You are on page 1of 16

HO CHI MINH CITY MRT LINE 1-CP 1b PROJECT

SHIMIZU-MAEDA JOINT OPERATION


PICTURE REPORT
SHIMIZU-MAEDA JOINT OPERATION (At the Opera House site/ Tại công trường Ga Opera House)

Content Made by: Lê Minh Đức


DELIVERY MSB AND LOCAL PANELS TO B2F (31 sets) Weather: Dry
DELIVERY LOCAL PANELS TO B1F (4 sets) Date: 10-Apr-19
No. 1 ROOF SLAB Pic.1

Check entrance and way out for vehicles

No. 2 ROOF SLAB Pic.2

Check entrance and way out for vehicles

No. 3 ROOF SLAB Pic.3

Set barrier and warning sign around access and way out
HO CHI MINH CITY MRT LINE 1-CP 1b PROJECT
SHIMIZU-MAEDA JOINT OPERATION
PICTURE REPORT
SHIMIZU-MAEDA JOINT OPERATION (At the Opera House site/ Tại công trường Ga Opera House)

Content Made by: Lê Minh Đức


DELIVERY MSB AND LOCAL PANELS TO B2F (31 sets) Weather: Dry
DELIVERY LOCAL PANELS TO B1F (4 sets) Date: 10-Apr-19
No. 4 ROOF SLAB Pic.4

Hoist and move panels to temporary opening No.4

No. 5 ROOF SLAB Pic.5

Hoist and move panels to temporary opening No.4

No. 6 B2F Pic.6

Hoist and move panels to temporary opening No.4


HO CHI MINH CITY MRT LINE 1-CP 1b PROJECT
SHIMIZU-MAEDA JOINT OPERATION
PICTURE REPORT
SHIMIZU-MAEDA JOINT OPERATION (At the Opera House site/ Tại công trường Ga Opera House)

Content Made by: Lê Minh Đức


DELIVERY MSB AND LOCAL PANELS TO B2F (31 sets) Weather: Dry
DELIVERY LOCAL PANELS TO B1F (4 sets) Date: 10-Apr-19
No. 7 B2F Pic.7

After put panel in design position, release and pull up the


steel cables. Then, place panel on hand pallet truck.

No. 8 B2F Pic.8

Moving panels to temporary places by hand pallet truck

No. 9 B1F, Axis 15~16; OC-OD Pic.9

Arrange these panel close together and connect by rope to


prevent falling down.
Setting "warning tape" barrier and "Do not Enter" around
temporary place.
HO CHI MINH CITY MRT LINE 1-CP 1b PROJECT
SHIMIZU-MAEDA JOINT OPERATION
PICTURE REPORT
SHIMIZU-MAEDA JOINT OPERATION (At the Opera House site/ Tại công trường Ga Opera House)

Content Made by: Lê Minh Đức


DELIVERY MSB AND LOCAL PANELS TO B2F (31 sets) Weather: Dry
DELIVERY LOCAL PANELS TO B1F (4 sets) Date: 10-Apr-19
No. 10 B2F, Axis 18~19; OC-OD Pic.10

Arrange these panel close together and connect by rope to


prevent falling down.
Setting "warning tape" barrier and "Do not Enter" around
temporary place.

No. 11 B1F, Axis 15~16; OC-OD Pic.11

Cleaning and finishing work.

No. 12 B1F, Axis 15~16; OC-OD Pic.12

Cleaning and finishing work.


HO CHI MINH CITY MRT LINE 1-CP 1b PROJECT
SHIMIZU-MAEDA JOINT OPERATION
PICTURE REPORT
SHIMIZU-MAEDA JOINT OPERATION (At the Opera House site/ Tại công trường Ga Opera House)

Content Made by: Ngo Quang dai


DELIVERY LOCAL PANELS TO B1F (6 sets) Weather: Sunny
Date: 13-Apr-19
No. 1 ROOF SLAB Pic.1

Sling panel, hoist and move panels to roof slab

No. 2 ROOF SLAB Pic.2

After put panel in roof slab

No. 3 ROOF SLAB Pic.3

After put panel on hand pallet truck, release and pull up


the steel cables.
HO CHI MINH CITY MRT LINE 1-CP 1b PROJECT
SHIMIZU-MAEDA JOINT OPERATION
PICTURE REPORT
SHIMIZU-MAEDA JOINT OPERATION (At the Opera House site/ Tại công trường Ga Opera House)

Content Made by: Ngo Quang dai


DELIVERY LOCAL PANELS TO B1F (6 sets) Weather: Sunny
Date: 13-Apr-19
No. 4 Roof slab ( Opening temporary 8) Pic.4

Move panel to Hoist and move to B1F

No. 5 Roof slab ( Opening temporary 8) Pic.5

Move panel to Hoist and move to B1F

No. 6 B1F Pic.6

Moving panels from Hoist to B1F slab.


HO CHI MINH CITY MRT LINE 1-CP 1b PROJECT
SHIMIZU-MAEDA JOINT OPERATION
PICTURE REPORT
SHIMIZU-MAEDA JOINT OPERATION (At the Opera House site/ Tại công trường Ga Opera House)

Content Made by: Ngo Quang dai


DELIVERY LOCAL PANELS TO B1F (6 sets) Weather: Sunny
Date: 13-Apr-19
No. 7 B1F Pic.7

Moving panels to temporary places by hand pallet truck

No. 8 B1F Pic.8

Moving panels to temporary places by hand pallet truck

No. 9 B1F ( axis 2-3 / OC-OD) Pic.9

Arrange these panel close together and install scaffold to


prevent falling down.
Setting "warning tape" barrier around temporary place.
HO CHI MINH CITY MRT LINE 1-CP 1b PROJECT
SHIMIZU-MAEDA JOINT OPERATION
PICTURE REPORT
SHIMIZU-MAEDA JOINT OPERATION (At the Opera House site/ Tại công trường Ga Opera House)

Content Made by: Ngo Quang dai


DELIVERY LOCAL PANELS TO B3F (10 sets) Weather: Sunny
Date: 16-Apr-19
No. 1 ROOF SLAB Pic.1

Sling panel, hoist and move panels to roof slab

No. 2 ROOF SLAB Pic.2

After put panel in roof slab

No. 3 Roof slab ( Opening temporary 8) Pic.3

Move panel to Hoist and move to B3F


HO CHI MINH CITY MRT LINE 1-CP 1b PROJECT
SHIMIZU-MAEDA JOINT OPERATION
PICTURE REPORT
SHIMIZU-MAEDA JOINT OPERATION (At the Opera House site/ Tại công trường Ga Opera House)

Content Made by: Ngo Quang dai


DELIVERY LOCAL PANELS TO B3F (10 sets) Weather: Sunny
Date: 16-Apr-19
No. 4 B3F Pic.4

Move panel from Hoist to B3F slab

No. 5 B3F Pic.5

Moving panels to temporary places by hand pallet truck

No. 6 B3F Pic.6

Moving panels to temporary places by hand pallet truck


HO CHI MINH CITY MRT LINE 1-CP 1b PROJECT
SHIMIZU-MAEDA JOINT OPERATION
PICTURE REPORT
SHIMIZU-MAEDA JOINT OPERATION (At the Opera House site/ Tại công trường Ga Opera House)

Content Made by: Ngo Quang dai


DELIVERY LOCAL PANELS TO B3F (10 sets) Weather: Sunny
Date: 16-Apr-19
No. 7 B3F Pic.7

Moving panels to temporary places by hand pallet truck

No. 8 B3F ( axis 15 / OB-OC) Pic.8

Arrange these panel close together and install scaffold to


prevent falling down.
Setting "warning tape" barrier around temporary place.
HO CHI MINH CITY MRT LINE 1-CP 1b PROJECT
SHIMIZU-MAEDA JOINT OPERATION
PICTURE REPORT
SHIMIZU-MAEDA JOINT OPERATION (At the Opera House site/ Tại công trường Ga Opera House)

Content Made by: Ngo Quang dai


DELIVERY LOCAL PANELS TO B4F (4 sets) Weather: Sunny
Date: 11-Apr-19
No. 1 ROOF SLAB Pic.1

Sling panel, hoist and move panels to roof slab

No. 2 ROOF SLAB Pic.2

After put panel in roof slab

No. 3 ROOF SLAB Pic.3

After put panel on hand pallet truck, release and pull up the
steel cables.
HO CHI MINH CITY MRT LINE 1-CP 1b PROJECT
SHIMIZU-MAEDA JOINT OPERATION
PICTURE REPORT
SHIMIZU-MAEDA JOINT OPERATION (At the Opera House site/ Tại công trường Ga Opera House)

Content Made by: Ngo Quang dai


DELIVERY LOCAL PANELS TO B4F (4 sets) Weather: Sunny
Date: 11-Apr-19
No. 4 B4F ( Opening temporary 8) Pic.4

Move panel to Hoist and move to B4F


After move panel from Hoist to B4F slab.

No. 5 B4F Pic.5

Moving panels to temporary places by hand pallet truck

No. 6 B4F Pic.6

Moving panels to temporary places by hand pallet truck


HO CHI MINH CITY MRT LINE 1-CP 1b PROJECT
SHIMIZU-MAEDA JOINT OPERATION
PICTURE REPORT
SHIMIZU-MAEDA JOINT OPERATION (At the Opera House site/ Tại công trường Ga Opera House)

Content Made by: Ngo Quang dai


DELIVERY LOCAL PANELS TO B4F (4 sets) Weather: Sunny
Date: 11-Apr-19
No. 7 B4F ( axis 4 - OC) Pic.7

Arrange these panel close together and connect by rope to


prevent falling down.
Setting "warning tape" barrier around
temporary place.

No. 8 B4F ( axis 5 - OC) Pic.8

Arrange these panel close together and connect by rope to


prevent falling down.
Setting "warning tape" barrier around
temporary place.

No. 9 B4F ( axis 6 - OC) Pic.9

Arrange these panel close together and connect by rope to


prevent falling down.
Setting "warning tape" barrier around
temporary place.
HO CHI MINH CITY MRT LINE 1-CP 1b PROJECT
SHIMIZU-MAEDA JOINT OPERATION
PICTURE REPORT
SHIMIZU-MAEDA JOINT OPERATION (At the Opera House site/ Tại công trường Ga Opera House)

Content Made by: Than Quoc Hung


DELIVERY LOCAL PANELS TO B4F (6 sets) Weather: Sunny
Date: 17-Apr-19
No. 1 ROOF SLAB Pic.1

Sling panel, hoist and move panels to roof slab

No. 2 ROOF SLAB Pic.2

After put panel in roof slab

No. 3 Roof slab ( Opening temporary 8) Pic.3

Move panel to Hoist and move to B4F


HO CHI MINH CITY MRT LINE 1-CP 1b PROJECT
SHIMIZU-MAEDA JOINT OPERATION
PICTURE REPORT
SHIMIZU-MAEDA JOINT OPERATION (At the Opera House site/ Tại công trường Ga Opera House)

Content Made by: Than Quoc Hung


DELIVERY LOCAL PANELS TO B4F (6 sets) Weather: Sunny
Date: 17-Apr-19
No. 4 B4F Pic.4

Move panel from Hoist to B4F

No. 5 B4F Pic.5

Move panel to temporary place

No. 6 B4F Pic.6

Moving panels to temperary place


HO CHI MINH CITY MRT LINE 1-CP 1b PROJECT
SHIMIZU-MAEDA JOINT OPERATION
PICTURE REPORT
SHIMIZU-MAEDA JOINT OPERATION (At the Opera House site/ Tại công trường Ga Opera House)

Content Made by: Than Quoc Hung


DELIVERY LOCAL PANELS TO B4F (6 sets) Weather: Sunny
Date: 17-Apr-19
No. 7 B4F ( axis 4-8 / OB-OC) Pic.7

Arrange these panel side by side and tied up with rope to


prevent falling down.
Setting "warning tape" barrier around temporary place.

No. 8 B4F ( axis 4-8 / OB-OC) Pic.8

Arrange these panel side by side and tied up with rope to


prevent falling down.
Setting "warning tape" barrier around temporary place.