Professional Documents
Culture Documents
II Operations, Manufacturing
a. quality issues addressed by plant
b. vendor/supplier issues, claims
c. planned changes in manufacturing process: outsourcing,
subsystems assembly, etc.
d. adequacy of manufacturing facilities, M&E. – planned major
capital expenditures required
d. inventory issues:finished goods or slow moving. Causes and planned resolution
e. cost of quality detail
f. product performance issues: by product and by customer
g. product liability by product and by customer
h. major ongoing technical problems
i. warranty spending by installation site
j. major shipment or start-up delays
k. long-term purchasing/supply agreements: assumable? terminable?
l. plans to reduce fixed cost platforms
m. status of the Ft. Worth facility – major issues? contract machining activity?
Systems
a. review status of SAP; completeness of implementation; requirements for expanding for
Newco integration.
b. Review of hardware status, location and ownership of servers; possibility of contracting
elements of the system to HD for a multi-year period
c. review status of CAD/CAM systems at all locations.
d. systems issues generally: capability of the management team, planned or required upgrades,
reinstallations; principal terms, cost of the SAP contract, required hardware upgrades and
spending, disaster recovery program
Human Resources
a. structure of the human resources management team
b. benefit programs by location and organization level.
c. pension plans, obligation
d. employment contracts
e. employee issues or claims: age racial or other discrimination, sexual harassment,
wrongful termination, etc.
f. labor contacts, organizing activies.
g. Compensation structure generally, review of any relevant compensation surveys or analyses