Lesson 1 Christmas Tree.................................................... 1


Lesson 2 Piano.................................................................. 14
Lesson 3 Smart Lamp....................................................... 23
Lesson 4 Game Machine.................................................. 37
Lesson 5 Self Balancing Robot Car..................................46
Lesson 6 Fire Alarm......................................................... 57
Lesson 7 Automatic Door................................................. 72
Lesson 8 Weather Station................................................. 85
Lesson 9 Electric Screwdriver.......................................... 96
Lesson 10 Forklift...........................................................108
Lesson 11 Cart................................................................ 130
Lesson 12 Tower Crane.................................................. 153
Lesson 1
Christmas Tree

1
Building Instructions for Electronic Inventor

List of parts

Type Part name Part drawing Quantity

Structural
component—Beam08 Beam0824-064 2
24

Beam0824-096 2

Beam0824-112 2

Beam0824-144 6

Beam0824-176 4

Connector Plate B 7*9 1

Bracket 3*3 5

Me Auriga Me Auriga 1

Electronic template RJ25 connection line - 1


35cm

2
Lesson 1 Christmas Tree Colored LED RGB Strip

Colored LED RGB strip - 2


Electronic template 0.5m

Actuator drive/RJ25 1
adapter

18650 lithium battery 1


pack (2)

Expansion pack for 1


Beam2424-312
large parts

15
Hardware and tools M4*8 screw

28
M4*14 screw

4
M4*22 screw

18
M4 nut

2
Nylon cable ties 1.9*100

4*7*2 nylon spacer 2

1
Hook-and-loop fastener

2.5mm cross HEX 1


screwdriver

Note: The 0.5m colored LED RGB strip can be replaced by the 1m one.

Structural analysis

The Christmas tree has no distinct detachable structure.

Group work division

Each group consists of five persons.

3
Building Instructions for Electronic Inventor

Christmas tree construction

Step 1 - Column construction

Material preparation:

Beam0824-144 2 M4*8 screw 8

Plate B 7*9 1 Beam2424-312 1

Construction process:

1. Fix a plate B 7*9 by screwing M4*8 screws through four corner holes of the plate into the threaded
slots of the Beam0824-144.

4
Lesson 1 Christmas Tree Colored LED RGB Strip

2. Install the Beam2424 on the plate with M4*8 screws. Pay attention to the hole position.

Step 2 - Branch construction

Material preparation:

Beam0824-064 2 Bracket 3*3 4

Beam0824-096 2 M4*8 screw 4

Beam0824-112 2 M4*14 screw 24

Beam0824-144 4 M4*22 screw 4

Beam0824-176 4 M4 nut 12

5
Building Instructions for Electronic Inventor

Construction process:

1. Make the branch 1 as shown in the figure below. Connect the Beam0824-176 with the bracket 3*3, and
fix them with M4*14 screws and nuts.

2. Make the branch 2 as shown in the figure below. Pass an M4*14 screw through a hole on the
Beam0824-096 and screw it into the threaded slot of the Beam0824-144. Pass an M4*22 screw through
another hole on the Beam0824-096 and screw it into the Beam0824-144 with M4 nuts. Make the branch
3. Pass two M4*14 screws through the two longitudinal holes on the Beam0824-112, and screw them into
the threaded holes on the side of the Beam0824-096. Fix this component onto the Beam0824-064 with the
method of making the branch 2.

6
Lesson 1 Christmas Tree Colored LED RGB Strip

3. Install the branch 1 at the appropriate height of the Beam2424, and screw M4*8 screws into the
internal threaded slots of the Beam2424.

4. Use four M4*14 screws to install two branches 3 on the Beam2424 in the same way. Pay attention to
the position and direction of the branches 3.

7
Building Instructions for Electronic Inventor

5. Use four M4*14 screws to install two branches 2 with a branch 3 vertically.

Step 3 - Installation of the light emitting system

Material preparation:

Bracket 3*3 1 18650 lithium


1
battery pack (2)

M4*8 screw
Me Auriga 1 3

M4*14 screw
4
RJ25 1
Connection line - M4 nut 6
35cm
Nylon cable ties 2
Colored LED RGB 2 1.9*100
strip - 0.5m
4*7*2 nylon spacer 2
Actuator drive/RJ25 1
adapter Hook-and-loop 1
fastener
8
Lesson 1 Christmas Tree Colored LED RGB Strip

Construction process:

1. Install a bracket between the branch 1 and branch 2.

2. Install the steering gear driver/RJ25 adapter on the bracket 3*3 installed in the previous step.

9
Building Instructions for Electronic Inventor

3. Use an RJ25 connector to connect the actuator driver/RJ25 and the Me Auriga on the side of the branch 1.

4. Install a power supply with a hook-and-loop fastener under the Me Auriga.

10
Lesson 1 Christmas Tree Colored LED RGB Strip

5. Plug the plug of the lamp belt into the steering gear/RJ25 adapter, and then wrap it around the branch.

6. Wrap the lamp belt around the structural connection of the Christmas tree.

11
Building Instructions for Electronic Inventor

7. Use a bandage to fix the lamp belt.

12
Lesson 1 Christmas Tree Colored LED RGB Strip

8. The work is completed; let the Christmas lights go on through programming!

13
Building Instructions for Electronic Inventor Lesson 1 Christmas Tree Colored LED RGB Strip

Lesson 2
Piano

14 14
Lesson 2 Piano Wonderful Sound

List of parts

Part name Part Quantity


Type drawing

Structural Beam0824-048 4
components

Beam0824-080 2

Beam0824-096 4

Beam0824-144 2

Beam0412-140 8

Beam0412-156 8

Electronic template RJ25 cable - 20cm 1

RJ25 cable - 35cm 1

Me 4 Button 2

15
Building Instructions for Electronic Inventor

18650 lithium battery 1


Electronic template pack (2)

Me Auriga Me Auriga 1

Hardware and tools M4*8 screw 2

M4*14 screw 26

M4*22 screw 6

M4 nut 16

4*7*2 nylon spacer 2

Hook-and-loop fastener 1

2.5mm cross HEX 1


screwdriver

Structural analysis

The piano has no distinct detachable structure.

Group work division

Each group consists of five persons.

16
Building Instructions for Electronic Inventor Lesson 1 Christmas Tree2 Colored
Lesson LED RGBSound
Piano Wonderful Strip

Piano construction

Step 1 - Chassis construction

Material preparation:

Beam0412-156 2

M4*14 screw 18
2
Beam0824-048

M4*22 screw 6
Beam0824-080 2

4 M4 nut 12
Beam0824-096

Beam0824-144 2

Beam0412-140 2

Construction process:

1. Fix two Beam0824-096 and two Beam0824-144 with M4*22 screws as the following figure. The
bottom is the Beam0824-096 and the top is the Beam0824-144.

17 1717
Building Instructions for Electronic Inventor

2. Use 8 M4*14 screws to connect each end of the Beam0824-144 with a Beam0824-048, and connect
both ends of the Beam0824-144 with the Beam0824-080; pay attention to the hole position.

3. Place the Beam0412-156 on the top of the Beam0824-080; align the holes of the Beam0824-080 and
the Beam0412-156, and then place the Beam0824-096 as shown in the figure. Pass M4*14 screws through
the Beam0824-096 and the Beam0412-156, and then fix them on the side threaded holes on the
Beam0824-080 at the bottom.

18
Lesson 2 Piano Wonderful Sound

4. Follow the operation of the previous step, and place a Beam0412-156 between the threaded hole on
another side of the Beam0824-080 and the Beam0824-096, and then fix them with the M4*14 screws.

5. Continue to add two Beam0412-140 between the two Beam0824-096, and fix them with four M4*14
screws and M4 nuts. Pay attention to the positions of holes for installing and fixing.

19
Building Instructions for Electronic Inventor Lesson 1 Christmas Tree2 Colored
Lesson LED RGBSound
Piano Wonderful Strip

Step 2 - Installation of the control system

Material preparation:

M4*8 screw 2

M4*14 screw 8
Beam0824-048 2

M4 nut 4
RJ25
Cable - 20cm 1

4*7*2 nylon spacer 2


RJ25
1
Cable - 35cm
Hook-and-loop 1
Me 4 Button 2 fastener

18650 lithium
1
Battery pack (2)

Me Auriga 1

Construction process:

1. Fix the Me Auriga on the Beam0824-144 with four M4*14 screws and M4 nuts, pay attention to the
hole position.

20 2020
Lesson 2 Piano Wonderful Sound

2. Pass M4*8 screws through a Me 4 Button, and screw them into the threaded slots of the Beam0824-144 to fix
the Me 4 Button. Pay attention to add gaskets.

3. Connect the two button modules to the motherboard ports 7 and 9 respectively with RJ25 connection line.

21
Building Instructions for Electronic Inventor

4. Use four M4*14 screws to install the Beam0824-048 on the upper side of the Beam0824-096 as shown
below.

5. The work is completed.

22
Lesson 3
Smart Lamp

23
Building Instructions for Electronic Inventor

List of parts

Part name Part Quantity


Type drawing

Structural Beam0808-088 4
components

Beam0808-104 4

Beam0824-032 2

Beam0824-048 4

Beam0824-096 1

Connector Bracket 3*3 4

Plate B 7*9 2

Triangle plate 6*8 2

Electronic template RJ25 connection line - 2


20cm

24
Lesson 3 Smart Lamp Controllable Lighting

Me 3-Axis
1
Electronic template Accelerometer and Gyro
Sensor

Colored LED module 1

1
Base bracket B

18650 lithium battery 1


pack (2)

Expansion pack x1 1
MegaPi Pro V1.0

MegaPi Pro RJ25 1


shield V1.0

Hardware and tools 15


M4*8 screw

17
M4*14 screw

4
M4*22 screw

6
M4 nut

R4100 plastic rivet 4


(white nylon)

4
Hook-and-loop fastener

2.5mm cross HEX 4


screwdriver

Wrench 4

Structural analysis

The smart lamp has no distinct detachable structure.

25
Building Instructions for Electronic Inventor LessonLesson
1 Christmas Tree
3 Smart
Lesson 2 Colored
LampPiano LED RGB
Controllable
Wonderful Strip
Lighting
Sound

Group work division

Each group consists of five persons.

Smart lamp construction

Step 1 - Chassis construction

Material preparation:

Bracket 3*3 4

Beam0808-088 4
M4*14 screw 16

Beam0808-104 4

Beam0824-048 4

Construction process:

1. Place a Beam0808-088 and a Beam0808-104 at 90 degrees as shown in the figure below. Place the
Beam0824-048 on the top holes on two Beam0808. Align through-holes at both ends of the Beam0808 and
the side threaded holes of the Beam0824. Pass M4*14 screws through the bracket 3*3 and screw them into
2 holes. Fix the remaining three corners in the same way. Pay attention to the orientation of the threaded
slots.

26 2626
26
Lesson 3 Smart Lamp Controllable Lighting

2. Continue to add two Beam0808-088 and two Beam0808-104 at the top, and fix them with 8 M4*14
screws. Note that the threaded slots of the Beam0808 are all outward.

27
Building Instructions for Electronic Inventor

Step 2 - Installation of the Me Auriga

Material preparation:

Base bracket B 1 M4*8 screw 1

M4*14 screw 1
MegaPi Pro V1.0 1

M4 nut 2

MegaPi Pro
1 R4100 plastic rivet
RJ25 shield V1.0 3
(white nylon)

Construction process:

1. Put the bracket of the MegaPi Pro into the frame. Insert the threaded slot from one side, and then insert
the whole board.

28
Lesson 3 Smart Lamp Controllable Lighting

2. Pass three R4100 plastic rivets (white nylon) through the bracket 3*3 to fix the base bracket.

3. Pass M4*14 screws through the base bracket and the MegaPi Pro, and fix it with nuts on the side of the MegaPi
Pro; pay attention to the hole position.

29
Building Instructions for Electronic Inventor

4. Install the upper MegaPi Pro RJ25 shield.

Step 3 - Installation of the power supply and gyroscope

Material preparation:

Me 3-Axis
Beam0824-032 2 1
Accelerometer and
Gyro Sensor

Colored LED
Beam0824-096 1 module 1

18650 lithium 1
battery pack (2)
Plate B 7*9 2
M4*8 screw 14

Triangle plate 6*8 2 M4*22 screw 4

M4 nut 4
RJ25
2
Connection line - Hook-and-loop 1
20cm fastener

30
Lesson 3 Smart Lamp Controllable Lighting

Construction process:

1. Fasten the battery pack on the Beam0824-096 with a hook-and-loop fastener.

2. Install the battery assembly in the frame with M4*22 screws; pay attention to the direction.

31
Building Instructions for Electronic Inventor

3. Install a Beam0824-032 on the plate B 7*9 with two M4*8 screws. Pay attention to the hole position.

4. Connect the colored LED module to the port 8 of the Me Auriga with an RJ25 connection line.

32
Lesson 3 Smart Lamp Controllable Lighting

5. Use M4*8 screws to install the component made in step 3 on the Beam0808-088 at the top of the desk
lamp frame. Place the Beam0824 inward.

6. Use two M4*8 screws to install the LED module of the color lamp on the Beam0824-032.

33
Building Instructions for Electronic Inventor

7. Repeat Step 3 and pay attention to differences of installation hole positions.

8. Install the Me 3-Axis Accelerometer and Gyro Sensor at the port 9 with an RJ25 connection line.

34
Lesson 3 Smart Lamp Controllable Lighting

9. Install the component made in Step 7 in the threaded slots of the Beam0808-104 on the side of the desk
lamp with M4*8 screws, and install the gyroscope on the Beam0824-032.

10. Install a 6*8 triangle plate, as a protective cover, in the threaded slots of the Beam0808-104.

35
Building Instructions for Electronic Inventor

11. The work is completed.

36
Lesson 4
Game Machine

37
Building Instructions for Electronic Inventor

List of parts

Part name Part Quantity


Type drawing

Structural Beam0824-016 2
components

Beam0824-032 2

Beam0824-048 2

Beam0824-080 2

Beam0824-096 4

Beam0824-112 2

Beam0824-128 2

Electronic template RJ25 connection line - 2


20cm

RJ25 connection line - 1


35cm

38
Lesson 4 Game Machine Fun Games

Electronic template Me Sound Sensor 1

Me 7-Segment Display 1

2.4-inch Me TFT 1
LCD Screen

18650 lithium battery 1


pack (2)

Expansion pack x1 1
MegaPi Pro V1.0

MegaPi Pro RJ25 1


shield V1.0

Hardware and tools M4*8 screw 4

M4*14 screw 32

M4*22 screw 4

8
M4 nut

4*7*2 nylon spacer 2

1
Hook-and-loop fastener

2.5mm cross HEX 1


screwdriver

Wrench 1

Structural analysis

The game machine has no distinct detachable structure.

39
Building Instructions for Electronic Inventor

Group work division

Each group consists of five persons.

Construction of the game machine

Step 1 - Body construction

Material preparation:

Beam0824-016 2 Beam0824-096 2

Beam0824-032 2 Beam0824-112 2

Beam0824-128 2
Beam0824-048 2

Beam0824-080 2 M4*14 screw 24

Construction process:

1. Select one for each model of Beam0824 listed above, and assemble them into two components as
shown in the figure below.

40
Lesson 4 Game Machine Fun Games

Step 2 - Installation of the power supply and Me Auriga

Material preparation:

Beam0824-096 1 M4*14 screw 2

MegaPi Pro V1.0 1 M4*22 screw 4

M4 nut 6
MegaPi Pro RJ25
shield V1.0 1
4*7*2 nylon spacer 2

18650 lithium 1
battery pack Hook-and-loop 1
(2) fastener

Construction process:

1. On the component built in the previous step, pass an M4*14 screw through the first hole on the
Beam0824-048 side of the Beam0824-128, a nylon spacer, and the MegaPi Pro from bottom to top, and
then fasten them with an M4 nut. Fasten the rear of the MegaPi Pro with another Beam0824 component in
the same way. Keep the two Beam0824 components in the same direction, and then fasten other holes on
the MegaPi Pro.

41
Building Instructions for Electronic Inventor

2. Fasten the battery on one side of the Beam0824-096 with a hook-and-loop fastener.

3. Use the component made in Step 2 to connect two components made in Step 1 with four M4*22 screws
and four M4 nuts. Pay attention to the hole position and the battery orientation, and complete the general
structure of the game machine.

42
Lesson 4 Game Machine Fun Games

Step 3 - Sensor installation

Material preparation:

Beam0824-096 2 Me 7-Segment 2
Display

RJ25 2 2.4-inch Me TFT 2


Connection line -
LCD Screen
20cm

RJ25 M4*8 screw 4


2
Connection line -
35cm
M4*14 screw 6
Me Sound Sensor 2
M4 nut 2

Construction process:

1. Install the Beam0824-096 on the top of the two Beam0824-080 with four M4*14 screws. Refer to the
figure below.

43
Building Instructions for Electronic Inventor

2. Install the Me Sound Sensor and the Me 7-Segment Display on the top of the Beam0824-096 with four
M4*8 screws at the central position; install the 2.4-inch Me TFT LCD Screen on the top of the Beam0824-
096 with two M4*14 screws and two M4 nuts.

3. Connect the digital tube to the port 9 with an RJ25 connection line; connect the Me Sound Sensor to the
port 8, and connect the 2.4-inch Me TFT LCD Screen to the port 7.

44
Lesson 4 Game Machine Fun Games

4. The work is completed.

45
Lesson 5
Self Balancing
Robot Car

46
Lesson 5 Self Balancing Robot Car Gyroscope

List of parts

Part name Part Quantity


Type
drawing

Structural Beam0824-032 4
components

Beam0824-064 2

Beam0824-128 1

Basic drive part Injection timing pulley 2


90T

Shaft drive part Shaft connector 2

Shaft collar 4mm 2

Electronic template RJ25 cable - 20cm 1

Me 3-Axis Accelerometer 1
and Gyro Sensor

Base bracket B 1

47
Building Instructions for Electronic Inventor

Electronic template 18650 lithium battery 1


pack (2)

MegaPi Pro V1.0 1


Expansion pack x1

MegaPi Pro RJ25 shield 1


V1.0

Coding / DC motor 2
driver

Motor module Motor bracket 25 2

Moving part Slick tire 2

25mm DC encoder
motor pack (with a 2
connection line)

Hardware and tools M4*8 screw 7

16
M4*14 screw

M3*8 cross recessed


countersunk flat head 4
screw
5
M4 nut

6
M3*5 headless screw

1
Hook-and-loop fastener

2.5mm cross HEX 1


screwdriver

1
1.5mm HEX Allen key

48
Lesson 5 Self Balancing Robot Car Gyroscope

Structural analysis

The self balancing robot car has no distinct detachable structure.

Group work division

Each group consists of five persons.

Construction of the balancing car

Step 1 - Chassis construction

Material preparation:

Beam0824-032 4
Slick tire 2

Beam0824-064 2

Beam0824-128 1 25mm DC encoder


2
motor pack
(with a connection
line)
Injection timing 2
pulley 90T

2 12
Shaft connector M4*14 screw

2 M3*8 cross recessed


Shaft collar 4mm 4
countersunk flat
head screw

Motor bracket 25 2 M3*5 headless 6


screw

49
Building Instructions for Electronic Inventor

Construction process:

1. Take the corresponding Beam0824 and use eight M4*14 screws to construct the components as shown
in the figure below.

2. Fasten the motor bracket 25 with M3*8 cross recessed countersunk flat head screws, and keep the motor
socket and the protruding end of the bracket in the opposite direction.

50
Lesson 5 Self Balancing Robot Car Gyroscope

3. Install the motor component on the Beam0824 component with two M4*14 screws, and take the same
step for the other side.

4. Install the tires, and screw the M3*5 headless screws into the shaft connector to fix them with the shaft
collar.

51
Building Instructions for Electronic Inventor Lesson 1 Christmas
Lesson
Lesson
5 Self
Lesson Tree
3 Smart
Lesson 2 Colored
Balancing
4Lamp
GamePiano
Robot LED RGB
Controllable
Machine
Wonderful
Car Fun Strip
Gyroscope
Lighting
Games
Sound

Step 2 - Installation of the control system

Material preparation:

Coding / DC motor 2
driver

RJ25 1 M4*8 screw 7


Cable - 20cm

Me 3-Axis M4*14 screw 4


Accelerometer and 1
Gyro Sensor
5
M4 nut
1
Base bracket B
Hook-and-loop 1
fastener
18650 lithium 1
battery pack (2)

1
MegaPi Pro V1.0

MegaPi ProRJ25 1
shield V1.0

Construction process:

1. Install the gyroscope on the Beam0824-128 with M4*14 screws and M4 nuts; pay attention to the hole
position.

52 52
52
52
Lesson 5 Self Balancing Robot Car Gyroscope

2. Install the acrylic plate on the threaded slots of two Beam0824-032 on the top of the self balancing robot car
with two M4*8 screws.

3. Install the motherboard, and fasten it with M4*8 screws and M4*14 screws.

53
Building Instructions for Electronic Inventor

4. Plug in the MegaPi Pro shield and encoder motor driver, and connect them with wires. Install two DC
encoder motor drivers to the port 1 and port 2 respectively, and complete the circuit connection with two
encoder motors. If the forward and backward actions of the car are reversed, switch these two motors with
the connection ports of the MegaPi Pro; connect the gyroscope to the port 6 of the MegaPi Pro.

54
Lesson 5 Self Balancing Robot Car Gyroscope

5. Install the battery on the vertical Beam0824 on one side of the car, and fasten them with a hook-and-loop
fastener.

Expansion: Install the Beam0824 on both sides of the car, change the weight
distribution of the car to balance it.

55
Building Instructions for Electronic Inventor

5. The work is completed.

56
Lesson 6
Fire Alarm

57
Building Instructions for Electronic Inventor

List of parts

Part name Part Quantity


Type drawing

Structural Beam0808-056 1
components

Beam0808-080 2

Beam0808-088 1

Beam0808-152 1

Beam0824-064 7

Beam0824-144 1

Beam0824-160 3

Beam0412-060 2

Connector Plate B 7*9 4

Bracket P1 2

58
Lesson 6 Fire Alarm Fire Warning

Me Auriga Me Auriga 1

RJ25 connection line - 2


Electronic template 35cm

RJ25 connection line - 3


20cm

1
Colored LED module

Me Gas Detection 1
Module

1
Me 7-Segment Display

1
Me Flame Sensor

18650 lithium battery 1


pack (2)

Motor module Silicone air tube 0305 2

Pump motor DC 1
12V/370-04PM

Me DC Motor Driver 1

21
Hardware and tools M4*8 screw

M4*14 screw 39

9
4*7*2 nylon spacer

4
4*7*3 nylon spacer

R4100 plastic rivet 2


(white nylon)

Nylon cable ties 1.9*100 2

59
Building Instructions for Electronic Inventor Lesson 1 Christmas
Lesson
Lesson
5 Self
Lesson Tree
3 Smart
Lesson
Lesson
4LampColored
Balancing
Game
62Fire
Piano
Robot LED RGB
Controllable
Machine
Alarm
Wonderful
CarFire
Fun Strip
Gyroscope
Warning
Lighting
Games
Sound

Hardware and tools Hook-and-loop fastener 1

2.5mm cross HEX


screwdriver 1

Wrench 1

Structural analysis

The fire alarm has no distinct detachable structure.

Group work division

Each group consists of five persons.

Construction of the fire alarm

Step 1 - Cylinder construction

Material preparation:

2
Beam0412-060

1 M4*8 screw 8
Beam0808-056

1 M4*14 screw 27
Beam0808-088

1 4*7*2 nylon spacer 1


Beam0808-152

Beam0824-064 7

3
Beam0824-160

60 60
60
60
Lesson 6 Fire Alarm Fire Warning

Construction process:

1. Install three Beam0824-064 on the Beam0824-160 with M4*14 screws. Pay attention to the hole position
and orientation. Make a same component in the same way.

2. Insert two ends of a Beam0824 into the slots of a Beam0808, and screw an M4*8 screw into the
Beam0412-060 to connect the two components.

61
Building Instructions for Electronic Inventor

3. Install a Beam0824-064 on one side with two M4*14 screws, pay attention to the hole position and
orientation.

4. Install the Beam0824-160 on the top with four M4*14 screws.

62
Lesson 6 Fire Alarm Fire Warning

5. Install the Beam0808-056 and Beam0808-088 on one side, and the Beam0808-152 on the other side
with M4*14 screws. Ensure all screwed slots are outward. Add spacers when installing the Beam0808-
056.

Step 2 - Door leaf making

Material preparation:

Beam0808-080 2 2
Bracket P1

Plate B 7*9 4 11
M4*8 screw

63
Building Instructions for Electronic Inventor

Construction process:

1. Install a plate into the threaded slots of the Beam0808-056 with M4*8 screws as shown in the figure
below.

2. Make two baffles with M4*8 screw as shown in the figure below, and install the P1 bracket on another
end of the Beam0808-080.

64
Lesson 6 Fire Alarm Fire Warning

3. Install a baffle on the back of the fire alarm with M4*8 screws, and then install a plate 7*9 next to it.

65
Building Instructions for Electronic Inventor Lesson 1 Christmas
Lesson
Lesson
5 Self
Lesson Tree
3 Smart
Lesson
Lesson
4LampColored
Balancing
Game
62Fire
Piano
Robot LED RGB
Controllable
Machine
Alarm
Wonderful
CarFire
Fun Strip
Gyroscope
Warning
Lighting
Games
Sound

Step 3 - Installation of the fire system

Material preparation:

Me Auriga 1 Me DC Motor
Driver 1

RJ25 2
Connection line - 18650 lithium
35cm battery pack (2) 1

RJ25 3 Silicone air tube


Connection line - 0305 2
20cm
Colored LED 1
Pump motor DC
module
12V/370-04PM 1
Me Gas Detection 1
Module
M4*8 screw 2
Me 7-Segment 1
Display
M4*14 screw 12

Me Flame Sensor 1
4*7*2 nylon spacer 8

4 Hook-and-loop
4*7*3 nylon spacer 1
fastener

R4100 plastic rivet 2


(white nylon)

Construction process:

1. Fold two silicone air tubes and place them in the left space of the fire alarm.

66 66
66
66
Lesson 6 Fire Alarm Fire Warning

2. Cut off the white heads of the motor connection wire, and pull out the copper wire and connect it to two
copper sheets on the pump.

3. Bind the pump to the Beam0808 064 with nylon cable ties.

67
Building Instructions for Electronic Inventor

4. Install flame sensors on it with two M4*14 screws and two M4 nuts. Do not forget to add spacers.

5. Install a dual-servo driver on the back with plastic rivets, pay attention to the hole position, and do not
forget to add spacers.

68
Lesson 6 Fire Alarm Fire Warning

6. Pass two M4*8 screws through the Me Auriga and the other baffle as shown in the figure below, and
fasten them into the Beam0808 thread slots on the alarm. Ensure the two baffles are symmetrically
installed.

7. Pass M4*14 screws through the bracket P1 and the Beam0808-080, add spacers, connect the Beam0824-
144 by fastening four holes.

69
Building Instructions for Electronic Inventor

8. Install a colored LED module, a Me 7-Segment Display, and a Me Gas Detection Module orderly on the
Beam0824-144 with M4*14 screws. Pay attention to the hole position.

9. Connect the dual-servo driver module to the port 1 of the Me Auriga with an RJ25 connection line.
Connect the Me Flame Sensor, colored LED module, Me 7-Segment Display, and Me Gas Detection
Module to ports 7, 8, 9, and 10 of the Me Auriga, respectively. Fasten the RJ25 connection line with nylon
cable ties.

70
Lesson 6 Fire Alarm Fire Warning

10. Place the battery pack in front and connect the power supply port of the Me Auriga. Connect the hoses
to the inlet and outlet of the pump before using the fire alarm.

11. The work is completed.

71
Building Instructions for Electronic Inventor

Lesson 7
Automatic Door

72
Lesson 7 Automatic Door Automatic Sensing

List of parts

Part Quantity
Type Part name drawing

Structural 2
Beam0808-136
components

Beam0824-064 4

Beam0824-080 4

Beam0824-144 4

Beam0412-124 2

Plate Plate I1 2

Expansion pack X1 MegaPi Pro V1.0 1

MegaPi Pro RJ25 shield 1


V1.0

Smart servo 2

73
Building Instructions for Electronic Inventor

Expansion pack X1 Installation bracket 2

Rudder bracket 2

Virtual axis of servo 2

Terminal wire 20cm 1

Terminal wire 60cm 1

RJ25 cable - 35cm 2


Electronic template

Me PIR Motion Sensor 1

18650 lithium battery 1


pack (2)

Expansion pack for 2


Beam0808-312
large parts

Beam0824-320 1

Hardware and tools M4*8 screw 31

M4*14 screw 22

M4*22 screw 8

R4100 plastic rivet (white 2


nylon)

14
M4 nut

4*7*2 nylon spacer 2

74
Lesson 7 Automatic Door Automatic Sensing

Hardware and tools 4*8*1 nylon spacer 2

Hook-and-loop fastener 1

2.5mm cross HEX 1


screwdriver

1
Wrench

Structural analysis

An automatic door consists of a door frame and two door leaves.

Group work division

A group consists of five persons. Among them, three are responsible for making two door leaves, and two
are for making a door frame.

75
Building Instructions for Electronic Inventor Lesson 1 Christmas
Lesson
Lesson
Lesson
57Self
Lesson Tree
3Automatic
Smart
Lesson
Lesson Colored
Balancing
4Lamp
Game
62Fire
Door
Piano
Robot LED RGB
Controllable
Machine
Alarm
Automatic
Wonderful
CarFire
Fun Strip
Gyroscope
Warning
Lighting
Sensing
Games
Sound

Construction of the automatic door

Step 1 - Construction of the door frame

Material preparation:

M4*8 screw 8

Beam0824-080 2 M4*14 screw 4

Beam0824-144 4 M4*22 screw


8

2 M4 nut 4
Plate I1

Beam0808-312 2

Beam0824-320 1

Construction process:

1. Connect two Beam0824-144 with four M4*8 screws and the plate I1 as shown in the figure below.
Make two such components.

76 76
76
76
Lesson 7 Automatic Door Automatic Sensing

2. Pass M4*22 screws through the Beam0808-312 and the Beam0824-080 on one side. On the other side,
fasten the Beam0824-144 with the Beam0824-080 to the side threaded holes of the Beam0824-144, and
connect with another Beam0808-312.

3. Connect the Beam0824-320 with four M4*22 screws and M4 nuts on the plate I1. Pay attention to the
orientation and hole position.

77
Building Instructions for Electronic Inventor

Step 2 - Construction of door leaves

Material preparation:

Beam0824-064 4 Virtual axis of servo 2

Beam0824-080 2 Terminal wire 20cm 1

Beam0412-124 2 Terminal wire 60cm 1

Smart servo 2 22
M4*8 screw

Installation bracket 2 12
M4*14 screw

Rudder bracket 2 8
M4 nut

Construction process:

1. Connect the Beam0824-080 to the installation bracket with two M4*14 screws and M4 nuts.

78
Lesson 7 Automatic Door Automatic Sensing

2. Connect the components made in the previous step to the servo with M4*8 screws.

3. Put the virtual axis of the servo into the round hole on one side of the rudder bracket.

79
Building Instructions for Electronic Inventor

4. Connect the rudder bracket with the servo.

5. Connect the Beam0412-124 and Beam0824-064, Beam0808-136 components and the rudder bracket
with M4*14 screws and M4*8 screws as shown in the figure below, and make one door leaf. Then make
the other leaf with almost the same parts and operations.

80
Lesson 7 Automatic Door Automatic Sensing

Combination
Material preparation:

MegaPi Pro V1.0 1 RJ25 cable - 35cm 2

MegaPi Pro RJ25 1 Me PIR Motion


shield V1.0 Sensor 1

Terminal wire 20cm 1 18650 lithium


battery pack (2) 1

Terminal wire 60cm 1 M4*14 screw 6

Construction process:

1. Install the door leaf component on the upper Beam0824 of the door frame with two M4*14 screws as
shown in the figure below.

81
Building Instructions for Electronic Inventor

2. Install the Megapi Pro on the Beam0824-144 with two M4*14 screws and M4 nuts. Do not forget to
add a 4*7*2 spacer. Otherwise, the Megapi Pro may be short-circuited.

3. Connect the white end of the 20cm terminal line with the servo interface of the Megapi Pro, and the
other end with the red servo interface.

82
Lesson 7 Automatic Door Automatic Sensing

4. Connect one end of the 60cm terminal line to the servo and the other end to the white servo interface.

5. Fasten the Me PIR Motion Sensor next to the door with plastic rivets, and connect it to the port 6 of the
Megapi Pro with an RJ25 connection line.

83
Building Instructions for Electronic Inventor

6. Fasten the battery pack on the Beam0824-144 with a hook-and-loop fastener, and connect it with the
Megapi Pro.

7. The work is completed.

84
Lesson 8
Weather Station

85
Building Instructions for Electronic Inventor

List of parts

Part Quantity
Type Part name drawing

Structural 1
Beam0824-016
components

Beam0824-128 4

Beam0824-144 2

Beam0824-192 1

Connector Bracket 3*6 2

RJ25 cable - 20cm 4


Electronic module

RJ25 cable - 35cm 1

Me Light Sensor 1

Me 4 Button 1

86
Lesson 8 Meteorological Station Weather Forecast

Electronic template Me 7-Segment Display 1

Me Temperature and 1
Humidity Sensor

Me Gas Detection 1
Module

1
Base bracket B

18650 lithium battery 1


pack (2)

Expansion pack MegaPi Pro V1.0 1

MegaPi Pro RJ25 shield 1


V1.0

Hardware and tools M4*8 screw 6

28
M4*14 screw

M4 nut 14

4
4*7*2 nylon spacer

1
Hook-and-loop fastener

2.5mm cross HEX 1


screwdriver

Structural analysis

The weather station has no distinct detachable structure.

Group work division

Each group consists of five persons.

87
Building Instructions for Electronic Inventor

Construction of weather station

Step 1 - Main body construction


Material preparation:

Beam0824-016 1 Bracket 3*6 2

Beam0824-128 4 Me Light Sensor 1

Beam0824-144 2 M4*14 screw 22

Beam0824-192 1 M4 nut 4

Construction process:

1. Use two Beam0824-144 to clamp three Beam0824-128, and fasten them with 12 M4*14 screws as
shown in the figure below. Pay attention to the position and hole position.

88
Lesson 8 Meteorological Station Weather Forecast

2. Install the Beam0824-016 in the fourth hole position on one side of the Beam0824-192 with two
M4*14 screws.

3. Install the bracket 3*6 at both ends of the Beam0824-128 with M4*14 screws and nuts.

89
Building Instructions for Electronic Inventor

4. Install the Beam0824-192 component on the chassis with four M4*14 screws.

5. Pass M4*14 screws through the Me Light Sensor, install the sensor on the Beam0824, and connect the
Beam0824-128 component with the Beam0824-192 component.

90
Building Instructions for Electronic Inventor Lesson
Lesson 81 Meteorological
Lesson
LessonChristmas
Lesson57Self
Lesson Tree
3Automatic
Smart
Lesson
Lesson Colored
Balancing
4Lamp
Game
62Station
Fire
Door
Piano
Robot LED RGB
Controllable
Machine
Alarm
Automatic
Wonderful
Weather
CarFire
Fun Strip
Gyroscope
Warning
Lighting
Forecast
Sensing
Games
Sound

Step 2 - Installation of the power supply, Megapi Pro, and sensors

Material preparation:

1
MegaPi Pro V1.0

MegaPi Pro RJ25 1


shield V1.0

RJ25 4
M4*8 screw 6
Cable - 20cm

RJ25 1
M4*14 screw 6
Cable - 35cm

Me 7-Segment
1
Display M4 nut 10

Me 4 Button 1
4*7*2 nylon spacer 4
Me Temperature
and Humidity 1
Sensor Hook-and-loop 1
fastener
Me Gas Detection 1
Module

Base bracket B 1

18650 lithium 1
battery pack (2)

Construction process:

1. Install the Me 4 Button with two M4*14 screws and nuts to the position as the figure.

91 91
91
91
Building Instructions for Electronic Inventor

2. Install the Me 7-Segment Display onto the Beam0824-016 on the 192 component with two M4*8
screws as shown in the figure below.

3. Install the Me Gas Detection Module and the Me Temperature and Humidity Sensor onto the bracket
3*6 with four M4*8 screws as shown in the figure below.

92
Lesson 8 Meteorological Station Weather Forecast

4. Install the base bracket B to the second hole position (counting from top to bottom) of the Beam0824-192 with
two M4*14 screws and M4 nuts.

5. Install the Megapi Pro and the MegaPi Pro RJ25 shield, and fasten the two side holes on the right with two
M4*14 screws and M4 nuts.

93
Building Instructions for Electronic Inventor

6. Fasten the battery on one side of the Beam0824-192 with a hook-and-loop fastener.

7. Connect sensors and the Megapi Pro with RJ25 cable.

94
Lesson 8 Meteorological Station Weather Forecast

8. Connect the Me Gas Sensor to the port 8, Me Temperature and Humidity Sensor to the port 6, and Me Light
Sensor to the port 7 of the Megapi Pro. Connect the Me 7-Segment Display to the port 9, and the Me 4 Button to
the port 10 of the Megapi Pro.

9. The work is completed.

95
Lesson 9
Electric
Screwdriver

96
Lesson 9 Electric Screwdriver Screw Loosening & Twisting

List of parts

Part Quantity
Type Part name drawing

Structural 4
Beam0824-096
components

Beam0824-128 2

Beam0824-144 1

Beam0824-176 2

Injection timing pulley 2


Basic drive part
90T

Shaft drive part D shaft 4*128mm 2

Shaft connector 2

Shaft collar 4mm 4

Bearing 4*8*3mm 1

97
Building Instructions for Electronic Inventor

Me Auriga Me Auriga 1

RJ25 connection line -


Electronic template 2
35cm

Me Touch Sensor 2

18650 lithium battery 1


pack (2)

25mm DC encoder motor 1


Motor module pack (with a connection
line); moving parts also
have this motor.

Motor bracket 25 1

Hardware and tools M4*8 screw 2

M4*14 screw 34

M3*8 cross recessed


countersunk flat head 2
screw

M4 nut 7

M3*5 headless screw 8

Hook-and-loop fastener 1

2.5mm cross HEX 1


screwdriver

1.5mm HEX Allen key 1

2.5mm HEX Allen key 1

Bit holder 1

1
Wrench

98
Lesson 9 Electric Screwdriver Screw Loosening & Twisting

Structural analysis

The electric screwdriver can be detached into a bit holder and a handle.

Group work division

A group consists of five persons. Among them, two are responsible for making the bit holder, and three
are for making the handle.

99
Building Instructions for Electronic Inventor

Construction of bit holder

Step 1 - Cylinder construction

Material preparation:

Beam0824-096 25mm DC encoder 1


4 motor

Injection timing M4*14 screw 20


pulley 90T 2
M3*8 cross recessed
2
Shaft connector countersunk flat head
2
screw

Bearing 4*8*3mm 4
1 M3*5 headless screw

1
Motor bracket 25 Bit holder
1

Construction process:

1. Fasten the injection timing pulley 90T to the shaft connector with M4*14 screws.

1
0
Lesson 9 Electric Screwdriver Screw Loosening & Twisting

2. Fasten the motor bracket 25 and 25mm DC encoder motor with M3*8 cross recessed countersunk flat
head screws, and cover the bearing 4*8*3mm.

3. Put the injection timing pulley 90T component on a 25mm DC encoder motor, and use M3*5 headless
screws to fasten the shaft connector.

101
Building Instructions for Electronic Inventor

4. Put another component on the bit holder, and fasten the shaft connector with M3*5 headless screws.

5. Install four Beam0824-096 on the injection timing pulley 90T component with eight M4*14 screws.

102
Lesson 9 Electric Screwdriver Screw Loosening & Twisting

6. Follow the same operation for the other side. Align the through-holes of the shaft connector of the
timing pulley components on both sides, to prepare for placing the D shaft later.

Step 2 - Installation of the power supply and Me Auriga

Material preparation:

D shaft 4*128mm 2

Shaft collar 4mm 4 M3*5 4


headless
screw

103
Building Instructions for Electronic Inventor

Construction process:

1. Insert the D shaft into the through-hole of the shaft connector, and pass through the through-holes of the
shaft connector of the timing pulley components on both sides. Enclose one end with a shaft collar, and do
not fasten it temporarily.

2. Enclose the protrusive D shaft with a shaft collar at the other end. The operation is a little difficult, so it
requires a team work. After that, tighten the headless screws.

104
Building Instructions for Electronic Inventor Lesson
Lesson 9 Electric
Lesson 81Screwdriver
Lesson
LessonChristmas
Lesson Tree
Meteorological
57Self
Lesson
3Automatic
Smart
Lesson
Lesson
Balancing
4Screw
Lamp
GameColored
62Station
Fire
Door
Piano LED
Loosening
Robot RGB
Controllable
Machine
Alarm
Automatic
Wonderful
Weather
CarFire
Fun
& Strip
Gyroscope
Twisting
Warning
Lighting
Forecast
Sensing
Games
Sound

Construction of the handle

Step 1 - Construction of handle


Material preparation:

M4*8 screw 2

Beam0824-128 2 M4*14 screw 8

Beam0824-144 1 M4 nut 1

Beam0824-176 1

Me Touch Sensor 2

Construction process:

1. Fasten two Beam0824-128 between the Beam0824-176 and the Beam0824-144 with eight M4*14 screws
as shown in the figure below. Fasten the top Beam0824-128 and Beam0824-176 by passing M4*14 screws
through the Me Touch Sensor. Then install the remaining one Me Touch Sensor. Pay attention to the hole
position.

105
1
105 105
105
105
105
105
0
Building Instructions for Electronic Inventor

Combination

Material preparation:

Me Auriga 1 M4*14 screw 6

RJ25 connection line


2 M4 nut 6
- 35cm

18650 lithium
1 Hook-and-loop 1
battery pack (2)
fastener

Construction process:

1. Install the Me Auriga on the lower side of the upper Beam0824-128 with M4*14 screws and M4 nuts,
and fasten the cylinder built before on the Beam0824-176 with M4*14 screws and nuts.

106
Lesson 9 Electric Screwdriver Screw Loosening & Twisting

2. Connect two touch modules with an RJ25 connection line respectively, and connect the motor to the
motor interface 1 of the Me Auriga with encoder motor cable.

9. The work is completed.

107
Lesson 10
Forklift

108
Lesson 10 Forklift Streamline Operation

List of parts

Part
Type Part name drawing Quantity
Structural
components
Beam0824-080 2

Beam0824-192 1

Beam0824-112 1

Beam0824-160 4

Connector Beam0824 184 2

Bracket 3*3 1

Bracket U1 2

U bracket B 2

109
Building Instructions for Electronic Inventor

Connector Plate 3*6 1

Basic drive part Timing pulley 32T 2

Belt connect plate 1

Open-end timing belt 5m 1

Linear motion shaft


1
D8*312mm

Shaft collar 8mm 8

Shaft drive part

Bearing 8*16*5mm 2

Threaded shaft 4*39mm 1

Moving part
PU wheel 125*24 4
(with headless screws)

RJ25 connection line - 1


Electronic module
20cm

1
Me Joystick Module

Base bracket B 1

18650 lithium battery 1


pack (2)

Expansion pack x1 MegaPi Pro V1.0 1

MegaPi Pro RJ25 shield 1


V1.0

1
Coding / DC motor driver

110
Building Instructions for Electronic Inventor Lesson
Lesson 9 Electric
Lesson 81Screwdriver
Lesson
LessonChristmas
Lesson Tree
Meteorological
Lesson
57Self
Lesson
3Automatic
Smart
Lesson
Lesson
10
Balancing
GameColored
Forklift
4Screw
Lamp
62Station
Fire
Door
Piano LED
Loosening
Robot RGB
Controllable
Machine
Streamline
Alarm
Automatic
Wonderful
Weather
CarFire
Fun
& Strip
Gyroscope
Operation
Twisting
Warning
Lighting
Forecast
Sensing
Games
Sound

Motor module Motor bracket 25 1

25mm DC encoder motor 1


pack

M8 threaded D shaft
8mm*96mm 2
(Pu wheel accessory
package)

Slide Beam0824-496 2
Advanced drive part

Slider 2

Expansion pack for 2


Beam2424-504
large parts
M4*8 screw
Hardware and tools 34

M4*14 screw
40

M4*22 screw
14

M4 nut
38

M8 nut
2

M3*5 headless screw


6
4*7*10 nylon spacer 8

M4 lock nut 1

4*7*2 nylon spacer 2

M3*8 cross recessed


countersunk flat head 2
screw

Hook-and-loop fastener 1

111
1
111 111
111
111
111
111
0
Building Instructions for Electronic Inventor Lesson
Lesson 9 Electric
Lesson 81Screwdriver
Lesson
LessonChristmas
Lesson Tree
Meteorological
Lesson
57Self
Lesson
3Automatic
Smart
Lesson
Lesson
10
Balancing
GameColored
Forklift
4Screw
Lamp
62Station
Fire
Door
Piano LED
Loosening
Robot RGB
Controllable
Machine
Streamline
Alarm
Automatic
Wonderful
Weather
CarFire
Fun
& Strip
Gyroscope
Operation
Twisting
Warning
Lighting
Forecast
Sensing
Games
Sound

2.5mm cross HEX 1


Hardware and tools screwdriver

1.5mm HEX Allen 1


key

2.5mm HEX Allen 1


key

1
Wrench

Note:
Assemble the slider before assembling. Install the roller on the slider with four M4*22 screws and 4*7*10 spacers,
and put M4 nuts on the inside of the slider as shown in the figure below.

Structural analysis

The forklift has no distinct detachable structure.

Group work division

Each group consists of five persons.

112
1
112 112
112
112
112
112
0
Building Instructions for Electronic Inventor Lesson
Lesson 9 Electric
Lesson 81Screwdriver
Lesson
LessonChristmas
Lesson Tree
Meteorological
Lesson
57Self
Lesson
3Automatic
Smart
Lesson
Lesson
10
Balancing
GameColored
Forklift
4Screw
Lamp
62Station
Fire
Door
Piano LED
Loosening
Robot RGB
Controllable
Machine
Streamline
Alarm
Automatic
Wonderful
Weather
CarFire
Fun
& Strip
Gyroscope
Operation
Twisting
Warning
Lighting
Forecast
Sensing
Games
Sound

Forklift construction

Step 1 - Construction of main frame

Material preparation:

Slider Beam0824- 2
496

Slider 2

Beam0824-080 1
Beam2424-424 2

Beam0824-192 1
20
M4*8 screw
2
Beam0824-160
M4*14 screw 28

Beam0824-184 1
M4 nut 4

Bracket U1 2

U bracket B 2

Note:The new MakerSpace Kits include black linear motion slide units and bars of slider 496 instead of
silver linear motion slide units and sliders.

Construction process:

1. Fasten the slid track Beam0824-496 on the threaded slots of the Beam2424-424 with M4*14 screws,
pay attention to the hole position.

113
1
113 113
113
113
113
113
0
Building Instructions for Electronic Inventor

2. Install the bracket U1 at one end of the Beam0824-160 with two M4*14 screws and M4 nuts, and
construct one more such component.

3. Connect the other end of the Beam0824-160 to the Beam2424-424 of the component with M4*14
screws.

114
Lesson 10 Forklift Streamline Operation

4. Install the U bracket B at this joint, and connect the Beam2424-424 with M4*8 screws as shown in the
figure below. Pay attention to the connection position. Keep the two U brackets B in the same position.

5. Slide the slider from the other side of the guide rail, and repeat Steps 1 to 5 to construct one more such
component.

115
Building Instructions for Electronic Inventor

6. Pass four M4*14 screws through the Beam0824-080 and the Beam0824-184, and screw them into the
threaded holes on the sides of the Beam2424 of the component as shown in the figure below. Fasten the
other end of the Beam0824-184 on the sides of the Beam2424 of another component with four M4*8
screws passing through the Beam0824. Keep the two components in the same direction.

7. Make the Beam0824-192 and the Beam0824-160 into the component with eight M4*14 screws as shown
in the figure below.

116
Lesson 10 Forklift Streamline Operation

8. Install the component on the slider with four M4*14 screws.

117
Building Instructions for Electronic Inventor Lesson
Lesson 9 Electric
Lesson 81Screwdriver
Lesson
LessonChristmas
Lesson Tree
Meteorological
Lesson
57Self
Lesson
3Automatic
Smart
Lesson
Lesson
10
Balancing
GameColored
Forklift
4Screw
Lamp
62Station
Fire
Door
Piano LED
Loosening
Robot RGB
Controllable
Machine
Streamline
Alarm
Automatic
Wonderful
Weather
CarFire
Fun
& Strip
Gyroscope
Operation
Twisting
Warning
Lighting
Forecast
Sensing
Games
Sound

Step 2 - Construction of tire chassis


Material preparation:

M8 threaded D
shaft 2
8mm*96mm

Linear motion shaft M8 nut 2


1
D8*312mm

6 M3*5 headless screw 4


Shaft collar 8mm

Bearing 8*16*5mm 2

4
PU wheel 125*24
((with headless screws))

Construction process:

1. Pass the M8 D shaft 8mm*96mm through the shaft collar 8mm, the PU wheel 125*24, and the bearing
8*16*5mm, then mount it to the U bracket on the main body and tighten the headless screw M3*5 on the
shaft collar 8mm. Fasten the PU wheel 125*24 from the threaded end of the M8 D shaft 8mm*96mm with
a hex nut M8.

118
1
118 118
118
118
118
118
0
Lesson 10 Forklift Streamline Operation

2. Install another PU wheel on the other side in the same operation.

3. Pass the linear motion shaft D8*312mm through one U bracket B, thread it through two shaft collars
8mm, and get it passed through the other U bracket B. Then install the PU wheel 125*24 with coupling as
shown in the figure below. Tighten the headless screw on the coupling.

119
Building Instructions for Electronic Inventor

4. Fasten the shaft collar with M3*5 headless screws.

120
Lesson 10 Forklift Streamline Operation

Step 3 - Construction of transmission system

Material preparation:

M3*8 cross
Beam0824-080 recessed
1 2
countersun
k flat head
Bracket 3*3 1 screw
M4*8 screw
8

Timing pulley 32T 2 M4*14 screw


6

Belt connect plate 1 M4 nut


8

Open-end timing
belt 5m 1 Plate 3*6
1

Threaded shaft
4*39mm 1 M3*5 headless
screw 4

Motor bracket 25
1 M4 lock nut
1
25mm DC encoder
motor pack 1

Construction process:

1. Install the motor bracket on the motor with two M3*8 cross recessed countersunk flat head screws.
Pay attention to the orientation of the encoder motor wire.

121
Building Instructions for Electronic Inventor

2. Fix the timing pulley 32T on the motor axle with two M3*5 headless screws.

3. Install the bracket 3*3 on the Beam0824-080 at the top of the main body with four M4*14 screws and
M4 nuts.

122
Lesson 10 Forklift Streamline Operation

4. Connect the bracket 3*3 to the motor components directly with two M4*8 screws and M4 nuts, and pay
attention to the orientation.

5. Insert one threaded end of the threaded axle into the Beam0824-080, then fasten it with an M4 lock nut, and
put the other end into the timing pulley 32T; then fix it with headless screws on timing pulley.

123
Building Instructions for Electronic Inventor

6. Install the above components on the left Beam0824-160. Pay attention to the hole position.

7. Install a plate 3*6 on the slider with two M4*8 screws.

124
Lesson 10 Forklift Streamline Operation

8. Pass the open-end timing belt through two timing pulleys; fasten the two ends of the timing belt on the
bracket 3*6 of the slider; pass the timing belt through the hole in the middle of the belt connect plate, and
then fasten the connect plate with four M4*8 nuts and M4 nuts.

125
Building Instructions for Electronic Inventor

Step 4 - Installation of the control system

Material preparation:

1 Coding / DC motor 1
Beam0824-112 driver

RJ25 connection
1 M4*8 screw 6
line
- 20cm
Me Joystick 1 6
M4*14 screw
Module

Base bracket B 1 M4*22 screw 6

18650 lithium 1 M4 nut 12


battery pack (2)

1 Hook-and-loop 1
MegaPi Pro V1.0
fastener

MegaPi Pro 1 2
4*7*2 nylon spacer
RJ25 shield V1.0

Construction process:

1. Fasten the Beam0824-112 to the Beam0824-184 with four M4*14 screws and M4 nuts as shown in the
figure below.

126
Lesson 10 Forklift Streamline Operation

2. Install the base bracket B in the position with four M4*8 screws as shown in the figure below.

3. Fasten the MegaPi Pro to the base bracket B with two M4*8 screws, and then install the motion shield and the
motor drive board.

127
Building Instructions for Electronic Inventor

4. Install the Me Joystick Module at the hole position of the Beam0824-112 with two M4*14 screws and
M4 nuts. Do not forget to add spacers.

5. Fasten the battery pack with a hook-and-loop fastener to the position as shown in the figure below.

128
Lesson 10 Forklift Streamline Operation

6. Connect the connecting lines. Connect the motor line to the port 1 of the MegaPi Pro, and connect the Me
Joystick Module to the port 9 of the MegaPi Pro with an RJ25 connecting line.

7. The work is completed.

129
Lesson 11
Cart

130
Lesson 11 Cart Patrol Model

List of parts

Part Quantity
Type Part name drawing

Structural 8
Beam0808-072
components

Beam0824-016 2

Beam0824-032 4

Beam0824-048 2

Beam0824-064 2

Beam0824-128 2

Beam0412-092 2

Beam0412-236 2

Connector Bracket L1 4

131
Building Instructions for Electronic Inventor

Connector Bracket 3*3 4

Plate 3*6 2

Basic drive part Flange bearing 4*8*3mm 4

D shaft 4*56mm 2
Shaft drive part

Shaft connector 6

Threaded shaft 4*39mm 10

Electronic module RJ25 connection line - 1


50cm

Joystick 1

Base bracket B 1

18650 lithium battery 1


pack (2)

360*256 aluminium sheet 1

MegaPi Pro V1.0 1


Expansion pack x1

MegaPi Pro RJ25 shield 1


V1.0

Coding / DC motor driver 2

Motor module Motor bracket 25 2

Injection timing pulley 4


90T

132
Lesson 11 Cart Patrol Model

Moving part Slick tire 4

25mm DC encoder motor 2


pack

Expansion pack for 2


Beam0824-320
large parts

Beam0808-312 2

Hardware and tools M4*8 screw 24

M4*14 screw 36

M4*22 screw 14

28
M4 nut

M3*5 headless screw 18

M4 lock nut 26

Shaft collar 4mm 14

4*7*2 nylon spacer 12

4*7*10 nylon spacer 2

M3*8 cross recessed


countersunk flat head 4
screw

R4120 plastic rivet (white 4


nylon)

Hook-and-loop fastener 1

133
Building Instructions for Electronic Inventor

2.5mm cross HEX 1


Hardware and tools screwdriver

1.5mm HEX Allen key 1

2.5mm HEX Allen key 1

Wrench 1

Note: Please take out one 360*256 aluminium sheet from the extra accessory package.

Structural analysis

The cart has no distinct detachable structure.

Group work division

Each group consists of five persons.

134
Building Instructions for Electronic Inventor Lesson
Lesson 9 Electric
Lesson 81Screwdriver
Lesson
LessonChristmas
Lesson Tree
Meteorological
Lesson
57Self
Lesson
3Automatic
Smart
Lesson
Lesson
10
BalancingColored
Forklift
4Screw
Lesson
Lamp
Game
62Station
Fire
Door
Piano LED
Loosening
Robot
11 RGB
Controllable
Machine
Streamline
Alarm
Automatic
Cart
Wonderful
Weather
CarFire
Patrol
Fun
& Strip
Gyroscope
Operation
Twisting
Warning
Lighting
Forecast
Sensing
Games
Model
Sound

Cart construction

Step 1 - Construction of the cuttable linkage


Material preparation:

M4 lock nut 14
Beam0808-072 8

Shaft collar 4mm 6


Bracket L1 4

Threaded shaft 6 4*7*2 nylon spacer 12


4*39mm

8 4*7*10 nylon spacer 2


M4*22 screw

M3*5 headless 6
screw

Construction process:

1. Take two Beam0808-072, insert M4*22 screws at the intersection of the heads of two Beam0808, and
then fasten it with M4 lock nuts. Keep it rotatable at the beginning of connection. Then place the threaded
end of the threaded shaft 4*39 mm on both ends of two Beam0808-072, and fix them with M4 lock nuts.

135
1
135 135
135
135
135
135
0
Building Instructions for Electronic Inventor

2. Make another similar component with only one threaded shaft on one end. Then cross the two
components together, and fasten them with M4*22 screws and M4 lock nuts.

3. Put a spacer on the end with only one threaded shaft, and then put on the plate I1 and two spacers in turn,
and fasten them with the a shaft collar.

136
Lesson 11 Cart Patrol Model

4. Put one 4*7*10 nylon spacer and one 4*7*2 nylon spacer on the other end.

5. After putting on the plate I1, fasten the left side with a shaft collar, and put the 4*7*2 nylon spacer on
the right side. Fasten other threaded shafts in the same way.

137
Building Instructions for Electronic Inventor

6. Make a symmetrical component in the same way.

138
Lesson 11 Cart Patrol Model

Step 2 - Framework construction

Material preparation:

Beam0824-128 2

Beam0412-236 4
M4*8 screw 12

Bracket 3*3 2
M4*14 screw 12

Threaded shaft 2
4*39mm M4*22 screw 6

360*256 aluminium 1
sheet M4 nut 16

Plate 3*6 2 M3*5 headless 2


screw

Beam0808-312 2 6
M4 lock nut

Beam0824-320 2 Shaft collar 4mm 2

Construction process:

1.Insert the end with a threaded shaft into the Beam0824-032, and fasten it with a lock nut; insert the other end
into the Beam0808-312, and then put it into the shaft collar 4mm; screw M3*5 headless screws to fasten it.
Make one more such component.

139
Building Instructions for Electronic Inventor

2. Construct the Beam0824-320 and Beam0412-236 to be a rectangle frame with M4*8 screws as shown in
the figure below.

3. Insert the M4*14 screws into the bracket 3*3 and the hole positions at one corner of the aluminium
sheet, and then fasten them into the threaded holes on the sides of the Beam0824-032 component. Pay
attention to the hole position. Fasten the same part at another corner of the aluminium sheet. Keep the
position of the Beam0808 on both sides in parallel alignment.

140
Lesson 11 Cart Patrol Model

4. Take the components installed in the above step as the front of the aluminium sheet. Install the bracket 3*3 on
the rear side of the aluminium sheet with four M4*8 screws and M4 nuts as shown in the figure below.

5. Install the Beam0824-128 on the side of the bracket 3*3 installed above with M4*14 screws and M4 lock nuts
through holes at edge positions. Install the same components along the side of the short end of the aluminum
plate, to make the left and right sides to be symmetrical.

141
Building Instructions for Electronic Inventor

6. Install the Beam0824-320 and the Beam0412-236 component on the Beam0824-128. Only install three
M4*22 screws, and do the same operation on the other side.

7. Fasten the plate 3*6 inside on the other end of the Beam0824-320. Fasten one hole with one M4*14
screw and one M4 nut, and fasten the other with one threaded end of the threaded shaft and a lock nut.

142
Lesson 11 Cart Patrol Model

Step 3 - Installation of tires and cuttable linkage

Material preparation:

Flange bearing 4 M4*8 screw 8


4*8*3mm

D shaft 4*56mm 2 M4*14 screw 2

Shaft connector 4 M4 nut 10

Threaded shaft 2 M3*5 headless


screw 6
4*39mm

Injection timing pulley 4 M4 lock nut


90T 2

Slick tire 4 Shaft collar 4mm


6

Construction process:

1. Put the slick tire on the injection timing pulley 90T, and put on a flange bearing 4*8*3mm in the
middle.

143
Building Instructions for Electronic Inventor

2. Install the shaft connector on the other side of the injection timing pulley 90T, and use the D shaft to
penetrate the hole position. Fasten both sides with shaft collars.

3. Connect the cuttable linkage component and a plate I1 with a threaded shaft to the bracket 3*3 on the
aluminium sheet with M4*8 screws and lock nuts.

144
Lesson 11 Cart Patrol Model

4. Connect the plate I1 with two threaded shafts and the bracket 3*3 on the aluminium sheet with M4*14 screws
and lock nuts.

5. Install the tires on the threaded shafts, and fasten them with shaft collars.

145
Building Instructions for Electronic Inventor

6. Install the other side in the same way.

146
Building Instructions for Electronic Inventor Lesson
Lesson 9 Electric
Lesson 81Screwdriver
Lesson
LessonChristmas
Lesson Tree
Meteorological
Lesson
57Self
Lesson
3Automatic
Smart
Lesson
Lesson
10
BalancingColored
Forklift
4Screw
Lesson
Lamp
Game
62Station
Fire
Door
Piano LED
Loosening
Robot
11 RGB
Controllable
Machine
Streamline
Alarm
Automatic
Cart
Wonderful
Weather
CarFire
Patrol
Fun
& Strip
Gyroscope
Operation
Twisting
Warning
Lighting
Forecast
Sensing
Games
Model
Sound

Step 4 - Construction of the support system

Material preparation:

2 25mm DC encoder 2
Shaft connector motor

2 M4*8 screw 4
Beam0412-092

2 M4*14 screw 20
Beam0824-048

2 M4 lock nut 4
Beam0824-064

M3*8 cross 4
Beam0824-016 2 recessed
countersunk flat
head screw
Beam0824-032 2
M3*5 headless 4
screw

Motor bracket 25 2

Construction process:

1. Install the motor bracket 25 on the 25mm DC encoder motor, and then install the upper Beam0824-016
with M4*14 screws and M4 nuts.

147
1
147 147
147
147
147
147
0
Building Instructions for Electronic Inventor

2. On the basis of the previous step, connect the previous Beam0824-048, a Beam0824-064 and a
Beam0824-032 with M4*14 screws as shown in the figure below.

3. Install the Beam0412-092 on the shaft connector with M4*8 screws, and then install the component on
the motor axle. Fasten the shaft connector with M3*5 headless screws, and make a symmetrical
component in the same way.

148
Lesson 11 Cart Patrol Model

4. Install the component on the Beam0824-320 through the threaded hole on the side of the Beam0824-032 at the
end of the component, and put the Beam0412 into the LED RGB strip hole of the aluminium sheet.

149
Building Instructions for Electronic Inventor Lesson
Lesson 9 Electric
Lesson 81Screwdriver
Lesson
LessonChristmas
Lesson Tree
Meteorological
Lesson
57Self
Lesson
3Automatic
Smart
Lesson
Lesson
10
BalancingColored
Forklift
4Screw
Lesson
Lamp
Game
62Station
Fire
Door
Piano LED
Loosening
Robot
11 RGB
Controllable
Machine
Streamline
Alarm
Automatic
Cart
Wonderful
Weather
CarFire
Patrol
Fun
& Strip
Gyroscope
Operation
Twisting
Warning
Lighting
Forecast
Sensing
Games
Model
Sound

Step 5 - Construction of the control system

Material preparation:

RJ25 connection Coding / DC motor 2


1
line driver
- 50cm
M4*14 screw 2
Joystick 1

M4 nut 2
Base bracket B 1

R4120 plastic rivet 4


18650 lithium 1 (white nylon)
battery pack (2)
Hook-and-loop 1
1 fastener
MegaPi Pro V1.0

MegaPi Pro 1
RJ25 shield V1.0

Construction process:

1. Fasten the base bracket and the MegaPi Pro together to the aluminum sheet with plastic rivets.

150
1
150 150
150
150
150
150
0
Lesson 11 Cart Patrol Model

2. Install the Me Joystick Module on the Beam0808-312 with two M4*14 screws and M4 nuts (fasten the RJ25
connection line with nylon cable ties).

3. Install the MegaPi Pro RJ25 shield, and connect the encoder motor with the motor ports 1 and 2 with
the encoder motor cable, and connect the Me Joystick Module to the MegaPi Pro 12 with the RJ25
connection line.

151
Building Instructions for Electronic Inventor

4. Fasten the battery pack on the aluminium sheet with a hook-and-loop fastener and connect it with the
power supply port of the MegaPi Pro.

5. The work is completed.

152
Lesson 12
Tower Crane

153
Building Instructions for Electronic Inventor

List of parts

Part Quantity
Type Part name drawing

Structural Beam0808-088 2
components

Beam0824-048 2

Beam0824-064 2

Beam0824-080 2

Beam0824-144 2

Beam0824-160 2

Beam0824-192 6

Connector Disc D72 2

Plate 3*6 4

154
Lesson 12 Tower Crane Flexible Lifting

Connector Bracket 3*3 4

Bracket U1 1

Bracket L1 1

Basic drive part 2


Timing pulley 18T

Timing pulley 32T 1

Belt connect plate 1

Open-end timing belt 5m 1

Timing belt 123T 1


(98MXL)

1
Timing pulley 90T

Linear motion shaft 1


Shaft drive part
D8*96mm

2
D shaft 4*56mm

V-slot bearing 4

Flange bearing 2
4*8*3mm

Shaft collar 4mm 2

Shaft collar 8mm 2

Bearing 8*16*5mm 2

Coupling 4*4mm 1

8mm shaft clamping hub 1

155
Building Instructions for Electronic Inventor

8mm bearing bracket A 2


Shaft drive part

RJ25 connection line - 1


Electronic module
20cm

Me 4 Button 1

18650 lithium battery 1


pack (2)

Me Auriga Me Auriga 1

Motor module Motor bracket 25 1

Motor bracket 37 1

25mm DC encoder motor 2


pack

Expansion pack for


Beam0824-320 2
large parts

Slider 496 1

Hardware and tools M4*8 screw 34

M4*14 screw 53

M4*22 screw 16

M4 nut 46

7
M3*5 headless screw

2
4*7*2 nylon spacer

156
Lesson 12 Tower Crane Flexible Lifting

M3*8 cross recessed


Hardware and tools countersunk flat head 4
screw

Hook-and-loop fastener 1

2.5mm cross HEX 1


screwdriver

Basic drive part 1.5mm HEX Allen key 1

2.5mm HEX Allen key 1

Wrench 1

Note: If Beam0824-192 are not enough, use belt connect plates in the basic drive parts to combine two
shorter Beam0824 to replace a Beam0824-192. Note that the screw should be screwed into the
threaded hole in the middle of the Beam0824.

Structural analysis

The tower crane consists of a davit arm, a rotator and a base.

Group work division

Each group consists of five persons. Among them, two responsible for constructing the davit arm, and
three for constructing the rotator and the base.

157
Building Instructions for Electronic Inventor

Construction of the base

Step 1 - Construction of the base frame

Material preparation:

Beam0824-160 2
2 Beam0824-064

Beam0824-192 Beam0824-080 2
6

12
M4*8 screw
Disc D72
2
27
M4*14 screw
8mm shaft clamping
hub 1 Linear motion shaft 1
D8*96mm

Construction process:

1. Assembly a quadrilateral bracket by placing two Beam0824-160 between two Beam0824-192, and then
install two Beam0824-064 in the inner middle of two Beam0824-192 with M4*14 screws. Install two
Beam0824-080 in the inner middle of two Beam0824-160 with M4*14 screws to make the base as shown
in the figure below.

158
Lesson 12 Tower Crane Flexible Lifting

2. Install an 8mm shaft clamping hub on the disc D72 with M4*14 screws, and align the axes of the
central round holes.

3. Insert the linear motion shaft D8*96mm into the shaft clamping hub, and fasten them with M4*14
screws.

159
Building Instructions for Electronic Inventor

4. Install four Beam0824-192 on the above disc component, and fasten them with M4*14 screws. Pay
attention to the hole position.

5. Fasten another disc with M4*8 screws at the other end.

160
Lesson 12 Tower Crane Flexible Lifting

6. Install the disc without a shaft clamping hub on the base installed at the beginning.

Step 2 - Construction of the rotating system

Material preparation:

1 Motor bracket 37
Beam0808-088 1

1 Timing pulley 32T


Bracket L1 1

M3*5 headless
1 2
Timing pulley 90T screw

M4*8 screw 4

25mm DC encoder 1 M4*14 screw 2


motor pack

M4 nut 2

M3*8 cross recessed


Shaft collar 8mm 1 countersunk flat 2
head screw

161
Building Instructions for Electronic Inventor

Construction process:

1. Fasten the Beam0808-088 with M4*8 screws to the upper disc as shown in the figure below.

2. Install the motor bracket 37 on the encoder motor 25 with M3*8 cross recessed countersunk flat head
screws.

162
Lesson 12 Tower Crane Flexible Lifting

3. Then install the electrical components of the previous step on the Beam0808-088.

4. Install the timing pulley 32T on the motor axle with M3*5 headless screws.

163
Building Instructions for Electronic Inventor

5. Put the 8mm shaft collar on the linear motion shaft, and fasten them with M3*5 headless screws.

6. Install the bracket L1 onto the synchronous pulley 90T with M4*14 screws and M4 nuts.

164
Lesson 12 Tower Crane Flexible Lifting

7. Install the timing belt. Adjust the belt by adjusting the positions of the motor component in the
threaded slots until the belt is tightened.

Rotator construction

Step 1 - Construction of the rotating system

Material preparation:

2
Beam0824-048

4
Beam0824-160 2 M4*22 screw

M4 nut 4
8mm bearing 2
bracket A

8 Bearing 8*16*5mm 2
M4*14 screw

165
Building Instructions for Electronic Inventor

Construction process:

1. Install 8mm bearing brackets A in the Beam0824-048 as shown in the figure below, and place the
bearings in the middle.

2. Install the upper Beam0824-160 on the Beam0824-048 component in the previous step, and fasten them
with M4*22 screws and M4 nuts.

166
Lesson 12 Tower Crane Flexible Lifting

Construction of davit arm

Step 1 - Construction of the davit arm frame


Material preparation:

Beam0808-088 1
Beam0824-320 2

Plate 3*6 2
Slider 496 1

Bracket 3*3 4 M4*8 screw 10

Timing pulley 2 10
M4*14 screw
18T

1
Coupling 4*4mm
M4 nut 14

1
D shaft 4*56mm 2
4*7*2 nylon spacer

1 M3*8 cross recessed


Motor bracket 25 2
countersunk flat
head screw

167
Building Instructions for Electronic Inventor
Building Instructions for Electronic Inventor Lesson
Lesson 9 Electric
Lesson 81Screwdriver
Lesson
LessonChristmas
Lesson57Self
Lesson Tree
Meteorological
Lesson
3Automatic
Smart
Lesson
Lesson
10
12
BalancingColored
Forklift
Tower
4Screw
Lesson
Lamp
Game
62Station
Fire
Door
Piano
Crane LED
Loosening
Robot
11 RGB
Controllable
Machine
Streamline
Alarm
Automatic
Cart
Wonderful
Weather
Flexible
CarFire
Patrol
Fun
& Strip
Gyroscope
Operation
Twisting
Warning
Lighting
Forecast
Sensing
Games
Lifting
Model
Sound

Construction process:

1. Install two brackets 3*3 with four M4*14 screws and M4 nuts at both ends of the Beam0824-320 as
shown in the figure below. Fasten the brackets on one side by two holes on the outside, and fasten the
brackets on the other side by diagonal holes. Make two such components.

2. Connect the two components made in the previous step to the two brackets 3*3 through a plate 3*6
with four M4*8 screws and M4 nuts. Pay attention to the installation sequence and screw hole positions.

168
1
168 168
168
168
168
168
0
Lesson 12 Tower Crane Flexible Lifting

3. Connect the two brackets 3*3 through a plate 3*6 with two M4*14 screws and M4 nuts at the other end. Pay
attention to the installation sequence and hole positions.

4. Install the upper slider 496 under the middle of the two connecting plates 3*6 in the previous step. Pass
M4*8 screws through the connecting plates, and screw them into the threaded slots of the slider to make
the davit arm frame.

169
Building Instructions for Electronic Inventor

5. Install the motor bracket 25 on the motor.

6. Install a Beam0808-088 into the threaded holes on the side of the Beam0824-320 of the davit arm
frame with two M4*14 screws. Ensure the threaded slots of the Beam0808 are placed outwards.

170
Lesson 12 Tower Crane Flexible Lifting

7. Install the motor on the Beam0808-088 with M4*14 screws. Do not forget to add spacers.

Step 2 - Construction of the synchronous rotating system

Material preparation:

2 Coupling 4*4mm
Timing pulley 18T 1

1
Belt connect plate Bracket U1
1

Open-end timing 1
belt 5m
Plate 3*6
2

D shaft 4*56mm 2
M4*8 screw 8

V-slot bearing 4
M4*22 screw 4

Flange bearing 2
4*8*3mm M4 nut 12

2 M3*5 headless
Shaft collar 4mm 4
screw

171
Building Instructions for Electronic Inventor

Construction process:

1. Connect the 4*56mm D shaft with the motor axle by coupling, and fasten M3*5 headless screws on the
coupling.

2. Put the timing pulley 18T on the D shaft. Screw the M3*5 headless screws until they contact with the D
shaft section. Fasten the timing pulley and the D shaft.

172
Lesson 12 Tower Crane Flexible Lifting

3. Fasten the bracket U1 to the other end of the davit arm with two M4*8 screws. Pay attention to the hole
position.

4. Insert the 4*56mm D shaft and the timing pulley 18T into the bracket, and fasten them with M3*5
headless screws. Insert two flange bearings 4*8*3 into the 4*56mm D shaft on both sides of the bracket.

173
Building Instructions for Electronic Inventor

5. Insert shaft collars 4mm on both sides of the D shaft, and tighten M3*5 headless screws.

6. Pass four M4*22 bolts through the plate 3*6, V-slot bearing and M4 nuts in turn to fasten them, and put
them into the slider 496.

174
Lesson 12 Tower Crane Flexible Lifting

7. Cover the plate 3*6 as shown in the figure below, and then fasten it with four M4 nuts.

8. Pass the open-end timing belt through the timing pulley 18T at both ends of the davit arm. Then pass
two ends of the timing belt through the belt connect plate and tighten the timing belt, and fasten it to the
plate 3*6 with M4*8 screws.

175
Building Instructions for Electronic Inventor

Combination

Material preparation:

M3*5 headless 1
Me Auriga
1 screw

RJ25
Connection line - 6
M4*14 screw
20cm 1

Hook-and-loop 1
Me 4 Button fastener
1

18650 lithium M4*22 screw 8


battery pack (2) 1

M4 nut 14
Shaft collar 8mm 1

Construction process:

1. Put the bearing bracket component built before on the 8mm linear motion shaft of the base, and fasten
the shaft with an 8mm shaft collar.

176
Lesson 12 Tower Crane Flexible Lifting

2. Connect the davit arm to the Beam0824-160 of the bearing support component with M4*22 screws, and
fasten them with M4 nuts. Pay attention to the hole position.

3. Install the Me 4 Button on the Beam0824-192 of the base with two M4*14 screws and M4 nuts.

177
Building Instructions for Electronic Inventor

4. Install the Me Auriga on another Beam0824-192 of the base in the same way.

5. Fasten the battery pack onto the Beam0824-192 with a hook-and-loop fastener. Ensure it is close to the
Me Auriga.

178
Lesson 12 Tower Crane Flexible Lifting

6. Connect the Me 4 Button to the port 6 of the Me Auriga with an RJ25 connection line. Connect the two
motors to the Me Auriga with motor line, and connect to the power supply.

7. The work is completed.