Professional Documents
Culture Documents
OMS
1.0 OBJECTIVE
1.1 The purpose of this procedure is to provide instructions for the maintenance of
UPS system in pooling substation.
2.0 SCOPE
2.1 This procedure applies to the activities related to the maintenance of UPS system
for the safe operation in pooling substation at the site, which may have direct affect on
the quality of Operation and Maintenance services of Bothe Wind Farm Development Pvt
Limited at this site.
5.0 DEFINITIONS
6.0 GENERAL
7.0 PROCEDURE:
7.1 Safety Instructions: Before starting any activity, ensure that the
equipment is completely isolated from power supply. Follow strictly
procedure for Tags and Locks during executing power supply. Follow
strictly procedure 49 104 228, and procedure 49 104 213 from safety
Manual for Tags and Locks and for electrical safety during executing
maintenance Tasks.
Also check and confirm Safety Note instructions for the Equipment.
8.0 RECORDS
9.0 FORMS