You are on page 1of 2

ASCO PowerQuest® : 5700 Family

Critical Facility, Power and Energy Management


Effectively manage your critical facility to increase Reliability, Compliance and Efficiency.
Whether it is just a generator and transfer switch, a single facility or multiple locations:
PowerQuest, the Critical Power Management System (CPMS) gives you the visibility and
insight needed to achieve your goals.

RELIABILITY COMPLIANCE EFFICIENCY


OPERATIONAL INTELLIGENCE REGULATORY COMPLIANCE OPERATIONAL EFFICIENCY
CAPACITY MANAGEMENT SERVICE LEVELS AGREEMENTS ENERGY EFFICIENCY
EASY ALARM MANAGEMENT ENERGY CERTIFICATIONS AUTOMATED REPORTS
COMPLETE FORENSICS ANALYSIS TESTING AND MAINTENANCE REMOTE CONTROL

100% BRAND AGNOSTIC

GENERATOR TRANSFORMER SWITCHGEAR TRANSFER LOAD BANK UPS CRAC/CRAH STATIC SWITCH SWITCHBOARDS/ SURGE POWER QUALITY
SWITCH DISTRIBUTION PROTECTION AND ENERGY

With the ASCO PowerQuest CPMS, you can:

• Understand power system and equipment status throughout the facility


• Quickly identify and resolve alarms to reduce downtime risk and increase reliability
• Monitor KW capacity and demand at any point in the distribution to effectively manage capital investments
• Ensure power quality compliance to increase capital life of business critical equipment and devices
• Leverage existing network infrastructure and add existing legacy equipment
• Analyze comprehensive forensics power quality and sequence of events in millisecond granularity
• Identify utility energy usage and demand billing discrepancies
• Reduce or eliminate power factor and demand penalties
• Monitor, Benchmark and Increase energy efficiency
• Allocate energy cost to departments or processes
Primary Capabilities and Features
| Aggregated Event Log |
Aggregated Event Log
TEST REPORT
Date Time Device Name Event Type Event Cause
01/13/2016 04:06:07 ATS 17 L E Acceptable -

TEST REPORT
01/13/2016 04:06:07 ATS 21 E E Acceptable -
01/13/2016 04:06:07 ATS 49 C E Acceptable -
01/13/2016 04:06:07 ATS 30 L E Acceptable -
01/13/2016 04:06:07 ATS 35 L E Acceptable -
01/13/2016 04:06:07 ATS 55 L E Acceptable -
01/13/2016 04:06:07 ATS 37 Q E Acceptable -

TEST REPORT
01/13/2016 04:06:07 ATS 46 Q E Acceptable -
01/13/2016 04:06:07 ATS 52 N E Acceptable -
01/13/2016 04:06:07 ATS 54 Q E Acceptable -
01/13/2016 04:06:07 ATS 38 L E Acceptable -
01/13/2016 04:06:07 ATS 33 C E Acceptable -
01/13/2016 04:06:07 ATS 10 Q E Acceptable -
01/13/2016 04:06:07 ATS 32 L E Acceptable -
01/13/2016 04:06:07 ATS 42 Q E Acceptable -
01/13/2016 04:06:07 ATS 34 Q E Acceptable -

Saint Dismas University Hospital 01/13/2016 04:06:07


01/13/2016 04:06:08
ATS 13 Q
ATS 03 L
E Acceptable
E Acceptable
-
-
01/13/2016 04:06:08 ATS 20 E E Acceptable -
160 Park Avenue, Florham Park, NJ 07932 01/13/2016 04:06:08 ATS 35 L N To E Transferred N Under Voltage
01/13/2016 04:08:48 ATS 38 L Engine Started Serial Comm Transfer
01/13/2016 04:08:48 ATS 12 L Engine Started Serial Comm Transfer
01/13/2016 04:08:48 ATS 30 L Engine Started Serial Comm Transfer
01/13/2016 04:08:48 ATS 32 L Engine Started Serial Comm Transfer
01/13/2016 04:08:48 ATS 17 L Engine Started Serial Comm Transfer
01/13/2016 04:08:49 ATS 03 L Engine Started Serial Comm Transfer

Automatically Generated 01/13/2016 04:08:49 ATS 50 L Engine Started Serial Comm Transfer
01/13/2016 04:08:49 ATS 08 L Engine Started Serial Comm Transfer
01/13/2016 04:08:49 ATS 55 L Engine Started Serial Comm Transfer
Created: Jan 13, 2016 05:34:29 AM 01/13/2016 04:09:45 ATS 12 L N To E Transferred Serial Comm Transfer
01/13/2016 04:09:45 ATS 55 L N To E Transferred Serial Comm Transfer
01/13/2016 04:09:51 ATS 51 C Engine Started Load Shed
Period: Jan 13, 2016 to Jan 20, 2016 01/13/2016 04:09:51 ATS 23 C Engine Started Load Shed
01/13/2016 04:09:51 ATS 53 C Engine Started Load Shed
01/13/2016 04:09:51 ATS 09 C Engine Started Load Shed
01/13/2016 04:09:51 ATS 18 C Engine Started Load Shed

ASCO
Report Period: 1/13/2016 4:05:59 AM - 1/13/2016 5:32:12 AM Page: 68 of 75
Report Created: Jan 13, 2016 05:34:29 AM Test Report

Created: Jan 13, 2016 05:34:29 AM Page 68 of 75


Period: Jan 13, 2016 to Jan 20, 2016 Test Report

Main Menu Automated Outage Engineered Dashboards1


and NFPA Compliance Reports

Drill Down Historical Trending Active Alarms


To View Equipment Details

Event Log Reference Library System Overview

5710 5750 5790


Hardware Server + Server + Server +


23inch Touchscreen 23inch Touchscreen 23inch Touchscreen

Number of Equipment Monitored 32 64 1281

Remote Clients Support 3 10 251

Monitoring & Control Yes Yes Yes

Email Notification Yes Yes Yes

BMS Communications Yes Yes Yes

System Event Log No Yes Yes

Historical Trending No Yes Yes

Automated Reports No Yes Yes

Power Quality Meter Analytics Yes Yes Yes

Redundant Storage No No Yes


1Consult ASCO for engineered dashboards, additional equipment or clients.

ASCO Power Technologies www.ascopower.com


160 Park Avenue, Florham Park, NJ 07932 customercare@ascopower.com • 1-800-800-ASCO (2726)
© February 2017. Publication 2001

You might also like