You are on page 1of 1

PROTOCOLO DE VOLADURA TALADROS LARGOS ORCOPAMPA

AREA: - FECHA: 22/02/2018

LABOR: TJ 874 TURNO: NOCHE

ZONA: GUARDIA: B

JEFE DE MINA: PIO CARRASCO/ EDWIN APAZA CARGADOR 01:

SUPERVISOR: LUCIANO USCA CARGADOR 02:

N° FILAS A DISPARAR 3 TN A DISPARAR:

FILAS DISPARADAS: ANCHO DE VETA: 1.7

ESQUEMA DE CARGUIO TJ 874

ESTANDAR
F. POTENCIA (Kg/ton)

0.80 1.00 FILA


1.00 0.75 S91 S92 S93 TOTAL
2.00 0.35 ALTURA DE BANCO (m) 7.50 7.50 7.50 7.50
3.00 0.30 MTRS PERF. POR FILA 22.5 22.5 22.5 67.5
4.00 0.25 N° TALADROS POR FILA 3 3 3 9
5.00 0.20 VOLUMEN TOTAL POR FILA 18.23 18.23 18.23 54.68
TONELADAS ROTAS POR FILA 54.68 54.68 54.68 164.03
TON/METRO 2.43 2.43 2.43 2.43
ANFO EN Kg 0 0 0 0
EMULEX 80 1 1/2x12 (Und) 6 6 6 18
EMULEX 80 1 1/4x12 (Und) 0 0 0 0
SEMEXSA 65 1 1/2x12 (Und) 66 66 66 199
EMULEX 45 1 1/4x12 (Und) 0 0 0 0
TOTAL EXPLOSIVO (Kg) 28.39 28.39 28.39 85
DENSIDA DE CARGA Kg/m 1.26 1.26 1.26 1.26
F.CARGA KG/m3 1.56 1.56 1.56 1.56
F. DE POTENCIA 0.52 0.52 0.52 0.52

Nº DE TALADRO LONGUITUD REAL DE CADA LONGITUD TOTAL DE


FILA TIPO DE EXPLOSIVO TACO INICIAL TACO FINAL CARGA DE FONDO CARGA 1 CARGA COLUMNA 1 CARGA COLUMNA 2 ANFO EN KG POR TAL. EMULEX 80 1 1/2x12 EMULEX 80 1 1/4x12 SEMEXSA 65 1 1/2x12 EMULEX 45 1 1/4x12 N° DE EXSANELES
PERFORADO TALADRO CARGA
S91 N1 SEMEXSA65 1 1/2x12 7.50 0.50 0.50 0.60 5.6 2.80 2.80 6.20 0.00 2 0.00 22.14 0.00 2.00
S91 N2 SEMEXSA65 1 1/2x12 7.50 0.50 0.50 0.60 5.6 2.80 2.80 6.20 0.00 2 0.00 22.14 0.00 2.00
S91 N3 SEMEXSA65 1 1/2x12 7.50 0.50 0.50 0.60 5.6 2.80 2.80 6.20 0.00 2 0.00 22.14 0.00 2.00
S92 N1 SEMEXSA65 1 1/2x12 7.50 0.50 0.50 0.60 5.6 2.80 2.80 6.20 0.00 2 0.00 22.14 0.00 2.00
S92 N2 SEMEXSA65 1 1/2x12 7.50 0.50 0.50 0.60 5.6 2.80 2.80 6.20 0.00 2 0.00 22.14 0.00 2.00
S92 N3 SEMEXSA65 1 1/2x12 7.50 0.50 0.50 0.60 5.6 2.80 2.80 6.20 0.00 2 0.00 22.14 0.00 2.00
S93 N1 SEMEXSA65 1 1/2x12 7.50 0.50 0.50 0.60 5.6 2.80 2.80 6.20 0.00 2 0.00 22.14 0.00 2.00
S93 N2 SEMEXSA65 1 1/2x12 7.50 0.50 0.50 0.60 5.6 2.80 2.80 6.20 0.00 2 0.00 22.14 0.00 2.00
S93 N3 SEMEXSA65 1 1/2x12 7.50 0.50 0.50 0.60 5.6 2.80 2.80 6.20 0.00 2 0.00 22.14 0.00 2.00
Total general 68 5 5 5 50 25 25 56 0 18 0 199 0 18

OBSERVACIONES:
…………………………………………………………………...……………………………………………………………………………………………………...………………………...………………………………………………………………………………………………………………………………………………………………...………..
………………………………………………………………………………...………………………………………………………………………………………………………………...………...………………………………………………………………………………………………………………………………………………………...………..

PERFORACIÓN Y VOLADURA JEFE DE MINA JEFE DE PLANEAMIENTO AT EXSA CARGADOR

RESIDENTE RESEFER SUPERINTENDENTE SUPERINTENDENTE


MINA PLANEAMIENTO

ADJUNTAR UNA COPIA DEL VALE DE EXPLOSIVO AL PROTOCOLO Y ENTREGAR AL AREA DE PyV