2.75m GRID 3.00m GRID 3.

25m GRID

A1 A2 A3 A4 A1 A2 A3 A4 A5 A1 A2 A3 A4

A5 A6 A7 A8 A9 A6 A7 A8 A9 A5 A6 A7 A8 A9
Po.CPT-FT-1A Pre.CPT- FT-1
Pre.CPT- FT-2
Po.CPT-FT-2A
Po.CPT-FT-1B Po.CPT-FT-3A
A10 A11 A12 A13 Po.CPT-FT-2B Pre.CPT- FT-3
3B
A10 A11 A12 A13 A14 T-FT-
A10 P o .C P A11 A12 A13

A14 A15 A16 A17 A18


A15 A16 A17 A18
A14 A15 A16 A17 A18

FIELD TRIAL LAYOUT

TYPICAL POST CPT LOCATION NOTES:


1. ALL DIMENSIONS ARE IN METERS UNLESS
OTHERWISE NOTED
2. - DENOTES VIBRO COMPACTION PROBE
A 3. - DENOTES PRE CPT POINT
B 4. - DENOTES POST CPT POINT

A= AT CENTROID
B= AT 1/3 DISTANCE

PROJECT TITLE: DRAWING TITLE: NAME DATE DRAWING NO. REVISION NO.

DRAWN H.H. 30.04.19


DUQM FISHERY HARBOUR Field Trial Layout CHECKED R.M. 30.04.19
0
APPROVED T.K. 30.04.19 SCALE NTS SHEET 1 OF 1