01 OBRAS PROVISIONALES
01.01 CARTEL DE OBRA DE 3.60 m. X 7.20 m. - GIGANTOGRAFIA (BANNER) U
01.02 CERCO PROVISIONAL DE MADERA CON TRIPLAY M
02 TRABAJOS PRELIMINARES
02.01 LIMPIEZA DE TERRENO MANUAL M2
02.02 TRAZO Y REPLANTEO PRELIMINAR M2
03 MOVIMIENTO DE TIERRAS
03.01 EXCAVACION DE ZANJAS PARA ZAPATAS Y CIMIENTOS CORRIDOS M3
03.02 RELLENO COMPACTADO MATERIAL PROPIO M3
03.03 NIVELACION INTERIOR Y COMPACTACION CON EQUIPO LIVIANO M2
03.04 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO M3
04 CONCRETO SIMPLE
04.01 FALZA ZAPATA 1:12+30%P.G. 10" MAX. M3
04.02 CIMIENTO CORRIDO 1:10 + 30% PG 8" M3
04.03 SOBRECIMIENTO CONCRETO F'c=210Kg/cm² M3
04.04 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO M2
04.05 FALSO PISO MEZCLA 1:8 e=4" M2
05 CONCRETO ARMADO
05.01 ZAPATAS
05.01.01 ZAPATAS CONCRETO F'C=210 KG/CM2 M3
05.01.02 ZAPATAS ACERO fy=4200 Kg/cm2 KG
05.02 COLUMNAS
05.02.01 COLUMNAS CONCRETO F'C=210 KG/CM2 M3
05.02.02 COLUMNAS ENCOFRADO Y DESENCOFRADO M2
05.02.03 COLUMNAS ACERO fy=4200 Kg/cm2 KG
05.03 VIGAS
05.03.01 VIGAS CONCRETO F'C=210 KG/CM2 M3
05.03.02 VIGAS ENCOFRADO Y DESENCOFRADO M2
05.03.03 VIGAS ACERO fy=4200 Kg/cm2 KG
05.04 LOSA ALIGERADA
05.04.01 LOSA ALIGERADA CONCRETO F'C=210 KG/CM2 M3
05.04.02 LOSA ALIGERADA ENCOFRADO Y DESENCOFRADO M2
05.04.03 LOSA ALIGERADA ACERO fy=4200 Kg/cm2 KG
05.04.04 LOSA ALIGERADA LADRILLO 30X30X15 UNID
METRADO
1.00
66.90
204.00
204.00
53.41
13.53
32.20
49.85
3.33
10.54
ITEM DESCRIPCIÓN UNID. CANT.
01 OBRAS PROVISIONALES
01.01 CARTEL DE OBRA DE 3.60 m. X 7.20 m. - GIGANTOGRAFIA (BANNER) U 1
02 TRABAJOS PRELIMINARES
02.01 LIMPIEZA DE TERRENO MANUAL M2
Limpieza de Terreno 1
03 MOVIMIENTO DE TIERRAS
03.01 EXCAVACION DE ZANJAS PARA ZAPATAS Y CIMIENTOS CORRIDOS M3
ZAPATAS
Z1 1
Z2 1
Z3 1
Z4 1
CIMIENTOS CORRIDOS ARMADOS
ENTRE EL EJE 4 Y EJE 4´ EN EL EJE A CC- 1 1
ENTRE EL EJE 4 Y EJE 4´ EN EL EJE C CC- 1 1
ENTRE EL EJE 3 Y EJE 4 EN EL EJE A CC- 1 1
ENTRE EL EJE 3 Y EJE 4 EN EL EJE C CC- 2 1
ENTRE EL EJE 2´ Y EJE 3 EN EL EJE A CC- 1 1
ENTRE EL EJE 2´ Y EJE 3 EN EL EJE A CC- 2 1
CIMIENTOS CORRIDOS
EJE 6 ENTRE EJE A Y EJE B CC-4 1
ENTRE EL EJE 5 Y EJE 6 EN EL EJE A CC-4 1
ENTRE EL EJE 5 Y EJE 6 EN EL EJE C CC-4 1
ENTRE EL EJE 5 Y EJE 6 EN EL EJE C CC-4 1
ENTRE EL EJE 5 Y EJE 6 EN EL EJE C CC-8 1
ENTRE EL EJE 1 Y EJE 2 EN EL EJE A CC-1 1
ENTRE EL EJE 1 Y EJE 2 EN EL EJE A CC-1 1
ENTRE EL EJE 1 Y EJE 2 ENTRE EL EJE A Y EJE B CC-2 1
ENTRE EL EJE 1 Y EJE 2 ENTRE EL EJE A Y EJE C CC-3 1
ENTRE EL EJE 1 Y EJE 2´ EN EL EJE C CC-5 1
ENTRE EL EJE 2 Y EJE 2´ ENTRE EL EJE A Y EJE C CC-6 1
ENTRE EL EJE 2´ Y EJE 3 ENTRE EL EJE A Y EJE C CC-7 1
ENTRE EL EJE 2´ Y EJE 3 ENTRE EL EJE A Y EJE C CC-7 1
ENTRE EL EJE 2´ Y EJE 3 ENTRE EL EJE A Y EJE C CC-7 1
03.02 RELLENO COMPACTADO MATERIAL PROPIO M3
ZAPATAS
Z1 1
Z2 1
Z3 1
Z4 1
CIMIENTOS CORRIDOS ARMADOS
ENTRE EL EJE 4 Y EJE 4´ EN EL EJE A CC- 1 1
ENTRE EL EJE 4 Y EJE 4´ EN EL EJE C CC- 1 1
ENTRE EL EJE 3 Y EJE 4 EN EL EJE A CC- 1 1
ENTRE EL EJE 3 Y EJE 4 EN EL EJE C CC- 2 1
ENTRE EL EJE 2´ Y EJE 3 EN EL EJE A CC- 1 1
ENTRE EL EJE 2´ Y EJE 3 EN EL EJE A CC- 2 1
CIMIENTOS CORRIDOS
EJE 6 ENTRE EJE A Y EJE B CC-4 1
ENTRE EL EJE 5 Y EJE 6 EN EL EJE A CC-4 1
ENTRE EL EJE 5 Y EJE 6 EN EL EJE C CC-4 1
ENTRE EL EJE 5 Y EJE 6 EN EL EJE C CC-4 1
ENTRE EL EJE 5 Y EJE 6 EN EL EJE C CC-8 1
ENTRE EL EJE 1 Y EJE 2 EN EL EJE A CC-1 1
ENTRE EL EJE 1 Y EJE 2 EN EL EJE A CC-1 1
ENTRE EL EJE 1 Y EJE 2 ENTRE EL EJE A Y EJE B CC-2 1
ENTRE EL EJE 1 Y EJE 2 ENTRE EL EJE A Y EJE C CC-3 1
ENTRE EL EJE 1 Y EJE 2´ EN EL EJE C CC-5 1
ENTRE EL EJE 2 Y EJE 2´ ENTRE EL EJE A Y EJE C CC-6 1
ENTRE EL EJE 2´ Y EJE 3 ENTRE EL EJE A Y EJE C CC-7 1
ENTRE EL EJE 2´ Y EJE 3 ENTRE EL EJE A Y EJE C CC-7 1
ENTRE EL EJE 2´ Y EJE 3 ENTRE EL EJE A Y EJE C CC-7 1
AMBIENTES
Ambiente 1 -Zona de ingreso 1.00
Ambiente 2-Patio de ingreso 1.00
Ambiente 3-Sala comedor 1.00
Ambiente 4 - Baño 1.00
Ambiente 5-Estudio 1.00
Ambiente 6-Patio central 1.00
Ambiente 7-Cocina 1.00
Ambiente 8 - Patio trasero 1.00
04 CONCRETO SIMPLE
04.01 FALZA ZAPATA 1:12+30%P.G. 10" MAX. M3
Z1 1
Z2 1
Z3 1
Z4 1
05 CONCRETO ARMADO
05.01 ZAPATAS
05.01.01 ZAPATAS CONCRETO F'C=210 KG/CM2 M3
05.02 COLUMNAS
05.02.01 COLUMNAS CONCRETO F'C=210 KG/CM2 M3
05.03 VIGAS
05.03.01 VIGAS CONCRETO F'C=210 KG/CM2 M3
1.00 1.00
66.90
1 25.40 25.40
1 25.50 25.50
2 8.00 16.00
53.41
32.20
1.00 4.06 0.10 0.41 0.41
1.00 34.93 0.10 3.49 3.49
1.00 52.37 0.25 13.09 13.09
1.00 1.88 0.25 0.47 0.47
1.00 9.02 0.05 0.45 0.45
1.00 19.17 0.25 4.79 4.79
1.00 20.50 0.25 5.13 5.13
1.00 43.72 0.10 4.37 4.37
Esponj 49.85
1.25 66.76
1.25 -16.91
3.33
1 1.20 2.00 0.30 0.72 0.72
3 1.00 1.30 0.30 0.39 1.17
2 1.00 1.50 0.30 0.45 0.90
1 1.20 1.50 0.30 0.54 0.54
10.54
1 1.08 0.50 0.50 0.27 0.27
1 2.11 0.50 0.50 0.53 0.53
1 4.28 0.50 0.50 1.07 1.07
1 4.38 0.50 0.50 1.10 1.10
1 3.54 0.50 0.50 0.88 0.88
1 0.45 1.68 0.50 0.38 0.38
1 1.85 0.45 0.50 0.42 0.42
1 1.78 0.45 0.50 0.40 0.40
1 5.18 0.55 0.50 1.42 1.42
1 7.82 0.55 0.50 2.15 2.15
1 1.66 0.55 0.50 0.46 0.46
1 0.50 1.89 0.50 0.47 0.47
1 3.62 0.55 0.50 1.00 1.00
7.03
1 4.85 3.89 0.087 1.64 1.64
1 61.99 0.087 5.39 5.39
80.86
1 4.85 3.89 18.87 18.87
1 61.99 61.99 61.99
673.53
1 4.85 3.89 8.33 157.16 157.16
1 61.99 8.33 516.38 516.38