You are on page 1of 6

See discussions, stats, and author profiles for this publication at: https://www.researchgate.

net/publication/261424816

Numerical relay protection coordination using simulation software

Conference Paper · January 2013

CITATIONS READS

2 1,764

3 authors:

Srete Nikolovski Mario Havranek


University of Osijek 1 PUBLICATION   2 CITATIONS   
193 PUBLICATIONS   199 CITATIONS   
SEE PROFILE
SEE PROFILE

Predrag Marić
University of Osijek
35 PUBLICATIONS   33 CITATIONS   

SEE PROFILE

Some of the authors of this publication are also working on these related projects:

Distribution Protection with High PV penetration View project

Assembling Automatic Meter Reading System using Open Source Hardware and Software View project

All content following this page was uploaded by Srete Nikolovski on 12 April 2014.

The user has requested enhancement of the downloaded file.


Numerical Relay Protection Coordination using
Simulation Software
S. Nikolovski*, M. Havranek , P. Marić*
* Faculty of Electrical Engineering Osijek, Croatia
srete.nikolovski@etfos.hr
mario.havranek@gmail.com
predrag.maric@etfos.hr

Abstract - The paper presents protection coordination of to the same busbar are stored in that busbar [2]. As a rule,
renewable energy source connected to bilaterally supplied the relay is best stored in the same folder as the e and/or
distribution network. Multifunctional numerical relays with current transformers which it uses.
the switching equipment, renewable energy source facility
and the distribution network have been detail modeled in
DIgSILENT Power Factory software. Overcurrent,
overvoltage, undervoltage, directional overcurrent,
underfrequency and overfrequenecy functions have been
used for protection coordination. Different relay
characteristics have been presented in one time-overcurrent
plot. The damage curve and characteristic currents of
electrical equipment in the network have been shown to set
the relay tripping times and current settings and for a good
and thorough protection of the equipment. Protection
coordination settings have been checked and verified
simulating faults with the real system values.

I. INTRODUCTION
Power system protection is a task of challenge for
power engineers. For better understanding such a task,
power system simulation tools are used. The paper
presents numerical protection adjustment in simulation
tool - DIgSILENT Powerfactory with own database of Figure 1. Small power plant (renewable source) connection to
numerical relays that contains time-curent curves of all distribution network
protective devices. The time-current curves (TCC) can be
coordinated with each other and with the short circuit
analysis results. Multiple easy-to-use graphical tool for II. RELAY MODEL CREATION
resolving protection devices coordination problems has The simplest way to create the relay model is
also included in this simulation tool. The sample case of normally done by right clicking a circuit-breaker and
the numerical protection adjustment is presented on the selecting New Protection device-Relay model, an empty
small power plant (renewable source) connection to the relay model (ElmRelay) will appears. The relay model
bilaterally supplied distribution network Fig 1. ABB has a reference to the relay type, the location, the device
numerical relays and Končar RFX numeric field terminal number and the list of slots. The location is normally set
have been used in simulations. automatically when the relay is defined in the single line
The DigSILENT Power Factory protection modelling diagram by right clicking the cubical [1]. The whole
features have been implemented with the following process of creating a specific relay model thus only asks
philosophy: the protection should be as realistic as for selecting a relay type from the database, in this case
possible; the user has to be able to create a new complex ABB numerical relays. Otherwise, a specific unknown
protection devices or alter existing ones. Although the relay type (according to the database) can be created
protection models may show high complexity, their use using advanced DIgSILENT Powerfactory functions such
must be kept easy. All protection models will act on as DSL, or using the database relay type with the same
circuit-breakers [1]. Protection devices are normally functions and adaptable function settings. The Končar
stored in the object which they act upon, but they may be RFX numerical field terminal model has been created
stored elsewhere when needed. Recommended, and by using multifunctional ABB REF 54x relay model
default is that protection devices which act upon a single template from the database applying the overcurrent
circuit-breaker are store in the cubicle which contains that function settings only. Fig. 1 describes the protection
circuit-breaker (highly recommended). Protection devices coordination scheme for the modelled system. The ABB
which act upon a two or more circuit-breakers connected REM 543 relay has been installed on J2 field for

MIPRO 2013/CTS 1107


generator and block-transformer primary protection (acts
on circuit-breaker on J2), the ABB REF 542 has been
installed on the J1 field for protection of cable between
small power plant and 20 kV switchyard (acts on circuit-
breaker on J1), the Končar RFX field terminal has been
installed on 20 kV switchyard. Relays installed on
External Grids (ABB REF 542 ) acts on corresponding
circuit-breakers of external grid facilities.
A. Overcurrent protection adjustment
The function of this protection is single-phase, two-
phase or three- phase overcurrent detection [2]. After the
relay model has been defined and all slot elements have
been created, the editing of the relay settings may be
started. The overcurrent protection includes: the time-
overcurrent protection and the instantaneous overcurrent
protection. The time-overcurrent protection (relay) allows Figure 3. Adjusting the instantaneous overcurrent protection
settings: the time-overcurrent characteristic, the pick up
current and the time dial. The time-overcurrent The relay trips if the remaining angle is smaller than 90°
characteristic use the time delay which can be an and if both the polarization and the operating
independent (definite) time or inverse time delay. In this voltage/current are large enough [2]. The directional
case, the time-overcurrent characteristic is the definite overcurrent protection adjustment has been presented on
time characteristic with an option to time dial set and to Fig.4.
choose the time-overcurrent characteristic. Fig. 2 presents
the time-overcurrent protection adjustment, while Fig. 3.
presents instantaneous overcurrent protection.

Figure 4. Adjusting the directional overcurrent protection


Figure 2. Adjusting the time-overcurrent protection
The tripping direction is an important fact for this type
The pick up current is set to 1.00 p.u secondary which protection adjustment because of the current income
equals 150 A primary and the definite time is set to value during the short circuit.
of 2.00 seconds (Fig. 2) .On the Fig. 3. the pick up current B. Undervoltage and overvoltage protection adjustment
is set to 1.80 p.u secondary which equals 270 A primary.
The time setting on Fig. 3 is set by default to 0.00 seconds The voltage drops can occur due to the network
which corresponds to instantaneous operation. overload, the faulty operation of a transformer tap
changer and during the short circuit. In this case
In the network supplied by two power sources is necessary undervoltage and overvoltage protection monitors any
to use Directional relay – a part of the relay model [1]. phase to phase voltage and will act on 20 kV circuit-
The directional relay calculates the angle between the breaker if the voltage drops or rise under/over certain
polarization voltage or current and the operating current.
limit that will lead to separate the connection between the
The polarization current or voltage is rotated for the
power plant and the rest of the system. The adjustment of
amount of the expected angle first.
the undervoltage protection is presented on the Fig. 5 and
Fig. 6.

1108 MIPRO 2013/CTS


C. Underfrequency and overfrequency protection
adjustment
Variations in the power supply frequency can occur
due to overloads when the network is fed by a limited
power source (power plant islanding operation), generator
frequency regulator faulty operation, power plant
disconnection from the interconnected network [2].
Adjustment of the underfrequency and overfrequency
protection is shown on Fig. 9 and Fig. 10.

Figure 5. Adjusting the undervoltage protection

Figure 6. Adjusting the undervoltage protection (fast) Figure 9. Adjusting the underfrequency protection

On the other hand, the protection is necessary during the


voltage increase over the allowed limit. Adjustment of the
overvoltage protection is shown on Fig. 7 and Fig.8.

Figure 10. Adjusting the overfrequency protection


Figure 7. Adjusting the overvoltage protection

III. TIME-OVERCURRENT PLOT CREATING


The plot VisOcplot is showing different relay and fuse
characteristic in one time-overcurrent plot. Additionally
the damage curve and characteristic currents of electrical
equipment in the network can easily be shown. This will
help to set the relay tripping times and current settings and
the selecting of fuses for a good and thorough protection
of the equipment.
There are several ways to create a time-overcurrent
plot (VisOcplot). The easiest way to create and show a
VisOcplot is to select one circuit-breaker, where
overcurrent relays are installed than right-click the circuit-
breaker to open the context sensitive menu. This will
Figure 8. Adjusting the overvoltage protection (fast)
show the option Create Time-Overcurrent Plot and Add to
Time-Overcurrent Plot. PowerFactory will then create a

MIPRO 2013/CTS 1109


new diagram showing the time-overcurrent plot for all rest of the distribution network and the small power plant
relays selected. It is also possible to create an a user are both isolated from the short circuit by tripping of those
defined “x-value” by right-clicking the graph and two relays. Such an action indicates good protection
selecting the Set Constant and x-value option. The vertical coordination.
line will show the values at the intersections of all
characteristics. The line movement can be realised by The time- overcurrent plots may also be used to
mouse dragging. The intersection of the calculated current change the relay characteristic graphically because a relay
with the time-overcurrent characteristic is labelled with characteristic is normally the minimum of two or more
tripping time. sub-characteristic [1].

DIgSILENT
I =534,935 pri.A
I =1302,703
I =2139,741
pri.A pri.A
The three- phase short circuit is simulated on the cable 100

between small power plant and 20 kV switchyard (the first


simulation case - location J1 on Fig.1) The vertical red-
[s]
coloured curve on the Fig. 11 represents the short circuit
current value on the short circuit location. The first relay
that will trip is the relay situated in the cubicle of the J1- 10
field -ABB REF 542 and also the nearest to the short- 5.000 s
circuit location. The tripping time for this relay shown on
the Fig.11 (red -coloured curve) equals 0.02 s. The second
tripping time according to this time-overcurrent plot
belongs to the relay situated on the 20 kV switchyard, the 1
RFX numerical terminal filed, shown as dark-blue- 0.600 s
coloured curve with the tripping time of 0,04 s. Tripping
times of those two relays indicate good protection
coordination because the short-circuit location is hereby 0.194 s

isolated from the rest of the power system.


0,1
DIgSILENT

I =535,068 pri.A I =1301,183


I =2140,272
pri.A pri.A
100 0.050 s

[s] 0.020 s

0,01
10 20,00100
kV 1000 [pri.A] 10000
Trafo 20 kV\Cub_2\REF 541 - J1 Rasklopiste Hrast 20 kV (HEP)\Cub_6\RIX elektra
5.000 s
Trafo 20 kV\Cub_1\REM 543 blok trafo
VP J2
20 kV Strizivojna\Cub_6\REF 543 Djakovo 3 re

I-t 1 Date: 9/22/2012


Annex:
1
Figure 12. Time-overcurrent plot with tripping times (short circuit-
on 20 kV switchyard)
0.194 s

0,1
The voltage protection coordination can be actuated
0.050 s disabling the current, the distance and the frequency
0.040 s
functions on observed relays. The undervoltage protection
0.020 s acts on generator circuit-breaker in case when the voltage
drops under the limited lower voltage value. Typically, the
0,01
20,00 kV
100 1000 [pri.A] lower voltage value on the generator relay is set to 85% of
10000
Trafo 20 kV\Cub_2\REF 541 - J1 Rasklopiste Hrast 20 kV (HEP)\Cub_6\RIX elektrana
nominal value. The generator block-transformer relay
Trafo 20 kV\Cub_1\REM 543 blok trafo J2 VP 20 kV Strizivojna\Cub_6\REF 543 Djakovo 3 relej
allows the fast undervoltage tripping function with the
time delay of 0,15 s for adjusted 70% of nominal voltage
I-t 1 Date: 9/22/2012
Annex:

value and the slow undervoltage tripping function with the


Figure 11. Time-overcurrent plot with tripping times (short circuit
on the J1- field)
time delay of 1,00 s for adjusted 85% of nominal voltage
value. The overvoltage protection acts on generator
circuit-breaker in case when the voltage rises over the
The time-overcurrent plot on Fig.12 shows the three
limited upper voltage value. The fast tripping function acts
phase short-circuit simulation results on the power plant
with the time delay of 0,18 s when the measured voltage
place of coupling to distribution network - 20 kV
increase above the 120% of nominal value, while the
switchyard (the second simulation case – Fig.1). In this
slow tripping function acts with the time delay of 1,98 s
case, the network contribution to short circuit is 1302.703
when the measured voltage increase above the 115% of
A primary while the contribution of the small power plant
nominal value. Islanding operation of small power plants
(renewable source) is 534.935 A. The relay situated on
is prohibited according to grid code. The voltage drop on
location – J1 REF 542 will trip instantaneously with the
the generator block transformer LV and HV busbars
time of the 0.020 s (red -coloured vertical line on Fig. 12),
during the three phase short-circuit on the J1 field is
while the remote relay REF 542 situated on the external
shown on Figure 13.
network busbars will trip instantaneously with time of the
0.050 s (light -blue -coloured vertical line on Fig. 12). The

1110 MIPRO 2013/CTS


DIgSILENT
1,20 IV. CONLUSION
0,90
The main purpose of this paper is to present the usage
of the simulation tool for numerical protection functions
0,60 adjustment. DIgSILENT PowerFactory simulation
software enables detailed modelling and assistance for
0,30
coordination settings of real digital numerical relays
0,00 according to calculations of short circuit using method of
symmetrical components and the real data for all network
-0,30
-0,1000 0,0097 0,1194 0,2291 0,3388 [s] 0,4485 components. The numerical protection functions have
Rasklopiste Hrast 20 kV (HEP): Voltage, Magnitude in p.u.
been tested during the short-circuit simulations on the two
1,20 network locations that are significantly sensitive to power
0.052 s
0.228 p.u. system protection settings. Protection functions
0,90
adjustments shown good protection coordination in both
0,60 analysed cases.
0.418 s
0,30 0.949 p.u.

0,00 REFERENCES
-0,30
[1] DIgSILENT Power Factory, User Manual, Gomoringen, 2008.
-0,1000 0,0097 0,1194 0,2291 0,3388 [s] 0,4485
Gen 6.3 kV: Voltage, Magnitude in p.u. [2] S. H. Horowitz, A. G. Phadke, Power system relaying, 3rd ed.,
Blok trafo napon
Date: 9/28/2012
John Wiley and Son Ltd, England, 2008.
Annex: /9
[3] Technical Reference Manual, REF 54_, ABB, 2005.
Figure 13. Voltage drop on HV (upper diagram) and LV (lower [4] Pilot Protective Relaying, ABB, Marcel Dekker ,Inc.; USA, 2000.
diagram) generator block-transformer busbar
[5] A.T. Johns and S. K. Salman, Digital Protection for Power
Systems IEEE Power Series 15, London ,1995.
During the voltage drop on the generator busbars, the
[6] M. Sachdev, M. Nagpal, A recursive least error squares
undervoltage protection trip and the small power plant is alghortihm for power system relaying and measurements
isolated from the rest of the system. applications, IEEE Transanctions on Power Delivery , Vol. 6, No.
3. 1991, pp. 1008-1015
DIgSILENT

80,00
[7] ANSI/IEEE C37.110 Standard : IEEE Guide for the application of
-0.008 s
current transformers used for protective relaying purposes
54.308 deg

60,00

40,00

0.234 s
0.000 deg

20,00

0,00

-20,00
-0,1000 0,0087 0,1174 0,2261 0,3348 [s] 0,4435
generator: Rotor angle with reference to reference machine angle in deg
generatorDate: 9/28/2012
Annex: /6

Figure 14. Small power plant generator isolation

MIPRO 2013/CTS 1111

View publication stats

You might also like