Professional Documents
Culture Documents
NOTES:
1 PROJECT MANAGER CAN ADD/MODIFY CONENT OF COLUMNS BASE ON EQUIPMENT ON SITE
2 FUEL CONSUMPTION TO BE TRACKED ON A DAILY BASE AND SHEET UPDATED ON SHAREPOINT
3 PURCHASING MANAGER TO MONITOR CONSUMPTION
TOTAL
FUEL GENSET (250KVA)
DATE BALANCE FUEL USED BALANCE
(DAY) CARRY RECEIVED
FORWARD (LTRS) (F+I+L+O+R+ (LTRS)
(LTRS)
D/M/Y FUEL CONSUMPTION
RUNNING
U+X+AA+AD) CONSUMED RATE
HRS
(LTRS) (LTRS/HR) -(F/G)
5 2 2.5 5 2 2.5 5 2
5 2 2.5 5 2 2.5 5 2
10 4 2.5 10 4 2.5 10 4
ELDING GENERATOR AIR COMPRESSOR 300 CFM TRUCK CRANE
2.5
2.5
0 0 #DIV/0! 0 0 #DIV/0! 0
VEHICLE MOVEMENT
3T CANTER
0 0 0 #DIV/0!
FUEL CONSUMPTION TRACKING SHEET
NOTES:
1 PROJECT MANAGER CAN ADD/MODIFY CONENT OF COLUMNS BASE ON EQUIPMENT ON SITE
2 FUEL CONSUMPTION TO BE TRACKED ON A DAILY BASE AND SHEET UPDATED ON SHAREPOINT
3 PURCHASING MANAGER TO PURCHASE FUEL AS PER RATES
TOTAL
FUEL GENSET (250KVA)
DATE BALANCE FUEL USED BALANCE
(DAY) BROUGHT RECEIVED
FORWARD (LTRS) (F+I+L+O+R+ (LTRS)
(LTRS)
D/M/Y FUEL CONSUMPTION
RUNNING
U+X+AA+AD) CONSUMED RATE
HRS
(LTRS) (LTRS/HR) -(F/G)
5 2 2.5 5 2 2.5 5 2
5 2 2.5 5 2 2.5 5 2
10 4 2.5 10 4 2.5 10 4
ELDING GENERATOR AIR COMPRESSOR 300 CFM TRUCK CRANE
2.5
2.5
0 0 #DIV/0! 0 0 #DIV/0! 0
VEHICLE MOVEMENT
3T CANTER
0 0 0 #DIV/0!