Project Report
On
“RADHIKA JEWELLARS”
Year: 2018-19
Submitted to
1
CERTIFICATE OF APPROVAL
This is to certify that the project work entitled “RADHIKA JEWELLARS” is
carried out by kajal vanshi, a student of PGDCA II Sem at Agarsen
Mahavidyalaya Purani Basti is here by approved as a credible work in the
degree of Post Graduation Diploma In Computer Application during the year
2018-19 From Pt. Ravishankar Shukla University, Raipur (CG).
Mr.Vikas Sharma
H.O.D
(Dept. of Comp. Sci.)
2
CERTIFICATE
This is to certify that the project work entitled “RADHIKA JEWELLARS”
Submitted to the Agarsen Mahavidyalaya by kajal vanshi,in partial fulfillment
for the requirement relating to nature and standard of the award of Post
Graduation Diploma In Computer Application degree by, Pt. Ravishankar
Shukla University, Raipur (CG) for the academic year
2018-19.This project work has been carried out under my guidance.
(Guide Name)
Mr. Vikas Sharma
3
CERTIFICATE OF EVALUATION
This is to certify that the project work entitled “RADHIKA JEWELLARS” is
carried out by kajal vanshi, a student of PGDCA II Semester at Agarsen
Mahavidyalaya, after proper evaluation and examination, is hereby approved
as a credible work in the discipline of computer science and is done in a
satisfactory manner for its acceptance as a requisite for the award of Post
Graduation Diploma In Computer Application II Semester during the year
2018-2019 from Pt. Ravishankar Shukla University, Raipur (CG)
4
DECLARATION
This is to certify that the project work entitled “RADHIKA JEWELLARS”
which is submitted by me in the partial fulfillment for the award of the degree
of Post Graduation Diploma In Computer Application, Agrasen
Mahavidyalaya Purani Basti, comprises the original work carried out by me. I
further declare that the work reported in this project has not been submitted
and will not be submitted, either in part or in full for the award of any other
degree or diploma in this institute or any other institute or University.
Place: Raipur kajal vanshi
Date: PGDCA II Semester
5
ACKNOWLEDGEMENT
This project is an inspiration, support, guidance, corporation and
facilities that were extended to us at their best and by person at all levels.
We were indebted to all of them.
We wish to acknowledgement our profound sense of gratitude to
the project guide Mr. Vikas Sharma for their remarkable guidance and
continued encouragement during the development of project. It was a
matter of great felicity and privilege for us to work under the aegis. We
would like to extend our special thanks to (Principal of- Agrasen
Mahavidyalaya Purani Basti) for boosting our confidence when we
were lacking so.
We offer our sincere thanks to Department staff members. Finally we
would also like to thank our entire classmate for their corporation and
support. We would like to pay our everlasting regards to our “Agrasen
Mahavidyalaya Purani Basti” Where this project gets completed.
6
Index
1. Objective & Scope of the project
2. Theoretical Background of Project
3. Definition of problem
4. System Analysis & Design
5. Methodology adopted, system Implementation & Detail of Hardware & Software used
6. System maintenance & Evaluation
7. Cost and benefit Analysis
8. Detailed Life Cycle of the project
o ERD,DFD
o Input and Out Put Screen Design
o Process involved
o Methodology used for testing
o Test Report, Printout of the code sheet
9. Conclusion
11.soft copy
7
OBJECTIVE AND SCOPE OF PROJECT
OBJECTIVES :-
As we all know about the manual work which creates much waste of time to maintain the records
for an organization. Here is presenting a product related with USHA SAHU through which the
user can Add, Modify or replace the records such as: Employee detail, Staff Detail, Connection
detail, Report details, Expences details for their organization. This project includes a login
window which contain a unique ID and Password , with the help of which, this project becomes
much secure and only the user who is eligible for accessing the project will be authorized for any
This project is easy to use for all. Its features like Menu driven programming makes it
familiar with the user. Multiple of works can be done at a point of time.
It enhances accuracy in calculation and reduce the efforts. This software mainly deals
8
THE FOLLOWING TOPICS INTRODUCE SELECTED NEW FEATURES:
Introduces new features of ADO, including support of RDO, segmentation of the ADO/Jet
Summarize what’s new in RDO, including event-driven programming, a new client batch cursor
Presents a table outlining six new properties to implement optimistic client batch update.
9
EVENT DRIVEN PROGRAMMING
Visual Basic is Object Oriented, i.e. it revolves around readymade objects and it is called
as EVENT DRIVEN, i.e. all the activities in a program are triggered by one event or another.
Each object has its own properties,
Determining its position, size, color, the appearance and nature of its text, and much more. Each
object also has its own event handling procedures.
In an event driven application the code doesn’t follows a predefined path, it executes
different code section in response to events. Events can be triggered by the user action, by
message from the system of other application or even from application itself. The sequence of
this event determines the sequence in which codes executes. Thus the path through the
application code written each time the program runs.
Visual basic system knows all about event handling procedures. It knows what a button is
and how it works. It also knows how to handle images, menus, dialog boxes, driven and
directory lists, and much else. The programmer’s job is to determine where, how and when an
object appears on screen, what its caption reads and what happens when an event occurs. The
event might be the opening of a form, the user clicking on a box. The programmer does not have
to write code to trap these events the system does that automatically. Because the program code
runs in response to event, as at any point whole range of event might be possible. The flow of
execution is not as fixed as in a traditional program.
The Pointer :-
The pointer is different from the rest of the tools, and is used for selecting object
that have been placed on the form. The system reverts to this when finished using any other tool.
It is marked by an arrow cursor.
A Picture Box :-
A picture box holds pictures created with paintbrush or similar art packages.
These must be in an acceptable- .BMP, .WMF, .ICO or .DMB, note that the commonly used
.PCX format is not acceptable.
10
Labels and Text boxes :-
Labels and Textboxes both hold text, but only the textboxes is capable of
receiving input from the user.
A Frame :-
A frame simply holds things together. If you place a set of controls within a
frame, they are all moved together as the frame is moved. Note that once a control has been
placed in a frame, it cannot be moved out onto the form and vice versa.
Command Button :-
Command button are one method of selection. They are typically used where
there are only a limited number of options – the choice may be OK or cancel, start or Quit.
Check Boxes :-
Check boxes act as toggle switches, turning options on or off.
Option Button :-
Option buttons are normally used to select one from a set of mutually exclusive
options.
List Boxes :-
List boxes display lists of items, so that the user can see what is available and
select one. If the list is too long to fit in the box, vertical scroll bars will be added at run time.
A Combo Box :-
A combo box combine a drop-down list with a slot in which users can enter their
own data when the program is running.
The Horizontal and Vertical scroll bars :-
The horizontal and vertical scroll bars are used on form to give a very flexible
means of setting values. You set the minimum and maximum values-anything between- 32768
and 32767.
The Timer :-
The timer is unusual in that it is of fixed size and is invisible once the program is
running. Its purpose is to control actions that must take place at or after intervals.
11
The Drive List box, Directory List box and File List box :-
The Drive List box, Directory List box and File List box can be used together to
give the standard Windows file management facilities. When the program runs they will initially
display the current drive and directory.
The Shape :-
The shape (a circle, oval, square or rectangle) and the Line are for purely
decorative purposes. For anything other than the simplest design, you will probably be better off
creating it with Paintbrush and importing into a picture or image box.
An Image :-
An Image is a limited version of a picture box. It has fewer features, but is
updated faster.
The Data Control :-
The Data control allows you to read records in from a database.
12
BACKEND :- MS-ACCESS
Access is an electronic database management system whose purpose I to help you to collect,
retrieve and present data for e.g.- with a company personal database you may want to collect
Objects of Access Database: Following are the six types of objects available in Access.
1. TABLES: A table is collection of data about a specific topic such has products and
suppliers. Tables are the fundamental structure in an access database because it stores the
data that you would be managing. Using a separate table for each topic means that you store
that data only once, which makes your database more efficient, and reduces data entry
errors.
2. QUERIES: A query is a tool for asking questions about data in your tables and for
performing action to your data. Queries can answer questions such as how many students
are below age of 15. You use query to view, change the analyze data in different ways. You
can also use them as the sources of records for forms, reports and data access page.
3. FORMS: Forms let you display and enter data in a convenient format that looks like a
fill in the blank form. Your forms can be plain and simple or quit elaborate with graphics,
lines and automatic look-up features that may data entry quick and easy. Forms can even
include other forms that let you enter data into several tables at once.
4. REMOTES: A report is effective way to present the data in a printed format, because
you have a control over the size and appearance of everything on a report, you can display
the information the way you want to see it.
5. MACROS: A macro is a set of one or more actions that each perform particular
operation, such as opening a form or printing a report. Macros can help you to automate
common tasks. For example, you can run macro that print a report when a user clicks a
command button.
6. MODULE: A module is collection of a VB for applications declarations and
procedures that are stored together as a unit. Like macros, modules allow you to automate
and customize access.
13
DEFINITION OF PROBLEM
14
SYSTEM ANALYSIS AND DESIGNING
SYSTEM ANALYSIS
EXISTING SYSTEM:
System Analysis is a detailed study of the various operations performed by a system and their
relationships within and outside of the system. Here the key question is- what all problems exist
in the present system? What must be done to solve the problem? Analysis Begins when a user or
manager begins a study of the program using existing system.
During analysis, data collected on the various files, decision points and transactions handled by
the present system. The commonly used tools in the system are Data Flow Diagram, interviews,
etc. Training, experience and common sense are required for collection of relevant information
needed to develop the system. The success of the system depends largely on how clearly the
problem is defined, thoroughly investigated and properly carried out through the choice of
solution. A good analysis model should provide not only the mechanisms of problem
understanding but also the frame work of the solution. Thus it should be studied thoroughly by
collecting data about the system. Then the proposed system should be analyzed thoroughly in
accordance with the needs.
In the current system we need to keep a number of records related to the student.
15
Proposed System
In our proposed system we have the provision for adding the details of the students. Another
advantage of the system is that it is very easy to edit the details of the student and delete a
student when it found unnecessary. Here is no facility of net connection, email facility is also not
provided. Online Admissions is not possible.
By developing the system, we can attain the following facilities:
Easy to handle and feasible.
Easy to operate.
Cost reduction.
Fast and convenient.
Computerization will almost minimize all the shortcoming of current manual system.
Computerization will be helpful in reducing extra manpower.
Data stored in computer is easily accessible than current manual system.
Searching any information in current manual system is tedious job as we have to go on
searching all the file and records.
Computerization make searching easy and instantaneous. Also, the results obtained are
consistent.
Computerization will definitely reduce paper work and thus reduce possibility of human
error.
It provides user-friendly interface to the user.
The graphical user interface makes the application more attractive and easily understandable
to the user.
Feasibility Study
Whatever we think need not be feasible .It is wise to think about the feasibility of any
problem we undertake. Feasibility is the study of impact, which happens in the organization by
the development of a system. The impact can be either positive or negative. When the positives
nominate the negatives, then the system is considered feasible. Here the feasibility study can be
performed in two ways such as technical feasibility and Economical Feasibility.
16
Technical Feasibility:
We can strongly says that it is technically feasible, since there will not be much difficulty in
getting required resources for the development and maintaining the system as well. All the
resources needed for the development of the software as well as the maintenance of the same is
available in the organization here we are utilizing the resources which are available already.
Economical Feasibility
Development of this application is highly economically feasible .The organization needed not
spend much m money for the development of t he system already available. The only thing is to
be done is making an environment for the development with an effective supervision. I f we are
doing so , we can attain the maximum usability of the corresponding resources .Even after the
development , the organization will not be in a condition to invest more in t he organization
.There fore , the system is economically feasible.
17
SYSTEM DESIGN
System Design is the solution to the creation of a new system. This is the important aspect made
up of several steps. The complete, efficient and successful system should provide the following
in succession: -
1. From where should we start
2. Where we have to go
3. Where should we stop
If the project is to be successful, we will need answer these questions. The answer of these
questions is schema manner and is known as system design. A systematic manner will be
followed so as to achieve beneficial result at the end. It involves starting with a vague idea and
ultimately developing it up into a useful system. The design phase is transition from a user
oriented to a document oriented to the programmers. The steps for the successful project are as
follows: -
1. We should define problem completely and the goals should be known before our
destination
In the next step, we should specify inputs and outputs of our interest
1. Then the structure of various database should be designed which will be used during the
programming
2. Next, we should design our programs of user friendly nature and always provide a way
to the user to read back the origin if he/she find any complex problem at any stage
3. We should know the function of each and every program which will leads us to or helps
us to read at the specified goal.
4. Then we write these individual programs which later on joining solve our problem
5. Next step involve then testing of these programs and correction – if necessary
6. At last, linking all the programs in a well-specified manner and combining in the form of
a menu, submenu etc. will be our defined problem.
18
METHODOLOGY ADOPTED SYSTEM IMPLEMENTATION &
DETAIL OF HARDWARE AND SOFTWARE REQUIREMENTS
METHODOLOGY ADOPTED
In this project,water fall model is used .
What is water fall model?
The waterfall model is a sequential software development model in which development is seen
as flowing downwards (like a waterfall) through several phases.
The waterfall model is one of the earliest structured models for software development. It consists
of the following sequential phases through which the development life cycle progresses:
System feasibility. In this phase, you consider the various aspects of the targeted
business process, find out which aspects are worth incorporating into a system, and
evaluate various approaches to building the required software.
19
Requirement analysis. In this phase, you capture software requirements in such a way
that they can be translated into actual use cases for the system. The requirements can
derive from use cases, performance goals, target deployment, and so on.
System design. In this phase, you identify the interacting components that make up the
system. You define the exposed interfaces, the communication between the interfaces,
key algorithms used, and the sequence of interaction. An architecture and design review
is conducted at the end of this phase to ensure that the design conforms to the previously
defined requirements.
Coding and unit testing. In this phase, you write code for the modules that make up the
system. You also review the code and individually test the functionality of each module.
Integration and system testing. In this phase, you integrate all of the modules in the
system and test them as a single system for all of the use cases, making sure that the
modules meet the requirements.
Deployment and maintenance. In this phase, you deploy the software system in the
production environment. You then correct any errors that are identified in this phase, and
add or modify functionality based on the updated requirements.
It allows you to compartmentalize the life cycle into various phases, which allows you to
plan the resources and effort required through the development process.
It enforces testing in every stage in the form of reviews and unit testing. You conduct
design reviews, code reviews, unit testing, and integration testing during the stages of the
life cycle.
It allows you to set expectations for deliverables after each phase.
You do not see a working version of the software until late in the life cycle. For this
reason, you can fail to detect problems until the system testing phase. Problems may be
more costly to fix in this phase than they would have been earlier in the life cycle.
20
When an application is in the system testing phase, it is difficult to change something that
was not carefully considered in the system design phase. The emphasis on early planning
tends to delay or restrict the amount of change that the testing effort can instigate, which
is not the case when a working model is tested for immediate feedback.
For a phase to begin, the preceding phase must be complete; for example, the system
design phase cannot begin until the requirement analysis phase is complete and the
requirements are frozen. As a result, the waterfall model is not able to accommodate
uncertainties that may persist after a phase is completed. These uncertainties may lead to
delays and extended project schedules.
SYSTEM IMPLEMENTATION
Implementation is the stage in the project where the theoretical design is turned into a working
system. The implementation phase constructs, installs and operates the new system. The most
crucial stage in achieving a new successful system is that it will work efficiently and effectively.
There are several activities involved while implementing a new project. They are
1. End user training
2. End user Education
3. Training on the application software
4. System Design
5. Parallel Run and To New System
6. Post implementation Review
21
End user Training:
The successful implementation of the new system will purely upon the involvement of the
officers working in that department. The officers will be imparted the necessary training on the
new technology
22
DETAILS OF HARDWARE AND SOFTWARE REQUIREMENTS
Software Requirements.
Software is a set of instructions (computer program) that when executed provide desired
function and performance, data structures that enables the program to adequately
manipulate information, and the Documents that describe the operation and use of
program. The minimum software required to execute this application as well as operating
environment is also mentioned below:
Versions
23
Hardware Requirement
24
SYSTEM MAINTAINENECE AND EVALUATION
Maintenance :
Evaluation :
query operations.
The new features can be added in our system to overcome the above limitations. These
are:
25
ENTITY RELATIONSHIP DIAGRAM
Has ADDMISSION
Has
STAFF
Login
Has HELP
Administration Password
CONTACT
Complain
username
26
DATABASE DESIGN
Database is an integrated collection of data and provides a centralized access to the data and
makes possible to treat data as a separate resource. Usually centralized data managing software
is called a Microsoft Access. The most significant different between Ms-Access and other type
of Data Management is the separation of data as seen by the program and data as store of on the
direct access storage device. This is the difference between logical and physical data.
TABLES
Login Table
Field Name Data Type
Username Text
Password Text
ADD Table
NAME TEXT
ADD TEXT
CONTACT NO. NUMBER
DATE OF BIRTH NUMBER
27
ITEM Table
ITEM CODE NUMBER
ITEM NAME TEXT
WEIGHT GMS NUMBER
RATE NUMBER
CATAGORY TEXT
TRANSACTION
S.NO. NUMBER
DATE NUMBER
CUSTOMER NAME TEXT
ADD TEXT
REPORT
CUSTOMER WISE ITEM WISE
28
Login Table
29
CATAGORY
CUSTOMER
30
ITEM
MAIN
31
MAIN0
MAIN2
32
SCREEN DESIGNS:-
LOGIN FORM
33
SPLASH FORM
34
ITEM
35
NEW CUSTOMER
36
NEW CATAGORY
37
BILL
38
ENTRY FORM
39
REPORTS FORM
40
METHODOLOGY USED FOR TESTING
SOFTWARE TESTING
Is the menu bar displayed in the appropriate contested some system related features included
either in menus or tools? Do pull –Down menu operation and Tool-bars work properly? Are all
menu function and pull down sub function properly listed ?; Is it possible to invoke each menu
function using a logical assumptions that if all parts of the system are correct, the goal will be
successfully achieved .? In adequate testing or non-testing will leads to errors that may appear
few months later.
This create two problem
1. Time delay between the cause and appearance of the problem.
2. The effect of the system errors on files and records within the system.
The purpose of the system testing is to consider all the likely variations to which it will be
suggested and push the systems to limits.
The testing process focuses on the logical intervals of the software ensuring that all statements
have been tested and on functional interval is
conducting tests to uncover errors and ensure that defined input will produce actual results that
agree with the required results.
Program level testing, modules level testing integrated and carried out.
41
White Box Testing
White box sometimes called “Glass box testing”, “clear box testing”, “transparent box testing”,
and “structural testing” is a test case design uses the control structure of the procedural design to
drive test case.
Using white box testing methods, the following tests were made on the system.
1. All independent paths within a module have been exercised once. In our system, ensuring
that case was selected and executed checked all case structures. The bugs that were
prevailing in some part of the code where fixed
2. All logical decisions were checked for the truth and falsity of the values.
While white-box testing can be applied at the unit, integration and system levels of the software
testing process, it is usually done at the unit level. It can test paths within a unit, paths between
units during integration, and between subsystems during a system–level test. Though this method
of test design can uncover many errors or problems, it might not detect unimplemented parts of
the specification or missing requirements.
42
WHITE BOX TESTING DIAGRAM
White box testing assumes that the tester can take a look at the code for the application block and
create test cases that look for any potential failure scenarios. During white box testing, you
analyze the code of the application block and prepare test cases for testing the functionality to
ensure that the class is behaving in accordance with the specifications and testing for robustness.
Input
Requirements
Functional specifications
High-level design documents
Detailed design documents
Application block source code
43
White Box Testing Steps
The white box testing process for an application block is shown in Figure 6.2.
1. Create test plans. Identify all white box test scenarios and prioritize them.
2. Profile the application block. This step involves studying the code at run time to
understand the resource utilization, time spent by various methods and operations, areas
in code that are not accessed, and so on.
3. Test the internal subroutines. This step ensures that the subroutines or the nonpublic
interfaces can handle all types of data appropriately.
4. Test loops and conditional statements. This step focuses on testing the loops and
conditional statements for accuracy and efficiency for different data inputs.
5. Perform security testing. White box security testing helps you understand possible
security loopholes by looking at the way the code handles security.
44
BLACK BOX TESTING
Black-box testing is a method of software testing that tests the functionality of an application as
opposed to its internal structures or workings .Specific knowledge of the application's
code/internal structure and programming knowledge in general is not required. This is black box
testing enables the software engineering to derive a set of input conditions that will fully exercise
all functional requirements for a program. Black box testing is not an alternative to White box
testing rather it is complementary approach that is likely to uncover a different class of errors
that white box methods like.
The tester is only aware of what the software is supposed to do, but not how i.e. when he enters a
certain input, he gets a certain output; without being aware of how the output was produced in
the first place
1. Interface errors
2. Performance in data structure
3. Performance errors
4. Initializing and termination errors
45
BLACK BOX TESTING DIAGRAM
Input
The following input is required for black box testing:
Requirements
Functional specifications
High-level design documents
Application block source code
The black box testing process for an application block is shown below
46
Black Box Testing Steps
Black box testing involves testing external interfaces to ensure that the code meets functional and
nonfunctional requirements. The various steps involved in black box testing are the following:
1. Create test plans. Create prioritized test plans for black box testing.
2. Test the external interfaces. Test the external interfaces for various type of inputs using
automated test suite.
3. Perform load testing. Load test the application block to analyze the behavior at various
load levels. This ensures that it meets all performance objectives that are stated as
requirements.
4. Perform stress testing. Stress test the application block to analyze various bottlenecks
and to identify any issues visible only under extreme load conditions, such as race
conditions and contentions.
5. Perform security testing. Test for possible threats in deployment scenarios. Deploy the
application block in a simulated target environment and try to hack the application by
exploiting any possible weakness of the application block.
6. Perform globalization testing. Execute test cases to ensure that the application block
can be integrated with applications targeted toward locales other than the default locale
used for development.
The first step in the process of black box testing is to create prioritized test plans. You can
prepare the test cases for black box testing even before you implement the application block. The
test cases are based on the requirements and the functional specification documents.
The detailed test plan document includes test cases for the following:
You need to test the external interfaces of the application block using the following strategies:
Ensure that the application block exposes interfaces that address all functional
specifications and requirements. To perform this validation testing, do the following:
1. Prepare a checklist of all requirements and features that are expected from the
application block.
2. Create test harnesses, such as NUnit, and small "hello world"' applications to use
all exposed APIs of the test application block.
47
3. Run the test harnesses.
Testing for various types of inputs. After ensuring that the application block exposes the
interfaces that address all of the functional specifications, you need to test the robustness of these
interfaces. You need to test for the following input types:
The number zero testing if the input is numeric
The null input
Invalid input or input that is out of the expected range
This testing ensures that the application block provides expected output for data within the
specified range and gracefully handles all invalid data. Meaningful error messages should be
displayed for invalid input.
Use load testing to analyze the application block behavior under normal and peak load
conditions. Load testing allows you to verify that the application block can meet the desired
performance objectives and does not overshoot the allocated budget for resource utilization such
as memory, processor, and network I/O. The requirements document usually lists the resource
utilization budget for the application block and the workload it should be able to support.
For example, the CMAB had the following performance objectives on a Web server (please note
that these objectives are totally fictitious and are only for the purpose of illustration):
You can measure metrics related to response times, throughput rates, and so on, for the load test.
In addition, you can measure other metrics that help you identify any potential bottlenecks.
48
Step 4: Perform Stress Testing
Use stress testing to evaluate the application block's behavior when it is pushed beyond the
normal or peak load conditions. The expectation from the system beyond load conditions is to
either return expected output or return meaningful error messages to the user without corrupting
the integrity of any data. The goal of stress testing is to discover bugs that surface only under
high load conditions, such as synchronization issues, race conditions, and memory leaks.
Black box security testing the application block identifies security vulnerabilities within the
application block by treating it as an independent unit. The testing is done at run time. The
purpose is to forcefully break the interfaces of the application block, intercept sensitive data
within the block, and so on.
Depending on the functionality the application block provides, test cases can be identified.
Examples of test cases and tests can be the following:
If the application block accepts data from a user, make sure it validates the input data by
creating test cases to pass different types of data, including unsafe data, through the
application block's interfaces and confirming that the application block is able to stop it
and handle it by providing appropriate error messages.
The goal of globalization testing is to detect potential problems in the application block that
could inhibit its successful integration with an application that uses culture resources different
than the default culture resources used for development. Globalization testing involves passing
culture-specific input to a sample application integrating the application block. It makes sure that
the code can handle all international support and supports any culture or locale settings without
breaking functionality that would cause data loss.
To perform globalization testing, you must install multiple language groups and set the culture or
locale to different cultures or locales, such as Japanese or German, from the local culture or
locale. Executing test cases in both Japanese and German environments, and a combination of
both, can cover most globalization issues.
49
Coding
Form1.Hide
form2.Show
Else
End If
End Sub
50
MDI FORM CODING
Private Sub ITEM_Click()
Form1.Show
End Sub
DataReport2.Show
End Sub
Form2.Show
End Sub
DataReport3.Show
End Sub
Form3.Show
End Sub
51
Form4.Show
End Sub
DataReport1.Show
End Sub
Form 5.Show
End Sub
Form6.Show
End Sub
52
NEW ITEM CODING
Dim db As Database
Dim rs As Recordset
Combo1.BackColor = vbYellow
End Sub
Combo1.BackColor = vbWhite
End Sub
Text1.SetFocus
Else
53
Flag = 0
rs.MoveFirst
For i = 1 To rs.RecordCount
Flag = 1
Exit For
End If
rs.MoveNext
Next i
If Flag = 0 Then
rs.AddNew
rs.Fields(0) = Text2.Text
rs.Fields(1) = Text1.Text
rs.Fields(2) = Text3.Text
rs.Fields(3) = Text4.Text
rs.Fields(4) = Combo1.Text
rs.Update
Text1.Text = ""
54
Text2.Text = ""
Text3.Text = ""
Text4.Text = ""
Combo1.Text = ""
Text1.SetFocus
Else
Text2.SetFocus
Text2.SelStart = 0
Text2.SelLength = Len(Text2.Text)
End If
End If
End Sub
Else
rs.Delete
rs.MoveFirst
Text2.Text = rs.Fields(0)
55
Text1.Text = rs.Fields(1)
Text3.Text = rs.Fields(2)
Text4.Text = rs.Fields(3)
Combo1.Text = rs.Fields(4)
End If
End Sub
Else
rs.Edit
rs.Fields(0) = Text2.Text
rs.Fields(1) = Text1.Text
rs.Fields(2) = Text3.Text
rs.Fields(3) = Text4.Text
rs.Fields(4) = Combo1.Text
rs.Update
End If
End Sub
56
Private Sub Command4_Click()
rs.MoveFirst
Text2.Text = rs.Fields(0)
Text1.Text = rs.Fields(1)
Text3.Text = rs.Fields(2)
Text4.Text = rs.Fields(3)
Combo1.Text = rs.Fields(4)
End Sub
rs.MovePrevious
rs.MoveFirst
Text2.Text = rs.Fields(0)
Text1.Text = rs.Fields(1)
Text3.Text = rs.Fields(2)
Text4.Text = rs.Fields(3)
Combo1.Text = rs.Fields(4)
Else
57
Text2.Text = rs.Fields(0)
Text1.Text = rs.Fields(1)
Text3.Text = rs.Fields(2)
Text4.Text = rs.Fields(3)
Combo1.Text = rs.Fields(4)
End If
End Sub
rs.MoveNext
rs.MoveLast
Else
Text2.Text = rs.Fields(0)
Text1.Text = rs.Fields(1)
Text3.Text = rs.Fields(2)
Text4.Text = rs.Fields(3)
Combo1.Text = rs.Fields(4)
End If
End Sub
58
Private Sub Command7_Click()
rs.MoveLast
Text2.Text = rs.Fields(0)
Text1.Text = rs.Fields(1)
Text3.Text = rs.Fields(2)
Text4.Text = rs.Fields(3)
Combo1.Text = rs.Fields(4)
End Sub
Text1.Text = ""
Text2.Text = ""
Text3.Text = ""
Text4.Text = ""
Combo1.Text = ""
Text1.SetFocus
End Sub
Form1.Hide
Form2.Hide
59
Form3.Hide
Form4.Hide
Form5.Hide
Form6.Hide
MDIForm1.Show
End Sub
Set db = OpenDatabase("mydb.mdb")
Set rs = db.OpenRecordset("item")
cat.MoveFirst
cat.MoveNext
Next i
End Sub
Text1.BackColor = vbYellow
End Sub
Text1.BackColor = vbWhite
60
End Sub
Text2.BackColor = vbYellow
End Sub
KeyAscii = 0
End If
End Sub
Text2.BackColor = vbWhite
End Sub
Text3.BackColor = vbYellow
End Sub
61
CONCLUSION
The project has been appreciated by all the users in the organization.
It is easy to use, since it uses the GUI provided in the user dialog.
62
FUTURE SCOPE OF THE PROJECT
There are many more features which can be added to this project. In futures this software
can be expanded easily. Those features will make this software to perform many more function
& this will make more useful. Some of the features which can be added to this software are
following:
software.