Abstract:
The reducing of time in construction project be the main proposed to decrease the amount of cost in a
certain project especially in the high-rise building process. This project contains the simplest ways how
the time reduces by change a type of construction system. As a conventional method for high rise
building, the major machine being used in the project is tower crane. However, this machine gives the
highest rank of dangerous in the work site. This study aimed to make a new idea of how to reduce the
hazards and dangerous in high rise building construction. This methods give an easiest for the contractor
to give a safer workplace and decreases a footprint while using a tower crane. This construction may
start by constructing the roofing to be a permanent roof for the building and will be continued by the
floor of the building. Other than that, the collaboration with Industrial Building System or precast panel
of a certain item in the building be a main of this study propose to achieve government policies toward
industrial revolution 4.0.
Keywords:
Lifting sytem; construction; high-rise building; building; simplest concept
1.0 INTRODUCTION
Lifting the construction system will be used for high rise construction. This may be allowed more safety
and reduce hazard during the work done. The efficiency will very good and integrated toward the
Industrial Building system and give minima of using time and reduce the cost of the construction
project.
The Lifting Construction for high rise building is a solution actually sees the roof of the buildings
constructed first, which is then raised by an integrated lifting system which allows for the creation of a
construction area. This area is surrounded by a protective wall that is attached to the roof. The structure
of the next floor is assembled at man’s height on the previous floor and is positioned using the adapted
roof and its hoisting system. All of the work is done ergonomically, safely and productively in order to
complete the floor subassembly prior to positioning it to its final height.
such asscaffolds, are primary accidental agents. Results of this study could enhance the knowledge and
awareness of construction workers and management of job-related injuries to decrease the incidence of
fatal occupational accidents.
3.0 METHODOLOGY
This paper utilized qualitative analysis in collecting, processing and analysing the data collected.
Content analysis is selected to meet these purposes. Content analysis is a research tool to determine the
presence of certain keywords, concepts or set of texts in a document. Qualitative researchers aim to
gather an in-depth of concept and details on how this lifting construction system will help the way to
reduce hazard during construction work and give a simple’s construction concept for high rise building
without using a high-rise construction pieces of machinery likes tower crane. Beside that this study may
also explain how fast a lifting construction system that collaborates with an industrial building system
that gains a reducing of time using for certain project construction in high rise building. Along with
document review of existing data in the form of the line graph, article, and journal. An extensive desk
study was conducted to gather information on fundamental using lifting construction give safer and
simplest construction system based on high rise building. Other than that, this finding also gives the
analysis of dangerous that been occurs in construction high rise building that increases the amount of
death because of work at a construction area in Malaysia. The purpose of this investigation is to gain
insight on how this lifting construction system gives a faster way and simplest construction work for
high rise building that will give a safer workplace. The advantages also if the concept of this project
archive, the company or contractor may reduce amount of cost for a project that be a major problem for
all type of construction industry. Regarding this lifting construction, a system is to increase the amount
of using precast panel or industrial building system, especially in high rise building construction.
Table 1 shown the analysis of the different categories of accident occurring in Malaysia as
contained in DOSH database about fatal accident occurring in construction sites of Malaysia
within a period of fourteen months.
5.0 CONCLUSION
This lifting construction system is the idea that may give the simplest ways of construction for high rise
building. This idea may give a good and safer workplace for the workers to avoid the hazard and bad
weather. Moreover, this system may start with the permanent root that is a shelter for the workers to
make an assembly of the precast item such as floor, wall, column, and beam. Lifting the construction
system been use avoid of using tower crane in a high-rise project as a conventional work. The main
advantages of this study give a reduced amount of delay about a certain project that may cause an
increase in cost. This system also may give a secure workplace that only not for workers but for
materials. After the roof had been installed, the cover will be attached to the building floor and it will
reduce the amount of falling object to the ground. Moreover, this idea can give more practice to make
construction at a small the site had been given.
REFERENCES
Ayob, A., Shaari, A. A., Zaki, M. F. M., & Munaaim, M. A. C. (2018, April). Fatal occupational injuries
in the Malaysian construction sector–causes and accidental agents. In IOP Conference Series: Earth
and Environmental Science (Vol. 140, No. 1, p. 012095). IOP Publishing.
Goh, K. C., Goh, H. H., Omar, M. F., Toh, T. C., & Zin, A. A. M. (2016). Accidents preventive practice
for high-rise construction. In MATEC web of conferences (Vol. 47, p. 04004). EDP Sciences.
Upbrella president Joey Larouche. (26 june , 2017). UPBRELLA SYSTEM WINS CONSTRUCTION
DISRUPTOR AWARD. Retrieved from upbrella:
http://www.upbrella.com/en/news/httpdailycommercialnewscomen-
usassociationsnews20176upbrella-system-wins-construction-disruptor
Williams, O. S., Hamid, R. A., & Misnan, M. S. (2017). Analysis of fatal building construction
accidents: Cases and causes. work, 4(8).
Yap, J. B. H., & Skitmore, M. (2018). Investigating design changes in Malaysian building
projects. Architectural Engineering and Design Management, 14(3), 218-238.