You are on page 1of 4

ANALISIS DE PRECIOS UNITARIOS

PROPONENTE:
LICITACION NO.
OBRA: AMPLIACION GAD PARROQUIAL POMASQUI

RUBRO DESCRIPCION:
511-1(4) MAMPOSTERIA BLOQUE 15cm

No. (A) EQUIPO No. Un RENDIM. UTILIZACION COSTO/H. MAQUINA


Unidades H. HM EQUIPO PROD. IMPROD. PROD.

(B) MANO DE OBRA No. de JORNAL FACTOR DE REGALIAS Y


Personas BASICO MAYORACION OTROS
maestro mayor 0.1 434.52 1.358
albañil 1.0 389.73 1.366
peon 1.0 384.72 1.367

(C) TRABAJO REALIZADO 15.00 COSTO HORARIO TOTAL (A) + (B)


(D) COSTO UNITARIO SIN MATERIAL NI TRANSPORTE ((A) + (B)) / (C)

(E) MATERIALES UNIDAD DE PRECIO CONSUMO


MEDIDA UNITARIO

(F) TRANSPORTE D.M.T. COSTO CONSUMO


UNITARIO / KM
(G) COSTO UNITARIO DIRECTO (D) + (E) + (F)
(H) COSTOS GENERALES 21.00%
COSTOS (I) IMPREVISTOS 5.00%
INDIRECTOS (J) UTILIDADES 10.00%
(K) ESCALAFON DE INGENIEROS CIVILES 1.00%
(N) PRECIO UNITARIO TOTAL (G) + (H) + (I) + (J)
(O) OBSERVACIONES
PRECIO ADOPTADO:
FECHA: May-02
RIOS

UNIDAD:
M2

COSTO/H. MAQUINA COSTO


IMPROD. TOTAL/H

TOTAL (A):

REGALIAS Y COSTO
OTROS TOTAL/H
3.82
3.45
3.41

TOTAL (B): 10.68

10.68
0.71

CONSUMO COSTO
TOTAL/H

TOTAL (E): -

CONSUMO COSTO
UNITARIO
TOTAL (E): -

0.71
x (G) 0.15
x (G+H) 0.04
x (G+H+I) 0.09
x (G+H+I+J) 0.01
1.01

ECIO ADOPTADO: 1.01