0.40 x 0.40
0.25 x 0.25
0.4 m
0.4 m
PAGAR BETON
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
1.70 m
2.0 m
Column Precast
Concrete K-225, 20 cm
x 20 cm x 2.5 m
0.20 m
0.30 m 0.25 m
KAYU GELAM Ø 10
CM, PANJANG 2.5 M
3.875 m
CK
0.2 m
Tie rod 20 cm x 20 cm x 7m
31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51
Column Precast
Concrete K-225, 20 cm
x 20 cm x 2.5 m
2.0 m
0.20 m 0.50 m
0.25 m
7.0 m
0.5 m
KAYU GELAM Ø 10
CM, PANJANG 2.5 M
DASAR PERHITUNGAN
SCOPE PEKERJAAN
1 Luas Lahan yang bisa diukur 29.508 m2 (lihat layout data survey).
Untuk trace sheet pile supaya smooth perlu tambahan luas sebesar 3.931 m2. Maka total luas timbunan 33.439 m2
(Lihat layout yg berwarna biru).
4 Pekerjaan Geotextile ( non woven) dihitung seluas 4.2 HA + 400 x 6 m (ditambah lipatan di sheet pile)
5 Elevasi top level timbunan 4 m diatas level jembatan jalan sicanang. Elevasi referensi di jembatan diasumsikan 100.
Maka top level timbunan pada elevasi 104 dengan luas lahan sekitar 33.439 m2.
Perkiraan volume timbunan untuk platform pelaksanaan sheet pile 35.200 m3 (Lihat detail hitungan)
Perkiraan volume total timbunan sampai elevasi 104 termasuk timbunan platform diperkirakan 200.131 m3 .
7 Pagar Beton
Terdiri dari
- Pekerjaan Galaian digali dari elevasi ground surface 97 sampai elevasi dasar 96.5 (Lihat detail hitungan)
- Pekerjaan Cerucuk Gelam Φ 10 cm @ 2.5 m dipasang pada setiap luas 80 cm x 80 cm. (Lihat detail hitungan)
- Pekerjaan Gravel Bedding dipasang setebal 10 cm pada dasar pondasi
- Pekerjaan Pasangan Batu kali 1:4 dilaksanakan setelah gravel bedding. Tinggi 7.5 m, lebar atas 1 m, lebar bawah 4.37
- Pekerjaan Beton sloof K225 ukuran 20 cm x 20 cm dan beton pengisi pondasi kaki kolom pracetak sepanjang 350 m
- Pekerjaan Kolom Beton Pracetak 20 cm x 20 cm x 2.5 m setiap jarak 2 m
- Pekerjaan dinding panel beton pracetak 7 cm x 50 cm x 2 m.
9 Soil Investigasi
Preparation of Works
- Persiapan peralatan sondir dan boring ls 1
- Mob demob kali 2
Akomodasi hari 40
Dokumentasi core box box 75
Pekerjaan Lapangan (Field Work)
Core Drillling in soil @75 m - 5 ttk m 375
Undisturb sample interval 5 m pcs 75
Standard Penetration Test (SPT) interval 5 m test 75
Sondering Test max depth 20 m (CR 200 kg/cm2) titik 2
Moving on site kali 5
Perancah unit 2
Jaga malam ls 1
Pekerjaan Laboratorium
Laboratory Test (Index Properties dan Engineering Propereties) test 75
Reporting and Analysis
Final Report buku 3
otal luas timbunan 33.439 m2
n di sheet pile)
etail hitungan)
erkirakan 200.131 m3 .
A1 29,508.00
A2 34,606.09
Tambahan 1 5,098.09
Tambahan 2 7,393.91
42,000.00
19 P 21.05 20.00
L 3.16 3.00 33.24
OGL 97.00
20 P 37.89 36.00
L 1.05 1.00 79.78
OGL 97.00
21 P 33.68 32.00
L 3.16 3.00 70.91
OGL 97.00
22 P 6.32 6.00
L 7.89 7.50 34.90
OGL 97.00
23 P 6.32 6.00
L 2.11 2.00 31.58
OGL 97.00
24 P 20.53 19.50
L 2.11 2.00 43.21
OGL 97.00
293.63
SUMMARY TIMBUNAN
Tambahan
Vol el. 104
Vol el. 104-100.5
P1
P2
L
PAGAR
P1
P2
P3
P4
P5
PINTU PAGAR
LUAS LAHAN YANG DIUKUR (DARATAN)
mm
mm 0.95
L1 230.53 219.00 L5 54.74
P1 58.95 56.00 P5 2.11
13,588.92 115.24
L2 15.79 15.00 L6 162.63
P2 18.95 18.00 P6 18.95
299.17 3,081.44
L3 250.53 238.00 L7 47.37
P3 16.84 16.00 P7 7.37
4,219.39 174.52
L4 242.11 230.00 L8 22.11
P4 29.47 28.00 P8 6.32
271.58 139.61
V
7.00 P 2.11 2.00 13.00
L 2.11 2.00 3.88
63.16 OGL 97.00 14.74
8.00 P 30.53 29.00 14.00
L 2.11 2.00 64.27
34.74 OGL 96.00 308.48
9.00 P 11.58 11.00 15.00
L 4.74 4.50 39.61
107.37 OGL 96.00 190.14
10.00 P 22.11 21.00 16.00
L 5.79 5.50 116.34
46.32 OGL 96.00 558.45
11.00 P 82.11 78.00 17.00
L 5.79 5.50 475.35
33.16 OGL 95.00 2,757.01
12.00 P 81.05 77.00 18.00
L 16.84 16.00 871.32
60.00 OGL 95.00 5,053.63
344.74 1,570.76 8,882.44
120.00
164.21
1,168.79 49.03 186.32
12,435.82 71,086.00
29,508.00
41,943.82
71,000.00
165,000.00
(78,000.00)
158,000.00
4,200.00
114.74 109.00
150.53 143.00
135.00
400.26
142.11
110.53 105.00
54.74 52.00
21.05 20.00
106.32
425.00
10.00
52.00 L9 37.89 36.00
2.00 P9 6.32 6.00
239.34
154.50 L10 33.68 32.00
18.00 P10 6.84 6.50
230.47
45.00 L11 5.26 5.00
7.00 P11 5.26 5.00
13.85
21.00
6.00 22,373.52
29,508.08
1.32
P 82.63 78.50
L 8.95 8.50 1,065.51
OGL 95.00 6,179.97
P 80.00 76.00
L 14.74 14.00 947.37
OGL 95.00 5,494.74
P 61.05 58.00
L 33.68 32.00 1,478.12
OGL 95.00 8,573.07
P 77.37 73.50
L 29.47 28.00 2,443.21
OGL 95.00 14,170.64
P 106.32 101.00
L 19.47 18.50 2,601.94
OGL 95.00 15,091.25
P 154.74 147.00
L 6.32 6.00 1,895.53
OGL 95.00 10,994.05
10,431.68 60,503.72
BILL OF QUANTITY PREPARATIONS WORK
(DAFTAR KUANTITAS PEKERJAAN)
PLTGU SICANANG, BELAWAN, MEDAN
I PEKERJAAN PERSIAPAN
Sub Total I
II PEKERJAAN UTAMA
2.3 Timbunan
2.3.1 Geotekstil m2 24,000.00
2.3.2 Platform Pekerjaan Pemancangan m3 71,000.00
2.3.3 Lokasi Utama m3 87,000.00
Sub Total II
B 10 % X A
C TOTAL A + B
OF QUANTITY PREPARATIONS WORK
DAFTAR KUANTITAS PEKERJAAN)
GU SICANANG, BELAWAN, MEDAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
-
- -
- -
- -
-
- -
- -
- -
-
- -
- -
- -
- -
- -
- -
-
- -
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
- -
- -
-
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -