:: Tamil Nadu Transmission Corporation Ltd ::

(A Subsidiary of TNEB Ltd.)

Grid Details Date : 09-Apr-19 Day : Tuesday


Sl. Details Total Lighting Minimum Morning Cons-
No. Capacity Peak Load Peak umption
MW MW MW MW MU
Date 8-4-2019 9-4-2019 9-4-2019 8-4-2019
Time Hrs. 18:55 1:50 7:40
Frequency HZ. 49.97 50.04 50.01
1 TNEB
a) Hydro 2307.9 517 203 174 6.349
b) Thermal 4320.0 3795 3155 3655 84.808
c) Gas 516.1 244 249 243 5.769
2 Independent Power Plant
(i) PPN 330.5 0 0 0 0.000
(ii) TAQA, ABAN, PENNA 416.0 369 288 365 7.405
3 Captive Power Plant(Intra state) 918 839 828
(ii) CPP (Purchase) 0 0 0
(iii) CPP (Wheeling) *1074 986.5 918 839 828
4 Non-Conventional Energy Schemes 87 92 88 24.008
(i) Co-Generation *688 84 88 84
(ii) Bio mass *237 4 3 4
979 1150 420 24.298
(iii) Wind *8367.14 979 1150 56 11.366
(iv) SOLAR *2444.23 0 0 364 12.932
5 CGS (capacity) - Share for TNEB 6223.0 3188 3978 4467 97.551
(i) Neyveli TS1 (BILATERAL) 386 386 270 270 270 6.745
(ii) NTPC (2600) + SIMHADRI (1000) 835
(iii) Neyveli TS2 (1470) 507
(iv) NeyveliTS1Expansion (420) 227
(v) NeyveliTS2Expansion (500) 270 5802.0 2886 3676 4165 90.042
(vi) Talcher St 2 (2000) 487
(vii) VALLUR (1500) 1065
(viii) NTPL (1000) 414
(ix) MAPS (440) 331
(x) KAPS (880) 226
(xi) KUDANKULAM ( 2000) 1152
(xii) Kudgi(2400) 323
(xiii) Eastern region power (External Assistance) 35 32 32 32 0.764

(ii) Power Purchase ( MTOA + LTOA+STOA) 3189.5 5171 4146 4722 104.763

Total 18289 15267 14100 14962 354.951


7 (i) Load Shedding 0 Nil 0 0.000
(ii) HT Relief & R&C 0 0 0 0.000
All time High Consumption 361.684 MU on 3-4-2019
Demand 16151 MW on 3-4-2019 19:05 50.01 Hz
Note: * All these items and new projects are not included in total Installed capacity.

# yesterday's solar generation(max): 1814 MW


(min) : 71 MW