Professional Documents
Culture Documents
Tacloban City
__________________________________________
In Partial Fulfilment of the
RUIZ, JUNEREL
March 2018
Table of Contents
ACKNOWLEDGEMENTS ...................................................................................................................... 5
CHAPTER I .............................................................................................................................................. 6
INTRODUCTION .................................................................................................................................... 6
Objectives of the Study ........................................................................................................................... 7
Scope and Delimitation .......................................................................................................................... 8
Significance of the Study......................................................................................................................... 9
CHAPTER 2 ........................................................................................................................................... 10
METHODOLOGY ................................................................................................................................. 10
Research Design ................................................................................................................................... 10
Research Locale ................................................................................................................................... 10
Figure 1. Location of Rockfil Stainless Metal Works Dot Supply Corporation ................................. 11
Research Instrument ............................................................................................................................. 11
Data Gathering Procedure ................................................................................................................... 12
Principles Used for the Proposed Facility Layout ................................................................................. 12
CHAPTER 3 ........................................................................................................................................... 13
CHAPTER 4 ........................................................................................................................................... 25
......................................................................................................................................................... 31
Improved Processes and Procedures .................................................................................................... 32
Improved Utilization of Resources ........................................................................................................ 33
Any other improvements in relation to the cited variables ..................................................................... 33
References ............................................................................................................................................ 34
APPROVAL SHEET
Industrial Engineering, this Facility Planning and Design Study, has been prepared and
submitted by John Kenneth Carlo Rosal, Junerel Ruiz, Mary Joy Superada, Precious Raine
A. Tamayo and Princess Dianne Yapan who are recommended for Oral Examination.
Adviser
Accepted in partial fulfillment of the requirements for the degree of Bachelor of Science
in Industrial Engineering.
This study would not have not been possible without the guidance and support of
everyone who wholeheartedly extended their hands one way or another which led to the
RUIZ, J.
ROSAL, J. K. C.
SUPERADA, M. J.
TAMAYO, P. R.
YAPAN, P. D.
INTRODUCTION
Steel is an alloy of iron, carbon and other elements. Because of its high tensile
strength and low cost, it is a major component used in buildings, infrastructure, tools, ships,
the industry stems from its linkages with numerous sectors, where its products serve as an
shipbuilding and repair, electronics, packaging, etc. and its equally important contributions
ensuring a strong domestic steel and steel‐based industry is vital in developing the
of reconstruction works after Super Typhoon Yolanda hit the region in 2013 that caused
massive devastation on the region. Both residential and commercial establishments are
being reconstructed and/or constructed and demand for stainless building equipment is on
the rise, an imminent opportunity that Mr. Roque R. Kudera didn’t miss.
Mr.Kudera established the Rockfil Stainless Metal Works Dot Supply Corporation
on July 2013, a few months before Typhoon Yolanda hit the city. Fortunately, the elevated
location of the store and its manufacturing facility saved it from severe damage that it was
able to recover faster than its competitors. The firm was initially engaged in manufacturing
steel windows and steel gates until they were able to source out funds and capital from time
to time and be able to manufacture high quality products using stainless steel. They sell all
kinds of stainless steel products and accessories and offer a complete line of custom
fabrication: from railings, to kitchen sinks and working tables, stainless letters/ signage and
may more; railings, kitchen cabinets, and other home furnishing products. With the still
increasing demand, the company intends to intensify its strategy to expand its products and
a. Name of Firm
c. Manufacturing Process
e. Plant Location
g. Work flow
j. Labor Requirements
k. Waste Disposal
2. To discuss & evaluate the conditions in Rockfill Stainless Metal Work dot
following:
a. Manufacturing Process
c. Plant Location
e. Work flow
h. Labor Requirements
i. Waste Disposal
This study focuses on the manufacturing system of Rockfil Stainless Metal Works
Dot Supply Corporation in terms of its process flow, work flow, product output, layout of
Data presented, results and findings of this study is only limited upon the
information disclosed by the management of Rockfil Stainless Metal Works Dot Supply
To the management, this study seeks to describe and evaluate the current facility
layout of Rockfill Stainless Metal Work dot Supply Corporation in order to come up with
To the employees, this study aims to optimize the facility layout of Rockfill
Stainless Metal Work dot Supply Corporation to provide ease of access and comfort to the
employees to conserve both cost and amount of work done, hence resulting in increased
To the market, this study aims to develop an effective and efficient facility layout
help Rockfill Stainless Metal Work dot Supply Corporation to further cater the increasing
To the researchers, this study focuses on the facility layout of Rockfill Stainless
Metal Work dot Supply Corporation, that such exposure will serve as training ground
To the future researchers, this study is essential for future researchers in similar
field and/or locale as this study may be used as reference for further improvement.
CHAPTER 2
METHODOLOGY
Research Design
This study employs a descriptive method since the researchers aim to look into the
current facility layout of Rockfill Stainless Metal Work dot Supply Corporation in order to
determine the factors affecting it and come up with a more efficient facility plan.
tabulating about prevailing conditions, trends, and processes and then making adequate and
facility layout of Rockfill Stainless Metal Work dot Supply Corporation and an open survey
of the employees to collect their reviews and assessment to provide a different perspective
Research Locale
This study will be conducted in Rockfil Stainless Metal Work Dot Supply
Corporation located in Brgy.110 Utap, Diversion Road, Tacloban City. The findings of the
Research Instrument
In conducting this study, interview among the management and observation of the
researchers is done. Upon the interview the researchers identify the different parts of the
facility and what will be the focus of the study, the observation will support further
status of the manufacturing system of Rockfil Stainless Metal Works Dot Supply
Corporation and an open survey of the employees to collect their reviews and assessment
1. 5S
2. Continuous Flow
3. Gemba
4. Hoshin Kanri
5. Jidoka
6. Just-in-Time
7. Reorder point
CHAPTER 3
The name of the firm studied is Rockfil Stainless Metal Works Dot Supply
Corporation. It was established in July 2013 by Mr. Roque R. Kudera, the president of the
Corporation.
Rockfil Stainless Metal Works Dot Supply Corporation produces a wide variety of
products made of stainless steel such as kitchenware, architectural, cooking and baking
materials. Stainless steel is notable for its stain resistance, corrosion resistance and low
maintenance making it an ideal material for many applications. The corrosion resistance
property of Stainless Steel is due to its chromium content with a minimum value of 10%
by mass. Since the firm supplies made to order stainless steel products, the output delivered
to the consumers are best suited to the customer’s specified requirements and/or design of
the product. The most commonly ordered products are scrubs sink, kitchen sink with
cabinet, stainless steel with cabinet, stainless table and S/S gutter.
Manufacturing Process
The final product is packaged for Packaging The pickup point of the product is
pick up also the same drive they use when
installing bumpers to cars, the pick
The product is placed at the pick up point also serves as the entrance
Pickup
up point for the customer to pick into the working area
up
Rockfil Stainless Metal Works dot Supply Corp. supplies customized stainless-steel
products and figure 2 showcases the major steps taken in manufacturing any stainless-steel
unit. First, orders are placed and the buyer provides the desired design or layout of the unit
to be ordered. Once the design is settled, necessary measurements are forwarded to the
workers to make sure that the dimensions of the unit is accurate and no raw material will
go to waste. Raw materials are cut according to the measurements forwarded and further
proceeds into the assembly process. In assembling, the raw materials are processed for it
to achieve the design and specifications provided by the buyer. After the assembly, the
semi-finished product is forwarded for finishing; this is where the product is shined and
finished for it to achieve its final look. Once all steps are completed, the unit can now be
The plant operates 6 days a week on a single continuous production shift daily.
Total
The volume indicated above does not include major customized projects such as
installation of railings which at times, requires them to do the assembly right on the site.
Hence, showing that the maximum plant capacity of Rockfil Stainless Metal Works dot
Supply Corporations is not only limited to the standard products they produce but can
accommodate customer specified product like custom made catering lamps, commercial
Plant Location
Utap, Diversion Road, Tacloban City. The raw materials used in producing stainless steel
products are shipped from Sta. Rosa Manila which arrives in huge wing vans. Basic utilities
such as water, electricity and fuel are accessible. The manufactured products are distributed
with the aid of their shop located right in front of the manufacturing plant, also along the
National Highway. The retail shop may be accessed by customers through any vehicle
passing along Maharlika High-way, although commuting through multicabs can be a bit of
a hassle tricycles can take you there, or if residing near Utap one may just walk.
Listed in Table 2 are the list of buildings and facilities in Rockfil Stainless Metal
No. of
Building/Facility Description/Illumination/Ventilation
workers
products.
▪ The shop being open on one side is well lit with
well
Comfort Room - ▪ The comfort rooms do not have their own exhaust
illumination
Rockfil Stainless Metal Works dot Supply Corporation has two main buildings both
in Brgy. 110 Utap Tacloban City along the national highway. The first building consists of
their retail store and a small office. On the other hand, their manufacturing facility is
located on the other side of the road. Travelling from the retail store to the manufacturing
plant can be risky given the number of cars travelling along the National Highway, being
a road away from each though is an advantage. Apart from the manufacturing plant, there
is also an office situated within the manufacturing facility. The working area indeed is
messy and can be disorganized during working hours, however good housekeeping can be
observed every after a day’s work since the workers clean the area in preparation for the
next day. The raw material’s storage has its own entrance and can be accessed from the
working area with a few travel time along a non-straight path. The manufacturing plant has
attaching car bumpers, the space however can accommodate a single unit of vehicle at its
maximum creating a space and traffic problem in cases when more than one vehicle is
involved. Scrap materials are contained in sacks and stacked in a corner, held by straws.
The location and stacking of scrap materials can be a cause of serious injury in case of
accidents. On the other hand, the working area-to-finishing-to-pick up point travel path is
RAW MATERIALS
*WORKING TABLE
USED FOR
CUTTING,
ASSEMBLING AND
WELDING
Figure 3. Existing Plant Layout of Rockfil Metal Works dot Supply Corporation
The existing manufacturing facility of Rockfil Stainless Metal Works dot Supply
Corporation which they have been using since 2013 is rented. The working area covers the
driveway as well since some installation such as in car bumpers are performed on the
are working on, the working area also serves as a path from the finishing area to the pick-
up point which is basically still inside the working area. An office is located in front of the
facility. The storage area is very accessible in terms of enclosure as no wall serves as a
divider or separator between it and the working area, however this may pose a problem in
controlling the usage of raw materials if not well regulated. The transfer of raw materials
from the storage to the working area is restricted by the limited space inside the facility,
hence slowing down material transfer from one point to another. Workers also tend to work
on the floor rather than on the working table which causes disorganized workplace,
capabilities of some of their machines are limited that they to outsource some procedures
The current workforce in Rockfill Stainless Metal Works dot Supply Corporation
are as follows:
Corporation
President 1
Vice President 1
Treasurer/Secretary 1
Director 2
Direct Labor
Welder/Painter 9
Total
Waste Disposal
Waste products generated from the cutting and assembling period are collected and
stored. The waste products are sold to firms engaged in reworking stainless-steel scrap.
The scrap varies in shape but sizes range from as little as an inch up to 3 inches. The pickup
of wastes is very erratic that the company usually end up with a huge stack before it being
disposed.
CHAPTER 4
The facility layout proposal is designed considering the findings based on the
results and discussion of Rockfil Stainless Metal Works dot Supply Corporation’s existing
facility layout, workflow, plant size, waste management and other factors such as the
impending plan of the management for expansion. The proposed Layout is designed with
5S
Though the steps in 5S is described mostly in terms of the materials and equipment
present in a facility, in this study 5S was applied to the evaluate the current manufacturing
Sort – Each of the steps in the existing manufacturing process was assessed to
determine whether this step should be retained, eliminated or combined with another step.
Set in order – In reference to the current sequence of operation, these steps were
Shine – This step aims to assure the that all steps shall be done orderly to avoid
wastage of work.
Standardize – This is step is necessary to have a specific set of guidelines that will
This tool aims to make sure that the work-in-process smoothly flows through the
production with minimal to no buffers in between the manufacturing process. This step
What inhibits the smooth flow of work in Rockfil Stainless Metal Works dot Supply
Corporation is the arrangement of different facilities and storage in their existing plant.
in areas as close to each other and avoiding arrangements that leads to backtracking,
Gemba
Gemba reminds the administrators to get of their offices and spend time on the plant
floor to furtherly understand the manufacturing process. This promotes a deep and
the workers.
The proposed facility layout ensures that the manufacturing facility is easily
monitored and accessed from the loft office. The office is located in a mezzanine that can
be accessed through a door outside the plant so that employees won’t have to travel extra
distance if they want to get into the office right away, and a terrace leading inside the
manufacturing facility for easy access when inspections are conducted. Wide windows also
Just-in-Time
manufacturing wherein no products are produced unless they are ordered. There are other
tools that if implemented correctly can help them meet demand while reducing wastes.
Heijunka may be used to maximize the utilization of both man and machine. There has to
be a properly logged set of orders with their steps identified such that similar steps of
different orders can be combined. If the same task is assigned to a specific person, that
person’s learning curve in terms of that particular task increases making him an expert on
that process. Hoshin Kanri or Policy Deployment can also be a great help to make sure
that goals are consistent and thorough to eliminate waste coming from poor communication
Jidoka
limited to the capacity of their machines. The company outsources usage of hydraulic press,
hence, investing in a new equipment will save them cost from outsourcing and they can
The 3 Mus shall be eliminated to reduce wastage. The most common waste in the
Improved Layout
WORKING TABLES
The new location of Rockfil Stainless Metal Works dot Supply Corporation is still
on Brgy. 110 Utap Tacloban City. The owner decided to keep the roadside store as it will
confuse their buyers if they suddenly change location and most importantly, the location is
very ideal for attracting customers, it being on a most populated road in the City with
people from all over the region passing through the National Highway. The manufacturing
plant on the other hand, will be on the right-hand side of the road if facing north. Legal
transactions and local barangay agreement are currently being undertaken prior to the start
of the construction of the new facility. The proposed layout considered essential Lean
Improved Workflow
2. Fabrication – once the order is received all necessary steps in fabrication happens
in the working area (raw material storage, fabrication area and finishing area).
layout. This eliminates wastage in travel time, motion and alleviate workload from the
workers.
Gemba, Heijunka and Hoshin Kairi
understanding of how the manufacturing works will help them come up with policies and
In developing a new facility plan it is important to learn from the issues and
problems of the previous, in order to come up with techniques and methods to avoid,
control or eliminate them. The proposed facility plan is designed such that all processes
and procedures will be improved in reference to the previous layout. The improvements
➢ Zero backtracking
The facility shall be surrounded with door-like entries which serves both as
ventilation and entry/exit points. Parts of the roof are covered transparent roofing material
to allow natural light inside the manufacturing facility which will save electric cost.
Improved Utilization of Resources
The proposed facility layout for the manufacturing plant of Rockfil Stainless Metal
Works dot Supply Corporation greatly improve the utilization of its human resource. The
facility plan is designed to minimize unnecessary travel time hence, conserving the
follows:
1. All scrap materials coming from one unit of order shall be recorded in order
to account the total utilization of raw material used and to have an estimate
2. Tools and equipment comes with every working table and be assigned to
specific worker/s per shift. It is the worker’s responsibility to make sure that
at the end of his shift, all tools and equipment are returned to their respective
containers.
3. Working tables and benches are designed to best suit user requirements and
their respective working tables instead of working on the floor which may