You are on page 1of 21

Your temporary usage period for IBM SPSS Statistics will expire in 6381

days.

GET
FILE='/Users/samuelpardomuan/Desktop/DAAATA copy.sav'.
DATASET NAME DataSet1 WINDOW=FRONT.
REGRESSION
/MISSING LISTWISE
/STATISTICS COEFF OUTS R ANOVA COLLIN TOL
/CRITERIA=PIN(.05) POUT(.10)
/NOORIGIN
/DEPENDENT VOL
/METHOD=ENTER DYIELD DPAYOUT LDAR GRWTH
/RESIDUALS DURBIN
/SAVE RESID.

Regression

Notes
Output Created 12-JUL-2018 21:12:52
Comments
Input Data /Users/samuelpardom
uan/Desktop/DAAATA
copy.sav
Active Dataset DataSet1
Filter <none>
Weight <none>
Split File <none>
N of Rows in Working 30
Data File
Missing Value Definition of Missing User-defined missing
Handling values are treated as
missing.
Cases Used Statistics are based
on cases with no
missing values for any
variable used.
Syntax REGRESSION
/MISSING
LISTWISE
/STATISTICS
COEFF OUTS R
ANOVA COLLIN TOL
/CRITERIA=PIN(.05)
POUT(.10)
/NOORIGIN
/DEPENDENT VOL
/METHOD=ENTER
DYIELD DPAYOUT
LDAR GRWTH
/RESIDUALS
DURBIN
/SAVE RESID.
Resources Processor Time 00:00:00.01
Elapsed Time 00:00:00.00
Memory Required 4112 bytes
Additional Memory 0 bytes
Required for Residual
Plots
Variables Created or RES_1 Unstandardized
Modified Residual

[DataSet1] /Users/samuelpardomuan/Desktop/DAAATA copy.sav


Variables Entered/Removeda
Variables Variables
Model Entered Removed Method
1 GRWTH, . Enter
DYIELD,
LDAR,
DPAYOUTb
a. Dependent Variable: VOL
b. All requested variables entered.

Model Summaryb
R Adjusted R Std. Error of Durbin-
Model R Square Square the Estimate Watson
1 .262 a .069 -.080 .1168229 1.713
a. Predictors: (Constant), GRWTH, DYIELD, LDAR, DPAYOUT
b. Dependent Variable: VOL

ANOVAa
Sum of Mean
Model Squares df SquareF Sig.
1 Regressio .025 4 .006
.462 .763b
n
Residual .341 25 .014
Total .366 29
a. Dependent Variable: VOL
b. Predictors: (Constant), GRWTH, DYIELD, LDAR, DPAYOUT

Coefficientsa
Standardize
Unstandardized d Collinearity
Coefficients Coefficients Statistics
Toleranc
Model B Std. Error Beta t Sig. e VIF
1 (Constant .912 .089 10.298 .000
)
DYIELD .861 2.396 .076 .359 .722 .823 1.215
DPAYOU -.069 .090 -.170 -.760 .454 .745 1.342
T
LDAR .104 .142 .161 .729 .473 .763 1.310
GRWTH .137 .110 .260 1.246 .224 .858 1.165
a. Dependent Variable: VOL

Collinearity Diagnosticsa
Variance Proportions
Dimensio Eigenvalu Condition (Constant DPAYOU
Model n e Index ) DYIELD T LDAR GRWTH
1 1 4.220 1.000 .00 .01 .01 .01 .01
2 .303 3.729 .01 .03 .75 .00 .09
3 .263 4.009 .01 .11 .09 .30 .09
4 .176 4.902 .00 .53 .02 .00 .49
5 .039 10.440 .97 .32 .13 .69 .33
a. Dependent Variable: VOL

Residuals Statisticsa
Std.
Minimum Maximum Mean Deviation N
Predicted Value .955966 1.084483 .999247 .0294941 30
Residual -.3679131 .2325940 .0000000 .1084673 30
Std. Predicted -1.467 2.890 .000 1.000 30
Value
Std. Residual -3.149 1.991 .000 .928 30
a. Dependent Variable: VOL

COMPUTE absres=ABS(RES_1).
EXECUTE.
NPAR TESTS
/K-S(NORMAL)=DYIELD DPAYOUT LDAR GRWTH VOL RES_1
/MISSING ANALYSIS.
NPar Tests

Notes
Output Created 12-JUL-2018 21:13:49
Comments
Input Data /Users/samuelpardom
uan/Desktop/DAAATA
copy.sav
Active Dataset DataSet1
Filter <none>
Weight <none>
Split File <none>
N of Rows in Working 30
Data File
Missing Value Definition of Missing User-defined missing
Handling values are treated as
missing.
Cases Used Statistics for each test
are based on all cases
with valid data for the
variable(s) used in that
test.
Syntax NPAR TESTS
/K-
S(NORMAL)=DYIELD
DPAYOUT LDAR
GRWTH VOL RES_1
/MISSING
ANALYSIS.
Resources Processor Time 00:00:00.01
Elapsed Time 00:00:00.00
Number of Cases 349525
Alloweda
a. Based on availability of workspace memory.

One-Sample Kolmogorov-Smirnov Test


DPAYOU Unstandardiz
DYIELD T LDAR GRWTH VOL ed Residual
N 30 30 30 30 30 30
Normal Parametersa,b Mean .018613 .319533 .371443 .398933 .999247 .0000000
Std. .0099801 .2783816 .1742639 .2126649 .1124058 .10846731
Deviation
Most Extreme Absolute .079 .136 .108 .139 .122 .151
Differences Positive .079 .136 .108 .139 .093 .124
Negative -.072 -.134 -.089 -.108 -.122 -.151
Test Statistic .079 .136 .108 .139 .122 .151
Asymp. Sig. (2-tailed) .200c,d .168c .200c,d .141c .200c,d .078c
a. Test distribution is Normal.
b. Calculated from data.
c. Lilliefors Significance Correction.
d. This is a lower bound of the true significance.

EXAMINE VARIABLES=DYIELD DPAYOUT LDAR GRWTH VOL absres


/PLOT BOXPLOT STEMLEAF
/COMPARE GROUPS
/STATISTICS DESCRIPTIVES EXTREME
/CINTERVAL 95
/MISSING LISTWISE
/NOTOTAL.

Explore
Notes
Output Created 12-JUL-2018 21:14:22
Comments
Input Data /Users/samuelpardomu
an/Desktop/DAAATA
copy.sav
Active Dataset DataSet1
Filter <none>
Weight <none>
Split File <none>
N of Rows in Working 30
Data File
Missing Value Definition of Missing User-defined missing
Handling values for dependent
variables are treated as
missing.
Cases Used Statistics are based on
cases with no missing
values for any
dependent variable or
factor used.
Syntax EXAMINE
VARIABLES=DYIELD
DPAYOUT LDAR
GRWTH VOL absres
/PLOT BOXPLOT
STEMLEAF
/COMPARE GROUPS
/STATISTICS
DESCRIPTIVES
EXTREME
/CINTERVAL 95
/MISSING LISTWISE
/NOTOTAL.
Resources Processor Time 00:00:03.96
Elapsed Time 00:00:04.00
Case Processing Summary
Cases
Valid Missing Total
N Percent N Percent N Percent
DYIELD 30 100.0% 0 0.0% 30 100.0%
DPAYOU 30 100.0% 0 0.0% 30 100.0%
T
LDAR 30 100.0% 0 0.0% 30 100.0%
GRWTH 30 100.0% 0 0.0% 30 100.0%
VOL 30 100.0% 0 0.0% 30 100.0%
absres 30 100.0% 0 0.0% 30 100.0%

Descriptives
Statistic Std. Error
DYIELD Mean .018613 .0018221
95% Confidence Lower .014886
Interval for Mean Bound
Upper .022339
Bound
5% Trimmed Mean .018299
Median .018300
Variance .000
Std. Deviation .0099801
Minimum .0026
Maximum .0406
Range .0380
Interquartile Range .0155
Skewness .304 .427
Kurtosis -.300 .833
DPAYOU Mean .319533 .0508253
T 95% Confidence Lower .215584
Interval for Mean Bound
Upper .423483
Bound
5% Trimmed Mean .298713
Median .284350
Variance .077
Std. Deviation .2783816
Minimum .0115
Maximum .9987
Range .9872
Interquartile Range .4168
Skewness 1.198 .427
Kurtosis 1.051 .833
LDAR Mean .371443 .0318161
95% Confidence Lower .306372
Interval for Mean Bound
Upper .436515
Bound
5% Trimmed Mean .370215
Median .396500
Variance .030
Std. Deviation .1742639
Minimum .0400
Maximum .6940
Range .6540
Interquartile Range .3240
Skewness .115 .427
Kurtosis -.857 .833
GRWTH Mean .398933 .0388271
95% Confidence Lower .319523
Interval for Mean Bound
Upper .478344
Bound
5% Trimmed Mean .396352
Median .334000
Variance .045
Std. Deviation .2126649
Minimum .1000
Maximum .7450
Range .6450
Interquartile Range .3965
Skewness .371 .427
Kurtosis -1.307 .833
VOL Mean .999247 .0205224
95% Confidence Lower .957274
Interval for Mean Bound
Upper 1.041220
Bound
5% Trimmed Mean 1.003417
Median .999000
Variance .013
Std. Deviation .1124058
Minimum .6100
Maximum 1.2450
Range .6350
Interquartile Range .1242
Skewness -.948 .427
Kurtosis 4.368 .833
absres Mean .0770 .01370
95% Confidence Lower .0490
Interval for Mean Bound
Upper .1050
Bound
5% Trimmed Mean .0669
Median .0471
Variance .006
Std. Deviation .07503
Minimum .01
Maximum .37
Range .36
Interquartile Range .06
Skewness 2.478 .427
Kurtosis 7.305 .833

Extreme Values
Case
Number Value
DYIELD Highest 1 28 .0406
2 24 .0392
3 18 .0313
4 9 .0286
5 7 .0285
Lowest 1 15 .0026
2 5 .0030
3 3 .0044
4 2 .0052
5 13 .0066
DPAYOU Highest 1 10 .9987
T 2 20 .9969
3 30 .9330
4 7 .5202
5 24 .5151
Lowest 1 15 .0115
2 3 .0242
3 28 .0412
4 13 .0412
5 23 .0531
LDAR Highest 1 20 .6940
2 26 .6750
3 30 .6450
4 22 .5990
5 2 .5400
Lowest 1 1 .0400
2 23 .1520
3 8 .1595
4 18 .1640
5 7 .1800
GRWTH Highest 1 29 .7450
2 13 .7230
3 1 .7200
4 4 .7200
5 27 .7110
Lowest 1 2 .1000
2 24 .1200
3 22 .1300
4 19 .1700
5 21 .1830
VOL Highest 1 7 1.2450
2 27 1.1803
3 6 1.1538
4 25 1.0965
5 2 1.0900a
Lowest 1 11 .6100
2 23 .8800
3 22 .9000
4 19 .9090
5 21 .9200
absres Highest 1 11 .37
2 7 .23
3 6 .17
4 27 .15
5 23 .13
Lowest 1 26 .01
2 12 .02
3 8 .02
4 28 .02
5 10 .03
a. Only a partial list of cases with the value 1.0900
are shown in the table of upper extremes.

DYIELD

DYIELD Stem-and-Leaf Plot

Frequency Stem & Leaf

3.00 0 . 234
3.00 0 . 569
5.00 1 . 00144
7.00 1 . 5588889
3.00 2 . 044
6.00 2 . 566688
1.00 3 . 1
1.00 3 . 9
1.00 4 . 0

Stem width: .0100


Each leaf: 1 case(s)
DPAYOUT

DPAYOUT Stem-and-Leaf Plot

Frequency Stem & Leaf

13.00 0 . 0000000011111
7.00 0 . 2222333
7.00 0 . 4455555
.00 0 .
3.00 0 . 999

Stem width: 1.0000


Each leaf: 1 case(s)
LDAR

LDAR Stem-and-Leaf Plot

Frequency Stem & Leaf

1.00 0 . 4
6.00 1 . 556889
4.00 2 . 0269
6.00 3 . 017999
5.00 4 . 11259
5.00 5 . 22349
3.00 6 . 479

Stem width: .1000


Each leaf: 1 case(s)
GRWTH

GRWTH Stem-and-Leaf Plot

Frequency Stem & Leaf

5.00 1 . 02378
7.00 2 . 0122568
5.00 3 . 01246
3.00 4 . 157
2.00 5 . 36
3.00 6 . 127
5.00 7 . 12224

Stem width: .1000


Each leaf: 1 case(s)
VOL

VOL Stem-and-Leaf Plot

Frequency Stem & Leaf

1.00 Extremes (=<.61)


1.00 8 . 8
6.00 9 . 002234
7.00 9 . 5777789
7.00 10 . 0122234
5.00 10 . 67999
.00 11 .
2.00 11 . 58
1.00 Extremes (>=1.25)

Stem width: .1000


Each leaf: 1 case(s)
absres

absres Stem-and-Leaf Plot

Frequency Stem & Leaf

2.00 0 . 11
10.00 0 . 2223333333
7.00 0 . 4444455
.00 0 .
4.00 0 . 8889
2.00 1 . 11
1.00 1 . 3
1.00 1 . 5
1.00 1 . 7
2.00 Extremes (>=.23)

Stem width: .10


Each leaf: 1 case(s)

You might also like