BAROY-STA.

CRUZ-SALONG PROVINCIAL ROAD


Objective: To rectify deffects in Baroy-Sta Cruz project in line with CMGP guidelines
April 2-5, 2019 - DILG
April 18, 2019 - CMGP

NO Concerns Recommendation/Actions Station Manpower

Remove the Entire project


1 Embedded/foreign embedded/foreign (0+000 - 4
materials, materials and seal with 9+440) several
appropriate materials locations
Pockmarks,
potholes, tire
marks, and
footmarks

Remove and replace 1/3


Transverse Cracks - of the pavement block Entire project
within 1.5m from (0+000 -
2.1 with transverse crack 9+440) 4
weakened plane several
within 1.50 m from the locations
joint weakened plane joint

Seal the transverse crack Entire project


2.2
Transverse Cracks - located within the middle (0+000 - 4
inside middle thirds third with pressurized 9+440) several
concrete epoxy locations

Transverse Cracks - Entire project


(0+000 -
2.3 acting as weakened Apply asphalt sealant 4
9+440) several
plane joint locations

Entire project
3 Restraint crack
Apply asphalt sealant on (0+000 - 4
the restraint 9+440) several
locations

Entire project
4 Major scaling
Remove and replace the (0+000 - 4
PCCP block 9+440) several
locations
Entire project
4 Major scaling
Remove and replace the (0+000 - 4
PCCP block 9+440) several
locations

Prepared By:
SOV
Person
Tools Needed Materials Needed Quantity Target Completion
Incharge

Cement 50 bags

4 - spatula Sand 10 cu.m.


DBM/SOV April 1 - 30, 2019

2 - shovel Ecolatex 25 pails

Cement (bags) 900

Sand (cu.m) 50
Jackhammer w/
compressor, Genset, Gravel G1 (cu.m) 100 DBM/SOV April 1 - 30, 2019
Compact Drill & Drill
bit - 25mm dia.
25mm round bar 25mm x 6m (30 pcs)

Epoxy (Sikador - 31) 30 cans (A & B)

Compressor,
pressurized gun, level Self leveling epoxy 20 cans DBM/SOV April 1 - 30, 2019
hose

Grinder , Genset , 4- Asphalt 15 boxes DBM/SOV April 1 - 30, 2019


spatula

Grinder , Genset , 4- Asphalt 15 boxes DBM/SOV April 1 - 30, 2019


spatula

Cement (bags) 2700


Sand (cu.m) 150
3 - Demolition DBM/SOV April 1 - 30, 2019
hammer & Genset
3 - Demolition DBM/SOV April 1 - 30, 2019
hammer & Genset
Crushed Gravel 3/8 (cu.m) 300

Requested By: Approved By:


DMB JAT