1 Excavation
2 Sandfilling
3 Creating a formwork
3.1 Shuttering
Steelwork for Plinth
4
Beam
5 Concreting for Plinth
5.1 PCC work
5.22 RCC work
6 Plastering for Plinth
Waterproofing for
5
Plinth
COLUMN
1 Creating a formwork
2 Reinforcement
Reinforcement for
2.1 Column
Reinforcement for
2.2 Beam
3 Concreting
Concrete for Column
upto Finished floor
3.1 level
Concrete for Column
3.2 from GF to Fl
Concrete for Column
from GF to First floor
3.2 lvl
Concrete for Column
from 1st floor to 2nd
3.3 floor lvl
3.2 Concrete for Beam
4 Curing
1 Preparation of Mortar
2 External walls
4 Curing
5 Removing Formwork
P
Preparation of surface
LABOUR
FOUNDATION WORK
Mixer
Bar
Mate Mazdoor Bhisti operato Mixer Vibrator Carpenter Glazier
bender
r
WATERPROOFING WORK
PLINTH BEAM
COLUMN AND BEAM CONSTRUCTION
BRICK WORK
SLAB CONSTRUCTION
PLASTERING WORK
EQUIPMENT
Number
of Per
Per day
Polisher Washer Painter Labour Labour
output
require output
d
SETTING LAYOUT
Levelling
1 instrument
2 Long nails
3 Hammer
4 Right angle
5 Steel tape
6 Cotton thread
7 Cement
8 Screen sand
9 Theodolite
10 Lime powder
Sl.No
1 EARTH WORK EXCAVATION
FOOTING - F1 3 6 7 6 Cu.Ft.
FOOTING - F2 12 6 6 6 Cu.Ft.
EXCAVATION
RFT L B
FOR PLINTH BEAM
2 SAND
FOOTING - F1 3 6 7 0.5 Cu.Ft. 63.00
3 PCC
FOOTING - F1 3 6 7 0.5 Cu.Ft. 63.00
5 RCC
CONCRETE FOR
5.1
FOOTING
CONCRETE FOR
5.3 RFT L B
PLINTH BEAM
CONCRETE FOR
5.5 RFT L B
LINTEL
9"(first floor) 184 0.75 0.5 Cu.Ft. 69
Cu.Ft. 27
CONCRETE FOR
COLUMNS ABOVE
5.7
F.L UPTO G.F
SLAB
CONCRETE FOR
5.8 RFT L B
ROOF BEAM
GROUND FLOOR -
142 0.75 0.75 Cu.Ft. 79.88
RB1
GROUND FLOOR -
128 0.75 0.75 Cu.Ft. 72.00
RB2
FIRST FLOOR -
94 0.75 0.75 Cu.Ft. 52.88
RB1
FIRST FLOOR -
73 0.75 0.75 Cu.Ft. 41.06
RB2
Cu.Ft. ###
CONCRETE FOR
5.9 L B AREA
ROOF SLAB
Cu.Ft. ###
CONCRETE FOR
5.1 L B T
SILL PLATE
Cu.Ft. 11
6 STEEL WORK
REINFORCEMENT Wt./sq
6.1 L B
FOR FOOTING .ft
REINFORCEMENT
6.2 FOR COLUMN wt./ft. ht.
UPTO First slab
REINFORCEMENT wt./s.f
6.6 L B
FOR SUNSHADE t
REINFORCEMENT Wt /
6.7 RFT
FOR ROOF BEAM ft.
GROUND FLOOR -
142 8 KG ###
RB1
GROUND FLOOR -
128 5.5 KG ###
RB2
FIRST FLOOR -
94 8 KG ###
RB1
FIRST FLOOR -
73 5.5 KG ###
RB2
MT 2.994
10% wastage 0.1 0.299
3.293
REINFORCEMNEN
6.8 T FOR ROOF
SLAB
Sq.Ft. ###
REINFORCEMNEN
T FOR ROOF Wt. AREA
SLAB
1.5 ### KG ###
MT 2.4
10% wastage 0.1 0.2
2.7
REINFORCEMENT wt./s.f
6.9 L B
FOR SILL PLATE t.
7 6 KG 42
2 6 KG 12
MT 0.05
10% wastage 0.1 0.01
0.06
7 BRICK WORK
WINDOW 1 6 4 4 Sq.Ft. 96
Sq.Ft. 1043
Sq.Ft. 721
Sq.Ft. 265.5
Sq.Ft. ###
9 VENTILATOR L B D
GROUND FLOOR
3 2 2 Sq.Ft. 12.00
& FIRST FLOOR
Sq.Ft. 12.00
10 EARTH FILLING L B D
27 44 1.25 Cu.Ft. 1485
CERAMIC
11 L B AREA
FLOORING IN
ADD 10%
(SKATING & 0.1 Sq.Ft. 171.6
WASTAGE)
Sq.Ft. 1888
12 WALL CLADDING L B AREA
40 7 Sq.Ft. 280
ADD 10%
(SKATING & 0.1 Sq.Ft. 28
WASTAGE)
Sq.Ft. 308
PLASTERING IN
13 CEILING &
SUNSHADE
ROOF BEAM
120.4 0.75 Sq.Ft. 90.28
(GROUND FLOOR)
ROOF BEAM
14.38 0.75 Sq.Ft. 10.78
(FIRST FLOOR)
Sq.Ft. ###
WALL
14 RFT ht.
PLASTERING
OUTER WALL
PLASTERING 1 128 10 Sq.Ft. ###
GROUND FLOOR
DEDUCTION
MAIN DOOR 1 4.5 7 0.75 Sq.Ft. 23.6
Sq.Ft. 1150.3
PLINTH
RFT ht
PLASTERING
OUTER WALL
PLASTERING RFT ht
FIRST FLOOR
Sq.Ft. 842.0
RFT ht
PLASTERING
69.75 7 471
PARAPET WALL
Sq.Ft. 471
INNER WALL
PLASTERING
Sq.Ft. ###
FIRST FLOOR 124 9.5 Sq.Ft. 1178.0
DEDUCTION
MAIN DOOR 1 4.5 7 0.75 Sq.Ft. 23.6
Sq.Ft. ###
CEMENT
15
PAINTING
OUTER WALL
PAINTING 1 40 11.583 463.3 Sq.Ft. 463.3
GROUND FLOOR
DEDUCTION
MAIN DOOR 1 4.5 7 0.75 Sq.Ft. 23.6
Sq.Ft. 333.6
OUTER WALL
PAINTING FIRST RFT ht
FLOOR
Sq.Ft. 842.0
RFT ht
PAINTING
69.75 7 471
PARAPET WALL
Sq.Ft. 471
INNER WALL
PAINTING
Sq.Ft. ###
Sq.Ft. ###
ENAMEL
17 PAINTING(Doors&
Windows)
GROUND FLOOR
DOOR
FIRST FLOOR
DOOR
GROUND FLOOR
WINDOW
FIRST FLOOR
WINDOW
Sq.Ft. ###
18 PLINTH STEPS 6 NOS. 6.0
19 EWC 2 NOS. 2 2
20 WASHBASIN 1 NOS. 1 1
21 SEPTIC TANK 12000 Liters NOS. ###
22 STEPS 24 NOS. 24.0
23 SINTEX TANK 2000 Liters NOS. ###
24 A.T.T 27 47 Sq.Ft. ###
WATER
25 27 47 Sq.Ft. ###
PROOFING