GENERATOR TRANSFORMER SWITCHGEAR TRANSFER LOAD BANK UPS CRAC/CRAH STATIC SWITCH SWITCHBOARDS/ SURGE POWER QUALITY
SWITCH DISTRIBUTION PROTECTION AND ENERGY
TEST REPORT
01/13/2016 04:06:07 ATS 21 E E Acceptable -
01/13/2016 04:06:07 ATS 49 C E Acceptable -
01/13/2016 04:06:07 ATS 30 L E Acceptable -
01/13/2016 04:06:07 ATS 35 L E Acceptable -
01/13/2016 04:06:07 ATS 55 L E Acceptable -
01/13/2016 04:06:07 ATS 37 Q E Acceptable -
TEST REPORT
01/13/2016 04:06:07 ATS 46 Q E Acceptable -
01/13/2016 04:06:07 ATS 52 N E Acceptable -
01/13/2016 04:06:07 ATS 54 Q E Acceptable -
01/13/2016 04:06:07 ATS 38 L E Acceptable -
01/13/2016 04:06:07 ATS 33 C E Acceptable -
01/13/2016 04:06:07 ATS 10 Q E Acceptable -
01/13/2016 04:06:07 ATS 32 L E Acceptable -
01/13/2016 04:06:07 ATS 42 Q E Acceptable -
01/13/2016 04:06:07 ATS 34 Q E Acceptable -
Automatically Generated 01/13/2016 04:08:49 ATS 50 L Engine Started Serial Comm Transfer
01/13/2016 04:08:49 ATS 08 L Engine Started Serial Comm Transfer
01/13/2016 04:08:49 ATS 55 L Engine Started Serial Comm Transfer
Created: Jan 13, 2016 05:34:29 AM 01/13/2016 04:09:45 ATS 12 L N To E Transferred Serial Comm Transfer
01/13/2016 04:09:45 ATS 55 L N To E Transferred Serial Comm Transfer
01/13/2016 04:09:51 ATS 51 C Engine Started Load Shed
Period: Jan 13, 2016 to Jan 20, 2016 01/13/2016 04:09:51 ATS 23 C Engine Started Load Shed
01/13/2016 04:09:51 ATS 53 C Engine Started Load Shed
01/13/2016 04:09:51 ATS 09 C Engine Started Load Shed
01/13/2016 04:09:51 ATS 18 C Engine Started Load Shed
ASCO
Report Period: 1/13/2016 4:05:59 AM - 1/13/2016 5:32:12 AM Page: 68 of 75
Report Created: Jan 13, 2016 05:34:29 AM Test Report