RETROFITTING OF HRD-DCW OF DOCUMENT No.

STREAM 1, 2 AND 3 B058-000-81-41-SOW-0001


(CIVIL-STRUCTURAL & ARCHITECTURAL) Rev-B
SCOPE OF WORK & SUPPLY
Page 7 of 18

4.2 Prospective Vendors shall be deemed to have studied the drawings enclosed with tender
and fully understood the nature and magnitude of the work before submitting the bids.
4.3 Vendor shall prepare drawings for construction / fabrication, and shall submit the same
to Owner/ EIL for approval and shall obtain the approval from Owner/EIL before
commencing the construction / fabrication.
5.0 DRAWINGS/ DOCUMENTS REQUIRED FROM VENDOR

5.1 WITH OFFER


The list of drawings/documents as required to be submitted along with offer is enclosed
in the tender document.
5.2 AFTER AWARD OF THE CONTRACT
The list of drawings/documents as required to be reviewed by representative of
Owner/ Owner is enclosed in the tender document.

After the job completion, Vendor shall prepare As Built drawings. Final certified ‘As Built’
drawings shall be submitted by the Vendor in AutoCad and all the documents in MS
office, as part of final documentation.
6.0 APPROVALS
Vendor shall obtain a p p r o v a l f r o m S t a t u t o r y Bodies like state
g o v e r n m e n t Authorities / Local Bodies etc.
Vendor to comply with the requirement of these authorities irrespective if it is mentioned or
not in the bid package & shall form part of Vendor’s scope of work including preparation of
required drawings/ documents.

7.0 LIST OF ATTACHMENTS

A) CONSTRUCTION STANDARD

Serial Rev
Standard No. Title
No No.
Abbreviations, legends and equipment
1 7-65-0001 3
symbols.
7-65-0101 Standard sections of brick storm water
2 6
drains.
7-65-0102 Concrete trapezoidal storm water drain
3 4
(height (H) < 3.0 m)

Format No. EIL 1641-1924 Rev. 1 Copyright EIL – All rights reserved

Page 1552 of 5328


RETROFITTING OF HRD-DCW OF DOCUMENT No.
STREAM 1, 2 AND 3 B058-000-81-41-SOW-0001
(CIVIL-STRUCTURAL & ARCHITECTURAL) Rev-B
SCOPE OF WORK & SUPPLY
Page 8 of 18

7-65-0103
4 Pipe culvert for storm water drainage. 3

7-65-0104
5 Box culvert type I, II, III and IV. 4

7-65-0106
6 Box culvert type V & VI. 4

7-65-0207
7 Valve Pit(RCC) Type-V for dia 2’’ to < 6’’ 3

7-65-0211 Detail of rungs for manholes, valve pits, tanks


8 4
etc.
7-65-0213
9 Conc. Bedding and encasements for pipes 4

7-65-0220
10 Valve pit Type-I for dia < 1.5’’ 5

7-65-0221
11 Valve pit Type-II for dia 2’’ to 6’’ valve 5

7-65-0224 Chequered Plate details(For masonary valve


12 2
pit type-I,II,III&IV)
7-65-0272 Unit drainage Details (Rectangular ditch
13 4
details)
7-65-0400 Standard detail of chain link fencing (with
14 3
conc. post)
7-65-0404
15 RCC pavement details. 3

B) SPECIFICAIONS

Serial Specification Rev


Title
No No. No.
Standard specification for chain link fencing
1 6-65-0013 3
grading

Standard specification for classification of soil


2 6-65-0016
for earth work in site grading

Standard specification for site grading & rock


3 6-65-0017 5
cutting for site grading

Format No. EIL 1641-1924 Rev. 1 Copyright EIL – All rights reserved

Page 1553 of 5328


RETROFITTING OF HRD-DCW OF DOCUMENT No.
STREAM 1, 2 AND 3 B058-000-81-41-SOW-0001
(CIVIL-STRUCTURAL & ARCHITECTURAL) Rev-B
SCOPE OF WORK & SUPPLY
Page 9 of 18

Standard specification for road & flexible


4 6-65-0018 7
pavements (upto WBM layer).

Standard specification for concrete


5 6-65-0019 3
pavement.

Standard specification for flexible pavements


6 6-65-0020 3
with bitumen premix carpet.

Standard specification for pipe culverts &


7 6-65-0021 3
ERC/ IRC crossing.
Standard specification for underground and
8 6-65-0027 above ground G.I. pipeline system (water 4
services)
Standard specification for fabrication and
9 6-65-0030 4
laying of underground piping.
Standard specification for misc. civil &
10 6-65-0035 structural works for U/G piping & other civil 3
works
Standard specification for plumbing &
11 6-65-0053 3
building drainage.

Standard specification for portable fire


12 6-66-0004 0
extinguisher

Civil & structural lumpsum turnkey works


13 6-68-0021
(LSTK works) - general requirements

8.0 SCOPE OF SUPPLY

OWNER’S SCOPE OF SUPPLY


-Nil

VENDOR’S SCOPE OF SUPPLY


-All items consumables/non consumables required to complete the job.

-All tools tackles, plant machinery etc. to complete the job.

-All material’s, equipment’s, tools & tackles, labours for the works as per scope of works
shall be in the contactor’s scope of supply and the cost of such supply shall be deemed to
have been included in the quoted price without any liability on the part of the Owner.