1.1 Application 1.2.1 Rated power is the maximum constant power that the
turbine can develop at constant speed in the range of air
1.1.1 Propulsion turbines and turbines for essential
inlet temperature between 0°C and 35°C. This power is to
services
The requirements of this Section apply to: be considered with 0 intake and exhaust losses and with an
air relative humidity of 60%.
a) all propulsion turbines
b) turbines intended for auxiliary services essential for
safety and navigation. 1.3 Documentation to be submitted
1.1.2 Turbines for auxiliary generators
1.3.1 For propulsion turbines and turbines intended for
In addition to the requirements contained in this Section,
auxiliary turbines driving electric generators are to comply driving machinery for essential services, the plans listed in
with the applicable requirements of Ch 3, Sec 3. Tab 1 are to be submitted.
1.1.3 Type approval The listed constructional plans are to be complete with all
Turbines intended for propulsion and essential services are dimensions and are to contain full indication of the types of
to be type approved by the Society. materials used.
b) When the devices are operated by hydraulic oil systems c) exhaust gas in specific locations of the flow gas path as
fitted for automatic operation, they are to be fed by two determined by the manufacturer.
pumps: one main pump and one standby pump. In any
event, the standby pump is to be independent. In spe- 2.5.7 Indicators, alarm and shutdown
cial cases, a hand-operated pump may be accepted as a
Tab 2 indicates the minimum control and monitoring
standby pump.
requirements for main propulsion and auxiliary turbines.
c) The starting up of any turbine is to be possible only
when the quick-closing devices are ready for operation.
3 Arrangement and installation
2.5.6 Automatic temperature controls
The following turbine services are to be fitted with auto- 3.1 Foundations
matic temperature controls so as to maintain steady state
conditions within the normal operating range of the main 3.1.1 Manufacturers and Shipyards are to arrange founda-
gas turbine: tions of turbines and connected reduction gears to be so
designed and built that hull movements do not give rise to
a) lubricating oil supply and discharge
significant movements between reduction gears and tur-
b) fuel oil supply (or, alternatively, automatic control of bines. In any event, such movements are to be absorbed by
fuel oil viscosity) suitable couplings.
3.4 Hot surfaces Turbines which are subjected to type testing are to be tested
in accordance with the scope specified below, it being
3.4.1 Hot surfaces with which the crew are likely to come taken for granted that:
into contact during operation are to be suitably guarded or • the turbine is optimised as required for the conditions of
insulated. See Ch 1, Sec 1, [3.7]. the type test
• the investigations and measurements required for relia-
3.5 Alignment ble turbine operation have been carried out during pre-
liminary internal tests by the turbine manufacturer
3.5.1
• the documentation to be submitted as required in
a) The Manufacturer is to take particular care in the align- [1.3.1] has been examined and, when necessary,
ment of turbine-reduction gearing, taking account of all approved by the Society and the latter has been
causes which may alter the alignment from cold condi- informed regarding the nature and extent of investiga-
tions to normal service conditions. tions carried out during pre-production stages.
b) When a structural tank is fitted in way of the turbine or
gearing foundations, the expected tank temperature var- 4.2 Type tests of turbines not admitted to an
iations are to be taken into account during alignment alternative inspection scheme
operations.
4.2.1 General
c) Propulsion turbines are to be fitted with indicators
showing the axial movements of rotors with respect to Turbines for which the Manufacturer is not admitted to test-
casings and the sliding movements of casings on the ing and inspections according to an alternative inspection
sliding feet. Such indicators are to be fitted in an easily scheme (see NR216 Materials and Welding, Ch 1, Sec 1,
visible position. This requirement does not apply to tur- [3.2]), are to be type tested in the presence of the Surveyor
bines fitted with roller bearings. in accordance with the following requirements.
The type test is subdivided into three stages:
3.6 Gratings
a) Stage A - Preliminary internal tests carried out by the
manufacturer
3.6.1 Gratings and any other structures in way of the slid-
ing feet or flexible supports are to be so arranged that tur- Stage A includes functional tests and collection of oper-
bine casing expansion is not restricted. ating values including testing hours during the internal
tests, the relevant results of which are to be presented to
the Surveyor during the type test. Testing hours of com-
3.7 Drains
ponents which are inspected are to be stated by the
manufacturer.
3.7.1 Turbines and the associated piping systems are to be
equipped with adequate means of drainage. b) Stage B - Type approval test
The type approval test is to be carried out in the pres-
3.8 Instruments ence of the Surveyor.
c) Stage C - Inspection of main turbine components.
3.8.1 Main and auxiliary turbines are to be fitted with calli-
pers and micrometers of a suitable type for verifying the After completion of the test programme, the main turbine
alignment of rotors and pinion and gear-wheel shafts, when components are to be inspected.
necessary.
The turbine manufacturer is to compile all results and meas-
At the time of installation on board, this check is to be per- urements for the turbine tested during the type test in a type
formed in the presence and to the satisfaction of the Surveyor. test report, which is to be submitted to the Society.
b) The load points may be selected according to the range • testing and rating of the safety systems.
of application.
4.2.4 Evaluation of test results
c) Functional tests under normal operating conditions
The results of the tests and checks required by Ch 1, Sec 2,
include:
[4.2.3] will be evaluated by the attending Surveyor. Nor-
1) The load points 25%, 50%, 75%, 100% of the rated mally the main operating data to be recorded during the
power for which type approval is requested, to be tests are those listed in Ch 1, Sec 2, [4.3.4].
carried out:
The values of temperatures and pressures of media, such as
• along the nominal (theoretical) propeller curve cooling media, lubricating oil, exhaust gases, etc., are to be
and at constant speed, for propulsion turbines within limits which, in the opinion of the Surveyor, are
• at constant speed, for turbines intended for gen- appropriate for the characteristics of the turbine tested.
erating sets.
4.2.5 Stage C - Inspection of turbine components
2) The limit points of the permissible operating range.
Immediately after the test run as per Ch 1, Sec 2, [4.2.3], a
These limit points are to be defined by the turbine selected number of components agreed between the manu-
manufacturer. facturer and the Society are to be presented for inspection
d) An alternative testing program may be agreed between to the Surveyor.
the manufacturer and the Society on a case by case
basis. 4.3 Type tests of turbines admitted to an
alternative inspection scheme
4.2.3 Stage B - Type approval tests in the presence
of the Surveyor
4.3.1 General
During the type test, the tests listed below are to be carried
Turbines admitted to testing and inspections according to
out in the presence of the Surveyor and the results are to be
an alternative inspection scheme (see NR216 Materials and
recorded in a report signed by both the turbine manufac-
Welding, Ch 1, Sec 1, [3.2]) are to be type tested in the
turer and the Surveyor.
presence of the Surveyor in accordance with the following
Any departures from this programme are to be agreed upon requirements.
by the manufacturer and the Society.
The selection of the turbine to be tested from the production
a) Load points line is to be agreed upon with the Surveyor.
The load points at which the turbine is to be operated
according to the power/speed diagram are those listed 4.3.2 Type test
below. The data to be measured and recorded when The programme of the type test is to be in general as speci-
testing the turbine at various load points are to include fied below, P being the rated power and n the correspond-
all necessary parameters for turbine operation. ing speed.
The operating time per load point depends on the tur- Any departures from this programme are to be agreed upon
bine characteristics (achievement of steady-state condi- by the manufacturer and the Society.
tion) and the time for collection of the operating values. a) 6 hours at full power
Normally, an operating time of 0,5 hour per load point
b) 10 hours shared at different partial loads (25%, 50%,
can be assumed.
75% and 90% of power P);
At the maximum continuous power as per the following
item (1) an operating time of two hours is required. Two c) 2 hours at intermittent loads
sets of readings are to be taken at a minimum interval of d) starting tests
one hour.
e) testing of speed governor, overspeed device and lubri-
1) test at maximum continuous power P: i.e. 100% cating oil system failure alarm device
output at 100% torque and 100% speed.
f) testing of the minimum speed along the nominal (theo-
2) test at maximum permissible torque (normally 110% retical) propeller curve, for main propulsion turbines
of nominal torque T) at 100% speed; or test at maxi- driving fixed pitch propellers, and of the minimum speed
mum permissible power and speed according to the with no brake load, for main propulsion turbines driving
nominal propeller curve. controllable pitch propellers or for auxiliary turbines.
3) tests at partial loads, e.g. 75%, 50%, 25% of maxi- The tests at the above-mentioned outputs are to be com-
mum continuous power P and speed according to bined together in working cycles which are to be repeated in
the nominal propeller curve. succession for the entire duration within the limits indicated.
In particular, the full power test is to be carried out at the 4.3.5 Inspection of main turbine components and
end of each cycle. evaluation of test results
The partial load tests specified in (b) are to be carried out: The provisions of Ch 1, Sec 2, [4.2.4] and Ch 1, Sec 2,
[4.2.5] are to be complied with, as far as applicable.
• along the nominal (theoretical) propeller curve and at
constant speed, for propulsion turbines
4.4 Material tests
• at constant speed, for turbines intended for generating
sets. 4.4.1 The materials for the construction of the parts listed in
Tab 3 are to be tested in compliance with the requirements
In the case of prototype turbines, the duration and pro- of NR216 Materials and Welding.
gramme of the type test will be specially considered by the
Magnetic particle or liquid penetrant tests are required for
Society.
the parts listed in Tab 3 and are to be effected by the Manu-
4.3.3 Alternatives facturer in positions agreed upon by the Surveyor, where
Manufacturer’s experience shows defects are most likely to
In cases of turbines for which the manufacturer submits
occur.
documentary evidence proving successful service experi-
ence or results of previous bench tests, the Society may, at For important structural parts of the turbine, in addition to
its discretion, allow a type test to be carried out, in the pres- the above-mentioned non-destructive tests, examination of
ence of the Surveyor according to a programme to be welded seams by approved methods of inspection may be
agreed upon in each instance. required.
Where there are grounds to doubt the soundness of any tur-
4.3.4 Data to be recorded bine component, non-destructive tests using approved
During the type test, at least the following particulars are to detecting methods may be required.
be recorded:
a) ambient air temperature, pressure and atmospheric 4.5 Inspections and testing during con-
humidity in the test room struction
b) cooling medium temperature at the inlet of the turbine 4.5.1 Inspections during construction
c) characteristics of the fuel and lubricating oil used during The following inspections and tests are to be carried out in
the test the presence of a Surveyor during the construction of all tur-
bines which are indicated in [1.1.1]. For on-board trials see
d) turbine speed
Ch 1, Sec 15, [3.6].
e) brake power • Material tests as required (see Ch 1, Sec 4, [4.1])
f) brake torque • Welding fabrication (see [4.5.2])
g) intake and exhaust losses • Hydrostatic tests (see [4.5.3])
h) lubricating oil pressure and temperature • Rotor balancing and overspeed test (see [4.5.4] and
[4.5.5])
i) exhaust gas temperature in locations of the flow gas
• Shop trials (See [4.5.6]).
path selected by the manufacturer
j) minimum starting air pressure and flow rate necessary to 4.5.2 Welding fabrication
purge and start the turbine in cold condition, if applica- Welding fabrication and testing is to be attended by the Sur-
ble. veyor, as may be deemed necessary by the Society.
Rotating parts (compressors and turbine rotors, shafts, all all all
stiff and flexible couplings, bolts for couplings and other
dynamically stressed parts, integral pinions and gears)
Stationary parts (castings for casings intended for a tem- all spot as agreed −
perature exceeding 230°C and plates for casings between the
intended for a temperature exceeding 370°C or pressure Manufacturer and the
exceeding 4 Mpa) Surveyor
Blades sample sample sample
Piping and associated fittings as required in the as required in the as required in the
appropriate Section of appropriate Section of appropriate Section of
the Rules the Rules the Rules