You are on page 1of 1

TCR Arabia Company Ltd.

PENETRANT TESTING REPORT


Client SAFCO Reference Code ASME V Article 6 Date Tested
Project SF2 TA2019 Test Procedure QCP/TCR/PT/3.0 Rev. 3 Report No.
Location Jubail KSA Acceptance Standard AS PER PROCEDURE Page 1 of 1

TEST METHOD CONSUMABLES SURFACE CONDITION


Solvent Removable Cleaner MAGNAFLUX SKC-S Welded Grinded
Water Washable Penetrant MAGNAFLUX SKL-S2 Machined ` Others
Post-Emulsifying Developer MAGNAFLUX SKD-SP2 Forged `
Visible Emulsifier - Casting `
Fluorescent Others - Rolled

INSPECTION PROCESS
Pre-Cleaning Wiping Emulsifier Application -
Penetrant Application Spraying Visible Light Intensity 100 fc
Penetrant Removal Wiping Black Light Intensity -
Developer Application Spraying Minimum Developing Time 10 mins.
Drying Process Normal Testing Temperature Ambient
Minimun Dwell Time 5 – 10 mins. Post-Cleaning -
Item Specification

TEST RESULTS
S.I No. Item Description Observation Result

NOTE:

Inspected by: Reviewed by:

TCR ARABIA NDT Level II CLIENT REPRESENTATIVE


Date Date

P.O. Box – 8143, GAS Gardens, King Abdulaziz Seaport Facility, Dammam-32224
(T) 00966-13-8475784 / 00966504997683 (e) sales@tcr-arabia.com (w) www.tcr-arabia.com

You might also like