TOOLS AND EQUIPMENTS

TYPE RATE PER DAY CALCULATION


1 Spade
2 Hoe
3 Trowel
4 Rack
5 Pick axe
6 Mattock
7 Bolster
8 Boning rods
9 Brick hammer
10 Bump cutter
11 Chain lewis & pen lewis
12 Chisel
13 Circular saw
14 Concrete mixer
15 Crowbar
16 Digging bar
17 End frame
18 Float
19 Head pan
20 Circular saw
21 Jack plane
22 Ladder
23 Line and pins
24 Mason's square
25 Measuring box
26 Polisher
27 Earth rammer
28 Sand screen machine
30 Tile cutter
31 Water truck 1773/-
PLASTERING & PAINTING TOOLS &
EQUIPMENTS
1 Paint scraper
2 Triangular load scraper
3 Steel wool
4 Bristle bruch
5 Wire brush
6 Putty knife
7 Spackling paste
8 Long handled brush
9 Scrub bush
10 Sandpaper
11 Sanding block
12 Caulking gun
13 Masking tape
14 Roller tray and grid
15 Brush comb
CONCRETE WORKS
1 Mixers
2 Wheelbarrows
3 Compactors 1648/-
4 Levels
5 Tape measures
6 Moisture retarders
7 Saws 200/-
8 Shovels
9 Rakes and come along rakes
10 Tampers
11 Vibrators 450/-
12 Screeds
13 Bull floats
14 Kneeling boards
15 Trowels
16 Float blades & troweling blades
17 Groove cutter
18 Edger
19 Brooms
20 Polishers
21 Grinders
22 Thermo hygrometers
23 Hammer drills or rotary drills
24 Concrete moisture meters
25 Relative humidity test kit
BRICK WORKS
1 Trowel
2 Chisels
3 Hammer
4 Jointer
5 Squares
6 Mason's level
7 Straight edge
8 Plumb bob
9 Plumb rule
EXCAVATION
1 Excavator 5000/-
2 Dumper 1500/-
3 Bulldozer
WATERPROOFING
1 Angle grinders
2 Cutting blades
3 Laser and water levels
4 Electric drills and screwdrivers
5 Fusion rollers
6 Straight edge
7 Hoses
8 Moisture meters
9 Heat welders
10 Hot air welders
11 Pressure injection equipment
12 Compressors 1376/-
13 Vacuum pumps
14 Pressure rollers
15 Seam probes
16 Solvent applicators
17 Spirit levels
18 Wood floats
STEEL WORK
1 Electric Rebar Cutters
2 Heavy Duty Rebar Cutter
3 Wire Rope Cutters`
4 Rebar Cutting Shear
5 Electric Automatic Rebar Benders
6 Spiral Hoop Radial Benders
7 Manual Rebar Tying Machines
8 Automatic Rebar Tying Equipment
BACKFILLING
1 Baby roller
2 Plate compactor 1648/-
3 Water tanker 1773/-

Type of equipment Average Capabilities

1. Bulldozer (D8) a.) Clearing 500 sq.m./hr.


b.) Stripping 200 sq.m./hr
c.) Excavation
1.) Common Soil 45 cu.m/hr.
2.) Slightly hard Materials 25 cu.m./hr.
d.) Quarrying
107 Common Materials 50 cu.m./hr.
108 Aggregates 40 cu.m./hr.
Boulders 15 cu.m./hr.
200 Needs Screening
e.) Pushing 3 cu.m./hr.

2. Road Grader a.) Sub grading 300 cu.m./hr.


b.) Spreading 50 cu.m./hr.

3. Payloader Loading 30 cu.m./hr.

4. Crane Shovel Loading 35 cu.m./hr.


5. Sheep Foot Roller a.) Static Rolling 15 cu.m./hr.
(12 passes – 15 cm. lift)
b.) Vibratory Rolling 135 cu.m./hr.
(6 passes – 20 cm. lift)
6. 3 – Wheel Road Roller a.) Static Rolling 24 cu.m./hr.
(6 passes – 20 cm. lift)
7. Tractor Drawn Roller a.) Vibratory Rolling 24 cu.m./hr.
(6 passes – 20 cm. lift)
8. Tandem Roller a.) Static Rolling 24 cu.m./hr.
(6 passes – 20 cm. lift)
b.) Vibratory Rolling 72 cu.m./hr.
(6 passes – 60 cm. lift)
9.) 6 – T Dump Truck a.) Hauling Common Borrow 3.5 cu.m./hr.
Base Course
b.) Hauling Selected Borrow 5.0 cu.m./hr.
c.) Hauling Concrete Batch 2 Batch/trip
‘Class A’
10. 2 ½ T – Dump Truck a.) Hauling Common Borrow 2.5 cu.m./trip
Base Course
b.) Hauling Selected Borrow 4.0 cu.m./trip
Base Concrete Batch 1.0 Batch/trip
‘ Class A ‘
11. Buggy a.) Hauling Concrete Mix 0.17 cu.m./trip
12. Wheel Borrow a.) Hauling Aggregates 0.17 cu.m./trip
b.) Hauling Concrete Mix 0.05 cu.m./trip
13. Water Truck a.) Watering 1000 sq.m./trip
14. Concrete Mixer a.) Mixing Concrete 9 cu.m./hr.
15. Rock Crusher a.) Crushing Mix sand & Gravel 30 cu.m./hr.
16. Concrete Vibrator a.) Vibrating Concrete Mix 40 cu.m./hr.
17. Concrete Floor Finisher a.) Finishing Concrete Floor 140 cu.m./hr.
18. Percussion Drilling a.) Drilling Hard Rock 0.23 m./hr.
b.) Drilling Loose Rock 0.30 m./hr.
c.) Drilling Lime Stone 0.38 m./hr.
d.) Drilling Sticky Clay 0.49 m./hr.
e.) Drilling Loose Clay 0.70 m./hr.

Machinery Fuel
Consumption

AVERAGE FUEL CONSUMPTION PERDAY

FUEL ENGINE GEAR GREASE OIL#10

OIL OIL

Crane, 140 liters(diesel) 4 liters 1 liter 2 lbs. –

Diesel Hammer, 20 liters - - - 1 liter

Bulldozer, 200 liters (Diesel) 3 liters 1 liter 1 lb. 1 liter

Payloader, 100 liters (Diesel) 3 liters 1 liter 1 lb. 1 liter

Grader, 120 liters (Diesel) 3 liters 1 liter 1 lb. 1 liter

Roller, 60 liters (Diesel) 2 liters 1 liter/wk. 2 lbs./wk. 1 liter

Dump Truck, 60 liters (Diesel) 1 liter 2liters/wk. 1 lb. 1 liter

Mixer (1-bagger), 40 liters (gas.) - - 0.5 lb. –


Vibrator, 15 liters (gasoline) - - - -

One Bagger Mixer – 100 bags/day

Crane – minimum of 2 piles/day (16 m. length including spotting)

A. LOADING CAPABILITIES OF FIVE (5) LABORERS


LOAD UNIT QUANTITY
Sand & Gravel Cu.m./hr 4
Common Cu.m./hr 5
Boulders Cu.m./hr 3
Cement bags/hr 300
R.S Bars kgs/hr 6000
Lumber bd.ft./hr 4000
Plywood pcs./hr. 2.5
Cobbles cu.m./hr 3.5

B. UNLOADING CAPABILITIES OF FIVE (5) LABORERS

LOAD UNIT QUANTITY


Sand & Gravel Cu.m./hr 6
Common Cu.m./hr 6
Cobbles cu.m./hr 5
Boulders Cu.m./hr 4
Cement bags/hr 300
R.S Bars kgs/hr 7000
Lumber bd.ft./hr 4000
Plywood pcs./hr. 2.5

Sand & Common Cobbles Boulders Cement R.S. Bars Lumber Plywood

Gravel

Cu.m./hr cu.m./hr. cu.m./hr. cu.m./hr. bags/hr kgs/hr. bd.ft./hr. pcs./hr.

6 6 5 4 300 7,000 4,000 2.5