Professional Documents
Culture Documents
C4 Xi
WH WT P1- P11 C6 P1 P11
HB
EB
WS TH
C3 HG C3 CC
WAW * S7
HS
C1
S6
C1
S1
S5
* Shall be = WA S2 HT
if wing wall is
needed or = 0
C2
BX BW BC WD
HF C5
C5
BF LF
###
###
###
###
###
0
###
###
###
###
0
0
0
0
E14
E21
E15
E23
EP2 EP1 EP3 E24
E22
es2 E16
E17
E18
es1
es3
Longitu. Transver.
9- Bill Of Quantities
E15
E23
E24
E16
E17
E18
Moment
(kN.m)
103359.38
1382.40
-
-
-
104741.8
Moment
(kN.m)
-
-
35120.31
5365.60
35120.31
5365.60
Moment
(kN.m)
-
29065.70
29065.70
q3
Mnet = 142663 (kN.m)
N= 36929.6 (kN) LF
X= 3.863 (m) q2
ecc. = 0.14 (m)
BF
LF
X= 2.083 (m)
q2
ecc. = 1.917 (m)
BF
A- PILE REACTIONS
B- DESIGN LOADS
Transversa
l
p3 p1
x
p2
d1 s3 s1
d1
d2 s2
d3 d2
D
d3
Longitudinal Pile 5
Pile 4 Pile 2
1 - Stem
1-
(per meter)
A= 1.30 (m2)
Yt = 0.65 (m)
1 1
Ig = 0.183 (m4)
2 - Toe
2-
(per meter)
A= 1.50 (m2)
Yt = 0.75 (m)
Ig = 0.281 (m4)
2
3 - Heel
3-
(per meter)
A= 1.50 (m2)
Yt = 0.75 (m)
Ig = 0.281 (m4)
3
13
11
12 04
05,06 & 07
03
08, 09&10
14
01 02
05,06 & 07
1 - Stem
1-
(per meter)
A= 1.30 (m2)
Yt = 0.65 (m)
1 1
Ig = 0.183 (m4)
2 - Toe
2-
(per meter)
A= 1.50 (m2)
Yt = 0.75 (m)
Ig = 0.281 (m4)
2
3 - Heel
3-
(per meter)
A= 1.50 (m2)
Yt = 0.75 (m)
Ig = 0.281 (m4)
3
13
11
12 04
05,06 & 07
03
08, 09&10
14
01 02
05,06 & 07
1 - Stem
1-
(per meter)
2 - Toe
2-
(per meter)
3 - Heel
3-
(per meter)
0
1 - Stem
1-
(per meter)
2 - Toe
2-
(per meter)
3 - Heel
3-
(per meter)
0