You are on page 1of 4

PRE‐BID SITE VISIT FORM 

Name of Project  Upgrading of Githurai ‐ Kimbo Road [Phase III] 
Tender No.: KURA/HQ/DEV/214/2018‐2019 
Employer  Kenya Urban Roads Authority (KURA) 
Employer’s  Eng. Denis Maingi 
representative 
conducting the Site 
Visit 
Location, Date and  Uhuru Kenyatta/Ndii‐ini Primary  3rd April 2019 1000hrs 
Time  School (End of Kahawa Sukari 
Avenue) 
Mandatory? If yes,  Yes  Signed, stamped letter of 
indicate documentation  introduction from the 
required  Employer 
Representative ID 
Document 
List of other  1) Crescent Contractors 
prospective bidders in  2) China Railway Tenth Engineering Group Co., Ltd. (CREC‐10) 
attendance  3) Changzheng Engineering Co., Ltd (CECO) 
4) Longyuan Co Ltd 
5) SS Mehta and Sons 
6) Jiangxi Zhongmei Eng. Construction (k) Co. Ltd 
7) China State Construction Engineering Corporation (CSCEC) 
8) Denix Contractors 
9) KAPS Contractors 
10) Cementers Contractors 
11) Victoria Contractors 
12) Baraka Contractors 
13) Quest Contractors 
14) Kiu Construction 
15) China Overseas Engineering Group Co. Ltd (COVEC) 
16) Kabuito Contractors 
17) Iota Contractors 
18) Ogle Contractors 
19) Sinohydro Corp 
20) Associated Contractors Ltd 
Project Overview  The proposed project consists of the following, total 7km 
1) Kahawa Sukari – Kimbo Road (1.6km) 
2) Kimbo – Eastern Bypass Link Road (2km) 
3) Further Roads within Kahawa Sukari (3.4) 
 
Proposed cross section 
6m carriageway, 1m shoulders, 2m footpaths 
Earthworks to formation level 
150mm base natural gravel on footpaths 
2 layers 200mm each hand packed stones. 

1 of 4 
50 mm AC (0/20mm) to carriageway 
35 mm AC (0/14mm) on shoulders and footpaths. 
Conduct of the Site  Start  Uhuru Kenyatta Primary School (End of Kahawa 
Visit:  Sukari Avenue): 1000hrs 
  1st Stop  End of Kahawa Sukari ‐ Kimbo Road 
Remarks: 
Kahawa Sukari – Kimbo Road is a 1.6 km earth 
road with a temporary gravel surface. 
Shall be completely reconstructed. 
  Drive  Other accesses within Kahawa Sukari and Kimbo 
through  areas 
3.4 km earth road with a temporary gravel 
surface. 
Shall be completely reconstructed. 
  2nd Stop  End of 1km from the end of Eastern Bypass Link 
Road. Existing electric fence shall be removed to 
allow for onstruction. 
Remarks: 
Kimbo – Eastern Bypass Link Road is a 2 km earth 
road. 
Shall be completely reconstructed. 
Further Observations:  Water 1) Minor Kiu River along Eastern Bypass Link 
Road. 
2) Water is available from Kiambu County 
Government supplies 
  Materials: Soils 
1) Mostly black cotton soil which will be spoiled 
at the Contractor’s cost 
Gravel 
1) May be obtained by leasing areas in the 
locality for borrow‐pits 
Sand 
1) May be obtained from local suppliers 
Hardcore 
The contractor may obtain from local suppliers 
or nearby quarries e.g. in Thika 
Aggregate 
1) No hard stone quarries present in the 
locality. Shall be imported by the Contractor. 
  Drainage 1) The entire road is located in a generally flat 
area 
  Local levies The successful contractor shall pay cess and 
other applicable taxes to the County 
Government of Kiambu 
  Settlements The entire road traverses a densely settled 
residential area. 
 

2 of 4 
 
Start of Project: Uhuru Kenyatta/ Ndii‐ini Primary School 
 

 
End of Kahawa Sukari – Kimbo Road, Start of Kimbo – Eastern Bypass Link 
 
 

   

3 of 4 
 
Kimbo Road: Heavy presence of informal structures 
 

 
Towards Eastern Bypass: Fence shall be removed to allow for construction of link road. 
 

4 of 4 

You might also like