MINISTRY OF RAILWAYS
(RAILWAY BOARD)
*****
No. 2003/CE-I/LX/59 New Delhi, dt. 21.6.2006.
CR, ER, ECR, ECoR, NR, NCR, NER, NFR, NWR, SR, SCR, SER, SECR, SWR, WR, WCR and
Metro Railway/Kolkata.
The General Manager (Const.), N.F.Railway, Guwahati.
The CAO/Const. All Indian Railways.
The CAO/Const., Metro Railway, Mumbai & Chennai.
Managing Director, Konkan Railway Corporation Ltd, Rail Bhawan, New Delhi.
Managing Director, IRCON, New Delhi.
Managing Director, RITES, New Delhi.
Managing Director, DMRC, N.B.C.C. Building, Pragati Vihar, New Delhi.
Managing Director, CONCOR, New Delhi.
Sub: Advance Correction Slip No.100 to the Indian Railways Permanent Way Manual.
-----
Ministry of Railways (Railway Board) have decided that correction/addition as
indicated in the enclosed Advance Correction Slip No. 100 dated 21.6.2006, to relevant
para of the IRPWM, be made.
(H.L. Suthar)
Director Civil Engg.(P),
Railway Board.
-2-
OSD(ME), DTK(MC), DTK(M), Dir.(Works) I & II, DLM, DCE(B&S), DVE-I & DVE-II,
IPWE(I).
****
NDIAN RAILWAYS PERMANENT WAY MANUAL
Advance Correction Slip No. 100 dated 21.06.2006
The existing sub para ( 1) of Para 902 shall stand replaced by the following :-
902 (1) The classification of level crossings shall be based on the volume of rail and road
traffic and visibility conditions.
The existing sub para 2 of Para 902 shall stand replaced by the following:
Class Criteria
Or
(c) ‘B’ class….for roads TVUs between 30,000 and 20,000 and
number of road vehicles greater than 750
The existing sub para 2 (a) of Para 907 shall stand replaced by the following:-
907 (2) (a) All level crossings in Special, A, and B1 classes will be interlocked and
protected by Signals and kept ‘Normally open to Road traffic; and may only be closed
against the road traffic for the passage of trains or for any other Railway operation by
taking off the signals.
Following sentence shall be added at the bottom of sub-para (1) (i) of para 916 :
“ However, the distance of W/L boards for unmanned level crossings on single line
section where visibility is clear, should be reduced to 350 m.”
….. 2/-
-2-
The existing sub para (1) of Para 919 shall stand replaced by the following:
919 (1) Periodical census of traffic at all level crossings, unmanned/manned shall be
taken once every three years. This shall be carried out for 7 days and total Train vehicle
Units (TVUs)/day (train units x Road vehicle units) are worked out. Train, Road vehicle,
Bullock carts and Tongas being considered as one unit; cycle rickshaw/Auto rickshaw
being considered as half unit. The census shall be carried out by a multi-disciplinary
inspectorial team consisting of representatives of CE, S&T and Traffic Departments.
The mechanism shall be set up by the Divisional Railway Manager to ensure that the
representatives are present for the census by laying down advance time table for carrying
out of census of level crossings.
The existing sub-para (b) (i) of Para 924 shall stand replaced by the following.
924 (b) (i) Based on traffic density, visibility and regular plying of buses etc. unmanned
level crossings have been categories into I-III for manning at Railways cost in a phased
manner on a programmed basis as per following priority.
Category I- Level crossing where TVUs exceed 6000, number of road vehicles
exceed 180 and where visibility is clear.
Category II – Level crossing where TVUs exceed 6000. number of road vehicles
exceed 120 and where visibility is restricted.
Category III – Level crossing where TVUs is between 3000 and 6000 and where
visibility is restricted.
Further, manning of any unmanned level crossing shall not be done if motor vehicles
do not ply regularly. Manning of category –III level crossings should be considered once
manning of first two categories is over. Further, if any unmanned level crossings gets
involved in more than 3 accidents in 3 years, it should be manned immediately
irrespective of the category to which it belongs.
Add following sentence at the end of sub-para (b) (ii) of Para 924:
“Further train route wise priority to be followed for manning will be ‘A’ route followed by
‘B’ ‘C’ ‘D’ ‘D Spl.’ ‘E Spl.’ And ‘E’.
“However Railways may de-man an existing level crossing gate in case the TVU level
falls below 80% of the value of the criteria laid down for manning in sub-para (b) (i)
above.”
*****