Professional Documents
Culture Documents
1600
6x4-16
4-16 4-16 4-16 approval of the Engineer. The
7x4-16
EL. (B)
B
Local zone spiral
Contractor shall submit for the
A A 5-32 A
reinforcement, approval of the Engineer details
(See note 5) of the Local Zone (bursting)
20 @ 300
5-16 reinforcement required to be
5-16
1600
5-32 Temporary Bearing used in conjuction with the
400
(See Note 4)
20 @ 300 5-32 250 Contractor’s approved Post-
Tensioning system.
400
300
C D
5-32 5-32 20 @ 200
5. For C.I.P. concrete pile reinforcement,
1-16
See Dwg. S-1.0009
900
900
5-16 5-16
E 20 @ 300
B B 1-16 6. Pile design assupmtion
6-32 6-32 (a) Pile Length measured from
100
the underside of the abutment
100
1-16 Each face CL Abutment & Pile seat=20.00m
100mm Blinding Concrete 5500 5500
100 (b) Allowable pile capacity
Reinforced Concrete Pile
= 1500kN
(20 @ 300) (20 @ 300) (20 @ 300)
(c) Minimum allowable pile
20 @ 300 spacing = 1500mm
SECTION C-C
C D 7. For Bridge 20 utilities, refer
STAGE 1
ELEVATION to dwg S-1.0011 and for pipe
1500 Scale 1 : 25
Scale 1 : 50 openings reinforcement details,
1200
refer to dwg S-1.0013.
450 750
20 @ 300
16636 5-32
20 @ 300
6x4-16 @ 220
1600
16 @ 300
fer
er
e
Levels Table
nt r
ref
904
en
.09
em
c e
Abutment 1 Abutment 2
r
-
-
.S
.
nf
wg
b re
wg
rei
20 @ 300
A 5.364 5.343
to d
400
d
e
5-32 250
w
we
to
20 @ 300
r
B 5.342 5.338
150
fo
for
300
5-32-B
5-32-B
20 @ 300
5-32-T
5-32-T
1-16 C 3.364 3.343
150
0
15
@150
D 3.342 3.338
900
20 @ 300
50
1-16
1800
15
@1
00
5-16
180
1500
5-16
2-20
CL Abutment
18
0
0
2-2
2-2
100
100
PARSONS
(W) 203x203x86
203 10
75x10 thk
8 L=1000
stiffness plate
Grouting
100
75x10 thk
Grouting Bridge 20
stiffness plate
1000x400x40
Integral Abutment Details
1500
40
between bearings
D
100x100x10th plate Section E-E DRAWN
MC AY
100 400 400 100
5-32%%c Top Cont Detail - 1 APPROVED
Temporary support TM
6-32%%c Bottom Cont Deck Support Structure
(20 @ 300) (20 @ 300) Elevation As Shown
Scale NTS
(20 @ 300) (20 @ 300)
Scale 1 : 50