Professional Documents
Culture Documents
www.mottmac.in
Our services
Planning and architecture
• Cost estimates
• Environmental impact assessment
• Infrastructure development for station premises
• Land study
• Master planning, feasibility study
Permanent way • Passenger and freight route planning
• Asset condition survey • Traffic planning in and around station premises
• Route assessment and structure gauging
• Survey work
• Yard layout
• Track design
• Line speed improvement
• Track Ride Quality Investigation (TARQUIN)
• Ballast-less track
Electrification and traction power
• Computer modelling and analysis
• Earthing and bonding strategy
• Interfaces and compatibility
• Main grid power supplies
• Optimised substation design, site location and spacing
• Overhead line and third rail distribution
Signalling and train control • Distributed generation in railway power networks
• Circuitry for remote relay interlocking • Engineering and project management of complete
• Control panel railway power distribution projects
• Enforcement (AWS, ATP, ATO, ATS) • SCADA, EMS, DMS and GIS
• Selection control tables and aspect sequence • Power supply (AC, DC and M&E services)
charts for remote relay and electronic
interlocking system
• Signal scheme plan
• Train control circuit infrastructure
• Train protection warning system
Rolling stock
• Advice for maintenance
• Design consultancy
• Layout of depot and workshop
• Procurement and specifications
Operations and movement in depot • Safety cases
• Freight handling in depot
• Infrastructure for depot and workshop
Landmark projects
Palm Jumeirah Monorail The £220 million, 5.5km Palm Jumeirah Monorail
in Dubai is designed to carry 6000 passengers per hour. Mott MacDonald was
technical advisor for all mechanical, electrical and process, civil and systems
engineering and reviewed all design documentation to ensure it complies with
client requirements. We also undertook a technical review of the operation and
maintenance tenders and represented the client on site from construction and
testing through to commissioning.
www.mottmac.in
Contact us
DC/12/09