixed soil and lifting of material all complete (Length & breath depending upon working condition) as per direction of the Engineer., Depth up to 3 m 10 cum
Spec. cl. No: 3003
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.1.I Unskilled day 7 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Excavation of pits/trenches for sub-surface Geo-technical investigation in mixed soil and lifting of material all complete (Length & breath depending upon working condition) as per direction of the Engineer., Depth up to 3 - 4.5 m 10 cum
Spec. cl. No: 3003
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.1.II Unskilled day 9 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Mobilisation and Demobilisation of drilling / Boring equipments, accessories, etc for sub-surface Geo-technical investigation as per direction ., BT Surfaced Road, Speed with load : 15 km / hour. 50 km-job
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No.
Norms
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Engineer /
Technician for
installation/
30.2.i day 3 0 0 Truck hour 8 0 0
dismantle of
boring
equipment
Unskilled for
installation of
drilling / boring
equipment for day 6 0 0
first bore hole
loading un
loading
Unskilled for
transportation
from road head day 6 0 0
to investigation
site
Unskilled for
loading and day 2 0 0
unloading
Skilled day 2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Mobilisation and Demobilisation of drilling / Boring equipments, accessories, etc for sub-surface Geo-technical investigation as per direction ., Gravelled Road, Speed with load : 15 km / hour. 50 km-job
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Engineer /
Technician for
installation/
30.2.ii day 4.5 0 0 Truck hour 12 0 0
dismantle of
boring
equipment
Unskilled for
installation of
drilling / boring
equipment for day 9 0 0
first bore hole
loading un
loading
Unskilled for
transportation
from road head day 9 0 0
to investigation
site
Unskilled for
loading and day 3 0 0
unloading
Skilled day 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Mobilisation and Demobilisation of drilling / Boring equipments, accessories, etc for sub-surface Geo-technical investigation as per direction ., Earthen road, Speed with load : 15 km / hour. 50 km-job
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Engineer /
Technician for
installation/
30.2.iii day 6 0 0 Truck hour 16 0 0
dismantle of
boring
equipment
Unskilled for
installation of
drilling / boring
equipment for day 12 0 0
first bore hole
loading un
loading
Unskilled for
transportation
from road head day 12 0 0
to investigation
site
Unskilled for
loading and day 6 0 0
unloading
Skilled day 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Erect dismantle and move boring rig with drilling equipments at each bore hole complete as directed by the Engineer.. 2 nos
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.3 Technician day 3 0 0
Unskilled day 3 0 0
Skilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Bore with shell and auger or by percussion method in all soils other than rock to a depth below ground level complete as directed by the Engineer., Depth below bed level upto 5.0 m 5 meter
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Auger / percussion
30.4.i Technician day 1 0 0 water KL 1 0 hour 8 0 0
0 drilling set
semi skilled day 2 0 0
Unskilled day 4 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Bore with shell and auger or by percussion method in all soils other than rock to a depth below ground level complete as directed by the Engineer., Depth below bed level 5.0 m - 10 m 5 meter
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Auger / percussion
30.4.ii Technician day 1.2 0 0 water KL 1.2 0 hour 9.6 0 0
0 drilling set
semi skilled day 2.4 0 0
Unskilled day 4.8 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Bore with shell and auger or by percussion method in all soils other than rock to a depth below ground level complete as directed by the Engineer., Depth below bed level 10 m - 15m 5 meter
Bore with shell and auger or by percussion method in all soils other than rock to a depth below ground level complete as directed by the Engineer., Depth below bed level 10 m - 15m 5 meter
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Auger / percussion
30.4.iii Technician day 1.4 0 0 water KL 1.4 0 hour 11.2 0 0
0 drilling set
semi skilled day 2.8 0 0
Unskilled day 5.6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Bore with shell and auger or by percussion method in all soils other than rock to a depth below ground level complete as directed by the Engineer., Depth below bed level 15 m - 20 m 5 meter
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Auger / percussion
30.4.iv Technician day 1.6 0 0 water KL 1.6 0 hour 12.8 0 0
0 drilling set
semi skilled day 3.2 0 0
Unskilled day 6.4 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Rotary core drilling in soil /rock and take continuous rock core to a depth below ground level with Tungstun carbide bits including core sampling all complete as directed, soft Soil, Depth below bed level upto 5.0 M 5 meter
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.5.A.i Technician day 0.5 0 0 Core box meter 5 0 Rotary drill hour 4 0 0
0
semi skilled day 1 0 0 Drill bit nos. 0.3 0 0
Unskilled day 3 0 0 water KL 2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Rotary core drilling in soil /rock and take continuous rock core to a depth below ground level with Tungstun carbide bits including core sampling all complete as directed, soft Soil, Depth below bed level 5.0 m - 10 m 5 meter
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.5.A.ii Technician day 0.6 0 0 Core box meter 5.5 0 Rotary drill hour 4.4 0 0
0
semi skilled day 1.1 0 0 Drill bit nos. 0.3 0 0
Unskilled day 3.3 0 0 water KL 2.2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Rotary core drilling in soil /rock and take continuous rock core to a depth below ground level with Tungstun carbide bits including core sampling all complete as directed, soft Soil, Depth below bed level 10 m - 15m 5 meter
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.5.A.ii
Technician day 0.6 0 0 Core box meter 6 0 Rotary drill hour 4.8 0 0
i 0
semi skilled day 1.2 0 0 Drill bit nos. 0.3 0 0
Unskilled day 3.6 0 0 water KL 2.4 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Rotary core drilling in soil /rock and take continuous rock core to a depth below ground level with Tungstun carbide bits including core sampling all complete as directed, soft Soil, Depth below bed level 15 m - 20 m 5 meter
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.5.A.iv Technician day 0.7 0 0 Core box meter 6.5 0 Rotary drill hour 5.2 0 0
0
semi skilled day 1.3 0 0 Drill bit nos. 0.3 0 0
Unskilled day 3.9 0 0 water KL 2.6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Rotary core drilling in soil /rock and take continuous rock core to a depth below ground level with Tungstun carbide bits including core sampling all complete as directed, soft Soil, Depth below bed level 20 m - 25 m 5 meter
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.5.A.v Technician day 0.7 0 0 Core box meter 7 0 Rotary drill hour 5.6 0 0
0
semi skilled day 1.4 0 0 Drill bit nos. 0.4 0 0
Unskilled day 4.2 0 0 water KL 2.8 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Rotary core drilling in soil /rock and take continuous rock core to a depth below ground level with Tungstun carbide bits including core sampling all complete as directed, soft Soil, Depth below bed level > 25 m 5 meter
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.5.A.vi Technician day 0.8 0 0 Core box meter 7.5 0 Rotary drill hour 6 0 0
0
semi skilled day 1.5 0 0 Drill bit nos. 0.4 0 0
Unskilled day 4.5 0 0 water KL 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Rotary core drilling in soil /rock and take continuous rock core to a depth below ground level with Tungstun carbide bits including core sampling all complete as directed, Soil ( gravel BMS etc), Depth below bed level upto 5.0 M 5 meter
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.5.B.i Technician day 1 0 0 Core box meter 5 0 Rotary drill hour 8 0 0
0
semi skilled day 1 0 0 Drill bit nos. 1 0 0
Unskilled day 8 0 0 water KL 2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Rotary core drilling in soil /rock and take continuous rock core to a depth below ground level with Tungstun carbide bits including core sampling all complete as directed, Soil ( gravel BMS etc), Depth below bed level 5.0 m - 10 m 5 meter
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.5.B.ii Technician day 1.1 0 0 Core box meter 5.5 0 Rotary drill hour 8.8 0 0
0
semi skilled day 1.1 0 0 Drill bit nos. 1.1 0 0
Unskilled day 8.8 0 0 water KL 2.2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Rotary core drilling in soil /rock and take continuous rock core to a depth below ground level with Tungstun carbide bits including core sampling all complete as directed, Soil ( gravel BMS etc), Depth below bed level 10 m - 15m 5 meter
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No.
Norms
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.5.B.iii Technician day 1.2 0 0 Core box meter 6 0 Rotary drill hour 9.6 0 0
0
semi skilled day 1.2 0 0 Drill bit nos. 1.2 0 0
Unskilled day 9.6 0 0 water KL 2.4 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Rotary core drilling in soil /rock and take continuous rock core to a depth below ground level with Tungstun carbide bits including core sampling all complete as directed, Soil ( gravel BMS etc), Depth below bed level 15 m - 20 m 5 meter
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.5.B.iv Technician day 1.3 0 0 Core box meter 6.5 0 Rotary drill hour 10.4 0 0
0
semi skilled day 1.3 0 0 Drill bit nos. 1.3 0 0
Unskilled day 10.4 0 0 water KL 2.6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Rotary core drilling in soil /rock and take continuous rock core to a depth below ground level with Tungstun carbide bits including core sampling all complete as directed, Soil ( gravel BMS etc), Depth below bed level 20 m - 25 m 5 meter
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.5.B.v Technician day 1.4 0 0 Core box meter 7 0 Rotary drill hour 11.2 0 0
0
semi skilled day 1.4 0 0 Drill bit nos. 1.4 0 0
Unskilled day 11.2 0 0 water KL 2.8 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Rotary core drilling in soil /rock and take continuous rock core to a depth below ground level with Tungstun carbide bits including core sampling all complete as directed, Soil ( gravel BMS etc), Depth below bed level > 25 m 5 meter
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.5.B.vi Technician day 1.5 0 0 Core box meter 7.5 0 Rotary drill hour 12 0 0
0
semi skilled day 1.5 0 0 Drill bit nos. 1.5 0 0
Unskilled day 12 0 0 water KL 3 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Rotary core drilling in soil /rock and take continuous rock core to a depth below ground level with Tungstun carbide bits including core sampling all complete as directed, Soft Rock, Depth below bed level upto 5.0 m 5 meter
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.5.C.i Technician day 1 0 0 Core box meter 5 0 Rotary drill hour 8 0 0
0
semi skilled day 1 0 0 Drill bit nos. 1 0 0
Unskilled day 6 0 0 water KL 4 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Rotary core drilling in soil /rock and take continuous rock core to a depth below ground level with Tungstun carbide bits including core sampling all complete as directed, Soft Rock, Depth below bed level 5.0 m - 10 m 5 meter
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.5.C.ii Technician day 1.1 0 0 Core box meter 5.5 0 Rotary drill hour 8.8 0 0
0
semi skilled day 1.1 0 0 Drill bit nos. 1.1 0 0
Unskilled day 6.6 0 0 water KL 4.4 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Rotary core drilling in soil /rock and take continuous rock core to a depth below ground level with Tungstun carbide bits including core sampling all complete as directed, Soft Rock, Depth below bed level 10 m - 15m : Add 20 5 meter
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.5.C.ii
Technician day 1.2 0 0 Core box meter 6 0 Rotary drill hour 9.6 0 0
i 0
semi skilled day 1.2 0 0 Drill bit nos. 1.2 0 0
Unskilled day 7.2 0 0 water KL 4.8 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Rotary core drilling in soil /rock and take continuous rock core to a depth below ground level with Tungstun carbide bits including core sampling all complete as directed, Soft Rock, Depth below bed level 15 m - 20 mM 5 meter
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.5.C.iv Technician day 1.3 0 0 Core box meter 6.5 0 Rotary drill hour 10.4 0 0
0
semi skilled day 1.3 0 0 Drill bit nos. 1.3 0 0
Unskilled day 7.8 0 0 water KL 5.2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Rotary core drilling in soil /rock and take continuous rock core to a depth below ground level with Tungstun carbide bits including core sampling all complete as directed, Soft Rock, Depth below bed level 20 m - 25 mM 5 meter
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.5.C.v Technician day 1.4 0 0 Core box meter 7 0 Rotary drill hour 11.2 0 0
0
semi skilled day 1.4 0 0 Drill bit nos. 1.4 0 0
Unskilled day 8.4 0 0 water KL 5.6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Rotary core drilling in soil /rock and take continuous rock core to a depth below ground level with Tungstun carbide bits including core sampling all complete as directed, Soft Rock, Depth below bed level > 25 5 meter
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.5.C.vi Technician day 1.5 0 0 Core box meter 7.5 0 Rotary drill hour 12 0 0
0
semi skilled day 1.5 0 0 Drill bit nos. 1.5 0 0
Unskilled day 9 0 0 water KL 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Rotary core drilling in soil /rock and take continuous rock core to a depth below ground level with Tungstun carbide bits including core sampling all complete as directed, Hard Rock, Depth below bed level upto 5.0 m 5 meter
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.5.D.i Technician day 1 0 0 Core box meter 5 0 Rotary drill hour 16 0 0
0
semi skilled day 2 0 0 Drill bit nos 1.5 0 0
Unskilled day 12 0 0 water KL 6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Rotary core drilling in soil /rock and take continuous rock core to a depth below ground level with Tungstun carbide bits including core sampling all complete as directed, Hard Rock, Depth below bed level 5.0 m - 10 m 5 meter
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.5.D.ii Technician day 1.1 0 0 Core box meter 5.5 0 Rotary drill hour 17.6 0 0
0
semi skilled day 2.2 0 0 Drill bit nos 1.7 0 0
Unskilled day 13.2 0 0 water KL 6.6 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Rotary core drilling in soil /rock and take continuous rock core to a depth below ground level with Tungstun carbide bits including core sampling all complete as directed, Hard Rock, Depth below bed level 10 m - 15m 5 meter
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.5.D.ii
Technician day 1.2 0 0 Core box meter 6 0 Rotary drill hour 19.2 0 0
i 0
semi skilled day 2.4 0 0 Drill bit nos 1.8 0 0
Unskilled day 14.4 0 0 water KL 7.2 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Rotary core drilling in soil /rock and take continuous rock core to a depth below ground level with Tungstun carbide bits including core sampling all complete as directed, Hard Rock, Depth below bed level 15 m - 20 mM 5 meter
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.5.D.iv Technician day 1.3 0 0 Core box meter 6.5 0 Rotary drill hour 20.8 0 0
0
semi skilled day 2.6 0 0 Drill bit nos 2 0 0
Unskilled day 15.6 0 0 water KL 7.8 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Rotary core drilling in soil /rock and take continuous rock core to a depth below ground level with Tungstun carbide bits including core sampling all complete as directed, Hard Rock, Depth below bed level 20 m - 25 mM 5 meter
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.5.D.v Technician day 1.4 0 0 Core box meter 7 0 Rotary drill hour 22.4 0 0
0
semi skilled day 2.8 0 0 Drill bit nos 2.1 0 0
Unskilled day 16.8 0 0 water KL 8.4 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Rotary core drilling in soil /rock and take continuous rock core to a depth below ground level with Tungstun carbide bits including core sampling all complete as directed, Hard Rock, Depth below bed level > 25 m 5 meter
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.5.D.vi Technician day 1.5 0 0 Core box meter 7.5 0 Rotary drill hour 24 0 0
0
semi skilled day 3 0 0 Drill bit nos 2.3 0 0
Unskilled day 18 0 0 water KL 9 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Taking disturbed sample during drilling as directed by the Engineer. 10 nos
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.6 Unskilled day 2 0 0 Cost of consumeable items: 25 % of labour cost 0
Technician day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Taking Undisturbed sample during drilling as directed by the Engineer. 10 nos
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.7 Unskilled day 4 0 0 Cost of consumeable items: 25 % of labour cost 0
Technician day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Carry out Standard penetration test (SPT) during borig as directed by the Engineer 10 nos
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
30.8 Unskilled day 4 0 0 SPT hammer day 1 0 0
Technician day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing & installing piezometers at the location of each bore holes for study of fluctuations in water table (Water table studies to be carried out weekly for a period of 3 months) with regular weekly interval and predetermined time & day each week
10 nos
and depth of water recorded with respect to the reduced level. Diurnal variations to be noted for 3 selected weeks during the period of observations and reporting.
Spec. cl. No: 3000
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
piezometr ( 10 nos 10
30.9 Unskilled day 90 0 0 m each for 3 month meter 100 0 0
duration)
for security
semi skilled day 12 0 0
Engineer /
day 3 0 0
Technician
for reading
Unskilled day 6 0 0
semi skilled day 3 0 0
Engineer /
day 1 0 0
Technician
for installation
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Providing and laying precast RCC railing of M 30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, center to center spacing between vertical post not to exceed 2000 mm, leaving
48 meter
adequate space between vertical post for expansion, complete as per Drawings and Technical specifications.
Spec. cl. No: 2000, 3105
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 5 per cent of material for handling and fixing of precast
31.1 Unskilled day 40.00 0 0 0
panels in position
Skilled day 8.00 0 0 HYSD bar tonne 0.87 0 0
Add 5 per cent of above cost for form work 0
Cement concrete M 30 cum 4.09 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing, fitting and fixing mild steel railing complete as per drawing and Technical Specification 100 m
Spec. cl. No: 3105
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 1 per cent of cost of Material for electricity charges,
31.2 Unskilled day 60.00 0 0 welding and drilling equipment, electrodes and other 0
consumables
Skilled day 30.00 0 0 Add 1 percent of cost of material for fixing vertical posts 0
Add @ 5 per cent of cost of Material for painting one shop
coat with red oxide primer and three coats of synthetic enamel
0
paint and consumables to safeguard against weathering and
corrosion.
MS bolts, nuts and washers tonne
0.15 0 0
MS bars tonne
0.18 0 0
MS Flat tonne
1.01 0 0
ISMC 100 tonne
2.95 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
Providing and fixing Drainage Spouts complete as per Drawing and Technical specifications. 10 no
Spec. cl. No: N/A
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add @ 5 per cent of cost of Material and Labour for
31.3 Unskilled day 4 0 0 electrodes, cutting gas, sealant, anti-corrosive bituminous 0
paint, mild steel grating etc.
Skilled day 1 0 0 Galvanized MS flat clamp nos 20 #NAME? #NAME?
For fixing in
GI bolt 10 mm Dia nos 60 0
position 0
Description of Work:
Filler joint, Providing & fixing 2 mm thick corrugated copper plate in expansion joint complete as per drawing & Technical Specification. 12 meter
Spec. cl. No: 3103
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
31.4.i Skilled day 1 0 0 Copper plate kg 55 0 0
Unskilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
, Providing & fixing 20 mm thick compressible fiber board in expansion joint complete as per drawing & Technical Specification. 12 meter
, Providing & fixing 20 mm thick compressible fiber board in expansion joint complete as per drawing & Technical Specification. 12 meter
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
31.4.ii Skilled day 1 0 0 20 mm thick compressible fiber board sqm 3 0 0
Unskilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: , Providing and fixing in position 20 mm thick pre-moulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per Drawing and
12 meter
technical specifications.
Spec. cl. No: N/A
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
31.4.iii Skilled day 1 0 0 Pre-moulded joint filler sqm 3.6 0 0
Unskilled day 1 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work:
, Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight 12 meter
Spec. cl. No: N/A
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
31.4.iv Skilled day 1 0 0 Bitumen cum 0.001 0 0
Unskilled day 1 0 0 Sand cum 0.012 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Asphaltic Plug joint, Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic
12 meter
direction), covered with a closure plate of 200 mm x 6 mm of weldable structural steel conforming to IS: 2062, as per Drawings and Technical Specifications.
Spec. cl. No: 3100
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Add 1 per cent cost of material for welding and foam
31.5 Skilled day 1 0 0 0 Roller hour 6 0 0
caulking/backer rod and other incidentals.
Unskilled day 2 0 0 Galvanized structural steel plate kg 113 0 0 Mastic cooker hour 6 0 0
Polymer modified bitumen kg 77.5 0 0
Crushed stone aggregate 12.5 mm nominal size cum 0.75 0 0
Sub total of A = 0 Sub total of B = 0 Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = 0 Sub total of A + B + C + D= 0 Contractor's overhead expenses 15% = 0 Norms Rate = 0
Unit Rate = 0
Description of Work: Tubular Steel Railing on Medium Weight Steel Channel ( ISMC series) 100 mm x 50 mm, Providing, fixing and erecting 50 mm dia steel pipe railing in 3 rows duly painted on medium weight steel channels (ISMC series) 100 mm x 50 mm, 1.2 metres
100 meter
high above ground, 2 m center to center, complete as per Drawing and Technical specifications.
Spec. cl. No: 3105
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Medium weight steel channel (ISMC series) 100 mm x 50 mm,
31.6 Plumber / skilled day 1 0 0 kg 993.6 0 Tractor-trolley hour 6 0 0
10.8 metres length @ 9.2 kg per meter 0
Unskilled day 4 0 0 Painting of channel section sqm 21.6 #NAME? #NAME?
Painting of pipe sqm 47.1 #NAME? #NAME?
Foundation concrete M-15 cum 6.48 #NAME? #NAME?
Excavation for foundation cum 12.96 #NAME? #NAME?
Add for drilling holes @ 2 per cent of cost of channels 0
Steel pipe 50 mm external dia as per IS: 1239 meter 300 0
0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Description of Work: Tubular Steel Railing on Precast RCC Posts, 1.2 m High Above Ground Level, Providing, fencing and erecting 50 mm dia painted steel pipe railing in 3 rows on precast M 20 grade RCC vertical posts 1.8 metres high (1.2 m above GL) with 3 holes 50
100 meter
mm dia for pipe, fixed 2 metres center to, complete as per Drawing and Technical Specifications.
Spec. cl. No: 3105
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
31.7 Unskilled day 6 0 0 Painting of pipe sqm 47.1 #NAME? #NAME? Tractor-trolley hour 6 0 0
Skilled
day 1 0 0 RCC M - 20 cum 3.2 #NAME?
( plumber) #NAME?
Foundation concrete M - 15 cum 6.48 #NAME? #NAME?
Excavation for foundation cum 12.96 #NAME? #NAME?
Steel pipe 50 mm dia as per IS: 1239 meter 300 0
0
Sub total of A = 0 Sub total of B = #NAME? Sub total of C = 0 Sub total of D = 0
Sub total of A +B + C = #NAME? Sub total of A + B + C + D= #NAME? Contractor's overhead expenses 15% = #NAME? Norms Rate = #NAME?
Unit Rate = #NAME?
Loading Manual
Collecti Remark Loading/Unload Blasting/Not
S.N. Description Unit /Unloadi Washing Amount Collection Washing Breaking/Mech
on s ing Blasting
ng anical Crushing
Gravel
a 5 mm - 70 mm m^3 0 0 0 0
b 40 mm m^3 0 0 0 0
c 20 mm m^3 0 0 0 0
d 8 mm m^3 0 0 0 0
e 40 mm - 70 mm m^3 0 0 0 0
f 70 mm - 100 mm m^3 0 0 0 0
Sand
a Quarry output less than 33% m^3 0 0 0 0
b Quarry output 33 - 66% m^3 0 0 0 0
c Quarry output more than 66% m^3 0 0 0 0
Collection, quarrying and sieving
d m^3 0 0 0
sand in local river 0
3 Rubble m^3 0 0 0 0
4 Aggregate m^3 0 0 0 0
a 70 mm - 100 mm m^3 0 0 0 0
b 40 mm - 70 mm m^3 0 0 0 0
c 20 mm - 40 mm m^3 0 0 0 0
d 10 mm - 20 mm m^3 0 0 0 0
e 10 mm m^3 0 0 0 0
Mechanical
a 13.2 mm m^3 0 0 0 0
b 20 mm m^3 0 0 0 0
c 40 mm m^3 0 0 0 0
Collection
Collecti
S.N. Description Unit Rate Amount
on
Gravel
a 5 mm - 70 mm m^3 2.06 0 0
b 40 mm m^3 3.09 0 0
c 20 mm m^3 4.12 0 0
d 8 mm m^3 6.18 0 0
e 40 mm - 70 mm m^3 4.12 0 0
f 70 mm - 100 mm m^3 3.09 0 0
Sand
a Quarry output less than 33% m^3 4.12 0 0
b Quarry output 33 - 66% m^3 3.09 0 0
c Quarry output more than 66% m^3 1.55 0 0
Collection, quarrying and sieving
d m^3 1.55 0 0
sand in local river
3 Rubble m^3 1.44 0 0
4 Aggregate m^3 1.44 0 0
Washing
S.N. Description Unit Washing Rate Amount
1 Gravel m^3 0.52 0 0
2 Sand m^3 0.52 0 0
3 Rubble m^3 0.21 0 0
4 Aggregate m^3 0.21 0 0
Loading/Unloading Manual
Unskille
S.N. Description Unit Tipper Total
d
1 Gravel m^3 0.14 0.14 0
2 Sand m^3 0.14 0.14 0
3 Rubble m^3 0.14 0.14 0
4 Aggregate m^3 0.14 0.14 0
Loading/Unloading Mechanical
Unskille
S.N. Description Unit Tipper Total
d
1 Gravel m^3 0.06 0.06 0
2 Sand m^3 0.06 0.06 0
3 Rubble m^3 0.14 0.14 0
4 Aggregate m^3 0.14 0.14 0
Loading/Unloading Manual
Unskille
S.N. Description Unit Skilled Truck Total
d
1 Cement or Steel tones 0.20 0.20 0
1000
2 Bricks 0.19 0.38 0
Nos.
3 Bitumen Drums tones 0.15 0.15 0
4 Timber tones 0.27 0.03 0.20 0
5 C.C. Blocks, Kerb, etc. m^3 0.40 0.05 0.30 0
Unit =
meter
[For 15
c 450/300 mm dia RCC Hume pipe nos 2.00 0.50 1.00 1.00 0
pipe/
length=
37.5 m]
Unit =
meter
750/600/450 mm dia RCC Hume [For 10
b 1.00 0.50 0.50 0.50 0
pipe nos pipe/
length=
25 m]
Unit =
meter
[For 15
c 450/300 mm dia RCC Hume pipe nos 1.00 0.10 0.50 0.50 0
pipe/
length=
37.5 m]
Unit =
meter
750/600/450 mm dia RCC Hume [For 10
b 3.00 0
pipe nos pipe/
length=
25 m]
Unit =
meter
[For 15
c 450/300 mm dia RCC Hume pipe nos 0
pipe/
length=
37.5 m]
1) District rates: Materials
Total Rate (C + R +
S.N. Description Unit District Rate (D) Collection Rate (C) Royalty (R) Transportation (Tp) Adopted Rate Remarks
Tp)
1 ISMC 100 tonne 0 0 0
2 10 - 5 mm 25% cum 0 0 0
3 10 mm Aggregate cum 0 0 0
12 Nos of back pipes,
4 meter 0 0 0
30 times used
2 Pack high built
5 lit 0 0 0
epoxy
2 Pack high built
6 polyur - ethane ( 2 lit 0 0 0
coat)
7 2.36 mm below cum 0 0 0
8 20 mm Aggregate cum 0 0 0
20 mm thick
9 compressible fiber sqm 0 0 0
board
10 22.4 mm to 5.6 mm cum 0 0 0
11 22.5 mm to 5.6 mm cum 0 0 0
12 25 - 10 mm 45% cum 0 0 0
13 26.5 mm to 4.75 mm cum 0 0 0
14 37.5 - 25 mm 15% cum 0 0 0
15 40 mm Aggregate cum 0 0 0
16 45 mm to 22.5 mm cum 0 0 0
17 5 mm and below 15% cum 0 0 0
50 mm thick natural
18 sqm 0 0 0
stone slab
19 53 mm to 26.5 mm cum 0 0 0
20 63 mm to 45 mm cum 0 0 0
AC pipe 100 mm dia.
21 (including wastage @ meter 0 0 0
5 per cent )
Accelerator compound
for Guniting @ 2 per
22 kg 0 0 0
cent of weight of
cement
Acrylic based bonding
23 kg 0 0 0
agent
24 Additive material kg 0 0 0
25 Admixture Kg 0 0 0
26 aggregate cum 0 0 0
Aggregate (Grading as
27 cum 0 0 0 0
per specification)
28 Aggregate 10 mm cum 0 0 0 0
29 Aggregate 12 mm cum 0 0 0
Aggregates size 19 to
30 cum 0 0 0
6 mm
Aggregates size 19 to
31 cum 0 0 0
9.5 mm
Aggregates size 37.5
32 cum 0 0 0
to 19 mm
Aggregates size 6 to
33 cum 0 0 0
0.075 mm
Aggregates size 9.5 to
34 cum 0 0 0
6 mm
Alkaline, polymeric,
35 elastomeric primer kg 0 0 0
agent
36 Bamboos nos 0 0 0
37 Barbed wire kg 0 0 0
38 Below 5.6 mm cum 0 0 0
39 Bentonite kg 0 0 0
40 Binder tonne 0 0 0
41 Binding Material cum 0 0 0
42 Binding wire Kg 0 0 0
43 Bitumen tonne 0 0 0
Bitumen ( cutback)
44 tonne 0 0 0
MC 30 ( for WBM)
Bitumen (cut back )
MC 70 ( for stabilized
45 tonne 0 0 0
soil base/ crusher run
macadam)
Bitumen (paving
46 tonne 0 0 0
grade)
47 Bitumen emulsion tonne 0 0 0
48 Bitumen emulsion tonne 0 0 0
Bitumen for BM @
3.5% by weight of mix
49 tonne 0 0 0
= 30.94 x 3.5 / 100 =
1.082
Bitumen VG 10 or
50 tonne 0 0 0
similar
51 Block stone cum 0 0 0
52 Borrowpit material cum 0 0 0
53 Boulder cum 0 0 0
Boulder ( 11 ton, )
54 cum 0 0 0
( ten times used)
55 Brick nos 0 0 0
56 Bricks Ist class nos 0 0 0
57 C.I. shoes for the pile Kg 0 0 0
Capping Layer
58 cum 0 0 0
Material
59 Carbon fiber sqm 0 0 0
Carbon laminated
60 sqm 0 0 0
sheet
61 Cement tonne 0 0 0
62 Cement mortar 1:3 tonne 0 0 0
63 Chemical kg 0 0 0
Chips, 19 mm nominal
64 cum 0 0 0
size
65 Clamps nos. 0 0 0
Coarse aggregates 6.3
66 mm to 13.2 mm size cum 0 0 0
@ 40 %
Coarse sand 30 per
67 cum 0 0 0
cent
68 collar for AC pipe nos. 0 0 0
Compensation for
69 earth Taken from cum 0 0 0
private land
Compensation for
70 cum 0 0 0
Gravel
compensation for
71 Locally available cum 0 0 0
Material
concrete penetrating
72 kg 0 0 0
corrosion inhibitor
73 Copper plate kg 0 0 0
74 Core box meter 0 0 0
Corrosion resistant
Structural steel
75 Kg 0 0 0
including 5 per cent
wastage
Crushed sand passing
76 cum 0 0 0
2.36 mm
Crushed stone
77 aggregate 12.5 mm cum 0 0 0
nominal size
Crushed stone
78 aggregate 13.2 mm to cum 0 0 0
5.6 mm
Crushed stone
79 cum 0 0 0
aggregate 20 mm
Crushed stone
80 aggregates 14 mm cum 0 0 0
nominal size
Crushed stone
81 aggregates 40 mm cum 0 0 0
nominal size
Crushed stone
82 aggregates 5.6 mm cum 0 0 0
size
Crushed stone
83 aggregates 6 mm cum 0 0 0
nominal size
Crushed stone
84 aggregates nominal cum 0 0 0
size 13.2 mm
Crushed stone
85 cum 0 0 0
chipping 11.2 mm size
Crushed stone
86 chipping 19 mm cum 0 0 0
nominal size
Crushed stone
87 chipping, 0-16 mm cum 0 0 0
size
Crushed stone
88 chipping, 10 mm cum 0 0 0
nominal size
Crushed stone
89 chipping, 13 mm cum 0 0 0
nominal size
Crushed stone
90 chipping, 13 mm cum 0 0 0
nominal size
Crushed stone
91 chipping, 13.2 mm to cum 0 0 0
5.6 mm
Crushed stone
92 chipping, 9.5 mm cum 0 0 0
nominal size
Crushed stone
93 chippings 6 mm cum 0 0 0
nominal size
Crushed stone grit 3
94 cum 0 0 0
mm
Crusher stone dust @
95 cum 0 0 0
31.9 %
96 Dori kg 0 0 0
97 Drill bit nos. 0 0 0
Drilling machine with
98 hour 0 0 0
bit and accessories
99 dust cum 0 0 0
100 Earth (compacted) cum 0 0 0
101 Electric Detonator nos. 0 0 0
102 Emulsion tonne 0 0 0
103 Emulsion tonne 0 0 0
Emulsion ( for primer
104 @ 1 lit /sqm including tonne 0 0 0
side slope)
Emulsion ( Tack coat
105 tonne 0 0 0
@ 0.6 lit/sqm)
106 Enamel paint Lit 0 0 0
107 Epoxy @ 0.8 kg/sqm kg 0 0 0
108 Epoxy Bonding Agent kg 0 0 0
109 Epoxy metal primer kg 0 0 0
Epoxy mortar ( @
110 kg 0 0 0
22kg / sqm)
111 Epoxy primer kg 0 0 0
expansion joint
( Elastomeric Slab
114 Steel Expansion Joint / meter 0 0 0
compression seal/ strip
/ modular strip. etc.)
MS angle iron 40 mm
156 kg 0 0 0
x 40 mm x 6 mm,
MS angle iron 50 mm
157 kg 0 0 0
x 50 mm x 6 mm,
158 MS bars tonne 0 0 0
159 MS Bolt and nuts kg 0 0 0
160 MS clamp nos. 0 0 0
161 MS Flat tonne 0 0 0
162 MS pipes dia. 40 mm m 0 0 0
MS sheet 14 gauge &
163 kg 0 0 0
angle stiffners
164 Mud (clay) cum 0 0 0
165 Nails, spikes, etc. kg 0 0 0
166 Nipples nos. 0 0 0
Non shrink self
167 compacting micro kg 0 0 0
concrete
168 Nut bolt nos 0 0 0
169 Nuts & bolts Kg 0 0 0
Nuts & bolts 6 mm
170 dia. ( @approx. 2 kg nos. 0 0 0
per 100 nos)
PC based Super
171 kg 0 0 0
plasticizer
172 Planks 38 mm thick. cum 0 0 0
Ply wood 12 mm
173 sqm 0 0 0
thick.
174 Ply wood 9 mm thick. sqm 0 0 0
Polymer modified
175 kg 0 0 0
bitumen
176 polymer mortar M-45 kg 0 0 0
177 Pozzoplus kg 0 0 0
Pre-coated stone chips
of 13 mm nominal size
178 cum 0 0 0
@ 0.005 cum per 10
sqm
Pre-moulded joint
179 sqm 0 0 0
filler
Pre-packed polymer
concrete based on
epoxy system
180 kg 0 0 0
complete with curing
compound, initiator
and promoter
181 Primer kg 0 0 0
Project signboards
with size of 1.8 x 1.2
m having details of
182 contract in the format nos 0 0 0
and wording as
directed by the
Engineer
PVC Pipes 200 mm
183 meter 0 0 0
dia
Rafter, beam, battens
184 cum 0 0 0
etc.
Ready to use sprayable
185 thixotropic repair kg 0 0 0
mortar
186 Rubble cum 0 0 0 0
187 Rust clean agent kg 0 0 0
188 Sal wood cum 0 0 0
sand ( 1.7 mm - 600
189 cum 0 0 0
micron)
190 Sand ( ten times used) cum. 0 0 0
191 Sand bags Nos 0 0 0
Sand of size 4.75 to
192 cum 0 0 0
0.075 mm
Screening / coarse
193 cum 0 0 0
sand
194 Sealant kg 0 0 0
Sheathing duct ID 66
195 meter 0 0 0
mm
Slow-curing bitumen
196 Kg 0 0 0
emulsion
soil/ borrowpit
197 cum 0 0 0
material
Steel helmet and
cushion block on top
198 Kg 0 0 0
of casing head during
driving
Steel pipe 50 mm
199 external dia as per IS: meter 0 0 0
1239
200 Stone cum 0 0 0
Stone crushed
201 aggregates 11.2 mm to cum 0 0 0
0.09
Stone crushed
202 aggregates 13.2 mm to cum 0 0 0
0.09 mm
203 Stone crusher dust cum 0 0 0
Stone crusher dust
204 cum 0 0 0
finer than 3 mm
Plate compactor/power
44 hour
rammer
Materials
1 ISMC 100 tonne 0 0 0
2 10 - 5 mm 25% cum 0 0 0
3 10 mm Aggregate cum 0 0 0
12 Nos of back pipes,
4 meter 0 0 0
30 times used
2 Pack high built
5 lit 0 0 0
epoxy
2 Pack high built
6 polyur - ethane ( 2 lit 0 0 0
coat)
7 2.36 mm below cum 0 0 0
8 20 mm Aggregate cum 0 0 0
20 mm thick
9 compressible fiber sqm 0 0 0
board
10 22.4 mm to 5.6 mm cum 0 0 0
11 22.5 mm to 5.6 mm cum 0 0 0
12 25 - 10 mm 45% cum 0 0 0
13 26.5 mm to 4.75 mm cum 0 0 0
14 37.5 - 25 mm 15% cum 0 0 0
15 40 mm Aggregate cum 0 0 0
16 45 mm to 22.5 mm cum 0 0 0
17 5 mm and below 15% cum 0 0 0
50 mm thick natural
18 sqm 0 0 0
stone slab
19 53 mm to 26.5 mm cum 0 0 0
20 63 mm to 45 mm cum 0 0 0
AC pipe 100 mm dia.
21 (including wastage @ meter 0 0 0
5 per cent )
Accelerator compound
for Guniting @ 2 per
22 kg 0 0 0
cent of weight of
cement
Acrylic based bonding
23 kg 0 0 0
agent
24 Additive material kg 0 0 0
25 Admixture Kg 0 0 0
26 aggregate cum 0 0 0
Aggregate (Grading as
27 cum 0 0 0
per specification)
28 Aggregate 10 mm cum 0 0 0
29 Aggregate 12 mm cum 0 0 0
Aggregates size 19 to
30 cum 0 0 0
6 mm
Aggregates size 19 to
31 cum 0 0 0
9.5 mm
Aggregates size 37.5
32 cum 0 0 0
to 19 mm
Aggregates size 6 to
33 cum 0 0 0
0.075 mm
Aggregates size 9.5 to
34 cum 0 0 0
6 mm
Alkaline, polymeric,
35 elastomeric primer kg 0 0 0
agent
36 Bamboos nos 0 0 0
37 Barbed wire kg 0 0 0
38 Below 5.6 mm cum 0 0 0
39 Bentonite kg 0 0 0
40 Binder tonne 0 0 0
41 Binding Material cum 0 0 0
42 Binding wire Kg 0 0 0
43 Bitumen tonne 0 0 0
Bitumen ( cutback)
44 tonne 0 0 0
MC 30 ( for WBM)
Bitumen (cut back )
MC 70 ( for stabilized
45 tonne 0 0 0
soil base/ crusher run
macadam)
Bitumen (paving
46 tonne 0 0 0
grade)
47 Bitumen emulsion tonne 0 0 0
48 Bitumen emulsion tonne 0 0 0
Bitumen for BM @
3.5% by weight of mix
49 tonne 0 0 0
= 30.94 x 3.5 / 100 =
1.082
Bitumen VG 10 or
50 tonne 0 0 0
similar
51 Block stone cum 0 0 0
52 Borrowpit material cum 0 0 0
53 Boulder cum 0 0 0
Boulder ( 11 ton, )
54 cum 0 0 0
( ten times used)
55 Brick nos 0 0 0
56 Bricks Ist class nos 0 0 0
57 C.I. shoes for the pile Kg 0 0 0
Capping Layer
58 cum 0 0 0
Material
59 Carbon fiber sqm 0 0 0
Carbon laminated
60 sqm 0 0 0
sheet
61 Cement tonne 0 0 0
62 Cement mortar 1:3 tonne 0 0 0
63 Chemical kg 0 0 0
Chips, 19 mm nominal
64 cum 0 0 0
size
65 Clamps nos. 0 0 0
Coarse aggregates 6.3
66 mm to 13.2 mm size cum 0 0 0
@ 40 %
Coarse sand 30 per
67 cum 0 0 0
cent
68 collar for AC pipe nos. 0 0 0
Compensation for
69 earth Taken from cum 0 0 0
private land
Compensation for
70 cum 0 0 0
Gravel
compensation for
71 Locally available cum 0 0 0
Material
concrete penetrating
72 kg 0 0 0
corrosion inhibitor
73 Copper plate kg 0 0 0
74 Core box meter 0 0 0
Corrosion resistant
Structural steel
75 Kg 0 0 0
including 5 per cent
wastage
Crushed sand passing
76 cum 0 0 0
2.36 mm
Crushed stone
77 aggregate 12.5 mm cum 0 0 0
nominal size
Crushed stone
78 aggregate 13.2 mm to cum 0 0 0
5.6 mm
Crushed stone
79 cum 0 0 0
aggregate 20 mm
Crushed stone
80 aggregates 14 mm cum 0 0 0
nominal size
Crushed stone
81 aggregates 40 mm cum 0 0 0
nominal size
Crushed stone
82 aggregates 5.6 mm cum 0 0 0
size
Crushed stone
83 aggregates 6 mm cum 0 0 0
nominal size
Crushed stone
84 aggregates nominal cum 0 0 0
size 13.2 mm
Crushed stone
85 cum 0 0 0
chipping 11.2 mm size
Crushed stone
86 chipping 19 mm cum 0 0 0
nominal size
Crushed stone
87 chipping, 0-16 mm cum 0 0 0
size
Crushed stone
88 chipping, 10 mm cum 0 0 0
nominal size
Crushed stone
89 chipping, 13 mm cum 0 0 0
nominal size
Crushed stone
90 chipping, 13 mm cum 0 0 0
nominal size
Crushed stone
91 chipping, 13.2 mm to cum 0 0 0
5.6 mm
Crushed stone
92 chipping, 9.5 mm cum 0 0 0
nominal size
Crushed stone
93 chippings 6 mm cum 0 0 0
nominal size
Crushed stone grit 3
94 cum 0 0 0
mm
Crusher stone dust @
95 cum 0 0 0
31.9 %
96 Dori kg 0 0 0
97 Drill bit nos. 0 0 0
Drilling machine with
98 hour 0 0 0
bit and accessories
99 dust cum 0 0 0
100 Earth (compacted) cum 0 0 0
101 Electric Detonator nos. 0 0 0
102 Emulsion tonne 0 0 0
103 Emulsion tonne 0 0 0
Emulsion ( for primer
104 @ 1 lit /sqm including tonne 0 0 0
side slope)
Emulsion ( Tack coat
105 tonne 0 0 0
@ 0.6 lit/sqm)
106 Enamel paint Lit 0 0 0
107 Epoxy @ 0.8 kg/sqm kg 0 0 0
108 Epoxy Bonding Agent kg 0 0 0
109 Epoxy metal primer kg 0 0 0
Epoxy mortar ( @
110 kg 0 0 0
22kg / sqm)
111 Epoxy primer kg 0 0 0
expansion joint
( Elastomeric Slab
114 Steel Expansion Joint / meter 0 0 0
compression seal/ strip
/ modular strip. etc.)
MS angle iron 40 mm
156 kg 0 0 0
x 40 mm x 6 mm,
MS angle iron 50 mm
157 kg 0 0 0
x 50 mm x 6 mm,
158 MS bars tonne 0 0 0
159 MS Bolt and nuts kg 0 0 0
160 MS clamp nos. 0 0 0
161 MS Flat tonne 0 0 0
162 MS pipes dia. 40 mm m 0 0 0
MS sheet 14 gauge &
163 kg 0 0 0
angle stiffners
164 Mud (clay) cum 0 0 0
165 Nails, spikes, etc. kg 0 0 0
166 Nipples nos. 0 0 0
Non shrink self
167 compacting micro kg 0 0 0
concrete
168 Nut bolt nos 0 0 0
169 Nuts & bolts Kg 0 0 0
Nuts & bolts 6 mm
170 dia. ( @approx. 2 kg nos. 0 0 0
per 100 nos)
PC based Super
171 kg 0 0 0
plasticizer
172 Planks 38 mm thick. cum 0 0 0
Ply wood 12 mm
173 sqm 0 0 0
thick.
174 Ply wood 9 mm thick. sqm 0 0 0
Polymer modified
175 kg 0 0 0
bitumen
176 polymer mortar M-45 kg 0 0 0
177 Pozzoplus kg 0 0 0
Pre-coated stone chips
of 13 mm nominal size
178 cum 0 0 0
@ 0.005 cum per 10
sqm
Pre-moulded joint
179 sqm 0 0 0
filler
Pre-packed polymer
concrete based on
epoxy system
180 kg 0 0 0
complete with curing
compound, initiator
and promoter
181 Primer kg 0 0 0
Project signboards
with size of 1.8 x 1.2
m having details of
182 contract in the format nos 0 0 0
and wording as
directed by the
Engineer
PVC Pipes 200 mm
183 meter 0 0 0
dia
Rafter, beam, battens
184 cum 0 0 0
etc.
Ready to use sprayable
185 thixotropic repair kg 0 0 0
mortar
186 Rubble cum 0 0 0
187 Rust clean agent kg 0 0 0
188 Sal wood cum 0 0 0
sand ( 1.7 mm - 600
189 cum 0 0 0
micron)
190 Sand ( ten times used) cum. 0 0 0
191 Sand bags Nos 0 0 0
Sand of size 4.75 to
192 cum 0 0 0
0.075 mm
Screening / coarse
193 cum 0 0 0
sand
194 Sealant kg 0 0 0
Sheathing duct ID 66
195 meter 0 0 0
mm
Slow-curing bitumen
196 Kg 0 0 0
emulsion
soil/ borrowpit
197 cum 0 0 0
material
Steel helmet and
cushion block on top
198 Kg 0 0 0
of casing head during
driving
Steel pipe 50 mm
199 external dia as per IS: meter 0 0 0
1239
200 Stone cum 0 0 0
Stone crushed
201 aggregates 11.2 mm to cum 0 0 0
0.09
Stone crushed
202 aggregates 13.2 mm to cum 0 0 0
0.09 mm
203 Stone crusher dust cum 0 0 0
Stone crusher dust
204 cum 0 0 0
finer than 3 mm
Equipments
1 Tractor-trolley hour 0 0 0
2 Dozer/ Excavator hour 0 0 0
Drilling machine with
3 hour 0 0 0
bit and accessories
4 Air Compressor hour 0 0 0
5 Tractor with ripper hour 0 0 0
6 Joint Cutting Machine hour 0 0 0
7 Crane hour 0 0 0
8 Truck hour 0 0 0
9 Jeep/ pickup hour 0 0 0
10 Dial gauge 4 Nos day 0 0 0
11 Spirit Level day 0 0 0
12 Benkelman Beam hour 0 0 0
13 Heavy Truck hour 0 0 0
14 Measuring Cylinder day 0 0 0
15 Can day 0 0 0
16 Air tight Bottle day 0 0 0
17 Oven/Rapid Moisture day 0 0 0
18 Balance(20 kg) day 0 0 0
19 Baseplate day 0 0 0
20 Field Density Jar day 0 0 0
Dynamic cone
21 day 0 0 0
penetrometer
22 Mould hour 0 0 0
23 Balance (0.1 gm.) hour 0 0 0
24 Tray (75*75 cm) hour 0 0 0
25 Shear test equipment hour 0 0 0
26 Schmidt Hammer day 0 0 0
Laboratory Crusher
27 hour 0 0 0
Machine
28 Balance (1 Kg) hour 0 0 0
29 Rubber Mallet hour 0 0 0
30 Sieve Shaker hour 0 0 0
31 Sieves set hour 0 0 0
32 Hydraulic excavator hour 0 0 0
Jack hammer /Rock
33 hour 0 0 0
drill
34 Dozer hour 0 0 0
35 Tipper hour 0 0 0
36 Excavator hour 0 0 0
37 Loader hour 0 0 0
38 Water tanker hour 0 0 0
39 Roller hour 0 0 0
40 Vibratory roller hour 0 0 0
41 Motor grader hour 0 0 0
42 Tractor with rotavator hour 0 0 0
Plate compactor/power
43 hour 0 0 0
rammer
Plate compactor/power
44 hour 0 0 0
rammer
Providing and installation of project signboards with size of 1.8 x 1.2 m as per
3 specification and instruction of engineer. nos
Providing and establishing camp with mobilization and demobilization for
4 contractor's Labour and staff and demolishing after completion of works as per job
the specifications and instruction of the Engineer.
Relocation of services / minor infrastructures, as per specifications and
5 instruction of the Engineer. job
6 Supply of Project Record as per specifications and instruction of the Engineer. set
Reinstatement of quarry sites at the completion of works as instructed by the
7 engineers.
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
8 sqm
lead of 30 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness., By Manual Means:-, In area of light jungle
(less than 15 number per 100 sqm)
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
9 sqm
lead of 30 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness., By Manual Means:-, In area of thorny jungle
( more than 15 numbers per 100 sqm)
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
12 sqm
lead of 30 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness., By Mechanical Means, In area of light jungle
(less than 15 number per 100 sqm )
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
13 sqm
lead of 30 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness., By Mechanical Means, In area of thorny
jungle ( more than 15 numbers per 100 sqm)
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
14 lead of 30 meters including removal and disposal of top organic soil not cum
exceeding 150 mm in thickness., By Mechanical Means, Felling and uprooting
of bamboo clearing the area, stacking of bamboo and disposing of wastes
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
15 sqm
lead of 1000 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness., By Manual Means:-, In area of light jungle
(less than 15 number per 100 sqm)
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
16 sqm
lead of 1000 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness., In area of thorny jungle ( more than 15
numbers per 100 sqm)
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
17 cum
lead of 1000 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness., Felling and uprooting of bamboo clearing the
area, stacking of bamboo and disposing of wastes
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
18 sqm
lead of 1000 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness., By Mechanical Means, In area of light jungle
(less than 15 number per 100 sqm )
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
19 sqm
lead of 1000 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness., By Mechanical Means, In area of thorny
jungle ( more than 15 numbers per 100 sqm)
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
20 lead of 1000 meters including removal and disposal of top organic soil not cum
exceeding 150 mm in thickness., By Mechanical Means, Felling and uprooting
of bamboo clearing the area, stacking of bamboo and disposing of wastes
Reinforced Soil wall Structure with Green Terra Mesh (GTM) Facing:,
Providing and fixing Flexible Geogrids ( e.g. Paralink) as primary
reinforcement for composite soil reinforcement system, made of polyester core
with polyethylene coating with design life >100 years including secondary
reinforcement of Green Terramesh system (GTM) as per Specifications Clause
67 2402 with Zn+PVC coated with Bio-Mat, Steel Greed made of MS bar (10 mm sqm
dia and grid size 160 mm x 160 mm), 3 nos of anchor bars of 10 mm dia to
maintain the slope of GTM, laying of Geo textile, drainage gallery filling with
boulder etc. all complete as per Specifications.
Reinforced Soil wall Structure with Concrete Facing:, Providing and fixing
Flexible Geogrids ( e.g. Paralink) as primary reinforcement for composite soil
reinforcement system, made of polyester core with polyethylene coating with
design life >100 years including secondary reinforcement of Green
Terramesh system (GTM) as per Specifications Clause 2402 with Zn+PVC
coated with Bio-Mat, Steel Greed made of MS bar (10 mm dia and grid size 160
68 mm x 160 mm), 3 nos of anchor bars of 10 mm dia to maintain the slope of sqm
GTM, laying of Geo textile, drainage gallery filling with boulder etc. all
complete as per Specifications., High Strength Flexible Geogrids ( made of
polyester core with polyethylene coating) with Strength as per design ( at
least 200 KN/ m)
Reinforced Soil wall Structure with Concrete Facing:, Providing and fixing
Flexible Geogrids ( e.g. Paralink) as primary reinforcement for composite soil
reinforcement system, made of polyester core with polyethylene coating with
design life >100 years including secondary reinforcement of Green
Terramesh system (GTM) as per Specifications Clause 2402 with Zn+PVC
69 coated with Bio-Mat, Steel Greed made of MS bar (10 mm dia and grid size 160 sqm
mm x 160 mm), 3 nos of anchor bars of 10 mm dia to maintain the slope of
GTM, laying of Geo textile, drainage gallery filling with boulder etc. all
complete as per Specifications., Para web 50 KN and 100 ken each
GI Barbed Wire Fencing 1.8 Meter High with RCC post, Providing and fixing
1.8 m high GI barbed wire fencing with 2.4 m RCC M 15 grade 150 mm x 150
mm concrete post placed every 3 m center-to-center founded in M 15 grade
cement concrete, 0.6 m below ground level, every 15th post, last but one end
72 post and corner post shall be strutted on both sides and end post on one side meter
only and provided with 9 horizontal lines and 2 diagonals interwoven with
horizontal wires, fixed with GI staples, turn buckles etc. complete as per
Drawing and Technical Specifications.
GI Barbed Wire Fencing 1.2 Meter High on Angle Iron, Providing and fixing
1.2 meters high GI barbed wire fencing with 1.8 m angle iron posts 40 mm x 40
mm x 6 mm placed every 3 meters center to center founded in M 15 grade
cement concrete, 0.6 meter below ground level, every 15th post, end post and
73 corner post shall be strutted on both sides and end post on one side only and meter
provided with 9 horizontal lines and 2 diagonals interwoven with horizontal
wires, fixed with GI staples, turn buckles etc. complete as per Drawing and
Technical Specifications.
GI Barbed Wire Fencing 1.8 Meter High, Providing and fixing 1.8 meters high
GI barbed wire fencing
with 2.4 m angle iron posts 50 mm x 50 mm x 6 mm placed every
3 meters center to center founded in M 15 grade cement
concrete, 0.6 meter below ground level, every 15th post, last but
74 one end post and corner post shall be strutted on both sides and meter
end post on one side only and provided with 12 horizontal lines
and 2 diagonals interwoven with horizontal wires, fixed with GI
staples, turn buckles etc. complete as per Drawing and Technical
Specifications
Field Test, Carryout Pile Load Test up to 200 tones including all consumable
75 and accessories as per test procedure mentioned in the Technical Specifications. nos/day
76 Laboratory Setup including supply of electricity, water, gas and heating etc. set
Providing, installing and maintaining Quality control laboratory with
77 equipment as specified in the Technical Specifications. set
78 Operation of Laboratory with Technical support of Laboratory staff Man-month
Field Test, Carryout Axle load survey including all consumables and
79 accessories. no. of reading
Field Test, Carryout Benkelman Beam Deflection Test including all
80 consumables and accessories. no of reading
Field Test, Carryout Field Density test of sub grade/ sub base/ base test by Sand
81 replacement Method as per procedure mentioned in the Technical nos
Specifications.
82 Field Test, Sampling from Subgrade, Sub base, base and Wearing Course nos
Field Test, Carryout Rapid Determination of CBR by dynamic core
83 penetrometer as per test procedure mentioned in the Technical Specifications. point
Field Test, Carryout Measurement of Pavement Thickness including all
84 consumable and accessories as per test procedure mentioned in the Technical point
Specifications.
Laboratory Test, Carryout Shear test of disturbed sample including all
85 consumable and accessories as per test procedure mentioned in the Technical nos
Specifications.
Field Test, Coring of asphalt concrete Sample from pavement including all
86 consumable and accessories as per test procedure mentioned in the Technical nos/day
Specifications.
Field Test, Carryout Schmidt Hammer Test including all consumable and
87 accessories as per test procedure mentioned in the Technical Specifications. no
Field Test, Carryout Bridge Load test (Load testing of one or more spans of
bridge as selected by the Engineer as per approved load test procedure
88 following relevant IS/IRC codes including deflection measuring instruments, nos
loading materials, recoding and analyzing the load testing results cleaning of
girder after load test, etc.)
Stripping and Storing Top Soil, Stripping, storing of top soil by road side at 15
m internal and re-application on embankment slopes, cut slopes and other areas
132 in localities where the available embankment Material is not conducive to plant cum
growth as per Drawing and Technical Specifications.
Stripping, Storing and Re-laying Top Soil from Borrow Areas in Agriculture
Fields., Stripping of top soil from borrow areas located in agriculture fields,
storing at a suitable place, spreading and re-laying after taking the borrow earth
133 to maintain fertility of the agricultural field, finishing it to the required levels to cum
the satisfaction of the farmer as per Drawing and Technical Specifications.
Providing suitable material and Back filling behind abutment, wing wall and
139 return wall complete as per Drawing and Technical Specifications., Granular cum
Material
Providing suitable material and Back filling behind abutment, wing wall and
140 return wall complete as per Drawing and Technical Specifications., Sandy cum
Material
Providing suitable material and Back filling behind abutment, wing wall and
141 return wall complete as per Drawing and Technical Specifications., Locally cum
available Material including compaction by tamping rod ( without watering)
Providing suitable material and Back filling behind abutment, wing wall and
142 return wall complete as per Drawing and Technical Specifications., Locally cum
available Material, with out watering and compaction by tamping rod
Providing and laying of Filter media with granular Material/stone crushed
aggregates to a thickness of not less than 600 mm with smaller size towards the
143 soil and bigger size towards the wall and provided over the entire surface behind cum
abutment, wing wall and return wall to the full height compacted to a firm
condition complete as per drawing and Technical Specification.
Providing, laying and spreading Material on a prepared sub grade, adding the
designed quantity of cement to the spread Material, mixing in place , grading
156 and compacting at OMC to achieve the desired unconfined compressive cum
strength and to form a layer of sub-base/base as per Drawing and Technical
Specifications.
Providing, laying, spreading and compacting graded stone aggregate to wet mix
macadam specification including premixing the Material with water at OMC
177 laying in uniform layers in sub- base / base course on well prepared surface and cum
compacting to achieve required density as per Drawing and Technical
Specifications., Base course with B2 material
Providing, laying, spreading and compacting graded stone aggregate to wet mix
macadam specification including premixing the Material with water at OMC
178 laying in uniform layers in sub- base / base course on well prepared surface and cum
compacting to achieve required density as per Drawing and Technical
Specifications., Sub Base course with S1 material
Providing, laying, spreading and compacting graded stone aggregate to wet mix
macadam specification including premixing the Material with water at OMC
179 laying in uniform layers in sub- base / base course on well prepared surface and cum
compacting to achieve required density as per Drawing and Technical
Specifications., Sub Base course with S2 material
Seal Surfacing, Providing and laying seal coat sealing the voids in a bituminous
217 surface as per Drawing and Technical Specifications. sqm
Slurry Seal, Providing and laying slurry seal consisting of a mixture of fine
aggregates, Portland cement filler, bituminous emulsion and water on a road
218 surface including cleaning of surface, mixing of slurry seal in a suitable mobile sqm
plant, laying and compacting to provide even riding surface as per Drawing and
Technical Specifications., 5 mm thickness
Slurry Seal, Providing and laying slurry seal consisting of a mixture of fine
aggregates, Portland cement filler, bituminous emulsion and water on a road
219 surface including cleaning of surface, mixing of slurry seal in a suitable mobile sqm
plant, laying and compacting to provide even riding surface as per Drawing and
Technical Specifications., 3 mm thickness
Slurry Seal, Providing and laying slurry seal consisting of a mixture of fine
aggregates, Portland cement filler, bituminous emulsion and water on a road
220 surface including cleaning of surface, mixing of slurry seal in a suitable mobile sqm
plant, laying and compacting to provide even riding surface as per Drawing and
Technical Specifications., 1.5 mm thickness
Fog Spray, Providing and applying low viscosity bitumen emulsion for sealing
221 cracks less than 3 mm wide or incipient fretting or disintegration in an existing sqm
bituminous surfacing as per Drawing and Technical Specifications.
Fog Spray, Providing and applying low viscosity bitumen emulsion for sealing
cracks less than 3 mm wide or incipient fretting or disintegration in an existing
222 bituminous surfacing as per Drawing and Technical Specifications., Blind the sqm
fog spray
Bituminous Cold Mix ( Including Gravel Emulsion), Providing, laying and
rolling of bituminous cold mix on prepared base consisting of a mixture of
unheated mineral aggregate and emulsified or cutback bitumen, including
223 mixing in a plant of suitable type as per Drawing and Technical Specifications., cum
Using bitumen emulsion and 9.5 mm or 13.2 mm size aggregate
Sand Asphalt Base Course, Providing, laying and rolling sand-asphalt base
227 course composed of sand, mineral filler and bituminous binder on a prepared cum
sub-grade or sub-base as per Drawing and Technical Specifications.
Anti- Stripping agent, Providing and mixing of Anti stripping agent as per
228 Design/ direction of Engineer kg
Bitumen Cutter, Providing and mixing of Bitumen cutter as per design /
229 direction of Engineer lit
Modified Binder, Supply of modified binder (produced by mixing bitumen with
modifier such as natural rubber or crumb rubber or any other polymer found
230 compatible with bitumen) as per Specifications and direction of the Engineer. tonne
Otta seal, Providing and laying Otta seal surface as wearing course in single
231 coat using river bed shingles /aggregates of specified size ( 0- 16 mm) laid on sqm
prepared surface as per Drawing and Technical Specifications.
Recipe Cold Mix, Providing and laying of premix of crushed stone aggregates
and emulsion binder, mixed in a batch type cold mixing plant, laid over
232 prepared surface, by paver finisher, rolled with a pneumatic tired roller initially cum
and finished with a smooth steel wheel roller, all as per specifications., 75 mm
thickness
Recipe Cold Mix, Providing and laying of premix of crushed stone aggregates
and emulsion binder, mixed in a batch type cold mixing plant, laid over
233 prepared surface, by paver finisher, rolled with a pneumatic tired roller initially cum
and finished with a smooth steel wheel roller, all as per specifications., 40 mm
thickness
Recipe Cold Mix, Providing and laying of premix of crushed stone aggregates
and emulsion binder, mixed in a batch type cold mixing plant, laid over
234 prepared surface, by paver finisher, rolled with a pneumatic tired roller initially cum
and finished with a smooth steel wheel roller, all as per specifications., 25 mm
thickness
Brick work for footpath, Providing and laying flat brick over 60 mm thick
236 sand bed in footpath including excavation sand bedding all complete as per sqm
specification.
Precast Cement Concrete M 20 Kerb , Providing and laying of /20 precast
cement concrete Kerb 38 cm * 20 cm * 25 cm ( H*B*L) with 12 mm thick 1:3
237 cement sand mortar bedding and joints including foundation excavation meter
levelling but excluding foundation concrete for foundation or sand gravel
material, all complete as per Drawing and Technical Specifications.
Cast in Situ Cement Concrete or natural stone block for footpath, Providing and
laying of precast / cast in situ 50 mm thick cement concrete slab footpath on
238 12 mm thick 1: 3 cement sand mortar over the prepared base, all complete as per sqm
Drawing and Technical Specifications.
, Providing and laying 25 mm thick Natural stone slab footpath on 12 mm
239 thick 1: 3 cement sand mortar over the prepared base, all complete as per sqm
specification.
Cast in Situ Cement Concrete Kerb , Providing and laying cement concrete
Kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in
M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having
240 50 mm projection beyond Kerb stone, Kerb stone laid with Kerb laying meter
machine, foundation concrete laid manually, all complete as per Drawing and
Technical Specifications.
Cast in Situ Cement Concrete M 20 Kerb with Channel, Providing and laying
cement concrete Kerb with channel with top and bottom width 115 and 165 mm
respectively, 250 mm high in M 20 grade PCC on grade foundation 150 mm
241 thick, Kerb channel 300 mm wide, 50 mm thick in PCC grade, sloped towards meter
the Kerb, Kerb stone with channel laid with Kerb laying machine, foundation
concrete laid manually, all complete as specification.
Brick work for footpath, Providing and laying brick on edge over 60 mm thick
242 sand bed in footpath including excavation sand bedding all complete as per sqm
Drawing and Technical Specifications.
Kilometer Stone, Providing and Fixing Reinforced cement concrete M 15 grade
243 kilometer Post including painting and printing as per Standard Drawing-2070 no
and Technical Specifications. position, One kilometer post (precast)
Non Reflective Traffic Signs, Providing and fixing of Non reflective warning,
mandatory and informatory sign board of 2 mm thick MS Sheet with back
support frame fixed on heavy 50 mm tube or Channel section
244 of 75 mm X 40 mm firmly fixed to the ground by means of properly designed no
foundation with M 10/40 grade cement concrete 300 mm x 300 mm x 300 mm, l
as per drawings and Technical Specification/ DOR Publication.
Painting Two Coats on Concrete Surfaces, Providing and Painting two coats
248 after filling the surface with synthetic enamel paint in all shades on concrete / sqm
plaster surfaces as per Drawing and Technical Specifications.
Painting on Steel Surfaces, Providing and applying two coats of ready mix paint
249 of approved brand on steel surface after through cleaning of surface to give an sqm
even shade as per Drawing and Technical Specifications.
Painting on Wood Surfaces, Providing and applying two coats of ready mix
250 paint of approved brand on wood surface after thorough cleaning of surface to sqm
give an even shade as per Drawing and Technical Specifications.
Painting Lines, Dashes, Arrows etc. on Roads in Two Coats, Providing required
material and Painting lines, dashes, arrows etc. on roads in two coats on new
work with ready mixed road marking paint conforming to NS 408/ IS 164 on
251 bituminous surface, including cleaning the surface of all dirt, dust and other sqm
foreign matter, demarcation at site and traffic control as per Drawing and
Technical Specifications., Over 10 cm in width
Painting Lines, Dashes, Arrows etc. on Roads in Two Coats, Providing required
material and Painting lines, dashes, arrows etc. on roads in two coats on new
work with ready mixed road marking paint conforming to NS 408/ IS 164 on
252 bituminous surface, including cleaning the surface of all dirt, dust and other sqm
foreign matter, demarcation at site and traffic control as per Drawing and
Technical Specifications., Up to 10 cm in width
Painting Lines, Dashes, Arrows etc. on Roads in Two Coats on Old Work,
Providing required materials and Painting lines, dashes, arrows etc. on roads in
two coats on old work with ready mixed road marking paint conforming to NS
253 408/ IS: 164 on bituminous surface, including cleaning the surface of all dirt, sqm
dust and other foreign matter, demarcation at site and traffic control as per
Drawing and Technical Specifications., over 10 cm in width
Painting Lines, Dashes, Arrows etc. on Roads in Two Coats on Old Work,
Providing required materials and Painting lines, dashes, arrows etc. on roads in
two coats on old work with ready mixed road marking paint conforming to NS
254 408/ IS: 164 on bituminous surface, including cleaning the surface of all dirt, sqm
dust and other foreign matter, demarcation at site and traffic control as per
Drawing and Technical Specifications., Up to 10 cm in width
Providing and fixing of road stud 100x 100 mm, die-cast in aluminum, resistant
to corrosive effect of salt and grit, fitted with lenses reflectors, installed in
concrete or asphaltic surface by drilling hole 30 mm upto a depth of 60 mm and
bedded in a suitable bituminous grout or epoxy mortar, all as per Specification
clause 1505., Providing and fixing of road stud 100 x 100 mm, die-cast in
257 aluminum, resistant to corrosive effect of salt and grit, fitted with lenses no
reflectors, installed in concrete or asphaltic surface by drilling hole 30 mm upto
a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all
as per Drawing and Technical Specifications.
Kilometer Stone, Providing and Fixing Reinforced cement concrete M 15 grade
258 kilometer Post including painting and printing as per Standard Drawing-2070 no
and Technical Specifications. position, Five kilometer Post (precast)
Road Delineators Post, Providing and installation of 150 mm * 150 mm 1. 5 m
long delineators (road way indicators, hazard markers, object markers), 80-100
259 cm high above ground level, painted black and white in 20 cm wide strips, no
buried or pressed into the ground and conforming to the drawings and Technical
Specifications.
Metal Beam Crash Barrier, Type - A, "W" : Metal Beam Crash Barrier,
Providing and erecting a "W" metal beam crash barrier comprising of 3 mm
thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on
ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m center to center,
261 meter
1.8 m high, 1.1 m below ground/road level metal beam rail to be fixed on the
vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long
complete as per Drawing and Technical Specifications.
Metal Beam Crash Barrier, Type - B, "THRIE" : Metal Beam Crash Barrier,
Providing and erecting a "Thrie" metal beam crash barrier comprising of 3 mm
thick corrugated sheet metal beam rail, 85 cm above road/ground level, fixed on
ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m center to center,
262 meter
2.1 m high with 1.3 m below ground level, metal beam rail to be fixed on the
vertical post with a space of channel section 150 x 75 x 5 mm, 546 mm long
complete as per Drawing and Technical specifications.
Metal Beam Crash Barrier, Flexible Crash Barrier, Wire Rope Safety Barrier,
Providing and erecting a wire rope safety barrier with vertical posts of medium
weight RS Joist (ISMB series) 100 mm x 75 mm (11.50 kg/m), 1.50 m long
0.85 m above ground and 0.65 m below ground level, split at the bottom for
better grip, embedded in M 15 grade cement concrete 450 x 450 x 450 mm, 1.50
m center to center and with 4 horizontal steel wire rope 40 mm dia and anchored
263 at terminal posts 15 m apart. Terminal post to be embedded in M 15 grade meter
cement concrete foundation 2400 x 450 x 900 mm (depth), strengthened by a
strut of RS joist 100 x 75 mm, 2 m long at 450 inclination and a tie 100 x 8 mm,
1.50 m long at the bottom, all embedded in foundation concrete as per design ,
Drawing and Technical Specifications.
Street Lighting, Providing and erecting street light mounted on a steel circular
hollow pole of standard specifications for street lighting, 9 m high spaced 40 m
267 apart, 1.8 m overhang on both sides if fixed in the median and on one side if no
fixed on the footpath, fitted with sodium vapor lamp and fixed firmly in
concrete foundation as per design , Drawing and Technical Specifications..
Rumble Strips, Providing and making of Rumble strips with premix bituminous
carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at
approved locations to control speed, marked with white strips of road marking
paint., Provision of 15 Nos rumble strips covered with premix bituminous
268 sqm
carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at
approved locations to control speed, marked with white strips of road marking
paint.
Lettering new Letter and Figures of any Shade, Providing and lettering new
269 letter and figures of any shade with synthetic enamel paint black or any other cm-letter
approved color to give an even shade, Nepali
Lettering new Letter and Figures of any Shade, Providing and lettering new
270 letter and figures of any shade with synthetic enamel paint black or any other cm-letter
approved color to give an even shade, English and Roman
Providing, Boring and installing bored cast-in-situ RCC Pile excluding
Reinforcement and Concrete in all types of soil including Bentonite and other
271 consumable and removal of excavated earth with necessary lifts and lead all meter
complete as per Drawing and Technical Specifications., Pile diameter-750 mm
Providing, driving and installing precast RCC. pile of specified size and quality
281 complete as per drawing and & Technical Specification, Pile diameter -300 mm Running meter
Providing, driving and installing precast RCC. pile of specified size and quality
282 complete as per drawing and & Technical Specification, Pile diameter -500 mm Running meter
Providing, driving and installing precast RCC. pile of specified size and quality
283 complete as per drawing and & Technical Specification, Pile diameter - 600 mm Running meter
, or providing steel helmet on top of pile head during driving, stacking of piles
284 at site
Driving Vertical Steel Piles / Sheet piles excluding cost of steel complete as per
285 Drawing and & Technical Specification tonne
Providing and laying Plain/Reinforced Cement Concrete excluding
286 reinforcement in Well Foundation all complete as per Drawing and Technical cum
Specifications., Top plug, Grade M 15 PCC
Providing and laying Plain/Reinforced Cement Concrete excluding
287 reinforcement in Well Foundation all complete as per Drawing and Technical cum
Specifications., Intermediate plug, Grade M 25 PCC
Providing and Constructing of temporary Island for well sinking as per Drawing
and instruction of the Engineer., Assuming depth of water 1.0 m and height of
288 island to be 1.25 m. and island 16 m diameter for Construction of Well no
Foundation for 8 m dia. Well.
Providing and laying Plain/Reinforced Cement Concrete excluding
289 reinforcement in Well Foundation all complete as per Drawing and Technical cum
Specifications., Intermediate plug, Grade M 20 PCC
Providing and laying Plain/Reinforced Cement Concrete excluding
290 reinforcement in Well Foundation all complete as per Drawing and Technical cum
Specifications., Well cap, RCC Grade M 20
Providing and constructing one span service road to reach island location from
one pier location to another pier location as per Drawing and instruction of the
291 Engineer., Assuming span length 30 m, width of service road 10 m and depth of meter
water 1 m
Providing and Laying Cutting Edge of Mild Steel for Well Foundation
292 complete as per Drawing and Technical Specification. tonne
Providing and laying Plain/Reinforced Cement Concrete excluding
293 reinforcement in Well Foundation all complete as per Drawing and Technical cum
Specifications., Well curb, RCC M 20 Grade
Providing and laying Plain/Reinforced Cement Concrete excluding
294 reinforcement in Well Foundation all complete as per Drawing and Technical cum
Specifications., Well curb, RCC M 25 Grade
Providing and laying Plain/Reinforced Cement Concrete excluding
295 reinforcement in Well Foundation all complete as per Drawing and Technical cum
Specifications., Well curb, RCC M 30 Grade
Providing and laying Plain/Reinforced Cement Concrete excluding
296 reinforcement in Well Foundation all complete as per Drawing and Technical cum
Specifications., Well Steining, PCC M 20 Grade
Providing and laying Plain/Reinforced Cement Concrete excluding
297 reinforcement in Well Foundation all complete as per Drawing and Technical cum
Specifications., Well Steining, RCC M 20 Grade
Providing and laying Plain/Reinforced Cement Concrete excluding
298 reinforcement in Well Foundation all complete as per Drawing and Technical cum
Specifications., Well Steining, RCC M 25 Grade
Providing and laying Plain/Reinforced Cement Concrete excluding
299 reinforcement in Well Foundation all complete as per Drawing and Technical cum
Specifications., Well Steining, RCC M 30 Grade
Providing and laying Plain/Reinforced Cement Concrete excluding
reinforcement in Well Foundation all complete as per Drawing and Technical
300 Specifications., Bottom Plug (Concrete to be placed using tremie pipe), PCC cum
Grade M 20
Providing and laying Plain/Reinforced Cement Concrete excluding
reinforcement in Well Foundation all complete as per Drawing and Technical
301 Specifications., Bottom Plug (Concrete to be placed using tremie pipe), PCC cum
Grade M 20, Where underwater concreting in involved
Providing and laying Plain/Reinforced Cement Concrete excluding
reinforcement in Well Foundation all complete as per Drawing and Technical
302 Specifications., Bottom Plug (Concrete to be placed using tremie pipe), PCC cum
Grade M 25, Where underwater concreting in involved
Providing and laying Plain/Reinforced Cement Concrete excluding
reinforcement in Well Foundation all complete as per Drawing and Technical
303 Specifications., Bottom Plug (Concrete to be placed using tremie pipe), PCC cum
Grade M 25
Providing and laying Plain/Reinforced Cement Concrete excluding
304 reinforcement in Well Foundation all complete as per Drawing and Technical cum
Specifications., Well cap, RCC Grade M 25
Providing and laying Plain/Reinforced Cement Concrete excluding
305 reinforcement in Well Foundation all complete as per Drawing and Technical cum
Specifications., Well cap, RCC Grade M 30
Providing and laying Plain/Reinforced Cement Concrete excluding
306 reinforcement in Well Foundation all complete as per Drawing and Technical cum
Specifications., Well cap, RCC Grade M 35
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
307 per Drawing and Technical specifications., Diameter of well - 6 m., Sandy Soil, meter
Depth below bed level upto 3.0 M
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
308 per Drawing and Technical specifications., Diameter of well - 6 m., Sandy Soil, meter
Beyond 3 m upto 10 m depth
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
309 per Drawing and Technical specifications., Diameter of well - 6 m., Sandy Soil, meter
Beyond 10 m upto 20 m
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
310 per Drawing and Technical specifications., Diameter of well - 6 m., Sandy Soil, meter
Beyond 20 m upto 30 m
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
311 per Drawing and Technical specifications., Diameter of well - 6 m., Sandy Soil, meter
Beyond 20 m upto 30 m
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
312 per Drawing and Technical specifications., Diameter of well - 6 m., Clayey Soil, meter
Depth below bed level upto 3.0 m
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
313 per Drawing and Technical specifications., Diameter of well - 6 m., Clayey Soil, meter
Beyond 3 m upto 10 m depth
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
314 per Drawing and Technical specifications., Diameter of well - 6 m., Clayey Soil, meter
Beyond 10 m upto 20 m
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
315 per Drawing and Technical specifications., Diameter of well - 6 m., Clayey Soil, meter
Beyond 10 m upto 20 m
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
316 per Drawing and Technical specifications., Diameter of well - 6 m., Clayey Soil, meter
Beyond 20 m upto 30 m
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
317 per Drawing and Technical specifications., Diameter of well - 6 m., Clayey Soil, meter
Beyond 20 m upto 30 m
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
318 per Drawing and Technical specifications., Diameter of well - 6 m., Clayey Soil, meter
Beyond 20 m upto 30 m
Providing accessories and Sinking of 6 m external diameter well (other than
319 pneumatic method of sinking) through all types soil/rock of strata complete as meter
per Drawing and Technical specifications., Diameter of well - 6 m., Soft Rock
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
320 per Drawing and Technical specifications., Diameter of well - 6 m., Hard Rock meter
Buried Joint, Providing and laying a buried expansion joint, expansion gap
being 20 mm, covered with 12 mm thick, 200 mm wide galvanized wieldable
structural steel plate as per IS: 2062, placed symmetrical to center line of the
481 joint, resting freely over the top surface of the deck concrete, welding of 8 mm meter
dia. 100 mm long galvanized nails spaced 300 mm c/c along the center line of
the plate as per Drawing and Specifications.
Strip Seal Expansion Joint, Providing and laying of a strip seal expansion joint
484 catering to maximum horizontal movement upto 70 mm, complete as per meter
approved Drawings and Technical specifications.
Modular Strip / Box Seal Joint, Providing and laying of a modular strip Box seal
expansion joint including anchorage catering to a horizontal movement beyond
485 70 mm and upto 140 mm, complete as per Drawings and Technical
Specifications .
Modular Strip / Box Seal Joint, Providing and laying of a modular strip box seal
486 expansion joint catering to a horizontal movement beyond 140 mm and upto meter
210 mm, complete as per Drawings and Technical specifications.
Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal
487 mix) in Foundation complete as per Drawing and Technical Specifications. cum
Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal
488 mix) in Foundation complete as per Drawing and Technical Specifications., cum
Manual Mixing
Providing and laying of Plain/Reinforced Cement Concrete in Foundation
489 complete as per Drawing and Technical Specifications, PCC Grade M 15 cum
Providing and laying of Plain/Reinforced Cement Concrete in Foundation
490 complete as per Drawing and Technical Specifications, PCC Grade M 15, cum
Manual Mixing
Providing and laying of Plain/Reinforced Cement Concrete in Foundation
491 complete as per Drawing and Technical Specifications, PCC Grade M 20 cum
Providing and laying of Plain/Reinforced Cement Concrete in Foundation
492 complete as per Drawing and Technical Specifications., RCC Grade M 20 cum
Providing and laying of Plain/Reinforced Cement Concrete in Foundation
493 complete as per Drawing and Technical Specifications., PCC Grade M 25 cum
Providing and laying of Plain/Reinforced Cement Concrete in Foundation
494 complete as per Drawing and Technical Specifications., RCC Grade M 25 cum
Providing and laying of Plain/Reinforced Cement Concrete in Foundation
495 complete as per Drawing and Technical Specifications., PCC Grade M 30 cum
Providing and laying of Plain/Reinforced Cement Concrete in Foundation
496 complete as per Drawing and Technical Specifications., RCC Grade M30 cum
Providing and laying of Plain/Reinforced Cement Concrete in Foundation
497 complete as per Drawing and Technical Specifications., RCC Grade M 35 cum
Providing and laying , fitting and placing un-coated Mild steel / HYSD
498 reinforcement complete in foundation as per drawing and technical specification tonne
638 sqm
, Zinc + PVC coated Hexagonal mesh type 100 mm x 120 mm, mesh wire
2.7 mm/3.7 mm, selvage wire 3.4 mm/4.4 mm, lacing wire 2.2 mm/3.2 mm with
Pac coating thickness nominal 0.5 mm ( minimum 0.38 mm)
Providing mechanically woven double twisted crates / mattress including
rolling, cutting and with lacing wire and binding wire as per specification.
639 sqm
, Zinc + PVC coated Hexagonal mesh type 80 mm x 100 mm, mesh wire 2.2
mm/3.2 mm, selvage wire 2.7 mm/3.7 mm, lacing wire 2.2 mm/3.2 mm with
Pac coating thickness nominal 0.5 mm ( minimum 0.38 mm)
Assembling mechanical woven Gabion boxes /mattresses, placing in position
including stretching; forming compartments; tying the sides and diaphragms
640 with binding wire in each mesh; tying with bracing wires and tie wires; and sqm
tying down the lid complete as per specification (stone filling not included
Providing and filling stone/boulder in gabion boxes/mattress etc.. Including
641 dressing, bedding, bonding all complete as per Drawing and Technical cum
Specifications.
Laying and fixing of Geo-Textile all complete as per specification., Providing
642 and laying of a geotextile filter between pitching and embankment slopes as per sqm
Drawing and Technical Specifications.
Laying and fixing of Geo-Textile all complete as per specification., Providing
643 and laying and fixing of Geo-membrane all complete as per specification. sqm
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Spraying of humus on the on the
644 top of gravel (on the top surface of 3-D profile) using humus spraying machine, sqm
In shallow slopes (< 45 degrees slope angle)
GEOSYNTHETIC AND REINFORCED EARTH, Sub-Surface Drain with
Geotextiles, Providing and laying sub surface drain 200 mm dia using
geotextiles treated with carbon black to a stable network and a planar geo-
645 composite structure, joints wrapped with geotextile to prevent ingress of soil, meter
including excavation and backfilling as per Drawing and Technical
Specifications.
Narrow Filter Sub-Surface Drain, Providing and making narrow filter sub-
surface drain consisting of porous or perforated pipe laid in narrow trench
646 surrounded by a geotextile filter fabric, with a minimum of 450 mm overlap of meter
fabric and installed including excavation and backfilling
Laying Paving Fabric Beneath a Pavement Overlay, Providing and laying
paving fabric over a tack coat of paving grade Bitumen, laid at the rate of 1 kg
647 per sqm over thoroughly cleaned and repaired surface to provide a water sqm
resistant membrane and crack retarding layer as per Drawing and Technical
Specifications.
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Providing and filling the installed
653 3-D galvanized steel profile with angular material of size 32-63 mm using sqm
equipment such as excavator, dredger crane or loader, In shallow slopes (< 45
degrees slope angle)
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Providing and filling the installed
654 3-D galvanized steel profile with angular material of size 32-63 mm using sqm
equipment such as excavator, dredger crane or loader, In slopes (>45 degrees
slope angle)
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Filling the installed 3-D galvanized
655 steel profile with gravel size 32-63 mm, manually, In shallow slopes (< 45 sqm
degrees slope angle)
Providing and laying Plum concrete ( Boulder mixed concrete) as per Drawing
656 and Specifications, 70% M 15 concrete and 30% boulders/stones, Using cum
Mechanical Aids
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Spraying of humus on the on the
657 top of gravel (on the top surface of 3-D profile) using humus spraying machine, sqm
In slopes (>45 degrees slope angle)
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Spraying of humus on the on the
658 top of gravel (on the top surface of 3-D profile) manually, In shallow slopes (< sqm
45 degrees slope angle)
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Spraying of humus on the on the
659 top of gravel (on the top surface of 3-D profile) manually, In slopes (>45 sqm
degrees slope angle)
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Providing and driving the equal
angle T-section galvanized steel nails with curved head (16 mm dia steel hook)
and tapered at tail (size between T-25 x 25 x 3 mm to T-40 X 40 X 5 mm,
(equivalent to Indian Steel ISA 2525, 3030,3535 or 4040) by using handheld or
pneumatic hammer (nail length between 0.6 m -3.5 m), first drilling a hole of
660 diameter 28-43 mm (size of T-section+ 3 mm) and filling with cement mortar meter
and then driving the nails to fix the semi-flexible 3-D galvanized steel panel on
the slopes or embankments, max spacing of nails is 1.5 m., Driving T-nails in
soft soil using small dia. pre-bored holes without using cement mortar, For flat
surface and shallow slopes < 45°
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
661 mat for slope protection and erosion control, In slopes (>45 degrees slope meter
angle)
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Providing and driving of 28 mm
662 dia GEWI (Threaded) steel nails by drilling holes of 90 mm dia using cement meter
grouting for fixing of semi-flexible 3-D steel mats upto a length of 4 to 8 m on
slopes, On soft soils
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Providing and driving of 28 mm
663 dia GEWI (Threaded) steel nails by drilling holes of 90 mm dia using cement meter
grouting for fixing of semi-flexible 3-D steel mats upto a length of 4 to 8 m on
slopes, On rocky soils (4-8 m)
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Providing and driving of 28 mm
664 dia GEWI (Threaded) steel nails by drilling holes of 90 mm dia using cement meter
grouting for fixing of semi-flexible 3-D steel mats upto a length >8 m on slopes,
On soft soils
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Providing and driving of 28 mm
665 dia GEWI (Threaded) steel nails by drilling holes of 90 mm dia using cement meter
grouting for fixing of semi-flexible 3-D steel mats upto a length >8 m on slopes,
On rocky soils
Providing and laying boulders apron on river bed for protection against scour
666 with Boulder / Stones weighing not less than 40 kg each complete as per cum
drawing and Technical specification., Manual Means
Providing and laying boulders apron on river bed for protection against scour
667 with Boulder / Stones weighing not less than 40 kg each complete as per cum
drawing and Technical specification., Mechanical means
Providing and laying boulders apron on river bed for protection against scour
668 with Boulder / Stones weighing not less than 40 kg each complete as per cum
drawing and Technical specification., Mechanical means for Bigger boulder
Providing and laying of apron with cement concrete blocks of size 0.5 x 0.5 x
669 0.5 m cast in-situ and made with nominal mix of M-15 grade cement concrete cum
with a minimum cement content of 250 kg/cum ., Manual means
Providing and laying of apron with cement concrete blocks of size 0.5 x 0.5 x
670 0.5 m cast in-situ and made with nominal mix of M-15 grade cement concrete cum
with a minimum cement content of 250 kg/cum ., Mechanical means
Providing and laying Pitching on slopes laid over prepared filter media
671 including boulder apron laid dry in front of toe of embankment complete as per cum
drawing and Technical specifications, Stone/Boulder
Providing and laying Pitching on slopes laid over prepared filter media
including boulder apron laid dry in front of toe of embankment complete as per
672 drawing and Technical specifications, Cement Concrete Blocks of size 0.3 x 0.3 cum
x 0.3 m cast in cement concrete of Grade M 15, Manual Means
Providing and laying Filter material underneath pitching in slopes complete as
673 per drawing and Technical specification cum
Providing and laying Grouted Stone Pitching in protection work, with stone size
674 not less than 0.01 cum and cement: sand mortar (1:3) all complete as per cum
Drawing and Technical Specifications.
Providing and laying 20 mm dia tor steel dowel bar including drilling 35 mm
dia bore hole in rock necessary bending, hooking tying reinforcement in
675 position and grouting etc. complete as per Drawing and Technical meter
specifications., Without using Mechanical aid
Providing and laying 20 mm dia tor steel dowel bar including drilling 35 mm
dia bore hole in rock necessary bending, hooking tying reinforcement in
676 position and grouting etc. complete as per Drawing and Technical meter
specifications., Using Mechanical Aid
Providing and fixing of 25 mm – dia steel rock bolts with mechanical/ wedge
type anchorage including drilling 35 mm dia hole providing 150 mm long 20
677 mm thick steel tapered wedge 10 mm thick 200 mm X 200 mm plate washer meter
and nuts, tighten bolt by torque wrench all complete
Providing and laying HDPE pipes with perforations including joining, series II,
678 HDPE pipe 250 mm dia meter
Providing and laying HDPE pipes with perforations including joining, series II,
679 HDPE pipe 160 mm dia meter
Providing and laying Plum concrete ( Boulder mixed concrete) as per Drawing
680 and Specifications, 60% M 15 concrete and 40% boulders/stones, using cum
Mechanical Aids
Providing and laying Plum concrete ( Boulder mixed concrete) as per Drawing
681 and Specifications, 60% M 15 concrete and 40% boulders/stones, Manual cum
means
Sub-Surface Drains with Perforated Pipe, Providing and laying subsurface drain
with perforated pipe of 100 mm internal diameter of metal/ asbestos cement/
cement concrete/PVC, closely jointed, perforations ranging from 3 mm to 6 mm
682 depending upon size of material surrounding the pipe, with 150 mm bedding meter
below the pipe and 300 mm cushion above the pipe,. as per Drawing and
Specifications.
Providing and inserting nipples with approved fixing compound after drilling
holes for grouting as per Technical Specifications including subsequent
741 cutting/removal and sealing of the hole as necessary of nipples after completion
of grouting with Cement/Epoxy
Providing and Sealing of cracks/porous concrete by injection process through
742 nipples/Grouting complete as per Technical Specification., Cement Grout kg
Providing and Sealing of cracks/porous concrete by injection process through
743 nipples/Grouting complete as per Technical Specification., Cement Mortar (1:1) kg
Grouting
Providing and Sealing of cracks/porous concrete by injection process through
744 nipples/Grouting complete as per Technical Specification., Low viscosity epoxy liter
injection resin
Providing and replacement of Crash Barrier as per Drawing, Technical
745 Specifications and instruction of the Engineer. meter
Patching of damaged concrete surface with polymer concrete/ micro concrete
and curing compounds, Providing and applying polymer concrete and curing
746 compounds on damaged concrete surface as per instructions of manufacturer sqm
and approval of the Engineer.
Patching of damaged concrete surface with polymer concrete/ micro concrete
and curing compounds, Providing and applying Micro concreting on damaged
concrete (slab/beam/abutment section of the bridges )with ready to use high
747 early high strength , free flow , non shrink self compacting Micro concrete ( M cum
60 & above)With adding 20% local aggregates of 10 mm down) as per
instructions of manufacturer and approval of the Engineer.
Providing and applying Epoxy adhesive and Sealing of crack / porous concrete
749 with Epoxy Grout by injection with nipples complete as per direction of the kg
Engineer.
Providing and Applying epoxy mortar over leached, honey combed and spalled
750 concrete surface and exposed steel reinforcement complete as per Technical sqm
Specification
Providing and applying the Shotcreate mixture mechanically with compressed
751 air under pressure, sprayable less rebound ( rebou and quick setting comnd 25 sqm
%) as per Technical specifications and direction of the Engineer.
Providing and applying pre-packed cement based polymer mortar for
752 replacement of spalled concrete sqm
Providing and applying Epoxy bonding of new concrete to old concrete as per
753 technical Specifications and direction of the Engineer. sqm
Providing and replacement of Bearings complete as per Technical Specification
754 and direction of the Engineer. nos
Providing required parts and rectification of Bearings as per Technical
755 Specifications and direction of the Engineer. nos
Providing and replacement of Expansion Joints complete as per drawings,
756 Technical specifications and direction of the Engineer. meter
Providing and replacement of Damaged Concrete Railing as per Drawing,
757 Technical Specifications and direction of the Engineer,. meter
Providing and replacement of Damaged mild steel railing as per Drawing,
758 Technical Specifications and direction of the Engineer. meter
Repair of Crash Barrier, Providing and repair of concrete crash barrier with
cement concrete M-30 grade by cutting and trimming the damaged portion to a
759 regular shape, cleaning the area to be repaired thoroughly, applying cement meter
concert after erection of proper form work.
Providing and repair of RCC railing to bring it to the original shape as per
760 Drawing, Technical Specifications and instruction of the Engineer., Repair of meter
RCC Railing
Repair of Steel Railing, Providing and repair of steel railing to bring it to the
761 original shape as per Drawing, Technical Specifications and direction of the meter
Engineer.
Painting of Steel Bridge, Providing and painting steel bridge including removal
762 of old paints by sand blasting cleaning and repairing of metal surfaces for the sqm
application of new paints as per specification and direction of the Engineer.
Providing and Painting of steel bridges with one coat of primer, one coat of
763 epoxy and 2 coats of acrylic polyurethane as per specification. sqm
Providing and painting of steel bridges with one coat of primer, one coat of
764 epoxy and 2 coats of acrylic polyurethane, without sprayer machine as per sqm
specification
Repair of Joint Grooves with Epoxy Mortar, Providing and repair of spalled
joint grooves of contraction joints, longitudinal joints and expansion joints in
765 concrete pavements using epoxy mortar or epoxy concrete as per Technical meter
Specifications and direction of the Engineer.
Repair of old Joints Sealant, Providing and repair of old joints including
removal of existing sealant and re sealing of contraction, longitudinal or
766 expansion joints in concrete pavement with fresh sealant material as per meter
Drawing and Technical Specifications.
Concrete Jacketing, Preparation, hacking and cleaning of existing surface for
767 concrete jacketing as per direction of the Engineer. sqm
Concrete Jacketing, Drilling Holes on existing concrete surface of 16 mm
768 diameter and 300 mm depth nos
769 Concrete Jacketing, Providing and fixing Anchor bar kg
770 Concrete Jacketing, Providing and Filling drill hole with Epoxy Grout
Concrete Jacketing, Providing and applying Micro silica/ silica fume concreting
for concrete jacketing works ( slab /beam/ abutment section of the bridges ) as
771 per instructions of manufacturer and as approved by the Engineer. cum
Planting grass on site, Planting rooted grass slips on the slopes <45o including
preparation of slips on site. a max of 5 cm depth with metal rod or Operation
818 includes digging planting hole to hard-wood peg, depending on the nature of the sqm
soil. The planting drills should be space
Planting grass on site, Planting rooted grass slips on the slopes 45o - 60o
including preparation of slips on site. a max of 5 cm depth with metal rod or
819 Operation includes digging planting hole to hard-wood peg, depending on the sqm
nature of the soil. The planting drills should be space
Planting grass on site, Planting rooted grass slips on the slopes > 60o including
preparation of slips on site. a max of 5 cm depth with metal rod or Operation
820 includes digging planting hole to hard-wood peg, depending on the nature of the sqm
soil. The planting drills should be space
Planting shrub and tree seedling and cutting on site, Planting containerized tree
and shrub seedlings, including pitting, transplanting, composting and placing
821 tree guards, on toe of embankment slopes in plain areas, not less than 8 m from nos
the road center line. Pit size 30 cm diameter x depth. Compost volume 1/4 of
the volume of the pit, mixed with original soil.
Planting shrub and tree seedling and cutting on site, Planting containerized tree
and shrub seedlings, including pitting, transplanting, composting and mulching,
822 on slopes < 30o . Pit size 30 cm diameter x depth mix Compost with soil nos
and back fill into pit to 1/4 of the pit volume
Planting shrub and tree seedling and cutting on site, Planting containerized tree
and shrub seedlings, including pitting, transplanting, composting and mulching,
823 on slopes 30o . - 400 Pit size 30 cm diameter x depth mix Compost with nos
soil and back fill into pit to 1/4 of the pit volume
Planting shrub and tree seedling and cutting on site, Planting rooted tree stump
cutting and bare root seedlings, including pitting, transplanting, composting and
824 mulching on slopes <300. Pit size 10 cm diameter x depth. Compost volume nos
1/4 of volume of the pit mix with original soil.
Planting shrub and tree seedling and cutting on site, Planting rooted tree stump
cutting and bare root seedlings, including pitting, transplanting, composting and
825 mulching on slopes <300 - 45o Pit size 10 cm diameter x depth. Compost nos
volume 1/4 of volume of the pit mix with original soil.
Planting shrub and tree seedling and cutting on site, Planting rooted tree stump
cutting and bare root seedlings, including pitting, transplanting, composting and
826 mulching on slopes > 45o Pit size 10 cm diameter x depth. Compost volume nos
1/4 of volume of the pit mix with original soil.
Vegetative palisade construction, brush layering and fascines, Collection of
hardwood for cuttings for planting Material (e.g. assuro, namdi phul,
827 simali)from the sources within of the road. Material to be approx. 1 km in nos
length and minimum 5 cm in diameter.
Vegetative palisade construction, brush layering and fascines, Preparation and
planting of live pegs selected species(e.g. assuro, namdi phul, simali)of
828 minimum length to 0.5 m depth into hard ground. Pegs spaced at centers meter
within rows, and interwoven with vegetation.
Vegetative palisade construction, brush layering and fascines, Preparation and
planting of live pegs selected species(e.g. assuro, namdi phul, simali)of
829 minimum length to 0.5 m depth into soft debris. Pegs spaced at 5- centers meter
within rows, and interwoven with vegetation.
Vegetative palisade construction, brush layering and fascines, Site preparation
830 for fascine laying: earth works in excavation of trench to 20 cm depth meter
Vegetative palisade construction, brush layering and fascines, Laying of live
fascines, using live hardwood cuttings of selected species(e.g. assuro, namdi
831 phul, simali) of minimum length placed in bundles to give 4 running meters of meter
cutting per meter of fascine, including backfilling of trench and careful
compaction.
Jute netting works, Standard jute netting for bare slopes and under planting with
slips. Spinning raw jute from 100% jute fiber into yarn and weaving the yarn
into netting. Hand spun yarn 5 to 8 mm in diameter, width of net 1.20 meters
832 warp strands 27 no per , mesh size 30-40 mm sq. and 1.25 kg/m weight at 1.20 sqm
m width.[Note A Toro is the weaving shuttle, bamboo culm.]normally made
from a split large
Jute netting works, Wide mesh jute netting for holding mulch on slopes.
Spinning raw jute from 100% jute fiber into yarn and weaving the yarn into
netting. Hand spun yarn 3 to 5 mm in diameter 1.20 m side and 11.2 m long.
833 Mesh size 150 mm x 500 mm rectangular mesh and 0.25 kg/m at 1.20 m width. sqm
[Note A torso is the weaving shuttle, normally made from a split large bamboo
culm.]
Jute netting works, Placing 30-40 mm square mesh jute netting on bare slopes
(for later under planting with grass slips), including pegging with live
834 hardwood cutting or split bamboo pegs and loosening tension so that the net sqm
hugs the slope throughout.
Jute netting works, Placing 150 x 500 mm mesh jute netting to hold mulch on
slopes, including application of mulch and pegging with live hardwood cutting
835 or split bamboo pegs and loosening tension so that the net hugs the slope sqm
throughout.
Gabion bolster cylinders, Providing and laying 60 cm dia gabion bolsters
panels: 70 x 100 mm hexagonal mesh wire (10 swg frame and 12 Swg mesh)
836 including Earthwork excavation filling with boulder, back filling all complete meter
as per Drawing and Technical Specifications.
Gabion bolster cylinders, Providing and laying 30 cm dia gabion bolsters
panels: 70 x 100mm hexagonal mesh wire (10 swg frame and 12 Swg mesh)
837 including Earthwork excavation filling with boulder, back filling all complete meter
as per Drawing and Technical Specifications.
Gabion bolster cylinders, Anchoring bolster: 12 mm dia MS re-bar cut into 2 m
838 lengths for anchorage and placed at intervals meter
839 Gabion bolster cylinders, Providing and laying of terram paper (geotextile) meter
Bamboo tree guards, Providing and weaving bamboo tree guards using bamboo
poles as uprights: 1.60 m in height ; and weaving split bamboo with the outer
840 wall intact around the posts. Dimension of the guard are 0.60 m diameter x 1.30 meter
high.
Turfing, Grass sodding works including sod cutting , transporting , placing in
841 position and water sprinkling (Lead upto 10 m). sqm
842 Turfing, Providing and Spreading manure on the grass turf. sqm
Turfing, Turfing with Sods, Providing, furnishing and laying of the live sods of
perennial turf forming grass on embankment slope, verges or other locations
843 shown on the drawing or as directed by the engineer including preparation of sqm
ground, fetching of sods and watering.
Turfing, Seeding and Mulching, Providing required material, Preparation of
seed bed on previously laid top soil, furnishing and placing of seeds, fertilizer,
844 mulching material, applying bituminous emulsion at the rate of 0.23 liters per sqm
sqm and laying and fixing jute netting, including watering for 3 months all as
per specification
Spreading of Sludge Farm Yard Manure or/and good Earth, Providing and
845 Spreading of sludge farm yard manure or/ and good earth in required thickness cum
(cost of sludge, farm yard manure or/and good earth to be paid for separately)
Grassing with ' Doobs' Grass, Providing and grassing with 'Doobs' grass
including watering and maintenance of the lawn for 30 days or more till the
846 grass forms a thick lawn free from weeds and fit for moving including sqm
supplying good earth if needed, In rows 15 cm apart in either direction
847 Grassing with ' Doobs' Grass, In rows 7.5 cm apart in either direction sqm
Making Lawns including Ploughing and Dragging, Providing and making lawns
including ploughing and breaking of clod, removal of rubbish, dressing and
848 supplying Doobs grass roots and planting at 15 cm apart, including supplying sqm
and spreading of farm yard manure at rate of 0.18 cum per 100 sqm
Maintenance of Lawns or Turfing of Slopes, Regular Maintenance of lawns or
849 Turfing of slopes (rough grassing) for a period of one year including sqm
watering etc.
Turfing Lawns with Fine Grassing including Ploughing, Dressing, Providing
and Turfing lawns with fine grassing including ploughing, dressing including
850 breaking of clods, removal of rubbish, dressing and supplying Doobs grass roots sqm
at 10 cm apart, including supplying and spreading of farm yard manure at rate
of 0.6 cum per 100 sqm
Maintenance of Lawns with Fine Grassing for the First Year, Regular
851 Maintenance of lawns with fine grassing for the first year including watering sqm
etc.
Planting and Maintaining of Permanent Hedges, Providing and Planting
permanent hedges including digging of trenches, 60 cm wide and 45 cm deep,
852 refilling the excavated earth mixed with farmyard manure, supplied at the rate meter
of 4.65 cum per 100 metres and supplying and planting hedge plants at 30 cm
apart
Renovation Lawns including, Weeding, Forking the Ground, Top Dressing with
Forked Soil, Renovation lawns including, weeding, forking the ground, top
dressing with forked soil, watering and maintenance the lawns, for 30 days or
857 more, till the grass forms a thick lawn, free from weeds, and fit for moving and sqm
disposal of rubbish as directed, including supplying good earth, if needed but
excluding the cost of well decayed farm yard manure
Half Brick Circular Tree Guard, in 2nd Class Brick, internal diametre 1.25
metres, and height 1.2 metres, above ground and 0.20 metre below ground,
Providing and laying half brick circular tree guard, in 2nd class brick, internal
diametre 1.25 metres, and height 1.2 metres, above ground and 0.20 metre
858 nos
below ground, bottom two courses laid dry, and top three courses in cement
mortar 1:6 (1 cement 6 sand) and the intermediate courses being in dry honey
comb masonry, as per design complete
Edging with 2nd Class Bricks, Laid Dry Lengthwise, Providing and edging with
2nd class bricks, laid dry lengthwise, including excavation, refilling,
859 consolidation, with a hand packing and spreading nearly surplus earth within a meter
lead of 50 metres
Making Tree Guard 53 cm dia and 1.3 meter height as per Design from empty
bitumen drums, Providing and making tree guard 53 cm dia and 1.3 m high as
860 per design from empty bitumen drum, slit suitably to permit sun and air, nos
(supplied by the department at stock issue rate) including providing and fixing 2
nos MS sheet rings 50 x 0.5 mm with rivets, complete in all respect
Making Tree Guard 53 cm dia and 2 meter height as per Design from empty
bitumen drums, Providing and making tree guard 53 cm dia and 2 metres high
as per design from empty bitumen drums, slit suitably to permit sun and air,
( supplied by the department at stock issue rate) including providing and
861 nos
fixing four legs 40 cm long of 30 x 3 mm MS riveted to tree guard and
providing and fixing 2 nos MS sheet rings 50 x 0.5 mm with rivets complete in
all respects
Wrought Iron and Mild Steel Welded Work, Providing Wrought iron and mild
steel welded work (using angles, square bars, tees and channel grills, grating
frames, gates and tree guards of any size and design etc. including cost of
862 screens and welding rods or bolts and nuts complete fixed in position but kg
without the cost of excavation and concrete for fixing which will be paid
separately
Tree Guard with MS Iron, Providing and fixing MS iron tree guard 60 cm dia
and 2 meter high above ground level formed of 4 Nos (25 x 6 mm) and 8 Nos
(25 x 3 mm) vertical MS riveted to 3 Nos (25 x 6 mm) iron rings in two halves,
863 bolted together with 8 mm dia and 30 mm long bolts including painting two nos
coats with paint of approved brand over a coat of priming, complete in all
respects.
Tree Guard with MS Angle Iron and Steel Wire, Providing and fixing tree guard
0.60 meter square, 2.00 meter high fabricated with MS angle iron 30 x 30 x 3
864 mm, MS iron 25 x 3 mm and steel wire 3 mm dia welded and fabricated as per nos
design in two halves bolted together
Compensatory Afforestation, Planting trees as compensatory afforestation at the
rate of 290 trees per hectare at a spacing of 6 m by grubbing and leveling the
865 ground upto a depth of 150 mm, digging holes 0.9 m dia, 1 m deep, mixing farm sqm
yard/sludge manure with soil, planting of sapling 2 m high with 25 cm dia stem,
backfilling the hole and watering
Fog Spray, Providing and applying low viscosity bitumen emulsion for sealing
866 cracks less than 3 mm wide or incipient fretting or disintegration in an existing sqm
bituminous surfacing.
Fog Spray, Providing and applying low viscosity bitumen emulsion for sealing
cracks less than 3 mm wide or incipient fretting or disintegration in an existing
867 bituminous surfacing., In case it is decided by the engineer to blind the fog sqm
spray.
Hill Side Drain Clearance, Removal of earth from the choked hill side drain and
868 disposing it on the valley side manually meter
Maintenance,Carryout Routine ( regular maintenance) of Black top/ Gravel
869 road in plain area ( Terai) as per Technical Specifications and direction of the Km - day
Engineer,
Maintenance, Carryout Routine ( regular maintenance) of Black top/ Gravel
870 road in Hilly area as per Technical Specifications and direction of the Engineer, Km - day
Maintenance of Earthen Shoulder (filling with fresh soil), Providing and making
up loss of Material/ irregularities on shoulder to the design level by adding fresh
875 approved soil and compacting as per Technical Specification and direction of
the Engineer.
Maintenance of Earth Shoulder (stripping excess soil), Stripping excess soil
876 from the shoulder surface to achieve the approved level and compacting as per sqm
Technical Specifications and direction of the Engineer.
Providing, laying and restoration of rain cuts with gravel or river bed
Material , benching for 300 mm width, laying fresh Material in layers not
877 exceeding 250 mm and compacting to restore the original alignment, levels and cum
slopes as per Technical specifications and direction of the Engineer., Mechanical
Means including conveyance of river bed gravel with lead
Crack Filling, Providing and filling of crack using slow - curing bitumen
883 emulsion and applying crusher dust in case crack are wider than 3 mm as per meter
Technical Specifications and instruction of the Engineer
Dusting, Providing and applying crusher dust to areas of road where bleeding
884 of excess bitumen has occurred as per Technical Specifications and direction of sqm
the Engineer.
Slurry Seal, Providing and laying slurry seal consisting of a mixture of fine
aggregates, Portland cement filler, bituminous emulsion and water on a road
885 surface including cleaning of surface, mixing of slurry seal in a suitable mobile sqm
plant, laying and compacting to provide even riding surface, 5 mm thickness
Slurry Seal, Providing and laying slurry seal consisting of a mixture of fine
aggregates, Portland cement filler, bituminous emulsion and water on a road
886 surface including cleaning of surface, mixing of slurry seal in a suitable mobile sqm
plant, laying and compacting to provide even riding surface, 3 mm thickness
Slurry Seal, Providing and laying slurry seal consisting of a mixture of fine
aggregates, Portland cement filler, bituminous emulsion and water on a road
887 surface including cleaning of surface, mixing of slurry seal in a suitable mobile sqm
plant, laying and compacting to provide even riding surface, 1.5 mm thickness
Crack Prevention Courses, Stress Absorbing Membrane (SAM) crack width less
than 6 mm, Providing and laying of a stress absorbing membrane over a cracked
road surface, with crack width below 6 mm after cleaning with a mechanical
broom, using modified binder , sprayed at the rate of 9 kg per 10 sqm and
888 sqm
spreading 5.6 mm crushed stone aggregates @ 0.11 cum per 10 sqm with
hydraulic chip spreader, sweeping the surface for uniform spread of aggregates
as per Drawing and Technical Specifications.
Rotary core drilling in soil /rock and take continuous rock core to a depth
below ground level with Tungstun carbide bits including core sampling all
921 complete as directed, Soil ( gravel BMS etc), Depth below bed level 5.0 m - 10 meter
m
Rotary core drilling in soil /rock and take continuous rock core to a depth
below ground level with Tungstun carbide bits including core sampling all
922 complete as directed, Soil ( gravel BMS etc), Depth below bed level 10 m - 15m meter
Rotary core drilling in soil /rock and take continuous rock core to a depth
below ground level with Tungstun carbide bits including core sampling all
923 complete as directed, Soil ( gravel BMS etc), Depth below bed level 15 m - 20 meter
m
Rotary core drilling in soil /rock and take continuous rock core to a depth
below ground level with Tungstun carbide bits including core sampling all
924 complete as directed, Soil ( gravel BMS etc), Depth below bed level 20 m - 25 meter
m
Rotary core drilling in soil /rock and take continuous rock core to a depth
925 below ground level with Tungstun carbide bits including core sampling all meter
complete as directed, Soil ( gravel BMS etc), Depth below bed level > 25 m
Rotary core drilling in soil /rock and take continuous rock core to a depth
926 below ground level with Tungstun carbide bits including core sampling all meter
complete as directed, Soft Rock, Depth below bed level upto 5.0 m
Rotary core drilling in soil /rock and take continuous rock core to a depth
927 below ground level with Tungstun carbide bits including core sampling all meter
complete as directed, Soft Rock, Depth below bed level 5.0 m - 10 m
Rotary core drilling in soil /rock and take continuous rock core to a depth
928 below ground level with Tungstun carbide bits including core sampling all meter
complete as directed, Soft Rock, Depth below bed level 10 m - 15m : Add 20
Rotary core drilling in soil /rock and take continuous rock core to a depth
929 below ground level with Tungstun carbide bits including core sampling all meter
complete as directed, Soft Rock, Depth below bed level 15 m - 20 mM
Rotary core drilling in soil /rock and take continuous rock core to a depth
930 below ground level with Tungstun carbide bits including core sampling all meter
complete as directed, Soft Rock, Depth below bed level 20 m - 25 mM
Rotary core drilling in soil /rock and take continuous rock core to a depth
931 below ground level with Tungstun carbide bits including core sampling all meter
complete as directed, Soft Rock, Depth below bed level > 25
Rotary core drilling in soil /rock and take continuous rock core to a depth
932 below ground level with Tungstun carbide bits including core sampling all meter
complete as directed, Hard Rock, Depth below bed level upto 5.0 m
Rotary core drilling in soil /rock and take continuous rock core to a depth
933 below ground level with Tungstun carbide bits including core sampling all meter
complete as directed, Hard Rock, Depth below bed level 5.0 m - 10 m
Rotary core drilling in soil /rock and take continuous rock core to a depth
934 below ground level with Tungstun carbide bits including core sampling all meter
complete as directed, Hard Rock, Depth below bed level 10 m - 15m
Rotary core drilling in soil /rock and take continuous rock core to a depth
935 below ground level with Tungstun carbide bits including core sampling all meter
complete as directed, Hard Rock, Depth below bed level 15 m - 20 mM
Rotary core drilling in soil /rock and take continuous rock core to a depth
936 below ground level with Tungstun carbide bits including core sampling all meter
complete as directed, Hard Rock, Depth below bed level 20 m - 25 mM
Rotary core drilling in soil /rock and take continuous rock core to a depth
937 below ground level with Tungstun carbide bits including core sampling all meter
complete as directed, Hard Rock, Depth below bed level > 25 m
938 Taking disturbed sample during drilling as directed by the Engineer. nos
939 Taking Undisturbed sample during drilling as directed by the Engineer. nos
Carry out Standard penetration test (SPT) during borig as directed by the
940 Engineer nos
Providing & installing piezometers at the location of each bore holes for study
of fluctuations in water table (Water table studies to be carried out weekly for a
period of 3 months) with regular weekly interval and predetermined time & day
941 each week and depth of water recorded with respect to the reduced level. nos
Diurnal variations to be noted for 3 selected weeks during the period of
observations and reporting.
Providing and laying precast RCC railing of M 30 Grade, aggregate size not
exceeding 12 mm, true to line and grade, tolerance of vertical RCC post not to
942 exceed 1 in 500, center to center spacing between vertical post not to exceed meter
2000 mm, leaving adequate space between vertical post for expansion, complete
as per Drawings and Technical specifications.
Providing, fitting and fixing mild steel railing complete as per drawing and
943 Technical Specification m
Providing and fixing Drainage Spouts complete as per Drawing and Technical
944 specifications. no
Filler joint, Providing & fixing 2 mm thick corrugated copper plate in expansion
945 joint complete as per drawing & Technical Specification. meter
, Providing & fixing 20 mm thick compressible fiber board in expansion joint
946 complete as per drawing & Technical Specification. meter
, Providing and fixing in position 20 mm thick pre-moulded joint filler in
expansion joint for fixed ends of simply supported spans not exceeding 10 m to
947 cater for a horizontal movement upto 20 mm, covered with sealant complete as meter
per Drawing and technical specifications.
, Providing and filling joint sealing compound as per drawings and technical
948 specifications with coarse sand and 6 per cent bitumen by weight meter
Asphaltic Plug joint, Providing and laying of asphaltic plug joint to provide for
horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint
varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in
949 traffic direction), covered with a closure plate of 200 mm x 6 mm of weldable meter
structural steel conforming to IS: 2062, as per Drawings and Technical
Specifications.
Tubular Steel Railing on Medium Weight Steel Channel ( ISMC series) 100 mm
x 50 mm, Providing, fixing and erecting 50 mm dia steel pipe railing in 3 rows
950 duly painted on medium weight steel channels (ISMC series) 100 mm x 50 mm, meter
1.2 metres high above ground, 2 m center to center, complete as per Drawing
and Technical specifications.
Tubular Steel Railing on Precast RCC Posts, 1.2 m High Above Ground Level,
Providing, fencing and erecting 50 mm dia painted steel pipe railing in 3 rows
951 on precast M 20 grade RCC vertical posts 1.8 metres high (1.2 m above GL) meter
with 3 holes 50 mm dia for pipe, fixed 2 metres center to, complete as per
Drawing and Technical Specifications.
Government of Nepal
Ministry of Physical Infrastructure & Transport
Department of Roads
Federal Road Supervision & Monitoring Office, Kathmandu
ROAD DIVISION HETAUDA
Details of Measurement
Contract Identification No :
BH No :
Nature of the work :
Name of Road :
S.N. Description of Works Unit Quantity Rate(NRs) Amount(NRs) Remarks
General
Operation and maintenance of Temporary diversion of road/ bridge to keep the
1 road serviceable through out the contract period as per specification and km-month/LS 0 0
instruction of engineer
Carry out maintenance of the existing road to keep the road serviceable through
2 out the contract period as per specification and instruction of the Engineer Km-month 0 0
Providing and installation of project signboards with size of 1.8 x 1.2 m as per
3 specification and instruction of engineer. nos 0 0
Providing and establishing camp with mobilization and demobilization for
4 contractor's Labour and staff and demolishing after completion of works as per job 0 0
the specifications and instruction of the Engineer.
Relocation of services / minor infrastructures, as per specifications and
5 instruction of the Engineer. job 0 0
6 Supply of Project Record as per specifications and instruction of the Engineer. set 0 0
Reinstatement of quarry sites at the completion of works as instructed by the
7 engineers. 0 0
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
8 sqm 0 0
lead of 30 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness., By Manual Means:-, In area of light jungle
(less than 15 number per 100 sqm)
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
9 sqm 0 0
lead of 30 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness., By Manual Means:-, In area of thorny jungle
( more than 15 numbers per 100 sqm)
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
12 sqm 0 0
lead of 30 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness., By Mechanical Means, In area of light jungle
(less than 15 number per 100 sqm )
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
13 sqm 0 0
lead of 30 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness., By Mechanical Means, In area of thorny
jungle ( more than 15 numbers per 100 sqm)
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
14 lead of 30 meters including removal and disposal of top organic soil not cum 0 0
exceeding 150 mm in thickness., By Mechanical Means, Felling and uprooting
of bamboo clearing the area, stacking of bamboo and disposing of wastes
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
15 sqm 0 0
lead of 1000 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness., By Manual Means:-, In area of light jungle
(less than 15 number per 100 sqm)
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
16 sqm 0 0
lead of 1000 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness., In area of thorny jungle ( more than 15
numbers per 100 sqm)
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
17 cum 0 0
lead of 1000 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness., Felling and uprooting of bamboo clearing the
area, stacking of bamboo and disposing of wastes
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
18 sqm 0 0
lead of 1000 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness., By Mechanical Means, In area of light jungle
(less than 15 number per 100 sqm )
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
19 sqm 0 0
lead of 1000 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness., By Mechanical Means, In area of thorny
jungle ( more than 15 numbers per 100 sqm)
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
20 lead of 1000 meters including removal and disposal of top organic soil not cum 0 0
exceeding 150 mm in thickness., By Mechanical Means, Felling and uprooting
of bamboo clearing the area, stacking of bamboo and disposing of wastes
Reinforced Soil wall Structure with Green Terra Mesh (GTM) Facing:,
Providing and fixing Flexible Geogrids ( e.g. Paralink) as primary
reinforcement for composite soil reinforcement system, made of polyester core
with polyethylene coating with design life >100 years including secondary
reinforcement of Green Terramesh system (GTM) as per Specifications Clause
67 2402 with Zn+PVC coated with Bio-Mat, Steel Greed made of MS bar (10 mm sqm 0 #NAME?
dia and grid size 160 mm x 160 mm), 3 nos of anchor bars of 10 mm dia to
maintain the slope of GTM, laying of Geo textile, drainage gallery filling with
boulder etc. all complete as per Specifications.
Reinforced Soil wall Structure with Concrete Facing:, Providing and fixing
Flexible Geogrids ( e.g. Paralink) as primary reinforcement for composite soil
reinforcement system, made of polyester core with polyethylene coating with
design life >100 years including secondary reinforcement of Green
Terramesh system (GTM) as per Specifications Clause 2402 with Zn+PVC
coated with Bio-Mat, Steel Greed made of MS bar (10 mm dia and grid size 160
68 mm x 160 mm), 3 nos of anchor bars of 10 mm dia to maintain the slope of sqm 0 #NAME?
GTM, laying of Geo textile, drainage gallery filling with boulder etc. all
complete as per Specifications., High Strength Flexible Geogrids ( made of
polyester core with polyethylene coating) with Strength as per design ( at
least 200 KN/ m)
Reinforced Soil wall Structure with Concrete Facing:, Providing and fixing
Flexible Geogrids ( e.g. Paralink) as primary reinforcement for composite soil
reinforcement system, made of polyester core with polyethylene coating with
design life >100 years including secondary reinforcement of Green
Terramesh system (GTM) as per Specifications Clause 2402 with Zn+PVC
69 coated with Bio-Mat, Steel Greed made of MS bar (10 mm dia and grid size 160 sqm 0 #NAME?
mm x 160 mm), 3 nos of anchor bars of 10 mm dia to maintain the slope of
GTM, laying of Geo textile, drainage gallery filling with boulder etc. all
complete as per Specifications., Para web 50 KN and 100 ken each
GI Barbed Wire Fencing 1.8 Meter High with RCC post, Providing and fixing
1.8 m high GI barbed wire fencing with 2.4 m RCC M 15 grade 150 mm x 150
mm concrete post placed every 3 m center-to-center founded in M 15 grade
cement concrete, 0.6 m below ground level, every 15th post, last but one end
72 post and corner post shall be strutted on both sides and end post on one side meter 0 #NAME?
only and provided with 9 horizontal lines and 2 diagonals interwoven with
horizontal wires, fixed with GI staples, turn buckles etc. complete as per
Drawing and Technical Specifications.
GI Barbed Wire Fencing 1.2 Meter High on Angle Iron, Providing and fixing
1.2 meters high GI barbed wire fencing with 1.8 m angle iron posts 40 mm x 40
mm x 6 mm placed every 3 meters center to center founded in M 15 grade
cement concrete, 0.6 meter below ground level, every 15th post, end post and
73 corner post shall be strutted on both sides and end post on one side only and meter 0 #NAME?
provided with 9 horizontal lines and 2 diagonals interwoven with horizontal
wires, fixed with GI staples, turn buckles etc. complete as per Drawing and
Technical Specifications.
GI Barbed Wire Fencing 1.8 Meter High, Providing and fixing 1.8 meters high
GI barbed wire fencing
with 2.4 m angle iron posts 50 mm x 50 mm x 6 mm placed every
3 meters center to center founded in M 15 grade cement
concrete, 0.6 meter below ground level, every 15th post, last but
74 one end post and corner post shall be strutted on both sides and meter 0 #NAME?
end post on one side only and provided with 12 horizontal lines
and 2 diagonals interwoven with horizontal wires, fixed with GI
staples, turn buckles etc. complete as per Drawing and Technical
Specifications
Field Test, Carryout Pile Load Test up to 200 tones including all consumable
75 and accessories as per test procedure mentioned in the Technical Specifications. nos/day 0 0
76 Laboratory Setup including supply of electricity, water, gas and heating etc. set 0 0
Providing, installing and maintaining Quality control laboratory with
77 equipment as specified in the Technical Specifications. set 0 0
78 Operation of Laboratory with Technical support of Laboratory staff Man-month 0 0
Field Test, Carryout Axle load survey including all consumables and
79 accessories. no. of reading 0 0
Field Test, Carryout Benkelman Beam Deflection Test including all
80 consumables and accessories. no of reading 0 0
Field Test, Carryout Field Density test of sub grade/ sub base/ base test by Sand
81 replacement Method as per procedure mentioned in the Technical nos 0 0
Specifications.
82 Field Test, Sampling from Subgrade, Sub base, base and Wearing Course nos 0 0
Field Test, Carryout Rapid Determination of CBR by dynamic core
83 penetrometer as per test procedure mentioned in the Technical Specifications. point 0 0
Field Test, Carryout Measurement of Pavement Thickness including all
84 consumable and accessories as per test procedure mentioned in the Technical point 0 0
Specifications.
Laboratory Test, Carryout Shear test of disturbed sample including all
85 consumable and accessories as per test procedure mentioned in the Technical nos 0 0
Specifications.
Field Test, Coring of asphalt concrete Sample from pavement including all
86 consumable and accessories as per test procedure mentioned in the Technical nos/day 0 0
Specifications.
Field Test, Carryout Schmidt Hammer Test including all consumable and
87 accessories as per test procedure mentioned in the Technical Specifications. no 0 0
Field Test, Carryout Bridge Load test (Load testing of one or more spans of
bridge as selected by the Engineer as per approved load test procedure
88 following relevant IS/IRC codes including deflection measuring instruments, nos 0 #NAME?
loading materials, recoding and analyzing the load testing results cleaning of
girder after load test, etc.)
Stripping and Storing Top Soil, Stripping, storing of top soil by road side at 15
m internal and re-application on embankment slopes, cut slopes and other areas
132 in localities where the available embankment Material is not conducive to plant cum 0 0
growth as per Drawing and Technical Specifications.
Stripping, Storing and Re-laying Top Soil from Borrow Areas in Agriculture
Fields., Stripping of top soil from borrow areas located in agriculture fields,
storing at a suitable place, spreading and re-laying after taking the borrow earth
133 to maintain fertility of the agricultural field, finishing it to the required levels to cum 0 0
the satisfaction of the farmer as per Drawing and Technical Specifications.
Providing suitable material and Back filling behind abutment, wing wall and
139 return wall complete as per Drawing and Technical Specifications., Granular cum 0 0
Material
Providing suitable material and Back filling behind abutment, wing wall and
140 return wall complete as per Drawing and Technical Specifications., Sandy cum 0 0
Material
Providing suitable material and Back filling behind abutment, wing wall and
141 return wall complete as per Drawing and Technical Specifications., Locally cum 0 0
available Material including compaction by tamping rod ( without watering)
Providing suitable material and Back filling behind abutment, wing wall and
142 return wall complete as per Drawing and Technical Specifications., Locally cum 0 0
available Material, with out watering and compaction by tamping rod
Providing and laying of Filter media with granular Material/stone crushed
aggregates to a thickness of not less than 600 mm with smaller size towards the
143 soil and bigger size towards the wall and provided over the entire surface behind cum 0 0
abutment, wing wall and return wall to the full height compacted to a firm
condition complete as per drawing and Technical Specification.
Providing, laying and spreading Material on a prepared sub grade, adding the
designed quantity of cement to the spread Material, mixing in place , grading
156 and compacting at OMC to achieve the desired unconfined compressive cum 0 0
strength and to form a layer of sub-base/base as per Drawing and Technical
Specifications.
Providing, laying, spreading and compacting graded stone aggregate to wet mix
macadam specification including premixing the Material with water at OMC
177 laying in uniform layers in sub- base / base course on well prepared surface and cum 0 #NAME?
compacting to achieve required density as per Drawing and Technical
Specifications., Base course with B2 material
Providing, laying, spreading and compacting graded stone aggregate to wet mix
macadam specification including premixing the Material with water at OMC
178 laying in uniform layers in sub- base / base course on well prepared surface and cum 0 #NAME?
compacting to achieve required density as per Drawing and Technical
Specifications., Sub Base course with S1 material
Providing, laying, spreading and compacting graded stone aggregate to wet mix
macadam specification including premixing the Material with water at OMC
179 laying in uniform layers in sub- base / base course on well prepared surface and cum 0 #NAME?
compacting to achieve required density as per Drawing and Technical
Specifications., Sub Base course with S2 material
Seal Surfacing, Providing and laying seal coat sealing the voids in a bituminous
217 surface as per Drawing and Technical Specifications. sqm 0 0
Slurry Seal, Providing and laying slurry seal consisting of a mixture of fine
aggregates, Portland cement filler, bituminous emulsion and water on a road
218 surface including cleaning of surface, mixing of slurry seal in a suitable mobile sqm 0 0
plant, laying and compacting to provide even riding surface as per Drawing and
Technical Specifications., 5 mm thickness
Slurry Seal, Providing and laying slurry seal consisting of a mixture of fine
aggregates, Portland cement filler, bituminous emulsion and water on a road
219 surface including cleaning of surface, mixing of slurry seal in a suitable mobile sqm 0 0
plant, laying and compacting to provide even riding surface as per Drawing and
Technical Specifications., 3 mm thickness
Slurry Seal, Providing and laying slurry seal consisting of a mixture of fine
aggregates, Portland cement filler, bituminous emulsion and water on a road
220 surface including cleaning of surface, mixing of slurry seal in a suitable mobile sqm 0 0
plant, laying and compacting to provide even riding surface as per Drawing and
Technical Specifications., 1.5 mm thickness
Fog Spray, Providing and applying low viscosity bitumen emulsion for sealing
221 cracks less than 3 mm wide or incipient fretting or disintegration in an existing sqm 0 0
bituminous surfacing as per Drawing and Technical Specifications.
Fog Spray, Providing and applying low viscosity bitumen emulsion for sealing
cracks less than 3 mm wide or incipient fretting or disintegration in an existing
222 bituminous surfacing as per Drawing and Technical Specifications., Blind the sqm 0 0
fog spray
Bituminous Cold Mix ( Including Gravel Emulsion), Providing, laying and
rolling of bituminous cold mix on prepared base consisting of a mixture of
unheated mineral aggregate and emulsified or cutback bitumen, including
223 mixing in a plant of suitable type as per Drawing and Technical Specifications., cum 0 0
Using bitumen emulsion and 9.5 mm or 13.2 mm size aggregate
Sand Asphalt Base Course, Providing, laying and rolling sand-asphalt base
227 course composed of sand, mineral filler and bituminous binder on a prepared cum 0 0
sub-grade or sub-base as per Drawing and Technical Specifications.
Anti- Stripping agent, Providing and mixing of Anti stripping agent as per
228 Design/ direction of Engineer kg 0 0
Bitumen Cutter, Providing and mixing of Bitumen cutter as per design /
229 direction of Engineer lit 0 0
Modified Binder, Supply of modified binder (produced by mixing bitumen with
modifier such as natural rubber or crumb rubber or any other polymer found
230 compatible with bitumen) as per Specifications and direction of the Engineer. tonne 0 0
Otta seal, Providing and laying Otta seal surface as wearing course in single
231 coat using river bed shingles /aggregates of specified size ( 0- 16 mm) laid on sqm 0 0
prepared surface as per Drawing and Technical Specifications.
Recipe Cold Mix, Providing and laying of premix of crushed stone aggregates
and emulsion binder, mixed in a batch type cold mixing plant, laid over
232 prepared surface, by paver finisher, rolled with a pneumatic tired roller initially cum 0 0
and finished with a smooth steel wheel roller, all as per specifications., 75 mm
thickness
Recipe Cold Mix, Providing and laying of premix of crushed stone aggregates
and emulsion binder, mixed in a batch type cold mixing plant, laid over
233 prepared surface, by paver finisher, rolled with a pneumatic tired roller initially cum 0 0
and finished with a smooth steel wheel roller, all as per specifications., 40 mm
thickness
Recipe Cold Mix, Providing and laying of premix of crushed stone aggregates
and emulsion binder, mixed in a batch type cold mixing plant, laid over
234 prepared surface, by paver finisher, rolled with a pneumatic tired roller initially cum 0 0
and finished with a smooth steel wheel roller, all as per specifications., 25 mm
thickness
Brick work for footpath, Providing and laying flat brick over 60 mm thick
236 sand bed in footpath including excavation sand bedding all complete as per sqm 0 0
specification.
Precast Cement Concrete M 20 Kerb , Providing and laying of /20 precast
cement concrete Kerb 38 cm * 20 cm * 25 cm ( H*B*L) with 12 mm thick 1:3
237 cement sand mortar bedding and joints including foundation excavation meter 0 #NAME?
levelling but excluding foundation concrete for foundation or sand gravel
material, all complete as per Drawing and Technical Specifications.
Cast in Situ Cement Concrete or natural stone block for footpath, Providing and
laying of precast / cast in situ 50 mm thick cement concrete slab footpath on
238 12 mm thick 1: 3 cement sand mortar over the prepared base, all complete as per sqm 0 #NAME?
Drawing and Technical Specifications.
, Providing and laying 25 mm thick Natural stone slab footpath on 12 mm
239 thick 1: 3 cement sand mortar over the prepared base, all complete as per sqm 0 0
specification.
Cast in Situ Cement Concrete Kerb , Providing and laying cement concrete
Kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in
M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having
240 50 mm projection beyond Kerb stone, Kerb stone laid with Kerb laying meter 0 0
machine, foundation concrete laid manually, all complete as per Drawing and
Technical Specifications.
Cast in Situ Cement Concrete M 20 Kerb with Channel, Providing and laying
cement concrete Kerb with channel with top and bottom width 115 and 165 mm
respectively, 250 mm high in M 20 grade PCC on grade foundation 150 mm
241 thick, Kerb channel 300 mm wide, 50 mm thick in PCC grade, sloped towards meter 0 0
the Kerb, Kerb stone with channel laid with Kerb laying machine, foundation
concrete laid manually, all complete as specification.
Brick work for footpath, Providing and laying brick on edge over 60 mm thick
242 sand bed in footpath including excavation sand bedding all complete as per sqm 0 0
Drawing and Technical Specifications.
Kilometer Stone, Providing and Fixing Reinforced cement concrete M 15 grade
243 kilometer Post including painting and printing as per Standard Drawing-2070 no 0 #NAME?
and Technical Specifications. position, One kilometer post (precast)
Non Reflective Traffic Signs, Providing and fixing of Non reflective warning,
mandatory and informatory sign board of 2 mm thick MS Sheet with back
support frame fixed on heavy 50 mm tube or Channel section
244 of 75 mm X 40 mm firmly fixed to the ground by means of properly designed no 0 #NAME?
foundation with M 10/40 grade cement concrete 300 mm x 300 mm x 300 mm, l
as per drawings and Technical Specification/ DOR Publication.
Painting Two Coats on Concrete Surfaces, Providing and Painting two coats
248 after filling the surface with synthetic enamel paint in all shades on concrete / sqm 0 0
plaster surfaces as per Drawing and Technical Specifications.
Painting on Steel Surfaces, Providing and applying two coats of ready mix paint
249 of approved brand on steel surface after through cleaning of surface to give an sqm 0 0
even shade as per Drawing and Technical Specifications.
Painting on Wood Surfaces, Providing and applying two coats of ready mix
250 paint of approved brand on wood surface after thorough cleaning of surface to sqm 0 0
give an even shade as per Drawing and Technical Specifications.
Painting Lines, Dashes, Arrows etc. on Roads in Two Coats, Providing required
material and Painting lines, dashes, arrows etc. on roads in two coats on new
work with ready mixed road marking paint conforming to NS 408/ IS 164 on
251 bituminous surface, including cleaning the surface of all dirt, dust and other sqm 0 #NAME?
foreign matter, demarcation at site and traffic control as per Drawing and
Technical Specifications., Over 10 cm in width
Painting Lines, Dashes, Arrows etc. on Roads in Two Coats, Providing required
material and Painting lines, dashes, arrows etc. on roads in two coats on new
work with ready mixed road marking paint conforming to NS 408/ IS 164 on
252 bituminous surface, including cleaning the surface of all dirt, dust and other sqm 0 #NAME?
foreign matter, demarcation at site and traffic control as per Drawing and
Technical Specifications., Up to 10 cm in width
Painting Lines, Dashes, Arrows etc. on Roads in Two Coats on Old Work,
Providing required materials and Painting lines, dashes, arrows etc. on roads in
two coats on old work with ready mixed road marking paint conforming to NS
253 408/ IS: 164 on bituminous surface, including cleaning the surface of all dirt, sqm 0 #NAME?
dust and other foreign matter, demarcation at site and traffic control as per
Drawing and Technical Specifications., over 10 cm in width
Painting Lines, Dashes, Arrows etc. on Roads in Two Coats on Old Work,
Providing required materials and Painting lines, dashes, arrows etc. on roads in
two coats on old work with ready mixed road marking paint conforming to NS
254 408/ IS: 164 on bituminous surface, including cleaning the surface of all dirt, sqm 0 #NAME?
dust and other foreign matter, demarcation at site and traffic control as per
Drawing and Technical Specifications., Up to 10 cm in width
Providing and fixing of road stud 100x 100 mm, die-cast in aluminum, resistant
to corrosive effect of salt and grit, fitted with lenses reflectors, installed in
concrete or asphaltic surface by drilling hole 30 mm upto a depth of 60 mm and
bedded in a suitable bituminous grout or epoxy mortar, all as per Specification
clause 1505., Providing and fixing of road stud 100 x 100 mm, die-cast in
257 aluminum, resistant to corrosive effect of salt and grit, fitted with lenses no 0 #NAME?
reflectors, installed in concrete or asphaltic surface by drilling hole 30 mm upto
a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all
as per Drawing and Technical Specifications.
Kilometer Stone, Providing and Fixing Reinforced cement concrete M 15 grade
258 kilometer Post including painting and printing as per Standard Drawing-2070 no 0 #NAME?
and Technical Specifications. position, Five kilometer Post (precast)
Road Delineators Post, Providing and installation of 150 mm * 150 mm 1. 5 m
long delineators (road way indicators, hazard markers, object markers), 80-100
259 cm high above ground level, painted black and white in 20 cm wide strips, no 0 #NAME?
buried or pressed into the ground and conforming to the drawings and Technical
Specifications.
Metal Beam Crash Barrier, Type - A, "W" : Metal Beam Crash Barrier,
Providing and erecting a "W" metal beam crash barrier comprising of 3 mm
thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on
ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m center to center,
261 meter 0 #NAME?
1.8 m high, 1.1 m below ground/road level metal beam rail to be fixed on the
vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long
complete as per Drawing and Technical Specifications.
Metal Beam Crash Barrier, Type - B, "THRIE" : Metal Beam Crash Barrier,
Providing and erecting a "Thrie" metal beam crash barrier comprising of 3 mm
thick corrugated sheet metal beam rail, 85 cm above road/ground level, fixed on
ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m center to center,
262 meter 0 #NAME?
2.1 m high with 1.3 m below ground level, metal beam rail to be fixed on the
vertical post with a space of channel section 150 x 75 x 5 mm, 546 mm long
complete as per Drawing and Technical specifications.
Metal Beam Crash Barrier, Flexible Crash Barrier, Wire Rope Safety Barrier,
Providing and erecting a wire rope safety barrier with vertical posts of medium
weight RS Joist (ISMB series) 100 mm x 75 mm (11.50 kg/m), 1.50 m long
0.85 m above ground and 0.65 m below ground level, split at the bottom for
better grip, embedded in M 15 grade cement concrete 450 x 450 x 450 mm, 1.50
m center to center and with 4 horizontal steel wire rope 40 mm dia and anchored
263 at terminal posts 15 m apart. Terminal post to be embedded in M 15 grade meter 0 #NAME?
cement concrete foundation 2400 x 450 x 900 mm (depth), strengthened by a
strut of RS joist 100 x 75 mm, 2 m long at 450 inclination and a tie 100 x 8 mm,
1.50 m long at the bottom, all embedded in foundation concrete as per design ,
Drawing and Technical Specifications.
Street Lighting, Providing and erecting street light mounted on a steel circular
hollow pole of standard specifications for street lighting, 9 m high spaced 40 m
267 apart, 1.8 m overhang on both sides if fixed in the median and on one side if no 0 #NAME?
fixed on the footpath, fitted with sodium vapor lamp and fixed firmly in
concrete foundation as per design , Drawing and Technical Specifications..
Rumble Strips, Providing and making of Rumble strips with premix bituminous
carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at
approved locations to control speed, marked with white strips of road marking
paint., Provision of 15 Nos rumble strips covered with premix bituminous
268 sqm 0 0
carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at
approved locations to control speed, marked with white strips of road marking
paint.
Lettering new Letter and Figures of any Shade, Providing and lettering new
269 letter and figures of any shade with synthetic enamel paint black or any other cm-letter 0 #NAME?
approved color to give an even shade, Nepali
Lettering new Letter and Figures of any Shade, Providing and lettering new
270 letter and figures of any shade with synthetic enamel paint black or any other cm-letter 0 #NAME?
approved color to give an even shade, English and Roman
Providing, Boring and installing bored cast-in-situ RCC Pile excluding
Reinforcement and Concrete in all types of soil including Bentonite and other
271 consumable and removal of excavated earth with necessary lifts and lead all meter 0 0
complete as per Drawing and Technical Specifications., Pile diameter-750 mm
Providing, driving and installing precast RCC. pile of specified size and quality
281 complete as per drawing and & Technical Specification, Pile diameter -300 mm Running meter 0 0
Providing, driving and installing precast RCC. pile of specified size and quality
282 complete as per drawing and & Technical Specification, Pile diameter -500 mm Running meter 0 0
Providing, driving and installing precast RCC. pile of specified size and quality
283 complete as per drawing and & Technical Specification, Pile diameter - 600 mm Running meter 0 0
, or providing steel helmet on top of pile head during driving, stacking of piles
284 at site 0 0
Driving Vertical Steel Piles / Sheet piles excluding cost of steel complete as per
285 Drawing and & Technical Specification tonne 0 0
Providing and laying Plain/Reinforced Cement Concrete excluding
286 reinforcement in Well Foundation all complete as per Drawing and Technical cum 0 0
Specifications., Top plug, Grade M 15 PCC
Providing and laying Plain/Reinforced Cement Concrete excluding
287 reinforcement in Well Foundation all complete as per Drawing and Technical cum 0 0
Specifications., Intermediate plug, Grade M 25 PCC
Providing and Constructing of temporary Island for well sinking as per Drawing
and instruction of the Engineer., Assuming depth of water 1.0 m and height of
288 island to be 1.25 m. and island 16 m diameter for Construction of Well no 0 0
Foundation for 8 m dia. Well.
Providing and laying Plain/Reinforced Cement Concrete excluding
289 reinforcement in Well Foundation all complete as per Drawing and Technical cum 0 0
Specifications., Intermediate plug, Grade M 20 PCC
Providing and laying Plain/Reinforced Cement Concrete excluding
290 reinforcement in Well Foundation all complete as per Drawing and Technical cum 0 0
Specifications., Well cap, RCC Grade M 20
Providing and constructing one span service road to reach island location from
one pier location to another pier location as per Drawing and instruction of the
291 Engineer., Assuming span length 30 m, width of service road 10 m and depth of meter 0 0
water 1 m
Providing and Laying Cutting Edge of Mild Steel for Well Foundation
292 complete as per Drawing and Technical Specification. tonne 0 0
Providing and laying Plain/Reinforced Cement Concrete excluding
293 reinforcement in Well Foundation all complete as per Drawing and Technical cum 0 0
Specifications., Well curb, RCC M 20 Grade
Providing and laying Plain/Reinforced Cement Concrete excluding
294 reinforcement in Well Foundation all complete as per Drawing and Technical cum 0 0
Specifications., Well curb, RCC M 25 Grade
Providing and laying Plain/Reinforced Cement Concrete excluding
295 reinforcement in Well Foundation all complete as per Drawing and Technical cum 0 0
Specifications., Well curb, RCC M 30 Grade
Providing and laying Plain/Reinforced Cement Concrete excluding
296 reinforcement in Well Foundation all complete as per Drawing and Technical cum 0 0
Specifications., Well Steining, PCC M 20 Grade
Providing and laying Plain/Reinforced Cement Concrete excluding
297 reinforcement in Well Foundation all complete as per Drawing and Technical cum 0 0
Specifications., Well Steining, RCC M 20 Grade
Providing and laying Plain/Reinforced Cement Concrete excluding
298 reinforcement in Well Foundation all complete as per Drawing and Technical cum 0 0
Specifications., Well Steining, RCC M 25 Grade
Providing and laying Plain/Reinforced Cement Concrete excluding
299 reinforcement in Well Foundation all complete as per Drawing and Technical cum 0 0
Specifications., Well Steining, RCC M 30 Grade
Providing and laying Plain/Reinforced Cement Concrete excluding
reinforcement in Well Foundation all complete as per Drawing and Technical
300 Specifications., Bottom Plug (Concrete to be placed using tremie pipe), PCC cum 0 #NAME?
Grade M 20
Providing and laying Plain/Reinforced Cement Concrete excluding
reinforcement in Well Foundation all complete as per Drawing and Technical
301 Specifications., Bottom Plug (Concrete to be placed using tremie pipe), PCC cum 0 0
Grade M 20, Where underwater concreting in involved
Providing and laying Plain/Reinforced Cement Concrete excluding
reinforcement in Well Foundation all complete as per Drawing and Technical
302 Specifications., Bottom Plug (Concrete to be placed using tremie pipe), PCC cum 0 0
Grade M 25, Where underwater concreting in involved
Providing and laying Plain/Reinforced Cement Concrete excluding
reinforcement in Well Foundation all complete as per Drawing and Technical
303 Specifications., Bottom Plug (Concrete to be placed using tremie pipe), PCC cum 0 0
Grade M 25
Providing and laying Plain/Reinforced Cement Concrete excluding
304 reinforcement in Well Foundation all complete as per Drawing and Technical cum 0 0
Specifications., Well cap, RCC Grade M 25
Providing and laying Plain/Reinforced Cement Concrete excluding
305 reinforcement in Well Foundation all complete as per Drawing and Technical cum 0 #NAME?
Specifications., Well cap, RCC Grade M 30
Providing and laying Plain/Reinforced Cement Concrete excluding
306 reinforcement in Well Foundation all complete as per Drawing and Technical cum 0 0
Specifications., Well cap, RCC Grade M 35
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
307 per Drawing and Technical specifications., Diameter of well - 6 m., Sandy Soil, meter 0 0
Depth below bed level upto 3.0 M
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
308 per Drawing and Technical specifications., Diameter of well - 6 m., Sandy Soil, meter 0 0
Beyond 3 m upto 10 m depth
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
309 per Drawing and Technical specifications., Diameter of well - 6 m., Sandy Soil, meter 0 0
Beyond 10 m upto 20 m
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
310 per Drawing and Technical specifications., Diameter of well - 6 m., Sandy Soil, meter 0 0
Beyond 20 m upto 30 m
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
311 per Drawing and Technical specifications., Diameter of well - 6 m., Sandy Soil, meter 0 0
Beyond 20 m upto 30 m
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
312 per Drawing and Technical specifications., Diameter of well - 6 m., Clayey Soil, meter 0 0
Depth below bed level upto 3.0 m
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
313 per Drawing and Technical specifications., Diameter of well - 6 m., Clayey Soil, meter 0 0
Beyond 3 m upto 10 m depth
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
314 per Drawing and Technical specifications., Diameter of well - 6 m., Clayey Soil, meter 0 0
Beyond 10 m upto 20 m
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
315 per Drawing and Technical specifications., Diameter of well - 6 m., Clayey Soil, meter 0 0
Beyond 10 m upto 20 m
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
316 per Drawing and Technical specifications., Diameter of well - 6 m., Clayey Soil, meter 0 0
Beyond 20 m upto 30 m
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
317 per Drawing and Technical specifications., Diameter of well - 6 m., Clayey Soil, meter 0 0
Beyond 20 m upto 30 m
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
318 per Drawing and Technical specifications., Diameter of well - 6 m., Clayey Soil, meter 0 0
Beyond 20 m upto 30 m
Providing accessories and Sinking of 6 m external diameter well (other than
319 pneumatic method of sinking) through all types soil/rock of strata complete as meter 0 0
per Drawing and Technical specifications., Diameter of well - 6 m., Soft Rock
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
320 per Drawing and Technical specifications., Diameter of well - 6 m., Hard Rock meter 0 0
Buried Joint, Providing and laying a buried expansion joint, expansion gap
being 20 mm, covered with 12 mm thick, 200 mm wide galvanized wieldable
structural steel plate as per IS: 2062, placed symmetrical to center line of the
481 joint, resting freely over the top surface of the deck concrete, welding of 8 mm meter 0 #NAME?
dia. 100 mm long galvanized nails spaced 300 mm c/c along the center line of
the plate as per Drawing and Specifications.
Strip Seal Expansion Joint, Providing and laying of a strip seal expansion joint
484 catering to maximum horizontal movement upto 70 mm, complete as per meter 0 #NAME?
approved Drawings and Technical specifications.
Modular Strip / Box Seal Joint, Providing and laying of a modular strip Box seal
expansion joint including anchorage catering to a horizontal movement beyond
485 70 mm and upto 140 mm, complete as per Drawings and Technical 0 0
Specifications .
Modular Strip / Box Seal Joint, Providing and laying of a modular strip box seal
486 expansion joint catering to a horizontal movement beyond 140 mm and upto meter 0 #NAME?
210 mm, complete as per Drawings and Technical specifications.
Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal
487 mix) in Foundation complete as per Drawing and Technical Specifications. cum 0 0
Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal
488 mix) in Foundation complete as per Drawing and Technical Specifications., cum 0 0
Manual Mixing
Providing and laying of Plain/Reinforced Cement Concrete in Foundation
489 complete as per Drawing and Technical Specifications, PCC Grade M 15 cum 0 0
Providing and laying of Plain/Reinforced Cement Concrete in Foundation
490 complete as per Drawing and Technical Specifications, PCC Grade M 15, cum 0 #NAME?
Manual Mixing
Providing and laying of Plain/Reinforced Cement Concrete in Foundation
491 complete as per Drawing and Technical Specifications, PCC Grade M 20 cum 0 0
Providing and laying of Plain/Reinforced Cement Concrete in Foundation
492 complete as per Drawing and Technical Specifications., RCC Grade M 20 cum 0 0
Providing and laying of Plain/Reinforced Cement Concrete in Foundation
493 complete as per Drawing and Technical Specifications., PCC Grade M 25 cum 0 0
Providing and laying of Plain/Reinforced Cement Concrete in Foundation
494 complete as per Drawing and Technical Specifications., RCC Grade M 25 cum 0 0
Providing and laying of Plain/Reinforced Cement Concrete in Foundation
495 complete as per Drawing and Technical Specifications., PCC Grade M 30 cum 0 0
Providing and laying of Plain/Reinforced Cement Concrete in Foundation
496 complete as per Drawing and Technical Specifications., RCC Grade M30 cum 0 0
Providing and laying of Plain/Reinforced Cement Concrete in Foundation
497 complete as per Drawing and Technical Specifications., RCC Grade M 35 cum 0 0
Providing and laying , fitting and placing un-coated Mild steel / HYSD
498 reinforcement complete in foundation as per drawing and technical specification tonne 0 0
Narrow Filter Sub-Surface Drain, Providing and making narrow filter sub-
surface drain consisting of porous or perforated pipe laid in narrow trench
646 surrounded by a geotextile filter fabric, with a minimum of 450 mm overlap of meter 0 #NAME?
fabric and installed including excavation and backfilling
Laying Paving Fabric Beneath a Pavement Overlay, Providing and laying
paving fabric over a tack coat of paving grade Bitumen, laid at the rate of 1 kg
647 per sqm over thoroughly cleaned and repaired surface to provide a water sqm 0 #NAME?
resistant membrane and crack retarding layer as per Drawing and Technical
Specifications.
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Providing and filling the installed
653 3-D galvanized steel profile with angular material of size 32-63 mm using sqm 0 #NAME?
equipment such as excavator, dredger crane or loader, In shallow slopes (< 45
degrees slope angle)
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Providing and filling the installed
654 3-D galvanized steel profile with angular material of size 32-63 mm using sqm 0 #NAME?
equipment such as excavator, dredger crane or loader, In slopes (>45 degrees
slope angle)
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Filling the installed 3-D galvanized
655 steel profile with gravel size 32-63 mm, manually, In shallow slopes (< 45 sqm 0 #NAME?
degrees slope angle)
Providing and laying Plum concrete ( Boulder mixed concrete) as per Drawing
656 and Specifications, 70% M 15 concrete and 30% boulders/stones, Using cum 0 #NAME?
Mechanical Aids
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Spraying of humus on the on the
657 top of gravel (on the top surface of 3-D profile) using humus spraying machine, sqm 0 #NAME?
In slopes (>45 degrees slope angle)
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Spraying of humus on the on the
658 top of gravel (on the top surface of 3-D profile) manually, In shallow slopes (< sqm 0 #NAME?
45 degrees slope angle)
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Spraying of humus on the on the
659 top of gravel (on the top surface of 3-D profile) manually, In slopes (>45 sqm 0 #NAME?
degrees slope angle)
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Providing and driving the equal
angle T-section galvanized steel nails with curved head (16 mm dia steel hook)
and tapered at tail (size between T-25 x 25 x 3 mm to T-40 X 40 X 5 mm,
(equivalent to Indian Steel ISA 2525, 3030,3535 or 4040) by using handheld or
pneumatic hammer (nail length between 0.6 m -3.5 m), first drilling a hole of
660 diameter 28-43 mm (size of T-section+ 3 mm) and filling with cement mortar meter 0 #NAME?
and then driving the nails to fix the semi-flexible 3-D galvanized steel panel on
the slopes or embankments, max spacing of nails is 1.5 m., Driving T-nails in
soft soil using small dia. pre-bored holes without using cement mortar, For flat
surface and shallow slopes < 45°
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
661 mat for slope protection and erosion control, In slopes (>45 degrees slope meter 0 #NAME?
angle)
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Providing and driving of 28 mm
662 dia GEWI (Threaded) steel nails by drilling holes of 90 mm dia using cement meter 0 #NAME?
grouting for fixing of semi-flexible 3-D steel mats upto a length of 4 to 8 m on
slopes, On soft soils
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Providing and driving of 28 mm
663 dia GEWI (Threaded) steel nails by drilling holes of 90 mm dia using cement meter 0 #NAME?
grouting for fixing of semi-flexible 3-D steel mats upto a length of 4 to 8 m on
slopes, On rocky soils (4-8 m)
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Providing and driving of 28 mm
664 dia GEWI (Threaded) steel nails by drilling holes of 90 mm dia using cement meter 0 #NAME?
grouting for fixing of semi-flexible 3-D steel mats upto a length >8 m on slopes,
On soft soils
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Providing and driving of 28 mm
665 dia GEWI (Threaded) steel nails by drilling holes of 90 mm dia using cement meter 0 #NAME?
grouting for fixing of semi-flexible 3-D steel mats upto a length >8 m on slopes,
On rocky soils
Providing and laying boulders apron on river bed for protection against scour
666 with Boulder / Stones weighing not less than 40 kg each complete as per cum 0 #NAME?
drawing and Technical specification., Manual Means
Providing and laying boulders apron on river bed for protection against scour
667 with Boulder / Stones weighing not less than 40 kg each complete as per cum 0 #NAME?
drawing and Technical specification., Mechanical means
Providing and laying boulders apron on river bed for protection against scour
668 with Boulder / Stones weighing not less than 40 kg each complete as per cum 0 #NAME?
drawing and Technical specification., Mechanical means for Bigger boulder
Providing and laying of apron with cement concrete blocks of size 0.5 x 0.5 x
669 0.5 m cast in-situ and made with nominal mix of M-15 grade cement concrete cum 0 #NAME?
with a minimum cement content of 250 kg/cum ., Manual means
Providing and laying of apron with cement concrete blocks of size 0.5 x 0.5 x
670 0.5 m cast in-situ and made with nominal mix of M-15 grade cement concrete cum 0 0
with a minimum cement content of 250 kg/cum ., Mechanical means
Providing and laying Pitching on slopes laid over prepared filter media
671 including boulder apron laid dry in front of toe of embankment complete as per cum 0 #NAME?
drawing and Technical specifications, Stone/Boulder
Providing and laying Pitching on slopes laid over prepared filter media
including boulder apron laid dry in front of toe of embankment complete as per
672 drawing and Technical specifications, Cement Concrete Blocks of size 0.3 x 0.3 cum 0 #NAME?
x 0.3 m cast in cement concrete of Grade M 15, Manual Means
Providing and laying Filter material underneath pitching in slopes complete as
673 per drawing and Technical specification cum 0 #NAME?
Providing and laying Grouted Stone Pitching in protection work, with stone size
674 not less than 0.01 cum and cement: sand mortar (1:3) all complete as per cum 0 #NAME?
Drawing and Technical Specifications.
Providing and laying 20 mm dia tor steel dowel bar including drilling 35 mm
dia bore hole in rock necessary bending, hooking tying reinforcement in
675 position and grouting etc. complete as per Drawing and Technical meter 0 #NAME?
specifications., Without using Mechanical aid
Providing and laying 20 mm dia tor steel dowel bar including drilling 35 mm
dia bore hole in rock necessary bending, hooking tying reinforcement in
676 position and grouting etc. complete as per Drawing and Technical meter 0 #NAME?
specifications., Using Mechanical Aid
Providing and fixing of 25 mm – dia steel rock bolts with mechanical/ wedge
type anchorage including drilling 35 mm dia hole providing 150 mm long 20
677 mm thick steel tapered wedge 10 mm thick 200 mm X 200 mm plate washer meter 0 #NAME?
and nuts, tighten bolt by torque wrench all complete
Providing and laying HDPE pipes with perforations including joining, series II,
678 HDPE pipe 250 mm dia meter 0 #NAME?
Providing and laying HDPE pipes with perforations including joining, series II,
679 HDPE pipe 160 mm dia meter 0 #NAME?
Providing and laying Plum concrete ( Boulder mixed concrete) as per Drawing
680 and Specifications, 60% M 15 concrete and 40% boulders/stones, using cum 0 #NAME?
Mechanical Aids
Providing and laying Plum concrete ( Boulder mixed concrete) as per Drawing
681 and Specifications, 60% M 15 concrete and 40% boulders/stones, Manual cum 0 #NAME?
means
Sub-Surface Drains with Perforated Pipe, Providing and laying subsurface drain
with perforated pipe of 100 mm internal diameter of metal/ asbestos cement/
cement concrete/PVC, closely jointed, perforations ranging from 3 mm to 6 mm
682 depending upon size of material surrounding the pipe, with 150 mm bedding meter 0 #NAME?
below the pipe and 300 mm cushion above the pipe,. as per Drawing and
Specifications.
Providing and inserting nipples with approved fixing compound after drilling
holes for grouting as per Technical Specifications including subsequent
741 cutting/removal and sealing of the hole as necessary of nipples after completion 0 0
of grouting with Cement/Epoxy
Providing and Sealing of cracks/porous concrete by injection process through
742 nipples/Grouting complete as per Technical Specification., Cement Grout kg 0 0
Providing and Sealing of cracks/porous concrete by injection process through
743 nipples/Grouting complete as per Technical Specification., Cement Mortar (1:1) kg 0 0
Grouting
Providing and Sealing of cracks/porous concrete by injection process through
744 nipples/Grouting complete as per Technical Specification., Low viscosity epoxy liter 0 0
injection resin
Providing and replacement of Crash Barrier as per Drawing, Technical
745 Specifications and instruction of the Engineer. meter 0 0
Patching of damaged concrete surface with polymer concrete/ micro concrete
and curing compounds, Providing and applying polymer concrete and curing
746 compounds on damaged concrete surface as per instructions of manufacturer sqm 0 0
and approval of the Engineer.
Patching of damaged concrete surface with polymer concrete/ micro concrete
and curing compounds, Providing and applying Micro concreting on damaged
concrete (slab/beam/abutment section of the bridges )with ready to use high
747 early high strength , free flow , non shrink self compacting Micro concrete ( M cum 0 0
60 & above)With adding 20% local aggregates of 10 mm down) as per
instructions of manufacturer and approval of the Engineer.
Providing and applying Epoxy adhesive and Sealing of crack / porous concrete
749 with Epoxy Grout by injection with nipples complete as per direction of the kg 0 0
Engineer.
Providing and Applying epoxy mortar over leached, honey combed and spalled
750 concrete surface and exposed steel reinforcement complete as per Technical sqm 0 0
Specification
Providing and applying the Shotcreate mixture mechanically with compressed
751 air under pressure, sprayable less rebound ( rebou and quick setting comnd 25 sqm 0 0
%) as per Technical specifications and direction of the Engineer.
Providing and applying pre-packed cement based polymer mortar for
752 replacement of spalled concrete sqm 0 0
Providing and applying Epoxy bonding of new concrete to old concrete as per
753 technical Specifications and direction of the Engineer. sqm 0 0
Providing and replacement of Bearings complete as per Technical Specification
754 and direction of the Engineer. nos 0 #NAME?
Providing required parts and rectification of Bearings as per Technical
755 Specifications and direction of the Engineer. nos 0 #NAME?
Providing and replacement of Expansion Joints complete as per drawings,
756 Technical specifications and direction of the Engineer. meter 0 #NAME?
Providing and replacement of Damaged Concrete Railing as per Drawing,
757 Technical Specifications and direction of the Engineer,. meter 0 0
Providing and replacement of Damaged mild steel railing as per Drawing,
758 Technical Specifications and direction of the Engineer. meter 0 0
Repair of Crash Barrier, Providing and repair of concrete crash barrier with
cement concrete M-30 grade by cutting and trimming the damaged portion to a
759 regular shape, cleaning the area to be repaired thoroughly, applying cement meter 0 #NAME?
concert after erection of proper form work.
Providing and repair of RCC railing to bring it to the original shape as per
760 Drawing, Technical Specifications and instruction of the Engineer., Repair of meter 0 #NAME?
RCC Railing
Repair of Steel Railing, Providing and repair of steel railing to bring it to the
761 original shape as per Drawing, Technical Specifications and direction of the meter 0 0
Engineer.
Painting of Steel Bridge, Providing and painting steel bridge including removal
762 of old paints by sand blasting cleaning and repairing of metal surfaces for the sqm 0 0
application of new paints as per specification and direction of the Engineer.
Providing and Painting of steel bridges with one coat of primer, one coat of
763 epoxy and 2 coats of acrylic polyurethane as per specification. sqm 0 0
Providing and painting of steel bridges with one coat of primer, one coat of
764 epoxy and 2 coats of acrylic polyurethane, without sprayer machine as per sqm 0 0
specification
Repair of Joint Grooves with Epoxy Mortar, Providing and repair of spalled
joint grooves of contraction joints, longitudinal joints and expansion joints in
765 concrete pavements using epoxy mortar or epoxy concrete as per Technical meter 0 0
Specifications and direction of the Engineer.
Repair of old Joints Sealant, Providing and repair of old joints including
removal of existing sealant and re sealing of contraction, longitudinal or
766 expansion joints in concrete pavement with fresh sealant material as per meter 0 0
Drawing and Technical Specifications.
Concrete Jacketing, Preparation, hacking and cleaning of existing surface for
767 concrete jacketing as per direction of the Engineer. sqm 0 0
Concrete Jacketing, Drilling Holes on existing concrete surface of 16 mm
768 diameter and 300 mm depth nos 0 0
769 Concrete Jacketing, Providing and fixing Anchor bar kg 0 0
770 Concrete Jacketing, Providing and Filling drill hole with Epoxy Grout 0 0
Concrete Jacketing, Providing and applying Micro silica/ silica fume concreting
for concrete jacketing works ( slab /beam/ abutment section of the bridges ) as
771 per instructions of manufacturer and as approved by the Engineer. cum 0 0
Planting grass on site, Planting rooted grass slips on the slopes <45o including
preparation of slips on site. a max of 5 cm depth with metal rod or Operation
818 includes digging planting hole to hard-wood peg, depending on the nature of the sqm 0 #NAME?
soil. The planting drills should be space
Planting grass on site, Planting rooted grass slips on the slopes 45o - 60o
including preparation of slips on site. a max of 5 cm depth with metal rod or
819 Operation includes digging planting hole to hard-wood peg, depending on the sqm 0 #NAME?
nature of the soil. The planting drills should be space
Planting grass on site, Planting rooted grass slips on the slopes > 60o including
preparation of slips on site. a max of 5 cm depth with metal rod or Operation
820 includes digging planting hole to hard-wood peg, depending on the nature of the sqm 0 #NAME?
soil. The planting drills should be space
Planting shrub and tree seedling and cutting on site, Planting containerized tree
and shrub seedlings, including pitting, transplanting, composting and placing
821 tree guards, on toe of embankment slopes in plain areas, not less than 8 m from nos 0 #NAME?
the road center line. Pit size 30 cm diameter x depth. Compost volume 1/4 of
the volume of the pit, mixed with original soil.
Planting shrub and tree seedling and cutting on site, Planting containerized tree
and shrub seedlings, including pitting, transplanting, composting and mulching,
822 on slopes < 30o . Pit size 30 cm diameter x depth mix Compost with soil nos 0 #NAME?
and back fill into pit to 1/4 of the pit volume
Planting shrub and tree seedling and cutting on site, Planting containerized tree
and shrub seedlings, including pitting, transplanting, composting and mulching,
823 on slopes 30o . - 400 Pit size 30 cm diameter x depth mix Compost with nos 0 #NAME?
soil and back fill into pit to 1/4 of the pit volume
Planting shrub and tree seedling and cutting on site, Planting rooted tree stump
cutting and bare root seedlings, including pitting, transplanting, composting and
824 mulching on slopes <300. Pit size 10 cm diameter x depth. Compost volume nos 0 #NAME?
1/4 of volume of the pit mix with original soil.
Planting shrub and tree seedling and cutting on site, Planting rooted tree stump
cutting and bare root seedlings, including pitting, transplanting, composting and
825 mulching on slopes <300 - 45o Pit size 10 cm diameter x depth. Compost nos 0 #NAME?
volume 1/4 of volume of the pit mix with original soil.
Planting shrub and tree seedling and cutting on site, Planting rooted tree stump
cutting and bare root seedlings, including pitting, transplanting, composting and
826 mulching on slopes > 45o Pit size 10 cm diameter x depth. Compost volume nos 0 #NAME?
1/4 of volume of the pit mix with original soil.
Vegetative palisade construction, brush layering and fascines, Collection of
hardwood for cuttings for planting Material (e.g. assuro, namdi phul,
827 simali)from the sources within of the road. Material to be approx. 1 km in nos 0 0
length and minimum 5 cm in diameter.
Vegetative palisade construction, brush layering and fascines, Preparation and
planting of live pegs selected species(e.g. assuro, namdi phul, simali)of
828 minimum length to 0.5 m depth into hard ground. Pegs spaced at centers meter 0 #NAME?
within rows, and interwoven with vegetation.
Vegetative palisade construction, brush layering and fascines, Preparation and
planting of live pegs selected species(e.g. assuro, namdi phul, simali)of
829 minimum length to 0.5 m depth into soft debris. Pegs spaced at 5- centers meter 0 #NAME?
within rows, and interwoven with vegetation.
Vegetative palisade construction, brush layering and fascines, Site preparation
830 for fascine laying: earth works in excavation of trench to 20 cm depth meter 0 0
Vegetative palisade construction, brush layering and fascines, Laying of live
fascines, using live hardwood cuttings of selected species(e.g. assuro, namdi
831 phul, simali) of minimum length placed in bundles to give 4 running meters of meter 0 #NAME?
cutting per meter of fascine, including backfilling of trench and careful
compaction.
Jute netting works, Standard jute netting for bare slopes and under planting with
slips. Spinning raw jute from 100% jute fiber into yarn and weaving the yarn
into netting. Hand spun yarn 5 to 8 mm in diameter, width of net 1.20 meters
832 warp strands 27 no per , mesh size 30-40 mm sq. and 1.25 kg/m weight at 1.20 sqm 0 #NAME?
m width.[Note A Toro is the weaving shuttle, bamboo culm.]normally made
from a split large
Jute netting works, Wide mesh jute netting for holding mulch on slopes.
Spinning raw jute from 100% jute fiber into yarn and weaving the yarn into
netting. Hand spun yarn 3 to 5 mm in diameter 1.20 m side and 11.2 m long.
833 Mesh size 150 mm x 500 mm rectangular mesh and 0.25 kg/m at 1.20 m width. sqm 0 #NAME?
[Note A torso is the weaving shuttle, normally made from a split large bamboo
culm.]
Jute netting works, Placing 30-40 mm square mesh jute netting on bare slopes
(for later under planting with grass slips), including pegging with live
834 hardwood cutting or split bamboo pegs and loosening tension so that the net sqm 0 #NAME?
hugs the slope throughout.
Jute netting works, Placing 150 x 500 mm mesh jute netting to hold mulch on
slopes, including application of mulch and pegging with live hardwood cutting
835 or split bamboo pegs and loosening tension so that the net hugs the slope sqm 0 #NAME?
throughout.
Gabion bolster cylinders, Providing and laying 60 cm dia gabion bolsters
panels: 70 x 100 mm hexagonal mesh wire (10 swg frame and 12 Swg mesh)
836 including Earthwork excavation filling with boulder, back filling all complete meter 0 #NAME?
as per Drawing and Technical Specifications.
Gabion bolster cylinders, Providing and laying 30 cm dia gabion bolsters
panels: 70 x 100mm hexagonal mesh wire (10 swg frame and 12 Swg mesh)
837 including Earthwork excavation filling with boulder, back filling all complete meter 0 #NAME?
as per Drawing and Technical Specifications.
Gabion bolster cylinders, Anchoring bolster: 12 mm dia MS re-bar cut into 2 m
838 lengths for anchorage and placed at intervals meter 0 #NAME?
839 Gabion bolster cylinders, Providing and laying of terram paper (geotextile) meter 0 #NAME?
Bamboo tree guards, Providing and weaving bamboo tree guards using bamboo
poles as uprights: 1.60 m in height ; and weaving split bamboo with the outer
840 wall intact around the posts. Dimension of the guard are 0.60 m diameter x 1.30 meter 0 #NAME?
high.
Turfing, Grass sodding works including sod cutting , transporting , placing in
841 position and water sprinkling (Lead upto 10 m). sqm 0 0
842 Turfing, Providing and Spreading manure on the grass turf. sqm 0 #NAME?
Turfing, Turfing with Sods, Providing, furnishing and laying of the live sods of
perennial turf forming grass on embankment slope, verges or other locations
843 shown on the drawing or as directed by the engineer including preparation of sqm 0 #NAME?
ground, fetching of sods and watering.
Turfing, Seeding and Mulching, Providing required material, Preparation of
seed bed on previously laid top soil, furnishing and placing of seeds, fertilizer,
844 mulching material, applying bituminous emulsion at the rate of 0.23 liters per sqm 0 #NAME?
sqm and laying and fixing jute netting, including watering for 3 months all as
per specification
Spreading of Sludge Farm Yard Manure or/and good Earth, Providing and
845 Spreading of sludge farm yard manure or/ and good earth in required thickness cum 0 0
(cost of sludge, farm yard manure or/and good earth to be paid for separately)
Grassing with ' Doobs' Grass, Providing and grassing with 'Doobs' grass
including watering and maintenance of the lawn for 30 days or more till the
846 grass forms a thick lawn free from weeds and fit for moving including sqm 0 #NAME?
supplying good earth if needed, In rows 15 cm apart in either direction
847 Grassing with ' Doobs' Grass, In rows 7.5 cm apart in either direction sqm 0 #NAME?
Making Lawns including Ploughing and Dragging, Providing and making lawns
including ploughing and breaking of clod, removal of rubbish, dressing and
848 supplying Doobs grass roots and planting at 15 cm apart, including supplying sqm 0 #NAME?
and spreading of farm yard manure at rate of 0.18 cum per 100 sqm
Maintenance of Lawns or Turfing of Slopes, Regular Maintenance of lawns or
849 Turfing of slopes (rough grassing) for a period of one year including sqm 0 #NAME?
watering etc.
Turfing Lawns with Fine Grassing including Ploughing, Dressing, Providing
and Turfing lawns with fine grassing including ploughing, dressing including
850 breaking of clods, removal of rubbish, dressing and supplying Doobs grass roots sqm 0 #NAME?
at 10 cm apart, including supplying and spreading of farm yard manure at rate
of 0.6 cum per 100 sqm
Maintenance of Lawns with Fine Grassing for the First Year, Regular
851 Maintenance of lawns with fine grassing for the first year including watering sqm 0 #NAME?
etc.
Planting and Maintaining of Permanent Hedges, Providing and Planting
permanent hedges including digging of trenches, 60 cm wide and 45 cm deep,
852 refilling the excavated earth mixed with farmyard manure, supplied at the rate meter 0 #NAME?
of 4.65 cum per 100 metres and supplying and planting hedge plants at 30 cm
apart
Renovation Lawns including, Weeding, Forking the Ground, Top Dressing with
Forked Soil, Renovation lawns including, weeding, forking the ground, top
dressing with forked soil, watering and maintenance the lawns, for 30 days or
857 more, till the grass forms a thick lawn, free from weeds, and fit for moving and sqm 0 #NAME?
disposal of rubbish as directed, including supplying good earth, if needed but
excluding the cost of well decayed farm yard manure
Half Brick Circular Tree Guard, in 2nd Class Brick, internal diametre 1.25
metres, and height 1.2 metres, above ground and 0.20 metre below ground,
Providing and laying half brick circular tree guard, in 2nd class brick, internal
diametre 1.25 metres, and height 1.2 metres, above ground and 0.20 metre
858 nos 0 #NAME?
below ground, bottom two courses laid dry, and top three courses in cement
mortar 1:6 (1 cement 6 sand) and the intermediate courses being in dry honey
comb masonry, as per design complete
Edging with 2nd Class Bricks, Laid Dry Lengthwise, Providing and edging with
2nd class bricks, laid dry lengthwise, including excavation, refilling,
859 consolidation, with a hand packing and spreading nearly surplus earth within a meter 0 #NAME?
lead of 50 metres
Making Tree Guard 53 cm dia and 1.3 meter height as per Design from empty
bitumen drums, Providing and making tree guard 53 cm dia and 1.3 m high as
860 per design from empty bitumen drum, slit suitably to permit sun and air, nos 0 #NAME?
(supplied by the department at stock issue rate) including providing and fixing 2
nos MS sheet rings 50 x 0.5 mm with rivets, complete in all respect
Making Tree Guard 53 cm dia and 2 meter height as per Design from empty
bitumen drums, Providing and making tree guard 53 cm dia and 2 metres high
as per design from empty bitumen drums, slit suitably to permit sun and air,
( supplied by the department at stock issue rate) including providing and
861 nos 0 #NAME?
fixing four legs 40 cm long of 30 x 3 mm MS riveted to tree guard and
providing and fixing 2 nos MS sheet rings 50 x 0.5 mm with rivets complete in
all respects
Wrought Iron and Mild Steel Welded Work, Providing Wrought iron and mild
steel welded work (using angles, square bars, tees and channel grills, grating
frames, gates and tree guards of any size and design etc. including cost of
862 screens and welding rods or bolts and nuts complete fixed in position but kg 0 #NAME?
without the cost of excavation and concrete for fixing which will be paid
separately
Tree Guard with MS Iron, Providing and fixing MS iron tree guard 60 cm dia
and 2 meter high above ground level formed of 4 Nos (25 x 6 mm) and 8 Nos
(25 x 3 mm) vertical MS riveted to 3 Nos (25 x 6 mm) iron rings in two halves,
863 bolted together with 8 mm dia and 30 mm long bolts including painting two nos 0 #NAME?
coats with paint of approved brand over a coat of priming, complete in all
respects.
Tree Guard with MS Angle Iron and Steel Wire, Providing and fixing tree guard
0.60 meter square, 2.00 meter high fabricated with MS angle iron 30 x 30 x 3
864 mm, MS iron 25 x 3 mm and steel wire 3 mm dia welded and fabricated as per nos 0 #NAME?
design in two halves bolted together
Compensatory Afforestation, Planting trees as compensatory afforestation at the
rate of 290 trees per hectare at a spacing of 6 m by grubbing and leveling the
865 ground upto a depth of 150 mm, digging holes 0.9 m dia, 1 m deep, mixing farm sqm 0 #NAME?
yard/sludge manure with soil, planting of sapling 2 m high with 25 cm dia stem,
backfilling the hole and watering
Fog Spray, Providing and applying low viscosity bitumen emulsion for sealing
866 cracks less than 3 mm wide or incipient fretting or disintegration in an existing sqm 0 #NAME?
bituminous surfacing.
Fog Spray, Providing and applying low viscosity bitumen emulsion for sealing
cracks less than 3 mm wide or incipient fretting or disintegration in an existing
867 bituminous surfacing., In case it is decided by the engineer to blind the fog sqm 0 0
spray.
Hill Side Drain Clearance, Removal of earth from the choked hill side drain and
868 disposing it on the valley side manually meter 0 0
Maintenance,Carryout Routine ( regular maintenance) of Black top/ Gravel
869 road in plain area ( Terai) as per Technical Specifications and direction of the Km - day 0 0
Engineer,
Maintenance, Carryout Routine ( regular maintenance) of Black top/ Gravel
870 road in Hilly area as per Technical Specifications and direction of the Engineer, Km - day 0 0
Maintenance of Earthen Shoulder (filling with fresh soil), Providing and making
up loss of Material/ irregularities on shoulder to the design level by adding fresh
875 approved soil and compacting as per Technical Specification and direction of 0 0
the Engineer.
Maintenance of Earth Shoulder (stripping excess soil), Stripping excess soil
876 from the shoulder surface to achieve the approved level and compacting as per sqm 0 0
Technical Specifications and direction of the Engineer.
Providing, laying and restoration of rain cuts with gravel or river bed
Material , benching for 300 mm width, laying fresh Material in layers not
877 exceeding 250 mm and compacting to restore the original alignment, levels and cum 0 0
slopes as per Technical specifications and direction of the Engineer., Mechanical
Means including conveyance of river bed gravel with lead
Crack Filling, Providing and filling of crack using slow - curing bitumen
883 emulsion and applying crusher dust in case crack are wider than 3 mm as per meter 0 0
Technical Specifications and instruction of the Engineer
Dusting, Providing and applying crusher dust to areas of road where bleeding
884 of excess bitumen has occurred as per Technical Specifications and direction of sqm 0 0
the Engineer.
Slurry Seal, Providing and laying slurry seal consisting of a mixture of fine
aggregates, Portland cement filler, bituminous emulsion and water on a road
885 surface including cleaning of surface, mixing of slurry seal in a suitable mobile sqm 0 0
plant, laying and compacting to provide even riding surface, 5 mm thickness
Slurry Seal, Providing and laying slurry seal consisting of a mixture of fine
aggregates, Portland cement filler, bituminous emulsion and water on a road
886 surface including cleaning of surface, mixing of slurry seal in a suitable mobile sqm 0 0
plant, laying and compacting to provide even riding surface, 3 mm thickness
Slurry Seal, Providing and laying slurry seal consisting of a mixture of fine
aggregates, Portland cement filler, bituminous emulsion and water on a road
887 surface including cleaning of surface, mixing of slurry seal in a suitable mobile sqm 0 #NAME?
plant, laying and compacting to provide even riding surface, 1.5 mm thickness
Crack Prevention Courses, Stress Absorbing Membrane (SAM) crack width less
than 6 mm, Providing and laying of a stress absorbing membrane over a cracked
road surface, with crack width below 6 mm after cleaning with a mechanical
broom, using modified binder , sprayed at the rate of 9 kg per 10 sqm and
888 sqm 0 0
spreading 5.6 mm crushed stone aggregates @ 0.11 cum per 10 sqm with
hydraulic chip spreader, sweeping the surface for uniform spread of aggregates
as per Drawing and Technical Specifications.
Rotary core drilling in soil /rock and take continuous rock core to a depth
below ground level with Tungstun carbide bits including core sampling all
921 complete as directed, Soil ( gravel BMS etc), Depth below bed level 5.0 m - 10 meter 0 0
m
Rotary core drilling in soil /rock and take continuous rock core to a depth
below ground level with Tungstun carbide bits including core sampling all
922 complete as directed, Soil ( gravel BMS etc), Depth below bed level 10 m - 15m meter 0 0
Rotary core drilling in soil /rock and take continuous rock core to a depth
below ground level with Tungstun carbide bits including core sampling all
923 complete as directed, Soil ( gravel BMS etc), Depth below bed level 15 m - 20 meter 0 0
m
Rotary core drilling in soil /rock and take continuous rock core to a depth
below ground level with Tungstun carbide bits including core sampling all
924 complete as directed, Soil ( gravel BMS etc), Depth below bed level 20 m - 25 meter 0 0
m
Rotary core drilling in soil /rock and take continuous rock core to a depth
925 below ground level with Tungstun carbide bits including core sampling all meter 0 0
complete as directed, Soil ( gravel BMS etc), Depth below bed level > 25 m
Rotary core drilling in soil /rock and take continuous rock core to a depth
926 below ground level with Tungstun carbide bits including core sampling all meter 0 0
complete as directed, Soft Rock, Depth below bed level upto 5.0 m
Rotary core drilling in soil /rock and take continuous rock core to a depth
927 below ground level with Tungstun carbide bits including core sampling all meter 0 0
complete as directed, Soft Rock, Depth below bed level 5.0 m - 10 m
Rotary core drilling in soil /rock and take continuous rock core to a depth
928 below ground level with Tungstun carbide bits including core sampling all meter 0 0
complete as directed, Soft Rock, Depth below bed level 10 m - 15m : Add 20
Rotary core drilling in soil /rock and take continuous rock core to a depth
929 below ground level with Tungstun carbide bits including core sampling all meter 0 0
complete as directed, Soft Rock, Depth below bed level 15 m - 20 mM
Rotary core drilling in soil /rock and take continuous rock core to a depth
930 below ground level with Tungstun carbide bits including core sampling all meter 0 0
complete as directed, Soft Rock, Depth below bed level 20 m - 25 mM
Rotary core drilling in soil /rock and take continuous rock core to a depth
931 below ground level with Tungstun carbide bits including core sampling all meter 0 0
complete as directed, Soft Rock, Depth below bed level > 25
Rotary core drilling in soil /rock and take continuous rock core to a depth
932 below ground level with Tungstun carbide bits including core sampling all meter 0 0
complete as directed, Hard Rock, Depth below bed level upto 5.0 m
Rotary core drilling in soil /rock and take continuous rock core to a depth
933 below ground level with Tungstun carbide bits including core sampling all meter 0 0
complete as directed, Hard Rock, Depth below bed level 5.0 m - 10 m
Rotary core drilling in soil /rock and take continuous rock core to a depth
934 below ground level with Tungstun carbide bits including core sampling all meter 0 0
complete as directed, Hard Rock, Depth below bed level 10 m - 15m
Rotary core drilling in soil /rock and take continuous rock core to a depth
935 below ground level with Tungstun carbide bits including core sampling all meter 0 0
complete as directed, Hard Rock, Depth below bed level 15 m - 20 mM
Rotary core drilling in soil /rock and take continuous rock core to a depth
936 below ground level with Tungstun carbide bits including core sampling all meter 0 0
complete as directed, Hard Rock, Depth below bed level 20 m - 25 mM
Rotary core drilling in soil /rock and take continuous rock core to a depth
937 below ground level with Tungstun carbide bits including core sampling all meter 0 0
complete as directed, Hard Rock, Depth below bed level > 25 m
938 Taking disturbed sample during drilling as directed by the Engineer. nos 0 0
939 Taking Undisturbed sample during drilling as directed by the Engineer. nos 0 0
Carry out Standard penetration test (SPT) during borig as directed by the
940 Engineer nos 0 0
Providing & installing piezometers at the location of each bore holes for study
of fluctuations in water table (Water table studies to be carried out weekly for a
period of 3 months) with regular weekly interval and predetermined time & day
941 each week and depth of water recorded with respect to the reduced level. nos 0 0
Diurnal variations to be noted for 3 selected weeks during the period of
observations and reporting.
Providing and laying precast RCC railing of M 30 Grade, aggregate size not
exceeding 12 mm, true to line and grade, tolerance of vertical RCC post not to
942 exceed 1 in 500, center to center spacing between vertical post not to exceed meter 0 0
2000 mm, leaving adequate space between vertical post for expansion, complete
as per Drawings and Technical specifications.
Providing, fitting and fixing mild steel railing complete as per drawing and
943 Technical Specification m 0 0
Providing and fixing Drainage Spouts complete as per Drawing and Technical
944 specifications. no 0 0
Filler joint, Providing & fixing 2 mm thick corrugated copper plate in expansion
945 joint complete as per drawing & Technical Specification. meter 0 0
, Providing & fixing 20 mm thick compressible fiber board in expansion joint
946 complete as per drawing & Technical Specification. meter 0 0
, Providing and fixing in position 20 mm thick pre-moulded joint filler in
expansion joint for fixed ends of simply supported spans not exceeding 10 m to
947 cater for a horizontal movement upto 20 mm, covered with sealant complete as meter 0 0
per Drawing and technical specifications.
, Providing and filling joint sealing compound as per drawings and technical
948 specifications with coarse sand and 6 per cent bitumen by weight meter 0 0
Asphaltic Plug joint, Providing and laying of asphaltic plug joint to provide for
horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint
varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in
949 traffic direction), covered with a closure plate of 200 mm x 6 mm of weldable meter 0 0
structural steel conforming to IS: 2062, as per Drawings and Technical
Specifications.
Tubular Steel Railing on Medium Weight Steel Channel ( ISMC series) 100 mm
x 50 mm, Providing, fixing and erecting 50 mm dia steel pipe railing in 3 rows
950 duly painted on medium weight steel channels (ISMC series) 100 mm x 50 mm, meter 0 #NAME?
1.2 metres high above ground, 2 m center to center, complete as per Drawing
and Technical specifications.
Tubular Steel Railing on Precast RCC Posts, 1.2 m High Above Ground Level,
Providing, fencing and erecting 50 mm dia painted steel pipe railing in 3 rows
951 on precast M 20 grade RCC vertical posts 1.8 metres high (1.2 m above GL) meter 0 #NAME?
with 3 holes 50 mm dia for pipe, fixed 2 metres center to, complete as per
Drawing and Technical Specifications.
BH No : 0
Nature
of the 0
work :
Name
of Road 0
:
Rate in words
Rate(Without Vat in Amount (Without
S.N. Description of Works Unit Quantity (Without VAT in
NRs) VAT in NRs)
NRs)
General
Operation and maintenance of Temporary diversion of road/ bridge to
1 Carry
keep the
outroad serviceable
maintenance of through out the
the existing roadcontract
to keepperiod as serviceable
the road per km-month/LS 0
specification
2 through out theand instruction
contract periodof as
engineer
per specification and instruction of Km-month 0
Providing and installation of project signboards with size of 1.8 x 1.2 m
3 the Engineer
Providing and establishing camp with nos 0
as per specification and instruction ofmobilization
engineer. and demobilization for
4 contractor's Labour and staff and demolishing after completion of works job 0
Relocation of services / minor infrastructures, as per specifications and
5 as per the specifications and instruction of the Engineer. job 0
instruction of the Engineer.
Supply of Project Record as per specifications and instruction of the
6 set 0
Engineer.
Reinstatement of quarry sites at the completion of works as instructed by
7 0
the engineers.
disposal of unserviceable materials and stacking of serviceable Material
8 sqm 0
to be used
disposal of or auctioned, up
unserviceable to a leadand
materials of 30 metersofincluding
stacking removal
serviceable and
Material
9 sqm 0
to be used
work, steel or auctioned,
work, includingupscaffolding
to a lead ofwherever
30 meters including sorting
necessary, removalthe
and
10 cum 0
dismantled Material, disposal of unserviceable Material and stacking the
Clearing and Grubbing Road Land ., Clearing and grubbing road land
including uprooting rank vegetation, grass, bushes, shrubs, saplings and
trees girth up to 300 mm, removal of stumps of trees cut earlier and
disposal of unserviceable materials and stacking of serviceable Material
11 cum 0
to be used or auctioned, up to a lead of 30 meters including removal and
disposal of top organic soil not exceeding 150 mm in thickness., By
Manual Means:-, Felling and uprooting of bamboo clearing the area,
stacking of bamboo and disposing of wastes
Clearing and Grubbing Road Land ., Clearing and grubbing road land
including uprooting rank vegetation, grass, bushes, shrubs, saplings and
trees girth up to 300 mm, removal of stumps of trees cut earlier and
disposal of unserviceable materials and stacking of serviceable Material
12 sqm 0
to be used or auctioned, up to a lead of 30 meters including removal and
disposal of top organic soil not exceeding 150 mm in thickness., By
Mechanical Means, In area of light jungle (less than 15 number per 100
sqm )
Clearing and Grubbing Road Land ., Clearing and grubbing road land
including uprooting rank vegetation, grass, bushes, shrubs, saplings and
trees girth up to 300 mm, removal of stumps of trees cut earlier and
disposal of unserviceable materials and stacking of serviceable Material
13 sqm 0
to be used or auctioned, up to a lead of 30 meters including removal and
disposal of top organic soil not exceeding 150 mm in thickness., By
Mechanical Means, In area of thorny jungle ( more than 15 numbers per
100 sqm)
Clearing and Grubbing Road Land ., Clearing and grubbing road land
including uprooting rank vegetation, grass, bushes, shrubs, saplings and
trees girth up to 300 mm, removal of stumps of trees cut earlier and
disposal of unserviceable materials and stacking of serviceable Material
14 cum 0
to be used or auctioned, up to a lead of 30 meters including removal and
disposal of top organic soil not exceeding 150 mm in thickness., By
Mechanical Means, Felling and uprooting of bamboo clearing the area,
stacking of bamboo and disposing of wastes
Clearing and Grubbing Road Land ., Clearing and grubbing road land
including uprooting rank vegetation, grass, bushes, shrubs, saplings and
trees girth up to 300 mm, removal of stumps of trees cut earlier and
disposal of unserviceable materials and stacking of serviceable Material
15 sqm 0
to be used or auctioned, up to a lead of 1000 meters including removal
and disposal of top organic soil not exceeding 150 mm in thickness., By
Manual Means:-, In area of light jungle (less than 15 number per 100
sqm)
Clearing and Grubbing Road Land ., Clearing and grubbing road land
including uprooting rank vegetation, grass, bushes, shrubs, saplings and
trees girth up to 300 mm, removal of stumps of trees cut earlier and
16 disposal of unserviceable materials and stacking of serviceable Material sqm 0
to be used or auctioned, up to a lead of 1000 meters including removal
and disposal of top organic soil not exceeding 150 mm in thickness., In
area of thorny jungle ( more than 15 numbers per 100 sqm)
Clearing and Grubbing Road Land ., Clearing and grubbing road land
including uprooting rank vegetation, grass, bushes, shrubs, saplings and
trees girth up to 300 mm, removal of stumps of trees cut earlier and
disposal of unserviceable materials and stacking of serviceable Material
17 cum 0
to be used or auctioned, up to a lead of 1000 meters including removal
and disposal of top organic soil not exceeding 150 mm in thickness.,
Felling and uprooting of bamboo clearing the area, stacking of bamboo
and disposing of wastes
Clearing and Grubbing Road Land ., Clearing and grubbing road land
including uprooting rank vegetation, grass, bushes, shrubs, saplings and
trees girth up to 300 mm, removal of stumps of trees cut earlier and
disposal of unserviceable materials and stacking of serviceable Material
18 sqm 0
to be used or auctioned, up to a lead of 1000 meters including removal
and disposal of top organic soil not exceeding 150 mm in thickness., By
Mechanical Means, In area of light jungle (less than 15 number per 100
sqm )
Clearing and Grubbing Road Land ., Clearing and grubbing road land
including uprooting rank vegetation, grass, bushes, shrubs, saplings and
trees girth up to 300 mm, removal of stumps of trees cut earlier and
disposal of unserviceable materials and stacking of serviceable Material
19 sqm 0
to be used or auctioned, up to a lead of 1000 meters including removal
and disposal of top organic soil not exceeding 150 mm in thickness., By
Mechanical Means, In area of thorny jungle ( more than 15 numbers per
100 sqm)
Clearing and Grubbing Road Land ., Clearing and grubbing road land
including uprooting rank vegetation, grass, bushes, shrubs, saplings and
trees girth up to 300 mm, removal of stumps of trees cut earlier and
disposal of unserviceable materials and stacking of serviceable Material
20 cum 0
to be used or auctioned, up to a lead of 1000 meters including removal
and disposal of top organic soil not exceeding 150 mm in thickness., By
Mechanical Means, Felling and uprooting of bamboo clearing the area,
stacking of bamboo and disposing of wastes
Reinforced Soil wall Structure with Tera Mesh System (TMS) Facing:,
Providing and fixing Flexible Geogrids ( e.g. Paralink) as primary
reinforcement for composite soil reinforcement system, made of
66 polyester core with polyethylene coating including secondary sqm 0
reinforcement of Terramesh system (TMS) as per Specifications Clause
2402 with Zinc +PVC coated as Facing material, laying of Geo textile,
drainage gallery filling with boulder all complete as per Specifications
Reinforced Soil wall Structure with Green Terra Mesh (GTM) Facing:,
Providing and fixing Flexible Geogrids ( e.g. Paralink) as primary
reinforcement for composite soil reinforcement system, made of
polyester core with polyethylene coating with design life >100 years
including secondary reinforcement of Green Terramesh system (GTM)
67 sqm 0
as per Specifications Clause 2402 with Zn+PVC coated with Bio-Mat,
Steel Greed made of MS bar (10 mm dia and grid size 160 mm x 160
mm), 3 nos of anchor bars of 10 mm dia to maintain the slope of GTM,
laying of Geo textile, drainage gallery filling with boulder etc. all
complete as per Specifications.
GI Barbed Wire Fencing 1.2 Meter high with RCC post, Providing and
fixing 1.8 meters high GI barbed wire fencing
with 2.4 m angle iron posts 50 mm x 50 mm x 6 mm placed every
3 meters center to center founded in M 15 grade cement
concrete, 0.6 meter below ground level, every 15th post, last but
71 meter 0
one end post and corner post shall be strutted on both sides and
end post on one side only and provided with 12 horizontal lines
and 2 diagonals interwoven with horizontal wires, fixed with GI
staples, turn buckles etc. complete as per Drawing and Technical
Specifications
GI Barbed Wire Fencing 1.8 Meter High with RCC post, Providing and
fixing 1.8 m high GI barbed wire fencing with 2.4 m RCC M 15 grade
150 mm x 150 mm concrete post placed every 3 m center-to-center
founded in M 15 grade cement concrete, 0.6 m below ground level,
72 every 15th post, last but one end post and corner post shall be strutted meter 0
on both sides and end post on one side only and provided with 9
horizontal lines and 2 diagonals interwoven with horizontal wires, fixed
with GI staples, turn buckles etc. complete as per Drawing and Technical
Specifications.
GI Barbed Wire Fencing 1.2 Meter High on Angle Iron, Providing and
fixing 1.2 meters high GI barbed wire fencing with 1.8 m angle iron posts
40 mm x 40 mm x 6 mm placed every 3 meters center to center founded
in M 15 grade cement concrete, 0.6 meter below ground level, every
73 meter 0
15th post, end post and corner post shall be strutted on both sides and
end post on one side only and provided with 9 horizontal lines and 2
diagonals interwoven with horizontal wires, fixed with GI staples, turn
buckles etc. complete as per Drawing and Technical Specifications.
GI Barbed Wire Fencing 1.8 Meter High, Providing and fixing 1.8 meters
high GI barbed wire fencing
with 2.4 m angle iron posts 50 mm x 50 mm x 6 mm placed every
3 meters center to center founded in M 15 grade cement
concrete, 0.6 meter below ground level, every 15th post, last but
74 meter 0
one end post and corner post shall be strutted on both sides and
end post on one side only and provided with 12 horizontal lines
and 2 diagonals interwoven with horizontal wires, fixed with GI
staples, turn buckles etc. complete as per Drawing and Technical
Specifications
Field Test, Carryout Pile Load Test up to 200 tones including all
75 consumable and accessories as per test procedure mentioned in the nos/day 0
Technical Specifications.
Laboratory Setup including supply of electricity, water, gas and heating
76 set 0
etc.
Providing, installing and maintaining Quality control laboratory with
77 set 0
equipment as specified in the Technical Specifications.
78 Operation of Laboratory with Technical support of Laboratory staff Man-month 0
Field Test, Carryout Axle load survey including all consumables and
79 no. of reading 0
accessories.
Field Test, Carryout Benkelman Beam Deflection Test including all
80 no of reading 0
consumables and accessories.
Field Test, Carryout Field Density test of sub grade/ sub base/ base test
81 by Sand replacement Method as per procedure mentioned in the nos 0
Technical Specifications.
Field Test, Sampling from Subgrade, Sub base, base and Wearing
82 nos 0
Course
Field Test, Carryout Rapid Determination of CBR by dynamic core
83 penetrometer as per test procedure mentioned in the Technical point 0
Specifications.
Field Test, Carryout Measurement of Pavement Thickness including all
84 consumable and accessories as per test procedure mentioned in the point 0
Technical Specifications.
Laboratory Test, Carryout Shear test of disturbed sample including all
85 consumable and accessories as per test procedure mentioned in the nos 0
Technical Specifications.
Field Test, Coring of asphalt concrete Sample from pavement including
86 all consumable and accessories as per test procedure mentioned in the nos/day 0
Technical Specifications.
Field Test, Carryout Schmidt Hammer Test including all consumable and
87 accessories as per test procedure mentioned in the Technical no 0
Specifications.
Field Test, Carryout Bridge Load test (Load testing of one or more spans
of bridge as selected by the Engineer as per approved load test
88 procedure following relevant IS/IRC codes including deflection nos 0
measuring instruments, loading materials, recoding and analyzing the
load testing results cleaning of girder after load test, etc.)
Laboratory Test, Sample preparation for inappropriate sample by
crushing for LAA, ACV, AIV test including all consumable and
89 nos 0
accessories as per test procedure mentioned in the Technical
Specifications.
Laboratory Test, Carry out Grain size Analysis including all consumable
90 and accessories as per test procedure mentioned in the Technical nos 0
Specifications.
Providing and Laying Reinforced cement concrete NP3 Flush jointed
91 pipe for culverts including fixing with cement mortar 1:2 as per Drawing meter 0
and Technical Specifications., 900 mm internal dia.
Providing, jointing and laying HDPE pipes with or without collar etc.
92 complete in place as per Drawing and Technical Specifications., a) 110 meter 0
mm/125 mm outer dia.
Providing and Laying Reinforced cement concrete NP3 Flush jointed
93 pipe for culverts including fixing with cement mortar 1:2 as per Drawing meter 0
and Technical Specifications., 300 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Flush jointed
94 pipe for culverts including fixing with cement mortar 1:2 as per Drawing meter 0
and Technical Specifications., 450 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Flush jointed
95 pipe for culverts including fixing with cement mortar 1:2 as per Drawing meter 0
and Technical Specifications., 600 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Flush jointed
96 pipe for culverts including fixing with cement mortar 1:2 as per Drawing meter 0
and Technical Specifications., 1000 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Flush jointed
97 pipe for culverts including fixing with cement mortar 1:2 as per Drawing meter 0
and Technical Specifications., 1200 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Collar jointed
98 pipe for culverts including fixing collar with cement mortar 1:2 as per meter 0
Drawing and Technical Specifications., 300 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Collar jointed
99 pipe for culverts including fixing collar with cement mortar 1:2 as per meter 0
Drawing and Technical Specifications., 450 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Collar jointed
100 pipe for culverts including fixing collar with cement mortar 1:2 as per meter 0
Drawing and Technical Specifications., 600 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Collar jointed
101 pipe for culverts including fixing collar with cement mortar 1:2 as per meter 0
Drawing and Technical Specifications., 900 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Collar jointed
102 pipe for culverts including fixing collar with cement mortar 1:2 as per meter 0
Drawing and Technical Specifications., 1000 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Collar jointed
103 pipe for culverts including fixing collar with cement mortar 1:2 as per meter 0
Drawing and Technical Specifications., 1200 mm internal dia.
Providing and laying concrete channeling as per Drawing and Technical
104 0
Specifications., Cast in situ
Providing and laying concrete channeling as per Drawing and Technical
105 0
Specifications., Pre cast
106 Laying (Joining) of Precast concrete panel meter 0
Earthwork Excavation in Cutting., Roadway Excavation in all types of
Soil by Manual Means ., Roadway Excavation in all types of soil as per
107 drawing and technical specification, including removal of stumps and cum 0
other deleterious matter, with all lifts and lead as per Drawing and
instruction of the Engineer.
, Prime Coat with emulsion, for manual works, Providing and applying
primer coat with Bitumen emulsion on prepared surface of granular
185 lit 0
base including cleaning of road surface and spraying primer at specified
rate as per Technical Specification.
Tack Coat, Tack coat with Bitumen By Mechanical Means, Providing and
186 applying tack coat with hot Bitumen at specified rate on the prepared lit 0
non-bituminous surfaces including cleaning as per Technical Speciation .
, Tack coat with Bitumen by Manual Means, Providing and applying tack
187 coat with hot Bitumen at the specified rate the prepared surfaces lit 0
including cleaning as per Technical Speciation .
Seal Surfacing, Providing and laying seal coat sealing the voids in a
217 sqm 0
bituminous surface as per Drawing and Technical Specifications.
Fog Spray, Providing and applying low viscosity bitumen emulsion for
sealing cracks less than 3 mm wide or incipient fretting or disintegration
221 sqm 0
in an existing bituminous surfacing as per Drawing and Technical
Specifications.
Fog Spray, Providing and applying low viscosity bitumen emulsion for
sealing cracks less than 3 mm wide or incipient fretting or disintegration
222 sqm 0
in an existing bituminous surfacing as per Drawing and Technical
Specifications., Blind the fog spray
Brick work for footpath, Providing and laying flat brick over 60 mm
236 thick sand bed in footpath including excavation sand bedding all sqm 0
complete as per specification.
Precast Cement Concrete M 20 Kerb , Providing and laying of /20
precast cement concrete Kerb 38 cm * 20 cm * 25 cm ( H*B*L) with 12
mm thick 1:3 cement sand mortar bedding and joints including
237 meter 0
foundation excavation levelling but excluding foundation concrete for
foundation or sand gravel material, all complete as per Drawing and
Technical Specifications.
Brick work for footpath, Providing and laying brick on edge over 60
242 mm thick sand bed in footpath including excavation sand bedding all sqm 0
complete as per Drawing and Technical Specifications.
Kilometer Stone, Providing and Fixing Reinforced cement concrete M 15
grade kilometer Post including painting and printing as per Standard
243 no 0
Drawing-2070 and Technical Specifications. position, One kilometer post
(precast)
Providing and fixing of road stud 100x 100 mm, die-cast in aluminum,
resistant to corrosive effect of salt and grit, fitted with lenses reflectors,
installed in concrete or asphaltic surface by drilling hole 30 mm upto a
depth of 60 mm and bedded in a suitable bituminous grout or epoxy
mortar, all as per Specification clause 1505., Providing and fixing of road
257 no 0
stud 100 x 100 mm, die-cast in aluminum, resistant to corrosive effect of
salt and grit, fitted with lenses reflectors, installed in concrete or
asphaltic surface by drilling hole 30 mm upto a depth of 60 mm and
bedded in a suitable bituminous grout or epoxy mortar, all as per
Drawing and Technical Specifications.
Metal Beam Crash Barrier, Flexible Crash Barrier, Wire Rope Safety
Barrier, Providing and erecting a wire rope safety barrier with vertical
posts of medium weight RS Joist (ISMB series) 100 mm x 75 mm (11.50
kg/m), 1.50 m long 0.85 m above ground and 0.65 m below ground
level, split at the bottom for better grip, embedded in M 15 grade cement
concrete 450 x 450 x 450 mm, 1.50 m center to center and with 4
263 meter 0
horizontal steel wire rope 40 mm dia and anchored at terminal posts 15
m apart. Terminal post to be embedded in M 15 grade cement concrete
foundation 2400 x 450 x 900 mm (depth), strengthened by a strut of RS
joist 100 x 75 mm, 2 m long at 450 inclination and a tie 100 x 8 mm, 1.50
m long at the bottom, all embedded in foundation concrete as per design
, Drawing and Technical Specifications.
Lettering new Letter and Figures of any Shade, Providing and lettering
269 new letter and figures of any shade with synthetic enamel paint black or cm-letter 0
any other approved color to give an even shade, Nepali
Lettering new Letter and Figures of any Shade, Providing and lettering
270 new letter and figures of any shade with synthetic enamel paint black or cm-letter 0
any other approved color to give an even shade, English and Roman
Supplying, fitting and fixing in position true to line and level POT-PTFE
bearing consisting of a metal piston supported by a disc or unreinforced
elastomer confined within a metal cylinder, sealing rings, dust seals,
480 tonne 0
PTFE surface sliding against stainless steel mating surface, complete
assembly to be of cast steel/fabricated structural steel, metal and
elastomer elements as per Drawing and Technical Specifications.
Modular Strip / Box Seal Joint, Providing and laying of a modular strip
Box seal expansion joint including anchorage catering to a horizontal
485 0
movement beyond 70 mm and upto 140 mm, complete as per Drawings
and Technical Specifications .
Modular Strip / Box Seal Joint, Providing and laying of a modular strip
box seal expansion joint catering to a horizontal movement beyond 140
486 meter 0
mm and upto 210 mm, complete as per Drawings and Technical
specifications.
Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for
487 nominal mix) in Foundation complete as per Drawing and Technical cum 0
Specifications.
Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for
488 nominal mix) in Foundation complete as per Drawing and Technical cum 0
Specifications., Manual Mixing
Providing and laying of Plain/Reinforced Cement Concrete in
489 Foundation complete as per Drawing and Technical Specifications, PCC cum 0
Grade M 15
Providing and laying of Plain/Reinforced Cement Concrete in
490 Foundation complete as per Drawing and Technical Specifications, PCC cum 0
Grade M 15, Manual Mixing
Providing and laying of Plain/Reinforced Cement Concrete in
491 Foundation complete as per Drawing and Technical Specifications, PCC cum 0
Grade M 20
Providing and laying of Plain/Reinforced Cement Concrete in
492 Foundation complete as per Drawing and Technical Specifications., cum 0
RCC Grade M 20
Providing and laying of Plain/Reinforced Cement Concrete in
493 Foundation complete as per Drawing and Technical Specifications., PCC cum 0
Grade M 25
Providing and laying of Plain/Reinforced Cement Concrete in
494 Foundation complete as per Drawing and Technical Specifications., cum 0
RCC Grade M 25
Providing and laying of Plain/Reinforced Cement Concrete in
495 Foundation complete as per Drawing and Technical Specifications., PCC cum 0
Grade M 30
Providing and laying of Plain/Reinforced Cement Concrete in
496 Foundation complete as per Drawing and Technical Specifications., cum 0
RCC Grade M30
Providing and laying of Plain/Reinforced Cement Concrete in
497 Foundation complete as per Drawing and Technical Specifications., cum 0
RCC Grade M 35
Providing and laying , fitting and placing un-coated Mild steel / HYSD
498 reinforcement complete in foundation as per drawing and technical tonne 0
specification
Providing and laying of Plain/Reinforced cement concrete in sub-
499 structure complete as per drawing and Technical Specifications, PCC cum 0
Grade M 15, Height upto 5 m
Providing and laying of Plain/Reinforced cement concrete in sub-
500 structure complete as per drawing and Technical Specifications, PCC cum 0
Grade M20, Height upto 5 m
Providing and laying of Plain/Reinforced cement concrete in sub-
501 structure complete as per drawing and Technical Specifications, PCC cum 0
Grade M 25, Height upto 5 m
Providing and laying of Plain/Reinforced cement concrete in sub-
502 structure complete as per drawing and Technical Specifications, PCC cum 0
Grade M 25, Height above 5 m to 10 m
Providing and laying of Plain/Reinforced cement concrete in sub-
503 structure complete as per drawing and Technical Specifications, PCC cum 0
Grade M 25, Height above 10 m
Providing and laying of Plain/Reinforced cement concrete in sub-
504 structure complete as per drawing and Technical Specifications, PCC cum 0
Grade M 30, Height upto 5 m
Providing and laying of Plain/Reinforced cement concrete in sub-
505 structure complete as per drawing and Technical Specifications, PCC cum 0
Grade M 30, Height above 5 m to 10 m
Providing and laying of Plain/Reinforced cement concrete in sub-
506 structure complete as per drawing and Technical Specifications, PCC cum 0
Grade M 30, Height above 10 m
Providing and laying of Plain/Reinforced cement concrete in sub-
507 structure complete as per drawing and Technical Specifications, RCC cum 0
Grade M 20, Height upto 5 m
Providing and laying of Plain/Reinforced cement concrete in sub-
508 structure complete as per drawing and Technical Specifications, RCC cum 0
Grade M 20, Height above 5 m to 10 m
Providing and laying of Plain/Reinforced cement concrete in sub-
509 structure complete as per drawing and Technical Specifications, RCC cum 0
Grade M 20, Height above 10 m
Providing and laying of Plain/Reinforced cement concrete in sub-
510 structure complete as per drawing and Technical Specifications, RCC cum 0
Grade M 25, Height upto 5 m
Providing and laying of Plain/Reinforced cement concrete in sub-
511 structure complete as per drawing and Technical Specifications, RCC cum 0
Grade M 25, Height above 5 m to 10 m
Providing and laying of Plain/Reinforced cement concrete in sub-
512 structure complete as per drawing and Technical Specifications, RCC cum 0
Grade M 25, Height above 10 m
Providing and laying of Plain/Reinforced cement concrete in sub-
513 structure complete as per drawing and Technical Specifications, RCC cum 0
Grade M 30, Height upto 5 m
Providing and laying of Plain/Reinforced cement concrete in sub-
514 structure complete as per drawing and Technical Specifications, RCC cum 0
Grade M 30, Height above 5 m to 10 m
Providing and laying of Plain/Reinforced cement concrete in sub-
515 structure complete as per drawing and Technical Specifications, RCC cum 0
Grade M 30, Height above 10 m
Providing and laying of Plain/Reinforced cement concrete in sub-
516 structure complete as per drawing and Technical Specifications, RCC cum 0
Grade M 35, Height upto 5 m
Providing and laying of Plain/Reinforced cement concrete in sub-
517 structure complete as per drawing and Technical Specifications, RCC cum 0
Grade M 35, Height above 5 m to 10 m
Providing and laying of Plain/Reinforced cement concrete in sub-
518 structure complete as per drawing and Technical Specifications, RCC cum 0
Grade M 35, Height above 10 m
Providing and laying , fitting and placing HYSD bar reinforcement in sub-
519 tonne 0
structure complete as per Drawing and Technical Specifications
Providing and laying ,fitting and placing Mild steel reinforcement
520 tonne 0
complete in sub-structure as per drawing and Technical Specification
651 Reinforced Earth Structures, Providing and lying facing elements of RCC sqm 0
Providing and Installation of soil nailing with semi-flexible 3-D galvanized
steel mat for slope protection and erosion control, Providing 3-D
galvanized steel panels from the palette, cutting them if necessary,
652 joining the panels to longer rows by overlapping and binding as sqm 0
necessary and putting on the slope, insertion of distribution bars or steel
ropes , fixing with clamps and marking holes for T-nails or static nails
(bored nails)
Providing and laying boulders apron on river bed for protection against
666 scour with Boulder / Stones weighing not less than 40 kg each complete cum 0
as per drawing and Technical specification., Manual Means
Providing and laying boulders apron on river bed for protection against
667 scour with Boulder / Stones weighing not less than 40 kg each complete cum 0
as per drawing and Technical specification., Mechanical means
Providing and laying boulders apron on river bed for protection against
scour with Boulder / Stones weighing not less than 40 kg each complete
668 cum 0
as per drawing and Technical specification., Mechanical means for
Bigger boulder
Providing and laying of apron with cement concrete blocks of size 0.5 x
0.5 x 0.5 m cast in-situ and made with nominal mix of M-15 grade
669 cum 0
cement concrete with a minimum cement content of 250 kg/cum .,
Manual means
Providing and laying of apron with cement concrete blocks of size 0.5 x
0.5 x 0.5 m cast in-situ and made with nominal mix of M-15 grade
670 cum 0
cement concrete with a minimum cement content of 250 kg/cum .,
Mechanical means
Providing and laying Pitching on slopes laid over prepared filter media
671 including boulder apron laid dry in front of toe of embankment complete cum 0
as per drawing and Technical specifications, Stone/Boulder
Providing and laying Pitching on slopes laid over prepared filter media
including boulder apron laid dry in front of toe of embankment complete
672 as per drawing and Technical specifications, Cement Concrete Blocks of cum 0
size 0.3 x 0.3 x 0.3 m cast in cement concrete of Grade M 15, Manual
Means
Providing and laying Filter material underneath pitching in slopes
673 cum 0
complete as per drawing and Technical specification
Providing and laying Grouted Stone Pitching in protection work, with
674 stone size not less than 0.01 cum and cement: sand mortar (1:3) all cum 0
complete as per Drawing and Technical Specifications.
Providing and laying 20 mm dia tor steel dowel bar including drilling 35
mm dia bore hole in rock necessary bending, hooking tying
675 meter 0
reinforcement in position and grouting etc. complete as per Drawing and
Technical specifications., Without using Mechanical aid
Providing and laying 20 mm dia tor steel dowel bar including drilling 35
mm dia bore hole in rock necessary bending, hooking tying
676 meter 0
reinforcement in position and grouting etc. complete as per Drawing and
Technical specifications., Using Mechanical Aid
Repair of old Joints Sealant, Providing and repair of old joints including
removal of existing sealant and re sealing of contraction, longitudinal or
766 meter 0
expansion joints in concrete pavement with fresh sealant material as per
Drawing and Technical Specifications.
Concrete Jacketing, Preparation, hacking and cleaning of existing
767 sqm 0
surface for concrete jacketing as per direction of the Engineer.
Concrete Jacketing, Drilling Holes on existing concrete surface of 16
768 nos 0
mm diameter and 300 mm depth
769 Concrete Jacketing, Providing and fixing Anchor bar kg 0
770 Concrete Jacketing, Providing and Filling drill hole with Epoxy Grout 0
Concrete Jacketing, Providing and applying Micro silica/ silica fume
concreting for concrete jacketing works ( slab /beam/ abutment section
771 cum 0
of the bridges ) as per instructions of manufacturer and as approved by
the Engineer.
Corrosion Treatment of Rebar's, Providing accessories and removal of
772 sqm 0
rust from exposed rebar area as per direction of the Engineer.
Corrosion Treatment of Rebar's, Providing and Application of Rust
773 Cleaning & passivating agent as per manufacturer' s guidelines and sqm 0
instruction of the Engineer.
Corrosion Treatment of Rebar's, Providing and Application of Alkaline,
polymeric, elastomeric formulation designed to protect steel from
774 sqm 0
corrosion as per manufacturer' s guidelines and instruction of the
Engineer.
Corrosion Treatment of Rebar's, Providing and Application of Acrylic
775 Based bond coat for reinforcement as per manufacturer' s guidelines sqm 0
and instruction of the Engineer.
Corrosion Treatment of Rebar's, Providing and Application of Pre-
776 packed polymer modified mortar as per manufacturer' s guidelines and 0
instruction of the Engineer.
Corrosion Treatment of Rebar's, Providing and Application of concrete
777 penetrating corrosion inhibitor as per manufacturer' s guidelines and sqm 0
instruction of the Engineer.
Providing and Application of 3 coat of high build micro porous anti
778 carbonation coating on concrete surface as per manufacturer' s sqm 0
guidelines and instruction of the Engineer.
Fiber Reinforced Polymer works, Providing and Application of Fiber
779 reinforced polymer ( carbon fiber) as per manufacturer' s guidelines and sqm 0
instruction of the Engineer.
Fiber Reinforced Polymer works, Providing and Application of carbon
780 laminated ( 50 mm wide 1.4 mm thick) system as per manufacturer' s meter 0
guidelines and instruction of the Engineer.
809 Compost and mulch production, Turning compost once per month. cum 0
Direct seedling on site, Broadcasting grass seeds on slopes <40o;
810 sqm 0
seedling rate 25 g per sqm.
Direct seedling on site, Broadcasting grass seeds on slopes <40o
811 sqm 0
;including cover with long mulch, seedling rate 25 g per sqm.
Direct seedling on site, Broadcasting grass seeds on slopes <40-45*
including cover with long mulch, and jute netting of mesh size 300 mm *
812 500 mm. Seedling @25 g per sqm. Operation includes pegging with sqm 0
suitable live pegs or hardwood cutting (e.g. Simali) 1 m spacing, jute net
of 6.75 m* size.
Direct seedling on site, Sowing shrub or tree seeds on all slopes at 25
813 cm intervals, including digging planting holes to 5 cm depth and sqm 0
covering with soil. Two seeds per planting hole.
Planting grass on site, Planting single node culm cutting of grass (e.g.
napier) on fill slopes<45 and embankment slopes in plain areas. Approx.
814 nos 0
length 15-, including digging planting hole 10 - 20 cm depth using a
metal rod or hardwood peg.
Planting grass on site, Planting single node culm cutting of grass (e.g.
815 napier) on fill slopes >45o Approx. length 15-, including digging planting nos 0
hole 10- depth using a metal rod or hardwood peg.
Planting grass on site, Planting single node culm cutting of grass (e.g.
816 napier) on fill slopes >45o Approx. length 15-, including digging planting nos 0
hole 10- depth using a metal rod or hardwood peg.
Planting grass on site, Planting rooted grass slips on embankment
slopes in plain areas, at spacing within the row. The first row is 0.75 m
817 meter 0
from the edge of the pavement and subsequent rows are spaced at
intervals down the embankment.
Planting grass on site, Planting rooted grass slips on the slopes <45o
including preparation of slips on site. a max of 5 cm depth with metal rod
818 sqm 0
or Operation includes digging planting hole to hard-wood peg,
depending on the nature of the soil. The planting drills should be space
Planting grass on site, Planting rooted grass slips on the slopes 45o -
60o including preparation of slips on site. a max of 5 cm depth with
819 sqm 0
metal rod or Operation includes digging planting hole to hard-wood peg,
depending on the nature of the soil. The planting drills should be space
Planting grass on site, Planting rooted grass slips on the slopes > 60o
including preparation of slips on site. a max of 5 cm depth with metal rod
820 sqm 0
or Operation includes digging planting hole to hard-wood peg,
depending on the nature of the soil. The planting drills should be space
Planting shrub and tree seedling and cutting on site, Planting rooted tree
stump cutting and bare root seedlings, including pitting, transplanting,
824 nos 0
composting and mulching on slopes <300. Pit size 10 cm diameter x
depth. Compost volume 1/4 of volume of the pit mix with original soil.
Planting shrub and tree seedling and cutting on site, Planting rooted tree
stump cutting and bare root seedlings, including pitting, transplanting,
825 nos 0
composting and mulching on slopes <300 - 45o Pit size 10 cm diameter
x depth. Compost volume 1/4 of volume of the pit mix with original soil.
Planting shrub and tree seedling and cutting on site, Planting rooted tree
stump cutting and bare root seedlings, including pitting, transplanting,
826 nos 0
composting and mulching on slopes > 45o Pit size 10 cm diameter x
depth. Compost volume 1/4 of volume of the pit mix with original soil.
Jute netting works, Standard jute netting for bare slopes and under
planting with slips. Spinning raw jute from 100% jute fiber into yarn and
weaving the yarn into netting. Hand spun yarn 5 to 8 mm in diameter,
832 sqm 0
width of net 1.20 meters warp strands 27 no per , mesh size 30-40 mm
sq. and 1.25 kg/m weight at 1.20 m width.[Note A Toro is the weaving
shuttle, bamboo culm.]normally made from a split large
Jute netting works, Wide mesh jute netting for holding mulch on slopes.
Spinning raw jute from 100% jute fiber into yarn and weaving the yarn
into netting. Hand spun yarn 3 to 5 mm in diameter 1.20 m side and 11.2
833 sqm 0
m long. Mesh size 150 mm x 500 mm rectangular mesh and 0.25 kg/m
at 1.20 m width. [Note A torso is the weaving shuttle, normally made
from a split large bamboo culm.]
Jute netting works, Placing 30-40 mm square mesh jute netting on bare
slopes (for later under planting with grass slips), including pegging with
834 sqm 0
live hardwood cutting or split bamboo pegs and loosening tension so
that the net hugs the slope throughout.
Jute netting works, Placing 150 x 500 mm mesh jute netting to hold
mulch on slopes, including application of mulch and pegging with live
835 sqm 0
hardwood cutting or split bamboo pegs and loosening tension so that the
net hugs the slope throughout.
Gabion bolster cylinders, Providing and laying 60 cm dia gabion
bolsters panels: 70 x 100 mm hexagonal mesh wire (10 swg frame and
836 meter 0
12 Swg mesh) including Earthwork excavation filling with boulder, back
filling all complete as per Drawing and Technical Specifications.
Grassing with ' Doobs' Grass, Providing and grassing with 'Doobs' grass
including watering and maintenance of the lawn for 30 days or more till
846 sqm 0
the grass forms a thick lawn free from weeds and fit for moving including
supplying good earth if needed, In rows 15 cm apart in either direction
847 Grassing with ' Doobs' Grass, In rows 7.5 cm apart in either direction sqm 0
Making Lawns including Ploughing and Dragging, Providing and making
lawns including ploughing and breaking of clod, removal of rubbish,
848 dressing and supplying Doobs grass roots and planting at 15 cm apart, sqm 0
including supplying and spreading of farm yard manure at rate of 0.18
cum per 100 sqm
Maintenance of Lawns or Turfing of Slopes, Regular Maintenance of
849 lawns or Turfing of slopes (rough grassing) for a period of one year sqm 0
including watering etc.
Turfing Lawns with Fine Grassing including Ploughing, Dressing,
Providing and Turfing lawns with fine grassing including ploughing,
850 dressing including breaking of clods, removal of rubbish, dressing and sqm 0
supplying Doobs grass roots at 10 cm apart, including supplying and
spreading of farm yard manure at rate of 0.6 cum per 100 sqm
Maintenance of Lawns with Fine Grassing for the First Year, Regular
851 Maintenance of lawns with fine grassing for the first year including sqm 0
watering etc.
Planting and Maintaining of Permanent Hedges, Providing and Planting
permanent hedges including digging of trenches, 60 cm wide and 45 cm
852 deep, refilling the excavated earth mixed with farmyard manure, meter 0
supplied at the rate of 4.65 cum per 100 metres and supplying and
planting hedge plants at 30 cm apart
Planting and Maintaining of Permanent Hedges, Maintenance of hedge
853 meter 0
for one year
Planting and Maintaining of Flowering Plants and Shrubs, Providing and
planting flowering plants and shrubs in central verge (200 plants and
854 meter 0
800 shrubs in two rows in one km length of road where width of verge is
3 m and above.)
Planting of Trees and their Maintenance for one Year, Providing and
Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1
856 m deep dug in the ground, mixing the soil with decayed farm yard/sludge nos 0
manure, planting the saplings, backfilling the trench, watering, fixing the
tree guard and maintaining the plants for one year
Half Brick Circular Tree Guard, in 2nd Class Brick, internal diametre 1.25
metres, and height 1.2 metres, above ground and 0.20 metre below
ground, Providing and laying half brick circular tree guard, in 2nd class
brick, internal diametre 1.25 metres, and height 1.2 metres, above
858 nos 0
ground and 0.20 metre below ground, bottom two courses laid dry, and
top three courses in cement mortar 1:6 (1 cement 6 sand) and the
intermediate courses being in dry honey comb masonry, as per design
complete
Edging with 2nd Class Bricks, Laid Dry Lengthwise, Providing and
edging with 2nd class bricks, laid dry lengthwise, including excavation,
859 meter 0
refilling, consolidation, with a hand packing and spreading nearly surplus
earth within a lead of 50 metres
Making Tree Guard 53 cm dia and 1.3 meter height as per Design from
empty bitumen drums, Providing and making tree guard 53 cm dia and
1.3 m high as per design from empty bitumen drum, slit suitably to
860 nos 0
permit sun and air, (supplied by the department at stock issue rate)
including providing and fixing 2 nos MS sheet rings 50 x 0.5 mm with
rivets, complete in all respect
Making Tree Guard 53 cm dia and 2 meter height as per Design from
empty bitumen drums, Providing and making tree guard 53 cm dia and 2
metres high as per design from empty bitumen drums, slit suitably to
861 permit sun and air, ( supplied by the department at stock issue rate) nos 0
including providing and fixing four legs 40 cm long of 30 x 3 mm MS
riveted to tree guard and providing and fixing 2 nos MS sheet rings 50 x
0.5 mm with rivets complete in all respects
Wrought Iron and Mild Steel Welded Work, Providing Wrought iron and
mild steel welded work (using angles, square bars, tees and channel
grills, grating frames, gates and tree guards of any size and design etc.
862 kg 0
including cost of screens and welding rods or bolts and nuts complete
fixed in position but without the cost of excavation and concrete for fixing
which will be paid separately
Tree Guard with MS Iron, Providing and fixing MS iron tree guard 60 cm
dia and 2 meter high above ground level formed of 4 Nos (25 x 6 mm)
and 8 Nos (25 x 3 mm) vertical MS riveted to 3 Nos (25 x 6 mm) iron
863 nos 0
rings in two halves, bolted together with 8 mm dia and 30 mm long bolts
including painting two coats with paint of approved brand over a coat of
priming, complete in all respects.
Tree Guard with MS Angle Iron and Steel Wire, Providing and fixing tree
guard 0.60 meter square, 2.00 meter high fabricated with MS angle iron
864 nos 0
30 x 30 x 3 mm, MS iron 25 x 3 mm and steel wire 3 mm dia welded and
fabricated as per design in two halves bolted together
Compensatory Afforestation, Planting trees as compensatory
afforestation at the rate of 290 trees per hectare at a spacing of 6 m by
grubbing and leveling the ground upto a depth of 150 mm, digging holes
865 sqm 0
0.9 m dia, 1 m deep, mixing farm yard/sludge manure with soil, planting
of sapling 2 m high with 25 cm dia stem, backfilling the hole and
watering
Fog Spray, Providing and applying low viscosity bitumen emulsion for
866 sealing cracks less than 3 mm wide or incipient fretting or disintegration sqm 0
in an existing bituminous surfacing.
Fog Spray, Providing and applying low viscosity bitumen emulsion for
sealing cracks less than 3 mm wide or incipient fretting or disintegration
867 sqm 0
in an existing bituminous surfacing., In case it is decided by the engineer
to blind the fog spray.
Hill Side Drain Clearance, Removal of earth from the choked hill side
868 meter 0
drain and disposing it on the valley side manually
Maintenance,Carryout Routine ( regular maintenance) of Black top/
869 Gravel road in plain area ( Terai) as per Technical Specifications and Km - day 0
direction of the Engineer,
Maintenance, Carryout Routine ( regular maintenance) of Black top/
870 Gravel road in Hilly area as per Technical Specifications and direction of Km - day 0
the Engineer,
Maintenance, Carryout Routine ( regular maintenance) of Black top/
871 Gravel road in Hilly area as per Technical Specifications and direction of 20 km per year 0
the Engineer,
Providing and restoration of rain cuts benching for 300 mm width, laying
fresh material in layers not exceeding 250 mm and compacting to
874 restore the original alignment, levels and slopes as per Specification and 0
direction of the Engineer., Mechanical Means including conveyance of
earth from other surrounding area with lead
Maintenance of Earthen Shoulder (filling with fresh soil), Providing and
making up loss of Material/ irregularities on shoulder to the design level
875 0
by adding fresh approved soil and compacting as per Technical
Specification and direction of the Engineer.
Maintenance of Earth Shoulder (stripping excess soil), Stripping excess
soil from the shoulder surface to achieve the approved level and
876 sqm 0
compacting as per Technical Specifications and direction of the
Engineer.
Providing, laying and restoration of rain cuts with gravel or river bed
Material , benching for 300 mm width, laying fresh Material in layers not
exceeding 250 mm and compacting to restore the original alignment,
877 cum 0
levels and slopes as per Technical specifications and direction of the
Engineer., Mechanical Means including conveyance of river bed gravel
with lead
Crack Filling, Providing and filling of crack using slow - curing bitumen
883 emulsion and applying crusher dust in case crack are wider than 3 mm meter 0
as per Technical Specifications and instruction of the Engineer
Rotary core drilling in soil /rock and take continuous rock core to a depth
914 below ground level with Tungstun carbide bits including core sampling meter 0
all complete as directed, soft Soil, Depth below bed level upto 5.0 M
Rotary core drilling in soil /rock and take continuous rock core to a depth
915 below ground level with Tungstun carbide bits including core sampling meter 0
all complete as directed, soft Soil, Depth below bed level 5.0 m - 10 m
Rotary core drilling in soil /rock and take continuous rock core to a depth
916 below ground level with Tungstun carbide bits including core sampling meter 0
all complete as directed, soft Soil, Depth below bed level 10 m - 15m
Rotary core drilling in soil /rock and take continuous rock core to a depth
917 below ground level with Tungstun carbide bits including core sampling meter 0
all complete as directed, soft Soil, Depth below bed level 15 m - 20 m
Rotary core drilling in soil /rock and take continuous rock core to a depth
918 below ground level with Tungstun carbide bits including core sampling meter 0
all complete as directed, soft Soil, Depth below bed level 20 m - 25 m
Rotary core drilling in soil /rock and take continuous rock core to a depth
919 below ground level with Tungstun carbide bits including core sampling meter 0
all complete as directed, soft Soil, Depth below bed level > 25 m
Rotary core drilling in soil /rock and take continuous rock core to a depth
below ground level with Tungstun carbide bits including core sampling
920 meter 0
all complete as directed, Soil ( gravel BMS etc), Depth below bed level
upto 5.0 M
Rotary core drilling in soil /rock and take continuous rock core to a depth
below ground level with Tungstun carbide bits including core sampling
921 meter 0
all complete as directed, Soil ( gravel BMS etc), Depth below bed level
5.0 m - 10 m
Rotary core drilling in soil /rock and take continuous rock core to a depth
below ground level with Tungstun carbide bits including core sampling
922 meter 0
all complete as directed, Soil ( gravel BMS etc), Depth below bed level
10 m - 15m
Rotary core drilling in soil /rock and take continuous rock core to a depth
below ground level with Tungstun carbide bits including core sampling
923 meter 0
all complete as directed, Soil ( gravel BMS etc), Depth below bed level
15 m - 20 m
Rotary core drilling in soil /rock and take continuous rock core to a depth
below ground level with Tungstun carbide bits including core sampling
924 meter 0
all complete as directed, Soil ( gravel BMS etc), Depth below bed level
20 m - 25 m
Rotary core drilling in soil /rock and take continuous rock core to a depth
below ground level with Tungstun carbide bits including core sampling
925 meter 0
all complete as directed, Soil ( gravel BMS etc), Depth below bed level
> 25 m
Rotary core drilling in soil /rock and take continuous rock core to a depth
926 below ground level with Tungstun carbide bits including core sampling meter 0
all complete as directed, Soft Rock, Depth below bed level upto 5.0 m
Rotary core drilling in soil /rock and take continuous rock core to a depth
927 below ground level with Tungstun carbide bits including core sampling meter 0
all complete as directed, Soft Rock, Depth below bed level 5.0 m - 10 m
Rotary core drilling in soil /rock and take continuous rock core to a depth
below ground level with Tungstun carbide bits including core sampling
928 meter 0
all complete as directed, Soft Rock, Depth below bed level 10 m - 15m :
Add 20
Rotary core drilling in soil /rock and take continuous rock core to a depth
below ground level with Tungstun carbide bits including core sampling
929 meter 0
all complete as directed, Soft Rock, Depth below bed level 15 m - 20
mM
Rotary core drilling in soil /rock and take continuous rock core to a depth
below ground level with Tungstun carbide bits including core sampling
930 meter 0
all complete as directed, Soft Rock, Depth below bed level 20 m - 25
mM
Rotary core drilling in soil /rock and take continuous rock core to a depth
931 below ground level with Tungstun carbide bits including core sampling meter 0
all complete as directed, Soft Rock, Depth below bed level > 25
Rotary core drilling in soil /rock and take continuous rock core to a depth
932 below ground level with Tungstun carbide bits including core sampling meter 0
all complete as directed, Hard Rock, Depth below bed level upto 5.0 m
Rotary core drilling in soil /rock and take continuous rock core to a depth
below ground level with Tungstun carbide bits including core sampling
933 meter 0
all complete as directed, Hard Rock, Depth below bed level 5.0 m - 10
m
Rotary core drilling in soil /rock and take continuous rock core to a depth
934 below ground level with Tungstun carbide bits including core sampling meter 0
all complete as directed, Hard Rock, Depth below bed level 10 m - 15m
Rotary core drilling in soil /rock and take continuous rock core to a depth
below ground level with Tungstun carbide bits including core sampling
935 meter 0
all complete as directed, Hard Rock, Depth below bed level 15 m - 20
mM
Rotary core drilling in soil /rock and take continuous rock core to a depth
below ground level with Tungstun carbide bits including core sampling
936 meter 0
all complete as directed, Hard Rock, Depth below bed level 20 m - 25
mM
Rotary core drilling in soil /rock and take continuous rock core to a depth
937 below ground level with Tungstun carbide bits including core sampling meter 0
all complete as directed, Hard Rock, Depth below bed level > 25 m
938 Taking disturbed sample during drilling as directed by the Engineer. nos 0
939 Taking Undisturbed sample during drilling as directed by the Engineer. nos 0
Providing & installing piezometers at the location of each bore holes for
study of fluctuations in water table (Water table studies to be carried out
weekly for a period of 3 months) with regular weekly interval and
941 nos 0
predetermined time & day each week and depth of water recorded with
respect to the reduced level. Diurnal variations to be noted for 3 selected
weeks during the period of observations and reporting.
Sub-Total
VAT 13%
Grand Total with VAT
Providing and installation of project signboards with size of 1.8 x 1.2 m as per
3 1.3 110 specification and instruction of engineer. nos 0
Providing and establishing camp with mobilization and demobilization for
4 1.4 111 contractor's Labour and staff and demolishing after completion of works as per job 0
the specifications and instruction of the Engineer.
Relocation of services / minor infrastructures, as per specifications and
5 1.5 111 instruction of the Engineer. job 0
6 1.6 116 Supply of Project Record as per specifications and instruction of the Engineer. set 0
Reinstatement of quarry sites at the completion of works as instructed by the
7 1.7 111 engineers. 0
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
8 2.1.I.i.A 201 sqm 0
lead of 30 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness., By Manual Means:-, In area of light jungle
(less than 15 number per 100 sqm)
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
9 2.1.I.i.B 201 sqm 0
lead of 30 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness., By Manual Means:-, In area of thorny jungle
( more than 15 numbers per 100 sqm)
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
11 2.1.I.i.C 201 lead of 30 meters including removal and disposal of top organic soil not cum 0
exceeding 150 mm in thickness., By Manual Means:-, Felling and uprooting of
bamboo clearing the area, stacking of bamboo and disposing of wastes
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
12 2.1.I.ii.A 201 sqm 0
lead of 30 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness., By Mechanical Means, In area of light jungle
(less than 15 number per 100 sqm )
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
13 2.1.I.ii.B 201 sqm 0
lead of 30 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness., By Mechanical Means, In area of thorny
jungle ( more than 15 numbers per 100 sqm)
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
14 2.1.I.ii.C 201 lead of 30 meters including removal and disposal of top organic soil not cum 0
exceeding 150 mm in thickness., By Mechanical Means, Felling and uprooting
of bamboo clearing the area, stacking of bamboo and disposing of wastes
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
15 2.1.II.i.A 201 sqm 0
lead of 1000 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness., By Manual Means:-, In area of light jungle
(less than 15 number per 100 sqm)
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
16 2.1.II.i.B 201 sqm 0
lead of 1000 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness., In area of thorny jungle ( more than 15
numbers per 100 sqm)
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
17 2.1.II.i.C 201 cum 0
lead of 1000 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness., Felling and uprooting of bamboo clearing the
area, stacking of bamboo and disposing of wastes
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
2.1.II.ii. materials and stacking of serviceable Material to be used or auctioned, up to a
18 201 sqm 0
A lead of 1000 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness., By Mechanical Means, In area of light jungle
(less than 15 number per 100 sqm )
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
2.1.II.ii. materials and stacking of serviceable Material to be used or auctioned, up to a
19 201 sqm 0
B lead of 1000 meters including removal and disposal of top organic soil not
exceeding 150 mm in thickness., By Mechanical Means, In area of thorny
jungle ( more than 15 numbers per 100 sqm)
Clearing and Grubbing Road Land ., Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable Material to be used or auctioned, up to a
2.1.II.ii.
20 201 lead of 1000 meters including removal and disposal of top organic soil not cum 0
C exceeding 150 mm in thickness., By Mechanical Means, Felling and uprooting
of bamboo clearing the area, stacking of bamboo and disposing of wastes
Reinforced Soil wall Structure with Green Terra Mesh (GTM) Facing:,
Providing and fixing Flexible Geogrids ( e.g. Paralink) as primary
reinforcement for composite soil reinforcement system, made of polyester core
with polyethylene coating with design life >100 years including secondary
reinforcement of Green Terramesh system (GTM) as per Specifications Clause
67 3.2 301 2402 with Zn+PVC coated with Bio-Mat, Steel Greed made of MS bar (10 mm sqm #NAME?
dia and grid size 160 mm x 160 mm), 3 nos of anchor bars of 10 mm dia to
maintain the slope of GTM, laying of Geo textile, drainage gallery filling with
boulder etc. all complete as per Specifications.
Reinforced Soil wall Structure with Concrete Facing:, Providing and fixing
Flexible Geogrids ( e.g. Paralink) as primary reinforcement for composite soil
reinforcement system, made of polyester core with polyethylene coating with
design life >100 years including secondary reinforcement of Green
Terramesh system (GTM) as per Specifications Clause 2402 with Zn+PVC
coated with Bio-Mat, Steel Greed made of MS bar (10 mm dia and grid size 160
68 3.3 301 mm x 160 mm), 3 nos of anchor bars of 10 mm dia to maintain the slope of sqm #NAME?
GTM, laying of Geo textile, drainage gallery filling with boulder etc. all
complete as per Specifications., High Strength Flexible Geogrids ( made of
polyester core with polyethylene coating) with Strength as per design ( at
least 200 KN/ m)
Reinforced Soil wall Structure with Concrete Facing:, Providing and fixing
Flexible Geogrids ( e.g. Paralink) as primary reinforcement for composite soil
reinforcement system, made of polyester core with polyethylene coating with
design life >100 years including secondary reinforcement of Green
Terramesh system (GTM) as per Specifications Clause 2402 with Zn+PVC
69 3.3_a 301 coated with Bio-Mat, Steel Greed made of MS bar (10 mm dia and grid size 160 sqm #NAME?
mm x 160 mm), 3 nos of anchor bars of 10 mm dia to maintain the slope of
GTM, laying of Geo textile, drainage gallery filling with boulder etc. all
complete as per Specifications., Para web 50 KN and 100 ken each
GI Barbed Wire Fencing 1.8 Meter High with RCC post, Providing and fixing
1.8 m high GI barbed wire fencing with 2.4 m RCC M 15 grade 150 mm x 150
mm concrete post placed every 3 m center-to-center founded in M 15 grade
cement concrete, 0.6 m below ground level, every 15th post, last but one end
72 4.2.B 404 post and corner post shall be strutted on both sides and end post on one side meter #NAME?
only and provided with 9 horizontal lines and 2 diagonals interwoven with
horizontal wires, fixed with GI staples, turn buckles etc. complete as per
Drawing and Technical Specifications.
GI Barbed Wire Fencing 1.2 Meter High on Angle Iron, Providing and fixing
1.2 meters high GI barbed wire fencing with 1.8 m angle iron posts 40 mm x 40
mm x 6 mm placed every 3 meters center to center founded in M 15 grade
cement concrete, 0.6 meter below ground level, every 15th post, end post and
73 4.2.C 404 corner post shall be strutted on both sides and end post on one side only and meter #NAME?
provided with 9 horizontal lines and 2 diagonals interwoven with horizontal
wires, fixed with GI staples, turn buckles etc. complete as per Drawing and
Technical Specifications.
GI Barbed Wire Fencing 1.8 Meter High, Providing and fixing 1.8 meters high
GI barbed wire fencing
with 2.4 m angle iron posts 50 mm x 50 mm x 6 mm placed every
3 meters center to center founded in M 15 grade cement
concrete, 0.6 meter below ground level, every 15th post, last but
74 4.2.D 404 one end post and corner post shall be strutted on both sides and meter #NAME?
end post on one side only and provided with 12 horizontal lines
and 2 diagonals interwoven with horizontal wires, fixed with GI
staples, turn buckles etc. complete as per Drawing and Technical
Specifications
Field Test, Carryout Pile Load Test up to 200 tones including all consumable
75 5.4.10 500 and accessories as per test procedure mentioned in the Technical Specifications. nos/day 0
76 5.1 504 Laboratory Setup including supply of electricity, water, gas and heating etc. set 0
Providing, installing and maintaining Quality control laboratory with
77 5.2 504 equipment as specified in the Technical Specifications. set 0
78 5.3 504 Operation of Laboratory with Technical support of Laboratory staff Man-month 0
Field Test, Carryout Axle load survey including all consumables and
79 5.4.1 500 accessories. no. of reading 0
Field Test, Carryout Benkelman Beam Deflection Test including all
80 5.4.2 500 consumables and accessories. no of reading 0
Field Test, Carryout Field Density test of sub grade/ sub base/ base test by Sand
81 5.4.3 505 replacement Method as per procedure mentioned in the Technical nos 0
Specifications.
82 5.4.4 505 Field Test, Sampling from Subgrade, Sub base, base and Wearing Course nos 0
Field Test, Carryout Rapid Determination of CBR by dynamic core
83 5.4.5 505 penetrometer as per test procedure mentioned in the Technical Specifications. point 0
Field Test, Carryout Measurement of Pavement Thickness including all
84 5.4.6 505 consumable and accessories as per test procedure mentioned in the Technical point 0
Specifications.
Laboratory Test, Carryout Shear test of disturbed sample including all
85 5.5.13 505-508 consumable and accessories as per test procedure mentioned in the Technical nos 0
Specifications.
Field Test, Coring of asphalt concrete Sample from pavement including all
500,- consumable and accessories as per test procedure mentioned in the Technical nos/day
86 5.4.11 0
1300 Specifications.
Field Test, Carryout Schmidt Hammer Test including all consumable and
87 5.4.12 accessories as per test procedure mentioned in the Technical Specifications. no 0
Field Test, Carryout Bridge Load test (Load testing of one or more spans of
bridge as selected by the Engineer as per approved load test procedure
"500,200 following relevant IS/IRC codes including deflection measuring instruments,
88 5.4.13 nos #NAME?
0" loading materials, recoding and analyzing the load testing results cleaning of
girder after load test, etc.)
Stripping and Storing Top Soil, Stripping, storing of top soil by road side at 15
m internal and re-application on embankment slopes, cut slopes and other areas
132 9.5 905 in localities where the available embankment Material is not conducive to plant cum 0
growth as per Drawing and Technical Specifications.
Stripping, Storing and Re-laying Top Soil from Borrow Areas in Agriculture
Fields., Stripping of top soil from borrow areas located in agriculture fields,
storing at a suitable place, spreading and re-laying after taking the borrow earth
133 9.6 909 to maintain fertility of the agricultural field, finishing it to the required levels to cum 0
the satisfaction of the farmer as per Drawing and Technical Specifications.
Providing suitable material and Back filling behind abutment, wing wall and
139 9.11.A 908 return wall complete as per Drawing and Technical Specifications., Granular cum 0
Material
Providing suitable material and Back filling behind abutment, wing wall and
140 9.11.B 908 return wall complete as per Drawing and Technical Specifications., Sandy cum 0
Material
Providing suitable material and Back filling behind abutment, wing wall and
141 9.11.C 908 return wall complete as per Drawing and Technical Specifications., Locally cum 0
available Material including compaction by tamping rod ( without watering)
Providing suitable material and Back filling behind abutment, wing wall and
142 9.11.D 908 return wall complete as per Drawing and Technical Specifications., Locally cum 0
available Material, with out watering and compaction by tamping rod
Providing and laying of Filter media with granular Material/stone crushed
aggregates to a thickness of not less than 600 mm with smaller size towards the
143 9.12 909,910 soil and bigger size towards the wall and provided over the entire surface behind cum 0
abutment, wing wall and return wall to the full height compacted to a firm
condition complete as per drawing and Technical Specification.
Scarifying Existing road Surface to a Depth of 50 mm by
Manual Means, Scarifying the existing road surface to a depth of 50 mm and
144 10.1.A 1003 disposal of scarified Material with all lifts and leads as per Drawing and sqm 0
Technical Specifications.
Scarifying Existing road Surface to a Depth of 50 mm by
Manual Means, Scarifying the existing granular road surface to a depth of
145 10.1.B 1003 50mm and disposal of scarified Material with all lifts and leads within Right of sqm 0
way as per Drawing and Technical Specifications.
Scarifying Existing road Surface to a depth of 50 mm by Mechanical Means,
Scarifying the existing road surface to a depth of 50 mm and disposal of
146 10.2.A 1003 scarified Material with in all lifts and lead as per Drawing and Technical sqm 0
Specifications.
Scarifying Existing road Surface to a depth of 50 mm by Mechanical Means,
Scarifying the existing bituminous road surface to a depth of 50 mm and
147 10.2.B 1003 disposal of scarified Material with in all lifts and lead as per Drawing and sqm 0
Technical Specifications.
Construction of Subgrade and Earthen Shoulders with approved Material
( capping layer), Providing and laying sub-grade and earthen shoulders with
148 10.3.A 1004 approved Material obtained from borrow pits with all lifts & leads as per sqm 0
Drawing and Technical Specifications.
Compacting Original Ground, Compacting original ground supporting sub-
1003, grade, Loosening of the ground upto a level of 500 mm below the sub-grade
149 10.4.I_a level, watered, graded and compacted in layers as per Drawing and Technical sqm 0
1005
Specifications.
Compacting Original Ground, Compacting original ground supporting
embankment, Loosening, leveling and Compacting original ground supporting
1003, embankment to facilitate placement of first layer of embankment, scarified to a sqm
150 10.4.II_a 0
1005 depth of 150 mm, mixed with water at OMC and then compacted by rolling so
as to achieve dry density as per Drawing and Technical Specifications.
Lime Stabilization for Improving Sub-grade, Providing , laying and spreading
available soil with 3 per cent slaked lime having minimum content of 70 per
151 10.5.A 1006 cent of CaO, mixing, grading and compacting at OMC to the desired density to sqm 0
form a layer of sub grade as per Drawing and Technical Specifications., By
Mechanical Means
Providing, laying and spreading Material on a prepared sub grade, adding the
designed quantity of cement to the spread Material, mixing in place , grading
156 12.3 and compacting at OMC to achieve the desired unconfined compressive cum 0
strength and to form a layer of sub-base/base as per Drawing and Technical
Specifications.
Providing, laying, spreading and compacting graded stone aggregate to wet mix
macadam specification including premixing the Material with water at OMC
176 12.14.A laying in uniform layers in sub- base / base course on well prepared surface and cum #NAME?
compacting to achieve required density as per Drawing and Technical
Specifications., Base course with B1 material
Providing, laying, spreading and compacting graded stone aggregate to wet mix
macadam specification including premixing the Material with water at OMC
177 12.14.B laying in uniform layers in sub- base / base course on well prepared surface and cum #NAME?
compacting to achieve required density as per Drawing and Technical
Specifications., Base course with B2 material
Providing, laying, spreading and compacting graded stone aggregate to wet mix
macadam specification including premixing the Material with water at OMC
178 12.14.C laying in uniform layers in sub- base / base course on well prepared surface and cum #NAME?
compacting to achieve required density as per Drawing and Technical
Specifications., Sub Base course with S1 material
Providing, laying, spreading and compacting graded stone aggregate to wet mix
macadam specification including premixing the Material with water at OMC
179 12.14.D laying in uniform layers in sub- base / base course on well prepared surface and cum #NAME?
compacting to achieve required density as per Drawing and Technical
Specifications., Sub Base course with S2 material
Prime Coat, Prime Coat, with MC 30 / 70 by Mechanical Means, Providing and
applying prime coat with Hot Bitumen ( including cutter) on prepared surface of
180 13.1.A 1302 granular base including cleaning of road surface and spraying by mechanical lit 0
means as per Technical Specification ., Bitumen ( cutback) MC 30 ( for WBM)
Seal Surfacing, Providing and laying seal coat sealing the voids in a bituminous
217 13.11 1310 surface as per Drawing and Technical Specifications. sqm 0
Slurry Seal, Providing and laying slurry seal consisting of a mixture of fine
aggregates, Portland cement filler, bituminous emulsion and water on a road
218 13.12.i 1310 surface including cleaning of surface, mixing of slurry seal in a suitable mobile sqm 0
plant, laying and compacting to provide even riding surface as per Drawing and
Technical Specifications., 5 mm thickness
Slurry Seal, Providing and laying slurry seal consisting of a mixture of fine
aggregates, Portland cement filler, bituminous emulsion and water on a road
219 13.12.ii 1310 surface including cleaning of surface, mixing of slurry seal in a suitable mobile sqm 0
plant, laying and compacting to provide even riding surface as per Drawing and
Technical Specifications., 3 mm thickness
Slurry Seal, Providing and laying slurry seal consisting of a mixture of fine
aggregates, Portland cement filler, bituminous emulsion and water on a road
220 13.12.iii 1310 surface including cleaning of surface, mixing of slurry seal in a suitable mobile sqm 0
plant, laying and compacting to provide even riding surface as per Drawing and
Technical Specifications., 1.5 mm thickness
Fog Spray, Providing and applying low viscosity bitumen emulsion for sealing
221 13.13 1310 cracks less than 3 mm wide or incipient fretting or disintegration in an existing sqm 0
bituminous surfacing as per Drawing and Technical Specifications.
Fog Spray, Providing and applying low viscosity bitumen emulsion for sealing
cracks less than 3 mm wide or incipient fretting or disintegration in an existing
222 13.13_a 1310 bituminous surfacing as per Drawing and Technical Specifications., Blind the sqm 0
fog spray
Bituminous Cold Mix ( Including Gravel Emulsion), Providing, laying and
rolling of bituminous cold mix on prepared base consisting of a mixture of
unheated mineral aggregate and emulsified or cutback bitumen, including
223 13.14.i 1313 mixing in a plant of suitable type as per Drawing and Technical Specifications., cum 0
Using bitumen emulsion and 9.5 mm or 13.2 mm size aggregate
Sand Asphalt Base Course, Providing, laying and rolling sand-asphalt base
227 13.15. 1312 course composed of sand, mineral filler and bituminous binder on a prepared cum 0
sub-grade or sub-base as per Drawing and Technical Specifications.
Anti- Stripping agent, Providing and mixing of Anti stripping agent as per
228 13.16 1300 Design/ direction of Engineer kg 0
Bitumen Cutter, Providing and mixing of Bitumen cutter as per design /
229 13.17 1300 direction of Engineer lit 0
Modified Binder, Supply of modified binder (produced by mixing bitumen with
modifier such as natural rubber or crumb rubber or any other polymer found
230 13.18 1300 compatible with bitumen) as per Specifications and direction of the Engineer. tonne 0
Otta seal, Providing and laying Otta seal surface as wearing course in single
231 13.19 1315 coat using river bed shingles /aggregates of specified size ( 0- 16 mm) laid on sqm 0
prepared surface as per Drawing and Technical Specifications.
Recipe Cold Mix, Providing and laying of premix of crushed stone aggregates
and emulsion binder, mixed in a batch type cold mixing plant, laid over
232 13.20.i 1313 prepared surface, by paver finisher, rolled with a pneumatic tired roller initially cum 0
and finished with a smooth steel wheel roller, all as per specifications., 75 mm
thickness
Recipe Cold Mix, Providing and laying of premix of crushed stone aggregates
and emulsion binder, mixed in a batch type cold mixing plant, laid over
233 13.20.ii 1313 prepared surface, by paver finisher, rolled with a pneumatic tired roller initially cum 0
and finished with a smooth steel wheel roller, all as per specifications., 40 mm
thickness
Recipe Cold Mix, Providing and laying of premix of crushed stone aggregates
and emulsion binder, mixed in a batch type cold mixing plant, laid over
234 13.20.iii 1313 prepared surface, by paver finisher, rolled with a pneumatic tired roller initially cum 0
and finished with a smooth steel wheel roller, all as per specifications., 25 mm
thickness
Brick work for footpath, Providing and laying flat brick over 60 mm thick
236 14.5.B 1403 sand bed in footpath including excavation sand bedding all complete as per sqm 0
specification.
Precast Cement Concrete M 20 Kerb , Providing and laying of /20 precast
cement concrete Kerb 38 cm * 20 cm * 25 cm ( H*B*L) with 12 mm thick 1:3
237 14.1 1401 cement sand mortar bedding and joints including foundation excavation meter #NAME?
levelling but excluding foundation concrete for foundation or sand gravel
material, all complete as per Drawing and Technical Specifications.
Cast in Situ Cement Concrete or natural stone block for footpath, Providing and
laying of precast / cast in situ 50 mm thick cement concrete slab footpath on
238 14.2.A 1401 12 mm thick 1: 3 cement sand mortar over the prepared base, all complete as per sqm #NAME?
Drawing and Technical Specifications.
, Providing and laying 25 mm thick Natural stone slab footpath on 12 mm
239 14.2.B 1401 thick 1: 3 cement sand mortar over the prepared base, all complete as per sqm 0
specification.
Cast in Situ Cement Concrete Kerb , Providing and laying cement concrete
Kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in
M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having
240 14.3 1401 50 mm projection beyond Kerb stone, Kerb stone laid with Kerb laying meter 0
machine, foundation concrete laid manually, all complete as per Drawing and
Technical Specifications.
Cast in Situ Cement Concrete M 20 Kerb with Channel, Providing and laying
cement concrete Kerb with channel with top and bottom width 115 and 165 mm
respectively, 250 mm high in M 20 grade PCC on grade foundation 150 mm
241 14.4 1401 thick, Kerb channel 300 mm wide, 50 mm thick in PCC grade, sloped towards meter 0
the Kerb, Kerb stone with channel laid with Kerb laying machine, foundation
concrete laid manually, all complete as specification.
Brick work for footpath, Providing and laying brick on edge over 60 mm thick
242 14.5.A 1403 sand bed in footpath including excavation sand bedding all complete as per sqm 0
Drawing and Technical Specifications.
Kilometer Stone, Providing and Fixing Reinforced cement concrete M 15 grade
243 15.11.ii 1506 kilometer Post including painting and printing as per Standard Drawing-2070 no #NAME?
and Technical Specifications. position, One kilometer post (precast)
Non Reflective Traffic Signs, Providing and fixing of Non reflective warning,
mandatory and informatory sign board of 2 mm thick MS Sheet with back
support frame fixed on heavy 50 mm tube or Channel section
244 15.1 1501 of 75 mm X 40 mm firmly fixed to the ground by means of properly designed no #NAME?
foundation with M 10/40 grade cement concrete 300 mm x 300 mm x 300 mm, l
as per drawings and Technical Specification/ DOR Publication.
Painting Two Coats on Concrete Surfaces, Providing and Painting two coats
248 15.4 1501 after filling the surface with synthetic enamel paint in all shades on concrete / sqm 0
plaster surfaces as per Drawing and Technical Specifications.
Painting on Steel Surfaces, Providing and applying two coats of ready mix paint
249 15.5 1501 of approved brand on steel surface after through cleaning of surface to give an sqm 0
even shade as per Drawing and Technical Specifications.
Painting on Wood Surfaces, Providing and applying two coats of ready mix
250 15.6 1509 paint of approved brand on wood surface after thorough cleaning of surface to sqm 0
give an even shade as per Drawing and Technical Specifications.
Painting Lines, Dashes, Arrows etc. on Roads in Two Coats, Providing required
material and Painting lines, dashes, arrows etc. on roads in two coats on new
work with ready mixed road marking paint conforming to NS 408/ IS 164 on
251 15.7.i 1503 bituminous surface, including cleaning the surface of all dirt, dust and other sqm #NAME?
foreign matter, demarcation at site and traffic control as per Drawing and
Technical Specifications., Over 10 cm in width
Painting Lines, Dashes, Arrows etc. on Roads in Two Coats, Providing required
material and Painting lines, dashes, arrows etc. on roads in two coats on new
work with ready mixed road marking paint conforming to NS 408/ IS 164 on
252 15.7.ii 1503 bituminous surface, including cleaning the surface of all dirt, dust and other sqm #NAME?
foreign matter, demarcation at site and traffic control as per Drawing and
Technical Specifications., Up to 10 cm in width
Painting Lines, Dashes, Arrows etc. on Roads in Two Coats on Old Work,
Providing required materials and Painting lines, dashes, arrows etc. on roads in
two coats on old work with ready mixed road marking paint conforming to NS
253 15.8.i 1503 408/ IS: 164 on bituminous surface, including cleaning the surface of all dirt, sqm #NAME?
dust and other foreign matter, demarcation at site and traffic control as per
Drawing and Technical Specifications., over 10 cm in width
Painting Lines, Dashes, Arrows etc. on Roads in Two Coats on Old Work,
Providing required materials and Painting lines, dashes, arrows etc. on roads in
two coats on old work with ready mixed road marking paint conforming to NS
254 15.8.ii 1503 408/ IS: 164 on bituminous surface, including cleaning the surface of all dirt, sqm #NAME?
dust and other foreign matter, demarcation at site and traffic control as per
Drawing and Technical Specifications., Up to 10 cm in width
Metal Beam Crash Barrier, Type - A, "W" : Metal Beam Crash Barrier,
Providing and erecting a "W" metal beam crash barrier comprising of 3 mm
thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on
ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m center to center,
261 15.14.A 1509 meter #NAME?
1.8 m high, 1.1 m below ground/road level metal beam rail to be fixed on the
vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long
complete as per Drawing and Technical Specifications.
Metal Beam Crash Barrier, Type - B, "THRIE" : Metal Beam Crash Barrier,
Providing and erecting a "Thrie" metal beam crash barrier comprising of 3 mm
thick corrugated sheet metal beam rail, 85 cm above road/ground level, fixed on
ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m center to center,
262 15.14.B 1509 meter #NAME?
2.1 m high with 1.3 m below ground level, metal beam rail to be fixed on the
vertical post with a space of channel section 150 x 75 x 5 mm, 546 mm long
complete as per Drawing and Technical specifications.
Metal Beam Crash Barrier, Flexible Crash Barrier, Wire Rope Safety Barrier,
Providing and erecting a wire rope safety barrier with vertical posts of medium
weight RS Joist (ISMB series) 100 mm x 75 mm (11.50 kg/m), 1.50 m long
0.85 m above ground and 0.65 m below ground level, split at the bottom for
better grip, embedded in M 15 grade cement concrete 450 x 450 x 450 mm, 1.50
m center to center and with 4 horizontal steel wire rope 40 mm dia and anchored
263 15.14.C 1509 at terminal posts 15 m apart. Terminal post to be embedded in M 15 grade meter #NAME?
cement concrete foundation 2400 x 450 x 900 mm (depth), strengthened by a
strut of RS joist 100 x 75 mm, 2 m long at 450 inclination and a tie 100 x 8 mm,
1.50 m long at the bottom, all embedded in foundation concrete as per design ,
Drawing and Technical Specifications.
Street Lighting, Providing and erecting street light mounted on a steel circular
hollow pole of standard specifications for street lighting, 9 m high spaced 40 m
267 15.16 missing apart, 1.8 m overhang on both sides if fixed in the median and on one side if no #NAME?
fixed on the footpath, fitted with sodium vapor lamp and fixed firmly in
concrete foundation as per design , Drawing and Technical Specifications..
Rumble Strips, Providing and making of Rumble strips with premix bituminous
carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at
approved locations to control speed, marked with white strips of road marking
paint., Provision of 15 Nos rumble strips covered with premix bituminous
268 15.17 1300 sqm 0
carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at
approved locations to control speed, marked with white strips of road marking
paint.
Lettering new Letter and Figures of any Shade, Providing and lettering new
269 15.18.i 1506 letter and figures of any shade with synthetic enamel paint black or any other cm-letter #NAME?
approved color to give an even shade, Nepali
Lettering new Letter and Figures of any Shade, Providing and lettering new
270 15.18.ii 1506 letter and figures of any shade with synthetic enamel paint black or any other cm-letter #NAME?
approved color to give an even shade, English and Roman
Providing, Boring and installing bored cast-in-situ RCC Pile excluding
Reinforcement and Concrete in all types of soil including Bentonite and other
271 16.1.C 1612 consumable and removal of excavated earth with necessary lifts and lead all meter 0
complete as per Drawing and Technical Specifications., Pile diameter-750 mm
Providing, Boring and installing bored cast-in-situ RCC Pile excluding
Reinforcement and Concrete in all types of soil including Bentonite and other
272 16.1.A 1612 consumable and removal of excavated earth with necessary lifts and lead all meter 0
complete as per Drawing and Technical Specifications., Pile diameter-500 mm
Providing, driving and installing precast RCC. pile of specified size and quality
281 16.3.A 1613 complete as per drawing and & Technical Specification, Pile diameter -300 mm Running meter 0
Providing, driving and installing precast RCC. pile of specified size and quality
282 16.3.B 1613 complete as per drawing and & Technical Specification, Pile diameter -500 mm Running meter 0
Providing, driving and installing precast RCC. pile of specified size and quality
283 16.3.C 1613 complete as per drawing and & Technical Specification, Pile diameter - 600 mm Running meter 0
, or providing steel helmet on top of pile head during driving, stacking of piles
284 16.3.C_a at site 0
Driving Vertical Steel Piles / Sheet piles excluding cost of steel complete as per
285 16.4 1613 Drawing and & Technical Specification tonne 0
Providing and laying Plain/Reinforced Cement Concrete excluding
1700, reinforcement in Well Foundation all complete as per Drawing and Technical cum
286 17.3.E.i 0
2000 Specifications., Top plug, Grade M 15 PCC
Providing and laying Plain/Reinforced Cement Concrete excluding
1700, reinforcement in Well Foundation all complete as per Drawing and Technical cum
287 17.3.D.ii 0
2000 Specifications., Intermediate plug, Grade M 25 PCC
Providing and Constructing of temporary Island for well sinking as per Drawing
and instruction of the Engineer., Assuming depth of water 1.0 m and height of
288 17.1.A 1700 island to be 1.25 m. and island 16 m diameter for Construction of Well no 0
Foundation for 8 m dia. Well.
Providing and laying Plain/Reinforced Cement Concrete excluding
1700, reinforcement in Well Foundation all complete as per Drawing and Technical cum
289 17.3.D.i 0
2000 Specifications., Intermediate plug, Grade M 20 PCC
Providing and laying Plain/Reinforced Cement Concrete excluding
1700, reinforcement in Well Foundation all complete as per Drawing and Technical cum
290 17.3.F.i 0
2000 Specifications., Well cap, RCC Grade M 20
Providing and constructing one span service road to reach island location from
one pier location to another pier location as per Drawing and instruction of the
291 17.1.B 1700 Engineer., Assuming span length 30 m, width of service road 10 m and depth of meter 0
water 1 m
Providing and Laying Cutting Edge of Mild Steel for Well Foundation
292 17.2 1700 complete as per Drawing and Technical Specification. tonne 0
Providing and laying Plain/Reinforced Cement Concrete excluding
1700, reinforcement in Well Foundation all complete as per Drawing and Technical cum
293 17.3.A.i 0
2000 Specifications., Well curb, RCC M 20 Grade
Providing and laying Plain/Reinforced Cement Concrete excluding
1703, reinforcement in Well Foundation all complete as per Drawing and Technical cum
294 17.3.A.ii 0
2000 Specifications., Well curb, RCC M 25 Grade
Providing and laying Plain/Reinforced Cement Concrete excluding
17.3.A.ii 1703, reinforcement in Well Foundation all complete as per Drawing and Technical cum
295 0
i 2000 Specifications., Well curb, RCC M 30 Grade
Providing and laying Plain/Reinforced Cement Concrete excluding
1704, reinforcement in Well Foundation all complete as per Drawing and Technical cum
296 17.3.B.i 0
2000 Specifications., Well Steining, PCC M 20 Grade
Providing and laying Plain/Reinforced Cement Concrete excluding
1704, reinforcement in Well Foundation all complete as per Drawing and Technical cum
297 17.3.B.ii 0
2000 Specifications., Well Steining, RCC M 20 Grade
Providing and laying Plain/Reinforced Cement Concrete excluding
1704, reinforcement in Well Foundation all complete as per Drawing and Technical cum
298 17.3.B.iii 0
2000 Specifications., Well Steining, RCC M 25 Grade
Providing and laying Plain/Reinforced Cement Concrete excluding
1704, reinforcement in Well Foundation all complete as per Drawing and Technical cum
299 17.3.B.iv 0
2000 Specifications., Well Steining, RCC M 30 Grade
Providing and laying Plain/Reinforced Cement Concrete excluding
reinforcement in Well Foundation all complete as per Drawing and Technical
300 17.3.C.i 1706 Specifications., Bottom Plug (Concrete to be placed using tremie pipe), PCC cum #NAME?
Grade M 20
Providing and laying Plain/Reinforced Cement Concrete excluding
17.3.C.i_ reinforcement in Well Foundation all complete as per Drawing and Technical
301 1706 Specifications., Bottom Plug (Concrete to be placed using tremie pipe), PCC cum 0
a
Grade M 20, Where underwater concreting in involved
Providing and laying Plain/Reinforced Cement Concrete excluding
reinforcement in Well Foundation all complete as per Drawing and Technical
302 17.3.C.ii 1706 Specifications., Bottom Plug (Concrete to be placed using tremie pipe), PCC cum 0
Grade M 25, Where underwater concreting in involved
Providing and laying Plain/Reinforced Cement Concrete excluding
17.3.C.ii reinforcement in Well Foundation all complete as per Drawing and Technical
303 1706 Specifications., Bottom Plug (Concrete to be placed using tremie pipe), PCC cum 0
_a
Grade M 25
Providing and laying Plain/Reinforced Cement Concrete excluding
1700, reinforcement in Well Foundation all complete as per Drawing and Technical cum
304 17.3.F.ii 0
2000 Specifications., Well cap, RCC Grade M 25
Providing and laying Plain/Reinforced Cement Concrete excluding
1700, reinforcement in Well Foundation all complete as per Drawing and Technical cum
305 17.3.F.iii #NAME?
2000 Specifications., Well cap, RCC Grade M 30
Providing and laying Plain/Reinforced Cement Concrete excluding
1700, reinforcement in Well Foundation all complete as per Drawing and Technical cum
306 17.3.F.iv 0
2000 Specifications., Well cap, RCC Grade M 35
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
307 17.4.A.i 1705 per Drawing and Technical specifications., Diameter of well - 6 m., Sandy Soil, meter 0
Depth below bed level upto 3.0 M
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
308 17.4.A.ii 1705 per Drawing and Technical specifications., Diameter of well - 6 m., Sandy Soil, meter 0
Beyond 3 m upto 10 m depth
Providing accessories and Sinking of 6 m external diameter well (other than
17.4.A.ii pneumatic method of sinking) through all types soil/rock of strata complete as
309 1705 per Drawing and Technical specifications., Diameter of well - 6 m., Sandy Soil, meter 0
i
Beyond 10 m upto 20 m
Providing accessories and Sinking of 6 m external diameter well (other than
17.4.A.iv pneumatic method of sinking) through all types soil/rock of strata complete as
310 1705 per Drawing and Technical specifications., Diameter of well - 6 m., Sandy Soil, meter 0
.a
Beyond 20 m upto 30 m
Providing accessories and Sinking of 6 m external diameter well (other than
17.4.A.iv pneumatic method of sinking) through all types soil/rock of strata complete as
311 1705 per Drawing and Technical specifications., Diameter of well - 6 m., Sandy Soil, meter 0
.b
Beyond 20 m upto 30 m
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
312 17.4.B.i 1705 per Drawing and Technical specifications., Diameter of well - 6 m., Clayey Soil, meter 0
Depth below bed level upto 3.0 m
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
313 17.4.B.ii 1705 per Drawing and Technical specifications., Diameter of well - 6 m., Clayey Soil, meter 0
Beyond 3 m upto 10 m depth
Providing accessories and Sinking of 6 m external diameter well (other than
17.4.B.iii pneumatic method of sinking) through all types soil/rock of strata complete as
314 1705 per Drawing and Technical specifications., Diameter of well - 6 m., Clayey Soil, meter 0
.a
Beyond 10 m upto 20 m
Providing accessories and Sinking of 6 m external diameter well (other than
17.4.B.iii pneumatic method of sinking) through all types soil/rock of strata complete as
315 1705 per Drawing and Technical specifications., Diameter of well - 6 m., Clayey Soil, meter 0
.b
Beyond 10 m upto 20 m
Providing accessories and Sinking of 6 m external diameter well (other than
17.4.B.iv pneumatic method of sinking) through all types soil/rock of strata complete as
316 1705 per Drawing and Technical specifications., Diameter of well - 6 m., Clayey Soil, meter 0
.a
Beyond 20 m upto 30 m
Providing accessories and Sinking of 6 m external diameter well (other than
17.4.B.iv pneumatic method of sinking) through all types soil/rock of strata complete as
317 1705 per Drawing and Technical specifications., Diameter of well - 6 m., Clayey Soil, meter 0
.b
Beyond 20 m upto 30 m
Providing accessories and Sinking of 6 m external diameter well (other than
17.4.B.iv pneumatic method of sinking) through all types soil/rock of strata complete as
318 1705 per Drawing and Technical specifications., Diameter of well - 6 m., Clayey Soil, meter 0
.c
Beyond 20 m upto 30 m
Providing accessories and Sinking of 6 m external diameter well (other than
319 17.4.C 1705 pneumatic method of sinking) through all types soil/rock of strata complete as meter 0
per Drawing and Technical specifications., Diameter of well - 6 m., Soft Rock
Providing accessories and Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types soil/rock of strata complete as
320 17.4.D 1705 per Drawing and Technical specifications., Diameter of well - 6 m., Hard Rock meter 0
, Height above 9 m Increase the rate by 10% for every additional meter height to
18.11.a.i the rate for the previous height or Design as a special case and derive Norms
463 0
v
Buried Joint, Providing and laying a buried expansion joint, expansion gap
being 20 mm, covered with 12 mm thick, 200 mm wide galvanized wieldable
structural steel plate as per IS: 2062, placed symmetrical to center line of the
481 19.7 1901 joint, resting freely over the top surface of the deck concrete, welding of 8 mm meter #NAME?
dia. 100 mm long galvanized nails spaced 300 mm c/c along the center line of
the plate as per Drawing and Specifications.
no Providing and laying of PCC M 15 Grade leveling course below approach slab
576 "20.10" cum 0
number complete as per drawing and Technical specification
Providing and laying of Reinforced cement concrete approach slab including
577 20.11 2014 reinforcement and formwork complete as per drawing and Technical cum #NAME?
specification
Providing and laying Cement concrete wearing coat M-30 grade including
578 20.12 2000 reinforcement complete as per drawing and Technical Specifications cum #NAME?
Providing, fitting and fixing high tensile steel wires/strands ( Tendons) including
579 21.1 2100 all accessories for stressing, stressing operations and grouting complete as per tonne 0
Drawing and Technical Specifications.
Precast - pre-tensioned Girders, Providing, pre-casting, transportation and
2000, placing in position precast pre-tensioned concrete girders as per drawing and cum
580 21.2 #NAME?
2100 technical specifications, Grade of concrete - M 40
2000, Providing and fixing Helical pipes in voided concrete slabs as per Drawing and
581 21.3 Technical Specifications. meter 0
2100
Providing , Fabricating , assembling and erecting structural steel components /
elements including nut, bolt, gusset plate, including shop drawings, facilities for
582 22.1.A 2200 inspection & testing and trial assembling all complete as per specification., RS tonne 0
Joist, Heavy Zinc Coating
Providing , Fabricating , assembling and erecting structural steel components /
elements including nut, bolt, gusset plate, including shop drawings, facilities for
583 22.1.A_a 2200 inspection & testing and trial assembling all complete as per specification., RS tonne 0
Joist, painting one shop coat with red oxide primer and two coats of synthetic
enamel
Narrow Filter Sub-Surface Drain, Providing and making narrow filter sub-
surface drain consisting of porous or perforated pipe laid in narrow trench
646 24.8 2404 surrounded by a geotextile filter fabric, with a minimum of 450 mm overlap of meter #NAME?
fabric and installed including excavation and backfilling
Laying Paving Fabric Beneath a Pavement Overlay, Providing and laying
paving fabric over a tack coat of paving grade Bitumen, laid at the rate of 1 kg
647 24.9 2410 per sqm over thoroughly cleaned and repaired surface to provide a water sqm #NAME?
resistant membrane and crack retarding layer as per Drawing and Technical
Specifications.
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Providing and filling the installed
24.12.B1
653 2411 3-D galvanized steel profile with angular material of size 32-63 mm using sqm #NAME?
.i equipment such as excavator, dredger crane or loader, In shallow slopes (< 45
degrees slope angle)
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Providing and filling the installed
24.12.B1
654 2411 3-D galvanized steel profile with angular material of size 32-63 mm using sqm #NAME?
.ii equipment such as excavator, dredger crane or loader, In slopes (>45 degrees
slope angle)
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
24.12.B2 mat for slope protection and erosion control, Filling the installed 3-D galvanized
655 2411 steel profile with gravel size 32-63 mm, manually, In shallow slopes (< 45 sqm #NAME?
.i
degrees slope angle)
Providing and laying Plum concrete ( Boulder mixed concrete) as per Drawing
656 24.21.B.I 2421 and Specifications, 70% M 15 concrete and 30% boulders/stones, Using cum #NAME?
Mechanical Aids
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
24.12.C1 mat for slope protection and erosion control, Spraying of humus on the on the
657 2411 top of gravel (on the top surface of 3-D profile) using humus spraying machine, sqm #NAME?
.ii
In slopes (>45 degrees slope angle)
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
24.12.C2 mat for slope protection and erosion control, Spraying of humus on the on the
658 2411 top of gravel (on the top surface of 3-D profile) manually, In shallow slopes (< sqm #NAME?
.i
45 degrees slope angle)
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
24.12.C2 mat for slope protection and erosion control, Spraying of humus on the on the
659 2411 top of gravel (on the top surface of 3-D profile) manually, In slopes (>45 sqm #NAME?
.ii
degrees slope angle)
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Providing and driving the equal
angle T-section galvanized steel nails with curved head (16 mm dia steel hook)
and tapered at tail (size between T-25 x 25 x 3 mm to T-40 X 40 X 5 mm,
(equivalent to Indian Steel ISA 2525, 3030,3535 or 4040) by using handheld or
pneumatic hammer (nail length between 0.6 m -3.5 m), first drilling a hole of
24.12.D.i
660 2411 diameter 28-43 mm (size of T-section+ 3 mm) and filling with cement mortar meter #NAME?
.p and then driving the nails to fix the semi-flexible 3-D galvanized steel panel on
the slopes or embankments, max spacing of nails is 1.5 m., Driving T-nails in
soft soil using small dia. pre-bored holes without using cement mortar, For flat
surface and shallow slopes < 45°
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
24.12.D.i
661 2411 mat for slope protection and erosion control, In slopes (>45 degrees slope meter #NAME?
.q angle)
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Providing and driving of 28 mm
662 24.12.E.i 2411 dia GEWI (Threaded) steel nails by drilling holes of 90 mm dia using cement meter #NAME?
grouting for fixing of semi-flexible 3-D steel mats upto a length of 4 to 8 m on
slopes, On soft soils
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Providing and driving of 28 mm
24.12.E.i
663 2411 dia GEWI (Threaded) steel nails by drilling holes of 90 mm dia using cement meter #NAME?
i grouting for fixing of semi-flexible 3-D steel mats upto a length of 4 to 8 m on
slopes, On rocky soils (4-8 m)
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Providing and driving of 28 mm
664 24.12.F.i 2411 dia GEWI (Threaded) steel nails by drilling holes of 90 mm dia using cement meter #NAME?
grouting for fixing of semi-flexible 3-D steel mats upto a length >8 m on slopes,
On soft soils
Providing and Installation of soil nailing with semi-flexible 3-D galvanized steel
mat for slope protection and erosion control, Providing and driving of 28 mm
24.12.F.i
665 2411 dia GEWI (Threaded) steel nails by drilling holes of 90 mm dia using cement meter #NAME?
i grouting for fixing of semi-flexible 3-D steel mats upto a length >8 m on slopes,
On rocky soils
Providing and laying boulders apron on river bed for protection against scour
666 24.13.A 2416 with Boulder / Stones weighing not less than 40 kg each complete as per cum #NAME?
drawing and Technical specification., Manual Means
Providing and laying boulders apron on river bed for protection against scour
667 24.13.B 2416 with Boulder / Stones weighing not less than 40 kg each complete as per cum #NAME?
drawing and Technical specification., Mechanical means
Providing and laying boulders apron on river bed for protection against scour
668 24.13.C 2416 with Boulder / Stones weighing not less than 40 kg each complete as per cum #NAME?
drawing and Technical specification., Mechanical means for Bigger boulder
Providing and laying of apron with cement concrete blocks of size 0.5 x 0.5 x
669 24.14.A 2416 0.5 m cast in-situ and made with nominal mix of M-15 grade cement concrete cum #NAME?
with a minimum cement content of 250 kg/cum ., Manual means
Providing and laying of apron with cement concrete blocks of size 0.5 x 0.5 x
670 24.14.B 2416 0.5 m cast in-situ and made with nominal mix of M-15 grade cement concrete cum 0
with a minimum cement content of 250 kg/cum ., Mechanical means
Providing and laying Pitching on slopes laid over prepared filter media
671 24.15.A 2416 including boulder apron laid dry in front of toe of embankment complete as per cum #NAME?
drawing and Technical specifications, Stone/Boulder
Providing and laying Pitching on slopes laid over prepared filter media
including boulder apron laid dry in front of toe of embankment complete as per
672 24.15.B 2416 drawing and Technical specifications, Cement Concrete Blocks of size 0.3 x 0.3 cum #NAME?
x 0.3 m cast in cement concrete of Grade M 15, Manual Means
Providing and laying Filter material underneath pitching in slopes complete as
673 24.16 2414 per drawing and Technical specification cum #NAME?
Providing and laying Grouted Stone Pitching in protection work, with stone size
674 24.17 2416 not less than 0.01 cum and cement: sand mortar (1:3) all complete as per cum #NAME?
Drawing and Technical Specifications.
Providing and laying 20 mm dia tor steel dowel bar including drilling 35 mm
dia bore hole in rock necessary bending, hooking tying reinforcement in
675 24.18.A 2413 position and grouting etc. complete as per Drawing and Technical meter #NAME?
specifications., Without using Mechanical aid
Providing and laying 20 mm dia tor steel dowel bar including drilling 35 mm
dia bore hole in rock necessary bending, hooking tying reinforcement in
676 24.18.B 2413 position and grouting etc. complete as per Drawing and Technical meter #NAME?
specifications., Using Mechanical Aid
Providing and fixing of 25 mm – dia steel rock bolts with mechanical/ wedge
type anchorage including drilling 35 mm dia hole providing 150 mm long 20
677 24.19 2413 mm thick steel tapered wedge 10 mm thick 200 mm X 200 mm plate washer meter #NAME?
and nuts, tighten bolt by torque wrench all complete
Providing and laying HDPE pipes with perforations including joining, series II,
678 24.20.A 2414 HDPE pipe 250 mm dia meter #NAME?
Providing and laying HDPE pipes with perforations including joining, series II,
679 24.20.B 2414 HDPE pipe 160 mm dia meter #NAME?
Providing and laying Plum concrete ( Boulder mixed concrete) as per Drawing
24.21.A.
680 2421 and Specifications, 60% M 15 concrete and 40% boulders/stones, using cum #NAME?
I Mechanical Aids
Providing and laying Plum concrete ( Boulder mixed concrete) as per Drawing
24.21.A.
681 2421 and Specifications, 60% M 15 concrete and 40% boulders/stones, Manual cum #NAME?
I means
Sub-Surface Drains with Perforated Pipe, Providing and laying subsurface drain
with perforated pipe of 100 mm internal diameter of metal/ asbestos cement/
cement concrete/PVC, closely jointed, perforations ranging from 3 mm to 6 mm
682 24.22 2414 depending upon size of material surrounding the pipe, with 150 mm bedding meter #NAME?
below the pipe and 300 mm cushion above the pipe,. as per Drawing and
Specifications.
Providing and inserting nipples with approved fixing compound after drilling
holes for grouting as per Technical Specifications including subsequent
741 27.4 2709 cutting/removal and sealing of the hole as necessary of nipples after completion 0
of grouting with Cement/Epoxy
Providing and Sealing of cracks/porous concrete by injection process through
742 27.5.A 2709 nipples/Grouting complete as per Technical Specification., Cement Grout kg 0
Providing and Sealing of cracks/porous concrete by injection process through
743 27.5.B 2709 nipples/Grouting complete as per Technical Specification., Cement Mortar (1:1) kg 0
Grouting
Providing and Sealing of cracks/porous concrete by injection process through
744 27.5.C 2709 nipples/Grouting complete as per Technical Specification., Low viscosity epoxy liter 0
injection resin
Providing and replacement of Crash Barrier as per Drawing, Technical
745 27.16 2700 Specifications and instruction of the Engineer. meter 0
Patching of damaged concrete surface with polymer concrete/ micro concrete
and curing compounds, Providing and applying polymer concrete and curing
746 27.6.A 2700 compounds on damaged concrete surface as per instructions of manufacturer sqm 0
and approval of the Engineer.
Patching of damaged concrete surface with polymer concrete/ micro concrete
and curing compounds, Providing and applying Micro concreting on damaged
concrete (slab/beam/abutment section of the bridges )with ready to use high
747 27.6.B 2700 early high strength , free flow , non shrink self compacting Micro concrete ( M cum 0
60 & above)With adding 20% local aggregates of 10 mm down) as per
instructions of manufacturer and approval of the Engineer.
Providing and applying Epoxy adhesive and Sealing of crack / porous concrete
749 27.7 2706 with Epoxy Grout by injection with nipples complete as per direction of the kg 0
Engineer.
Providing and Applying epoxy mortar over leached, honey combed and spalled
750 27.8 2707 concrete surface and exposed steel reinforcement complete as per Technical sqm 0
Specification
Providing and applying the Shotcreate mixture mechanically with compressed
751 27.9 2710 air under pressure, sprayable less rebound ( rebou and quick setting comnd 25 sqm 0
%) as per Technical specifications and direction of the Engineer.
Providing and applying pre-packed cement based polymer mortar for
752 27.10' 2700 replacement of spalled concrete sqm 0
Providing and applying Epoxy bonding of new concrete to old concrete as per
753 27.11 2708 technical Specifications and direction of the Engineer. sqm 0
Providing and replacement of Bearings complete as per Technical Specification
754 27.12 2711 and direction of the Engineer. nos #NAME?
Providing required parts and rectification of Bearings as per Technical
755 27.13 2711 Specifications and direction of the Engineer. nos #NAME?
Providing and replacement of Expansion Joints complete as per drawings,
756 27.14 2700 Technical specifications and direction of the Engineer. meter #NAME?
Providing and replacement of Damaged Concrete Railing as per Drawing,
757 27.15 2700 Technical Specifications and direction of the Engineer,. meter 0
Providing and replacement of Damaged mild steel railing as per Drawing,
758 27.17 2700 Technical Specifications and direction of the Engineer. meter 0
Repair of Crash Barrier, Providing and repair of concrete crash barrier with
cement concrete M-30 grade by cutting and trimming the damaged portion to a
759 27.18 2700 regular shape, cleaning the area to be repaired thoroughly, applying cement meter #NAME?
concert after erection of proper form work.
Providing and repair of RCC railing to bring it to the original shape as per
760 27.19 2700 Drawing, Technical Specifications and instruction of the Engineer., Repair of meter #NAME?
RCC Railing
Repair of Steel Railing, Providing and repair of steel railing to bring it to the
761 27.20' 2700 original shape as per Drawing, Technical Specifications and direction of the meter 0
Engineer.
Painting of Steel Bridge, Providing and painting steel bridge including removal
762 27.21 2713 of old paints by sand blasting cleaning and repairing of metal surfaces for the sqm 0
application of new paints as per specification and direction of the Engineer.
Providing and Painting of steel bridges with one coat of primer, one coat of
763 27.22 2713 epoxy and 2 coats of acrylic polyurethane as per specification. sqm 0
Providing and painting of steel bridges with one coat of primer, one coat of
764 27.23 2713 epoxy and 2 coats of acrylic polyurethane, without sprayer machine as per sqm 0
specification
Repair of Joint Grooves with Epoxy Mortar, Providing and repair of spalled
joint grooves of contraction joints, longitudinal joints and expansion joints in
765 27.24 2700 concrete pavements using epoxy mortar or epoxy concrete as per Technical meter 0
Specifications and direction of the Engineer.
Repair of old Joints Sealant, Providing and repair of old joints including
removal of existing sealant and re sealing of contraction, longitudinal or
766 27.25 2700 expansion joints in concrete pavement with fresh sealant material as per meter 0
Drawing and Technical Specifications.
Concrete Jacketing, Preparation, hacking and cleaning of existing surface for
767 27.26.A 2700 concrete jacketing as per direction of the Engineer. sqm 0
Concrete Jacketing, Drilling Holes on existing concrete surface of 16 mm
768 27.26.B 2700 diameter and 300 mm depth nos 0
769 27.26.C 2700 Concrete Jacketing, Providing and fixing Anchor bar kg 0
770 27.26.D Concrete Jacketing, Providing and Filling drill hole with Epoxy Grout 0
Concrete Jacketing, Providing and applying Micro silica/ silica fume concreting
for concrete jacketing works ( slab /beam/ abutment section of the bridges ) as
771 27.26.E 2700 per instructions of manufacturer and as approved by the Engineer. cum 0
Planting grass on site, Planting rooted grass slips on the slopes <45o including
preparation of slips on site. a max of 5 cm depth with metal rod or Operation
818 28.8.E 2807 includes digging planting hole to hard-wood peg, depending on the nature of the sqm #NAME?
soil. The planting drills should be space
Planting grass on site, Planting rooted grass slips on the slopes 45o - 60o
including preparation of slips on site. a max of 5 cm depth with metal rod or
819 28.8.F 2807 Operation includes digging planting hole to hard-wood peg, depending on the sqm #NAME?
nature of the soil. The planting drills should be space
Planting grass on site, Planting rooted grass slips on the slopes > 60o including
preparation of slips on site. a max of 5 cm depth with metal rod or Operation
820 28.8.G 2807 includes digging planting hole to hard-wood peg, depending on the nature of the sqm #NAME?
soil. The planting drills should be space
Planting shrub and tree seedling and cutting on site, Planting containerized tree
and shrub seedlings, including pitting, transplanting, composting and placing
821 28.9.A 2807 tree guards, on toe of embankment slopes in plain areas, not less than 8 m from nos #NAME?
the road center line. Pit size 30 cm diameter x depth. Compost volume 1/4 of
the volume of the pit, mixed with original soil.
Planting shrub and tree seedling and cutting on site, Planting containerized tree
and shrub seedlings, including pitting, transplanting, composting and mulching,
822 28.9.B 2807 on slopes < 30o . Pit size 30 cm diameter x depth mix Compost with soil nos #NAME?
and back fill into pit to 1/4 of the pit volume
Planting shrub and tree seedling and cutting on site, Planting containerized tree
and shrub seedlings, including pitting, transplanting, composting and mulching,
823 28.9.C 2807 on slopes 30o . - 400 Pit size 30 cm diameter x depth mix Compost with nos #NAME?
soil and back fill into pit to 1/4 of the pit volume
Planting shrub and tree seedling and cutting on site, Planting rooted tree stump
cutting and bare root seedlings, including pitting, transplanting, composting and
824 28.9.D 2807 mulching on slopes <300. Pit size 10 cm diameter x depth. Compost volume nos #NAME?
1/4 of volume of the pit mix with original soil.
Planting shrub and tree seedling and cutting on site, Planting rooted tree stump
cutting and bare root seedlings, including pitting, transplanting, composting and
825 28.9.E 2807 mulching on slopes <300 - 45o Pit size 10 cm diameter x depth. Compost nos #NAME?
volume 1/4 of volume of the pit mix with original soil.
Planting shrub and tree seedling and cutting on site, Planting rooted tree stump
cutting and bare root seedlings, including pitting, transplanting, composting and
826 28.9.F 2807 mulching on slopes > 45o Pit size 10 cm diameter x depth. Compost volume nos #NAME?
1/4 of volume of the pit mix with original soil.
Vegetative palisade construction, brush layering and fascines, Collection of
hardwood for cuttings for planting Material (e.g. assuro, namdi phul,
827 28.10.A 2897 simali)from the sources within of the road. Material to be approx. 1 km in nos 0
length and minimum 5 cm in diameter.
Vegetative palisade construction, brush layering and fascines, Preparation and
planting of live pegs selected species(e.g. assuro, namdi phul, simali)of
828 28.10.B 2897 minimum length to 0.5 m depth into hard ground. Pegs spaced at centers meter #NAME?
within rows, and interwoven with vegetation.
Vegetative palisade construction, brush layering and fascines, Preparation and
planting of live pegs selected species(e.g. assuro, namdi phul, simali)of
829 28.10.C 2897 minimum length to 0.5 m depth into soft debris. Pegs spaced at 5- centers meter #NAME?
within rows, and interwoven with vegetation.
Vegetative palisade construction, brush layering and fascines, Site preparation
830 28.10.D 2897 for fascine laying: earth works in excavation of trench to 20 cm depth meter 0
Vegetative palisade construction, brush layering and fascines, Laying of live
fascines, using live hardwood cuttings of selected species(e.g. assuro, namdi
831 28.10.E 2897 phul, simali) of minimum length placed in bundles to give 4 running meters of meter #NAME?
cutting per meter of fascine, including backfilling of trench and careful
compaction.
Jute netting works, Standard jute netting for bare slopes and under planting with
slips. Spinning raw jute from 100% jute fiber into yarn and weaving the yarn
into netting. Hand spun yarn 5 to 8 mm in diameter, width of net 1.20 meters
832 28.11.A 2808 warp strands 27 no per , mesh size 30-40 mm sq. and 1.25 kg/m weight at 1.20 sqm #NAME?
m width.[Note A Toro is the weaving shuttle, bamboo culm.]normally made
from a split large
Jute netting works, Wide mesh jute netting for holding mulch on slopes.
Spinning raw jute from 100% jute fiber into yarn and weaving the yarn into
netting. Hand spun yarn 3 to 5 mm in diameter 1.20 m side and 11.2 m long.
833 28.11.B 2808 Mesh size 150 mm x 500 mm rectangular mesh and 0.25 kg/m at 1.20 m width. sqm #NAME?
[Note A torso is the weaving shuttle, normally made from a split large bamboo
culm.]
Jute netting works, Placing 30-40 mm square mesh jute netting on bare slopes
(for later under planting with grass slips), including pegging with live
834 28.11.C 2808 hardwood cutting or split bamboo pegs and loosening tension so that the net sqm #NAME?
hugs the slope throughout.
Jute netting works, Placing 150 x 500 mm mesh jute netting to hold mulch on
slopes, including application of mulch and pegging with live hardwood cutting
835 28.11.D 2808 or split bamboo pegs and loosening tension so that the net hugs the slope sqm #NAME?
throughout.
Gabion bolster cylinders, Providing and laying 60 cm dia gabion bolsters
panels: 70 x 100 mm hexagonal mesh wire (10 swg frame and 12 Swg mesh)
836 28.12.A 2809 including Earthwork excavation filling with boulder, back filling all complete meter #NAME?
as per Drawing and Technical Specifications.
Gabion bolster cylinders, Providing and laying 30 cm dia gabion bolsters
panels: 70 x 100mm hexagonal mesh wire (10 swg frame and 12 Swg mesh)
837 28.12.B 2809 including Earthwork excavation filling with boulder, back filling all complete meter #NAME?
as per Drawing and Technical Specifications.
Gabion bolster cylinders, Anchoring bolster: 12 mm dia MS re-bar cut into 2 m
838 28.12.C 2809 lengths for anchorage and placed at intervals meter #NAME?
839 28.12.D 2809 Gabion bolster cylinders, Providing and laying of terram paper (geotextile) meter #NAME?
Bamboo tree guards, Providing and weaving bamboo tree guards using bamboo
poles as uprights: 1.60 m in height ; and weaving split bamboo with the outer
840 28.13.A 2810 wall intact around the posts. Dimension of the guard are 0.60 m diameter x 1.30 meter #NAME?
high.
Turfing, Grass sodding works including sod cutting , transporting , placing in
841 28.14.A 2812 position and water sprinkling (Lead upto 10 m). sqm 0
842 28.14.B 2812 Turfing, Providing and Spreading manure on the grass turf. sqm #NAME?
Turfing, Turfing with Sods, Providing, furnishing and laying of the live sods of
perennial turf forming grass on embankment slope, verges or other locations
843 28.14.C 2812 shown on the drawing or as directed by the engineer including preparation of sqm #NAME?
ground, fetching of sods and watering.
Turfing, Seeding and Mulching, Providing required material, Preparation of
seed bed on previously laid top soil, furnishing and placing of seeds, fertilizer,
844 28.14.D 2812 mulching material, applying bituminous emulsion at the rate of 0.23 liters per sqm #NAME?
sqm and laying and fixing jute netting, including watering for 3 months all as
per specification
Spreading of Sludge Farm Yard Manure or/and good Earth, Providing and
845 25.15 2812 Spreading of sludge farm yard manure or/ and good earth in required thickness cum 0
(cost of sludge, farm yard manure or/and good earth to be paid for separately)
Grassing with ' Doobs' Grass, Providing and grassing with 'Doobs' grass
including watering and maintenance of the lawn for 30 days or more till the
846 28.16.i 2812 grass forms a thick lawn free from weeds and fit for moving including sqm #NAME?
supplying good earth if needed, In rows 15 cm apart in either direction
847 28.16.ii 2812 Grassing with ' Doobs' Grass, In rows 7.5 cm apart in either direction sqm #NAME?
Making Lawns including Ploughing and Dragging, Providing and making lawns
including ploughing and breaking of clod, removal of rubbish, dressing and
848 28.17 2812 supplying Doobs grass roots and planting at 15 cm apart, including supplying sqm #NAME?
and spreading of farm yard manure at rate of 0.18 cum per 100 sqm
Maintenance of Lawns or Turfing of Slopes, Regular Maintenance of lawns or
849 28.18 2811 Turfing of slopes (rough grassing) for a period of one year including sqm #NAME?
watering etc.
Turfing Lawns with Fine Grassing including Ploughing, Dressing, Providing
and Turfing lawns with fine grassing including ploughing, dressing including
850 28.19 2812 breaking of clods, removal of rubbish, dressing and supplying Doobs grass roots sqm #NAME?
at 10 cm apart, including supplying and spreading of farm yard manure at rate
of 0.6 cum per 100 sqm
Maintenance of Lawns with Fine Grassing for the First Year, Regular
851 28.20' 2811 Maintenance of lawns with fine grassing for the first year including watering sqm #NAME?
etc.
Planting and Maintaining of Permanent Hedges, Providing and Planting
permanent hedges including digging of trenches, 60 cm wide and 45 cm deep,
852 28.21.a 2807 refilling the excavated earth mixed with farmyard manure, supplied at the rate meter #NAME?
of 4.65 cum per 100 metres and supplying and planting hedge plants at 30 cm
apart
Half Brick Circular Tree Guard, in 2nd Class Brick, internal diametre 1.25
metres, and height 1.2 metres, above ground and 0.20 metre below ground,
Providing and laying half brick circular tree guard, in 2nd class brick, internal
diametre 1.25 metres, and height 1.2 metres, above ground and 0.20 metre
858 28.25 2811 nos #NAME?
below ground, bottom two courses laid dry, and top three courses in cement
mortar 1:6 (1 cement 6 sand) and the intermediate courses being in dry honey
comb masonry, as per design complete
Edging with 2nd Class Bricks, Laid Dry Lengthwise, Providing and edging with
2nd class bricks, laid dry lengthwise, including excavation, refilling,
859 28.26 2811 consolidation, with a hand packing and spreading nearly surplus earth within a meter #NAME?
lead of 50 metres
Making Tree Guard 53 cm dia and 1.3 meter height as per Design from empty
bitumen drums, Providing and making tree guard 53 cm dia and 1.3 m high as
860 28.27 2811 per design from empty bitumen drum, slit suitably to permit sun and air, nos #NAME?
(supplied by the department at stock issue rate) including providing and fixing 2
nos MS sheet rings 50 x 0.5 mm with rivets, complete in all respect
Making Tree Guard 53 cm dia and 2 meter height as per Design from empty
bitumen drums, Providing and making tree guard 53 cm dia and 2 metres high
as per design from empty bitumen drums, slit suitably to permit sun and air,
( supplied by the department at stock issue rate) including providing and
861 28.28 2811 nos #NAME?
fixing four legs 40 cm long of 30 x 3 mm MS riveted to tree guard and
providing and fixing 2 nos MS sheet rings 50 x 0.5 mm with rivets complete in
all respects
Wrought Iron and Mild Steel Welded Work, Providing Wrought iron and mild
steel welded work (using angles, square bars, tees and channel grills, grating
frames, gates and tree guards of any size and design etc. including cost of
862 28.29 2811 screens and welding rods or bolts and nuts complete fixed in position but kg #NAME?
without the cost of excavation and concrete for fixing which will be paid
separately
Tree Guard with MS Iron, Providing and fixing MS iron tree guard 60 cm dia
and 2 meter high above ground level formed of 4 Nos (25 x 6 mm) and 8 Nos
(25 x 3 mm) vertical MS riveted to 3 Nos (25 x 6 mm) iron rings in two halves,
863 28.30' 2811 bolted together with 8 mm dia and 30 mm long bolts including painting two nos #NAME?
coats with paint of approved brand over a coat of priming, complete in all
respects.
Tree Guard with MS Angle Iron and Steel Wire, Providing and fixing tree guard
0.60 meter square, 2.00 meter high fabricated with MS angle iron 30 x 30 x 3
864 28.31 2800 mm, MS iron 25 x 3 mm and steel wire 3 mm dia welded and fabricated as per nos #NAME?
design in two halves bolted together
Compensatory Afforestation, Planting trees as compensatory afforestation at the
rate of 290 trees per hectare at a spacing of 6 m by grubbing and leveling the
865 28.32 2807 ground upto a depth of 150 mm, digging holes 0.9 m dia, 1 m deep, mixing farm sqm #NAME?
yard/sludge manure with soil, planting of sapling 2 m high with 25 cm dia stem,
backfilling the hole and watering
Fog Spray, Providing and applying low viscosity bitumen emulsion for sealing
866 29.15 2903 cracks less than 3 mm wide or incipient fretting or disintegration in an existing sqm #NAME?
bituminous surfacing.
Fog Spray, Providing and applying low viscosity bitumen emulsion for sealing
cracks less than 3 mm wide or incipient fretting or disintegration in an existing
867 29.15_a 2903 bituminous surfacing., In case it is decided by the engineer to blind the fog sqm 0
spray.
2900, Hill Side Drain Clearance, Removal of earth from the choked hill side drain and
868 29.18 disposing it on the valley side manually meter 0
900
Maintenance,Carryout Routine ( regular maintenance) of Black top/ Gravel
869 29.1.A 2902 road in plain area ( Terai) as per Technical Specifications and direction of the Km - day 0
Engineer,
Maintenance, Carryout Routine ( regular maintenance) of Black top/ Gravel
870 29.1.B 2902 road in Hilly area as per Technical Specifications and direction of the Engineer, Km - day 0
Maintenance of Earthen Shoulder (filling with fresh soil), Providing and making
up loss of Material/ irregularities on shoulder to the design level by adding fresh
875 29.7 2906 approved soil and compacting as per Technical Specification and direction of 0
the Engineer.
Maintenance of Earth Shoulder (stripping excess soil), Stripping excess soil
876 29.8 2906 from the shoulder surface to achieve the approved level and compacting as per sqm 0
Technical Specifications and direction of the Engineer.
Providing, laying and restoration of rain cuts with gravel or river bed
Material , benching for 300 mm width, laying fresh Material in layers not
877 29.9 2904 exceeding 250 mm and compacting to restore the original alignment, levels and cum 0
slopes as per Technical specifications and direction of the Engineer., Mechanical
Means including conveyance of river bed gravel with lead
Maintenance of bituminous surface road with Emulsion, Providing required
material and repair to pot holes including removal of failed material, trimming
878 29.10.i 2903 the sides to vertical , leveling the bottom, cleaning, filled with 75 mm cum 0
Bituminous macadam applying bitumen /emulsion prime coat and tack coat
as per Technical Specifications and direction of the Engineer.
Crack Filling, Providing and filling of crack using slow - curing bitumen
883 29.12 2903 emulsion and applying crusher dust in case crack are wider than 3 mm as per meter 0
Technical Specifications and instruction of the Engineer
Dusting, Providing and applying crusher dust to areas of road where bleeding
884 29.13 2903 of excess bitumen has occurred as per Technical Specifications and direction of sqm 0
the Engineer.
Slurry Seal, Providing and laying slurry seal consisting of a mixture of fine
aggregates, Portland cement filler, bituminous emulsion and water on a road
885 29.14.I 2903 surface including cleaning of surface, mixing of slurry seal in a suitable mobile sqm 0
plant, laying and compacting to provide even riding surface, 5 mm thickness
Slurry Seal, Providing and laying slurry seal consisting of a mixture of fine
aggregates, Portland cement filler, bituminous emulsion and water on a road
886 29.14.II 2903 surface including cleaning of surface, mixing of slurry seal in a suitable mobile sqm 0
plant, laying and compacting to provide even riding surface, 3 mm thickness
Slurry Seal, Providing and laying slurry seal consisting of a mixture of fine
aggregates, Portland cement filler, bituminous emulsion and water on a road
887 29.14.III surface including cleaning of surface, mixing of slurry seal in a suitable mobile sqm #NAME?
plant, laying and compacting to provide even riding surface, 1.5 mm thickness
Crack Prevention Courses, Stress Absorbing Membrane (SAM) crack width less
than 6 mm, Providing and laying of a stress absorbing membrane over a cracked
road surface, with crack width below 6 mm after cleaning with a mechanical
broom, using modified binder , sprayed at the rate of 9 kg per 10 sqm and
888 29.16.I 2903 sqm 0
spreading 5.6 mm crushed stone aggregates @ 0.11 cum per 10 sqm with
hydraulic chip spreader, sweeping the surface for uniform spread of aggregates
as per Drawing and Technical Specifications.
Rotary core drilling in soil /rock and take continuous rock core to a depth
below ground level with Tungstun carbide bits including core sampling all
921 30.5.B.ii 3000 complete as directed, Soil ( gravel BMS etc), Depth below bed level 5.0 m - 10 meter 0
m
Rotary core drilling in soil /rock and take continuous rock core to a depth
below ground level with Tungstun carbide bits including core sampling all
922 30.5.B.iii 3000 complete as directed, Soil ( gravel BMS etc), Depth below bed level 10 m - 15m meter 0
Rotary core drilling in soil /rock and take continuous rock core to a depth
below ground level with Tungstun carbide bits including core sampling all
923 30.5.B.iv 3000 complete as directed, Soil ( gravel BMS etc), Depth below bed level 15 m - 20 meter 0
m
Rotary core drilling in soil /rock and take continuous rock core to a depth
below ground level with Tungstun carbide bits including core sampling all
924 30.5.B.v 3000 complete as directed, Soil ( gravel BMS etc), Depth below bed level 20 m - 25 meter 0
m
Rotary core drilling in soil /rock and take continuous rock core to a depth
925 30.5.B.vi 3000 below ground level with Tungstun carbide bits including core sampling all meter 0
complete as directed, Soil ( gravel BMS etc), Depth below bed level > 25 m
Rotary core drilling in soil /rock and take continuous rock core to a depth
926 30.5.C.i 3000 below ground level with Tungstun carbide bits including core sampling all meter 0
complete as directed, Soft Rock, Depth below bed level upto 5.0 m
Rotary core drilling in soil /rock and take continuous rock core to a depth
927 30.5.C.ii 3000 below ground level with Tungstun carbide bits including core sampling all meter 0
complete as directed, Soft Rock, Depth below bed level 5.0 m - 10 m
Rotary core drilling in soil /rock and take continuous rock core to a depth
928 30.5.C.iii 3000 below ground level with Tungstun carbide bits including core sampling all meter 0
complete as directed, Soft Rock, Depth below bed level 10 m - 15m : Add 20
Rotary core drilling in soil /rock and take continuous rock core to a depth
929 30.5.C.iv 3000 below ground level with Tungstun carbide bits including core sampling all meter 0
complete as directed, Soft Rock, Depth below bed level 15 m - 20 mM
Rotary core drilling in soil /rock and take continuous rock core to a depth
930 30.5.C.v 3000 below ground level with Tungstun carbide bits including core sampling all meter 0
complete as directed, Soft Rock, Depth below bed level 20 m - 25 mM
Rotary core drilling in soil /rock and take continuous rock core to a depth
931 30.5.C.vi 3000 below ground level with Tungstun carbide bits including core sampling all meter 0
complete as directed, Soft Rock, Depth below bed level > 25
Rotary core drilling in soil /rock and take continuous rock core to a depth
932 30.5.D.i 3000 below ground level with Tungstun carbide bits including core sampling all meter 0
complete as directed, Hard Rock, Depth below bed level upto 5.0 m
Rotary core drilling in soil /rock and take continuous rock core to a depth
933 30.5.D.ii 3000 below ground level with Tungstun carbide bits including core sampling all meter 0
complete as directed, Hard Rock, Depth below bed level 5.0 m - 10 m
Rotary core drilling in soil /rock and take continuous rock core to a depth
30.5.D.ii
934 3000 below ground level with Tungstun carbide bits including core sampling all meter 0
i complete as directed, Hard Rock, Depth below bed level 10 m - 15m
Rotary core drilling in soil /rock and take continuous rock core to a depth
935 30.5.D.iv 3000 below ground level with Tungstun carbide bits including core sampling all meter 0
complete as directed, Hard Rock, Depth below bed level 15 m - 20 mM
Rotary core drilling in soil /rock and take continuous rock core to a depth
936 30.5.D.v 3000 below ground level with Tungstun carbide bits including core sampling all meter 0
complete as directed, Hard Rock, Depth below bed level 20 m - 25 mM
Rotary core drilling in soil /rock and take continuous rock core to a depth
937 30.5.D.vi 3000 below ground level with Tungstun carbide bits including core sampling all meter 0
complete as directed, Hard Rock, Depth below bed level > 25 m
938 30.6 3000 Taking disturbed sample during drilling as directed by the Engineer. nos 0
939 30.7 3000 Taking Undisturbed sample during drilling as directed by the Engineer. nos 0
Carry out Standard penetration test (SPT) during borig as directed by the
940 30.8 3000 Engineer nos 0
Providing & installing piezometers at the location of each bore holes for study
of fluctuations in water table (Water table studies to be carried out weekly for a
period of 3 months) with regular weekly interval and predetermined time & day
941 30.9 3000 each week and depth of water recorded with respect to the reduced level. nos 0
Diurnal variations to be noted for 3 selected weeks during the period of
observations and reporting.
Providing and laying precast RCC railing of M 30 Grade, aggregate size not
exceeding 12 mm, true to line and grade, tolerance of vertical RCC post not to
2000, exceed 1 in 500, center to center spacing between vertical post not to exceed meter
942 31.1 0
3105 2000 mm, leaving adequate space between vertical post for expansion, complete
as per Drawings and Technical specifications.
Providing, fitting and fixing mild steel railing complete as per drawing and
943 31.2 3105 Technical Specification m 0
Providing and fixing Drainage Spouts complete as per Drawing and Technical
944 31.3 N/A specifications. no 0
Filler joint, Providing & fixing 2 mm thick corrugated copper plate in expansion
945 31.4.i 3103 joint complete as per drawing & Technical Specification. meter 0
, Providing & fixing 20 mm thick compressible fiber board in expansion joint
946 31.4.ii complete as per drawing & Technical Specification. meter 0
, Providing and fixing in position 20 mm thick pre-moulded joint filler in
expansion joint for fixed ends of simply supported spans not exceeding 10 m to
947 31.4.iii N/A cater for a horizontal movement upto 20 mm, covered with sealant complete as meter 0
per Drawing and technical specifications.
, Providing and filling joint sealing compound as per drawings and technical
948 31.4.iv N/A specifications with coarse sand and 6 per cent bitumen by weight meter 0
Asphaltic Plug joint, Providing and laying of asphaltic plug joint to provide for
horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint
varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in
949 31.5 3100 traffic direction), covered with a closure plate of 200 mm x 6 mm of weldable meter 0
structural steel conforming to IS: 2062, as per Drawings and Technical
Specifications.
Tubular Steel Railing on Medium Weight Steel Channel ( ISMC series) 100 mm
x 50 mm, Providing, fixing and erecting 50 mm dia steel pipe railing in 3 rows
950 31.6 3105 duly painted on medium weight steel channels (ISMC series) 100 mm x 50 mm, meter #NAME?
1.2 metres high above ground, 2 m center to center, complete as per Drawing
and Technical specifications.
Tubular Steel Railing on Precast RCC Posts, 1.2 m High Above Ground Level,
Providing, fencing and erecting 50 mm dia painted steel pipe railing in 3 rows
951 31.7 3105 on precast M 20 grade RCC vertical posts 1.8 metres high (1.2 m above GL) meter #NAME?
with 3 holes 50 mm dia for pipe, fixed 2 metres center to, complete as per
Drawing and Technical Specifications.