You are on page 1of 6
1) 3) 4) 6) 8) ‘The number of specimens required inthe submission of Concr REVIEW QUISTIONAIRE N MISCELLANEOUS MANUFACTURED MATERIALS AND SITUATIONAL PROBLEMS IN FIELD fe Hollow Blocks for testing a) 30s b) pes c} Bees 4) 260s Whats the bassin casting length of @ reguiar pile to be used i briage constuction a) testpiie b) dpotpile €) oad pile « 6) baer pile ‘Arnon load bearing conorete hollow block should have an individual strength requirement of a) atleast 3.45 MPa : b) atleast 6.90 MPa 6) atleast 250 MPa d) atleast 30MPa ‘A thousand of tons of steel bar stockpile in a bodega for its used in reinforcing concrete struct tested frst, por to is incorporation into th work. The result of test revealed that said reinforce steel bar passed the specications of both the yiald and tensile strength requirements, but however, it fated io rm weight. What a) b) 6) 4) rou do? teject the steel bars and not to allow to use secure a copy of Mil Testing Certficate coordinate none ofthe above A reinforce steel bar is considered to be undersized if itfailed to meet tensile requirement bj by measuring the cross-sectional area 6). itfaled to meet variation | mass d}) by measuring the diameter of the bar itself ‘Which ofthe following is used to determine the bearing capacity of concrete piles: a) test ple b) load test ©) California Bearing Ratio none of the above ans. the clanning and design so thai necessary adjustment in spacing of steel bar couleé be possibly made tn the submission of qualty samples in accredited laboratory what document should be pror to its receipt thal contain informction lie Kind of material, quanti represented, date of extraction ee. a) 5) eo} 4) ‘Status of field test performed worksnect ‘summary result of feld test sample card Which ofthe following is not the dutylresponsibilty of @ materialsman a) b) °) a) sleet shest pe ‘conducts materials survey for probable sources of materials prepare design mixes for concrete and asphalt mixes linear measurement see that a toting equigment are m: but you want to check ihe quailty, as a Materials Engineer what will you do? a) ‘conduct test for zinc coating secure a copy of Mill Testing Cerificate ‘obtain sample for tensile requirement none of the above ans._a ans._a 1a requirement ithas to be el requirement in variation in ans._e ans_¢ ans_a ans._d ‘wereioreeubjacted tesnig= 10.) Calibration of aborator testing equipment should be conducted 2) atleast once a year >) every two (2) years ans._a 2) as directed by the Materials Engineer 4) any ofthe above 11) Ina projec construction, when does the materials Engineer ofthe contector a) Project inspector b) Project Engineer of DPWH a8,_¢ C) Materials Engineer of DPWH 4) Project Engineer of contractor 12.) In the construction of CPWH projects, quality contol is the respor a) DPWH Project Engineer reporting b) OPWH Materials Engineer = - ans_e ©) Contractor a 18) both 2 andb 13) in a bridge construction, provision of railing is included in the contract and the Project Engineer should direct the contractor to use wht cass of concrete end appropriate cement content a) Gest A@ Stora! b) Clase 8 @ 85 baosin? ©) Class @ 8.6 bansim® ©) Class A @ 85 baasim’ 414.) Whats the required length of RSB sample for quality test? a) 1.5m/ 10,000 kgslsizeshipment b) 15m 1,000kgsisizelshipment ans._ ©) 4.0.m/ 10,000 kgslsize/shipment 4) 4.0.m/1,000kgslsizelshioment 15) whatis the required sice of test specimen fr G., sheets? fa) 3 p08 of 60 mm x 50 mm 1) 3968 of 60 mm x 60 mn ans_b ©) 308 of 70 mm x 70 mm d.) none of me above 416,) Whet kind of paint that has a reflectance or beads? a) Latex Paint b) Enamel Peint ans._¢ Cc). Rellectorized Paint 4) Siver Finish (Aluminum ) Paint 17,) At 16.000 kgs RS how many samples shall be submitted for Quality Test? a) 3pcs. 1.5msample b) 2p0s. 1.5msample ans_¢ ©) 2pes. 1.0m-sample ) 3pcs. .0msample 18) Paints tested for quality; 36% vehicle, 50% pigment, what percent for beads? ans_e a) 15% b) 10% ans_a c) 5% )_none ofthe above 419.) Quality control testing in OPWH prohect isthe resposibily ofthe a) OPWH by. Contractor et reagent 4) Construction supervibion consultant 20.) As materials Engineer, when isthe right ime to start sampling nd testing aggregate base course material? a) once the materials delivered and stockpile athe site 'b) 28 construction work progresses ans_¢ cc) once the source is identfied after the material was incorporated into the work 21.) Whatis the basis for acceptance or rejection of any constructon matenal? a) Minimum testing requirement . b) certificate of materials availabilty ans._d CC) ceticate of acceptance 6). meters test repotsresults 22) Feild samples does not nacessary maan thatthe stuctureitrepresens is defective, Why? a) maybe sampling is incorect may be samplings corect ans.__a ©) may be curing is correct 4) maybe testing is correct 23, How many samples shal be submitted for test 315 pals of fatwall enamel paints be used inthe prjest? a) pais bd pals ki aeusenar ee ans. cy Spas = 4) 2pais 24.) Belore the project stars the Matera's Engineer or The Technician must have a program on haw many samples foreach itm of ‘ork shoud be ested based on the minimum ting reqierents, What program or ror i this? 2), Program of wrk }_ Program of acuwes ans_d ©) Quality Control Activites 4} Quality Control Program 25) As the wor progresses the Materials Engineer should know how many sempes hes been submited and tasted and how many samples ae tobe submited, in oer word the Materials Engineer must lero what report o that helshe may be updated on the balance and on fle qual testo the constuction materials being used he project? a) Quality contol essurance report ) Quality contol program ans_¢ €) Status oftest 4) None ofthe above 28) Whats the required mixing of joint mortar for item $09 (Pive Culvert and Storm Dizins)? fa}, 1 paof coment and 2 parts sand by volume wih suicient water 1 part of cement and 3 parts sand by volume with sufciert water ans._a 2) 2partof cement and 2 pats sand by voiume wih sufcient water 4) none ofthe above 27.) Whats the required mixing of mata for tern 506 (Stone Masonry)? aa) 1 partof cement and 2 pats sand by volume with sufcient water ‘part of cement and 3 parts sand by volume with sufcient water ans._b €) 2part of cement and 2 pats sand by volume with sufclent water 4) none ofthe above 28) What of Materials Quality Control Monthly Reports? a} ually Control Assurance Report wih Status of Test b} Summary of Field Test and Status of Test ans._b ) Summary of Construction Materials used 4) Alloftre above 28) One ofthe duty of a Materials Engineers to see tot that all contructon materials be tested fa) afer the construction works fished b)_ before itis incorporate into the work ans_b c) during construction - 4) noneofthe above ~-20}.Saupiscoulities ji. tes should havea tag buaiug.a.vae, quliy ie aispinthnbnbut erie aid ie SuOMMe~ em sere om ‘and ete. What s the common name ofthat lag do you as Materials Engineer. a) Tegname b) Name tag ans c) Sample Identification 4) Sample Card

You might also like