INPUT DATA SHEET

Project : TK9764 - I/C No. 10 Deisgned : C. Malek


Bridge : AT STA. 0+100 - LEFT & RIGHT Checked : G. Marj
Date : 4/14/2019 Approved : G. Marj
LS
WW WA WB WC EB BT
CR CR

C4 Xi
WH WT P1- P11 C6 P1 P11
HB
EB
WS TH

C3 HG C3 CC

WAW * S7
HS

C1
S6
C1
S1
S5
* Shall be = WA S2 HT
if wing wall is
needed or = 0
C2

BX BW BC WD
HF C5
C5

BF LF

GEOMETRY DECK REACTIONS (kN)


Vertical Reactions Lateral loads (kN)
BF= 8.00 (m)

BT= 3.20 (m) (KN) DL Prestress LL Xi (m) a-Longitudinal


EB= 0.50 (m) ### P1 = 261.00 0.00 140.00 -10.00 a-
WC= 0.50 (m) ### P2 = 261.00 0.00 140.00 -7.50 H(brak.) 63.00
WB= 0.30 (m) ### P3 = 261.00 0.00 140.00 -5.00 H(E.Q.) 321.81
WA= 3.50 (m) ### P4 = 261.00 0.00 140.00 -2.50
WD= 0.00 (m) 0.00 P5 = 261.00 0.00 140.00 0.00 b-Transversal
BC= 1.30 (m) 652.50 P6 = 261.00 0.00 140.00 2.50 b-
BW= 0.00 (m) ### P7 = 261.00 0.00 140.00 5.00 H(E.Q.) 364.97
BX= 0.00 (m) ### P8 = 261.00 0.00 140.00 7.50
HS= 10.50 (m) ### P9 = 261.00 0.00 140.00 10.00
HF= 1.50 (m) 0.00 P10 = 0.00 0.00 0.00 0.00
HB= 1.90 (m) 0.00 P11 = 0.00 0.00 0.00 0.00
HG= 0.00 (m) 0.00 P12 = 0.00 0.00 0.00 0.00
HT= 0.60 (m) 0.00 2349.00 0.00 1260.00
LS= 25.00 (m) Soil data Materials
CR= 0.30 (m) g= 18.00 kN/m³ f'c = 25000 kN/m²
CC= 7.00 (m) f= 35.00 degree fy = 420000 kN/m²
LF= 25.00 (m) Ka = 0.271 gm = 17.00 kN/m3
WAW= 0.00 (m) m= 0.50 base fric. Horizontal Load factors
TH= 0.00 (m) Surch. = 11.00 kN/m² Braking 5 % of L.L.
WS= 3.00 (m) i= 0.00 degree Earthquake 13.7 % of Mass
WH= 0.75 (m) b= 0.00 degree
WT= 0.30 (m) d= 0.00 degree
WW= 3.00 (m) A= 0.40 Acc. Coeff.
Kh = 0.20 = A/2
Kv= 0.00
q= 11.31 degree

416558239.xls - Rev. 2.0 1 / 22 04/14/2019


Y= 2.205
KAE = 0.396

416558239.xls - Rev. 2.0 2 / 22 04/14/2019


CR

###
###
###
###
###
0
###
###
###
###
0
0
0
0

416558239.xls - Rev. 2.0 3 / 22 04/14/2019


TK9764 - I/C No. 10
OUTPUT DATA SHEET

Static Pressures Dynamic Pressures

E14
E21

E15

E23
EP2 EP1 EP3 E24
E22
es2 E16

E17

E18
es1
es3

1 - Own weight Arm. Moment 2 - Soil Loads Arm.


(m) (kN.m) (m)
C1 = 6987.50 (kN) 3.85 26901.88 S1 = 16537.50 (kN) 6.25
C2 = 0.00 (kN) - - S2 = 864.00 (kN) 1.60
C3 = 0.00 (kN) 3.85 0.00 S5 = 0.00 (kN) -
C4 = 356.25 (kN) 4.35 1549.69 S6 = 0.00 (kN) -
C5 = 7500.00 (kN) 4.00 30000.00 S7 = 0.00 (kN) -
C6 = 28.50 (kN) 3.70 105.45 Total 17401.50 (kN)
C7 = 0.00 (kN) 0.00 0.00
C8 = 84.38 (kN) 5.70 480.94
Total 14956.6 (kN) 59037.95

3- Abut. Dynamic forces Arm.


(m)
Moment
(kN.m)
4 - Static Earth pressure Arm.
(m)
E14 = 71.25 (kN) 11.05 787.31 Ka = 0.271
E15 = 0.00 (kN) - - es1 = 58.53 (kN/m2) -
E16 = 1397.50 (kN) 5.80 8105.50 es2 = 2.98 (kN/m )2
-
E17 = 0.00 (kN) - - EP1 = 8780.08 (kN) 4.00
E18 = 1500.00 (kN) 0.75 1125.00 EP2 = 894.27 (kN) 6.00
E19 = 16.88 (kN) 11.63 196.17 Total (under construction) 8780.08 (kN) -
E20 = 0.00 (kN) 10.87 0.00 Total (surcharge) 894.27 (kN) -
E21 = 598.50 (kN) 11.05 6613.43
E22 = 2709.00 (kN) 5.80 15712.20
E23 = 0.00 (kN) 6.52 0.00
E24 = 0.00 (kN) 5.80 0.00
E25 = 16.88 (kN) 10.95 184.78
Total 6310.00 (kN) 32724.39

416558239.xls - Rev. 2.0 4 / 22 04/14/2019


TK9764 - I/C No. 10

Longitu. Transver.

5 - Deck Reactions Arm. Moment Moment 6-Soil Dynamic Pressures Arm.


(m) (kN.m) (kN.m) (m)
D.L. 2349.00 (kN) 3.70 8691.30 0.00 Ka = 0.271
L.L. 1260.00 (kN) 3.70 4662.00 0.00 es3 = 26.91 (kN/m2) -
Brack 63.00 (kN) 8.60 - EP3 = 4036.90 (kN) 7.20
Total 4036.90 (kN)
Bearings (R+S+T) Reaction Arm. Moment
(m) (kN.m)
R+S+T 0.00 (kN) 10.10 0.00

7- Earthquake reaction Arm. Moment


(m) (kN.m) g= 18.00 kN/m³
E.Q. 321.81 (kN) 10.10 3250.311 q= 11.310 degree
Y= 2.205

8 - Surcharge Arm. Moment


(m) (kN.m) KAE = 0.396
L.L. 962.50 (kN) 6.25 6015.63 Kdyn. = 0.125

9- Bill Of Quantities

Concrete 595.44 (m3)

416558239.xls - Rev. 2.0 5 / 22 04/14/2019


TK9764 - I/C No. 10

E15

E23

E24

E16

E17

E18

Moment
(kN.m)
103359.38
1382.40
-
-
-
104741.8

Moment
(kN.m)

-
-
35120.31
5365.60
35120.31
5365.60

416558239.xls - Rev. 2.0 6 / 22 04/14/2019


TK9764 - I/C No. 10

Moment
(kN.m)

-
29065.70
29065.70

416558239.xls - Rev. 2.0 7 / 22 04/14/2019


TK9764 - I/C No. 10
CHECKING FOR STABILITY

A- CHECKING DURING CONSTRUCTION

Group I ( D.L. + EP. + Surch.)

1 - Check for sliding 2 - Check for overturning


1- 2-

Total Vertical load N = 33320.63 (kN) Overturning Moment Mo = 40485.91 (kN.m)

Total Lateral load F= 9674.34 (kN) Stabilising Moment Ms = 169795.4 (kN.m)

Factor of safety F.O.S. = 1.72 Factor of safety F.O.S. = 4.19

Group I ( D.L. + EP. )

1 - Check for sliding 2 - Check for overturning


1- 2-

Total Vertical load N = 32358.13 (kN) Overturning Moment Mo = 35120.31 (kN.m)

Total Lateral load F= 8780.08 (kN) Stabilising Moment Ms = 163779.7 (kN.m)

Factor of safety F.O.S. = 1.84 Factor of safety F.O.S. = 4.66

B- CHECKING AT SERVICE LOADING

Group I ( D.L. + L.L.+ EP. + Surch.)

1 - Check for sliding 2 - Check for overturning


1- 2-

Total Vertical load N = 36929.63 (kN) Overturning Moment Mo = 40485.91 (kN.m)

Total Lateral load F= 9737.34 (kN) Stabilising Moment Ms = 183148.7 (kN.m)

Factor of safety F.O.S. = 1.90 Factor of safety F.O.S. = 4.52

416558239.xls - Rev. 2.0 8 / 22 04/14/2019


TK9764 - I/C No. 10

3 - Check for stresses

q3
Mnet = 142663 (kN.m)
N= 36929.6 (kN) LF

X= 3.863 (m) q2
ecc. = 0.14 (m)
BF

Mfinal longitudinal = 5055.76 (kN.m) q4

Mfinal transversal = 0.00 (kN.m)


q1
Total bearing pressures
q1 = 203.61 (kN/m2) Area of base 200.0 (m2)
q2 = 203.61 (kN/m2) Inertia longitudinal 1066.7 (m4)
q3 = 165.69 (kN/m2) Inertia transversal 10416.7 (m4)
q4 = 165.69 (kN/m2) Y longitudinal 4.00 (m)
Y transversal 12.50 (m)

qmax = 203.61 (kN/m2) Corresponding to a net bearing pressure of 165.81 (kN/m2)

qaverage/net = 3/4 qmax/net + 1/4 qmin/net = 156.33 (kN/m2)

416558239.xls - Rev. 2.0 9 / 22 04/14/2019


TK9764 - I/C No. 10
CHECKING FOR STABILITY

C- CHECKING DURING EARTHQUAKE

Group VII ( D.L. + EP. + E.Q.) Stresses 133%

1 - Check for sliding 2 - Check for overturning


1- 2-

Total Vertical load N = 34707.13 (kN) Overturning Moment Mo = 100160.7 (kN.m)

Total Lateral load F = 19448.79 (kN) Stabilising Moment Ms = 172471.0 (kN.m)

Factor of safety F.O.S. = 0.89 Factor of safety F.O.S. = 1.72

3 - Check for stresses

Mnet = 72310 (kN.m)


N= 34707.1 (kN) q3

LF

X= 2.083 (m)
q2
ecc. = 1.917 (m)
BF

Mfinal longitudinal 66518.19 (kN.m) q4

Mfinal transversal = 3686.18 (kN.m)


q
Total bearing pressures 1
q1 = 427.40 (kN/m2) Area of base 200.0 (m2)
q2 = 418.56 (kN/m2) Inertia longitudinal 1066.7 (m4)
q3 = -80.33 (kN/m2) Inertia transversal 10416.7 (m4)
q4 = -71.48 (kN/m2) Y longitudinal 4.00 (m)
Y transversal 12.50 (m)

qmax = 427.40 (kN/m2) Corresponding to a net bearing pressure of 283.56 (kN/m2)

qaverage/net = 3/4 qmax/net + 1/4 qmin/net = 183.13 (kN/m2)

416558239.xls - Rev. 2.0 10 / 22 04/14/2019


TK9764 - I/C No. 10
PILE DATA SHEET

A- PILE REACTIONS

1 - Piles & Pile Cap Data


No. n1 n2 Ymax
Row d p s S x2 S y2
Piles
1 10 1.000 1.250 2.50 4.0 4.5 11.250 83.2 515.6
2 6 3.500 2.500 5.00 2.0 2.5 12.500 0.9 437.5
3 10 7.000 1.250 2.50 4.0 4.5 11.250 97.1 515.6
- - - - 0.0 0.0
- - - - 0.0 0.0
3 rows 26 Xcog = 3.88 m Ycog = 12.50 m 181.15 1468.8

Pile Diameter = 1000 mm


Pile Capacity = 1500 KN

PILE REACTIONS (UNFACTORED WORKING LOADS)


Pile1 Pile2 Pile3 Pile4 Pile5 Pile6 Allowable Shear Shear
increase in
GROUP (KN) (KN) (KN) (KN) long. tran.
(KN) (KN) capacity
(KN) (KN)

I 1433 1433 1407 1407 1422 1422 100 375 -


VII 2359 2302 288 232 1436 1499 133 748 12

B- DESIGN LOADS

PILE REACTIONS (FACTORED ULTIMATE LOADS)


Pile1 Pile2 Pile3 Pile4 Pile5 Pile6 Allowable Shear Shear
increase in
GROUP (KN) (KN) (KN) (KN) long. tran.
(KN) (KN) capacity
(KN) (KN)

I 2202 2202 1618 1618 1958 1958 100 651 -


VII 1773 1731 217 174 1080 1127 133 562 9

1 - Pile Cap Analysis Moments Shear


No.
Row d GI G VII GI G VII
Piles
1 10 1 1.25 1937.4 1541.9 880.62 700.85
2 6 3.5 2.5 -470 -264.8 470 264.83
3 10 7 1.25 1617.9 195.4 647.1 78.1
- 0 0 0
- 0 0 0
3 rows 26 Toe 1937.4 1541.9 880.62 700.85
Heel 1147.9 -69.48 1117.1 342.97

416558239.xls - Rev. 2.0 11 / 22 04/14/2019


TK9764 - I/C No. 10

Pile 3 Pile 6 Pile 1

Transversa
l
p3 p1
x

p2

d1 s3 s1
d1

d2 s2
d3 d2
D
d3

Longitudinal Pile 5
Pile 4 Pile 2

416558239.xls - Rev. 2.0 12 / 22 04/14/2019


TK9764 - I/C No. 10

416558239.xls - Rev. 2.0 13 / 22 04/14/2019


TK9764 - I/C No. 10

416558239.xls - Rev. 2.0 14 / 22 04/14/2019


TK9764 - I/C No. 10
DESIGN FOR MOMENT

1 - Stem
1-
(per meter)

A= 1.30 (m2)
Yt = 0.65 (m)
1 1
Ig = 0.183 (m4)

Stem GROUP I GROUP VII

Mu = KN.m 1994.3 2807.7


d= m 1.17 1.17
fr = Mpa 3.1 3.1
Mcr = KN.m 885.1 885.1
1.2 Mcr = KN.m 1062.2 1.2 Mcr < Mu, OK 1062.2 1.2 Mcr < Mu, OK
m= 19.76 19.76
Rn = Mpa 1.61872 2.27896
r= % 0.401 0.575
a= cm 9.28 0.33 13.30 0.33
As = cm2 46.96 67.31

2 - Toe
2-
(per meter)

A= 1.50 (m2)
Yt = 0.75 (m)
Ig = 0.281 (m4)
2

Toe GROUP I GROUP VII

Mu = KN.m 1438.2 1157.9


d= m 1.35 1.35
fr = Mpa 3.1 3.1
Mcr = KN.m 1178.4 1178.4
1.2 Mcr = KN.m 1414.1 1.2 Mcr < Mu, OK 1414.1 Redesign elastic
m= 19.76 19.76
Rn = Mpa 0.8768 0.70591
r= % 0.213 0.171 use rmin = 0.18%
a= cm 5.69 27 4.56 27
As = cm2 28.79 23.08 Asmin = 27 cm2

416558239.xls - Rev. 2.0 15 / 22 04/14/2019


TK9764 - I/C No. 10

3 - Heel
3-
(per meter)

A= 1.50 (m2)
Yt = 0.75 (m)
Ig = 0.281 (m4)
3

Heel GROUP I GROUP VII

Mu = KN.m 656 1457


d= m 1.35 1.35
fr = Mpa 3.1 3.1
Mcr = KN.m 1178.4 1178.4
1.2 Mcr = KN.m 1414.1 Redesign elastic 1414.1 1.2 Mcr < Mu, OK
m= 19.76 19.76
Rn = Mpa 0.39972 0.88815
r= % 0.096 use rmin = 0.18% 0.216
a= cm 2.56 27 5.77
As = cm2 12.97 Asmin = 27 cm2 29.17

Summary of Reinforcement 1/2


Foundation
POZ As CAP ARALIK ARALIK ADET
No. cm2 / m DIAM. SPAC. SPAC. No.
mm Cm Cm
01 28.79 20 10.91 15 Unacceptable Spac.
02 - - -
03 29.17 20 10.77 15 Unacceptable Spac.
04 - - -
05 27.00 25 18.18 15 Spac. OK
06 27.00 25 18.18 15 Spac. OK
07 27.00 25 18.18 15 Spac. OK
08 5.33 14 28.86 25 Spac. OK
09 5.33 16 37.70 25 Spac. OK
10 5.33 16 37.70 25 Spac. OK
11 19.50 20 16.11 15 Spac. OK
12 53.33 32 15.08 15 Spac. OK
13 13.98 25 35.10 15 Spac. OK
14 3 No 20 - 100 Spac. OK

416558239.xls - Rev. 2.0 16 / 22 04/14/2019


TK9764 - I/C No. 10

Summary of Reinforcement 2/2


wall
POZ As CAP ARALIK ARALIK ADET
No. cm2 / m DIAM. SPAC. SPAC. No.
mm Cm Cm
18 #REF! 16 #REF! 15 #REF! Wall min horiz/face
27 #REF! 14 #REF! 15 #REF! BackWall min horiz
23 #REF! 16 #REF! 15 #REF! Back Wall min vert
24 - 14 - - - Bracket long steel
25 #REF! 16 #REF! 15 #REF! Bracket Main steel
26 - 16 - 20 - Bracket Dowel bars

13

11

12 04
05,06 & 07
03
08, 09&10

14

01 02
05,06 & 07

416558239.xls - Rev. 2.0 17 / 22 04/14/2019


TK9764 - I/C No. 10
DESIGN FOR MOMENT

1 - Stem
1-
(per meter)

A= 1.30 (m2)
Yt = 0.65 (m)
1 1
Ig = 0.183 (m4)

Stem GROUP I GROUP VII

Mu = KN.m 1994.3 2807.7


d= m 1.17 1.17
fr = Mpa 3.1 3.1
Mcr = KN.m 885.1 885.1
1.2 Mcr = KN.m 1062.2 1.2 Mcr < Mu, OK 1062.2 1.2 Mcr < Mu, OK
m= 19.76 19.76
Rn = Mpa 1.61872 2.27896
r= % 0.401 0.575
a= cm 9.28 0.33 13.30 0.33
As = cm2 46.96 67.31

2 - Toe
2-
(per meter)

A= 1.50 (m2)
Yt = 0.75 (m)
Ig = 0.281 (m4)
2

Toe GROUP I GROUP VII

Mu = KN.m 1228.4 -795.3


d= m 1.35 1.35
fr = Mpa 3.1 3.1
Mcr = KN.m 1178.4 1178.4
1.2 Mcr = KN.m 1414.1 Redesign elastic 1414.1 Redesign elastic
m= 19.76 19.76
Rn = Mpa 0.7489 -0.48486
r= % 0.182 -0.114 use rmin = 0.18%
a= cm 4.84 27 -3.05 27
As = cm2 24.51 -15.41 Asmin = 27 cm2

416558239.xls - Rev. 2.0 18 / 22 04/14/2019


TK9764 - I/C No. 10

3 - Heel
3-
(per meter)

A= 1.50 (m2)
Yt = 0.75 (m)
Ig = 0.281 (m4)
3

Heel GROUP I GROUP VII

Mu = KN.m 811 1387


d= m 1.35 1.35
fr = Mpa 3.1 3.1
Mcr = KN.m 1178.4 1178.4
1.2 Mcr = KN.m 1414.1 Redesign elastic 1414.1 Redesign elastic
m= 19.76 19.76
Rn = Mpa 0.4945 0.84579
r= % 0.119 use rmin = 0.18% 0.206
a= cm 3.18 27 5.48
As = cm2 16.08 Asmin = 27 cm2 27.75

Summary of Reinforcement 1/2


Foundation
POZ As CAP ARALIK ARALIK ADET
No. cm2 / m DIAM. SPAC. SPAC. No.
mm Cm Cm
01 27.00 25 18.18 15 Spac. OK
02 - - -
03 27.75 25 17.69 15 Spac. OK
04 - - -
05 27.00 25 18.18 15 Spac. OK
06 27.00 25 18.18 15 Spac. OK
07 27.00 25 18.18 15 Spac. OK
08 5.33 14 28.86 25 Spac. OK
09 5.33 16 37.70 25 Spac. OK
10 5.33 16 37.70 25 Spac. OK
11 19.50 20 16.11 15 Spac. OK
12 53.33 32 15.08 15 Spac. OK
13 13.98 25 35.10 15 Spac. OK
14 3 No 20 - 100 Spac. OK

416558239.xls - Rev. 2.0 19 / 22 04/14/2019


TK9764 - I/C No. 10

Summary of Reinforcement 2/2


wall
POZ As CAP ARALIK ARALIK ADET
No. cm2 / m DIAM. SPAC. SPAC. No.
mm Cm Cm
18 #REF! 16 #REF! 15 #REF! Wall min horiz/face
27 #REF! 14 #REF! 15 #REF! BackWall min horiz
23 #REF! 16 #REF! 15 #REF! Back Wall min vert
24 - 14 - - - Bracket long steel
25 #REF! 16 #REF! 15 #REF! Bracket Main steel
26 - 16 - 20 - Bracket Dowel bars

13

11

12 04
05,06 & 07
03
08, 09&10

14

01 02
05,06 & 07

416558239.xls - Rev. 2.0 20 / 22 04/14/2019


TK9764 - I/C No. 10
DESIGN FOR SHEAR

1 - Stem
1-
(per meter)

Stem GROUP I GROUP VII

Vu = KN/m 527.8 597.8


d= m 1.17 1.17
vu = Mpa 0.45 0.51
vc = Mpa 0.83 0.83
f vc = Mpa 0.71 Ø vc > vu, OK 0.71 Ø vc > vu, OK

2 - Toe
2-
(per meter)

Toe GROUP I GROUP VII

Vu = KN/m 724.6 580.9


d= m 1.35 1.35
vu = Mpa 0.54 0.43
vc = Mpa 0.83 0.83
f vc = Mpa 0.71 Ø vc > vu, OK 0.71 Ø vc > vu, OK

3 - Heel
3-
(per meter)
0

Heel GROUP I GROUP VII

Vu = KN/m -14.1 408.8


d= m 1.35 1.35
vu = Mpa -0.01 0.30
vc = Mpa 0.83 0.83
f vc = Mpa 0.71 Ø vc > vu, OK 0.71 Ø vc > vu, OK

4 - Check for Punching


4-
(per meter)
b0 = 4.10 (m)
d= 1.35 (m)

Corner Pile GROUP I GROUP VII

Pmax = KN 2202 1773


Vn = KN 8847 8847
f Vn = KN 7520 Ø Vn > Pmax, OK 7520 Ø Vn > Pmax, OK

416558239.xls - Rev. 2.0 21 / 22 04/14/2019


TK9764 - I/C No. 10
DESIGN FOR SHEAR

1 - Stem
1-
(per meter)

Stem GROUP I GROUP VII

Vu = KN/m 527.8 597.8


d= m 1.17 1.17
vu = Mpa 0.45 0.51
vc = Mpa 0.83 0.83
f vc = Mpa 0.71 Ø vc > vu, OK 0.71 Ø vc > vu, OK

2 - Toe
2-
(per meter)

Toe GROUP I GROUP VII

Vu = KN/m 468.2 -209.8


d= m - 1.35
vu = Mpa ### -0.16
vc = Mpa 0.83 0.83
f vc = Mpa 0.71 #VALUE! 0.71 Ø vc > vu, OK

3 - Heel
3-
(per meter)
0

Heel GROUP I GROUP VII

Vu = KN/m 284.7 487.0


d= m 1.35 1.35
vu = Mpa 0.21 0.36
vc = Mpa 0.83 0.83
f vc = Mpa 0.71 Ø vc > vu, OK 0.71 Ø vc > vu, OK

416558239.xls - Rev. 1.0 22 / 22 04/14/2019