You are on page 1of 2

V12‐21‐14  

Group Reports 
Winter 2015 
 
 Group reports will be presented on Thursdays and each group must do the following: 
o Provide the instructor a one page summary concerning their work on the weekly 
topic as described below. This one page summary will include 
 Group number 
 Weekly topic name  
 Summary of the items shown below. 
o Present a brief status report on their group work about the weekly topic via a one or 
two slide PowerPoint that will be uploaded to OneDrive prior to the Thursday class. 
 
 Report 1 Project Location 
o Describe the location your group chose and why was it chosen? 
o You must select a local (Seattle area) major existing street or highway (an arterial, 
Interstate, etc). 
o You will be designing both an all new pavement structure (reconstruction) and a 
rehabilitation for the existing structure. Thus, your group will be doing two separate 
designs. 
 
 Report 2 Traffic and ESALS 
o Describe the traffic data your group is using and associated assumptions. 
o Explain how you converted traffic (traffic loads) to ESALs. 
o Clearly state the calculated ESALs per year for your project location. 
 
 Report 3 Subgrade and Unstabilized Materials Characterization 
o Describe the data your group used to characterize the subgrade soil conditions. 
o State the correlations your group used to estimate MR and keff. 
o Show or state the forms, plots, and sample calculations to arrive at MR and keff. 
o State your final estimates for MR and keff for final structural design. 
o State material properties for the other unstabilized materials you will likely use. 
 
 Report 4 HMA and PCC Mix Design Considerations and Properties 
o Describe the mix types to be used (max aggregate size, proportions, etc). Why did 
you chose them? 
o Who or what will be the source for the mix designs? 
o State the PG binder to be used for HMA.  
o What would be the target field compaction as a % of maximum theoretical density? 


 
V12‐21‐14  

o State the estimates for the major PCC properties (compressive strength, flexural 
strength, slump, water/cementitious ratio—at a minimum). What is the estimated 
elastic modulus for the PCC and HMA? 
 
 Report 5 Flexible and Rigid Structural Designs 
o Describe your group’s final structural designs which must include layer descriptions, 
thicknesses, and specific design tools or aids used. Clearly state the following: 
 Design life 
 Design ESALS 
 Major design inputs which will include subgrade characterization and major 
mix types and characteristics (both HMA and PCC). 
 List the major standard specifications that are applicable.  
 
 Report 6 Rehabilitation Design for Project Location 
o For the same location as the new pavement designs, summarize your group design 
that would rehabilitate the existing pavements. Clearly state the following: 
 Design life 
 Existing pavement data and assumptions 
 Specific design tool or aids used. 
 Details associated with the rehabilitation type (HMA overlay, PCC overlay, 
crack and seat overlay, etc) and the depth layer depths.  
 
 Report 7 Construction Considerations for New and Rehabilitation Designs 
o State the major equipment types required for the new and rehabilitation 
construction activities. 
o State the likely plant locations or material sources (HMA or PCC). Will the PCC will 
mixed on‐site or ready‐mix? 
o What are the expected construction conditions—heavy traffic—night‐time 
construction‐‐? 
 
 Final Group Report 
o The final group report shall incorporate the major elements associated with the 
weekly reports. It must be well‐formatted and include location information for the 
project. Assume the report will be turned over to the project owner for the follow‐
up (contracting, etc). 
o The report shall not exceed 10 pages including a cover page which identifies the 
group and project location. 
o All work to be word processed. 


 

You might also like