MECHANICAL ABBREVIATION LIST MECHANICAL SYMBOL LIST MECHANICAL DRAWING INDEX
ABBREVIATION DESCRIPTION ABBREVIATION DESCRIPTION ABBREVIATION DESCRIPTION 3,3,1*6<0%2/6 '8&7:25.6<0%2/6 SHEET NO. SHEET TITLE
SYMBOL DESCRIPTION SYMBOL DESCRIPTION M-001 MECHANICAL STANDARDS AND DRAWING INDEX
A COMPRESSED AIR FD FLOOR DRAIN O OXYGEN AV
A(___#) COMPRESSED AIR (SPECIFIC PSIG) FFD FUNNEL FLOOR DRAIN OA OUTSIDE AIR AIR VENT - AUTOMATIC AIR TERMINAL UNIT MD-140 4TH FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASE 1
MV TU-101

$
$

AAV AUTOMATIC AIR VENT FH FIRE HYDRANT OAT OUTSIDE AIR TEMPERATURE AIR VENT - MANUAL MD-170.A 7TH FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASES 2, 3 & 4
ACC AIR COOLED CONDENSER FHC FIRE HOSE CABINET OBD OPPOSED BLADE DAMPER AIR TERMINAL UNIT WITH HEATING COIL
ACCU AIR COOLED CONDENSER UNIT FHR FIRE HOSE RACK OC ON CENTER/CENTER TO CENTER BFP BACKFLOW PREVENTER TU-101 MD-170.B 7TH FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASES 4A & 4B
AD ACCESS DOOR FHV FIRE HOSE VALVE OD OUTSIDE DIAMETER
AD AREA DRAIN FLA FULL LOAD AMPS OFCI OVERLOAD CATCH BASIN LABORATORY AIR TERMINAL UNIT MD-240 4TH FLOOR PLUMBING DEMOLITION PLAN - PHASE 1
AE AIR EXTRACTOR FLR FLOOR OFOI OWNER FURNISHED, CONTRACTOR INSTALLED LTU-101
CIRCULATING PUMP MD-260.A 6TH FLOOR PLUMBING DEMOLITION PLAN - PHASES 2, 3 & 4
AFF ABOVE FINISHED FLOOR FM FLOW MEASURING DEVICE OL ONWER FURNISHED, OWNER INSTALLED
CO LABORATORY AIR TERMINAL UNIT WITH HEATING COIL MD-260.B 6TH FLOOR PLUMBING DEMOLITION PLAN - PHASE 4A
AHU AIR HANDLING UNIT FMS FLOW MEASURING STATION ORC OVERFLOW RAIN CONDUCTOR CLEAN OUT - IN FLOOR LTU-101
ALT ALTERNATE FPM FEET PER MINUTE ORD OVERFLOW ROOF DRAIN
CO MD-270.A 7TH FLOOR PLUMBING DEMOLITION PLAN - PHASES 2, 3 & 4
AMP AMPERE FP FIRE PUMP OS&Y OUTSIDE SCREW AND YOKE CLEAN OUT - FLANGE
APD AIR PRESSURE DROP FPTU FAN POWERED (AIR) TERMINAL UNIT OV OUTLET VELOCITY DAMPER - HORIZONTAL FIRE (EXISTING, NEW) MD-270.B 7TH FLOOR PLUMBING DEMOLITION PLAN - PHASE 4A
AR ARGON FS FLOOR SINK DIRECTION OF FLOW
ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATION FSEC FOOD SERVICE EQUIPMENT CONTRACTOR PACU PACKAGED AIR CONDITIONING UNIT MD-280.A 8TH FLOOR PLUMBING DEMOLITION PLAN - PHASES 2, 3 & 4
DIRECTION OF PITCH - DOWN DAMPER - HORIZONTAL FIRE / SMOKE (EXISTING, NEW)
AND AIR-CONDITIONING ENGINEERS FT FEET PBD PARALLEL BLADE DAMPER MD-280.B 8TH FLOOR PLUMBING DEMOLITION PLAN - PHASE 4A
ASR AUTOMATIC SPRINKLER RISER FTR FINNED TUBE RADIATION PC PUMPED CONDENSATE FINNED TUBE RADIATION
AUX AUXILIARY FV FACE VELOCITY PCW PROCESS COOLING WATER DAMPER - SMOKE (EXISTING, NEW) MD-340 4TH FLOOR HVAC PIPING DEMOLITION PLAN - PHASE 1
AV ACID VENT PCWR PROCESS COOLING WATER RETURN FIRE PROTECTION - SIAMESE CONNECTION - FREE STANDING
AVTR ACID VENT THROUGH ROOF G NATURAL GAS PCWS PROCESS COOLING WATER SUPPLY MD-360 6TH FLOOR HVAC PIPING DEMOLITION PLAN - PHASE 3
AW ACID WASTE GA GAUGE PD PRESSURE DROP (FEET OF WATER) FIRE PROTECTION - SIAMESE CONNECTION - WALL MOUNTED DAMPER - VERTICAL FIRE (EXISTING, NEW)
MD-370 7TH FLOOR HVAC PIPING DEMOLITION PLAN - PHASE 3
GAL GALLON PH PERIMETER HEAT
FIRE PROTECTION - SPRINKLER HEAD, CONCEALED MD-380.A 8TH FLOOR HVAC PIPING DEMOLITION PLAN - PHASES 2, 3 & 4
BAS BUILDING AUTOMATION SYSTEM GRH GRAVITY RELIEF HOOD PHR PERIMETER HEAT RETURN DAMPER - VERTICAL FIRE / SMOKE (EXISTING, NEW)
BCU BLOWER COIL UNIT GPH GALLONS PER HOUR PHS PERIMETER HEAT SUPPLY FIRE PROTECTION - SPRINKLER HEAD, PENDANT
BDD BACK DRAFT DAMPER GPM GALLONS PER MINUTE PNL PANEL BDD
MD-380.B 8TH FLOOR HVAC PIPING DEMOLITION PLAN - PHASE 4A
BFF BELOW FINISHED FLOOR PPM PARTS PER MILLION FIRE PROTECTION - SPRINKLER HEAD, UPRIGHT DAMPER - BACK DRAFT MD-440 4TH FLOOR SHEET METAL DEMOLITION PLAN - PHASE 1
BFP BACKFLOW PREVENTER H HYDROGEN PRESS PRESSURE
FIRE PROTECTION - SPRINKLER HEAD, SIDEWALL M DAMPER - MOTORIZED MD-470.A 7TH FLOOR SHEET METAL DEMOLITION PLAN - PHASES 2, 3 & 4
BHP BRAKE HORSEPOWER HB HOSE BIBB PRV PRESSURE REDUCING VALVE
BOD BOTTOM OF DUCT HC HEATING COIL PSAN PUMPED SANITARY FLOOR DRAIN MD-470.B 7TH FLOOR SHEET METAL DEMOLITION PLAN - PHASE 4A
BOP BOTTOM OF PIPE HD HOT DECK PSI POUNDS PER SQUARE INCH DAMPER - VOLUME (MANUALLY ADJUSTABLE)

%
%

BTU BRITISH THERMAL UNIT HEPA HIGH EFFICIENCY PARTICULATE ARRESTANCE PSIA POUNDS PER SQUARE INCH - ABSOLUTE FLOOR DRAIN - ELEVATION MD-480.A 8TH FLOOR SHEET METAL DEMOLITION PLAN - PHASES 2, 3 & 4
BTUH BRITISH THERMAL UNIT PER HOUR HL HIGH LIMIT PSIG POUNDS PER SQUARE INCH - GAUGE
BWV BACKWATER VALVE HOA HAND/OFF/AUTO PST PUMPED STORM FLOOR DRAIN - FUNNEL DIFFUSER - BLANK OFF MD-480.B 8TH FLOOR SHEET METAL DEMOLITION PLAN - PHASE 4A
HP HEAT PUMP PW PURIFIED WATER MD-940 4TH FLOOR MEDICAL GAS DEMOLITION PLAN - PHASE 1
C COMMON HP HORSEPOWER PWR PURIFIED WATER RETURN FLOOR DRAIN - FUNNEL, ELEVATION
DIFFUSER - LINEAR SLOT
CAP CAPACITY HPCW HIGH PRESSURE DOMESTIC COLD WATER PWS PURIFIED WATER SUPPLY FLOW MEASURING DEVICE MD-970 7TH FLOOR MEDICAL GAS DEMOLITION PLAN - PHASES 2 & 3
CAV CONSTANT AIR VOLUME HPHW HIGH PRESSURE DOMESTIC HOT WATER
FS MD-971 7TH FLOOR MEDICAL GAS DEMOLITION PLAN - PHASE 4
CB CATCH BASIN HPHWR HIGH PRESSURE DOMESTIC HOT WATER RETURN (R) RELOCATED FLOW SWITCH DIFFUSER - SQUARE OR RECTANGULAR
CC COOLING COIL HPL HEAT PUMP LOOP R RETURN GRILLE OR REGISTER HB MD-972 7TH FLOOR MEDICAL GAS DEMOLITION PLAN - PHASE 4A
CD COLD DECK HPLR HEAT PUMP LOOP RETURN RA RETURN AIR HOSE BIBB
MH DUCT CROSS SECTION - SUPPLY M-140 4TH FLOOR FIRE PROTECTION PLAN - PHASE 1
CD CONDENSATE DRAIN HPLS HEAT PUMP LOOP SUPPLY RAT RETURN AIR TEMPERATURE
MANHOLE
CFCI CONTRACTOR FURNISHED, CONTRACTOR INSTALLED HR HOUR RC RAIN CONDUCTOR
CFH CUBIC FEET PER HOUR HTG HEATING RCP RADIANT CEILING PANEL
M-170.A 7TH FLOOR FIRE PROTECTION PLAN - PHASES 2, 3 & 4
OPEN SITE DRAIN DUCT CROSS SECTION - RETURN OR EXHAUST
CFM CUBIC FEET PER MINUTE HV HEATING VENTILATING RD ROOF DRAIN M-170.B 7TH FLOOR FIRE PROTECTION PLAN - PHASES 4A & 4B
CH CHILLER HVAC HEATING, VENTILATING, AIR CONDITIONING REQD REQUIRED PIPE - ANCHOR
CHW CHILLED WATER HWH HOT WATER HEATING REF ROOF EXHAUST FAN DUCT CROSS SECTION - EXHAUST M-240 4TH FLOOR PLUMBING NEW WORK PLAN - PHASE 1
CHR CHILLED WATER RETURN HWR HOT WATER HEATING RETURN RF RETURN FAN PIPE - CAP OR PLUG
M-260 6TH FLOOR PLUMBING NEW WORK PLAN - PHASES 3 & 4
CHS CHILLED WATER SUPPLY HWS HOT WATER HEATING SUPPLY RH RELATIVE HUMIDITY DUCT - FLEXIBLE CONNECTION
PIPE - ELBOW DOWN
CLG COOLING HX HEAT EXCHANGER RL REFRIGERANT LIQUID M-270 7TH FLOOR PLUMBING NEW WORK PLAN - PHASES 3 & 4
CNDS CONDENSATE HZ HERTZ RLFA RELIEF AIR PIPE - ELBOW UP
CNDS (__#) CONDENSATE (SPECIFIC PSIG) RPM REVOLUTIONS PER MINUTE DUCT - FLEXIBLE DUCT M-280 8TH FLOOR PLUMBING NEW WORK PLAN - PHASES 3 & 4
CO CLEAN OUT IAQ INDOOR AIR QUALITY RS REFRIGERANT SUCTION PIPE - EPANSION JOINT OR COMPENSATOR M-340 4TH FLOOR HVAC PIPING NEW WORK PLAN - PHASE 1
CO2 CARBON DIOXIDE ID INSIDE DIAMETER RTU ROOFTOP UNIT
PIPE - FLANGE DUCT TAKE-OFF - ROUND CONICAL M-360 6TH FLOOR HVAC PIPING NEW WORK PLAN - PHASES 3 & 4B
CONT CONTINUATION OR CONTINUED IE INVERT ELEVATION
CONTR CONTRACTOR IH INTAKE HOOD S SUPPLY AIR DIFFUSER OR GRILLE PIPE - HOSE AND BRAID FLEXIBLE CONNECTION
CONV CONVECTOR IN INCHES SA SOUND ATTENUATOR DUCT TAKE-OFF - RECTANGULAR WITH SHOE TAP
M-370 7TH FLOOR HVAC PIPING NEW WORK PLAN - PHASES 3 & 4B
COP COEFFICIENT OF PERFORMACE IR INFRARED HEATER SA SUPPLY AIR PIPE - RUBBER FLEXIBLE CONNECTION M-380.A 8TH FLOOR HVAC PIPING NEW WORK PLAN - PHASES 2, 3 & 4
COS CENTRAL OPERATOR STATION IW INDIRECT WASTE SAN SANITARY SEWER, BELOW GROUND

&
&

CP CIRCULATING PUMP SAT SUPPLY AIR TEMPERATURE PIPE - GUIDE ELBOW - RECTANGULAR WITH TURNING VANES M-380.B 8TH FLOOR HVAC PIPING NEW WORK PLAN - PHASE 4A
CRU CONDENSATE RETURN UNIT JC JANITOR'S CLOSET SECT SECTION
CSS CLINICAL SERVICE SINK JP JOCKEY PUMP SF SUPPLY FAN PIPE - TEE DOWN M-430 3RD FLOOR SHEET METAL NEW WORK PLAN - PHASE 1
ELBOW - RECTANGULAR/ ROUND SMOOTH RADIUS
CT COOLING TOWER SH SHOWER PIPE - TEE UP M-440 4TH FLOOR SHEET METAL NEW WORK PLAN - PHASE 1
CUH CABINET UNIT HEATER KW KILOWATT SK SINK
CWR CONDENSER WATER RETURN KWH KILOWATT-HOUR SMR SNOW MELT RETURN PIPE - UNION ELBOW DOWN - RECTANGULAR M-470.A 7TH FLOOR SHEET METAL NEW WORK PLAN - PHASES 2, 3 & 4
CWS CONDENSER WATER SUPPLY SMS SNOW MELT SUPPLY P/T M-470.B 7TH FLOOR SHEET METAL NEW WORK PLAN - PHASES 4A & 4B
LAT LEAVING AIR TEMPERATURE SP STATIC PRESSURE PRESSURE AND TEMPERATURE TEST PLUG ELBOW DOWN - ROUND
D&T DRIP AND TRAP LAB LABRATORY SPEC SPECIFICATION M-480.A 8TH FLOOR SHEET METAL NEW WORK PLAN - PHASES 2, 3 & 4
DA DISCHARGE AIR LAV LAVATORY SPKLR SPRINKLER
PRESSURE GAUGE AND COCK M-480.B 8TH FLOOR SHEET METAL NEW WORK PLAN - PHASES 4A & 4B
DAT DISCHARGE AIR TEMPERATURE LBS POUNDS SQFT SQUARE FOOT/SQUARE FEET ELBOW UP - RECTANGULAR
DB DRY BULB LDB LEAVING DRY BULB S/S START/STOP REDUCER - CONCENTRIC M-940 4TH FLOOR MEDICAL GAS NEW WORK PLAN - PHASE 1
DCW DOMESTIC COLD WATER LL LOW LIMIT SS SERVICE SINK
DDC DIRECT DIGITAL CONTROL LPC LOW PRESSURE CONDENSATE SS SOIL, WASTE, OR SANITARY SEWER REDUCER - ECCENTRIC ELBOW UP - ROUND M-970 7TH FLOOR MEDICAL GAS NEW WORK PLAN - PHASE 3
DEG DEGREE LPS LOW PRESSURE STEAM ST STORM
DFU DRAINAGE FIXTURE UNITS LRA LOCKED ROTOR AMPS STD STANDARD ROOF/OVERFLOW DRAIN M-971 7TH FLOOR MEDICAL GAS NEW WORK PLAN - PHASE 4
FAN - AXIAL
DHW DOMESTIC HOT WATER LWB LEAVING WET BULB STK STACK M-601 MECHANICAL DETAILS
STEAM TRAP - FLOAT AND THERMOSTATIC
DHWR DOMESTIC HOT WATER RETURN LWT LEAVING WATER TEMPERATURE STM STEAM
DHWS DOMESTIC HOT WATER SUPPLY STM(__#) STEAM (SPECIFIC PSIG) STRAINER FAN - CENTRIFUGAL (ELEVATION) M-602 MECHANICAL DETAILS
DIA DIAMETER MA MEDICAL AIR S/W SUMMER/WINTER M-701 MECHANICAL SCHEDULES
DMPR DAMPER MAT MIXED AIR TEMPERATURE SW SWITCH STRAINER WITH BLOW-OFF
HEATING COIL
D/N DAY/NIGHT MAU MAKE-UP AIR UNIT M-702 MECHANICAL SCHEDULES
DN DOWN MAX MAXIMUM T TRANSFER GRILLE D
THERMOMETER M-801 TEMPERATURE CONTROLS
DNZ DOWNSPOUT NOZZLE MBH THOUSAND BRITISH THERMAL UNITS PER HOUR TC TEMPERATURE CONTROL INCLINED DROP IN DIRECTION OF AIRFLOW
DS DUCT SILENCER MCA MINIMUM CIRCUIT AMPACITY TC TEMPERING COIL TRAP M-802 TEMPERATURE CONTROLS
DT DRAIN TILE MCC MOTOR CONTROL CENTER TCP TEMPERATURE CONTROL PANEL R
DTC DRAIN TILE CONNECTION MECH MECHANICAL TD TRENCH DRAIN INCLINED RISE IN DIRECTION OF AIRFLOW
DWH DOMESTIC WATER HEATER MEZZ MEZZANINE TEMP TEMPERATURE VALVE - ANGLE

'
'

DWG DRAWING MFR MANUFACTURER TEMP TEMPORARY INTAKE OR RELIEF HOOD


MGVB MEDICAL GAS VALVE BOX TH TERMINAL HEATING VALVE - BALL
(E) EXISTING MH MANHOLE THA TOTAL HEAT ABSORBED VALVE - BALANCE (i.e. BALANCE VALVE TO 0.5 GPM)
E EXHAUST GRILLE OR REGISTER MIN MINIMUM THR TERMINAL HEATING RETURN 0.5 REGISTER - RETURN OR EXHAUST
EA EACH MISC MISCELLANEOUS THR TOTAL HEAT REJECTED VALVE - COMINATION BALANCE & FLOW MEASURING
EA EXHAUST AIR MMBH MILLION BRITISH THERMAL UNITS PER HOUR THS TERMINAL HEATING SUPPLY 0.5 (i.e. BALANCE VALVE TO 0.5 GPM)
VALVE - BUTTERFLY REGISTER - RETURN WITH BOOT
EAT ENTERING AIR TEMPERATURE M/S MOTOR STARTER TSP TOTAL STATIC PRESSURE
EC EXPANSION COMPENSATOR MTD MOUNTED TU (AIR) TERMINAL UNIT
VALVE - CHECK
ECUH ELECTRIC CABINET UNIT HEATER MTR MOTOR TV TURNING VANES REGISTER - TRANSFER GRILLE
EDB ENTERING DRY BULB MV MANUAL AIR VENT TYP TYPICAL VALVE - SPRING CHECK
EER ENERGY EFFICIENCY RATIO MV MEDICAL VACUUM
EES EMERGENCY EYE WASH / SHOWER UH UNIT HEATER VALVE - GAS (MANUAL) ROOF EXHAUST FAN
EEW EMERGENCY EYE WASH N NITROGEN UL UNDERWRITER'S LABORATORY
EF EXHAUST FAN N2O NITROUS OXIDE UON UNLESS OTHERWISE NOTED VALVE - GLOBE
TRANSISTION - CONCENTRIC
EFF EFFICIENCY NC NOISE CRITERIA UR URINAL
VALVE - ISOLATION
EHC ELECTRIC HEATING COIL NC NORMALLY CLOSED UV UNIT VENTILATOR
EJ EXPANSION JOINT NCTC NORMALLY CLOSED TIMED CLOSED VALVE - NEEDLE TRANSISTION - ECCENTRIC
EL ELEVATION NCTO NORMALLY CLOSED TIMED OPEN V VALVE
ELEC ELECTRICAL NFPA NATIONAL FIRE PROTECTION AGENCY V VENT VALVE - OS&Y UNIT HEATER - HORIZONTAL THROW
EMS ENERGY MANAGEMENT SYSTEM NOTC NORMALLY OPEN TIMED CLOSED VAC VACUUM STANDARD METHODS OF NOTATION
ERL ENERGY RECOVERY LOOP NOTO NORMALLY OPEN TIMED OPEN VAV VARIABLE AIR VOLUME VALVE - PLUG
ERLR ENERGY RECOVERY LOOP RETURN NIC NOT IN CONTRACT VB VACUUM BREAKER UNIT HEATER - VERTICAL THROW
ERLS ENERGY RECOVERY LOOP SUPPLY NO NORMALLY OPEN VD VOLUME DAMPER (MANUALLY ADJUSTABLE) S-1 SUPPLY DIFFUSER WITH SCHEDULE TAG "1", SECTION OR PLAN NUMBER
VALVE - PRESSURE REGULATING
ERU ENERGY RECOVERY UNIT NOM NOMINAL VOL VOLUME 10ø 10" DIAMETER NECK SIZE
ESH EMERGENCY SHOWER NPCW NON POTABLE COLD WATER VFC VARIABLE FREQUENCY CONTROLER VALVE - PRESSURE REDUCING '28%/(/,1('8&7:25.6<0%2/6 350 350 CFM 1
ESP EXTERNAL STATIC PRESSURE VTR VENT THROUGH ROOF SYMBOL DESCRIPTION M5.1
EUH ELECTRIC UNIT HEATER VTU VENTURI TERMINAL UNIT R-1 RETURN REGISTER WITH SCHEDULE TAG "1",
VALVE - PRESSURE RELIEF

(
(

EWB ENTERING WET BULB VUV VERTICAL UNIT VENTILATOR DUCT TAKE-OFF - RECTANGULAR WITH SHOE TAP 22x22 22"x 22" NECK SIZE SHEET WHERE SECTION IS DRAWN
EWC ELECTRIC WATER COOLER 640 640 CFM
EWT ENTERING WATER TEMPERATURE W WASTE VALVE - PRESSURE & TEMPERATURE RELIEF EXHAUST REGISTER E DESIGNATION SIMILAR.
EXH EXHAUST W&V WASTE AND VENT AREA OF ENLARGEMENT
VTR
WB WET BULB VENT THROUGH ROOF DUCT TAKE-OFF - ROUND CONICAL
TU-101 AIR TERMINAL UNIT WITH HEATING COIL NO. 101
F FIRE PROTECTION WC WATER CLOSET WH PLAN NUMBER
°F DEGREEES FAHRENHEIT WC WATER COLUMN WALL HYDRANT WITH SERVICE CLEARANCE SHOWN
1
F&B FACE AND BYPASS WG WATER GAUGE
F&T FLOAT AND THERMOSTATIC WH WALL HYDRANT ELBOW - RECTANGULAR WITH TURNING VANES M5.1
FA FACE AREA WPD WATER PRESSURE DROP '28%/(/,1(3,3,1*6<0%2/6
SHEET WHERE ENLARGED PLAN IS DRAWN
FCU FAN COIL UNIT WT WEIGHT
DESCRIPTION LABORATORY AIR TERMINAL WITH HEATING COIL NO. 101
SYMBOL ELBOW - RECTANGULAR SHORT RADIUS WITH SPLITTER VANES LTU-101 WITH SERVICE CLEARANCE SHOWN
XFMR TRANSFORMER FLANGE SECTION OR PLAN NUMBER
FLEX CONNECTION ELBOW - ROUND
8 1 SECTION OR ENLARGED PLAN
STRAINER - BASKET PIPE DIAMETER NOTATION SCALE: 1/8" = 1' - 0"
ELBOW - RECTANGULAR SMOOTH RADIUS 8 ALL SIZES IN INCHES M5.1
TEMPERATURE CONTROL - PARTIAL SYMBOLS LIST STRAINER - Y TYPE

DUCT SIZE NOTATION SHEET WHERE SECTION IS CUT OR
SYMBOL DESCRIPTION SYMBOL DESCRIPTION VALVE - 2 WAY CONTROL ELBOW DOWN - RECTANGULAR
ALL SIZES IN INCHES ENLARGED PLAN IS REFERENCED
22x10 18x14ø
CO2 CARBON DIOXIDE SENSOR OS OCCUPANCY SENSOR VALVE - 3 WAY CONTROL ELBOW DOWN - ROUND
OVAL DUCT SHEET M1.0
MATCHLINE
CO CARBON MONOXIDE SENSOR PT PRESSURE TRANSMITTER ELBOW UP - RECTANGULAR RECTANGULAR DUCT SHEET M1.1
VALVE - BUTTERFLY

)
)

DPT DIFFERENTIAL PRESSURE TRANSMITTER SP STATIC PRESSURE SENSOR OR PROBE


ELBOW UP - ROUND CONSTRUCTION NOTE (NUMBER) OR HEAVY LINE WEIGHT INDICATES NEW WORK
VALVE - CHECK
FM
DEMOLITION NOTE (LETTER)
FLOW METER VALVE - 2 WAY CONTROL VALVE 1
VALVE - DETECTOR CHECK HEATING COIL LIGHT LINE WEIGHT INDICATES EXISTING
GUARD FOR STAT OR SENSOR VALVE - 3 WAY CONTROL VALVE EQUIPMENT OR REFERENCED INFORMATION
EQUIPMENT DESIGNATION,
D
INCLINED DROP IN DIRECTION OF AIRFLOW (i.e. EXHAUST FAN NUMBER 1)
H HUMIDISTAT OR HUMIDITY SENSOR T THERMOSTAT OR TEMPERATURE SENSOR EF GRAY LINE INDICATES BACKGROUND INFORMATION
(AS DEFINED ON TC DRAWINGS) (AS DEFINED ON TC DRAWINGS) VALVE - OS&Y HORIZONTAL STEM 1
R
INCLINED RISE IN DIRECTION OF AIRFLOW PIPING RISER DESIGNATION,
(i.e. HOT WATER RISER NUMBER 1)
NOTE: LIST OF ADDITIONAL SYMBOLS & ABBREVIATIONS ASSOCIATED WITH VALVE - OS&Y VERTICAL STEM DASHED LINES INDICATE PIPING
TEMPERATURE CONTROLS ARE IDENTIFIED ON TC DRAWINGS. TRANSITION - CONCENTRIC HW-1 ROUTED BELOW SLAB OR GRADE
NEW SYSTEM COMPONENT
TRANSITION -ECCENTRIC HATCH MARKS INDICATE EQUIPMENT OR MATERIALS TO
BE DISCONNECTED AND REMOVED.
EXISTING SYSTEM COMPONENT TO REMAIN
.
POINT OF NEW CONNECTION SYMBOL
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

MECHANICAL STANDARDS PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * AND DRAWING INDEX 9$352-(&7180%(5

$
$

67
506-15-101

1
NOTE: SOME SYMBOLS AND ABBREVIATIONS -$0(6&
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
SHOWN MAY NOT APPLY TO THIS PROJECT. &2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES M-001
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
MECHANICAL DEMOLITION GENERAL NOTES:
1 ANY INTERRUPTION OF EXISTING SERVICES AND/OR EQUIPMENT SHALL BE PERFORMED AT A TIME APPROVED IN
W-L W-M W-N ADVANCE BY THE OWNER'S REPRESENTATIVE.

$
$

2 THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THE WORK. ACTUAL ROUTING AND
SIZES OF EXISTING PIPING AND DUCTWORK MIGHT DIFFER TO A LIMITED EXTENT FROM WHAT IS SHOWN. MAJOR
DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL EXISTING CONDITIONS SHALL BE REPORTED TO THE
ENGINEER.
3 THE EXACT EXTENT OF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK.
4 ALL MECHANICAL ITEMS TO BE REMOVED SHALL BE REMOVED COMPLETE, INCLUDING ALL RELATED ITEMS SUCH AS
HANGERS, SUPPORTS, CONTROLS, ETC. CAP ALL OPEN ENDED PIPES AND DUCTWORK.
22
5 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL NEW WORK
PLANS. INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR
MODIFIED) AND FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK. COORDINATE AS REQUIRED WITH
EEG SETUP STRUCTURAL.
TRAINING ROOM
B451 6 EXISTING SPRINKLER SYSTEM SHALL REMAIN FUNCTIONAL DURING CONSTRUCTION. INTERRUPTIONS OF EXISTING
SERVICE SHALL BE COORDINATED WITH THE OWNER.
EEG-EMG-EP
AUTONOMIC FUNTION
LAB OFFICE 7 CONSTRUCTION AREAS THAT ARE NOT SEPARATED FROM THE AREA WITH A 1-HOUR RATED WALL SHALL HAVE THE
B452 B449 SPRINKLER HEADS TURNED UP.
21

%
%

OFFICE
INPATIENT ATTENDING B447
# DEMOLITION KEY NOTES:
B448
A REMOVE, RELOCATE AND/OR REPLACE FIRE PROTECTION SPRINKLERS AND PIPING IN THIS AREA AS REQUIRED BY
THE NEW WORK.
CORRIDOR
C408
OFFICE A
B445
PROGRAM SUPPORT
ASSISTANT
B446
20
OFFICE SERVICE
B443 ELEVATOR
S-5 MALE
TOILET
SERVICE C400
ELEVATOR
LOBBY

&
&

C4-1
STORAGE
B441 SERVICE
ELEVATOR
SHAFT S-6
S-16
MECHANICAL
B442
CORRIDOR
C4-2
A
STAIR #3
19
UP
FEC
B422a
B433 QUALITY
MANAGEMENT
ELEC B431
T

'
'

B434
17
COMM CLOSET
B432
W-I W-J W-K
FOURTH FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASE 1
SCALE: 1/8" = 1'-0"

(
(

)
)

5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(


EXPANDED ENDOSCOPY AND

*
*

4TH FLOOR FIRE PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * PROTECTION DEMOLITION 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
PLAN - PHASE 1
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES MD-140
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
MECHANICAL DEMOLITION GENERAL NOTES:
1 ANY INTERRUPTION OF EXISTING SERVICES AND/OR EQUIPMENT SHALL BE PERFORMED AT A TIME APPROVED IN
ADVANCE BY THE OWNER'S REPRESENTATIVE.

$
$

2 THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THE WORK. ACTUAL ROUTING AND
SIZES OF EXISTING PIPING AND DUCTWORK MIGHT DIFFER TO A LIMITED EXTENT FROM WHAT IS SHOWN. MAJOR
DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL EXISTING CONDITIONS SHALL BE REPORTED TO THE
E-H ENGINEER.
E-H
3 THE EXACT EXTENT OF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK.
4 ALL MECHANICAL ITEMS TO BE REMOVED SHALL BE REMOVED COMPLETE, INCLUDING ALL RELATED ITEMS SUCH AS
HANGERS, SUPPORTS, CONTROLS, ETC. CAP ALL OPEN ENDED PIPES AND DUCTWORK.
5 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL NEW WORK
PLANS. INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR
MODIFIED) AND FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK. COORDINATE AS REQUIRED WITH
STRUCTURAL.
6 EXISTING SPRINKLER SYSTEM SHALL REMAIN FUNCTIONAL DURING CONSTRUCTION. INTERRUPTIONS OF EXISTING
SERVICE SHALL BE COORDINATED WITH THE OWNER.
7 CONSTRUCTION AREAS THAT ARE NOT SEPARATED FROM THE AREA WITH A 1-HOUR RATED WALL SHALL HAVE THE
SPRINKLER HEADS TURNED UP.
9 9

%
%

# DEMOLITION KEY NOTES:


A REMOVE, RELOCATE AND/OR REPLACE FIRE PROTECTION SPRINKLERS AND PIPING IN THIS AREA AS REQUIRED BY
THE NEW WORK.
E-E E-F E-G
UP UP
E-E E-F E-G
8 8
FILM
PROCESSING
CORRIDOR D716A
C7-34
ERCP ERCP
STAFF RADIOGRAPHIC PROCEDURE PROCEDURE
LOUNGE VIEW D716 D716
D711 D714
C7-25

&
&

CORRIDOR

VIEW
STAFF
D716B
TOILET
D711A
A
HSKG CORRIDOR
D710 C7-28
A
7 7
OFFICE
D709
COLONOSCOPY
PROCEDURE EGD PROCEDURE
PAT. TOILET D717 D720
D715A
OFFICE
D708

'
'

OFFICE
D707
BY-PASS
D720B
BY-PASS
D717A PAT. TLT. PAT. TLT.
D717B D720A
6 6
CORRIDOR
C7-33
OFFICE
D706 PRE./POST OP
CORRIDOR
OBSERV.
C7-29
D715
COLONOSCOPY EGD
PROCEDURE PROCEDURE
D725 D725
PAT. TOILET
OFFICE D715B
D705
E-K

(
(

OFFICE
D703B
CORRIDOR EXERCISE 4
C7-31 D722
STORAGE
EQUIPMENT
5 5 C744A
OFFICE BED AREA
D703 D726
PAT. TOILET
D701
A
PULM MED
TESTING AREA SPEC. PROCEDURE
D726A D724
CORRIDOR
C7-30 SOILED
SUPPLIES
OFFICE C746
D703A STORAGE CLEANUP /
PAT. TOILET EQUIPMENT REPAIR / TEST.
D726B PULM /MED C716 C744
VENT TEST
D723
3

)
)

RECEPTIOIN WAITING
D700 C7-8
WAITING
C7-8
4 4
REF.
SEVENTH FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASE 3 SEVENTH FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASE 4 SEVENTH FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASE 2
SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

7TH FLOOR FIRE PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * PROTECTION DEMOLITION 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
PLAN - PHASES 2, 3 & 4
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES MD-170.A
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
MECHANICAL DEMOLITION GENERAL NOTES:
1 ANY INTERRUPTION OF EXISTING SERVICES AND/OR EQUIPMENT SHALL BE PERFORMED AT A TIME APPROVED IN
ADVANCE BY THE OWNER'S REPRESENTATIVE.

$
$

2 THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THE WORK. ACTUAL ROUTING AND
SIZES OF EXISTING PIPING AND DUCTWORK MIGHT DIFFER TO A LIMITED EXTENT FROM WHAT IS SHOWN. MAJOR
E-H DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL EXISTING CONDITIONS SHALL BE REPORTED TO THE
E-H ENGINEER.
3 THE EXACT EXTENT OF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK.
4 ALL MECHANICAL ITEMS TO BE REMOVED SHALL BE REMOVED COMPLETE, INCLUDING ALL RELATED ITEMS SUCH AS
HANGERS, SUPPORTS, CONTROLS, ETC. CAP ALL OPEN ENDED PIPES AND DUCTWORK.
5 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL NEW WORK
PLANS. INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR
MODIFIED) AND FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK. COORDINATE AS REQUIRED WITH
STRUCTURAL.
6 EXISTING SPRINKLER SYSTEM SHALL REMAIN FUNCTIONAL DURING CONSTRUCTION. INTERRUPTIONS OF EXISTING
SERVICE SHALL BE COORDINATED WITH THE OWNER.
7 CONSTRUCTION AREAS THAT ARE NOT SEPARATED FROM THE AREA WITH A 1-HOUR RATED WALL SHALL HAVE THE
SPRINKLER HEADS TURNED UP.
9 9

%
%

# DEMOLITION KEY NOTES:


A REMOVE, RELOCATE AND/OR REPLACE FIRE PROTECTION SPRINKLERS AND PIPING IN THIS AREA AS REQUIRED BY
THE NEW WORK.
UP UP
E-E E-F E-G
E-E E-F E-G
8 8
SCOPE CLEAN A
D719
A

&
&

7 7

'
'

6 6

(
(

5 5

)
)

4 4
SEVENTH FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASE 4A SEVENTH FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASE 4B
SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

7TH FLOOR FIRE PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * PROTECTION DEMOLITION 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
PLAN - PHASES 4A & 4B
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES MD-170.B
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
MECHANICAL DEMOLITION GENERAL NOTES:
1 ANY INTERRUPTION OF EXISTING SERVICES AND/OR EQUIPMENT SHALL BE PERFORMED AT A TIME APPROVED IN
ADVANCE BY THE OWNER'S REPRESENTATIVE.
2 THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THE WORK. ACTUAL ROUTING AND

$
$

SIZES OF EXISTING PIPING AND DUCTWORK MIGHT DIFFER TO A LIMITED EXTENT FROM WHAT IS SHOWN. MAJOR
DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL EXISTING CONDITIONS SHALL BE REPORTED TO THE
ENGINEER.
W-L W-M W-N
3 THE EXACT EXTENT OF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK.
4 ALL MECHANICAL ITEMS TO BE REMOVED SHALL BE REMOVED COMPLETE, INCLUDING ALL RELATED ITEMS SUCH AS
HANGERS, SUPPORTS, CONTROLS, ETC. CAP ALL OPEN ENDED PIPES AND DUCTWORK.
5 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL NEW WORK
PLANS. INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR
MODIFIED) AND FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK. COORDINATE AS REQUIRED WITH
STRUCTURAL.
22
6 EXISTING SPRINKLER SYSTEM SHALL REMAIN FUNCTIONAL DURING CONSTRUCTION. INTERRUPTIONS OF EXISTING
SERVICE SHALL BE COORDINATED WITH THE OWNER.
C EEG SETUP 7 CONSTRUCTION AREAS THAT ARE NOT SEPARATED FROM THE AREA WITH A 1-HOUR RATED WALL SHALL HAVE THE
TRAINING ROOM SPRINKLER HEADS TURNED UP.
B451
EEG-EMG-EP
AUTONOMIC FUNTION
LAB OFFICE
B452 B449
# PLUMBING DEMOLITION KEY NOTES:

%
%

A REMOVE EXISTING SCOPE WASHER, TEMPERING VALVES, FILTERS, EYEWASH AND RELATED PIPING, VALVES AND
FITTINGS. TURN OVER TO OWNER. REMOVE BRANCH PIPING BACK TO MAIN OR LAST ACTIVE BRANCH AN CAP. REMOVE
21 EXISTING R.O. SYSTEM, FILTERS AND ASSOCIATED ACCESSORIES.
OFFICE
INPATIENT ATTENDING B447 C B DISCONNECT LV, LA, CW, G PIPING FROM HOOD BEING RELOCATED. REMOVE BRANCH PIPING BACK TO MAIN OR LAST
B448 ACTIVE BRANCH AND CAP.
(TYP)
CORRIDOR C REMOVE PLUMBING FIXTURE AND ASSOCIATED BRANCH PIPING BACK TO MAIN OR LAST ACTIVE BRANCH AND CAP.

DHW
C408

DCW
D REMOVE PLUMBING PIPING AS INDICATED AND CAP.
OFFICE
B445 E REMOVE EXISTING 1.28 GPF WATER CLOSET. TURN OVER TO OWNER. REMOVE ASSOCIATED BRANCH PIPING TO MAIN
OR LAST ACTIVE BRANCH AND CAP.
PROGRAM SUPPORT
ASSISTANT F EXISTING EYEWASH AND ACCESSORIES TO BE SALVAGED AND RELOCATED.
B446
20
SS
SS
OFFICE SERVICE
B443 ELEVATOR
S-5 MALE

&
&

TOILET
SERVICE C400
ELEVATOR
LOBBY
C4-1
STORAGE
B441 SERVICE
ELEVATOR
SHAFT S-6
S-16
MECHANICAL
B442
CORRIDOR
C4-2
STAIR #3
19
UP
FEC
B422a

'
'

B433 QUALITY
MANAGEMENT
ELEC B431
T
B434
17
COMM CLOSET
B432
W-I W-J W-K

(
(

FOURTH FLOOR PLUMBING DEMOLITION PLAN - PHASE 1


SCALE: 1/8" = 1'-0"

)
)

5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(


EXPANDED ENDOSCOPY AND

*
*

4TH FLOOR PLUMBING PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * DEMOLITION PLAN - PHASE 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
1
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES MD-240
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
E-J
MECHANICAL DEMOLITION GENERAL NOTES:
1 ANY INTERRUPTION OF EXISTING SERVICES AND/OR EQUIPMENT SHALL BE PERFORMED AT A TIME APPROVED IN
ADVANCE BY THE OWNER'S REPRESENTATIVE.
2 THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THE WORK. ACTUAL ROUTING AND

$
$

SIZES OF EXISTING PIPING AND DUCTWORK MIGHT DIFFER TO A LIMITED EXTENT FROM WHAT IS SHOWN. MAJOR
E-H E-H DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL EXISTING CONDITIONS SHALL BE REPORTED TO THE
ENGINEER.
3 THE EXACT EXTENT OF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK.
4 ALL MECHANICAL ITEMS TO BE REMOVED SHALL BE REMOVED COMPLETE, INCLUDING ALL RELATED ITEMS SUCH AS
HANGERS, SUPPORTS, CONTROLS, ETC. CAP ALL OPEN ENDED PIPES AND DUCTWORK.
5 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL NEW WORK
PLANS. INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR
MODIFIED) AND FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK. COORDINATE AS REQUIRED WITH
STRUCTURAL.
6 EXISTING SPRINKLER SYSTEM SHALL REMAIN FUNCTIONAL DURING CONSTRUCTION. INTERRUPTIONS OF EXISTING
SERVICE SHALL BE COORDINATED WITH THE OWNER.
7 CONSTRUCTION AREAS THAT ARE NOT SEPARATED FROM THE AREA WITH A 1-HOUR RATED WALL SHALL HAVE THE
9 9 SPRINKLER HEADS TURNED UP.

%
%

# PLUMBING DEMOLITION KEY NOTES:


A REMOVE EXISTING SCOPE WASHER, TEMPERING VALVES, FILTERS, EYEWASH AND RELATED PIPING, VALVES AND
FITTINGS. TURN OVER TO OWNER. REMOVE BRANCH PIPING BACK TO MAIN OR LAST ACTIVE BRANCH AN CAP. REMOVE
EXISTING R.O. SYSTEM, FILTERS AND ASSOCIATED ACCESSORIES.
B DISCONNECT LV, LA, CW, G PIPING FROM HOOD BEING RELOCATED. REMOVE BRANCH PIPING BACK TO MAIN OR LAST
E-E E-F E-G E-E E-F E-G ACTIVE BRANCH AND CAP.
C REMOVE PLUMBING FIXTURE AND ASSOCIATED BRANCH PIPING BACK TO MAIN OR LAST ACTIVE BRANCH AND CAP.
4"
8 8 D REMOVE PLUMBING PIPING AS INDICATED AND CAP.
4" SS
E REMOVE EXISTING 1.28 GPF WATER CLOSET. TURN OVER TO OWNER. REMOVE ASSOCIATED BRANCH PIPING TO MAIN
OR LAST ACTIVE BRANCH AND CAP.
4"

SS
4"
D F EXISTING EYEWASH AND ACCESSORIES TO BE SALVAGED AND RELOCATED.
4"
4" 4"

SS
SS

D
V

&
&

SS
4" D
SS
7 D
7
SS
SS

D
SS
D

'
'

4" SS
6 6 SS
D
D
SS
4"

SS
V

SS
4"

V
E-K
D
4
SS

(
(

D
SS
SS
5 SS 5 4"
SS
D D
D
4"
4"
SS D

SS
D SS
4" 3
D

SS
SS
V

V
SS

)
)

4 4
SIXTH FLOOR INTERSTITIAL PLUMBING DEMOLITION PLAN - PHASE 3 SIXTH FLOOR INTERSTITIAL PLUMBING DEMOLITION PLAN - PHASE 4 SIXTH FLOOR INTERSTITIAL PLUMBING DEMOLITION PLAN - PHASE 2
SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

6TH FLOOR PLUMBING PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * DEMOLITION PLAN - 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
PHASES 2, 3 & 4
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES MD-260.A
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
E-E E-F E-G
MECHANICAL DEMOLITION GENERAL NOTES:
1 ANY INTERRUPTION OF EXISTING SERVICES AND/OR EQUIPMENT SHALL BE PERFORMED AT A TIME APPROVED IN
ADVANCE BY THE OWNER'S REPRESENTATIVE.
2 THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THE WORK. ACTUAL ROUTING AND

$
$

SIZES OF EXISTING PIPING AND DUCTWORK MIGHT DIFFER TO A LIMITED EXTENT FROM WHAT IS SHOWN. MAJOR
DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL EXISTING CONDITIONS SHALL BE REPORTED TO THE
ENGINEER.
3 THE EXACT EXTENT OF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK.
4 ALL MECHANICAL ITEMS TO BE REMOVED SHALL BE REMOVED COMPLETE, INCLUDING ALL RELATED ITEMS SUCH AS
HANGERS, SUPPORTS, CONTROLS, ETC. CAP ALL OPEN ENDED PIPES AND DUCTWORK.
5 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL NEW WORK
PLANS. INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR
MODIFIED) AND FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK. COORDINATE AS REQUIRED WITH
STRUCTURAL.
6 EXISTING SPRINKLER SYSTEM SHALL REMAIN FUNCTIONAL DURING CONSTRUCTION. INTERRUPTIONS OF EXISTING
SERVICE SHALL BE COORDINATED WITH THE OWNER.
7 CONSTRUCTION AREAS THAT ARE NOT SEPARATED FROM THE AREA WITH A 1-HOUR RATED WALL SHALL HAVE THE
SPRINKLER HEADS TURNED UP.
9

%
%

# PLUMBING DEMOLITION KEY NOTES:


E-H A REMOVE EXISTING SCOPE WASHER, TEMPERING VALVES, FILTERS, EYEWASH AND RELATED PIPING, VALVES AND
FITTINGS. TURN OVER TO OWNER. REMOVE BRANCH PIPING BACK TO MAIN OR LAST ACTIVE BRANCH AN CAP. REMOVE
EXISTING R.O. SYSTEM, FILTERS AND ASSOCIATED ACCESSORIES.
B DISCONNECT LV, LA, CW, G PIPING FROM HOOD BEING RELOCATED. REMOVE BRANCH PIPING BACK TO MAIN OR LAST
ACTIVE BRANCH AND CAP.
C REMOVE PLUMBING FIXTURE AND ASSOCIATED BRANCH PIPING BACK TO MAIN OR LAST ACTIVE BRANCH AND CAP.
8 D REMOVE PLUMBING PIPING AS INDICATED AND CAP.
SS
E REMOVE EXISTING 1.28 GPF WATER CLOSET. TURN OVER TO OWNER. REMOVE ASSOCIATED BRANCH PIPING TO MAIN
OR LAST ACTIVE BRANCH AND CAP.
4"
F EXISTING EYEWASH AND ACCESSORIES TO BE SALVAGED AND RELOCATED.
D

&
&

'
'

(
(

)
)

4
SIXTH FLOOR INTERSTITIAL PLUMBING DEMOLITION PLAN - PHASE 4A
SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

6TH FLOOR PLUMBING PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * DEMOLITION PLAN - PHASE 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
4A
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES MD-260.B
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
MECHANICAL DEMOLITION GENERAL NOTES:
1 ANY INTERRUPTION OF EXISTING SERVICES AND/OR EQUIPMENT SHALL BE PERFORMED AT A TIME APPROVED IN
ADVANCE BY THE OWNER'S REPRESENTATIVE.
2 THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THE WORK. ACTUAL ROUTING AND

$
$

SIZES OF EXISTING PIPING AND DUCTWORK MIGHT DIFFER TO A LIMITED EXTENT FROM WHAT IS SHOWN. MAJOR
E-H DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL EXISTING CONDITIONS SHALL BE REPORTED TO THE
E-H ENGINEER.
3 THE EXACT EXTENT OF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK.
4 ALL MECHANICAL ITEMS TO BE REMOVED SHALL BE REMOVED COMPLETE, INCLUDING ALL RELATED ITEMS SUCH AS
HANGERS, SUPPORTS, CONTROLS, ETC. CAP ALL OPEN ENDED PIPES AND DUCTWORK.
5 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL NEW WORK
PLANS. INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR
MODIFIED) AND FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK. COORDINATE AS REQUIRED WITH
STRUCTURAL.
6 EXISTING SPRINKLER SYSTEM SHALL REMAIN FUNCTIONAL DURING CONSTRUCTION. INTERRUPTIONS OF EXISTING
SERVICE SHALL BE COORDINATED WITH THE OWNER.
7 CONSTRUCTION AREAS THAT ARE NOT SEPARATED FROM THE AREA WITH A 1-HOUR RATED WALL SHALL HAVE THE
SPRINKLER HEADS TURNED UP.
9 9

%
%

# PLUMBING DEMOLITION KEY NOTES:


A REMOVE EXISTING SCOPE WASHER, TEMPERING VALVES, FILTERS, EYEWASH AND RELATED PIPING, VALVES AND
FITTINGS. TURN OVER TO OWNER. REMOVE BRANCH PIPING BACK TO MAIN OR LAST ACTIVE BRANCH AN CAP. REMOVE
UP UP
EXISTING R.O. SYSTEM, FILTERS AND ASSOCIATED ACCESSORIES.
B DISCONNECT LV, LA, CW, G PIPING FROM HOOD BEING RELOCATED. REMOVE BRANCH PIPING BACK TO MAIN OR LAST
E-E E-F E-G E-E E-F E-G ACTIVE BRANCH AND CAP.
C REMOVE PLUMBING FIXTURE AND ASSOCIATED BRANCH PIPING BACK TO MAIN OR LAST ACTIVE BRANCH AND CAP.
8 8 D REMOVE PLUMBING PIPING AS INDICATED AND CAP.
E REMOVE EXISTING 1.28 GPF WATER CLOSET. TURN OVER TO OWNER. REMOVE ASSOCIATED BRANCH PIPING TO MAIN
FILM
OR LAST ACTIVE BRANCH AND CAP.
PROCESSING
CORRIDOR D716A
C7-34 F EXISTING EYEWASH AND ACCESSORIES TO BE SALVAGED AND RELOCATED.
ERCP ERCP
STAFF RADIOGRAPHIC PROCEDURE PROCEDURE
LOUNGE VIEW D716 D716
D711 D714
C7-25

C
CORRIDOR

VIEW
STAFF
D716B
TOILET

&
&

D711A
C
HSKG CORRIDOR
E D710 C7-28
C
7 7
E
OFFICE C C
D709
C
COLONOSCOPY
PROCEDURE EGD PROCEDURE
PAT. TOILET D717 D720
D715A
OFFICE
D708
C C

'
'

OFFICE F PAT. TLT. PAT. TLT. BY-PASS


D707 D717B D720A D720B
C A A C
F F
BY-PASS
D717A C C F
6 6
CORRIDOR C
C7-33
OFFICE C C
D706 PRE./POST OP CORRIDOR
OBSERV. C7-29
D715
COLONOSCOPY EGD
PROCEDURE PROCEDURE
D725 D725
PAT. TOILET
OFFICE D715B
D705
E
C C
C E-K
OFFICE
D703B
EXERCISE

(
(

CORRIDOR 4
C7-31 D722
STORAGE
EQUIPMENT
5 5 C744A
C C
OFFICE
D703 E BED AREA C
PAT. TOILET
D726
D701
F C
PULM MED
TESTING AREA SPEC. PROCEDURE
D726A D724
CORRIDOR B
C
C7-30
SOILED
OFFICE SUPPLIES
C
D703A C C746
PAT. TOILET STORAGE CLEANUP /
E D726B EQUIPMENT REPAIR / TEST.
PULM /MED C716
VENT TEST C744
D723
3
RECEPTIOIN WAITING
D700 C7-8 C

)
)

WAITING
C7-8
4 4
REF.
SEVENTH FLOOR PLUMBING DEMOLITION PLAN - PHASE 3 SEVENTH FLOOR PLUMBING DEMOLITION PLAN - PHASE 4 SEVENTH FLOOR PLUMBING DEMOLITION PLAN - PHASE 2
SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

7TH FLOOR PLUMBING PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * DEMOLITION PLAN - 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
PHASES 2, 3 & 4
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES MD-270.A
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
E-E E-F E-G
MECHANICAL DEMOLITION GENERAL NOTES:
1 ANY INTERRUPTION OF EXISTING SERVICES AND/OR EQUIPMENT SHALL BE PERFORMED AT A TIME APPROVED IN
ADVANCE BY THE OWNER'S REPRESENTATIVE.
2 THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THE WORK. ACTUAL ROUTING AND

$
$

SIZES OF EXISTING PIPING AND DUCTWORK MIGHT DIFFER TO A LIMITED EXTENT FROM WHAT IS SHOWN. MAJOR
DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL EXISTING CONDITIONS SHALL BE REPORTED TO THE
ENGINEER.
3 THE EXACT EXTENT OF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK.
4 ALL MECHANICAL ITEMS TO BE REMOVED SHALL BE REMOVED COMPLETE, INCLUDING ALL RELATED ITEMS SUCH AS
HANGERS, SUPPORTS, CONTROLS, ETC. CAP ALL OPEN ENDED PIPES AND DUCTWORK.
5 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL NEW WORK
PLANS. INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR
MODIFIED) AND FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK. COORDINATE AS REQUIRED WITH
STRUCTURAL.
6 EXISTING SPRINKLER SYSTEM SHALL REMAIN FUNCTIONAL DURING CONSTRUCTION. INTERRUPTIONS OF EXISTING
SERVICE SHALL BE COORDINATED WITH THE OWNER.
7 CONSTRUCTION AREAS THAT ARE NOT SEPARATED FROM THE AREA WITH A 1-HOUR RATED WALL SHALL HAVE THE
SPRINKLER HEADS TURNED UP.
9

%
%

# PLUMBING DEMOLITION KEY NOTES:


A REMOVE EXISTING SCOPE WASHER, TEMPERING VALVES, FILTERS, EYEWASH AND RELATED PIPING, VALVES AND
FITTINGS. TURN OVER TO OWNER. REMOVE BRANCH PIPING BACK TO MAIN OR LAST ACTIVE BRANCH AN CAP. REMOVE
E-H EXISTING R.O. SYSTEM, FILTERS AND ASSOCIATED ACCESSORIES.
UP
B DISCONNECT LV, LA, CW, G PIPING FROM HOOD BEING RELOCATED. REMOVE BRANCH PIPING BACK TO MAIN OR LAST
ACTIVE BRANCH AND CAP.
C REMOVE PLUMBING FIXTURE AND ASSOCIATED BRANCH PIPING BACK TO MAIN OR LAST ACTIVE BRANCH AND CAP.
D REMOVE PLUMBING PIPING AS INDICATED AND CAP.
8
SCOPE CLEAN E REMOVE EXISTING 1.28 GPF WATER CLOSET. TURN OVER TO OWNER. REMOVE ASSOCIATED BRANCH PIPING TO MAIN
D719 F OR LAST ACTIVE BRANCH AND CAP.
A F EXISTING EYEWASH AND ACCESSORIES TO BE SALVAGED AND RELOCATED.
C

&
&

'
'

(
(

)
)

4
SEVENTH FLOOR PLUMBING DEMOLITION PLAN - PHASE 4A
SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

7TH FLOOR PLUMBING PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * DEMOLITION PLAN - PHASE 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
4A
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES MD-270.B
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
MECHANICAL DEMOLITION GENERAL NOTES:
1 ANY INTERRUPTION OF EXISTING SERVICES AND/OR EQUIPMENT SHALL BE PERFORMED AT A TIME APPROVED IN
ADVANCE BY THE OWNER'S REPRESENTATIVE.
E-H 2 THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THE WORK. ACTUAL ROUTING AND

$
$

E-H SIZES OF EXISTING PIPING AND DUCTWORK MIGHT DIFFER TO A LIMITED EXTENT FROM WHAT IS SHOWN. MAJOR
DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL EXISTING CONDITIONS SHALL BE REPORTED TO THE
ENGINEER.
3 THE EXACT EXTENT OF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK.
4 ALL MECHANICAL ITEMS TO BE REMOVED SHALL BE REMOVED COMPLETE, INCLUDING ALL RELATED ITEMS SUCH AS
HANGERS, SUPPORTS, CONTROLS, ETC. CAP ALL OPEN ENDED PIPES AND DUCTWORK.
5 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL NEW WORK
PLANS. INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR
MODIFIED) AND FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK. COORDINATE AS REQUIRED WITH
STRUCTURAL.
6 EXISTING SPRINKLER SYSTEM SHALL REMAIN FUNCTIONAL DURING CONSTRUCTION. INTERRUPTIONS OF EXISTING
SERVICE SHALL BE COORDINATED WITH THE OWNER.
9 9 7 CONSTRUCTION AREAS THAT ARE NOT SEPARATED FROM THE AREA WITH A 1-HOUR RATED WALL SHALL HAVE THE
SPRINKLER HEADS TURNED UP.

%
%

# PLUMBING DEMOLITION KEY NOTES:


DN DN
A REMOVE EXISTING SCOPE WASHER, TEMPERING VALVES, FILTERS, EYEWASH AND RELATED PIPING, VALVES AND
FITTINGS. TURN OVER TO OWNER. REMOVE BRANCH PIPING BACK TO MAIN OR LAST ACTIVE BRANCH AN CAP. REMOVE
EXISTING R.O. SYSTEM, FILTERS AND ASSOCIATED ACCESSORIES.
E-E E-F E-G E-E E-F E-G B DISCONNECT LV, LA, CW, G PIPING FROM HOOD BEING RELOCATED. REMOVE BRANCH PIPING BACK TO MAIN OR LAST
ACTIVE BRANCH AND CAP.
C REMOVE PLUMBING FIXTURE AND ASSOCIATED BRANCH PIPING BACK TO MAIN OR LAST ACTIVE BRANCH AND CAP.
8 8
V V
DHWR D REMOVE PLUMBING PIPING AS INDICATED AND CAP.
DHW
DCW
3/4" E REMOVE EXISTING 1.28 GPF WATER CLOSET. TURN OVER TO OWNER. REMOVE ASSOCIATED BRANCH PIPING TO MAIN
3/4" OR LAST ACTIVE BRANCH AND CAP.
3/4"
2" F EXISTING EYEWASH AND ACCESSORIES TO BE SALVAGED AND RELOCATED.
1" 2 1/2"
4"
3"

V
4"
V

DHWR
DHWR

DHW

&
&

DCW
DHW

V
DCW
V

D D
D
D V
7 D
7
1" 1 1/4" 3/4"
DHWR DHWR
DHW DHW
DCW DCW
V
1 1/2" 2" 2"
3" 2 1/2"
4" 1 1/4"
2 1/2" 3/4"
1" D
4"
D D

'
'

D
D
6 6
D
1"
DHWR
DHW
DCW
2" 3/4"
D D D E-K
2"
2"
V V 4
3/4" 3/4" 1 1/4"
DHWR DHWR
DHW DHW

(
(

DCW DCW
1 1/4" 1 1/4"
1 1/4"
5 5 V
D
V V
3"
D 4" D
2"
2 1/2"
1" V
4"

SS
D

DHW
DCW
V

V
DHWR

DHWR
DHW
4"

DCW
1"

V
2 1/2"
2 1/2"
4" DCW
3" D DHW
DHWR
1 1/2"
3 3/4"
D
DCW
DHW
DHWR

)
)

4 4
EIGHTH FLOOR INTERSTITIAL PLUMBING DEMOLITION PLAN - PHASE 3 EIGHTH FLOOR INTERSTITIAL PLUMBING DEMOLITION PLAN - PHASE 4 EIGHTH FLOOR INTERSTITIAL PLUMBING DEMOLITION PLAN - PHASE 2
SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

8TH FLOOR PLUMBING PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * DEMOLITION PLAN - 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
PHASES 2, 3 & 4
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES MD-280.A
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
E-E E-F E-G
MECHANICAL DEMOLITION GENERAL NOTES:
1 ANY INTERRUPTION OF EXISTING SERVICES AND/OR EQUIPMENT SHALL BE PERFORMED AT A TIME APPROVED IN
ADVANCE BY THE OWNER'S REPRESENTATIVE.
2 THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THE WORK. ACTUAL ROUTING AND

$
$

SIZES OF EXISTING PIPING AND DUCTWORK MIGHT DIFFER TO A LIMITED EXTENT FROM WHAT IS SHOWN. MAJOR
DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL EXISTING CONDITIONS SHALL BE REPORTED TO THE
ENGINEER.
3 THE EXACT EXTENT OF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK.
4 ALL MECHANICAL ITEMS TO BE REMOVED SHALL BE REMOVED COMPLETE, INCLUDING ALL RELATED ITEMS SUCH AS
HANGERS, SUPPORTS, CONTROLS, ETC. CAP ALL OPEN ENDED PIPES AND DUCTWORK.
5 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL NEW WORK
PLANS. INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR
MODIFIED) AND FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK. COORDINATE AS REQUIRED WITH
STRUCTURAL.
6 EXISTING SPRINKLER SYSTEM SHALL REMAIN FUNCTIONAL DURING CONSTRUCTION. INTERRUPTIONS OF EXISTING
SERVICE SHALL BE COORDINATED WITH THE OWNER.
7 CONSTRUCTION AREAS THAT ARE NOT SEPARATED FROM THE AREA WITH A 1-HOUR RATED WALL SHALL HAVE THE
9 SPRINKLER HEADS TURNED UP.

%
%

# PLUMBING DEMOLITION KEY NOTES:


DN E-H A REMOVE EXISTING SCOPE WASHER, TEMPERING VALVES, FILTERS, EYEWASH AND RELATED PIPING, VALVES AND
FITTINGS. TURN OVER TO OWNER. REMOVE BRANCH PIPING BACK TO MAIN OR LAST ACTIVE BRANCH AN CAP. REMOVE
EXISTING R.O. SYSTEM, FILTERS AND ASSOCIATED ACCESSORIES.
B DISCONNECT LV, LA, CW, G PIPING FROM HOOD BEING RELOCATED. REMOVE BRANCH PIPING BACK TO MAIN OR LAST
ACTIVE BRANCH AND CAP.
3/4" C REMOVE PLUMBING FIXTURE AND ASSOCIATED BRANCH PIPING BACK TO MAIN OR LAST ACTIVE BRANCH AND CAP.
1 1/2"
8 D REMOVE PLUMBING PIPING AS INDICATED AND CAP.
V
DHW
DHW
DCW E REMOVE EXISTING 1.28 GPF WATER CLOSET. TURN OVER TO OWNER. REMOVE ASSOCIATED BRANCH PIPING TO MAIN
3/4" OR LAST ACTIVE BRANCH AND CAP.
3/4"
F EXISTING EYEWASH AND ACCESSORIES TO BE SALVAGED AND RELOCATED.
D

&
&

'
'

(
(

)
)

4
EIGHTH FLOOR INTERSTITIAL PLUMBING DEMOLITION PLAN - PHASE 4A
SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

8TH FLOOR PLUMBING PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * DEMOLITION PLAN - PHASE 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
4A
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES MD-280.B
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
MECHANICAL DEMOLITION GENERAL NOTES:
1 ANY INTERRUPTION OF EXISTING SERVICES AND/OR EQUIPMENT SHALL BE PERFORMED AT A TIME APPROVED IN
ADVANCE BY THE OWNER'S REPRESENTATIVE.
W-L W-M W-N 2 THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THE WORK. ACTUAL ROUTING AND
SIZES OF EXISTING PIPING AND DUCTWORK MIGHT DIFFER TO A LIMITED EXTENT FROM WHAT IS SHOWN. MAJOR

$
$

DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL EXISTING CONDITIONS SHALL BE REPORTED TO THE
ENGINEER.
3 THE EXACT EXTENT OF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK.
4 ALL MECHANICAL ITEMS TO BE REMOVED SHALL BE REMOVED COMPLETE, INCLUDING ALL RELATED ITEMS SUCH AS
HANGERS, SUPPORTS, CONTROLS, ETC. CAP ALL OPEN ENDED PIPES AND DUCTWORK.
5 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL NEW WORK
22 PLANS. INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR
MODIFIED) AND FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK. COORDINATE AS REQUIRED WITH
STRUCTURAL.
EEG SETUP 6 EXISTING SPRINKLER SYSTEM SHALL REMAIN FUNCTIONAL DURING CONSTRUCTION. INTERRUPTIONS OF EXISTING
TRAINING ROOM SERVICE SHALL BE COORDINATED WITH THE OWNER.
B451
EEG-EMG-EP 7 CONSTRUCTION AREAS THAT ARE NOT SEPARATED FROM THE AREA WITH A 1-HOUR RATED WALL SHALL HAVE THE
AUTONOMIC FUNTION SPRINKLER HEADS TURNED UP.
LAB OFFICE
B452 B449
# HVAC PIPING DEMOLITION KEY NOTES:

%
%

21
INPATIENT ATTENDING OFFICE A REMOVE EXISTING HWH & HWHR PIPING AS INDICATED AND CAP AT MAIN.
B448 B447
CHR
CHS
HWR
HWS

B REMOVE EXISTING FINNED TUBE RADIATION AND ASSOCIATED PIPING AS INDICATED.


E E
CORRIDOR C PREPARE EXISTING HWH & HWHR FOR CONNECTION TO NEW FINNED TUBE RADIATION.
C408
F
D REMOVE EXISTING TERMINAL UNIT AND ASSOCIATED PIPING AS INDICATED. CAP PIPING AT MAIN OR PREPARE FOR
NEW CONNECTION.
OFFICE
B445
E E REMOVE EXISTING CONVECTOR. REMOVE EXISTING STEAM AND CONDENSATE PIPING BACK TO RISER OR LAST ACTIVE
PROGRAM SUPPORT BRANCH AND CAP.
ASSISTANT
B446 F EXISTING STEAM AND CONDENSATE RISERS TO BE RELOCATED.
20
OFFICE SERVICE
B443 ELEVATOR
S-5 MALE
TOILET
SERVICE C400
ELEVATOR

&
&

LOBBY
C4-1
STORAGE
B441 SERVICE
ELEVATOR
SHAFT S-6
S-16
MECHANICAL
B442
CORRIDOR
C4-2
STAIR #3
19
UP
FEC
B422a
B433 QUALITY
MANAGEMENT
ELEC B431

'
'

T
B434
17
COMM CLOSET
B432
W-I W-J W-K
FOURTH FLOOR HVAC PIPING DEMOLITION PLAN - PHASE 1

(
(

SCALE: 1/8" = 1'-0"

)
)

5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(


EXPANDED ENDOSCOPY AND

*
*

4TH FLOOR HVAC PIPING PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * DEMOLITION PLAN - PHASE 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
1
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES MD-340
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1" E-G E-H

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
MECHANICAL DEMOLITION GENERAL NOTES:
1 ANY INTERRUPTION OF EXISTING SERVICES AND/OR EQUIPMENT SHALL BE PERFORMED AT A TIME APPROVED IN
ADVANCE BY THE OWNER'S REPRESENTATIVE.

$
$

2 THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THE WORK. ACTUAL ROUTING AND
SIZES OF EXISTING PIPING AND DUCTWORK MIGHT DIFFER TO A LIMITED EXTENT FROM WHAT IS SHOWN. MAJOR
DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL EXISTING CONDITIONS SHALL BE REPORTED TO THE
ENGINEER.
3 THE EXACT EXTENT OF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK.
4 ALL MECHANICAL ITEMS TO BE REMOVED SHALL BE REMOVED COMPLETE, INCLUDING ALL RELATED ITEMS SUCH AS
HANGERS, SUPPORTS, CONTROLS, ETC. CAP ALL OPEN ENDED PIPES AND DUCTWORK.
5 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL NEW WORK
PLANS. INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR
MODIFIED) AND FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK. COORDINATE AS REQUIRED WITH
STRUCTURAL.
9 6 EXISTING SPRINKLER SYSTEM SHALL REMAIN FUNCTIONAL DURING CONSTRUCTION. INTERRUPTIONS OF EXISTING
SERVICE SHALL BE COORDINATED WITH THE OWNER.
7 CONSTRUCTION AREAS THAT ARE NOT SEPARATED FROM THE AREA WITH A 1-HOUR RATED WALL SHALL HAVE THE
SPRINKLER HEADS TURNED UP.
E-E E-F

%
%

# HVAC PIPING DEMOLITION KEY NOTES:


A REMOVE EXISTING HWH & HWHR PIPING AS INDICATED AND CAP AT MAIN.
C
B REMOVE EXISTING FINNED TUBE RADIATION AND ASSOCIATED PIPING AS INDICATED.
8
C PREPARE EXISTING HWH & HWHR FOR CONNECTION TO NEW FINNED TUBE RADIATION.
(E)3/4" HWS UP
D REMOVE EXISTING TERMINAL UNIT AND ASSOCIATED PIPING AS INDICATED. CAP PIPING AT MAIN OR PREPARE FOR
NEW CONNECTION.
E REMOVE EXISTING CONVECTOR. REMOVE EXISTING STEAM AND CONDENSATE PIPING BACK TO RISER OR LAST ACTIVE
BRANCH AND CAP.

HWS
F EXISTING STEAM AND CONDENSATE RISERS TO BE RELOCATED.
A

&
&

7
A 1

HWR
HWS
A

'
'

6
A
1
A

HWS

(
(

5
A HWR
A

)
)

4
SIXTH FLOOR INTERSTITIAL HVAC PIPING DEMOLITION PLAN - PHASE 3
SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

6TH FLOOR HVAC PIPING PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * DEMOLITION PLAN - PHASE 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
3
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES MD-360
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
MECHANICAL DEMOLITION GENERAL NOTES:
1 ANY INTERRUPTION OF EXISTING SERVICES AND/OR EQUIPMENT SHALL BE PERFORMED AT A TIME APPROVED IN
E-H ADVANCE BY THE OWNER'S REPRESENTATIVE.

$
$

2 THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THE WORK. ACTUAL ROUTING AND
SIZES OF EXISTING PIPING AND DUCTWORK MIGHT DIFFER TO A LIMITED EXTENT FROM WHAT IS SHOWN. MAJOR
DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL EXISTING CONDITIONS SHALL BE REPORTED TO THE
ENGINEER.
3 THE EXACT EXTENT OF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK.
4 ALL MECHANICAL ITEMS TO BE REMOVED SHALL BE REMOVED COMPLETE, INCLUDING ALL RELATED ITEMS SUCH AS
HANGERS, SUPPORTS, CONTROLS, ETC. CAP ALL OPEN ENDED PIPES AND DUCTWORK.
5 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL NEW WORK
PLANS. INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR
MODIFIED) AND FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK. COORDINATE AS REQUIRED WITH
STRUCTURAL.
6 EXISTING SPRINKLER SYSTEM SHALL REMAIN FUNCTIONAL DURING CONSTRUCTION. INTERRUPTIONS OF EXISTING
SERVICE SHALL BE COORDINATED WITH THE OWNER.
9
7 CONSTRUCTION AREAS THAT ARE NOT SEPARATED FROM THE AREA WITH A 1-HOUR RATED WALL SHALL HAVE THE
SPRINKLER HEADS TURNED UP.

%
%

UP
# HVAC PIPING DEMOLITION KEY NOTES:
A REMOVE EXISTING HWH & HWHR PIPING AS INDICATED AND CAP AT MAIN.
E-E E-F E-G B REMOVE EXISTING FINNED TUBE RADIATION AND ASSOCIATED PIPING AS INDICATED.
C C PREPARE EXISTING HWH & HWHR FOR CONNECTION TO NEW FINNED TUBE RADIATION.
8
D REMOVE EXISTING TERMINAL UNIT AND ASSOCIATED PIPING AS INDICATED. CAP PIPING AT MAIN OR PREPARE FOR
NEW CONNECTION.
FILM
PROCESSING E REMOVE EXISTING CONVECTOR. REMOVE EXISTING STEAM AND CONDENSATE PIPING BACK TO RISER OR LAST ACTIVE
CORRIDOR D716A BRANCH AND CAP.
C7-34
B ERCP F EXISTING STEAM AND CONDENSATE RISERS TO BE RELOCATED.
STAFF RADIOGRAPHIC PROCEDURE
LOUNGE VIEW D716
D711 D714
VIEW
STAFF
D716B
TOILET
D711A

&
&

B
HSKG
D710
7
OFFICE
D709
B
PAT. TOILET
D715A
OFFICE
D708
B
OFFICE

'
'

D707
B
6
CORRIDOR
C7-33
OFFICE
B D706 PRE./POST OP
OBSERV.
D715
PAT. TOILET
OFFICE D715B
D705
B
OFFICE
D703B
B

(
(

5
OFFICE BED AREA
D703 D726
PAT. TOILET
B D701
TESTING AREA
D726A
OFFICE
D703A
PAT. TOILET
B
D726B
RECEPTIOIN WAITING
D700 C7-8

)
)

4
SEVENTH FLOOR HVAC PIPING DEMOLITION PLAN - PHASE 3
SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

7TH FLOOR HVAC PIPING PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * DEMOLITION PLAN - PHASE 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
3
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES MD-370
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
E-G E-H E-E E-F
MECHANICAL DEMOLITION GENERAL NOTES:
1 ANY INTERRUPTION OF EXISTING SERVICES AND/OR EQUIPMENT SHALL BE PERFORMED AT A TIME APPROVED IN
ADVANCE BY THE OWNER'S REPRESENTATIVE.

$
$

2 THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THE WORK. ACTUAL ROUTING AND
SIZES OF EXISTING PIPING AND DUCTWORK MIGHT DIFFER TO A LIMITED EXTENT FROM WHAT IS SHOWN. MAJOR
DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL EXISTING CONDITIONS SHALL BE REPORTED TO THE
ENGINEER.
3 THE EXACT EXTENT OF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK.
4 ALL MECHANICAL ITEMS TO BE REMOVED SHALL BE REMOVED COMPLETE, INCLUDING ALL RELATED ITEMS SUCH AS
HANGERS, SUPPORTS, CONTROLS, ETC. CAP ALL OPEN ENDED PIPES AND DUCTWORK.
5 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL NEW WORK
PLANS. INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR
MODIFIED) AND FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK. COORDINATE AS REQUIRED WITH
STRUCTURAL.
6 EXISTING SPRINKLER SYSTEM SHALL REMAIN FUNCTIONAL DURING CONSTRUCTION. INTERRUPTIONS OF EXISTING
SERVICE SHALL BE COORDINATED WITH THE OWNER.
9 9 7 CONSTRUCTION AREAS THAT ARE NOT SEPARATED FROM THE AREA WITH A 1-HOUR RATED WALL SHALL HAVE THE
SPRINKLER HEADS TURNED UP.

%
%

E-E E-F
DN DN E-G E-H # HVAC PIPING DEMOLITION KEY NOTES:
A REMOVE EXISTING HWH & HWHR PIPING AS INDICATED AND CAP AT MAIN.
B REMOVE EXISTING FINNED TUBE RADIATION AND ASSOCIATED PIPING AS INDICATED.
C PREPARE EXISTING HWH & HWHR FOR CONNECTION TO NEW FINNED TUBE RADIATION.
8 8
D REMOVE EXISTING TERMINAL UNIT AND ASSOCIATED PIPING AS INDICATED. CAP PIPING AT MAIN OR PREPARE FOR
NEW CONNECTION.
E REMOVE EXISTING CONVECTOR. REMOVE EXISTING STEAM AND CONDENSATE PIPING BACK TO RISER OR LAST ACTIVE
BRANCH AND CAP.

HWR
HWS
3"
3"
3" F EXISTING STEAM AND CONDENSATE RISERS TO BE RELOCATED.
3"
HWS
HWR

&
&

D
D D
D D
1 1/4" 1 1/4"
1 1/4"
HWS HWS HWS
HWR HWR HWR
7 7
1 1/4" 1 1/4"
1 1/4"
D D D D D D
2 1/2"
2 1/2" 2 1/2"
2 1/2"

'
'

6 6
E-K
D D D D
D D 4

(
(

1"
1"
1 1/4"
HWS HWS HWS
HWR HWR HWR
5 1"
5 1" 1 1/4"
D D D D D
D D
D D D

HWS
HWS

HWR
HWR
3 1" 1 1/4"
HWS HWR
HWR HWS
2 1/2" 2 1/2"

)
)

1 1/4"
1"
4 4
EIGHTH FLOOR INTERSTITIAL HVAC PIPING DEMOLITION PLAN - PHASE 3 EIGHTH FLOOR INTERSTITIAL HVAC PIPING DEMOLITION PLAN - PHASE 4 EIGHTH FLOOR INTERSTITIAL HVAC PIPING DEMOLITION PLAN - PHASE 2
SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

8TH FLOOR HVAC PIPING PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * DEMOLITION PLAN - 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
PHASES 2, 3 & 4
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES MD-380.A
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
E-E E-F E-G
MECHANICAL DEMOLITION GENERAL NOTES:
1 ANY INTERRUPTION OF EXISTING SERVICES AND/OR EQUIPMENT SHALL BE PERFORMED AT A TIME APPROVED IN
ADVANCE BY THE OWNER'S REPRESENTATIVE.

$
$

2 THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THE WORK. ACTUAL ROUTING AND
SIZES OF EXISTING PIPING AND DUCTWORK MIGHT DIFFER TO A LIMITED EXTENT FROM WHAT IS SHOWN. MAJOR
DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL EXISTING CONDITIONS SHALL BE REPORTED TO THE
ENGINEER.
3 THE EXACT EXTENT OF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK.
4 ALL MECHANICAL ITEMS TO BE REMOVED SHALL BE REMOVED COMPLETE, INCLUDING ALL RELATED ITEMS SUCH AS
HANGERS, SUPPORTS, CONTROLS, ETC. CAP ALL OPEN ENDED PIPES AND DUCTWORK.
5 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL NEW WORK
PLANS. INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR
MODIFIED) AND FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK. COORDINATE AS REQUIRED WITH
STRUCTURAL.
6 EXISTING SPRINKLER SYSTEM SHALL REMAIN FUNCTIONAL DURING CONSTRUCTION. INTERRUPTIONS OF EXISTING
SERVICE SHALL BE COORDINATED WITH THE OWNER.
9 7 CONSTRUCTION AREAS THAT ARE NOT SEPARATED FROM THE AREA WITH A 1-HOUR RATED WALL SHALL HAVE THE
SPRINKLER HEADS TURNED UP.

%
%

DN # HVAC PIPING DEMOLITION KEY NOTES:


A REMOVE EXISTING HWH & HWHR PIPING AS INDICATED AND CAP AT MAIN.
B REMOVE EXISTING FINNED TUBE RADIATION AND ASSOCIATED PIPING AS INDICATED.
C PREPARE EXISTING HWH & HWHR FOR CONNECTION TO NEW FINNED TUBE RADIATION.
8 D REMOVE EXISTING TERMINAL UNIT AND ASSOCIATED PIPING AS INDICATED. CAP PIPING AT MAIN OR PREPARE FOR
NEW CONNECTION.
E REMOVE EXISTING CONVECTOR. REMOVE EXISTING STEAM AND CONDENSATE PIPING BACK TO RISER OR LAST ACTIVE
3" BRANCH AND CAP.
3"
E-H F EXISTING STEAM AND CONDENSATE RISERS TO BE RELOCATED.
HWS
HWR

&
&

D
1 1/4"
HWS
HWR
7
1 1/4"

'
'

(
(

)
)

4
EIGHTH FLOOR INTERSTITIAL HVAC PIPING DEMOLITION PLAN - PHASE 4A
SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

8TH FLOOR HVAC PIPING PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * DEMOLITION PLAN - PHASE 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
4A
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES MD-380.B
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
MECHANICAL DEMOLITION GENERAL NOTES:
1 ANY INTERRUPTION OF EXISTING SERVICES AND/OR EQUIPMENT SHALL BE PERFORMED AT A TIME APPROVED IN
W-L W-M W-N ADVANCE BY THE OWNER'S REPRESENTATIVE.
E-H 2 THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THE WORK. ACTUAL ROUTING AND
SIZES OF EXISTING PIPING AND DUCTWORK MIGHT DIFFER TO A LIMITED EXTENT FROM WHAT IS SHOWN. MAJOR

$
$

(E)1-EF-25 DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL EXISTING CONDITIONS SHALL BE REPORTED TO THE
ENGINEER.
3 THE EXACT EXTENT OF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK.
J
4 ALL MECHANICAL ITEMS TO BE REMOVED SHALL BE REMOVED COMPLETE, INCLUDING ALL RELATED ITEMS SUCH AS
22 HANGERS, SUPPORTS, CONTROLS, ETC. CAP ALL OPEN ENDED PIPES AND DUCTWORK.
G
EEG-EMG-EP 5 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL NEW WORK
I PLANS. INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR
AUTONOMIC FUNTION D EEG SETUP
LAB (TYP) TRAINING ROOM MODIFIED) AND FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK. COORDINATE AS REQUIRED WITH
B452 (TYP) B451 STRUCTURAL.
F
E (TYP) 6 EXISTING SPRINKLER SYSTEM SHALL REMAIN FUNCTIONAL DURING CONSTRUCTION. INTERRUPTIONS OF EXISTING
SERVICE SHALL BE COORDINATED WITH THE OWNER.
(TYP)
OFFICE
9 B449 7 CONSTRUCTION AREAS THAT ARE NOT SEPARATED FROM THE AREA WITH A 1-HOUR RATED WALL SHALL HAVE THE
SPRINKLER HEADS TURNED UP.
G
G
21
INPATIENT ATTENDING G # SHEET METAL DEMOLITION KEY NOTES:

%
%

B448
G OFFICE
B447 A REMOVE AND SAVE EXISTING FUME HOOD FOR REUSE. REFER TO 4TH FLOOR NEW WORK PLAN FOR NEW LOCATION.
CORRIDOR
C408 E
E-E E-F E-G (TYP)
B REMOVE ALL SHEET METAL AND EQUIPMENT ASSOCIATED WITH EXISTING FUME HOOD THAT WILL BE REMOVED AND
RELOCATED. REMOVE EXISTING HEPA FILTER, TERMINAL UNIT. REMOVE DUCT RUN BACK TO EXHAUST FAN 1-EF-38.
REMOVE EXHAUST FAN 1-EF-38 LOCATED ON THE MEZZANINE FLOOR (8TH LEVEL) OF THE WEST MECHANICAL ROOM.
PROGRAM SUPPORT
OFFICE
ASSISTANT
B445 D REMOVE EXISTING SUPPLY DIFFUSER, ASSOCIATED DUCTWORK AND SUPPORTS AS INDICATED.
B446
8 D
I
G
E REMOVE EXISTING RETURN OR EXHAUST GRILLE , ASSOCIATED DUCTWORK AND SUPPORTS AS INDICATED.
(TYP)
(TYP)
F REMOVE EXISTING TEMPERATURE SENSOR AS INDICATED.
20
OFFICE G REMOVE EXISTING ELECTRIC HEATING COIL, ASSOCIATED DUCTWORK, SUPPORTS, AND CONTROLS AS INDICATED.
B443
SERVICE H REMOVE EXISTING TERMINAL UNIT, ASSOCIATED DUCTWORK, SUPPORTS, AND CONTROLS AS INDICATED.
ELEVATOR
S-5 MALE I REMOVE EXISTING DUCTWORK AND SUPPORTS AS INDICATED.
TOILET
F
SERVICE C400
ELEVATOR J REFER TO NOTE 7 ON SHEET M-430.
(TYP)
26"x16" LOBBY
C4-1 K REFER TO NOTE 9 ON SHEET METAL NEW WORK PLANS.
STORAGE

&
&

B441 SERVICE
SHAFT ELEVATOR L REFER TO NOTE 10 ON SHEET METAL NEW WORK PLANS.
S-16 S-6
M REFER TO NOTE 11 ON PHASE 3 PLAN ON SHEET M-480.A
N REFER TO NOTE 12 ON PHASE 4 PLAN ON SHEET M-480.A.
7 MECHANICAL
B442
CORRIDOR
C4-2
STAIR #3
19
UP F
FEC E
(TYP)
B422a (TYP)
QUALITY
MANAGEMENT
B433 B431
ELEC H
T
B434 D
(TYP)

'
'

17 H-1506
COMM CLOSET
B432
6

28"ø RA
30"ø SA
16"ø EA
24"ø EA
26"ø SA

34"ø RA
W-I W-J W-K
FOURTH FLOOR SHEET METAL DEMOLITION PLAN - PHASE 1
SCALE: 1/8" = 1'-0"

(
(

5
22"ø RA 32"ø RA

24"x12" RA
I

20"ø EA
TU-10-29
TU-10-27
TU-10-25
16"ø SA 18"ø SA
TU-10-28 TU-10-26
TU-10-24

)
)

30"ø SA

28"ø RA
16"ø EA
3
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

4TH FLOOR SHEET METAL PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * DEMOLITION PLAN - PHASE 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
1
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,
FOURTH FLOOR INTERSTITIAL SHEET METAL DEMOLITION PLAN - PHASE 1

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
( 7HO
SCALE: 1/8" = 1'-0" 35
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES MD-440
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
MECHANICAL DEMOLITION GENERAL NOTES:
1 ANY INTERRUPTION OF EXISTING SERVICES AND/OR EQUIPMENT SHALL BE PERFORMED AT A TIME APPROVED IN
ADVANCE BY THE OWNER'S REPRESENTATIVE.
2 THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THE WORK. ACTUAL ROUTING AND
SIZES OF EXISTING PIPING AND DUCTWORK MIGHT DIFFER TO A LIMITED EXTENT FROM WHAT IS SHOWN. MAJOR
DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL EXISTING CONDITIONS SHALL BE REPORTED TO THE

$
$

ENGINEER.
E-H E-H
3 THE EXACT EXTENT OF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK.
(TO BE COMPLETED EACH (TO BE COMPLETED EACH
L L 4 ALL MECHANICAL ITEMS TO BE REMOVED SHALL BE REMOVED COMPLETE, INCLUDING ALL RELATED ITEMS SUCH AS
FOR PHASES 3, 4, 4A, 4B) FOR PHASES 3, 4, 4A, 4B)
HANGERS, SUPPORTS, CONTROLS, ETC. CAP ALL OPEN ENDED PIPES AND DUCTWORK.
5 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL NEW WORK
PLANS. INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR
MODIFIED) AND FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK. COORDINATE AS REQUIRED WITH
STRUCTURAL.
6 EXISTING SPRINKLER SYSTEM SHALL REMAIN FUNCTIONAL DURING CONSTRUCTION. INTERRUPTIONS OF EXISTING
1-AH-17 1-AH-17 SERVICE SHALL BE COORDINATED WITH THE OWNER.
1-AH-16 1-AH-16
1-RF-17 1-RF-17
7 CONSTRUCTION AREAS THAT ARE NOT SEPARATED FROM THE AREA WITH A 1-HOUR RATED WALL SHALL HAVE THE
SPRINKLER HEADS TURNED UP.
1-RF-16 1-RF-16
9 9
1-SF-16 1-SF-16
# SHEET METAL DEMOLITION KEY NOTES:
1-SF-17 1-SF-17
A REMOVE AND SAVE EXISTING FUME HOOD FOR REUSE. REFER TO 4TH FLOOR NEW WORK PLAN FOR NEW LOCATION.

%
%

K K
(TO BE COMPLETED EACH (TO BE COMPLETED EACH
B REMOVE ALL SHEET METAL AND EQUIPMENT ASSOCIATED WITH EXISTING FUME HOOD THAT WILL BE REMOVED AND
FOR PHASES 3, 4, 4A, 4B) FOR PHASES 3, 4, 4A, 4B)
E-E E-F E-G RELOCATED. REMOVE EXISTING HEPA FILTER, TERMINAL UNIT. REMOVE DUCT RUN BACK TO EXHAUST FAN 1-EF-38.
REMOVE EXHAUST FAN 1-EF-38 LOCATED ON THE MEZZANINE FLOOR (8TH LEVEL) OF THE WEST MECHANICAL ROOM.
UP UP
D REMOVE EXISTING SUPPLY DIFFUSER, ASSOCIATED DUCTWORK AND SUPPORTS AS INDICATED.
E-E E-F E-G E REMOVE EXISTING RETURN OR EXHAUST GRILLE , ASSOCIATED DUCTWORK AND SUPPORTS AS INDICATED.
F REMOVE EXISTING TEMPERATURE SENSOR AS INDICATED.
8 8 G REMOVE EXISTING ELECTRIC HEATING COIL, ASSOCIATED DUCTWORK, SUPPORTS, AND CONTROLS AS INDICATED.
H REMOVE EXISTING TERMINAL UNIT, ASSOCIATED DUCTWORK, SUPPORTS, AND CONTROLS AS INDICATED.
EFILM
PROCESSING
CORRIDOR (TYP)
D716A I REMOVE EXISTING DUCTWORK AND SUPPORTS AS INDICATED.
C7-34 D
ERCP ERCP J REFER TO NOTE 7 ON SHEET M-430.
STAFF (TYP)
RADIOGRAPHIC PROCEDURE PROCEDURE
LOUNGE VIEW D716 D716
D711 D714 K REFER TO NOTE 9 ON SHEET METAL NEW WORK PLANS.
C7-25
CORRIDOR

VIEW
STAFF L REFER TO NOTE 10 ON SHEET METAL NEW WORK PLANS.
D716B
TOILET

&
&

D711A
M REFER TO NOTE 11 ON PHASE 3 PLAN ON SHEET M-480.A
HSKG CORRIDOR I N REFER TO NOTE 12 ON PHASE 4 PLAN ON SHEET M-480.A.
D710 C7-28
(TYP)
7 7 F
OFFICE (TYP)
D709
D E
(TYP) (TYP)
COLONOSCOPY
PROCEDURE EGD PROCEDURE
PAT. TOILET D717 D720
F D715A
OFFICE
D708 (TYP)
E
D
(TYP)
(TYP)
OFFICE

'
'

D707
BY-PASS
D720B
BY-PASS
D717A PAT. TLT. PAT. TLT.
D717B D720A
6 6
CORRIDOR
C7-33 F
OFFICE E
D706 (TYP)
PRE./POST OP (TYP)
CORRIDOR F
OBSERV.
C7-29
D715 (TYP)
COLONOSCOPY EGD
PROCEDURE PROCEDURE
D725 D725
PAT. TOILET
OFFICE D715B
D705
E-K
D
OFFICE
D703B (TYP) I 4
CORRIDOR EXERCISE

(
(

C7-31 D722 (TYP)


STORAGE
EQUIPMENT
C744A
5 5
BED AREA F
OFFICE
D703 D726 (TYP)
PAT. TOILET
D701
I
PULM MEDD A
TESTING AREA (TYP)
SPEC. PROCEDURE
(TYP) D
D726A D724
CORRIDOR (TYP)
SOILED
C7-30 SUPPLIES
E C746
OFFICE STORAGE F
D703A F EQUIPMENT (TYP)
PAT. TOILET (TYP)
(TYP) C716
D726B I PULM /MED CLEANUP /
VENT TEST REPAIR / TEST.
D (TYP) C744
D723 3
(TYP) E
(TYP)
RECEPTIOIN WAITING
D700 C7-8 E

)
)

WAITING (TYP)
C7-8
4 4 REF.
SEVENTH FLOOR SHEET METAL DEMOLITION PLAN - PHASE 3 SEVENTH FLOOR SHEET METAL DEMOLITION PLAN - PHASE 4 SEVENTH FLOOR SHEET METAL DEMOLITION PLAN - PHASE 2
SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

7TH FLOOR SHEET METAL PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * DEMOLITION PLAN - 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
PHASES 2, 3 & 4
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES MD-470.A
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
E-E E-F E-G MECHANICAL DEMOLITION GENERAL NOTES:
1 ANY INTERRUPTION OF EXISTING SERVICES AND/OR EQUIPMENT SHALL BE PERFORMED AT A TIME APPROVED IN
ADVANCE BY THE OWNER'S REPRESENTATIVE.
2 THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THE WORK. ACTUAL ROUTING AND
SIZES OF EXISTING PIPING AND DUCTWORK MIGHT DIFFER TO A LIMITED EXTENT FROM WHAT IS SHOWN. MAJOR
DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL EXISTING CONDITIONS SHALL BE REPORTED TO THE
ENGINEER.

$
$

3 THE EXACT EXTENT OF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK.


(TO BE COMPLETED EACH
L 4 ALL MECHANICAL ITEMS TO BE REMOVED SHALL BE REMOVED COMPLETE, INCLUDING ALL RELATED ITEMS SUCH AS
FOR PHASES 3, 4, 4A, 4B)
HANGERS, SUPPORTS, CONTROLS, ETC. CAP ALL OPEN ENDED PIPES AND DUCTWORK.
5 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL NEW WORK
PLANS. INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR
MODIFIED) AND FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK. COORDINATE AS REQUIRED WITH
STRUCTURAL.
6 EXISTING SPRINKLER SYSTEM SHALL REMAIN FUNCTIONAL DURING CONSTRUCTION. INTERRUPTIONS OF EXISTING
1-AH-17
1-AH-16 SERVICE SHALL BE COORDINATED WITH THE OWNER.
1-RF-17
7 CONSTRUCTION AREAS THAT ARE NOT SEPARATED FROM THE AREA WITH A 1-HOUR RATED WALL SHALL HAVE THE
SPRINKLER HEADS TURNED UP.
1-RF-16
9
1-SF-16
1-SF-17
# SHEET METAL DEMOLITION KEY NOTES:
K

%
%

A REMOVE AND SAVE EXISTING FUME HOOD FOR REUSE. REFER TO 4TH FLOOR NEW WORK PLAN FOR NEW LOCATION.
(TO BE COMPLETED EACH
FOR PHASES 3, 4, 4A, 4B)
B REMOVE ALL SHEET METAL AND EQUIPMENT ASSOCIATED WITH EXISTING FUME HOOD THAT WILL BE REMOVED AND
E-H RELOCATED. REMOVE EXISTING HEPA FILTER, TERMINAL UNIT. REMOVE DUCT RUN BACK TO EXHAUST FAN 1-EF-38.
UP
REMOVE EXHAUST FAN 1-EF-38 LOCATED ON THE MEZZANINE FLOOR (8TH LEVEL) OF THE WEST MECHANICAL ROOM.
D REMOVE EXISTING SUPPLY DIFFUSER, ASSOCIATED DUCTWORK AND SUPPORTS AS INDICATED.
E REMOVE EXISTING RETURN OR EXHAUST GRILLE , ASSOCIATED DUCTWORK AND SUPPORTS AS INDICATED.
8 F REMOVE EXISTING TEMPERATURE SENSOR AS INDICATED.
SCOPE CLEAN
D719 G REMOVE EXISTING ELECTRIC HEATING COIL, ASSOCIATED DUCTWORK, SUPPORTS, AND CONTROLS AS INDICATED.
D
H REMOVE EXISTING TERMINAL UNIT, ASSOCIATED DUCTWORK, SUPPORTS, AND CONTROLS AS INDICATED.
E
I REMOVE EXISTING DUCTWORK AND SUPPORTS AS INDICATED.
J REFER TO NOTE 7 ON SHEET M-430.
F
K REFER TO NOTE 9 ON SHEET METAL NEW WORK PLANS.
L REFER TO NOTE 10 ON SHEET METAL NEW WORK PLANS.

&
&

M REFER TO NOTE 11 ON PHASE 3 PLAN ON SHEET M-480.A


PM
N REFER TO NOTE 12 ON PHASE 4 PLAN ON SHEET M-480.A.
PM
7
PM
PM
PM

'
'

PM
6
PM
PM
PM
PM

(
(

5
PM
PM
PM

)
)

4
SEVENTH FLOOR SHEET METAL DEMOLITION PLAN - PHASE 4A
SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

7TH FLOOR SHEET METAL PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * DEMOLITION PLAN - PHASE 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
4A
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES MD-470.B
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE. E-G E-H E-E E-F MECHANICAL DEMOLITION GENERAL NOTES:
1 ANY INTERRUPTION OF EXISTING SERVICES AND/OR EQUIPMENT SHALL BE PERFORMED AT A TIME APPROVED IN
ADVANCE BY THE OWNER'S REPRESENTATIVE.
2 THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THE WORK. ACTUAL ROUTING AND
SIZES OF EXISTING PIPING AND DUCTWORK MIGHT DIFFER TO A LIMITED EXTENT FROM WHAT IS SHOWN. MAJOR
DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL EXISTING CONDITIONS SHALL BE REPORTED TO THE
ENGINEER.

$
$

3 THE EXACT EXTENT OF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK.


4 ALL MECHANICAL ITEMS TO BE REMOVED SHALL BE REMOVED COMPLETE, INCLUDING ALL RELATED ITEMS SUCH AS
HANGERS, SUPPORTS, CONTROLS, ETC. CAP ALL OPEN ENDED PIPES AND DUCTWORK.
5 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL NEW WORK
PLANS. INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR
MODIFIED) AND FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK. COORDINATE AS REQUIRED WITH
STRUCTURAL.
6 EXISTING SPRINKLER SYSTEM SHALL REMAIN FUNCTIONAL DURING CONSTRUCTION. INTERRUPTIONS OF EXISTING
SERVICE SHALL BE COORDINATED WITH THE OWNER.
7 CONSTRUCTION AREAS THAT ARE NOT SEPARATED FROM THE AREA WITH A 1-HOUR RATED WALL SHALL HAVE THE
1-EF-12 1-EF-12 SPRINKLER HEADS TURNED UP.
9 9
1-EF-10 1-EF-10
1-EF-9 1-EF-9
# SHEET METAL DEMOLITION KEY NOTES:
1-EF-39 1-EF-39

%
%

A REMOVE AND SAVE EXISTING FUME HOOD FOR REUSE. REFER TO 4TH FLOOR NEW WORK PLAN FOR NEW LOCATION.
E-E E-F M N
DN 1-EF-24 DN 1-EF-24 E-G E-H B REMOVE ALL SHEET METAL AND EQUIPMENT ASSOCIATED WITH EXISTING FUME HOOD THAT WILL BE REMOVED AND
RELOCATED. REMOVE EXISTING HEPA FILTER, TERMINAL UNIT. REMOVE DUCT RUN BACK TO EXHAUST FAN 1-EF-38.
REMOVE EXHAUST FAN 1-EF-38 LOCATED ON THE MEZZANINE FLOOR (8TH LEVEL) OF THE WEST MECHANICAL ROOM.
D REMOVE EXISTING SUPPLY DIFFUSER, ASSOCIATED DUCTWORK AND SUPPORTS AS INDICATED.
E REMOVE EXISTING RETURN OR EXHAUST GRILLE , ASSOCIATED DUCTWORK AND SUPPORTS AS INDICATED.
8 8 F REMOVE EXISTING TEMPERATURE SENSOR AS INDICATED.

20"ø EA

12"ø EA
30"x24" RA
38"x36" RA
24"ø EA

32"x24" SA
38"x32" SA
20"ø EA
30"x24" RA

12"ø EA
38"x36" RA

G REMOVE EXISTING ELECTRIC HEATING COIL, ASSOCIATED DUCTWORK, SUPPORTS, AND CONTROLS AS INDICATED.

32"x24" SA
24"ø EA
38"x32" SA

H REMOVE EXISTING TERMINAL UNIT, ASSOCIATED DUCTWORK, SUPPORTS, AND CONTROLS AS INDICATED.
I
(TYP) I REMOVE EXISTING DUCTWORK AND SUPPORTS AS INDICATED.
J REFER TO NOTE 7 ON SHEET M-430.
I
K REFER TO NOTE 9 ON SHEET METAL NEW WORK PLANS.
(TYP)
L REFER TO NOTE 10 ON SHEET METAL NEW WORK PLANS.
12"x8"

&
&

14"x10"

H I M REFER TO NOTE 11 ON PHASE 3 PLAN ON SHEET M-480.A


H (TYP)

16"x10"
H N REFER TO NOTE 12 ON PHASE 4 PLAN ON SHEET M-480.A.
20"ø SA 18"ø SA 12"ø SA 18"ø SA 12"ø SA
H
7 7 H
H H
18"x16" RA 20"ø EA 20"ø EA 14"ø EA

10"x10" EA
I
(TYP)

24"x20" RA
18"ø EA
I
I

'
'

20"ø EA
(TYP)
(TYP)
6 6

22"ø SA
12"ø EA
20"ø EA
38"x36" RA
18"ø EA

24"x20" RA

38"x32" SA

38"x36" RA
38"x32" SA

22"ø SA
I
(TYP)
H
H 16"ø EA 16"ø EA
10"ø H H H
H

(
(

H
20"ø SA 18"ø SA 20"ø SA 18"ø SA 14"ø SA
5 H H 5
H H E-K
H H
18"ø RA 18"ø RA B
4
20"x16" EA
I
I
(TYP)
(TYP)
I B
B
10"ø

(TYP)
I
(TYP)

12"ø EA
20"ø EA
B 12"x8"

)
)

4 4 32"x28" RA 28"ø RA
H I
3 H (TYP)
14"x12"

6"ø
6"ø
6"ø

26"x26" SA 26"ø SA
EIGHTH FLOOR INTERSTITIAL SHEET METAL DEMOLITION PLAN - PHASE 3 EIGHTH FLOOR INTERSTITIAL SHEET METAL DEMOLITION PLAN - PHASE 4 EIGHTH FLOOR INTERSTITIAL SHEET METAL DEMOLITION PLAN - PHASE 2
SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

8TH FLOOR SHEET METAL PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * DEMOLITION PLAN - 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
PHASES 2, 3 & 4
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES MD-480.A
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
MECHANICAL DEMOLITION GENERAL NOTES:
1 ANY INTERRUPTION OF EXISTING SERVICES AND/OR EQUIPMENT SHALL BE PERFORMED AT A TIME APPROVED IN
ADVANCE BY THE OWNER'S REPRESENTATIVE.
2 THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THE WORK. ACTUAL ROUTING AND
SIZES OF EXISTING PIPING AND DUCTWORK MIGHT DIFFER TO A LIMITED EXTENT FROM WHAT IS SHOWN. MAJOR
DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL EXISTING CONDITIONS SHALL BE REPORTED TO THE
ENGINEER.

$
$

E-H
3 THE EXACT EXTENT OF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK.
4 ALL MECHANICAL ITEMS TO BE REMOVED SHALL BE REMOVED COMPLETE, INCLUDING ALL RELATED ITEMS SUCH AS
HANGERS, SUPPORTS, CONTROLS, ETC. CAP ALL OPEN ENDED PIPES AND DUCTWORK.
5 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL NEW WORK
PLANS. INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR
MODIFIED) AND FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK. COORDINATE AS REQUIRED WITH
STRUCTURAL.
6 EXISTING SPRINKLER SYSTEM SHALL REMAIN FUNCTIONAL DURING CONSTRUCTION. INTERRUPTIONS OF EXISTING
SERVICE SHALL BE COORDINATED WITH THE OWNER.
7 CONSTRUCTION AREAS THAT ARE NOT SEPARATED FROM THE AREA WITH A 1-HOUR RATED WALL SHALL HAVE THE
SPRINKLER HEADS TURNED UP.
9
# SHEET METAL DEMOLITION KEY NOTES:

%
%

A REMOVE AND SAVE EXISTING FUME HOOD FOR REUSE. REFER TO 4TH FLOOR NEW WORK PLAN FOR NEW LOCATION.
DN B REMOVE ALL SHEET METAL AND EQUIPMENT ASSOCIATED WITH EXISTING FUME HOOD THAT WILL BE REMOVED AND
RELOCATED. REMOVE EXISTING HEPA FILTER, TERMINAL UNIT. REMOVE DUCT RUN BACK TO EXHAUST FAN 1-EF-38.
REMOVE EXHAUST FAN 1-EF-38 LOCATED ON THE MEZZANINE FLOOR (8TH LEVEL) OF THE WEST MECHANICAL ROOM.
D REMOVE EXISTING SUPPLY DIFFUSER, ASSOCIATED DUCTWORK AND SUPPORTS AS INDICATED.
E-E E-F E-G
E REMOVE EXISTING RETURN OR EXHAUST GRILLE , ASSOCIATED DUCTWORK AND SUPPORTS AS INDICATED.
8 F REMOVE EXISTING TEMPERATURE SENSOR AS INDICATED.
G REMOVE EXISTING ELECTRIC HEATING COIL, ASSOCIATED DUCTWORK, SUPPORTS, AND CONTROLS AS INDICATED.
30"x24" RA

20"ø EA
38"x36" RA
24"ø EA
38"x32" SA

32"x24" SA
12"ø EA
H REMOVE EXISTING TERMINAL UNIT, ASSOCIATED DUCTWORK, SUPPORTS, AND CONTROLS AS INDICATED.
I REMOVE EXISTING DUCTWORK AND SUPPORTS AS INDICATED.
J REFER TO NOTE 7 ON SHEET M-430.
I K REFER TO NOTE 9 ON SHEET METAL NEW WORK PLANS.
(TYP)
L REFER TO NOTE 10 ON SHEET METAL NEW WORK PLANS.

&
&

H M REFER TO NOTE 11 ON PHASE 3 PLAN ON SHEET M-480.A


18"x16" RA
N REFER TO NOTE 12 ON PHASE 4 PLAN ON SHEET M-480.A.
20"ø SA 18"ø SA 12"ø SA
7
20"ø EA 14"ø EA

'
'

(
(

)
)

4
EIGHTH FLOOR INTERSTITIAL SHEET METAL DEMOLITION PLAN - PHASE 4A
SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

8TH FLOOR SHEET METAL PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * DEMOLITION PLAN - PHASE 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
4A
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES MD-480.B
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
MECHANICAL DEMOLITION GENERAL NOTES:
1 ANY INTERRUPTION OF EXISTING SERVICES AND/OR EQUIPMENT SHALL BE PERFORMED AT A TIME APPROVED IN
ADVANCE BY THE OWNER'S REPRESENTATIVE.
2 THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THE WORK. ACTUAL ROUTING AND

$
$

SIZES OF EXISTING PIPING AND DUCTWORK MIGHT DIFFER TO A LIMITED EXTENT FROM WHAT IS SHOWN. MAJOR
DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL EXISTING CONDITIONS SHALL BE REPORTED TO THE
ENGINEER.
3 THE EXACT EXTENT OF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK.
4 ALL MECHANICAL ITEMS TO BE REMOVED SHALL BE REMOVED COMPLETE, INCLUDING ALL RELATED ITEMS SUCH AS
HANGERS, SUPPORTS, CONTROLS, ETC. CAP ALL OPEN ENDED PIPES AND DUCTWORK.
W-L W-M W-N
5 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL NEW WORK
PLANS. INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR
MODIFIED) AND FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK. COORDINATE AS REQUIRED WITH
STRUCTURAL.
6 EXISTING SPRINKLER SYSTEM SHALL REMAIN FUNCTIONAL DURING CONSTRUCTION. INTERRUPTIONS OF EXISTING
SERVICE SHALL BE COORDINATED WITH THE OWNER.
7 CONSTRUCTION AREAS THAT ARE NOT SEPARATED FROM THE AREA WITH A 1-HOUR RATED WALL SHALL HAVE THE
SPRINKLER HEADS TURNED UP.
22
EEG SETUP
TRAINING ROOM # MEDICAL GAS DEMOLITION KEY NOTES:

%
%

B451
A A REMOVE EXISTING MEDICAL GAS OUTLETS, PIPING, AND SUPPORTS AS INDICATED.
EEG-EMG-EP OFFICE
B REMOVE EXISTING MEDICAL GAS ZONE VALVE BOX AND ASSOCIATED PIPING COMPLETE. REMOVE PIPING AS
AUTONOMIC FUNTION B449
INDICATED FROM ZONE VALVE BOX BACK TO NEAREST ACTIVE BRANCH OR MAIN AND CAP.
LAB
B452
C REMOVE EXISTING MED GAS AREA ALARMS AND ASSOCIATED SENSOR TUBING COMPLETE.
21 D REMOVE EXISTING MEDICAL GAS PIPING AS INDICATED AND PREPARE PIPE FOR NEW CONNECTION.
OFFICE
MGVB B415 E PROVIDE TEMPORARY AREA ALARM PANEL. LOCATE AS SHOWN ON SHEET M-970. PROVIDE REMOTE
B447
ANUNCIATOR/REPEATER AT TEMPORARY NURSE STATION "ACROSS THE HALL" FROM AREA ALRAM PANEL.
COORDINATE WITH OWNER.
B D
F PROVIDE TEMPORARY MA AND MV SUPPLY TO OUTLETS DURING PHASE 4.
INPATIENT ATTENDING
B448
OFFICE
B445
PROGRAM SUPPORT CORRIDOR
ASSISTANT C408
B446

&
&

20

MV
MA
OFFICE SERVICE
B443 ELEVATOR
S-5 MALE
TOILET
SERVICE C400
ELEVATOR
LOBBY
C4-1
STORAGE

O
B441 SERVICE
ELEVATOR
SHAFT S-6
S-16
MECHANICAL
B442
CORRIDOR
C4-2
STAIR #3

'
'

19
UP
FEC
B422a
B433 QUALITY
MANAGEMENT
ELEC B431
T
B434
17
COMM CLOSET
B432

(
(

W-I W-J W-K


FOURTH FLOOR MEDICAL GAS DEMOLITION PLAN - PHASE 1
SCALE: 1/8" = 1'-0"

)
)

5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(


EXPANDED ENDOSCOPY AND

*
*

4TH FLOOR MEDICAL GAS PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * DEMOLITION PLAN - PHASE 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
1
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES MD-940
BID DOCUMENTS
        
        
E-E E-F
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
E-E E-F E-G
6
CORRIDOR
C7-33

$
$

OFFICE
D706
PRE./POST OP
OBSERV.
8 D715
FILM

MV
PROCESSING
PAT. TOILET

O
D716A A
D715B
OFFICE

MA
(TYP)
CORRIDOR D705 A
C7-34

N2O
(TYP)

G
LV
ERCP
MV

PROCEDURE

LA
STAFF RADIOGRAPHIC
O

D716
LOUNGE VIEW
D711
MA

D714
N2O

%
%

VIEW MGVB -7.4-A


LV

STAFF D716B
TOILET OFFICE
LA

MGVB-7.6-A
D711A B D703B
3/4"
1 1/2"
1 1/2" 1"
1 1/2" 2 1/2"
HSKG B
1"
D710
MGVB-7.5-E
A
MGVB-7.1-A (TYP)
(D715) B
MGVB -7.2-C 5
BED AREA
OFFICE D726
D703
7
PAT. TOILET

&
&

NO2
D701
OFFICE MA
D709 O
MV A
(TYP)
TESTING AREA
D726A
1 1/2"
1 1/2" 1 1/2"
1" 1"
2 1/2"
PAT. TOILET
D715A
A
C (TYP) OFFICE
OFFICE D703A
D708
PAT. TOILET
D726B
A
(TYP)

'
'

MV

MV
O

O
G
MA

MA
1-AAP-7.1 C RECEPTIOIN WAITING
LV

1-AAP-7.2 D700 C7-8


OFFICE 1-AAP-7.3

N2O
LA

D707

G
1-AAP-7.4

LV
1-AAP-7.5

LA
4
MV
O

6
MA

CORRIDOR
C7-33

(
(

OFFICE
D706
PRE./POST OP
OBSERV.
D715
7TH FLOOR MEDICAL GAS DEMOLITION PLAN - (NORTH) (PHASE 3) 7TH FLOOR MEDICAL GAS DEMOLITION PLAN - (SOUTH) (PHASE 3)
SCALE: 1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
E-K
4 MECHANICAL DEMOLITION GENERAL NOTES: # MEDICAL GAS DEMOLITION KEY NOTES:
1 ANY INTERRUPTION OF EXISTING SERVICES AND/OR EQUIPMENT SHALL BE PERFORMED AT A TIME APPROVED IN A REMOVE EXISTING MEDICAL GAS OUTLETS, PIPING, AND SUPPORTS AS INDICATED.
ADVANCE BY THE OWNER'S REPRESENTATIVE.

LV
LA
MG
MGVB-7.23-D B REMOVE EXISTING MEDICAL GAS ZONE VALVE BOX AND ASSOCIATED PIPING COMPLETE. REMOVE PIPING AS
MGVB-7.24-F 2 THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THE WORK. ACTUAL ROUTING AND INDICATED FROM ZONE VALVE BOX BACK TO NEAREST ACTIVE BRANCH OR MAIN AND CAP.
SIZES OF EXISTING PIPING AND DUCTWORK MIGHT DIFFER TO A LIMITED EXTENT FROM WHAT IS SHOWN. MAJOR
DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL EXISTING CONDITIONS SHALL BE REPORTED TO THE

)
)

C REMOVE EXISTING MED GAS AREA ALARMS AND ASSOCIATED SENSOR TUBING COMPLETE.
ENGINEER.
A B
D REMOVE EXISTING MEDICAL GAS PIPING AS INDICATED AND PREPARE PIPE FOR NEW CONNECTION.
3 THE EXACT EXTENT OF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK.
E PROVIDE TEMPORARY AREA ALARM PANEL. LOCATE AS SHOWN ON SHEET M-970. PROVIDE REMOTE
4 ALL MECHANICAL ITEMS TO BE REMOVED SHALL BE REMOVED COMPLETE, INCLUDING ALL RELATED ITEMS SUCH AS ANUNCIATOR/REPEATER AT TEMPORARY NURSE STATION "ACROSS THE HALL" FROM AREA ALRAM PANEL.
HANGERS, SUPPORTS, CONTROLS, ETC. CAP ALL OPEN ENDED PIPES AND DUCTWORK. COORDINATE WITH OWNER.
A B 5 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL NEW WORK F PROVIDE TEMPORARY MA AND MV SUPPLY TO OUTLETS DURING PHASE 4.
PLANS. INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR
MODIFIED) AND FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK. COORDINATE AS REQUIRED WITH
STRUCTURAL.
MGVB-7.26-A
3 6 EXISTING SPRINKLER SYSTEM SHALL REMAIN FUNCTIONAL DURING CONSTRUCTION. INTERRUPTIONS OF EXISTING
SERVICE SHALL BE COORDINATED WITH THE OWNER.
7 CONSTRUCTION AREAS THAT ARE NOT SEPARATED FROM THE AREA WITH A 1-HOUR RATED WALL SHALL HAVE THE
SPRINKLER HEADS TURNED UP.
REF.
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

7TH FLOOR MEDICAL GAS PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * DEMOLITION PLAN - 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
PHASES 2 & 3
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - As indicated 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
SEVENTH FLOOR MEDICAL GAS DEMOLITION PLAN - PHASE 2 35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
SCALE: 1/8" = 1'-0" 2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES MD-970
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
E-G E-H E-G E-H
BY-PASS MECHANICAL DEMOLITION GENERAL NOTES:
D720B
1 ANY INTERRUPTION OF EXISTING SERVICES AND/OR EQUIPMENT SHALL BE PERFORMED AT A TIME APPROVED IN
BY-PASS ADVANCE BY THE OWNER'S REPRESENTATIVE.
D717A PAT. TLT. PAT. TLT.

$
$

D717B D720A 2 THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THE WORK. ACTUAL ROUTING AND
SIZES OF EXISTING PIPING AND DUCTWORK MIGHT DIFFER TO A LIMITED EXTENT FROM WHAT IS SHOWN. MAJOR
DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL EXISTING CONDITIONS SHALL BE REPORTED TO THE
6 ENGINEER.
3 THE EXACT EXTENT OF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK.
3/4"
8 1 1/2" A
1 1/2" 4 ALL MECHANICAL ITEMS TO BE REMOVED SHALL BE REMOVED COMPLETE, INCLUDING ALL RELATED ITEMS SUCH AS
1" (TYP) A HANGERS, SUPPORTS, CONTROLS, ETC. CAP ALL OPEN ENDED PIPES AND DUCTWORK.
1 1/2"
1" 2 1/2" (TYP)
3/4" 5 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL NEW WORK
CORRIDOR PLANS. INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR
1 1/2"
C7-29 MODIFIED) AND FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK. COORDINATE AS REQUIRED WITH
1 1/2" 1" STRUCTURAL.
1 1/2" 2 1/2"
1" EGD 6 EXISTING SPRINKLER SYSTEM SHALL REMAIN FUNCTIONAL DURING CONSTRUCTION. INTERRUPTIONS OF EXISTING
COLONOSCOPY PROCEDURE SERVICE SHALL BE COORDINATED WITH THE OWNER.
MV

PROCEDURE D725
O

D725
7 CONSTRUCTION AREAS THAT ARE NOT SEPARATED FROM THE AREA WITH A 1-HOUR RATED WALL SHALL HAVE THE
MA

SPRINKLER HEADS TURNED UP.

MV
ERCP
N2O

O
PROCEDURE F

MA
G

D716
LV

N2O
LA

%
%

G
B

C7-25

LV
CORRIDOR
MGVB-7.9-C A

LA
(D725) # MEDICAL GAS DEMOLITION KEY NOTES:
(TYP)
MGVB-7.8-C A REMOVE EXISTING MEDICAL GAS OUTLETS, PIPING, AND SUPPORTS AS INDICATED.
B B MGVB-7.10-A B REMOVE EXISTING MEDICAL GAS ZONE VALVE BOX AND ASSOCIATED PIPING COMPLETE. REMOVE PIPING AS
(D722) INDICATED FROM ZONE VALVE BOX BACK TO NEAREST ACTIVE BRANCH OR MAIN AND CAP.
C REMOVE EXISTING MED GAS AREA ALARMS AND ASSOCIATED SENSOR TUBING COMPLETE.
3/4" A
CORRIDOR D REMOVE EXISTING MEDICAL GAS PIPING AS INDICATED AND PREPARE PIPE FOR NEW CONNECTION.
C7-28 (TYP)
CORRIDOR EXERCISE E PROVIDE TEMPORARY AREA ALARM PANEL. LOCATE AS SHOWN ON SHEET M-970. PROVIDE REMOTE
MA MA
B B C7-31 D722 ANUNCIATOR/REPEATER AT TEMPORARY NURSE STATION "ACROSS THE HALL" FROM AREA ALRAM PANEL.
O O
COORDINATE WITH OWNER.
MV MV
MGVB -7.3-C 1 1/2" F PROVIDE TEMPORARY MA AND MV SUPPLY TO OUTLETS DURING PHASE 4.
MGVB-7.2-C (D717) 1" 1"
3/4"
G
LV
7 LA
3/4"

&
&

NO2
5 3/4"
MA MA B
O O
MV MV MGVB-7.7-C
3/4"
1 1/2"
COLONOSCOPY
PROCEDURE
D717 EGD PROCEDURE
A D720
PULM MED
(TYP) SPEC. PROCEDURE
D724
A

MV
A
CORRIDOR

O
(TYP) (TYP) C7-30

MA
B
1 1/2" MGVB-7.21-A
1 1/2"

N2O
(D722)
1 1/2" 1"

'
'

1" 2 1/2"

LV
LA
PULM /MED
VENT TEST
A D723

MV
(TYP)

O
MA
G
LV
BY-PASS

LA
D720B
BY-PASS
D717A PAT. TLT. PAT. TLT. WAITING G
LV
D717B D720A C7-8 LA
G
LV
LA
6 3/4" 1"
4 3/4"
3/4"
1 1/2" A
1 1/2"

(
(

1" (TYP) A
1 1/2"

MV
1" 2 1/2" (TYP)

O
CORRIDOR

MA
C7-29
EGD
COLONOSCOPY PROCEDURE

MV
PROCEDURE D725

O
D725
7TH FLOOR MEDICAL GAS DEMOLITION PLAN - (NORTH) (PHASE 4) 7TH FLOOR MEDICAL GAS DEMOLITION PLAN - (SOUTH) (PHASE 4)
SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0"

)
)

5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(


EXPANDED ENDOSCOPY AND

*
*

7TH FLOOR MEDICAL GAS PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * DEMOLITION PLAN - PHASE 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
4
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/4" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES MD-971
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
MECHANICAL DEMOLITION GENERAL NOTES:
1 ANY INTERRUPTION OF EXISTING SERVICES AND/OR EQUIPMENT SHALL BE PERFORMED AT A TIME APPROVED IN
ADVANCE BY THE OWNER'S REPRESENTATIVE.

$
$

2 THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THE WORK. ACTUAL ROUTING AND
SIZES OF EXISTING PIPING AND DUCTWORK MIGHT DIFFER TO A LIMITED EXTENT FROM WHAT IS SHOWN. MAJOR
E-H DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL EXISTING CONDITIONS SHALL BE REPORTED TO THE
ENGINEER.
3 THE EXACT EXTENT OF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK.
4 ALL MECHANICAL ITEMS TO BE REMOVED SHALL BE REMOVED COMPLETE, INCLUDING ALL RELATED ITEMS SUCH AS
HANGERS, SUPPORTS, CONTROLS, ETC. CAP ALL OPEN ENDED PIPES AND DUCTWORK.
5 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL NEW WORK
PLANS. INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR
MODIFIED) AND FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK. COORDINATE AS REQUIRED WITH
STRUCTURAL.
6 EXISTING SPRINKLER SYSTEM SHALL REMAIN FUNCTIONAL DURING CONSTRUCTION. INTERRUPTIONS OF EXISTING
SERVICE SHALL BE COORDINATED WITH THE OWNER.
7 CONSTRUCTION AREAS THAT ARE NOT SEPARATED FROM THE AREA WITH A 1-HOUR RATED WALL SHALL HAVE THE
9 SPRINKLER HEADS TURNED UP.

%
%

# MEDICAL GAS DEMOLITION KEY NOTES:


UP A REMOVE EXISTING MEDICAL GAS OUTLETS, PIPING, AND SUPPORTS AS INDICATED.
B REMOVE EXISTING MEDICAL GAS ZONE VALVE BOX AND ASSOCIATED PIPING COMPLETE. REMOVE PIPING AS
E-E E-F E-G INDICATED FROM ZONE VALVE BOX BACK TO NEAREST ACTIVE BRANCH OR MAIN AND CAP.
C REMOVE EXISTING MED GAS AREA ALARMS AND ASSOCIATED SENSOR TUBING COMPLETE.
8 D REMOVE EXISTING MEDICAL GAS PIPING AS INDICATED AND PREPARE PIPE FOR NEW CONNECTION.
SCOPE CLEAN E PROVIDE TEMPORARY AREA ALARM PANEL. LOCATE AS SHOWN ON SHEET M-970. PROVIDE REMOTE
D719 ANUNCIATOR/REPEATER AT TEMPORARY NURSE STATION "ACROSS THE HALL" FROM AREA ALRAM PANEL.
COORDINATE WITH OWNER.
A
F PROVIDE TEMPORARY MA AND MV SUPPLY TO OUTLETS DURING PHASE 4.

&
&

'
'

(
(

)
)

4
SEVENTH FLOOR MEDICAL GAS DEMOLITION PLAN - PHASE 4A
SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

7TH FLOOR MEDICAL GAS PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * DEMOLITION PLAN - PHASE 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
4A
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES MD-972
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
FIRE PROTECTION GENERAL NOTES:
1 THESE DRAWINGS ARE DIAGRAMMATIC, AND REPRESENT THE GENERAL INTENT AND ARRANGEMENT OF SYSTEMS. THEY ARE NOT TO
BE CONSIDERED FABRICATION/COORDINATION/SHOP DRAWINGS. COORDINATION WITH OTHER TRADES IS REQUIRED. PROVIDE THE
ADDITIONAL FITTINGS AND OFFSETS THAT WILL BE REQUIRED TO COMPLETE EACH SYSTEM AND TO AVOID INTERFERENCES WITH ALL
OTHER SYSTEMS INCLUDING THE STRUCTURE, SHEET METAL, OTHER PIPING SYSTEMS, ELECTRICAL CONDUITS, BUS DUCTS, CABLE
TRAY, LIGHT FIXTURES, ETC. AND/OR OTHER SPACE CONSTRAINTS.

$
$

W-L W-M W-N


2 INSTALL SYSTEMS SUCH THAT REQUIRED CLEARANCE AND SERVICE ACCESS SPACE IS PROVIDED AROUND ALL MECHANICAL AND
ELECTRICAL EQUIPMENT, AND AROUND ANY COMPONENTS WHICH REQUIRE SERVICE ACCESS.
3 PIPING AND DUCTWORK SHALL NOT BE INSTALLED ABOVE ELECTRICAL TRANSFORMERS, SWITCHBOARDS, PANELBOARDS OR MOTOR
CONTROL CENTERS.
4 MINIMUM RUN-OUT PIPE SIZE TO SPRINKLER HEADS SHALL BE 1".
5 PROVIDE AN AUTOMATIC WET PIPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 <<<LIGHT HAZARD>>> CLASSIFICATION.
22 HYDRAULIC CALCULATIONS SHALL BE BASED ON DENSITY OF <<<0.10>>> GPM/SQ FT. OVER THE MOST REMOTE <<<1500>>> SQ. FT.
6 BUILDING 1 WEST: THERE IS NO RECENT FLOW TEST INFORMATION. CONTRACTOR SHALL MAKE HIS OWN PRESSURE AND FLOW TEST
PRIOR TO SYSTEM DESIGN.
7 BUILDING 1 EAST: ACCORDING TO THE MOST RECENT FLOW TEST INFORMATION MADE AVAILABLE BY THE OWNER, THE STATIC
VENT STORAGE
PRESSURE IS 201 PSI AND THE RESIDUAL PRESSURE IS 68.2 PSI WITH 250 GPM FLOWING. CONTRACTOR SHALL MAKE HIS OWN
B452 PRESSURE AND FLOW TEST PRIOR TO SYSTEM DESIGN.
# CONSTRUCTION KEY NOTES:

%
%

ASST. CHIEF RESP.


CARE 1 RELOCATE AND/OR REPLACE FIRE PROTECTION SPRINKLERS IN THIS AREA AS REQUIRED BY THE NEW WORK. REFER TO REFLECTED
B450 21 CEILING PLANS AND COORDINATE EXACT SPRINKLER HEAD TYPES AND LOCATIONS WITH ARCHITECTURAL TRADES.
SET-UP
B451
CHIEF RESP. CARE
B448 1
REPROCESSING
B449
CHIEF OF PULMONARY
B446 VENT HOLDING
B447
20
CASE MANAGER
SECRETARY B444
B445
HOME CARE

&
&

HALLWAY
COORDINATOR
C408
B443
COPY/PRINTER
B441
1
19
UP HALLWAY
B431
REPORT ROOM
B431D
RESP. CLINICIAL

'
'

SUPPORT PHYSICIAN
B431A B431B PHYSICIAN
B431C
17
W-I W-J W-K

(
(

FOURTH FLOOR FIRE PROTECTION PLAN - PHASE 1


SCALE: 1/8" = 1'-0"

)
)

5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(


EXPANDED ENDOSCOPY AND

*
*

4TH FLOOR FIRE PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * PROTECTION PLAN - PHASE 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
1
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES M-140
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
FIRE PROTECTION GENERAL NOTES:
E-H 1 THESE DRAWINGS ARE DIAGRAMMATIC, AND REPRESENT THE GENERAL INTENT AND ARRANGEMENT OF SYSTEMS. THEY ARE NOT TO
BE CONSIDERED FABRICATION/COORDINATION/SHOP DRAWINGS. COORDINATION WITH OTHER TRADES IS REQUIRED. PROVIDE THE
ADDITIONAL FITTINGS AND OFFSETS THAT WILL BE REQUIRED TO COMPLETE EACH SYSTEM AND TO AVOID INTERFERENCES WITH ALL
OTHER SYSTEMS INCLUDING THE STRUCTURE, SHEET METAL, OTHER PIPING SYSTEMS, ELECTRICAL CONDUITS, BUS DUCTS, CABLE
TRAY, LIGHT FIXTURES, ETC. AND/OR OTHER SPACE CONSTRAINTS.

$
$

2 INSTALL SYSTEMS SUCH THAT REQUIRED CLEARANCE AND SERVICE ACCESS SPACE IS PROVIDED AROUND ALL MECHANICAL AND
E-H ELECTRICAL EQUIPMENT, AND AROUND ANY COMPONENTS WHICH REQUIRE SERVICE ACCESS.
3 PIPING AND DUCTWORK SHALL NOT BE INSTALLED ABOVE ELECTRICAL TRANSFORMERS, SWITCHBOARDS, PANELBOARDS OR MOTOR
CONTROL CENTERS.
4 MINIMUM RUN-OUT PIPE SIZE TO SPRINKLER HEADS SHALL BE 1".
5 PROVIDE AN AUTOMATIC WET PIPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 <<<LIGHT HAZARD>>> CLASSIFICATION.
HYDRAULIC CALCULATIONS SHALL BE BASED ON DENSITY OF <<<0.10>>> GPM/SQ FT. OVER THE MOST REMOTE <<<1500>>> SQ. FT.
6 BUILDING 1 WEST: THERE IS NO RECENT FLOW TEST INFORMATION. CONTRACTOR SHALL MAKE HIS OWN PRESSURE AND FLOW TEST
9 PRIOR TO SYSTEM DESIGN.
7 BUILDING 1 EAST: ACCORDING TO THE MOST RECENT FLOW TEST INFORMATION MADE AVAILABLE BY THE OWNER, THE STATIC
PRESSURE IS 201 PSI AND THE RESIDUAL PRESSURE IS 68.2 PSI WITH 250 GPM FLOWING. CONTRACTOR SHALL MAKE HIS OWN
PRESSURE AND FLOW TEST PRIOR TO SYSTEM DESIGN.
9
# CONSTRUCTION KEY NOTES:
UP

%
%

1 RELOCATE AND/OR REPLACE FIRE PROTECTION SPRINKLERS IN THIS AREA AS REQUIRED BY THE NEW WORK. REFER TO REFLECTED
CEILING PLANS AND COORDINATE EXACT SPRINKLER HEAD TYPES AND LOCATIONS WITH ARCHITECTURAL TRADES.
E-E E-F E-G
UP
8
E-E E-F E-G
8
CORRIDOR 1
C7-28
ENDO/BRONCS
PROCEDURE ROOM - 2
PT. TOILET D709
D701P SCOPE STORAGE
CLEAN UTILITY D711C 1
D708
PRE/POST-OP 14

&
&

D701Q
BARIATRIC
PRE/POST-OP 13 - 7
PRIVACY ANTE ROOM DECON
D711 D711A
D701N PT. TOILET HLD
D706 D711B
7
ENDOSCOPY
SOILED HOLDING PROCEDURE ROOM - 3
PRE/POST-OP 11 D710 D713
D701M PRE/POST-OP 12
D701L SCOPE STORAGE
D715C
ST. TOILET
D714
ANTE ROOM
PRE/POST-OP 9 PRE/POST-OP 10HYDRATION STATION D715
D701K D701J D716 DECON
HLD
D715A
D715B

'
'

CORRIDOR
6 C7-29
HYDRATION STATION NURSE NOURISHMENT
D705 D701H D718
ENDOSCOPY SCOPE STORAGE
6 PROCEDURE ROOM - 2 D715D
PT. TOILET
D717
D704
CORRIDOR
CORRIDOR C7-30
C7-31
ST. TOILET
D728
LINEN
D703
MEDS
PRE/POST-OP 8 D720 SCOPE STORAGE
D701G D721C
CORRIDOR ENDOSCOPY
PRE/POST-OP 7 C7-32
E-K
PROCEDURE ROOM - 1
D701F
D719
KAREN'S OFFICE
D722
4

(
(

5
PRE/POST-OP 6
D701E ANTE ROOM HLD
D721 DECON D721B
D721A 1
PRE/POST-OP 5
5 D701D
PT. TOILET
D702 STORAGE
D724
SCOPE STORAGE
PRE/POST-OP 3 D721D TEMPORARY WAIT AND
D701C CHECK-IN
PRE/POST-OP 4 C7-8
ERCP/BRONCS
D701B IT
PROCEDURE ROOM - 1
D727
D723
HSK
PRE/POST-OP 1 D725 3
D701A PHYS LAB
D726 4
STORAGE
D700

)
)

4 REF.
SEVENTH FLOOR FIRE PROTECTION PLAN - PHASE 3 SEVENTH FLOOR FIRE PROTECTION PLAN - PHASE 4 SEVENTH FLOOR FIRE PROTECTION PLAN - PHASE 2
SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

7TH FLOOR FIRE PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * PROTECTION PLAN - 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
PHASES 2, 3 & 4
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES M-170.A
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
FIRE PROTECTION GENERAL NOTES:
1 THESE DRAWINGS ARE DIAGRAMMATIC, AND REPRESENT THE GENERAL INTENT AND ARRANGEMENT OF SYSTEMS. THEY ARE NOT TO
BE CONSIDERED FABRICATION/COORDINATION/SHOP DRAWINGS. COORDINATION WITH OTHER TRADES IS REQUIRED. PROVIDE THE
ADDITIONAL FITTINGS AND OFFSETS THAT WILL BE REQUIRED TO COMPLETE EACH SYSTEM AND TO AVOID INTERFERENCES WITH ALL
OTHER SYSTEMS INCLUDING THE STRUCTURE, SHEET METAL, OTHER PIPING SYSTEMS, ELECTRICAL CONDUITS, BUS DUCTS, CABLE
TRAY, LIGHT FIXTURES, ETC. AND/OR OTHER SPACE CONSTRAINTS.

$
$

E-H
E-H 2 INSTALL SYSTEMS SUCH THAT REQUIRED CLEARANCE AND SERVICE ACCESS SPACE IS PROVIDED AROUND ALL MECHANICAL AND
ELECTRICAL EQUIPMENT, AND AROUND ANY COMPONENTS WHICH REQUIRE SERVICE ACCESS.
3 PIPING AND DUCTWORK SHALL NOT BE INSTALLED ABOVE ELECTRICAL TRANSFORMERS, SWITCHBOARDS, PANELBOARDS OR MOTOR
CONTROL CENTERS.
4 MINIMUM RUN-OUT PIPE SIZE TO SPRINKLER HEADS SHALL BE 1".
5 PROVIDE AN AUTOMATIC WET PIPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 <<<LIGHT HAZARD>>> CLASSIFICATION.
HYDRAULIC CALCULATIONS SHALL BE BASED ON DENSITY OF <<<0.10>>> GPM/SQ FT. OVER THE MOST REMOTE <<<1500>>> SQ. FT.
6 BUILDING 1 WEST: THERE IS NO RECENT FLOW TEST INFORMATION. CONTRACTOR SHALL MAKE HIS OWN PRESSURE AND FLOW TEST
PRIOR TO SYSTEM DESIGN.
7 BUILDING 1 EAST: ACCORDING TO THE MOST RECENT FLOW TEST INFORMATION MADE AVAILABLE BY THE OWNER, THE STATIC
PRESSURE IS 201 PSI AND THE RESIDUAL PRESSURE IS 68.2 PSI WITH 250 GPM FLOWING. CONTRACTOR SHALL MAKE HIS OWN
PRESSURE AND FLOW TEST PRIOR TO SYSTEM DESIGN.
9 9
# CONSTRUCTION KEY NOTES:

%
%

1 RELOCATE AND/OR REPLACE FIRE PROTECTION SPRINKLERS IN THIS AREA AS REQUIRED BY THE NEW WORK. REFER TO REFLECTED
CEILING PLANS AND COORDINATE EXACT SPRINKLER HEAD TYPES AND LOCATIONS WITH ARCHITECTURAL TRADES.
UP UP
E-E E-F E-G E-E E-F E-G
1
8 8
NURSE
D707
1
TECH SUPERVISOR
OFFICE
D729

&
&

7 7

'
'

6 6

(
(

5 5

)
)

4 4
SEVENTH FLOOR FIRE PROTECTION PLAN - PHASE 4A SEVENTH FLOOR FIRE PROTECTION PLAN - PHASE 4B
SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

7TH FLOOR FIRE PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * PROTECTION PLAN - 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
PHASES 4A & 4B
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES M-170.B
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1" E-E E-F E-G

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
9 PLUMBING GENERAL NOTES:
1 THESE DRAWINGS ARE DIAGRAMMATIC, AND REPRESENT THE GENERAL INTENT AND ARRANGEMENT OF SYSTEMS. THEY ARE NOT TO
BE CONSIDERED FABRICATION/COORDINATION/SHOP DRAWINGS. COORDINATION WITH OTHER TRADES IS REQUIRED. PROVIDE THE
ADDITIONAL FITTINGS AND OFFSETS THAT WILL BE REQUIRED TO COMPLETE EACH SYSTEM AND TO AVOID INTERFERENCES WITH ALL
OTHER SYSTEMS INCLUDING THE STRUCTURE, SHEET METAL, OTHER PIPING SYSTEMS, ELECTRICAL CONDUITS, BUS DUCTS, CABLE
TRAY, LIGHT FIXTURES, ETC. AND/OR OTHER SPACE CONSTRAINTS.
THESE DRAWINGS ARE DIAGRAMMATIC, AND REPRESENT THE GENERAL INTENT AND ARRANGEMENT OF SYSTEMS. THEY ARE NOT TO
(E)1 1/2 LA(100#) BE CONSIDERED FABRICATION/COORDINATION/SHOP DRAWINGS. COORDINATION WITH OTHER TRADES IS REQUIRED. PROVIDE THE
(E)1 1/2 G

$
$

(E)2 LV ADDITIONAL FITTINGS AND OFFSETS THAT WILL BE REQUIRED TO COMPLETE EACH SYSTEM AND TO AVOID INTERFERENCES WITH ALL
OTHER SYSTEMS INCLUDING THE STRUCTURE, SHEET METAL, OTHER PIPING SYSTEMS, ELECTRICAL CONDUITS, BUS DUCTS, CABLE
TRAY, LIGHT FIXTURES, ETC. AND/OR OTHER SPACE CONSTRAINTS.
3/4"
2 INSTALL SYSTEMS SUCH THAT REQUIRED CLEARANCE AND SERVICE ACCESS SPACE IS PROVIDED AROUND ALL MECHANICAL AND
3/4"
ELECTRICAL EQUIPMENT, AND AROUND ANY COMPONENTS WHICH REQUIRE SERVICE ACCESS.
LV
LA
G 3 PIPING AND DUCTWORK SHALL NOT BE INSTALLED ABOVE ELECTRICAL TRANSFORMERS, SWITCHBOARDS, PANELBOARDS OR MOTOR
3/4" CONTROL CENTERS.
8
PROVIDE PRESSURE 4 COORDINATE AND PROVIDE ACCESS DOORS WITHIN INACCESSIBLE CEILING, SHAFT, AND CHASE AREAS FOR ALL COMPONENTS WHICH
REDUCING VALVE FOR REQUIRE SERVICE ACCESS. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.
LAB AIR (100# TO 50#)
5 PROVIDE SUPPLEMENTARY STEEL AS REQUIRED FOR THE PROPER SUPPORT OF ALL SYSTEMS.
6 REFER TO ARCHITECTURAL PLANS FOR DIMENSIONED LOCATIONS OF PLUMBING FIXTURES.
7 HOT AND COLD WATER PIPING RUN-OUTS TO LAVATORIES AND SINKS SHALL BE 1/2" UNLESS OTHERWISE NOTED.
8 PLUMBING VENT PIPING THROUGH ROOF SHALL BE LOCATED A MINIMUM OF 10'-0" FROM ANY FRESH AIR INTAKE LOCATION AND A
MINIMUM OF 18" CLEAR FROM THE INSIDE FACE OF PARAPET.
9 PROVIDE CODE REQUIRED CLEARANCE FOR ALL CLEANOUTS INSTALLED IN SANITARY WASTE AND VENT PIPING.

%
%

10 MINIMUM UNDERGROUND PIPE SIZE SHALL BE 3".


LV
LA

7
G

# PLUMBING CONSTRUCTION KEY NOTES:


1 PROVIDE ROUGH-IN AND FINAL CONNECTION FOR GASSES FOR RELOCATED HOOD. 1/2 LA, 1/2 LV, 1/2 G.
2 PROVIDE ROUGH-IN AND FINAL CONNECTION FOR SINK FURNISHED AS PART OF MEDICAL CASEWORK. FURNISH AND INSTALL FAUCET
AND DRAIN IN MEDICAL CASEWORK. REFER TO SPECIFICATIONS.
3 PROVIDE ROUGH-IN AND FINAL CONNECTION FOR ICE MAKER.
4 3/4 DHW, 3/4 DCW, 1 1/2 VENT, 2 SS
5 3/4 DHW, 1 1/2 DCW, 2 VENT, 4 SS
6 1 1/2 DCW, 2 VENT, 4 SS
7 3/4 DCW, 1 1/2 VENT, 2 SS. PROVIDE INDIRECT WASTE DRAIN TO SS. REFER TO DETAIL ON M-601.

&
&

8 1 1/2 DCW, 2 VENT


9 3/4 DHW, 3/4 DCW, 2 VENT, 3 SS. PROVIDE BFP, FILTERS, GAUGES, MIXING VALVES, AND R.O. SYSTEM PER EQUIPMENT
6 MANUFACTURER'S REQUIREMENTS.
10 ROUTE 2 VENT ABOVE CEILING TO NEAREST 2 OR LARGER EXISTING VENT PIPING AND CONNECT. ROUTE 3 SS BELOW FLOOR IN THIRD
FLOOR CEILING SPACE TO NEAREST 3 OR LARGER EXISTING SS PIPING AND CONNECT. REFER TO 3-COMPARTMENT SINK PLUMBING
DIAGRAM ON SHEET M-601.
11 PROVIDE 2 MICRON FILTER ON EACH HOT AND COLD WATER INLET TO FAUCET. MATCH EXISTING.
3/4"
3/4"
3/4"

'
'

5
W-I W-J W-K W-L W-M W-N W-P W-Q W-R

LV
LA
G
22
VENT STORAGE
B452

(
(

4
ASST. CHIEF RESP.
CARE
B450
21
CHIEF RESP. CARE
2" SET-UP
B448
B451 2 V UP
3 SS DN

DCW
DHW
3/4" REPROCESSING
B449 10
CHIEF OF PULMONARY
DHW
B446 DCW
P-531
3/4" VENT HOLDING
B447 1
HALLWAY
20 C408
3
SS

)
)

SS

LV
LA
SECRETARY CASE MANAGER

G
B445 B444

G
LA
LV
HOME CARE
COORDINATOR
B443
3/4" COPY/PRINTER
3/4" B441
3/4"
2 FOURTH FLOOR PLUMBING PLAN - PHASE 1
EXPANSION LOOPS AT BUILDING EXPANSION
LV SCALE: 1/8" = 1'-0"
LA
G
BUILDING EXPANSION JOINT
1
19
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
UP
HALLWAY EXPANDED ENDOSCOPY AND

*
*

REPORT ROOM 4TH FLOOR PLUMBING NEW PULMONARY CLINICAL SPACES


B431
B431D
2) 0 ,&+ ,
7( * WORK PLAN - PHASE 1 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
RESP. CLINICIAL 3$8/ 3HWHU%DVVR$VVRFLDWHV,QF
SUPPORT PHYSICIAN

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
PHYSICIAN &2168/7,1*(1*,1((56
B431A B431B 1R

1 ((
B431C 07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
17 ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES M-240
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
PLUMBING GENERAL NOTES:
1 THESE DRAWINGS ARE DIAGRAMMATIC, AND REPRESENT THE GENERAL INTENT AND ARRANGEMENT OF SYSTEMS. THEY ARE NOT TO
BE CONSIDERED FABRICATION/COORDINATION/SHOP DRAWINGS. COORDINATION WITH OTHER TRADES IS REQUIRED. PROVIDE THE
ADDITIONAL FITTINGS AND OFFSETS THAT WILL BE REQUIRED TO COMPLETE EACH SYSTEM AND TO AVOID INTERFERENCES WITH ALL
OTHER SYSTEMS INCLUDING THE STRUCTURE, SHEET METAL, OTHER PIPING SYSTEMS, ELECTRICAL CONDUITS, BUS DUCTS, CABLE
TRAY, LIGHT FIXTURES, ETC. AND/OR OTHER SPACE CONSTRAINTS.

$
$

E-H E-H THESE DRAWINGS ARE DIAGRAMMATIC, AND REPRESENT THE GENERAL INTENT AND ARRANGEMENT OF SYSTEMS. THEY ARE NOT TO
BE CONSIDERED FABRICATION/COORDINATION/SHOP DRAWINGS. COORDINATION WITH OTHER TRADES IS REQUIRED. PROVIDE THE
ADDITIONAL FITTINGS AND OFFSETS THAT WILL BE REQUIRED TO COMPLETE EACH SYSTEM AND TO AVOID INTERFERENCES WITH ALL
OTHER SYSTEMS INCLUDING THE STRUCTURE, SHEET METAL, OTHER PIPING SYSTEMS, ELECTRICAL CONDUITS, BUS DUCTS, CABLE
TRAY, LIGHT FIXTURES, ETC. AND/OR OTHER SPACE CONSTRAINTS.
2 INSTALL SYSTEMS SUCH THAT REQUIRED CLEARANCE AND SERVICE ACCESS SPACE IS PROVIDED AROUND ALL MECHANICAL AND
ELECTRICAL EQUIPMENT, AND AROUND ANY COMPONENTS WHICH REQUIRE SERVICE ACCESS.
3 PIPING AND DUCTWORK SHALL NOT BE INSTALLED ABOVE ELECTRICAL TRANSFORMERS, SWITCHBOARDS, PANELBOARDS OR MOTOR
CONTROL CENTERS.
4 COORDINATE AND PROVIDE ACCESS DOORS WITHIN INACCESSIBLE CEILING, SHAFT, AND CHASE AREAS FOR ALL COMPONENTS WHICH
REQUIRE SERVICE ACCESS. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.
5 PROVIDE SUPPLEMENTARY STEEL AS REQUIRED FOR THE PROPER SUPPORT OF ALL SYSTEMS.
6 REFER TO ARCHITECTURAL PLANS FOR DIMENSIONED LOCATIONS OF PLUMBING FIXTURES.
9 9
7 HOT AND COLD WATER PIPING RUN-OUTS TO LAVATORIES AND SINKS SHALL BE 1/2" UNLESS OTHERWISE NOTED.
8 PLUMBING VENT PIPING THROUGH ROOF SHALL BE LOCATED A MINIMUM OF 10'-0" FROM ANY FRESH AIR INTAKE LOCATION AND A
MINIMUM OF 18" CLEAR FROM THE INSIDE FACE OF PARAPET.

%
%

9 PROVIDE CODE REQUIRED CLEARANCE FOR ALL CLEANOUTS INSTALLED IN SANITARY WASTE AND VENT PIPING.
10 MINIMUM UNDERGROUND PIPE SIZE SHALL BE 3".
E-E E-F E-G
E-E E-F E-G
8 8 # PLUMBING CONSTRUCTION KEY NOTES:
SS
CO 2" 4" 4" 1 PROVIDE ROUGH-IN AND FINAL CONNECTION FOR GASSES FOR RELOCATED HOOD. 1/2 LA, 1/2 LV, 1/2 G.
SS SS
2 PROVIDE ROUGH-IN AND FINAL CONNECTION FOR SINK FURNISHED AS PART OF MEDICAL CASEWORK. FURNISH AND INSTALL FAUCET
4" 4" AND DRAIN IN MEDICAL CASEWORK. REFER TO SPECIFICATIONS.
4" SS UP
4"
2" SS UP 3 PROVIDE ROUGH-IN AND FINAL CONNECTION FOR ICE MAKER.
2" SS UP
4 3/4 DHW, 3/4 DCW, 1 1/2 VENT, 2 SS

SS
2" SS UP
SS
V

5 3/4 DHW, 1 1/2 DCW, 2 VENT, 4 SS

V
4"

&
&

2" 4"
3" 6 1 1/2 DCW, 2 VENT, 4 SS
CO SS
SS 3" SS CO 7 3/4 DCW, 1 1/2 VENT, 2 SS. PROVIDE INDIRECT WASTE DRAIN TO SS. REFER TO DETAIL ON M-601.
4" SS UP 3"
2" SS UP
8 1 1/2 DCW, 2 VENT
2" SS UP
2" SS UP 2" SS UP
7 2" SS UP 7 9 3/4 DHW, 3/4 DCW, 2 VENT, 3 SS. PROVIDE BFP, FILTERS, GAUGES, MIXING VALVES, AND R.O. SYSTEM PER EQUIPMENT
2" SS UP
3" 3" 4" MANUFACTURER'S REQUIREMENTS.
CO SS
3" SS UP 10 ROUTE 2 VENT ABOVE CEILING TO NEAREST 2 OR LARGER EXISTING VENT PIPING AND CONNECT. ROUTE 3 SS BELOW FLOOR IN THIRD
4"
FLOOR CEILING SPACE TO NEAREST 3 OR LARGER EXISTING SS PIPING AND CONNECT. REFER TO 3-COMPARTMENT SINK PLUMBING
DIAGRAM ON SHEET M-601.
2" SS UP
3" SS UP
2" SS UP 3" 11 PROVIDE 2 MICRON FILTER ON EACH HOT AND COLD WATER INLET TO FAUCET. MATCH EXISTING.
2" SS UP
4" SS UP
2" SS UP
2" SS UP

SS
2" SS UP
3" SS UP
2" SS UP CO

'
'

SS SS CO
2" SS UP 3" 2" SS UP
4" SS UP 3"
2" SS UP
3" SS UP
6 6 SS CO
2" SS UP 3"
2" SS UP
4" 4"
SS
CO
4"
2" SS UP
2" SS UP
4" SS UP

SS
V

SS
V
SS
2" SS UP
4"
2" SS UP 4"
2" SS UP 4" 2"
SS CO
2" SS UP

(
(

2" SS UP 2" SS UP
2"
2" SS UP
5 CO SS 5 3"
3" SS UP
4" SS CO
3" SS UP
4" SS UP
4" 4"
3" SS UP
2" SS UP 2" SS UP
2"
CO SS
2" 4" 3"
2" SS UP SS CO
3"
2" SS UP
2" SS UP
2" SS UP

SS

SS

)
)

V
3" SS UP
4 4
SIXTH FLOOR INTERSTITIAL PLUMBING PLAN - PHASE 3 SIXTH FLOOR INTERSTITIAL PLUMBING PLAN - PHASE 4
SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

6TH FLOOR PLUMBING NEW PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * WORK PLAN - PHASES 3 & 4 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES M-260
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
PLUMBING GENERAL NOTES:
1 THESE DRAWINGS ARE DIAGRAMMATIC, AND REPRESENT THE GENERAL INTENT AND ARRANGEMENT OF SYSTEMS. THEY ARE NOT TO
BE CONSIDERED FABRICATION/COORDINATION/SHOP DRAWINGS. COORDINATION WITH OTHER TRADES IS REQUIRED. PROVIDE THE
ADDITIONAL FITTINGS AND OFFSETS THAT WILL BE REQUIRED TO COMPLETE EACH SYSTEM AND TO AVOID INTERFERENCES WITH ALL
OTHER SYSTEMS INCLUDING THE STRUCTURE, SHEET METAL, OTHER PIPING SYSTEMS, ELECTRICAL CONDUITS, BUS DUCTS, CABLE
TRAY, LIGHT FIXTURES, ETC. AND/OR OTHER SPACE CONSTRAINTS.

$
$

THESE DRAWINGS ARE DIAGRAMMATIC, AND REPRESENT THE GENERAL INTENT AND ARRANGEMENT OF SYSTEMS. THEY ARE NOT TO
E-H BE CONSIDERED FABRICATION/COORDINATION/SHOP DRAWINGS. COORDINATION WITH OTHER TRADES IS REQUIRED. PROVIDE THE
E-H ADDITIONAL FITTINGS AND OFFSETS THAT WILL BE REQUIRED TO COMPLETE EACH SYSTEM AND TO AVOID INTERFERENCES WITH ALL
OTHER SYSTEMS INCLUDING THE STRUCTURE, SHEET METAL, OTHER PIPING SYSTEMS, ELECTRICAL CONDUITS, BUS DUCTS, CABLE
TRAY, LIGHT FIXTURES, ETC. AND/OR OTHER SPACE CONSTRAINTS.
2 INSTALL SYSTEMS SUCH THAT REQUIRED CLEARANCE AND SERVICE ACCESS SPACE IS PROVIDED AROUND ALL MECHANICAL AND
ELECTRICAL EQUIPMENT, AND AROUND ANY COMPONENTS WHICH REQUIRE SERVICE ACCESS.
3 PIPING AND DUCTWORK SHALL NOT BE INSTALLED ABOVE ELECTRICAL TRANSFORMERS, SWITCHBOARDS, PANELBOARDS OR MOTOR
CONTROL CENTERS.
4 COORDINATE AND PROVIDE ACCESS DOORS WITHIN INACCESSIBLE CEILING, SHAFT, AND CHASE AREAS FOR ALL COMPONENTS WHICH
REQUIRE SERVICE ACCESS. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.
5 PROVIDE SUPPLEMENTARY STEEL AS REQUIRED FOR THE PROPER SUPPORT OF ALL SYSTEMS.
6 REFER TO ARCHITECTURAL PLANS FOR DIMENSIONED LOCATIONS OF PLUMBING FIXTURES.
9 9 7 HOT AND COLD WATER PIPING RUN-OUTS TO LAVATORIES AND SINKS SHALL BE 1/2" UNLESS OTHERWISE NOTED.
8 PLUMBING VENT PIPING THROUGH ROOF SHALL BE LOCATED A MINIMUM OF 10'-0" FROM ANY FRESH AIR INTAKE LOCATION AND A
MINIMUM OF 18" CLEAR FROM THE INSIDE FACE OF PARAPET.

%
%

9 PROVIDE CODE REQUIRED CLEARANCE FOR ALL CLEANOUTS INSTALLED IN SANITARY WASTE AND VENT PIPING.
10 MINIMUM UNDERGROUND PIPE SIZE SHALL BE 3".
UP UP
E-E E-F E-G E-E E-F E-G
(E)EWC
# PLUMBING CONSTRUCTION KEY NOTES:
8 8
CORRIDOR 1 PROVIDE ROUGH-IN AND FINAL CONNECTION FOR GASSES FOR RELOCATED HOOD. 1/2 LA, 1/2 LV, 1/2 G.
C7-28
DHW 2 PROVIDE ROUGH-IN AND FINAL CONNECTION FOR SINK FURNISHED AS PART OF MEDICAL CASEWORK. FURNISH AND INSTALL FAUCET
4 V 5 4 AND DRAIN IN MEDICAL CASEWORK. REFER TO SPECIFICATIONS.
DCW 3 PROVIDE ROUGH-IN AND FINAL CONNECTION FOR ICE MAKER.
P-408 P-116
PT. TOILET
4 3/4 DHW, 3/4 DCW, 1 1/2 VENT, 2 SS
D701P 2 ENDO/BRONCS
CLEAN UTILITY
4 PROCEDURE ROOM - 2
PRE/POST-OP 14 D708 5 3/4 DHW, 1 1/2 DCW, 2 VENT, 4 SS
D709
D701Q

&
&

BARIATRIC
2 SCOPE STORAGE 6 1 1/2 DCW, 2 VENT, 4 SS
PRE/POST-OP 13 -
PRIVACY D711C
D701N 7 3/4 DCW, 1 1/2 VENT, 2 SS. PROVIDE INDIRECT WASTE DRAIN TO SS. REFER TO DETAIL ON M-601.
PT. TOILET 4 P-525-R 4
D706 6 4
2 8 1 1/2 DCW, 2 VENT
P-408 P-104 P-408
4 9 3/4 DHW, 3/4 DCW, 2 VENT, 3 SS. PROVIDE BFP, FILTERS, GAUGES, MIXING VALVES, AND R.O. SYSTEM PER EQUIPMENT
SOILED HOLDING P-710 MANUFACTURER'S REQUIREMENTS.
7 D710
7 P-524
2 11 9
4 DECON HLD
PRE/POST-OP 11 4 P-408 ANTE ROOM 10 ROUTE 2 VENT ABOVE CEILING TO NEAREST 2 OR LARGER EXISTING VENT PIPING AND CONNECT. ROUTE 3 SS BELOW FLOOR IN THIRD
PRE/POST-OP 12 D711A D711B
D701M D711 FLOOR CEILING SPACE TO NEAREST 3 OR LARGER EXISTING SS PIPING AND CONNECT. REFER TO 3-COMPARTMENT SINK PLUMBING
D701L 9 DIAGRAM ON SHEET M-601.
2
4 4 2 6 4 11 PROVIDE 2 MICRON FILTER ON EACH HOT AND COLD WATER INLET TO FAUCET. MATCH EXISTING.
P-408 ST. TOILET
D714 ENDOSCOPY
P-103 PROCEDURE ROOM - 3
HYDRATION STATION 4 D713
D716 SCOPE STORAGE
2 2 D715C
P-528 2
PRE/POST-OP 10 4
PRE/POST-OP 9 D701J
D701K P-610 3 4 P-525-R
9

'
'

ANTE ROOM HLD


HYDRATION STATION P-528 DECON
NOURISHMENT D715 D715B
D705 D715A 9
4 11
6 D718 2 P-524
NURSE 3
DCW D701H
V
P-104 P-710
6
PT. TOILET 8
6 P-408
7 CORRIDOR
D704 P-408 P-525-L
4 4 C7-29
CORRIDOR 4 CORRIDOR 4
4
C7-31 C7-30
4 2 SCOPE STORAGE
LINEN D715D
D703
P-408 6
ENDOSCOPY
PRE/POST-OP 8 MEDS PROCEDURE ROOM - 2 ST. TOILET
P-103
D701G D720 D717 D728
P-408
4 2
PRE/POST-OP 7
D701F
4
SCOPE STORAGE
4 ENDOSCOPY
2 4 D721C
KAREN'S OFFICE PROCEDURE ROOM - 1
2 D722 D719
4
2

(
(

PRE/POST-OP 6
D701E P-408
4
2 4 P-710
P-525-R
PRE/POST-OP 5
5 STORAGE 5
D701D 9
P-408 D724 ANTE ROOM
PT. TOILET DECON HLD
D721
D702 6 D721A D721B
2 11 P-524
P-104 9
PRE/POST-OP 3
4
D701C
PRE/POST-OP 4
2 4 4 D701B 4 P-525-L
4
2 P-524 SCOPE STORAGE
D721D
4
P-408
ERCP/BRONCS
2 4 PROCEDURE ROOM - 1 IT
D723 D727
PRE/POST-OP 1
D701A PHYS LAB 2
STORAGE D726
HSK

)
)

D700 D725
P-502
CORRIDOR 9
C7-4
4 4
SEVENTH FLOOR PLUMBING PLAN - PHASE 3 SEVENTH FLOOR PLUMBING PLAN - PHASE 4
SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

7TH FLOOR PLUMBING NEW PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * WORK PLAN - PHASES 3 & 4 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES M-270
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE. E-E E-F
PLUMBING GENERAL NOTES:
1 THESE DRAWINGS ARE DIAGRAMMATIC, AND REPRESENT THE GENERAL INTENT AND ARRANGEMENT OF SYSTEMS. THEY ARE NOT TO
BE CONSIDERED FABRICATION/COORDINATION/SHOP DRAWINGS. COORDINATION WITH OTHER TRADES IS REQUIRED. PROVIDE THE
ADDITIONAL FITTINGS AND OFFSETS THAT WILL BE REQUIRED TO COMPLETE EACH SYSTEM AND TO AVOID INTERFERENCES WITH ALL
OTHER SYSTEMS INCLUDING THE STRUCTURE, SHEET METAL, OTHER PIPING SYSTEMS, ELECTRICAL CONDUITS, BUS DUCTS, CABLE
TRAY, LIGHT FIXTURES, ETC. AND/OR OTHER SPACE CONSTRAINTS.

$
$

E-H THESE DRAWINGS ARE DIAGRAMMATIC, AND REPRESENT THE GENERAL INTENT AND ARRANGEMENT OF SYSTEMS. THEY ARE NOT TO
BE CONSIDERED FABRICATION/COORDINATION/SHOP DRAWINGS. COORDINATION WITH OTHER TRADES IS REQUIRED. PROVIDE THE
ADDITIONAL FITTINGS AND OFFSETS THAT WILL BE REQUIRED TO COMPLETE EACH SYSTEM AND TO AVOID INTERFERENCES WITH ALL
OTHER SYSTEMS INCLUDING THE STRUCTURE, SHEET METAL, OTHER PIPING SYSTEMS, ELECTRICAL CONDUITS, BUS DUCTS, CABLE
TRAY, LIGHT FIXTURES, ETC. AND/OR OTHER SPACE CONSTRAINTS.
2 INSTALL SYSTEMS SUCH THAT REQUIRED CLEARANCE AND SERVICE ACCESS SPACE IS PROVIDED AROUND ALL MECHANICAL AND
ELECTRICAL EQUIPMENT, AND AROUND ANY COMPONENTS WHICH REQUIRE SERVICE ACCESS.
3 PIPING AND DUCTWORK SHALL NOT BE INSTALLED ABOVE ELECTRICAL TRANSFORMERS, SWITCHBOARDS, PANELBOARDS OR MOTOR
CONTROL CENTERS.
4 COORDINATE AND PROVIDE ACCESS DOORS WITHIN INACCESSIBLE CEILING, SHAFT, AND CHASE AREAS FOR ALL COMPONENTS WHICH
REQUIRE SERVICE ACCESS. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.
5 PROVIDE SUPPLEMENTARY STEEL AS REQUIRED FOR THE PROPER SUPPORT OF ALL SYSTEMS.
6 REFER TO ARCHITECTURAL PLANS FOR DIMENSIONED LOCATIONS OF PLUMBING FIXTURES.
9 9
7 HOT AND COLD WATER PIPING RUN-OUTS TO LAVATORIES AND SINKS SHALL BE 1/2" UNLESS OTHERWISE NOTED.
8 PLUMBING VENT PIPING THROUGH ROOF SHALL BE LOCATED A MINIMUM OF 10'-0" FROM ANY FRESH AIR INTAKE LOCATION AND A
MINIMUM OF 18" CLEAR FROM THE INSIDE FACE OF PARAPET.

%
%

9 PROVIDE CODE REQUIRED CLEARANCE FOR ALL CLEANOUTS INSTALLED IN SANITARY WASTE AND VENT PIPING.
DN DN E-G E-H 10 MINIMUM UNDERGROUND PIPE SIZE SHALL BE 3".
E-E E-F E-G
8 3/4" 2" 2" 8 # PLUMBING CONSTRUCTION KEY NOTES:
V V
V V 3/4" DHWR
DHW
DHWR DCW 1 PROVIDE ROUGH-IN AND FINAL CONNECTION FOR GASSES FOR RELOCATED HOOD. 1/2 LA, 1/2 LV, 1/2 G.
DHW
DCW
2 PROVIDE ROUGH-IN AND FINAL CONNECTION FOR SINK FURNISHED AS PART OF MEDICAL CASEWORK. FURNISH AND INSTALL FAUCET

V
1 1/2" 1" 1 1/2" AND DRAIN IN MEDICAL CASEWORK. REFER TO SPECIFICATIONS.
1"
5
DHW

DCW

3 PROVIDE ROUGH-IN AND FINAL CONNECTION FOR ICE MAKER.


V

4 4

V
4 3/4 DHW, 3/4 DCW, 1 1/2 VENT, 2 SS
5 3/4 DHW, 1 1/2 DCW, 2 VENT, 4 SS
V

DHWR

&
&

DHWR
DHW

6 1 1/2 DCW, 2 VENT, 4 SS

DHW
4
DCW

4 4 7 3/4 DCW, 1 1/2 VENT, 2 SS. PROVIDE INDIRECT WASTE DRAIN TO SS. REFER TO DETAIL ON M-601.
V

DCW
6

V
4 V
4 8 1 1/2 DCW, 2 VENT
4

V
7 7 9 9 3/4 DHW, 3/4 DCW, 2 VENT, 3 SS. PROVIDE BFP, FILTERS, GAUGES, MIXING VALVES, AND R.O. SYSTEM PER EQUIPMENT

V
MANUFACTURER'S REQUIREMENTS.
DHWR DHWR
DHW DHW
DCW DCW 10 ROUTE 2 VENT ABOVE CEILING TO NEAREST 2 OR LARGER EXISTING VENT PIPING AND CONNECT. ROUTE 3 SS BELOW FLOOR IN THIRD
V

V
FLOOR CEILING SPACE TO NEAREST 3 OR LARGER EXISTING SS PIPING AND CONNECT. REFER TO 3-COMPARTMENT SINK PLUMBING
DIAGRAM ON SHEET M-601.
V V
2" 6 2" 11 PROVIDE 2 MICRON FILTER ON EACH HOT AND COLD WATER INLET TO FAUCET. MATCH EXISTING.
4 9
4
4
4
4
4
4
9
2"
2" 3/4"

'
'

3/4" V

V
3/4" DHWR 9
1"
DHWR DHW
8 DHW DCW
DCW
1" 1 1/2"
1 1/2"
1 1/2" 4

V
6 V V
6 1 1/4"
4 4
2"
2"
DHWR

V
7 DHW
DCW
4

DCW
4
4 1 1/2" 2" 6
V
4
4
3/4"
3/4" 4
DHW

V
DCW 4
V V V
1 1/2" DHWR DHWR

(
(

4 DHW DHW
DCW DCW
4
3/4"
2"
5 5 V
4 V V 9
V V

V
DHWR
6 DHW
DCW

V
9

V
V

V
1 1/2"
4

DHWR
1 1/2"

V
V 4 4

DHW
DCW

DHW
DHWR

V
3/4" 1 1/4"
3/4" 1"
DHWR

DCW
V
DHW
DCW
1" 1" 1 1/2"
4
4
4 2"
4
V
DCW
DHW
DHWR

)
)

9
4 4
EIGHTH FLOOR INTERSTITIAL PLUMBING PLAN - PHASE 3 EIGHTH FLOOR INTERSTITIAL PLUMBING PLAN - PHASE 4
SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

8TH FLOOR PLUMBING NEW PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * WORK PLAN - PHASES 3 & 4 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56

(( 5
1R

1
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES M-280
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
HVAC PIPING GENERAL NOTES:
1 THESE DRAWINGS ARE DIAGRAMMATIC, AND REPRESENT THE GENERAL INTENT AND ARRANGEMENT OF SYSTEMS. THEY ARE
NOT TO BE CONSIDERED FABRICATION/COORDINATION/SHOP DRAWINGS. COORDINATION WITH OTHER TRADES IS REQUIRED.
PROVIDE THE ADDITIONAL FITTINGS AND OFFSETS THAT WILL BE REQUIRED TO COMPLETE EACH SYSTEM AND TO AVOID

$
$

INTERFERENCES WITH ALL OTHER SYSTEMS INCLUDING THE STRUCTURE, SHEET METAL, OTHER PIPING SYSTEMS,
ELECTRICAL CONDUITS, BUS DUCTS, CABLE TRAY, LIGHT FIXTURES, ETC. AND/OR OTHER SPACE CONSTRAINTS.
2 INSTALL SYSTEMS SUCH THAT REQUIRED CLEARANCE AND SERVICE ACCESS SPACE IS PROVIDED AROUND ALL MECHANICAL
AND ELECTRICAL EQUIPMENT, AND AROUND ANY COMPONENTS WHICH REQUIRE SERVICE ACCESS.
W-L W-M W-N
3 PIPING AND DUCTWORK SHALL NOT BE INSTALLED ABOVE ELECTRICAL TRANSFORMERS, SWITCHBOARDS, PANELBOARDS OR
MOTOR CONTROL CENTERS.
4 COORDINATE AND PROVIDE ACCESS DOORS WITHIN INACCESSIBLE CEILING, SHAFT, AND CHASE AREAS FOR ALL
COMPONENTS WHICH REQUIRE SERVICE ACCESS. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.
5 PROVIDE SUPPLEMENTARY STEEL AS REQUIRED FOR THE PROPER SUPPORT OF ALL SYSTEMS.
6 SUBMIT PROPOSED METHODS OF ANCHORING AND GUIDING PIPING SYSTEMS TO STRUCTURAL ENGINEER FOR APPROVAL.
22 7 COORDINATE LOCATION OF DUCT-MOUNTED HYDRONIC DEVICES WITH SHEET METAL TRADES.
8 BRANCH PIPING SERVING TERMINAL UNIT HEATING COILS OR RADIANT CEILING PANELS SHALL BE 3/4" UNLESS OTHERWISE
NOTED. BRANCH PIPING SERVING MORE THAN ONE TERMINAL UNIT HEATING COIL SHALL BE 1" UNLESS OTHERWISE NOTED.
VENT STORAGE BRANCH PIPING SERVING HOT WATER UNIT HEATERS AND CABINET UNIT HEATERS SHALL BE 1" UNLESS OTHERWISE NOTED.
B452
9 MOUNT THERMOSTATS 48" A.F.F., UNLESS OTHERWISE NOTED. LOCATE AS CLOSE AS POSSIBLE TO DOOR WHEN INDICATED
NEAR DOOR. COORDINATE EXACT LOCATION WITH ALL OTHER TRADES.

%
%

ASST. CHIEF RESP.


CARE
B450 21
CHR

SET-UP
CHS

B451
# HVAC PIPING CONSTRUCTION KEY NOTES:
HWR
HWS

CHIEF RESP. CARE 1 3/4 HWH & HWHR CONNECTIONS TO NEW TERMINAL UNIT. TYPICAL FOR ALL NEW TERMINAL UNITS.
B448
(E)STM AND CNDS RISER
2 CONNECT TO EXISTING STEAM AND CONDENSATE PIPING ABOVE 4TH FLOOR CEILING. OFFSET AND RUN TO NEW CHASE AND
DOWN THROUGH FLOOR. RUN IN 3RD FLOOR CEILING AND RECONNECT TO EXISTING RISERS.
REPROCESSING
B449
CHIEF OF PULMONARY 2
B446 VENT HOLDING
B447

CNDS
STM
20
1"
1"

&
&

SECRETARY CASE MANAGER


B445 B444
HALLWAY HOME CARE
C408 COORDINATOR
COPY/PRINTER B443
B441
19
UP
HALLWAY

'
'

B431 REPORT ROOM


B431D
RESP. CLINICIAL
PHYSICIAN
SUPPORT PHYSICIAN
B431B
B431A B431C
17
W-I W-J W-K

(
(

FOURTH FLOOR HVAC PIPING PLAN - PHASE 1


SCALE: 1/8" = 1'-0"

)
)

5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(


EXPANDED ENDOSCOPY AND

*
*

4TH FLOOR HVAC PIPING PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * NEW WORK PLAN - PHASE 1 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES M-340
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
E-G E-H E-G E-H
HVAC PIPING GENERAL NOTES:
1 THESE DRAWINGS ARE DIAGRAMMATIC, AND REPRESENT THE GENERAL INTENT AND ARRANGEMENT OF SYSTEMS. THEY ARE
NOT TO BE CONSIDERED FABRICATION/COORDINATION/SHOP DRAWINGS. COORDINATION WITH OTHER TRADES IS REQUIRED.
PROVIDE THE ADDITIONAL FITTINGS AND OFFSETS THAT WILL BE REQUIRED TO COMPLETE EACH SYSTEM AND TO AVOID

$
$

INTERFERENCES WITH ALL OTHER SYSTEMS INCLUDING THE STRUCTURE, SHEET METAL, OTHER PIPING SYSTEMS,
ELECTRICAL CONDUITS, BUS DUCTS, CABLE TRAY, LIGHT FIXTURES, ETC. AND/OR OTHER SPACE CONSTRAINTS.
2 INSTALL SYSTEMS SUCH THAT REQUIRED CLEARANCE AND SERVICE ACCESS SPACE IS PROVIDED AROUND ALL MECHANICAL
AND ELECTRICAL EQUIPMENT, AND AROUND ANY COMPONENTS WHICH REQUIRE SERVICE ACCESS.
3 PIPING AND DUCTWORK SHALL NOT BE INSTALLED ABOVE ELECTRICAL TRANSFORMERS, SWITCHBOARDS, PANELBOARDS OR
MOTOR CONTROL CENTERS.
4 COORDINATE AND PROVIDE ACCESS DOORS WITHIN INACCESSIBLE CEILING, SHAFT, AND CHASE AREAS FOR ALL
COMPONENTS WHICH REQUIRE SERVICE ACCESS. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.
5 PROVIDE SUPPLEMENTARY STEEL AS REQUIRED FOR THE PROPER SUPPORT OF ALL SYSTEMS.
6 SUBMIT PROPOSED METHODS OF ANCHORING AND GUIDING PIPING SYSTEMS TO STRUCTURAL ENGINEER FOR APPROVAL.
7 COORDINATE LOCATION OF DUCT-MOUNTED HYDRONIC DEVICES WITH SHEET METAL TRADES.
8 BRANCH PIPING SERVING TERMINAL UNIT HEATING COILS OR RADIANT CEILING PANELS SHALL BE 3/4" UNLESS OTHERWISE
9 9 NOTED. BRANCH PIPING SERVING MORE THAN ONE TERMINAL UNIT HEATING COIL SHALL BE 1" UNLESS OTHERWISE NOTED.
BRANCH PIPING SERVING HOT WATER UNIT HEATERS AND CABINET UNIT HEATERS SHALL BE 1" UNLESS OTHERWISE NOTED.
9 MOUNT THERMOSTATS 48" A.F.F., UNLESS OTHERWISE NOTED. LOCATE AS CLOSE AS POSSIBLE TO DOOR WHEN INDICATED
NEAR DOOR. COORDINATE EXACT LOCATION WITH ALL OTHER TRADES.

%
%

E-E E-F E-E E-F


# HVAC PIPING CONSTRUCTION KEY NOTES:
1 3/4 HWH & HWHR CONNECTIONS TO NEW TERMINAL UNIT. TYPICAL FOR ALL NEW TERMINAL UNITS.
8 8 2 CONNECT TO EXISTING STEAM AND CONDENSATE PIPING ABOVE 4TH FLOOR CEILING. OFFSET AND RUN TO NEW CHASE AND
DOWN THROUGH FLOOR. RUN IN 3RD FLOOR CEILING AND RECONNECT TO EXISTING RISERS.
(E)3/4" HWS UP (E)3/4" HWS UP
1"
3/4" HWR UP
1" 1"

HWS
HWR

HWS

&
&

7 7
1"

HWR
HWS
3/4" HWS UP

'
'

6 6
3/4" HWR UP
1"

HWR
HWS

(
(

5 5
HWR

)
)

4 4
SIXTH FLOOR INTERSTITIAL HVAC PIPING PLAN - PHASE 3 SIXTH FLOOR INTERSTITIAL HVAC PIPING PLAN - PHASE 4B
SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

6TH FLOOR HVAC PIPING PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * NEW WORK PLAN - PHASES 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
3 & 4B
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES M-360
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
E-E E-F E-G E-H
HVAC PIPING GENERAL NOTES:
1 THESE DRAWINGS ARE DIAGRAMMATIC, AND REPRESENT THE GENERAL INTENT AND ARRANGEMENT OF SYSTEMS. THEY ARE
NOT TO BE CONSIDERED FABRICATION/COORDINATION/SHOP DRAWINGS. COORDINATION WITH OTHER TRADES IS REQUIRED.
PROVIDE THE ADDITIONAL FITTINGS AND OFFSETS THAT WILL BE REQUIRED TO COMPLETE EACH SYSTEM AND TO AVOID
E-H

$
$

INTERFERENCES WITH ALL OTHER SYSTEMS INCLUDING THE STRUCTURE, SHEET METAL, OTHER PIPING SYSTEMS,
ELECTRICAL CONDUITS, BUS DUCTS, CABLE TRAY, LIGHT FIXTURES, ETC. AND/OR OTHER SPACE CONSTRAINTS.
2 INSTALL SYSTEMS SUCH THAT REQUIRED CLEARANCE AND SERVICE ACCESS SPACE IS PROVIDED AROUND ALL MECHANICAL
AND ELECTRICAL EQUIPMENT, AND AROUND ANY COMPONENTS WHICH REQUIRE SERVICE ACCESS.
3 PIPING AND DUCTWORK SHALL NOT BE INSTALLED ABOVE ELECTRICAL TRANSFORMERS, SWITCHBOARDS, PANELBOARDS OR
MOTOR CONTROL CENTERS.
4 COORDINATE AND PROVIDE ACCESS DOORS WITHIN INACCESSIBLE CEILING, SHAFT, AND CHASE AREAS FOR ALL
COMPONENTS WHICH REQUIRE SERVICE ACCESS. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.
5 PROVIDE SUPPLEMENTARY STEEL AS REQUIRED FOR THE PROPER SUPPORT OF ALL SYSTEMS.
6 SUBMIT PROPOSED METHODS OF ANCHORING AND GUIDING PIPING SYSTEMS TO STRUCTURAL ENGINEER FOR APPROVAL.
7 COORDINATE LOCATION OF DUCT-MOUNTED HYDRONIC DEVICES WITH SHEET METAL TRADES.
9
8 BRANCH PIPING SERVING TERMINAL UNIT HEATING COILS OR RADIANT CEILING PANELS SHALL BE 3/4" UNLESS OTHERWISE
9 NOTED. BRANCH PIPING SERVING MORE THAN ONE TERMINAL UNIT HEATING COIL SHALL BE 1" UNLESS OTHERWISE NOTED.
BRANCH PIPING SERVING HOT WATER UNIT HEATERS AND CABINET UNIT HEATERS SHALL BE 1" UNLESS OTHERWISE NOTED.
9 MOUNT THERMOSTATS 48" A.F.F., UNLESS OTHERWISE NOTED. LOCATE AS CLOSE AS POSSIBLE TO DOOR WHEN INDICATED
NEAR DOOR. COORDINATE EXACT LOCATION WITH ALL OTHER TRADES.

%
%

UP
E-E
UP
E-F E-G
# HVAC PIPING CONSTRUCTION KEY NOTES:
8
1 3/4 HWH & HWHR CONNECTIONS TO NEW TERMINAL UNIT. TYPICAL FOR ALL NEW TERMINAL UNITS.
CORRIDOR 8 FTR (E)3/4" HWS DN 2 CONNECT TO EXISTING STEAM AND CONDENSATE PIPING ABOVE 4TH FLOOR CEILING. OFFSET AND RUN TO NEW CHASE AND
C7-28
1 DOWN THROUGH FLOOR. RUN IN 3RD FLOOR CEILING AND RECONNECT TO EXISTING RISERS.
1' - 6" NURSE
1.0 MBH D707
0.5 GPM
PT. TOILET
D701P CLEAN UTILITY
D708 3/4" HWR DN
PRE/POST-OP 14
D701Q
BARIATRIC

&
&

PRE/POST-OP 13 -
PRIVACY
D701N PT. TOILET
D706
7 SOILED HOLDING
D710
PRE/POST-OP 11 PRE/POST-OP 12
7
D701M D701L
ST. TOILET
D714
HYDRATION STATION
PRE/POST-OP 9
PRE/POST-OP 10 D716
D701K
3/4" HWS DN D701J
FTR
1

'
'

ROUTE HWR PIPING THROUGH HYDRATION STATION


1' - 6" NURSE NOURISHMENT
CHASE ON 7TH FLOOR BEFORE 1.0 MBH D705
DROPPING DOWN TO 6TH FLOOR 0.5 GPM D701H D718
INTERSTITIAL FLOOR BELOW
PT. TOILET
6 D704
CORRIDOR
C7-31
6
3/4" HWR DN
LINEN
D703
MEDS
PRE/POST-OP 8
D720
D701G
PRE/POST-OP 7
D701F
KAREN'S OFFICE
D722
PRE/POST-OP 6
D701E

(
(

PRE/POST-OP 5
5 D701D
STORAGE
PT. TOILET
D724 5
D702
PRE/POST-OP 3
D701C
PRE/POST-OP 4
D701B
CORRIDOR
C7-30
PRE/POST-OP 1
D701A PHYS LAB
STORAGE D726
D700

)
)

CORRIDOR
C7-4
4
4
SEVENTH FLOOR HVAC PIPING PLAN - PHASE 3 SEVENTH FLOOR HVAC PIPING PLAN - PHASE 4B
SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

7TH FLOOR HVAC PIPING PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * NEW WORK PLAN - PHASES 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
3 & 4B
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES M-370
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE. E-G E-H E-E E-F
HVAC PIPING GENERAL NOTES:
1 THESE DRAWINGS ARE DIAGRAMMATIC, AND REPRESENT THE GENERAL INTENT AND ARRANGEMENT OF SYSTEMS. THEY ARE
NOT TO BE CONSIDERED FABRICATION/COORDINATION/SHOP DRAWINGS. COORDINATION WITH OTHER TRADES IS REQUIRED.
PROVIDE THE ADDITIONAL FITTINGS AND OFFSETS THAT WILL BE REQUIRED TO COMPLETE EACH SYSTEM AND TO AVOID

$
$

INTERFERENCES WITH ALL OTHER SYSTEMS INCLUDING THE STRUCTURE, SHEET METAL, OTHER PIPING SYSTEMS,
ELECTRICAL CONDUITS, BUS DUCTS, CABLE TRAY, LIGHT FIXTURES, ETC. AND/OR OTHER SPACE CONSTRAINTS.
2 INSTALL SYSTEMS SUCH THAT REQUIRED CLEARANCE AND SERVICE ACCESS SPACE IS PROVIDED AROUND ALL MECHANICAL
AND ELECTRICAL EQUIPMENT, AND AROUND ANY COMPONENTS WHICH REQUIRE SERVICE ACCESS.
3 PIPING AND DUCTWORK SHALL NOT BE INSTALLED ABOVE ELECTRICAL TRANSFORMERS, SWITCHBOARDS, PANELBOARDS OR
MOTOR CONTROL CENTERS.
4 COORDINATE AND PROVIDE ACCESS DOORS WITHIN INACCESSIBLE CEILING, SHAFT, AND CHASE AREAS FOR ALL
COMPONENTS WHICH REQUIRE SERVICE ACCESS. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.
5 PROVIDE SUPPLEMENTARY STEEL AS REQUIRED FOR THE PROPER SUPPORT OF ALL SYSTEMS.
6 SUBMIT PROPOSED METHODS OF ANCHORING AND GUIDING PIPING SYSTEMS TO STRUCTURAL ENGINEER FOR APPROVAL.
7 COORDINATE LOCATION OF DUCT-MOUNTED HYDRONIC DEVICES WITH SHEET METAL TRADES.
9 9
8 BRANCH PIPING SERVING TERMINAL UNIT HEATING COILS OR RADIANT CEILING PANELS SHALL BE 3/4" UNLESS OTHERWISE
NOTED. BRANCH PIPING SERVING MORE THAN ONE TERMINAL UNIT HEATING COIL SHALL BE 1" UNLESS OTHERWISE NOTED.
BRANCH PIPING SERVING HOT WATER UNIT HEATERS AND CABINET UNIT HEATERS SHALL BE 1" UNLESS OTHERWISE NOTED.
9 MOUNT THERMOSTATS 48" A.F.F., UNLESS OTHERWISE NOTED. LOCATE AS CLOSE AS POSSIBLE TO DOOR WHEN INDICATED
NEAR DOOR. COORDINATE EXACT LOCATION WITH ALL OTHER TRADES.

%
%

E-E E-F
DN DN E-G E-H
# HVAC PIPING CONSTRUCTION KEY NOTES:
8 8
1 3/4 HWH & HWHR CONNECTIONS TO NEW TERMINAL UNIT. TYPICAL FOR ALL NEW TERMINAL UNITS.
3"
2 CONNECT TO EXISTING STEAM AND CONDENSATE PIPING ABOVE 4TH FLOOR CEILING. OFFSET AND RUN TO NEW CHASE AND
DOWN THROUGH FLOOR. RUN IN 3RD FLOOR CEILING AND RECONNECT TO EXISTING RISERS.
3"

HWS
HWS

HWR
HWR

3" 3"

&
&

TU-16-13 TU-16-14
HWS
TU-16-1 TU-16-3
1 1/4" 1 1
1 1/4"
(TYP) (TYP)
HWS HWS HWS
HWR HWR HWR
7 7
1 1/4" 1 1/4" 1 1/4"
TU-16-16
TU-16-2 TU-16-4 TU-16-5 TU-16-6 1 1/4" TU-16-15
2 1/2"
2 1/2"
2 1/2" 2 1/2"
HWS
HWR

'
'

HWS
HWR
6 6
E-K
2 1/2"
2 1/2"
4
TU-16-11
TU-16-18 TU-16-21
TU-16-8 TU-16-10
1 1 1 1/4"
1"

(
(

(TYP) (TYP)
HWS HWS HWS
HWR HWR HWR
5 5 1"
1"
1" 1 1/4"
TU-16-7 TU-16-9 TU-16-12 TU-16-17 TU-16-19 TU-16-20 TU-16-22

HWS
HWR
TU-17-29

HWS
1
3

HWR
1 1/4"
HWR
HWS
1 1/4"

)
)

4 4
EIGHTH FLOOR INTERSTITIAL HVAC PIPING PLAN - PHASE 2
SCALE: 1/8" = 1'-0"
EIGHTH FLOOR INTERSTITIAL HVAC PIPING PLAN - PHASE 3 EIGHTH FLOOR INTERSTITIAL HVAC PIPING PLAN - PHASE 4
SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

8TH FLOOR HVAC PIPING PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * NEW WORK PLAN - PHASES 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
2, 3 & 4
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES M-380.A
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
HVAC PIPING GENERAL NOTES:
1 THESE DRAWINGS ARE DIAGRAMMATIC, AND REPRESENT THE GENERAL INTENT AND ARRANGEMENT OF SYSTEMS. THEY ARE
NOT TO BE CONSIDERED FABRICATION/COORDINATION/SHOP DRAWINGS. COORDINATION WITH OTHER TRADES IS REQUIRED.
PROVIDE THE ADDITIONAL FITTINGS AND OFFSETS THAT WILL BE REQUIRED TO COMPLETE EACH SYSTEM AND TO AVOID

$
$

INTERFERENCES WITH ALL OTHER SYSTEMS INCLUDING THE STRUCTURE, SHEET METAL, OTHER PIPING SYSTEMS,
E-H ELECTRICAL CONDUITS, BUS DUCTS, CABLE TRAY, LIGHT FIXTURES, ETC. AND/OR OTHER SPACE CONSTRAINTS.
2 INSTALL SYSTEMS SUCH THAT REQUIRED CLEARANCE AND SERVICE ACCESS SPACE IS PROVIDED AROUND ALL MECHANICAL
AND ELECTRICAL EQUIPMENT, AND AROUND ANY COMPONENTS WHICH REQUIRE SERVICE ACCESS.
3 PIPING AND DUCTWORK SHALL NOT BE INSTALLED ABOVE ELECTRICAL TRANSFORMERS, SWITCHBOARDS, PANELBOARDS OR
MOTOR CONTROL CENTERS.
4 COORDINATE AND PROVIDE ACCESS DOORS WITHIN INACCESSIBLE CEILING, SHAFT, AND CHASE AREAS FOR ALL
COMPONENTS WHICH REQUIRE SERVICE ACCESS. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.
5 PROVIDE SUPPLEMENTARY STEEL AS REQUIRED FOR THE PROPER SUPPORT OF ALL SYSTEMS.
6 SUBMIT PROPOSED METHODS OF ANCHORING AND GUIDING PIPING SYSTEMS TO STRUCTURAL ENGINEER FOR APPROVAL.
7 COORDINATE LOCATION OF DUCT-MOUNTED HYDRONIC DEVICES WITH SHEET METAL TRADES.
9 8 BRANCH PIPING SERVING TERMINAL UNIT HEATING COILS OR RADIANT CEILING PANELS SHALL BE 3/4" UNLESS OTHERWISE
NOTED. BRANCH PIPING SERVING MORE THAN ONE TERMINAL UNIT HEATING COIL SHALL BE 1" UNLESS OTHERWISE NOTED.
BRANCH PIPING SERVING HOT WATER UNIT HEATERS AND CABINET UNIT HEATERS SHALL BE 1" UNLESS OTHERWISE NOTED.
9 MOUNT THERMOSTATS 48" A.F.F., UNLESS OTHERWISE NOTED. LOCATE AS CLOSE AS POSSIBLE TO DOOR WHEN INDICATED
NEAR DOOR. COORDINATE EXACT LOCATION WITH ALL OTHER TRADES.

%
%

DN
E-E E-F E-G
# HVAC PIPING CONSTRUCTION KEY NOTES:
8 1 3/4 HWH & HWHR CONNECTIONS TO NEW TERMINAL UNIT. TYPICAL FOR ALL NEW TERMINAL UNITS.
3" 2 CONNECT TO EXISTING STEAM AND CONDENSATE PIPING ABOVE 4TH FLOOR CEILING. OFFSET AND RUN TO NEW CHASE AND
3" DOWN THROUGH FLOOR. RUN IN 3RD FLOOR CEILING AND RECONNECT TO EXISTING RISERS.
HWS
HWR

&
&

TU-16-23
1 1/4"
HWS
HWR
7 1 1 1/4"

'
'

(
(

)
)

4
EIGHTH FLOOR INTERSTITIAL HVAC PIPING PLAN - PHASE 4A
SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

8TH FLOOR HVAC PIPING PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * NEW WORK PLAN - PHASE 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
4A
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES M-380.B
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
SHEET METAL GENERAL NOTES:
1 THESE DRAWINGS ARE DIAGRAMMATIC, AND REPRESENT THE GENERAL INTENT AND ARRANGEMENT OF SYSTEMS. THEY ARE
NOT TO BE CONSIDERED FABRICATION/COORDINATION/SHOP DRAWINGS. COORDINATION WITH OTHER TRADES IS REQUIRED.
PROVIDE THE ADDITIONAL FITTINGS AND OFFSETS THAT WILL BE REQUIRED TO COMPLETE EACH SYSTEM AND TO AVOID
E-H INTERFERENCES WITH ALL OTHER SYSTEMS INCLUDING THE STRUCTURE, SHEET METAL, OTHER PIPING SYSTEMS, ELECTRICAL
CONDUITS, BUS DUCTS, CABLE TRAY, LIGHT FIXTURES, ETC. AND/OR OTHER SPACE CONSTRAINTS.

$
$

2 INSTALL SYSTEMS SUCH THAT REQUIRED CLEARANCE AND SERVICE ACCESS SPACE IS PROVIDED AROUND ALL MECHANICAL
AND ELECTRICAL EQUIPMENT, AND AROUND ANY COMPONENTS WHICH REQUIRE SERVICE ACCESS.
3 PIPING AND DUCTWORK SHALL NOT BE INSTALLED ABOVE ELECTRICAL TRANSFORMERS, SWITCHBOARDS, PANELBOARDS OR
MOTOR CONTROL CENTERS.
4 COORDINATE AND PROVIDE ACCESS DOORS WITHIN INACCESSIBLE CEILING, SHAFT, AND CHASE AREAS FOR ALL COMPONENTS
WHICH REQUIRE SERVICE ACCESS. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.
5 PROVIDE SUPPLEMENTARY STEEL AS REQUIRED FOR THE PROPER SUPPORT OF ALL SYSTEMS.
6 REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR DIMENSIONED LOCATION OF GRILLES, REGISTERS, AND
DIFFUSERS.
9 7 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL DEMOLITION PLANS.
INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR MODIFIED) AND
FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK.
# SHEET METAL CONSTRUCTION KEY NOTES:

%
%

1 REBALANCE EXISTING BRANCHES.


2 ROOM PRESSURE MONITOR AND SWITCH.
E-E E-F E-G 3 PROVIDE TEMPORARY CAP AT DUCT OPENING FOR CONNECTION IN FUTURE PHASE.
4 ROOM PRESSURE MONITOR INSTALLED ABOVE DOOR.
8
5 OFFSET EXHAUST DUCT AS REQUIRED.
6 TIE EXHAUST DUCT TO EXISTING LOUVER IN MECHANICAL ROOM.
D311
7 PERFORM COMPLETE AIRFLOW TESTING FOR EXHAUST FAN 1-EF-25 AND ITS INLETS PRIOR TO DEMOLITION. SUBMIT AIRFLOW
D314 D316 TESTING REPORT TO ENGINEER. AFTER CONNECTING ROOM D305 TO EXHAUST FAN 1-EF-25, PROVIDE NEW SHEAVES AND
MOTOR AND REBALANCE EXISTING INLETS TO ORIGINAL AIR QUANTITIES.
8 IN ROOM D305, REBALANCE (2) EXISTING SUPPLY DIFFUSERS TO 320 CFM EACH, AND REBALANCE (1) EXISTING EXHAUST GRILLE
TO 740 CFM. IN THE 4TH FLOOR INTERSTITIAL SPACE, REBALANCE EXISTING TERMINAL UNIT TU-10-28 SERVING ROOM D305 TO
640 CFM.
D310
9 COMPLETE THE FOLLOWING EACH FOR PHASES 3, 4, 4A, AND 4B: PERFORM COMPLETE AIRFLOW TESTING FOR AHU 1-AH-16
D314A D316A SUPPLY FAN 1-SF-16 AND ITS INLETS PRIOR TO CURRENT PHASE DEMOLITION WORK. SUBMIT AIRFLOW TESTING REPORT TO
ENGINEER. AFTER COMPLETION OF CURRENT PHASE SUPPLY AIR DUCT WORK, REBALANCE EXISTING INLETS TO ORIGINAL AIR
D314B

&
&

D316B QUANTITIES.
C3-12A C3-12B 10 COMPLETE THE FOLLOWING EACH FOR PHASES 3, 4, 4A, AND 4B: PERFORM COMPLETE AIRFLOW TESTING FOR RETURN AIR FAN
1-RF-16 AND ITS INLETS PRIOR TO CURRENT PHASE DEMOLITION WORK. SUBMIT AIRFLOW TESTING REPORT TO ENGINEER.
AFTER COMPLETION OF CURRENT PHASE RETURN AIR DUCT WORK, REBALANCE EXISTING INLETS TO ORIGINAL AIR QUANTITIES.
7
11 PERFORM COMPLETE AIRFLOW TESTING FOR EXHAUST FAN 1-EF-39 AND ITS INLETS PRIOR TO PHASE 3 DEMOLITION WORK.
SUBMIT AIRFLOW TESTING REPORT TO ENGINEER. AFTER COMPLETION OF PHASE 3 EXHAUST WORK, REBALANCE EXISTING
INLETS TO ORIGINAL AIR QUANTITIES.
D309 12 PERFORM COMPLETE AIRFLOW TESTING FOR EXHAUST FAN 1-EF-39 AND ITS INLETS PRIOR TO PHASE 4 DEMOLITION WORK.
SUBMIT AIRFLOW TESTING REPORT TO ENGINEER. AFTER COMPLETION OF PHASE 4 EXHAUST WORK, PROVIDE NEW SHEAVES
AND MOTOR AND REBALANCE EXISTING INLETS TO ORIGINAL AIR QUANTITIES.
D313
D315
D317
D307

'
'

D308
6
D317A
D306
D327

(
(

5
8
D305
C3-10
D304
C3-11

)
)

4
D302 D340 D339
STAIRS
D300 D301
3
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

3RD FLOOR SHEET METAL PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * NEW WORK PLAN - PHASE 1 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,
THIRD FLOOR SHEET METAL PLAN - PHASE 1

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
(
SCALE: 1/8" = 1'-0" 35 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES M-430
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
W-E W-F W-H W-L W-M W-N
22
S-1 S-1
R-1 6Ø VENT STORAGE
E-H 6Ø
6Ø 85 B452

$
$

85
(E)1-EF-25 120
6"x8" 6"x8"
HALLWAY
ASST. CHIEF RESP. C408
10"x6"

CARE R-1
7 B450 S-1 6Ø

12"x8"

120 S-1
85 6Ø
EHC 85
R-1
3 6Ø
120 EHC EHC
CHIEF RESP. CARE 4 5
B448 S-1 12"x10" 21

120 6"x8" SET-UP
12"x14" 12"x14"
R-1
EHC R-1 6Ø B451
2 8Ø 115
205 R-1 S-1
S-1 6Ø 8Ø
9 8Ø 50 150
EHC 205
1 10"ø
REPROCESSING
S-1 6"x10"
CHIEF OF PULMONARY E-1 B449
8Ø 6"x10" M
B446 12Ø
210 500 S-1
12Ø
R-1 400 RELOCATED FUME HOOD
14"x12"
M


HALLWAY 210 CASE MANAGER

%
%

C408 E-1 B444


6Ø VENT HOLDING
100 B447 20
CONNECT TO EXISTING RETURN
E-E E-F E-G AIR DUCT IN MECHANICAL ROOM 8"x8"
S-1
S-1
R-2 6Ø EHC
6"x8"

CONNECT TO EXISTING SUPPLY 8Ø


6Ø 120
8
120
AIR DUCT IN MECHANICAL ROOM 175 R-1 SECRETARY
6Ø B445
115 S-1
20"x12" 10"x10" 6Ø
8 R-2 120

120
1 R-1 HOME CARE
6Ø COORDINATOR
115 B443
S-1
EHC 8Ø EHC
175
6 7
10"ø
6"x8"

12"x10"

5
COPY/PRINTER
B441
HALLWAY REPORT ROOM

&
&

B431 B431D
19
UP S-1
R-3 6Ø R-3 S-1
22x10 70 22x10 6Ø
7 105
S-1 R-3 R-3
8Ø 22x10 22x10
150
S-1 S-1
8Ø 8Ø
150 150
5 12"x10"
TU-H-1506
17
RESP. CLINICIAL
PHYSICIAN PHYSICIAN
SUPPORT
MECHANICAL ROOM B431B B431C

10"ø
B431A
16

'
'

6 EF
1
W-I W-J W-K
6
15
14

24"ø EA
26"ø SA

28"ø RA
30"ø SA
16"ø EA
34"ø RA
# SHEET METAL CONSTRUCTION KEY NOTES:
1 REBALANCE EXISTING BRANCHES.

(
(

2 ROOM PRESSURE MONITOR AND SWITCH.


5 3 PROVIDE TEMPORARY CAP AT DUCT OPENING FOR CONNECTION IN FUTURE PHASE.
22"ø RA 32"ø RA
4 ROOM PRESSURE MONITOR INSTALLED ABOVE DOOR.
5 OFFSET EXHAUST DUCT AS REQUIRED.

24"x12" RA
6 TIE EXHAUST DUCT TO EXISTING LOUVER IN MECHANICAL ROOM.
24"x8" EA
7 PERFORM COMPLETE AIRFLOW TESTING FOR EXHAUST FAN 1-EF-25 AND ITS INLETS PRIOR TO DEMOLITION. SUBMIT AIRFLOW
TESTING REPORT TO ENGINEER. AFTER CONNECTING ROOM D305 TO EXHAUST FAN 1-EF-25, PROVIDE NEW SHEAVES AND
CONNECT TO EF-1-25 MOTOR AND REBALANCE EXISTING INLETS TO ORIGINAL AIR QUANTITIES.
EXHAUST DUCT
TU-10-29

20"ø EA
8 IN ROOM D305, REBALANCE (2) EXISTING SUPPLY DIFFUSERS TO 320 CFM EACH, AND REBALANCE (1) EXISTING EXHAUST GRILLE
TU-10-27 TO 740 CFM. IN THE 4TH FLOOR INTERSTITIAL SPACE, REBALANCE EXISTING TERMINAL UNIT TU-10-28 SERVING ROOM D305 TO
TU-10-25 640 CFM.
16"ø SA 18"ø SA 9 COMPLETE THE FOLLOWING EACH FOR PHASES 3, 4, 4A, AND 4B: PERFORM COMPLETE AIRFLOW TESTING FOR AHU 1-AH-16
SUPPLY FAN 1-SF-16 AND ITS INLETS PRIOR TO CURRENT PHASE DEMOLITION WORK. SUBMIT AIRFLOW TESTING REPORT TO
TU-10-28 TU-10-26 ENGINEER. AFTER COMPLETION OF CURRENT PHASE SUPPLY AIR DUCT WORK, REBALANCE EXISTING INLETS TO ORIGINAL AIR
FOURTH FLOOR SHEET METAL PLAN - PHASE 1 QUANTITIES.
8 TU-10-24
SCALE: 1/8" = 1'-0"

)
)

10 COMPLETE THE FOLLOWING EACH FOR PHASES 3, 4, 4A, AND 4B: PERFORM COMPLETE AIRFLOW TESTING FOR RETURN AIR FAN
4 1-RF-16 AND ITS INLETS PRIOR TO CURRENT PHASE DEMOLITION WORK. SUBMIT AIRFLOW TESTING REPORT TO ENGINEER.
AFTER COMPLETION OF CURRENT PHASE RETURN AIR DUCT WORK, REBALANCE EXISTING INLETS TO ORIGINAL AIR QUANTITIES.
SHEET METAL GENERAL NOTES:
11 PERFORM COMPLETE AIRFLOW TESTING FOR EXHAUST FAN 1-EF-39 AND ITS INLETS PRIOR TO PHASE 3 DEMOLITION WORK.
1 THESE DRAWINGS ARE DIAGRAMMATIC, AND REPRESENT THE GENERAL INTENT AND ARRANGEMENT OF SYSTEMS. THEY ARE SUBMIT AIRFLOW TESTING REPORT TO ENGINEER. AFTER COMPLETION OF PHASE 3 EXHAUST WORK, REBALANCE EXISTING
NOT TO BE CONSIDERED FABRICATION/COORDINATION/SHOP DRAWINGS. COORDINATION WITH OTHER TRADES IS REQUIRED. INLETS TO ORIGINAL AIR QUANTITIES.
PROVIDE THE ADDITIONAL FITTINGS AND OFFSETS THAT WILL BE REQUIRED TO COMPLETE EACH SYSTEM AND TO AVOID
INTERFERENCES WITH ALL OTHER SYSTEMS INCLUDING THE STRUCTURE, SHEET METAL, OTHER PIPING SYSTEMS, ELECTRICAL
CONDUITS, BUS DUCTS, CABLE TRAY, LIGHT FIXTURES, ETC. AND/OR OTHER SPACE CONSTRAINTS. 12 PERFORM COMPLETE AIRFLOW TESTING FOR EXHAUST FAN 1-EF-39 AND ITS INLETS PRIOR TO PHASE 4 DEMOLITION WORK.

16"ø EA
SUBMIT AIRFLOW TESTING REPORT TO ENGINEER. AFTER COMPLETION OF PHASE 4 EXHAUST WORK, PROVIDE NEW SHEAVES

30"ø SA

28"ø RA
AND MOTOR AND REBALANCE EXISTING INLETS TO ORIGINAL AIR QUANTITIES.
2 INSTALL SYSTEMS SUCH THAT REQUIRED CLEARANCE AND SERVICE ACCESS SPACE IS PROVIDED AROUND ALL MECHANICAL
AND ELECTRICAL EQUIPMENT, AND AROUND ANY COMPONENTS WHICH REQUIRE SERVICE ACCESS.
3 PIPING AND DUCTWORK SHALL NOT BE INSTALLED ABOVE ELECTRICAL TRANSFORMERS, SWITCHBOARDS, PANELBOARDS OR
MOTOR CONTROL CENTERS.
4 COORDINATE AND PROVIDE ACCESS DOORS WITHIN INACCESSIBLE CEILING, SHAFT, AND CHASE AREAS FOR ALL COMPONENTS
WHICH REQUIRE SERVICE ACCESS. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.
5 PROVIDE SUPPLEMENTARY STEEL AS REQUIRED FOR THE PROPER SUPPORT OF ALL SYSTEMS.
3 6 REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR DIMENSIONED LOCATION OF GRILLES, REGISTERS, AND
DIFFUSERS. 5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

4TH FLOOR SHEET METAL PULMONARY CLINICAL SPACES


7 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL DEMOLITION PLANS.
INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR MODIFIED) AND 2) 0 ,&+ ,
7( * NEW WORK PLAN - PHASE 1 9$352-(&7180%(5
FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK.

$
$

67
506-15-101

1
-$0(6&
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
FOURTH FLOOR INTERSTITIAL SHEET METAL PLAN - PHASE 1 HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
SCALE: 1/8" = 1'-0" $/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES M-440
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
SHEET METAL GENERAL NOTES:
1 THESE DRAWINGS ARE DIAGRAMMATIC, AND REPRESENT THE GENERAL INTENT AND ARRANGEMENT OF SYSTEMS. THEY ARE
NOT TO BE CONSIDERED FABRICATION/COORDINATION/SHOP DRAWINGS. COORDINATION WITH OTHER TRADES IS REQUIRED.
PROVIDE THE ADDITIONAL FITTINGS AND OFFSETS THAT WILL BE REQUIRED TO COMPLETE EACH SYSTEM AND TO AVOID
INTERFERENCES WITH ALL OTHER SYSTEMS INCLUDING THE STRUCTURE, SHEET METAL, OTHER PIPING SYSTEMS, ELECTRICAL

$
$

CONDUITS, BUS DUCTS, CABLE TRAY, LIGHT FIXTURES, ETC. AND/OR OTHER SPACE CONSTRAINTS.
E-H
E-H 2 INSTALL SYSTEMS SUCH THAT REQUIRED CLEARANCE AND SERVICE ACCESS SPACE IS PROVIDED AROUND ALL MECHANICAL
AND ELECTRICAL EQUIPMENT, AND AROUND ANY COMPONENTS WHICH REQUIRE SERVICE ACCESS.
10 (TO BE COMPLETED EACH 10 (TO BE COMPLETED EACH 3 PIPING AND DUCTWORK SHALL NOT BE INSTALLED ABOVE ELECTRICAL TRANSFORMERS, SWITCHBOARDS, PANELBOARDS OR
FOR PHASES 3, 4, 4A, 4B) FOR PHASES 3, 4, 4A, 4B) MOTOR CONTROL CENTERS.
4 COORDINATE AND PROVIDE ACCESS DOORS WITHIN INACCESSIBLE CEILING, SHAFT, AND CHASE AREAS FOR ALL COMPONENTS
WHICH REQUIRE SERVICE ACCESS. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.
5 PROVIDE SUPPLEMENTARY STEEL AS REQUIRED FOR THE PROPER SUPPORT OF ALL SYSTEMS.
6 REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR DIMENSIONED LOCATION OF GRILLES, REGISTERS, AND
1-AH-17 1-AH-17 DIFFUSERS.
1-AH-16 1-AH-16
1-RF-17 1-RF-17
7 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL DEMOLITION PLANS.
INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR MODIFIED) AND
1-RF-16 1-RF-16 FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK.
9 9
1-SF-16 1-SF-16

%
%

1-SF-17 1-SF-17
9 9
# SHEET METAL CONSTRUCTION KEY NOTES:
(TO BE COMPLETED EACH (TO BE COMPLETED EACH
FOR PHASES 3, 4, 4A, 4B) FOR PHASES 3, 4, 4A, 4B)
1 REBALANCE EXISTING BRANCHES.
UP UP
2 ROOM PRESSURE MONITOR AND SWITCH.
3 PROVIDE TEMPORARY CAP AT DUCT OPENING FOR CONNECTION IN FUTURE PHASE.
E-E E-F E-G E-E E-F E-G
4 ROOM PRESSURE MONITOR INSTALLED ABOVE DOOR.
8 8 5 OFFSET EXHAUST DUCT AS REQUIRED.
CORRIDOR 6 TIE EXHAUST DUCT TO EXISTING LOUVER IN MECHANICAL ROOM.
C7-28
14"ø UP
PT. TOILET
D701P 7 PERFORM COMPLETE AIRFLOW TESTING FOR EXHAUST FAN 1-EF-25 AND ITS INLETS PRIOR TO DEMOLITION. SUBMIT AIRFLOW
R-1 TESTING REPORT TO ENGINEER. AFTER CONNECTING ROOM D305 TO EXHAUST FAN 1-EF-25, PROVIDE NEW SHEAVES AND
14Ø
E-1 585 MOTOR AND REBALANCE EXISTING INLETS TO ORIGINAL AIR QUANTITIES.
S-1 6x6 2
6Ø S-1
100 PRE/POST-OP 14 12Ø
50 8 IN ROOM D305, REBALANCE (2) EXISTING SUPPLY DIFFUSERS TO 320 CFM EACH, AND REBALANCE (1) EXISTING EXHAUST GRILLE
D701Q CLEAN UTILITY E-1 14"x10" UP 460 (+ PRESSURIZED) TO 740 CFM. IN THE 4TH FLOOR INTERSTITIAL SPACE, REBALANCE EXISTING TERMINAL UNIT TU-10-28 SERVING ROOM D305 TO
D708 14x14 360 (- PRESSURIZED) SCOPE STORAGE 640 CFM.
S-1 6"x6" UP 820 ENDO/BRONCS D711C

&
&

8Ø S-1 8"ø UP
PROCEDURE ROOM - 2
130 8"x8" UP 6Ø 9 COMPLETE THE FOLLOWING EACH FOR PHASES 3, 4, 4A, AND 4B: PERFORM COMPLETE AIRFLOW TESTING FOR AHU 1-AH-16
S-1 D709
6Ø 100 SUPPLY FAN 1-SF-16 AND ITS INLETS PRIOR TO CURRENT PHASE DEMOLITION WORK. SUBMIT AIRFLOW TESTING REPORT TO
PT. TOILET ENGINEER. AFTER COMPLETION OF CURRENT PHASE SUPPLY AIR DUCT WORK, REBALANCE EXISTING INLETS TO ORIGINAL AIR
10"x10" 100
8"x8" S-1
D706 QUANTITIES.
12"x14"

S-1 S-1 12"x14" UP S-1 6Ø


BARIATRIC 10"x10" UP 8Ø 12Ø 6Ø PM 100
PRE/POST-OP 13 - 175 100
460 (+ PRESSURIZED) 10 COMPLETE THE FOLLOWING EACH FOR PHASES 3, 4, 4A, AND 4B: PERFORM COMPLETE AIRFLOW TESTING FOR RETURN AIR FAN
PRIVACY E-1 PM
ANTE ROOM 360 (- PRESSURIZED) 1-RF-16 AND ITS INLETS PRIOR TO CURRENT PHASE DEMOLITION WORK. SUBMIT AIRFLOW TESTING REPORT TO ENGINEER.
D701N 6x6 SOILED HOLDING
S-1 6"ø UP AFTER COMPLETION OF CURRENT PHASE RETURN AIR DUCT WORK, REBALANCE EXISTING INLETS TO ORIGINAL AIR QUANTITIES.
6"x8"

100 D710 D711 10Ø 4


DECON
265
7 S-1 7 D711A
PRE/POST-OP 12 S-1 11 PERFORM COMPLETE AIRFLOW TESTING FOR EXHAUST FAN 1-EF-39 AND ITS INLETS PRIOR TO PHASE 3 DEMOLITION WORK.
8Ø S-1 E-1 10"x12" UP
130 D701L 6Ø E-1 SUBMIT AIRFLOW TESTING REPORT TO ENGINEER. AFTER COMPLETION OF PHASE 3 EXHAUST WORK, REBALANCE EXISTING
6Ø PM 6x6
100 6x6 125 INLETS TO ORIGINAL AIR QUANTITIES.
110 125 HLD
PRE/POST-OP 11 10"x12" D711B
D701M ST. TOILET R-1 6"x6" UP 10"x10" UP 12 PERFORM COMPLETE AIRFLOW TESTING FOR EXHAUST FAN 1-EF-39 AND ITS INLETS PRIOR TO PHASE 4 DEMOLITION WORK.
14x14 4 SUBMIT AIRFLOW TESTING REPORT TO ENGINEER. AFTER COMPLETION OF PHASE 4 EXHAUST WORK, PROVIDE NEW SHEAVES
D714 S-1
820 10Ø E-1 CORRIDOR AND MOTOR AND REBALANCE EXISTING INLETS TO ORIGINAL AIR QUANTITIES.
E-1 360 10x10 C7-29
12"x8" UP 6x6 6"x6" UP 315
90 14"x10" UP S-1 SCOPE STORAGE
8"x8" UP 10"x10" UP 6Ø
12"x10" D715C
14"ø UP 8"x8" 100
S-1 S-1 PM
10Ø 10Ø
12"x12"

R-1PRE/POST-OP 10
14Ø D701J 235 HYDRATION STATION 360
E-1 ENDOSCOPY PM
585 D716
S-1 10x10 PROCEDURE ROOM - 3
8Ø S-1 285 D713 4
S-1

'
'

130 PRE/POST-OP 9 6Ø NOURISHMENT


HYDRATION STATION 100 ANTE ROOM 12"x12" UP 10Ø

10"x12"
D701K D718 HLD
D705 S-1 D715 265
10Ø S-1 E-1 6"x6" UP D715B
S-1 E-1 S-1 250 10"x10" UP 6Ø PM 6x6
8Ø 8x8 8"x8" UP 6Ø 125 125
180 230 100 CORRIDOR 10"x10" UP
PT. TOILET NURSE E-1 DECON
12"x10" UP 10x10 C7-30 4
D704 10"x10" D701H D715A
300
6"x6" UP 12"x10" UP E-1 SCOPE STORAGE
6 CORRIDOR 6 ENDOSCOPY 10x10
S-1 10"x10" UP D715D
LINEN 6Ø C7-31 PROCEDURE ROOM - 2 365
6"ø UP 4
D703 50 E-1 S-1 D717 PM 10"x12" UP
6x6 10Ø
100 S-1 8"x10" UP S-1 345 PM
8Ø 10"x12" R-1

10"x12"
125 175 S-1 8Ø
S-1 S-1 6Ø 200
6Ø R-1 100 8"ø UP
PRE/POST-OP 8 6Ø S-1 14x14 4

6"x8"
100 100 8Ø S-1
D701G 790 14"x10" UP 10Ø
140 8"ø UP 345
S-1 PRE/POST-OP 7 MEDS ST. TOILET
8Ø D720 E-1 D728
130 D701F
ENDOSCOPY 6x6
80 S-1 SCOPE STORAGE
PROCEDURE ROOM - 1 6Ø
S-1 D721C

8"x10"
12"x10" KAREN'S OFFICE R-1 D719 100
6Ø 14x14
E-K
65 D722 S-1
790 14"x10" UP 10Ø PM
12"x8" UP 8"x8"
345

(
(

R-1 PM
8"x8" UP 6Ø 4
PRE/POST-OP 6 4
65

12"x12"
D701E HLD
PT. TOILET S-1
S-1 S-1 10Ø D721B
D702 6Ø 10Ø 12"x12" UP 265
100 6"x6" UP 345
PRE/POST-OP 5
5 D701D 5 E-1
S-1 STORAGE 10x10
8Ø D724 ANTE ROOM S-1 E-1 6"x6" UP 365
PRE/POST-OP 3 E-1 R-1
130 D721 6Ø PM 6x6 12Ø
D701C 6x6 S-1 125 125 12"ø UP
100 6Ø 480
65 4 DECON 10"x10" UP 10"x12" UP
S-1 6"x6" UP D721A 8"x12"
8Ø S-1
130 8"x12" UP 4 SCOPE STORAGE

100 2 S-1 D721D
12"x8" UP 10"x10" UP 8"ø UP 12Ø 4 S-1
12"x10" PRE/POST-OP 4 595 (+ PRESSURIZED) PM 10Ø
10"x12"

D701B E-1 495 (- PRESSURIZED) 240-2


S-1 PM
S-1 16x16 18"x10" UP
E-1 CORRIDOR 1090 6Ø
R-1 8Ø 100 6"x10" UP
14Ø 10x10 C7-30
345 175 ERCP/BRONCS 6"x10" UP
585 R-2 TEMPORARY WAIT AND
PHYS LAB CORRIDOR PROCEDURE ROOM - 1 8Ø S-1
14"ø UP 6Ø CHECK-IN
D726 C7-30 D723 155
8"x8" S-2 100 C7-8
6"x12" UP 8Ø
8"x8" UP 155 3
6"ø UP
S-1 S-1

)
)

PRE/POST-OP 1 10Ø IT
8Ø D727
130 D701A S-1 245 S-1 6"x6" UP

14"x14"
6Ø 12Ø
STORAGE

6"x12"
100 595 (+ PRESSURIZED) E-1
D700 HSK
495 (- PRESSURIZED) 6x6
4 4 100 D725
14"x14" UP
REF.
SEVENTH FLOOR SHEET METAL PLAN - PHASE 3 SEVENTH FLOOR SHEET METAL PLAN - PHASE 4 SEVENTH FLOOR SHEET METAL PLAN - PHASE 2
SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

7TH FLOOR SHEET METAL PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * NEW WORK PLAN - PHASES 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
2, 3 & 4
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES M-470.A
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
SHEET METAL GENERAL NOTES:
1 THESE DRAWINGS ARE DIAGRAMMATIC, AND REPRESENT THE GENERAL INTENT AND ARRANGEMENT OF SYSTEMS. THEY ARE
NOT TO BE CONSIDERED FABRICATION/COORDINATION/SHOP DRAWINGS. COORDINATION WITH OTHER TRADES IS REQUIRED.
PROVIDE THE ADDITIONAL FITTINGS AND OFFSETS THAT WILL BE REQUIRED TO COMPLETE EACH SYSTEM AND TO AVOID
INTERFERENCES WITH ALL OTHER SYSTEMS INCLUDING THE STRUCTURE, SHEET METAL, OTHER PIPING SYSTEMS, ELECTRICAL

$
$

CONDUITS, BUS DUCTS, CABLE TRAY, LIGHT FIXTURES, ETC. AND/OR OTHER SPACE CONSTRAINTS.
E-H E-H
2 INSTALL SYSTEMS SUCH THAT REQUIRED CLEARANCE AND SERVICE ACCESS SPACE IS PROVIDED AROUND ALL MECHANICAL
(TO BE COMPLETED EACH (TO BE COMPLETED EACH AND ELECTRICAL EQUIPMENT, AND AROUND ANY COMPONENTS WHICH REQUIRE SERVICE ACCESS.
10 10
FOR PHASES 3, 4, 4A, 4B) FOR PHASES 3, 4, 4A, 4B)
3 PIPING AND DUCTWORK SHALL NOT BE INSTALLED ABOVE ELECTRICAL TRANSFORMERS, SWITCHBOARDS, PANELBOARDS OR
MOTOR CONTROL CENTERS.
4 COORDINATE AND PROVIDE ACCESS DOORS WITHIN INACCESSIBLE CEILING, SHAFT, AND CHASE AREAS FOR ALL COMPONENTS
WHICH REQUIRE SERVICE ACCESS. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.
5 PROVIDE SUPPLEMENTARY STEEL AS REQUIRED FOR THE PROPER SUPPORT OF ALL SYSTEMS.
1-AH-17 1-AH-17
1-AH-16 1-AH-16
1-RF-17 1-RF-17 6 REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR DIMENSIONED LOCATION OF GRILLES, REGISTERS, AND
DIFFUSERS.
1-RF-16 1-RF-16 7 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL DEMOLITION PLANS.
INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR MODIFIED) AND
9 9 FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK.
1-SF-16 1-SF-16
1-SF-17 1-SF-17
9 9

%
%

(TO BE COMPLETED EACH (TO BE COMPLETED EACH


FOR PHASES 3, 4, 4A, 4B) FOR PHASES 3, 4, 4A, 4B) # SHEET METAL CONSTRUCTION KEY NOTES:
UP UP
1 REBALANCE EXISTING BRANCHES.
E-E E-F E-G 2 ROOM PRESSURE MONITOR AND SWITCH.
E-E E-F E-G
3 PROVIDE TEMPORARY CAP AT DUCT OPENING FOR CONNECTION IN FUTURE PHASE.
8 8 4 ROOM PRESSURE MONITOR INSTALLED ABOVE DOOR.
8"ø UP
8"ø UP S-1
TECH SUPERVISOR S-1 NURSE
8Ø 8Ø 5 OFFSET EXHAUST DUCT AS REQUIRED.
OFFICE D707 175
170
6"ø UP D729
6 TIE EXHAUST DUCT TO EXISTING LOUVER IN MECHANICAL ROOM.
S-1
6Ø 7 PERFORM COMPLETE AIRFLOW TESTING FOR EXHAUST FAN 1-EF-25 AND ITS INLETS PRIOR TO DEMOLITION. SUBMIT AIRFLOW
125 TESTING REPORT TO ENGINEER. AFTER CONNECTING ROOM D305 TO EXHAUST FAN 1-EF-25, PROVIDE NEW SHEAVES AND
8"x6" UP MOTOR AND REBALANCE EXISTING INLETS TO ORIGINAL AIR QUANTITIES.
R-1
6Ø 8 IN ROOM D305, REBALANCE (2) EXISTING SUPPLY DIFFUSERS TO 320 CFM EACH, AND REBALANCE (1) EXISTING EXHAUST GRILLE
125 TO 740 CFM. IN THE 4TH FLOOR INTERSTITIAL SPACE, REBALANCE EXISTING TERMINAL UNIT TU-10-28 SERVING ROOM D305 TO
640 CFM.

&
&

9 COMPLETE THE FOLLOWING EACH FOR PHASES 3, 4, 4A, AND 4B: PERFORM COMPLETE AIRFLOW TESTING FOR AHU 1-AH-16
SUPPLY FAN 1-SF-16 AND ITS INLETS PRIOR TO CURRENT PHASE DEMOLITION WORK. SUBMIT AIRFLOW TESTING REPORT TO
PM PM ENGINEER. AFTER COMPLETION OF CURRENT PHASE SUPPLY AIR DUCT WORK, REBALANCE EXISTING INLETS TO ORIGINAL AIR
QUANTITIES.
PM PM
10 COMPLETE THE FOLLOWING EACH FOR PHASES 3, 4, 4A, AND 4B: PERFORM COMPLETE AIRFLOW TESTING FOR RETURN AIR FAN
1-RF-16 AND ITS INLETS PRIOR TO CURRENT PHASE DEMOLITION WORK. SUBMIT AIRFLOW TESTING REPORT TO ENGINEER.
7 7 AFTER COMPLETION OF CURRENT PHASE RETURN AIR DUCT WORK, REBALANCE EXISTING INLETS TO ORIGINAL AIR QUANTITIES.
PM PM
11 PERFORM COMPLETE AIRFLOW TESTING FOR EXHAUST FAN 1-EF-39 AND ITS INLETS PRIOR TO PHASE 3 DEMOLITION WORK.
SUBMIT AIRFLOW TESTING REPORT TO ENGINEER. AFTER COMPLETION OF PHASE 3 EXHAUST WORK, REBALANCE EXISTING
INLETS TO ORIGINAL AIR QUANTITIES.
12 PERFORM COMPLETE AIRFLOW TESTING FOR EXHAUST FAN 1-EF-39 AND ITS INLETS PRIOR TO PHASE 4 DEMOLITION WORK.
SUBMIT AIRFLOW TESTING REPORT TO ENGINEER. AFTER COMPLETION OF PHASE 4 EXHAUST WORK, PROVIDE NEW SHEAVES
AND MOTOR AND REBALANCE EXISTING INLETS TO ORIGINAL AIR QUANTITIES.
PM PM
PM PM

'
'

PM PM
6 6
PM PM
PM PM
PM PM
PM PM

(
(

5 5
PM PM
PM PM
PM PM

)
)

4 4
SEVENTH FLOOR SHEET METAL PLAN - PHASE 4A SEVENTH FLOOR SHEET METAL PLAN - PHASE 4B
SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

7TH FLOOR SHEET METAL PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * NEW WORK PLAN - PHASES 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
4A & 4B
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES M-470.B
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
E-E E-G E-H
SHEET METAL GENERAL NOTES:
1 THESE DRAWINGS ARE DIAGRAMMATIC, AND REPRESENT THE GENERAL INTENT AND ARRANGEMENT OF SYSTEMS. THEY ARE
NOT TO BE CONSIDERED FABRICATION/COORDINATION/SHOP DRAWINGS. COORDINATION WITH OTHER TRADES IS REQUIRED.
PROVIDE THE ADDITIONAL FITTINGS AND OFFSETS THAT WILL BE REQUIRED TO COMPLETE EACH SYSTEM AND TO AVOID
INTERFERENCES WITH ALL OTHER SYSTEMS INCLUDING THE STRUCTURE, SHEET METAL, OTHER PIPING SYSTEMS, ELECTRICAL

$
$

CONDUITS, BUS DUCTS, CABLE TRAY, LIGHT FIXTURES, ETC. AND/OR OTHER SPACE CONSTRAINTS.
E-H
2 INSTALL SYSTEMS SUCH THAT REQUIRED CLEARANCE AND SERVICE ACCESS SPACE IS PROVIDED AROUND ALL MECHANICAL
AND ELECTRICAL EQUIPMENT, AND AROUND ANY COMPONENTS WHICH REQUIRE SERVICE ACCESS.
3 PIPING AND DUCTWORK SHALL NOT BE INSTALLED ABOVE ELECTRICAL TRANSFORMERS, SWITCHBOARDS, PANELBOARDS OR
MOTOR CONTROL CENTERS.
4 COORDINATE AND PROVIDE ACCESS DOORS WITHIN INACCESSIBLE CEILING, SHAFT, AND CHASE AREAS FOR ALL COMPONENTS
WHICH REQUIRE SERVICE ACCESS. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.
5 PROVIDE SUPPLEMENTARY STEEL AS REQUIRED FOR THE PROPER SUPPORT OF ALL SYSTEMS.
6 REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR DIMENSIONED LOCATION OF GRILLES, REGISTERS, AND
DIFFUSERS.
1-EF-12 1-EF-12
7 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL DEMOLITION PLANS.
INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR MODIFIED) AND
9 9 FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK.
1-EF-10 1-EF-10
1-EF-9 1-EF-9

%
%

1-EF-39 1-EF-39
E-F 11 12
# SHEET METAL CONSTRUCTION KEY NOTES:
DN 1-EF-24 DN 1-EF-24
E-E E-F E-G
1 REBALANCE EXISTING BRANCHES.
2 ROOM PRESSURE MONITOR AND SWITCH.
3 PROVIDE TEMPORARY CAP AT DUCT OPENING FOR CONNECTION IN FUTURE PHASE.
4 ROOM PRESSURE MONITOR INSTALLED ABOVE DOOR.

30"x24" RA

20"ø EA

32"x24" SA
38"x36" RA
24"ø EA
38"x32" SA
8 8

12"ø EA
5 OFFSET EXHAUST DUCT AS REQUIRED.
14"ø RA DN
12"ø EA
20"ø EA

32"x24" SA
6 TIE EXHAUST DUCT TO EXISTING LOUVER IN MECHANICAL ROOM.
30"x24" RA
38"x36" RA
24"ø EA
38"x32" SA

14"ø 7 PERFORM COMPLETE AIRFLOW TESTING FOR EXHAUST FAN 1-EF-25 AND ITS INLETS PRIOR TO DEMOLITION. SUBMIT AIRFLOW
6"x6" EA DN TESTING REPORT TO ENGINEER. AFTER CONNECTING ROOM D305 TO EXHAUST FAN 1-EF-25, PROVIDE NEW SHEAVES AND
MOTOR AND REBALANCE EXISTING INLETS TO ORIGINAL AIR QUANTITIES.
14"x10"
AF
14"x10" EA DN 8 IN ROOM D305, REBALANCE (2) EXISTING SUPPLY DIFFUSERS TO 320 CFM EACH, AND REBALANCE (1) EXISTING EXHAUST GRILLE
1
TO 740 CFM. IN THE 4TH FLOOR INTERSTITIAL SPACE, REBALANCE EXISTING TERMINAL UNIT TU-10-28 SERVING ROOM D305 TO
8"x10"

8"ø SA DN
640 CFM.
8"x8" SA DN

6"x6"
8"ø

&
&

10"x10" SA DN 9 COMPLETE THE FOLLOWING EACH FOR PHASES 3, 4, 4A, AND 4B: PERFORM COMPLETE AIRFLOW TESTING FOR AHU 1-AH-16
12"x14"

8"x8" TU-16-14 SUPPLY FAN 1-SF-16 AND ITS INLETS PRIOR TO CURRENT PHASE DEMOLITION WORK. SUBMIT AIRFLOW TESTING REPORT TO
18"x16" 12"x14" SA DN
12"x14"

6"x6" EA DN ENGINEER. AFTER COMPLETION OF CURRENT PHASE SUPPLY AIR DUCT WORK, REBALANCE EXISTING INLETS TO ORIGINAL AIR
10"x10" 6"ø SA DN 6"x6" EA DN 6"ø SA DN
TU-16-1 TU-16-3 QUANTITIES.
TU-16-13
20"ø SA 18"ø SA 20"ø SA 18"ø SA 12"ø SA 10 COMPLETE THE FOLLOWING EACH FOR PHASES 3, 4, 4A, AND 4B: PERFORM COMPLETE AIRFLOW TESTING FOR RETURN AIR FAN
16"ø SA 1-RF-16 AND ITS INLETS PRIOR TO CURRENT PHASE DEMOLITION WORK. SUBMIT AIRFLOW TESTING REPORT TO ENGINEER.
TU-16-15 TU-16-16
AFTER COMPLETION OF CURRENT PHASE RETURN AIR DUCT WORK, REBALANCE EXISTING INLETS TO ORIGINAL AIR QUANTITIES.
6"ø

7 7
10"x12" SA DN
14"x10"
12"ø TU-16-6 11 PERFORM COMPLETE AIRFLOW TESTING FOR EXHAUST FAN 1-EF-39 AND ITS INLETS PRIOR TO PHASE 3 DEMOLITION WORK.
TU-16-2
10"x12" SUBMIT AIRFLOW TESTING REPORT TO ENGINEER. AFTER COMPLETION OF PHASE 3 EXHAUST WORK, REBALANCE EXISTING
TU-16-4 TU-16-5 20"ø EA 20"ø EA 14"ø EA INLETS TO ORIGINAL AIR QUANTITIES.
10"x10" EA DN
12"x12"

6"x6" EA DN 12 PERFORM COMPLETE AIRFLOW TESTING FOR EXHAUST FAN 1-EF-39 AND ITS INLETS PRIOR TO PHASE 4 DEMOLITION WORK.

12"x8"
SUBMIT AIRFLOW TESTING REPORT TO ENGINEER. AFTER COMPLETION OF PHASE 4 EXHAUST WORK, PROVIDE NEW SHEAVES

8"x8"
AND MOTOR AND REBALANCE EXISTING INLETS TO ORIGINAL AIR QUANTITIES.

12"x10"
AF

10"x10"
14"ø
6"x6" 14"x10" RA DN 1

8"x8"
10"x10"
12"x8" SA DN
12"x10"

6"x6" EA DN

12"x12"
8"x8" SA DN 10"x10" EA DN
14"ø RA DN

10"x10"
18"ø EA

24"x20" RA
38"x36" RA
38"x32" SA

22"ø SA
12"ø EA
20"ø EA

18"ø EA
38"x32" SA
8"x8" EA DN 12"x12" SA DN

'
'

10"x10" EA DN
10"x10" SA DN 6"x6" EA DN
12"x10" SA DN 12"x10" SA DN
6 10"x10" EA DN
6
6"x6" EA DN

38"x36" RA
10"x12" SA DN
6"ø SA DN 8"x10" SA DN 8"ø SA DN

12"x10"
3
8"ø RA DN
10"x6"
8"ø
14"x10" RA DN

22"ø SA
12"ø EA
20"ø EA

6"ø
24"x20" RA
AF
1 6"x6" EA DN
8"x8" SA DN E-K

6"x6"
10"x12"

8"x10"
16"x14"
14"x10" RA DN

12"x10"
12"x8" SA DN TU-16-11
6"x6" RA DN 4
TU-16-21
16"ø EA 16"ø EA 16"ø

8"x8"

12"x8"
TU-16-8 TU-16-10 TU-16-18
10"ø EA

(
(

12"x12" SA DN
20"ø SA 20"ø SA 18"ø SA 20"ø SA 18"ø SA 14"ø SA
14"ø SA TU-16-20

6"x6"
5 5 12"ø RA DN
TU-16-22

12"x10"

10"x10"
18"x10"

6"x6"
6"x6" EA DN TU-16-17 TU-16-19 12"x10" SA DN
TU-16-7 TU-16-9
20"ø RA 18"ø RA 18"ø RA

12"x12"
6"x6" EA DN
TU-16-12 10"x10" EA DN
12"ø

AF

12"x8"
1 12"x8" SA DN

14"x14"

14"ø
12"x10"

12"x12"

10"x6"
TU-17-29

10"x6"

8"x8"
8"ø SA DN AF
10"x10" EA DN
12"x8" SA DN 18"x10" EA DN 1 32"x28" RA 28"ø RA

12"x6"
6"x6"

38"x32" SA
8"ø
14"ø RA DN
3
10"x6" RA DN
8"x8" SA DN 26"x26" SA 26"ø SA
6"ø SA DN

14"x14"
6"x6" EA DN 6"x10" SA DN
12"x6" SA DN

)
)

14"x14" SA DN
4 4
EIGHTH FLOOR INTERSTITIAL SHEET METAL PLAN - PHASE 3 EIGHTH FLOOR INTERSTITIAL SHEET METAL PLAN - PHASE 4 EIGHTH FLOOR INTERSTITIAL SHEET METAL PLAN - PHASE 2
SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

8TH FLOOR SHEET METAL PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * NEW WORK PLAN - PHASES 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
2, 3 & 4
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES M-480.A
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
SHEET METAL GENERAL NOTES:
1 THESE DRAWINGS ARE DIAGRAMMATIC, AND REPRESENT THE GENERAL INTENT AND ARRANGEMENT OF SYSTEMS. THEY ARE
NOT TO BE CONSIDERED FABRICATION/COORDINATION/SHOP DRAWINGS. COORDINATION WITH OTHER TRADES IS REQUIRED.
PROVIDE THE ADDITIONAL FITTINGS AND OFFSETS THAT WILL BE REQUIRED TO COMPLETE EACH SYSTEM AND TO AVOID
INTERFERENCES WITH ALL OTHER SYSTEMS INCLUDING THE STRUCTURE, SHEET METAL, OTHER PIPING SYSTEMS, ELECTRICAL

$
$

CONDUITS, BUS DUCTS, CABLE TRAY, LIGHT FIXTURES, ETC. AND/OR OTHER SPACE CONSTRAINTS.
E-H E-H
2 INSTALL SYSTEMS SUCH THAT REQUIRED CLEARANCE AND SERVICE ACCESS SPACE IS PROVIDED AROUND ALL MECHANICAL
AND ELECTRICAL EQUIPMENT, AND AROUND ANY COMPONENTS WHICH REQUIRE SERVICE ACCESS.
3 PIPING AND DUCTWORK SHALL NOT BE INSTALLED ABOVE ELECTRICAL TRANSFORMERS, SWITCHBOARDS, PANELBOARDS OR
MOTOR CONTROL CENTERS.
4 COORDINATE AND PROVIDE ACCESS DOORS WITHIN INACCESSIBLE CEILING, SHAFT, AND CHASE AREAS FOR ALL COMPONENTS
WHICH REQUIRE SERVICE ACCESS. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.
5 PROVIDE SUPPLEMENTARY STEEL AS REQUIRED FOR THE PROPER SUPPORT OF ALL SYSTEMS.
6 REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR DIMENSIONED LOCATION OF GRILLES, REGISTERS, AND
DIFFUSERS.
7 COORDINATE OPENINGS IN THE 8TH FLOOR WHERE DUCT PENETRATIONS OCCUR WITH SHEET METAL DEMOLITION PLANS.
INFILL AND SEAL OPENINGS THAT ARE NOT REUSED. FOR EXISTING OPENINGS THAT ARE REUSED (AS-IS OR MODIFIED) AND
9 9 FOR NEW OPENINGS, SEAL TIGHT AROUND NEW DUCTWORK.

%
%

# SHEET METAL CONSTRUCTION KEY NOTES:


DN DN
E-F E-G E-F E-G
1 REBALANCE EXISTING BRANCHES.
E-E E-E
2 ROOM PRESSURE MONITOR AND SWITCH.
3 PROVIDE TEMPORARY CAP AT DUCT OPENING FOR CONNECTION IN FUTURE PHASE.
4 ROOM PRESSURE MONITOR INSTALLED ABOVE DOOR.
8 8
8"ø SA DN
5 OFFSET EXHAUST DUCT AS REQUIRED.

30"x24" RA
24"ø EA

12"ø EA
38"x32" SA

20"ø EA
38"x36" RA
8"ø SA DN

32"x24" SA
6 TIE EXHAUST DUCT TO EXISTING LOUVER IN MECHANICAL ROOM.
6"ø SA DN
7 PERFORM COMPLETE AIRFLOW TESTING FOR EXHAUST FAN 1-EF-25 AND ITS INLETS PRIOR TO DEMOLITION. SUBMIT AIRFLOW
TESTING REPORT TO ENGINEER. AFTER CONNECTING ROOM D305 TO EXHAUST FAN 1-EF-25, PROVIDE NEW SHEAVES AND
8"x6" RA DN MOTOR AND REBALANCE EXISTING INLETS TO ORIGINAL AIR QUANTITIES.
14"x10" EA

8"x10"
38"x36" RA

30"x24" RA
24"ø EA

32"x24" SA
12"ø EA
38"x32" SA

20"ø EA
8"x6" 8 IN ROOM D305, REBALANCE (2) EXISTING SUPPLY DIFFUSERS TO 320 CFM EACH, AND REBALANCE (1) EXISTING EXHAUST GRILLE
TO 740 CFM. IN THE 4TH FLOOR INTERSTITIAL SPACE, REBALANCE EXISTING TERMINAL UNIT TU-10-28 SERVING ROOM D305 TO
640 CFM.

8"ø

&
&

8"x8"
TU-16-13 9 COMPLETE THE FOLLOWING EACH FOR PHASES 3, 4, 4A, AND 4B: PERFORM COMPLETE AIRFLOW TESTING FOR AHU 1-AH-16
TU-16-23 SUPPLY FAN 1-SF-16 AND ITS INLETS PRIOR TO CURRENT PHASE DEMOLITION WORK. SUBMIT AIRFLOW TESTING REPORT TO
18"x16" RA 18"x16" RA
ENGINEER. AFTER COMPLETION OF CURRENT PHASE SUPPLY AIR DUCT WORK, REBALANCE EXISTING INLETS TO ORIGINAL AIR
TU-16-13 QUANTITIES.
20"ø SA 18"ø SA 12"ø SA 20"ø SA 18"ø SA 12"ø SA 10 COMPLETE THE FOLLOWING EACH FOR PHASES 3, 4, 4A, AND 4B: PERFORM COMPLETE AIRFLOW TESTING FOR RETURN AIR FAN
TU-16-1 1-RF-16 AND ITS INLETS PRIOR TO CURRENT PHASE DEMOLITION WORK. SUBMIT AIRFLOW TESTING REPORT TO ENGINEER.
7 7 AFTER COMPLETION OF CURRENT PHASE RETURN AIR DUCT WORK, REBALANCE EXISTING INLETS TO ORIGINAL AIR QUANTITIES.
11 PERFORM COMPLETE AIRFLOW TESTING FOR EXHAUST FAN 1-EF-39 AND ITS INLETS PRIOR TO PHASE 3 DEMOLITION WORK.
SUBMIT AIRFLOW TESTING REPORT TO ENGINEER. AFTER COMPLETION OF PHASE 3 EXHAUST WORK, REBALANCE EXISTING
20"ø EA 20"ø EA 14"ø EA INLETS TO ORIGINAL AIR QUANTITIES.
12 PERFORM COMPLETE AIRFLOW TESTING FOR EXHAUST FAN 1-EF-39 AND ITS INLETS PRIOR TO PHASE 4 DEMOLITION WORK.
SUBMIT AIRFLOW TESTING REPORT TO ENGINEER. AFTER COMPLETION OF PHASE 4 EXHAUST WORK, PROVIDE NEW SHEAVES
AND MOTOR AND REBALANCE EXISTING INLETS TO ORIGINAL AIR QUANTITIES.

'
'

6 6

18"ø EA
16"x14" RA

22"ø SA
12"ø EA
20"ø EA

(
(

24"x20" RA
5 5
18"ø RA

38"x36" RA
8"ø

)
)

4 4
EIGHTH FLOOR INTERSTITIAL SHEET METAL PLAN - PHASE 4A EIGHTH FLOOR INTERSTITIAL SHEET METAL PLAN - PHASE 4B
SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0"
5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
EXPANDED ENDOSCOPY AND

*
*

8TH FLOOR SHEET METAL PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * NEW WORK PLAN - PHASES 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
4A & 4B
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES M-480.B
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
MEDICAL GAS GENERAL NOTES:
1 THESE DRAWINGS ARE DIAGRAMMATIC, AND REPRESENT THE GENERAL INTENT AND ARRANGEMENT OF SYSTEMS. THEY ARE NOT
TO BE CONSIDERED FABRICATION/COORDINATION/SHOP DRAWINGS. COORDINATION WITH OTHER TRADES IS REQUIRED. PROVIDE
THE ADDITIONAL FITTINGS AND OFFSETS THAT WILL BE REQUIRED TO COMPLETE EACH SYSTEM AND TO AVOID INTERFERENCES
WITH ALL OTHER SYSTEMS INCLUDING THE STRUCTURE, SHEET METAL, OTHER PIPING SYSTEMS, ELECTRICAL CONDUITS, BUS
DUCTS, CABLE TRAY, LIGHT FIXTURES, ETC. AND/OR OTHER SPACE CONSTRAINTS.

$
$

2 INSTALL SYSTEMS SUCH THAT REQUIRED CLEARANCE AND SERVICE ACCESS SPACE IS PROVIDED AROUND ALL MECHANICAL AND
W-L W-M W-N ELECTRICAL EQUIPMENT, AND AROUND ANY COMPONENTS WHICH REQUIRE SERVICE ACCESS.
3 PIPING AND DUCTWORK SHALL NOT BE INSTALLED ABOVE ELECTRICAL TRANSFORMERS, SWITCHBOARDS, PANELBOARDS OR
MOTOR CONTROL CENTERS.
4 COORDINATE AND PROVIDE ACCESS DOORS WITHIN INACCESSIBLE CEILING, SHAFT, AND CHASE AREAS FOR ALL COMPONENTS
WHICH REQUIRE SERVICE ACCESS. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.
5 PROVIDE SUPPLEMENTARY STEEL AS REQUIRED FOR THE PROPER SUPPORT OF ALL SYSTEMS.
6 REFER TO ARCHITECTURAL PLANS FOR DIMENSIONED LOCATIONS OF MEDICAL GAS OUTLETS AND TO VERIFY QUANTITY OF MEDICAL
22 GAS OUTLETS.
7 NONFLAMMABLE MEDICAL GAS SYSTEMS SHALL COMPLY WITH <<<INSERT YEAR>>> EDITION OF NFPA 99C.
VENT STORAGE 8 VERIFY REQUIREMENTS AND PROVIDE ALL REQUIRED UTILITIES FOR OWNER FURNISHED EQUIPMENT.
B452

%
%

ASST. CHIEF RESP. # MEDICAL GAS CONSTRUCTION KEY NOTES:


CARE
B450 21 1 3/4 MV, 1/2 MA. PROVIDE ROUGH-IN AND FINAL CONNECTION FOR MED GAS OUTLETS. REFER TO PLAN FOR MED GAS OUTLET COUNT.
MGVB MED GAS COUNT COORDINATE MED GAS OUTLET LOCATIONS WITH ARCHITECTURAL TRADES.
MA 1 MV
3/4"
MV 1 1 MA
2 NOT USED.
CHIEF RESP. CARE 1" SET-UP
B448 B451

MV
3 1/2 O, 3/4 MV, 1/2 MA. PROVIDE ROUGH-IN AND FINAL CONNECTION FOR MED GAS OUTLETS. REFER TO PLAN FOR MED GAS OUTLET

MA
COUNT. COORDINATE MED GAS OUTLET LOCATIONS WITH ARCHITECTURAL TRADES.
REPROCESSING
B449 4 1/2 O, 1 1/4 MV, 1/2 MA, 1/2 N2O, 3/4 WAGD, 1/2 CO2. PROVIDE ROUGH-IN AND FINAL CONNECTION FOR MED GAS OUTLETS. CAP CO2 AT
MED GAS ZONE VALVE BOX FOR FUTURE CONNECTION TO FUTURE SYSTEM. REFER TO PLAN FOR MED GAS OUTLET COUNT.
COORDINATE MED GAS OUTLET LOCATIONS WITH ARCHITECTURAL TRADES.
CHIEF OF PULMONARY
B446 VENT HOLDING
B447 5 3/4 MV, 1/2 MA. PROVIDE ROUGH-IN AND FINAL CONNECTION FOR MED GAS OUTLETS. REFER TO PLAN FOR MED GAS OUTLET COUNT.
COORDINATE MED GAS OUTLET LOCATIONS WITH ARCHITECTURAL TRADES.
20
6 1 1/2 WAGD TO NEW WAGD VACUUM PUMP VP-WAGD-1 IN EXISTING MECHANICAL ROOM.
SECRETARY CASE MANAGER
HALLWAY B445 B444
C408

&
&

HOME CARE
COORDINATOR
COPY/PRINTER B443
B441

O
19
UP HALLWAY
B431
REPORT ROOM
B431D

'
'

RESP. CLINICIAL
SUPPORT
B431A PHYSICIAN
B431B
PHYSICIAN
B431C
17
W-I W-J W-K

(
(

FOURTH FLOOR MEDICAL GAS PLAN - PHASE 1


SCALE: 1/8" = 1'-0"

)
)

5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(


EXPANDED ENDOSCOPY AND

*
*

4TH FLOOR MEDICAL GAS PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * NEW WORK PLAN - PHASE 1 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/8" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES M-940
BID DOCUMENTS
        
        
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE.
E-E E-F E-E E-F
MEDICAL GAS GENERAL NOTES:
HYDRATION STATION 1 THESE DRAWINGS ARE DIAGRAMMATIC, AND REPRESENT THE GENERAL INTENT AND ARRANGEMENT OF SYSTEMS. THEY ARE NOT
D705 NURSE NOURISHMENT TO BE CONSIDERED FABRICATION/COORDINATION/SHOP DRAWINGS. COORDINATION WITH OTHER TRADES IS REQUIRED. PROVIDE
D701H D718 THE ADDITIONAL FITTINGS AND OFFSETS THAT WILL BE REQUIRED TO COMPLETE EACH SYSTEM AND TO AVOID INTERFERENCES
WITH ALL OTHER SYSTEMS INCLUDING THE STRUCTURE, SHEET METAL, OTHER PIPING SYSTEMS, ELECTRICAL CONDUITS, BUS

$
$

STAIR DUCTS, CABLE TRAY, LIGHT FIXTURES, ETC. AND/OR OTHER SPACE CONSTRAINTS.
O

#6
MA
MV

2 INSTALL SYSTEMS SUCH THAT REQUIRED CLEARANCE AND SERVICE ACCESS SPACE IS PROVIDED AROUND ALL MECHANICAL AND
MECHANICAL ELECTRICAL EQUIPMENT, AND AROUND ANY COMPONENTS WHICH REQUIRE SERVICE ACCESS.
D712 6
PT. TOILET
D704 3 PIPING AND DUCTWORK SHALL NOT BE INSTALLED ABOVE ELECTRICAL TRANSFORMERS, SWITCHBOARDS, PANELBOARDS OR
1 1/2" 1 1/2" MOTOR CONTROL CENTERS.
1 1/2" 1"
CORRIDOR 4 COORDINATE AND PROVIDE ACCESS DOORS WITHIN INACCESSIBLE CEILING, SHAFT, AND CHASE AREAS FOR ALL COMPONENTS
8 1" 2 1/2"
C7-31 WHICH REQUIRE SERVICE ACCESS. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.
5 PROVIDE SUPPLEMENTARY STEEL AS REQUIRED FOR THE PROPER SUPPORT OF ALL SYSTEMS.
1 1/2" 1 1/2"
CORRIDOR
MV

1 1/2" 1" 6 REFER TO ARCHITECTURAL PLANS FOR DIMENSIONED LOCATIONS OF MEDICAL GAS OUTLETS AND TO VERIFY QUANTITY OF MEDICAL
O

C7-28 1" GAS OUTLETS.


2 1/2"
LINEN
MA

D703 7 NONFLAMMABLE MEDICAL GAS SYSTEMS SHALL COMPLY WITH <<<INSERT YEAR>>> EDITION OF NFPA 99C.
N2O

3/4"
G

8 VERIFY REQUIREMENTS AND PROVIDE ALL REQUIRED UTILITIES FOR OWNER FURNISHED EQUIPMENT.
LV

MEDS

MV
D720
LA

PRE/POST-OP 8

O
1" 3 D701G CORRIDOR

MA
PT. TOILET C7-30

%
%

D701P

N2O
MED GAS COUNT

G
2O
3 MV

LV
PRE/POST-OP 14
1 MA
D701Q

LA
PRE/POST-OP 7
D701F 3 # MEDICAL GAS CONSTRUCTION KEY NOTES:
1 3/4 MV, 1/2 MA. PROVIDE ROUGH-IN AND FINAL CONNECTION FOR MED GAS OUTLETS. REFER TO PLAN FOR MED GAS OUTLET COUNT.
3 MED GAS COUNT COORDINATE MED GAS OUTLET LOCATIONS WITH ARCHITECTURAL TRADES.
BARIATRIC CLEAN UTILITY
2O
PRE/POST-OP 13 - D708 3 MV
PRIVACY 2 NOT USED.
O

MED GAS COUNT 1 MA MED GAS COUNT


MA

KAREN'S OFFICE
MV

D701N 2O 2O
3 MV 3 MV D722 3 1/2 O, 3/4 MV, 1/2 MA. PROVIDE ROUGH-IN AND FINAL CONNECTION FOR MED GAS OUTLETS. REFER TO PLAN FOR MED GAS OUTLET
1 1/4"
1 MA 1 MA COUNT. COORDINATE MED GAS OUTLET LOCATIONS WITH ARCHITECTURAL TRADES.
3 4 1/2 O, 1 1/4 MV, 1/2 MA, 1/2 N2O, 3/4 WAGD, 1/2 CO2. PROVIDE ROUGH-IN AND FINAL CONNECTION FOR MED GAS OUTLETS. CAP CO2 AT
PRE/POST-OP 6 MED GAS ZONE VALVE BOX FOR FUTURE CONNECTION TO FUTURE SYSTEM. REFER TO PLAN FOR MED GAS OUTLET COUNT.
3
D701E COORDINATE MED GAS OUTLET LOCATIONS WITH ARCHITECTURAL TRADES.
MED GAS COUNT MED GAS COUNT
2O 1 1/2"
2O 5 3/4 MV, 1/2 MA. PROVIDE ROUGH-IN AND FINAL CONNECTION FOR MED GAS OUTLETS. REFER TO PLAN FOR MED GAS OUTLET COUNT.
3 MV 3 MV
PT. TOILET TEMPORARY AREA COORDINATE MED GAS OUTLET LOCATIONS WITH ARCHITECTURAL TRADES.
1 MA 1 MA
D706 ALARM PANEL. REMOTE

O
1/2"
SIGNAL TO TEMPORARY

MA
1/2" 6 1 1/2 WAGD TO NEW WAGD VACUUM PUMP VP-WAGD-1 IN EXISTING MECHANICAL ROOM.

MV
3/4" NURSE STATION

&
&

3
7 5 3/4"
3 MED GAS COUNT
2O SOILED HOLDING PRE/POST-OP 5 PT. TOILET
1" 3 MV D701D D702
3/4" D710
1 MA STORAGE
D724 1 1/2" 1 1/2"
PRE/POST-OP 11
D701M 1 1/2" 1"
3 PRE/POST-OP 12 1" 2 1/2"
D701L
MED GAS COUNT
2O
3 MV
1 MA
3
ST. TOILET
D714
MV
O

1/2" CORRIDOR MED GAS COUNT PRE/POST-OP 4


C7-30 2O 3
MA

PRE/POST-OP 3 D701B
3 MV
1 MA D701C
MED GAS COUNT
G

MED GAS COUNT


2O
2O
3 MV PRE/POST-OP 10
LV

1" 3 MV

O
1 MA D701J 3
LA

1 MA

MV
MA

MV

'
'

1/2"

O
MGVB
MED GAS COUNT

MA
PRE/POST-OP 9 HYDRATION STATION
3 2O MA
D701K D716 MV
1 MV

N2O
MED GAS SENSOR MED GAS COUNT O
1 MA

G
1 1/4" LINES TO AREA 2O
MED GAS COUNT ALARM PANEL 3 MV 1/2"

LV
2O 1 MA PHYS LAB
3 MV 3/4"

LA
3 CONNECT D726
1 MA TO WAGD IN
PHASE 4
3
N2O
MED GAS AREA MA
ALARM PANEL O
MV
FINAL LOCATION WAGD
PRE/POST-OP 1 1 1/2" STORAGE
D701A 1" 3/4" D700
HYDRATION STATION
D705 NURSE NOURISHMENT
D701H D718

O
MGVB

MA
MV
6 4
PT. TOILET
MA

(
(

D704 MV
1 1/2" STAIR
1 1/2" O
#9
1 1/2" 1"
CORRIDOR 1"
1" 2 1/2"
C7-31 CORRIDOR 1 1/2"
C7-4 3/4"
7TH FLOOR MEDICAL GAS PLAN - (NORTH) (PHASE 3) 7TH FLOOR MEDICAL GAS PLAN - (SOUTH) (PHASE 3)
SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0"

)
)

5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(


EXPANDED ENDOSCOPY AND

*
*

7TH FLOOR MEDICAL GAS PULMONARY CLINICAL SPACES


2) 0 ,&+ ,
7( * NEW WORK PLAN - PHASE 3 9$352-(&7180%(5

$
$

67
506-15-101

1
-$0(6&
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/4" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
$/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES M-970
BID DOCUMENTS
        
        
E-H
THE FOLLOWING DIMENSION EQUALS 1"

WE RECYCLE
ONE INCH WHEN PRINTED TO SCALE. E-G E-H
ANTE ROOM MED GAS COUNT 5
MEDICAL GAS GENERAL NOTES:
3/4" DECON
D715 1 MV
1 1/2" D715A
1 1/2" 1 MA 1 THESE DRAWINGS ARE DIAGRAMMATIC, AND REPRESENT THE GENERAL INTENT AND ARRANGEMENT OF SYSTEMS. THEY ARE NOT
1 1/2" 1" TO BE CONSIDERED FABRICATION/COORDINATION/SHOP DRAWINGS. COORDINATION WITH OTHER TRADES IS REQUIRED. PROVIDE
1" 5 THE ADDITIONAL FITTINGS AND OFFSETS THAT WILL BE REQUIRED TO COMPLETE EACH SYSTEM AND TO AVOID INTERFERENCES
2 1/2" WITH ALL OTHER SYSTEMS INCLUDING THE STRUCTURE, SHEET METAL, OTHER PIPING SYSTEMS, ELECTRICAL CONDUITS, BUS

$
$

1 1/2" DUCTS, CABLE TRAY, LIGHT FIXTURES, ETC. AND/OR OTHER SPACE CONSTRAINTS.
6 2 INSTALL SYSTEMS SUCH THAT REQUIRED CLEARANCE AND SERVICE ACCESS SPACE IS PROVIDED AROUND ALL MECHANICAL AND
MV ELECTRICAL EQUIPMENT, AND AROUND ANY COMPONENTS WHICH REQUIRE SERVICE ACCESS.
HLD MA
MGVB
D715B 3 PIPING AND DUCTWORK SHALL NOT BE INSTALLED ABOVE ELECTRICAL TRANSFORMERS, SWITCHBOARDS, PANELBOARDS OR
MOTOR CONTROL CENTERS.
MGVB
COORDINATE EXACT MA 4 4 COORDINATE AND PROVIDE ACCESS DOORS WITHIN INACCESSIBLE CEILING, SHAFT, AND CHASE AREAS FOR ALL COMPONENTS
LOCATION WITH OWNER VP-WAGD MV
O WHICH REQUIRE SERVICE ACCESS. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.
1
N2O SCOPE STORAGE
WAGD D715D 5 PROVIDE SUPPLEMENTARY STEEL AS REQUIRED FOR THE PROPER SUPPORT OF ALL SYSTEMS.
ENDOSCOPY
PROCEDURE ROOM - 2
D717 6 REFER TO ARCHITECTURAL PLANS FOR DIMENSIONED LOCATIONS OF MEDICAL GAS OUTLETS AND TO VERIFY QUANTITY OF MEDICAL
MV

GAS OUTLETS.
6
O

7 NONFLAMMABLE MEDICAL GAS SYSTEMS SHALL COMPLY WITH <<<INSERT YEAR>>> EDITION OF NFPA 99C.
MA

9 MED GAS COUNT


4O
N2O

1 1/2" 6 MV 8 VERIFY REQUIREMENTS AND PROVIDE ALL REQUIRED UTILITIES FOR OWNER FURNISHED EQUIPMENT.
G

2 MA
LV

2 N2O
2 WAGD
LA

ST. TOILET
1 CO2 (FUTURE) D728
WAGD
MA
MV

%
%

WAGD
MED GAS COUNT
4O # MEDICAL GAS CONSTRUCTION KEY NOTES:
6 MV
2 MA ENDOSCOPY
2 N2O
SCOPE STORAGE 1 3/4 MV, 1/2 MA. PROVIDE ROUGH-IN AND FINAL CONNECTION FOR MED GAS OUTLETS. REFER TO PLAN FOR MED GAS OUTLET COUNT.
PROCEDURE ROOM - 1
2 WAGD D721C COORDINATE MED GAS OUTLET LOCATIONS WITH ARCHITECTURAL TRADES.
D719
1 CO2 (FUTURE)
2 NOT USED.
3/4" 3 1/2 O, 3/4 MV, 1/2 MA. PROVIDE ROUGH-IN AND FINAL CONNECTION FOR MED GAS OUTLETS. REFER TO PLAN FOR MED GAS OUTLET
3/4"
3/4" COUNT. COORDINATE MED GAS OUTLET LOCATIONS WITH ARCHITECTURAL TRADES.
MA MA
O MV O
MA 4 1/2 O, 1 1/4 MV, 1/2 MA, 1/2 N2O, 3/4 WAGD, 1/2 CO2. PROVIDE ROUGH-IN AND FINAL CONNECTION FOR MED GAS OUTLETS. CAP CO2 AT
MV MV MED GAS ZONE VALVE BOX FOR FUTURE CONNECTION TO FUTURE SYSTEM. REFER TO PLAN FOR MED GAS OUTLET COUNT.
MGVB COORDINATE MED GAS OUTLET LOCATIONS WITH ARCHITECTURAL TRADES.
HLD MGVB 3/4"
MA 4 1 1/2" MA
MV 1" 1" D721B 1 1/2"
MV
O 5 3/4 MV, 1/2 MA. PROVIDE ROUGH-IN AND FINAL CONNECTION FOR MED GAS OUTLETS. REFER TO PLAN FOR MED GAS OUTLET COUNT.
N2O G G COORDINATE MED GAS OUTLET LOCATIONS WITH ARCHITECTURAL TRADES.
?
WAGD LV LV
E-G ?
LA LA 6 1 1/2 WAGD TO NEW WAGD VACUUM PUMP VP-WAGD-1 IN EXISTING MECHANICAL ROOM.
3/4"
5

&
&

ANTE ROOM 5
8
D721
3/4" CORRIDOR
1 1/2" 1 1/2" MED GAS COUNT C7-29
1 1/2" 1" 1 MV 5
1" 1 MA
3/4" 2 1/2"
1 1/2" 1 1/2" 1 1/2" MED GAS COUNT
DECON
1 1/2" 1" D721A 1 MV
1" 1 MA
2 1/2"
1 1/2"

MV
O
MED GAS COUNT

MV
4O

MA

O
6 MV
MED GAS COUNT 2 MA

MA
N2O
4O 2 N2O

G
6 MV 2 WAGD

N2O
2 MA

LV
1 CO2 (FUTURE)
2 N2O

G
LA
2 WAGD SCOPE STORAGE

WAGD

LV
1 CO2 (FUTURE) D721D

WAGD

'
'

LA
ENDO/BRONCS
PROCEDURE ROOM - 2 ERCP/BRONCS
D709 PROCEDURE ROOM - 1
D723
IT
SCOPE STORAGE D727
D711C
MGVB MGVB
MA 4 CORRIDOR MA 4
MV C7-30 MV
O O
N2O N2O
WAGD MV WAGD
MA G
3/4" LV
MGVB LA
G HSK
5 LV
MED GAS COUNT LA D725
1 MV 5 3/4"
?

MV
7

MA
1 MA
? ANTE ROOM 1"

O
DECON

MA
D711 3/4" 3/4" 4

MV
D711A 3/4"
MA MA MA
MV
O O O

(
(

1"
MV MV
3/4" 1"
1 1/2" 1 1/2" 2 1/2"
MED GAS COUNT
1 MV
1 MA
HLD
MED GAS COUNT
D711B
4O
6 MV
2 MA

MV
O
2 N2O
2 WAGD

MA
1 CO2 (FUTURE)

N2O
SCOPE STORAGE 7TH FLOOR MEDICAL GAS PLAN - (SOUTH) (PHASE 4)

G
ENDOSCOPY D715C SCALE: 1/4" = 1'-0"

LV
PROCEDURE ROOM - 3

WAGD
D713

LA
CORRIDOR
C7-29
MED GAS
SENSOR LINES MGVB
TO AREA HLD
ALARM PANEL MA 4

)
)

MV D715B
O
N2O MED GAS COUNT
WAGD 1 MV
1 MA
N2O
MA
O
MV
WAGD
ANTE ROOM MED GAS COUNT 5
3/4" DECON
D715 1 MV
1 1/2" D715A
1 1/2" 1 MA
1 1/2" 1"
1" 2 1/2" 5
1 1/2"
6
MV
HLD MA
MGVB
D715B
MGVB
MA 4
MV 5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(
O EXPANDED ENDOSCOPY AND

*
*

N2O SCOPE STORAGE 7TH FLOOR MEDICAL GAS PULMONARY CLINICAL SPACES
WAGD D715D
ENDOSCOPY 2) 0 ,&+ ,
*
7( NEW WORK PLAN - PHASE 4 9$352-(&7180%(5

$
PROCEDURE ROOM - 2

67
506-15-101

1
D717
-$0(6&
3$8/ 3HWHU%DVVR$VVRFLDWHV,QF

5
(1*,1((5 '$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
&2168/7,1*(1*,1((56
1R

1 ((
07-01-2016 - 1/4" = 1'-0" 150008

/ ,& ( 1
/LYHUQRLV6XLWH


*,

6(
1
7UR\0LFKLJDQ

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW

'
35 ( 7HO
7TH FLOOR MEDICAL GAS PLAN - (NORTH) (PHASE 4) $/ '5$:,1*180%(5
)*5&792*394+
2) ( 352-(&7 EXPANDED ENDO. & PULMONARY
6 6 ,2 1 )D[
SCALE: 1/4" = 1'-0" ZZZ3HWHU%DVVR$VVRFLDWHVFRP ;*9*7&38&++&.78
3%$3URMHFW1R CLINICAL SPACES M-971
BID DOCUMENTS
        
        

WE RECYCLE

$
$

%
%

&
&

'
'

(
(

)
)

5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(


EXPANDED ENDOSCOPY AND

*
*

MECHANICAL DETAILS PULMONARY CLINICAL SPACES


9$352-(&7180%(5
3HWHU%DVVR$VVRFLDWHV,QF 506-15-101
&2168/7,1*(1*,1((56
'$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
07-01-2016 - NTS 150008

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW
352-(&7 EXPANDED ENDO. & PULMONARY '5$:,1*180%(5
CLINICAL SPACES M-601
BID DOCUMENTS
        
        

WE RECYCLE

$
$

%
%

&
&

'
'

(
(

)
)

5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(


EXPANDED ENDOSCOPY AND

*
*

MECHANICAL DETAILS PULMONARY CLINICAL SPACES


9$352-(&7180%(5
3HWHU%DVVR$VVRFLDWHV,QF 506-15-101
&2168/7,1*(1*,1((56
'$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
07-01-2016 - NTS 150008

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW
352-(&7 EXPANDED ENDO. & PULMONARY '5$:,1*180%(5
CLINICAL SPACES M-602
BID DOCUMENTS
        
        

WE RECYCLE

$
$

%
%

&
&

'
'

(
(

)
)

5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(


EXPANDED ENDOSCOPY AND

*
*

MECHANICAL SCHEDULES PULMONARY CLINICAL SPACES


9$352-(&7180%(5
3HWHU%DVVR$VVRFLDWHV,QF 506-15-101
&2168/7,1*(1*,1((56
'$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
07-01-2016 - NTS 150008

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW
352-(&7 EXPANDED ENDO. & PULMONARY '5$:,1*180%(5
CLINICAL SPACES M-701
BID DOCUMENTS
        
        

WE RECYCLE

$
$

%
%

&
&

'
'

(
(

)
)

5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(


EXPANDED ENDOSCOPY AND

*
*

MECHANICAL SCHEDULES PULMONARY CLINICAL SPACES


9$352-(&7180%(5
3HWHU%DVVR$VVRFLDWHV,QF 506-15-101
&2168/7,1*(1*,1((56
'$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
07-01-2016 - NTS 150008

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW
352-(&7 EXPANDED ENDO. & PULMONARY '5$:,1*180%(5
CLINICAL SPACES M-702
BID DOCUMENTS
        
        

WE RECYCLE

$
$

%
%

&
&

'
'

(
(

)
)

5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(


EXPANDED ENDOSCOPY AND

*
*

TEMPERATURE CONTROLS PULMONARY CLINICAL SPACES


9$352-(&7180%(5
3HWHU%DVVR$VVRFLDWHV,QF 506-15-101
&2168/7,1*(1*,1((56
'$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
07-01-2016 - NTS 150008

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW
352-(&7 EXPANDED ENDO. & PULMONARY '5$:,1*180%(5
CLINICAL SPACES M-801
BID DOCUMENTS
        
        

WE RECYCLE

$
$

%
%

&
&

'
'

(
(

)
)

5(9,6,216 '5$:,1*7,7/( 9$352-(&71$0(


EXPANDED ENDOSCOPY AND

*
*

TEMPERATURE CONTROLS PULMONARY CLINICAL SPACES


9$352-(&7180%(5
3HWHU%DVVR$VVRFLDWHV,QF 506-15-101
&2168/7,1*(1*,1((56
'$7( %8,/',1*180%(5 3/276&$/( &$(352-(&7180%(5
07-01-2016 - NTS 150008

ZZZFDHFRP
HOHYDWLQJKXPDQDFKLHYHPHQW
352-(&7 EXPANDED ENDO. & PULMONARY '5$:,1*180%(5
CLINICAL SPACES M-802
BID DOCUMENTS
        