PILE CAP DAN TIE BACK

0.40 x 0.40

0.25 x 0.25
0.4 m

0.4 m

Anchor Pile 25 x 25 atau 20 x 20

PAGAR BETON
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

1.70 m

2.0 m
Column Precast
Concrete K-225, 20 cm
x 20 cm x 2.5 m

Wall Precast Concrete


2 m x 0.5 m x 7 c

el. 104 Concrete Pondasi K-225, 30


cm x 30 cm x 50 cm Concrete Sloofe K-225, 20 c
x 20 cm

0.20 m

0.30 m 0.25 m
KAYU GELAM Ø 10
CM, PANJANG 2.5 M

3.875 m
CK

0.2 m
Tie rod 20 cm x 20 cm x 7m
31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51
Column Precast
Concrete K-225, 20 cm
x 20 cm x 2.5 m

Wall Precast Concrete K-225,


2 m x 0.5 m x 7 cm

2.0 m

ncrete Sloofe K-225, 20 cm


x 20 cm

0.20 m 0.50 m

0.25 m

Pasangan Batu Kali 1 : 4

7.0 m
0.5 m

KAYU GELAM Ø 10
CM, PANJANG 2.5 M
DASAR PERHITUNGAN

SCOPE PEKERJAAN

1 Luas Lahan yang bisa diukur 29.508 m2 (lihat layout data survey).
Untuk trace sheet pile supaya smooth perlu tambahan luas sebesar 3.931 m2. Maka total luas timbunan 33.439 m2
(Lihat layout yg berwarna biru).

2 Pekerjaan Celaring dan stripping diasumsikan sebesar 4.2 HA.

3 Pekerjaan stripping setebal 30 cm dihitung di area seluas 4.2 HA.


Jarak disposal area diasumsikan maksimum 5 km.

4 Pekerjaan Geotextile ( non woven) dihitung seluas 4.2 HA + 400 x 6 m (ditambah lipatan di sheet pile)

5 Elevasi top level timbunan 4 m diatas level jembatan jalan sicanang. Elevasi referensi di jembatan diasumsikan 100.
Maka top level timbunan pada elevasi 104 dengan luas lahan sekitar 33.439 m2.
Perkiraan volume timbunan untuk platform pelaksanaan sheet pile 35.200 m3 (Lihat detail hitungan)
Perkiraan volume total timbunan sampai elevasi 104 termasuk timbunan platform diperkirakan 200.131 m3 .

6 Pekerjaan Prestressed Concrete Sheet Pile type flat 22 mm x 500 mm.


Panjang diasumsikan 400 m. Untuk type flat panjang maksimum 12 m. Oleh karena belum ada data soil investigation,
diasumsikan panjang sheet pile 18 m, dimana 12 m berupa sheet pile dan yang 6 m berupa concrete wall K350 tebal 20
Volume besi beton pada beton bertulang diasumsikan 250 kg/m3 beton

7 Pagar Beton
Terdiri dari
- Pekerjaan Galaian digali dari elevasi ground surface 97 sampai elevasi dasar 96.5 (Lihat detail hitungan)
- Pekerjaan Cerucuk Gelam Φ 10 cm @ 2.5 m dipasang pada setiap luas 80 cm x 80 cm. (Lihat detail hitungan)
- Pekerjaan Gravel Bedding dipasang setebal 10 cm pada dasar pondasi
- Pekerjaan Pasangan Batu kali 1:4 dilaksanakan setelah gravel bedding. Tinggi 7.5 m, lebar atas 1 m, lebar bawah 4.37
- Pekerjaan Beton sloof K225 ukuran 20 cm x 20 cm dan beton pengisi pondasi kaki kolom pracetak sepanjang 350 m
- Pekerjaan Kolom Beton Pracetak 20 cm x 20 cm x 2.5 m setiap jarak 2 m
- Pekerjaan dinding panel beton pracetak 7 cm x 50 cm x 2 m.

8 Pekerjaan perkerasan terdiri dari limestone 50 cm dan sirtu 25 cm di bagian :


- Access road seluas 75 x 4 m2
- Stock sheet pile area 24 x 24 m2

9 Soil Investigasi
Preparation of Works
- Persiapan peralatan sondir dan boring ls 1
- Mob demob kali 2
Akomodasi hari 40
Dokumentasi core box box 75
Pekerjaan Lapangan (Field Work)
Core Drillling in soil @75 m - 5 ttk m 375
Undisturb sample interval 5 m pcs 75
Standard Penetration Test (SPT) interval 5 m test 75
Sondering Test max depth 20 m (CR 200 kg/cm2) titik 2
Moving on site kali 5
Perancah unit 2
Jaga malam ls 1
Pekerjaan Laboratorium
Laboratory Test (Index Properties dan Engineering Propereties) test 75
Reporting and Analysis
Final Report buku 3
otal luas timbunan 33.439 m2

n di sheet pile)

i jembatan diasumsikan 100.

etail hitungan)
erkirakan 200.131 m3 .

lum ada data soil investigation,


rupa concrete wall K350 tebal 20 cm.

hat detail hitungan)


m. (Lihat detail hitungan)

lebar atas 1 m, lebar bawah 4.375 m


olom pracetak sepanjang 350 m
CEK LUAS LAHAN
Skala 10.00 m 9.50
1.00 m 0.95
L1 256.84 244.00
L2 54.88 296.13 311.72
311.72
P1 134.74 128.00

A1 29,508.00
A2 34,606.09
Tambahan 1 5,098.09
Tambahan 2 7,393.91
42,000.00

TAMBAHAN TIMBUNAN DILUAR DAERAH SURVEY


Top Fill Elevation 100.50 A
1P 10.53 10.00
L 3.16 3.00 16.62
OGL 97.00
2P 3.16 3.00
L 2.63 2.50 9.14
OGL 97.00
3P 8.95 8.50
L 3.68 3.50 28.25
OGL 97.00
4P 4.21 4.00
L 2.11 2.00 12.19
OGL 97.00
5P 4.74 4.50
L 1.58 1.50 8.73
OGL 97.00
6P 10.00 9.50
L 1.58 1.50 15.79
OGL 97.00
90.72

19 P 21.05 20.00
L 3.16 3.00 33.24
OGL 97.00
20 P 37.89 36.00
L 1.05 1.00 79.78
OGL 97.00
21 P 33.68 32.00
L 3.16 3.00 70.91
OGL 97.00
22 P 6.32 6.00
L 7.89 7.50 34.90
OGL 97.00
23 P 6.32 6.00
L 2.11 2.00 31.58
OGL 97.00
24 P 20.53 19.50
L 2.11 2.00 43.21
OGL 97.00
293.63

SUMMARY TIMBUNAN

Tambahan
Vol el. 104
Vol el. 104-100.5

STRIPPING 42,000.00 X 0.30

FLAT CONCRETE SHEET PILE

P1
P2
L

PAGAR
P1
P2
P3
P4
P5

PINTU PAGAR
LUAS LAHAN YANG DIUKUR (DARATAN)
mm
mm 0.95
L1 230.53 219.00 L5 54.74
P1 58.95 56.00 P5 2.11
13,588.92 115.24
L2 15.79 15.00 L6 162.63
P2 18.95 18.00 P6 18.95
299.17 3,081.44
L3 250.53 238.00 L7 47.37
P3 16.84 16.00 P7 7.37
4,219.39 174.52
L4 242.11 230.00 L8 22.11
P4 29.47 28.00 P8 6.32
271.58 139.61

V
7.00 P 2.11 2.00 13.00
L 2.11 2.00 3.88
63.16 OGL 97.00 14.74
8.00 P 30.53 29.00 14.00
L 2.11 2.00 64.27
34.74 OGL 96.00 308.48
9.00 P 11.58 11.00 15.00
L 4.74 4.50 39.61
107.37 OGL 96.00 190.14
10.00 P 22.11 21.00 16.00
L 5.79 5.50 116.34
46.32 OGL 96.00 558.45
11.00 P 82.11 78.00 17.00
L 5.79 5.50 475.35
33.16 OGL 95.00 2,757.01
12.00 P 81.05 77.00 18.00
L 16.84 16.00 871.32
60.00 OGL 95.00 5,053.63
344.74 1,570.76 8,882.44

25.00 P 22.11 21.00


L 1.58 1.50 34.90
126.32 OGL 97.00 132.63
26.00 P 5.26 5.00
L 1.05 1.00 6.93
303.16 OGL 97.00 26.32
27.00 P 6.84 6.50
L 1.05 1.00 7.20
269.47 OGL 97.00 27.37
132.63

120.00

164.21
1,168.79 49.03 186.32

12,435.82 71,086.00
29,508.00
41,943.82

71,000.00
165,000.00
(78,000.00)
158,000.00

4,200.00

114.74 109.00
150.53 143.00
135.00

400.26

142.11
110.53 105.00
54.74 52.00
21.05 20.00
106.32

425.00

10.00
52.00 L9 37.89 36.00
2.00 P9 6.32 6.00
239.34
154.50 L10 33.68 32.00
18.00 P10 6.84 6.50
230.47
45.00 L11 5.26 5.00
7.00 P11 5.26 5.00
13.85
21.00
6.00 22,373.52
29,508.08
1.32

P 82.63 78.50
L 8.95 8.50 1,065.51
OGL 95.00 6,179.97
P 80.00 76.00
L 14.74 14.00 947.37
OGL 95.00 5,494.74
P 61.05 58.00
L 33.68 32.00 1,478.12
OGL 95.00 8,573.07
P 77.37 73.50
L 29.47 28.00 2,443.21
OGL 95.00 14,170.64
P 106.32 101.00
L 19.47 18.50 2,601.94
OGL 95.00 15,091.25
P 154.74 147.00
L 6.32 6.00 1,895.53
OGL 95.00 10,994.05
10,431.68 60,503.72
BILL OF QUANTITY PREPARATIONS WORK
(DAFTAR KUANTITAS PEKERJAAN)
PLTGU SICANANG, BELAWAN, MEDAN

NO. URAIAN PEKERJAAN SAT. VOLUME

I PEKERJAAN PERSIAPAN

1.1 Pembebasan Lahan Yang belum pindah ps 1.00


1.2 Pengamanan Jaringan Listrik PLN ls 1.00
1.3 Pengamanan Jaringan Pipa Gas ls 1.00
1.4 Kantor dan Barak Kerja ls 1.00
1.5 Pagar Proyek ls 1.00
1.6 Pengukuran ls 1.00
1.7 Soil Investigasi ls 1.00
1.8 Design and Shop Drawing ls 1.00
1.9 Mobilisasi ls 1.00

Sub Total I

II PEKERJAAN UTAMA

2.1 Site Clearing, Grubbing and Stripping


2.1.1 Site Clearing and Grubbing m2 42,000.00
2.1.2 Stripping m3 4,200.00

2.3 Timbunan
2.3.1 Geotekstil m2 24,000.00
2.3.2 Platform Pekerjaan Pemancangan m3 71,000.00
2.3.3 Lokasi Utama m3 87,000.00

2.4 Flat Prestressed Concrete K500 22 x 500 mm


2.4.1 Fabrikasi dan Pengadaan Bahan m 9,600.00
2.4.2 Pemancangan m 9,600.00
2.4.3 Access Road dan stock pile area m2 876.00

2.5 Precast Concrete Anchor Pile 25 x 25 cm2


2.5.1 Pengadaan Bahan m 1,920.00
2.5.2 Pemancangan m 1,920.00
2.5.3 Penyambungan titik 80

2.6 Tie Back/ Tie Rod Beam


2.6.1 Bobokan Concrete Sheet Pile buah 800.00
2.6.2 Bobokan Concrete Anchor Pile buah 80.00
2.6.3 Pile Cap Concrete 60 x 40 x 40 K225 m3 5.20
2.6.4 Tie Rod & Support Concrete Beam K225 2 x 20 x 20 x 700 m3 22.40
2.6.5 Plain Reinforcement Bar kg 6,900.00
2.6.6 Formworks type I m2 406.40

2.7 Pile Head Concrete Sheet Pile K225


2.7.1 Concrete K225 m3 128.00
NO. URAIAN PEKERJAAN SAT. VOLUME

2.7.2 Reinforcement Bar kg 32,000.00


2.7.3 Formworks type I m2 640.64

Sub Total II

III PEKERJAAN PAGAR

3.1 Pekerjaan Galian Tanah m3 441.00


3.2 Pondasi beton K225 40 x 40 x 85 m3
3.3 Cerucuk Gelam Ø 10 cm m 5,511.80
3.4 Gravel Bedding m3 110.30
3.5 Pondasi Batu Kali m3 1,926.00
3.6 Plesteran 1 : 3 m2 1,440.10
3.7 Concrete Sloof K225 20 x 20 and Fill Concrete K225 m3 23.40
3.8 Beton Pracetak Kolom 25 cm x 25 cm x 2.5 m unit 176.00
3.9 Beton Panel 7 cm x 50 cm x 2 m unit 700.00
3.10 Plain Reinforcement Bar kg 3,444.70
3.11 Formworks type I m2 119.70

Sub Total III

A Sub Total I + II + III

B 10 % X A

C TOTAL A + B
OF QUANTITY PREPARATIONS WORK
DAFTAR KUANTITAS PEKERJAAN)
GU SICANANG, BELAWAN, MEDAN

HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)

- -
- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
-

- -
- -
- -
-

- -
- -
- -
-

- -
- -
- -
-

- -
- -
- -
- -
- -
- -
-

- -
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
- -
- -
-
-

- -

- -
- -
- -
- -
- -
- -
- -
- -
- -