You are on page 1of 11

OH COSTS

Material
Labour Tools &
s.no ACTIVITY Cost driver cost in
cost machiner
rupees
y
Shuttering/
1 Direct labour Hours
formwork
1.1 1000 1305 300
Assembling for column
1.2 Assembling for Beam 2130 5244 600
1.3 Removal - Column 1000 1305
1.4 Removal - Beam 2130 5244
Direct labour Hours +
2 Reinforcement
Direct material cost
For columns upto 1st
2.1 3923 1854 2700
floor
For columns upto 2nd
2.2 3923 1854 2700
floor
For columns upto
2.3 3923 1854 2700
Terrace
2.4 For beams at 1st floor 5066 2500 5700
2.5 5066 2500 5700
For beams at 2nd floor
For beams at roof
2.6 5066 2500 5700
beam
Direct labour Hours +
3 Concreting
Direct material cost
3.1 Preparation 3435 2482
For columns upto 1st
3.2 6021 1200 470
floor
For columns upto 2nd
3.3 6021 1200 470
floor
For columns upto
3.4 6021 1200 470
Terrace
3.5 For beams at 1st floor 13970 2800 1640
3.6 13970 2800 1640
For beams at 2nd floor
For beams at roof
3.7 13970 2800 1640
beam
4 Curing Direct labour Hours
4.1 Curing for columns 945 150
4.2 Curing for Beams 2100 300

TOTAL= 2,27,500 93200 44640 35400


OH
COSTS
Others

###
COLUMN AND BEAM
LABOU
Material R
Rate in LABOUR
s.no ACTIVITY Unit Qty cost in RATES
figures REQUIRED
In
rupees
rupees
Shuttering/
1
formwork
Assembling for 1. Carpenter 500
1.1 cu.m 6.66 1000
column 2. Mazdoor 320

Assembling for 1. Carpenter 500


1.2 sq.m 142.3 2130
Beam 2. Mazdoor 320

1. Carpenter 500
1.3 Removal - Column cu.m 6.66 1000 2. Mazdoor 320

1. Carpenter 500
1.4 Removal - Beam sq.m 47.4 2130 2. Mazdoor 320
2 Reinforcement

1. Bar bender 500


For columns upto
2.1 KG 112 32690/tonne 3923 2. Mazdoor 350
1st floor
3. Fitter 455

1. Bar bender 500


For columns upto
2.2 KG 112 32690/tonne 3923 2. Mazdoor 350
2nd floor
3. Fitter 455

1. Bar bender 500


For columns upto
2.3 KG 112 32690/tonne 3923 2. Mazdoor 350
Terrace
3. Fitter 455

1. Bar bender 500


For beams at 1st
2.4 KG 155.4 32690/tonne 5066 2. Mazdoor 350
floor
3. Fitter 455

1. Bar bender 500


For beams at 2nd
2.5 KG 155.4 32690/tonne 5066 2. Mazdoor 350
floor
3. Fitter 455

1. Bar bender 500


For beams at roof
2.6 KG 155.4 32690/tonne 5066 2. Mazdoor 350
beam
3. Fitter 455

3 Concreting
1. Mazdoor
250
2. Bhisti
200
3.1 Preparation Cu.m 22.41 3. Mixer
350
operator
330
4. Mixer

1. Mazdoor 250
For columns upto 2. Bhisti 200
3.2 Cu.m 2.25 2676/cu.m 6021
1st floor 3. Mason 350
4. Vibrator 350

1. Mazdoor 250
For columns upto 2. Bhisti 200
3.3 Cu.m 2.25 2676/cu.m 6021
2nd floor 3. Mason 350
4. Vibrator 350

1. Mazdoor 250
For columns upto 2. Bhisti 200
3.4
Terrace
Cu.m 2.25 2676/cu.m 6021 3. Mason 350
4. Vibrator 350

1. Mazdoor 250
For beams at 1st 2. Bhisti 200
3.5 Cu.m 5.22 2676/cu.m 13970
floor 3. Mason 350
4. Vibrator 350

1. Mazdoor 250
For beams at 2nd 2. Bhisti 200
3.6 Cu.m 5.22 2676/cu.m 13970
floor 3. Mason 350
4. Vibrator 350

1. Mazdoor 250
For beams at roof 2. Bhisti 200
3.7 Cu.m 5.22 2676/cu.m 13970
beam 3. Mason 350
4. Vibrator 350

4 Curing
1. Mazdoor 250
4.1 Curing for columns Cu.m 6.7 2. Bhisti 200
3. Mason 350

1. Mazdoor 250
4.2 Curing for Beams Cu.m 15.6 2. Bhisti 200
3. Mason 350

TOTAL= 2,27,500 93200


LABOUR
Total
Labour No of Labour
output No of days Tool and Plants
productivity Labour per day cost

2 cu.m/ person 1 Joints & Ledges


5 cu.m 6.66/5= 1.33 days 1305
2 cu.m/ person 2 Posts

10 sq.m/ person 2 Joints & Ledges


60 sq.m142.3/60= 2.3 days 5244
10 sq.m/ person 4 Posts

2 cu.m/ person 1
5 cu.m 6.66/5= 1.33 days 1305
2 cu.m/ person 2
10 sq.m/ person 2
60 sq.m142.3/60= 2.3 days 5244
10 sq.m/ person 4

Rebar cutters - 1
1
Hammer - 2
2 100 kg 112/100=1.12 days 1854 Bar bending -1
1

Rebar cutters - 1
1
Hammer - 2
2 100 kg 112/100=1.12 days 1854 Bar bending -1
1

Rebar cutters - 1
1
Hammer - 2
2 100 kg 112/100=1.12 days 1854 Bar bending -1
1

Rebar cutters - 2
1
Hammer - 3
2 100 kg 155.4/100 =1.5 day 2500 Bar bending -2
1

Rebar cutters - 2
1
Hammer - 3
2 100 kg 155.4/100 =1.5 day 2500 Bar bending -2
1

Rebar cutters - 2
1
Hammer - 3
2 100 kg 155.4/100 =1.5 day 2500 Bar bending -2
1
2 cu.m/ person 3
1 cu.m/person 1 Wheel barrow - 2
15 cu.m22.41/15= 1.5 days 3435
2 cu.m/ person 1 Headpan- 2
2 cu.m/person 3

0.7 cu.m/ person 1 Wheel barrow - 1


0.3 cu.m/ person 1 Headpan- 2
2.2 cu.m 2.25/2.2= 1 Day 1200
0.5 cu.m/person 1 Trowel- 2
0.7 cu.m/person 1 Spade -2

0.7 cu.m/ person 1 Wheel barrow - 1


0.3 cu.m/ person 1 Headpan- 2
2.2 cu.m 2.25/2.2= 1 Day 1200
0.5 cu.m/person 1 Trowel- 2
0.7 cu.m/person 1 Spade -2

0.7 cu.m/ person 1 Wheel barrow - 1


0.3 cu.m/ person 1 Headpan- 2
2.2 cu.m 2.25/2.2= 1 Day 1200
0.5 cu.m/person 1 Trowel- 2
0.7 cu.m/person 1 Spade -2

0.7 cu.m/ person 2 Wheel barrow - 2


0.3 cu.m/ person 1 Headpan- 2
2.9 cu.m5.22/2.9= 2 days 2800
0.5 cu.m/person 1 Trowel- 2
0.7 cu.m/person 1 Spade -2

0.7 cu.m/ person 2 Wheel barrow - 2


0.3 cu.m/ person 1 Headpan- 2
2.9 cu.m5.22/2.9= 2 days 2800
0.5 cu.m/person 1 Trowel- 2
0.7 cu.m/person 1 Spade -2

0.7 cu.m/ person 2 Wheel barrow - 2


0.3 cu.m/ person 1 Headpan- 2
2.9 cu.m5.22/2.9= 2 days 2800
0.5 cu.m/person 1 Trowel- 2
0.7 cu.m/person 1 Spade -2

2 cu.m/ person 2
1 cu.m/ person 1 7 cu.m 6.7/7= 0.9 days 945 Water hose -2
2 cu.m/person 1

2 cu.m/ person 2
1 cu.m/ person 1 7 cu.m 15.6/7= 2 days 2100 Water hose -2
2 cu.m/person 1

29 days 44640
OVERHEAD COSTS

Tools & Plant Machinery Electricit


Machinery Total Water GST
cost cost y

300 300

600 600

Automatic Rebar
Tying Equipment
2000 -1 700 2700 85
Welding machine
-1

Automatic Rebar
Tying Equipment
2000 -1 700 2700 85 3295
Welding machine
-1

Automatic Rebar
Tying Equipment
2000 -1 700 2700 85
Welding machine
-1

Automatic Rebar
Tying Equipment
4800 -2 900 5700 140
Welding machine
-1

Automatic Rebar
Tying Equipment
4800 -2 900 5700 140 4255
Welding machine
-1

Automatic Rebar
Tying Equipment
4800 -2 900 5700 140
Welding machine
-1
Concrete mixer
232 2250 2482 300 100
-2

120 Vibrator - 1 350 470 154 80

120 Vibrator - 1 350 470 154 80 5057

120 Vibrator - 1 350 470 154 80

240 Vibrator - 2 1400 1640 370 185

240 Vibrator - 2 1400 1640 370 185 11203

240 Vibrator - 2 1400 1640 370 185

150 150 300

300 300 450

35400 2500 1600 23810


OSTS

Quality Safe Sanitation Storage


Security Haulage
inspection guards facilities area

1815 300 300

1100 700 500 500

3200

1400 700 500 500

5800
5800

900 1000 400 200

2000

1800 1000 500 300

800 100

7815 3400 2300 5800 1800 5200


WORK TYPE
COLUMN N BEAM
s.no ACTIVITY L B D No Unit Total
Shuttering/
1
formwork
Assembling for
1.1 0.23 0.23 3.05 42 cu.m 6.66
column
Assembling for
1.2 0.3 sq.m 142.3
Beam RFT 158.12
Removal -
1.3
Column
1.4 Removal - Beam RFT 158.12 0.3 sq.m 47.4
2 Reinforcement
For columns upto
2.1 0.8 10 14 KG 112
1st floor
For columns upto
2.2 0.8 10 14 KG 112
2nd floor
For columns upto
2.3 0.8 10 14 KG 112
Terrace
For beams at 1st
2.4 0.3 KG 155.4
floor RFT 158.12
For beams at
2.5 0.3 KG 155.4
2nd floor RFT 158.12
For beams at
2.6 0.3 KG 155.4
roof beam RFT 158.12
3 Concreting
For columns upto
3.1 0.23 0.23 3.05 14 Cu.m 2.25
1st floor
For columns upto
3.2 0.23 0.23 3.05 14 Cu.m 2.25
2nd floor
For columns upto
3.3 0.23 0.23 3.05 14 Cu.m 2.25
Terrace
For beams at 1st
3.4 0.15 0.22 Cu.m 5.22
floor RFT 158.12
For beams at
3.5 0.15 0.22 Cu.m 5.22
2nd floor RFT 158.12
For beams at
3.6 0.15 0.22 Cu.m 5.22
roof beam RFT 158.12
4 Curing
4.1 Curing for column 0.23 0.23 3.05 42 Cu.m 6.7
4.2 Curing for Beams Cu.m 15.6