PRE‐BID SITE VISIT FORM 

Name of Project  Construction to Bitumen Standards of Rhino Park and other 
Access Roads in Nairobi County 
Tender No.: KURA/DEV/HQ/ 213/2018‐2019 
Employer  Kenya Urban Roads Authority (KURA) 
Employer’s  Eng. Kelvin Mutemi 
representative 
conducting the Site 
Visit 
Location, Date and  Jn Rhino Park Road/Dagoretti  2nd April 2019 1000hrs 
Time  Road 
Mandatory? If yes,  Yes  Signed, stamped letter of 
indicate documentation  introduction from the 
required  Employer 
Representative ID 
Document 
List of other  1) Crescent Contractors 
prospective bidders in  2) Xiangshi Water Resources 
attendance  3) Lonyuan Co Ltd 
4) SS Mehta and Sons 
5) Jiangxi Zhongmei Eng. Construction (k) Co. Ltd 
6) Denix Contractors 
7) KAPS Contractors 
8) Baraka Contractors 
9) Quest Contractors 
10) Kiu Construction 
11) China Overseas Engineering Group Co. Ltd 
12) Kabuito Contractors 
13) Iota Contractors 
14) Associated Contractors Ltd 
Project Overview  The proposed project consists of 6 sections, total 7.8km 
1) Rhino Park Road/ Resurrection Garden Link (2.9km) 
2) Farm Lane (1.0km) 
3) Karinde Road (2km) 
4) Wambiri Road (1.5km). Jn Ngong Road, 8km away from the 
previous 3 roads 
5) St. Daniel Comboni Road (0.4km). Jn Ngong Road, 2km 
away from Wambiri Road 
 
Proposed cross section 
6m carriageway, 2m footpaths 
Earhworks to formation level (except Rhino Park Road) 
175 mm CIG 2% subbase 
150 mm GCS 2% base on carriageway and footpaths 
50 mm AC (0/20) wearing course for carriageway. 

1 of 4 
35 mm AC (0/14) wearing course on 200mm gravel base for 
footpaths. 
Conduct of the Site  Start  Jn Rhino Park Road/ Dagoretti Road 
Visit:  st
1  Stop  End of Rhino Park Road and Resurrection Garden 
Link 
Remarks: 
Rhino Park Road/ Resurection Garden Link is a 
3.8 km section. 
Earthworks (to formation level), cross culverts 
and 1 no. bridge are complete in this 
section. 
The Contractor shall proceed with 
pavement layers 
2nd Stop  End of Farm Lane 
Farm Lane is a 1.0 km earth road with a 
temporary gravel surface. 
Shall be completely reconstructed. 
3rd Stop  End of Karinde Road (Karinde Shopping Centre) 
Remarks: Karinde Road is a 2.0 km earth road 
with a temporary gravel surface. 
4th Stop  End of Wambiri Road 
Remarks: Wambiri Road is a 1.5 km earth road 
with a temporary gravel surface. 
Located 8km away from the previous 3 roads 
along Ngong’Road. 
th
5  Stop  End of St. Daniel Comboni Road 
Remarks: St. Daniel Comboni Road is a 0.4 km 
earth road with a temporary gravel surface. 
Located 2km away from Wambiri Road along 
Ngong’ Road. 
Further Observations:  Water 1) Minor river along Rhino Park Road. 
2) Water is available from Nairobi/Kiambu 
County Government supplies 
Materials: Soils 
1) Red volcanic soils are present along the 
entire alignment. Suitable for subgrade. 
Gravel 
1) May be obtained by leasing areas in the 
locality for borrow‐pits 
Sand 
2) May be obtained from local suppliers 
Aggregate 
3) No hard stone quarries present in the 
locality. Shall be imported by the Contractor. 
Drainage The area is well drained. 

2 of 4 
Local levies Cess shall be payable to the Nairobi/ Kiambu 
County Governments with regard to harvesting 
materials. 
Settlements The entire alignment is densely settled, 
particularly Karinde, Wambiri, which contain 
numerous informal buildings on the road 
reserve. 
 

 
Jn Rhino Park Road/ Dagoretti Road 
 

 
Earthworks complete along Rhino Park Road/ Resurrection Garden Link 
 

   

3 of 4 
 
Start of Farm Lane 
 

 
End of Wambiri Road. Heavy presence of informal settlements 
 