You are on page 1of 60
Mabey-Johnson Bridge Smartbook Version 2 15. 16. 17. 18. 19. 20. . Bridge Component Capabilities Table of Contents Intro. Bridge Truss Constructions. a. Key Abbreviations. Bridge Dimensions Bridge Weights. Bridge Properties. Bridge Constructions for Military Loads. End Reactions due to Military Loads. Bridge Foundations Typical Abutment Detail. Multiple Span Bridges. FlexiFloat Uni-Flote... . Component Lists... a. Standard Bridge Set. b. Long Span Set. c. Emergency Ramp Se 4. Launching Nose Components... 28 e. Roller Components. 29 f. Jacking Components. 29 g. Tools. 30 h. Span Junction Set. 31 i. Bridging Equipment...... 31 ii. Launching Equipment. 31 i, Fixed Pier Set........ 32 Site Layout Diagram. 33 Setting Out the Bridge Instructions. 34 Roller Leveling Table Instructions. 38 LSB Tables... a. Bridge Level. b. Design Table. ¢. Summary of Packing. Roller Leveling Form Blank. Conversion Tables...... ii MABEY & JOHNSON COMPACT 200 LOGISTIC SUPPORT BRIDGE ‘The Mabey Compact 200 was introduced in 1986 with taller panels to provide an increased ‘module than the previous Compact 100, which enabled the bridge to span gaps up to 60.96 meters, (200 ft) in single story truss construction. Another benefit ofthe taller panels was that a larger ‘transom could be used enabling the provision for two-lane traffic. Compact 200 Super was introduced in 1992 with panels that had stronger chords, which further increased the bending, capacity. ‘The Logistic Support Bridge (LSB) was developed from the Compact 200 Super to meet the requirement of various military users. LSB features include military grillages and ramps, and the system is supported with technical documentation including a safety study, a reliability and maintainability study, training package and user manuals. The capabilities of One Logistic Bridge Stock Module Set is as follows: Two separate 13 bay (40m) span bridges for Military Load Class 80T/110W. OR One 17 bay (50 m) span bridge for MLC 80T/1 10W. OR One 20 bay (60 m) span bridge for MLC 80T/1 10W. OR * One bridge of 80m overall length comprised of two 13 bay (40 m) spans joined with span junction equipment and supported by a 10 m pier for MLC 80T/1 10W, Cost for One Logistic Bridge Module Set is $1.25M, which includes transportation, training and ‘manuals. Lead times for various components (ramps) ranges from 3 to 12 weeks. Currently there are approximately 1200 meters of bridge modules available for ediate

You might also like