01.05 ELECTROBOMBAS
01.05.01 SALIDA PARA ELECTROBOMBA pto 4.00
01.08 BANDEJAS
01.08.01 BANDEJA METALICA PARA COMUNICACIONES m 113.25
01.08.02 BANDEJA METALICA PARA CORRIENTES DEBILES m 105.10
01.08.03 BANDEJA METALICA PARA ALIMENTADORES m 127.60
01.11 ALIMENTADORES
01.11.01 TABLERO TGE und 1.00
01.11.02 TABLERO TEST 1 und 1.00
01.11.03 TABLERO TEST 3 und 1.00
01.11.04 TABLERO T.EST und 1.00
01.11.05 TABLERO TDE 2 und 1.00
01.11.06 TABLERO TALT und 1.00
01.11.07 TABLERO TDE 4 und 1.00
01.11.08 TABLERO TEST2 und 1.00
01.11.09 TABLERO TBCI und 1.00
01.11.10 TABLERO TDE 3 und 1.00
01.11.11 TABLERO TDE 5 und 1.00
01.11.12 TABLERO TGN und 1.00
01.11.13 TABLERO TDN2 und 1.00
01.11.14 TABLERO TDN3 und 1.00
01.11.15 TABLERO TDN4 und 1.00
01.11.16 TABLERO TDN5 und 1.00
C1 - TGN 89.65 34.00 34.00 34.00 10.00 14.00 6.00 1.00 7.00 0.00 0.00 4.00 0.00 5.00 214.30
C2 - TGN 107.79 53.00 53.00 53.00 8.00 23.00 23.00 0.00 0.00 2.00 2.00 2.00 0.00 2.00 287.95
C3 - TGN 57.40 28.00 28.00 28.00 3.00 13.00 12.00 1.00 0.00 1.00 0.00 0.00 0.00 2.00 114.80
C4 - TGN 89.20 34.00 34.00 34.00 3.00 18.00 17.00 1.00 0.00 1.00 1.00 0.00 0.00 0.00 249.90
C5 - TGN 67.54 35.00 35.00 35.00 8.00 12.00 6.00 0.00 6.00 0.00 0.00 2.00 0.00 6.00 164.88
C1 - TGE 38.60 15.00 15.00 15.00 4.00 5.00 4.00 1.00 0.00 0.00 1.00 2.00 0.00 1.00 106.50
C2 - TGE 62.25 29.00 29.00 29.00 0.00 15.00 15.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 124.50
C3 - TGE 98.40 39.00 39.00 39.00 0.00 20.00 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 196.80
2° PISO
C1 - TDE 2 36.00 12.00 12.00 12.00 1.00 6.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 82.30
C1 - TDN 2 80.60 36.00 36.00 36.00 8.00 14.00 10.00 2.00 2.00 0.00 0.00 0.00 2.00 6.00 182.40
C2 - TDN 2 99.20 51.00 51.00 51.00 7.00 23.00 23.00 0.00 0.00 0.00 0.00 0.00 1.00 6.00 208.80
C3 - TDN 2 761.15 34.00 34.00 34.00 7.00 14.00 14.00 0.00 0.00 0.00 1.00 1.00 0.00 5.00 1,589.60
C4 - TDN 2 110.45 60.00 60.00 60.00 10.00 29.00 27.00 0.00 2.00 0.00 0.00 0.00 2.00 6.00 263.50
3° PISO
C1 - TDE 3 87.50 35.00 35.00 35.00 9.00 14.00 7.00 2.00 5.00 0.00 0.00 0.00 1.00 8.00 190.00
C2 - TDE 3 84.03 53.00 53.00 53.00 6.00 26.00 9.00 0.00 17.00 1.00 0.00 0.00 0.00 2.00 213.96
C1 - TDN 3 85.95 46.00 46.00 46.00 12.00 22.00 8.00 0.00 14.00 0.00 1.00 2.00 0.00 5.00 223.70
C2 - TDN 3 52.61 18.00 18.00 18.00 1.00 9.00 7.00 0.00 2.00 0.00 0.00 1.00 0.00 8.00 115.02
C3 - TDN 3 98.40 53.00 53.00 53.00 6.00 24.00 18.00 0.00 6.00 1.00 0.00 0.00 2.00 3.00 229.20
4° PISO
C1 - TDE 4 105.00 55.00 55.00 55.00 6.00 25.00 23.00 2.00 23.00 1.00 0.00 0.00 0.00 5.00 229.40
C1 - TDE 4 84.64 43.00 43.00 43.00 9.00 20.00 0.00 0.00 20.00 0.00 0.00 1.00 1.00 5.00 176.38
C2 - TDN 4 52.10 23.00 23.00 23.00 5.00 10.00 0.00 0.00 10.00 0.00 0.00 0.00 0.00 3.00 138.70
5° PISO
C1 - TDE 3 55.50 20.00 20.00 20.00 6.00 10.00 0.00 0.00 10.00 0.00 0.00 0.00 1.00 4.00 118.30
TOTAL 2,524.16 846.30 846.30 846.30 135.45 384.30 255.00 10.00 124.00 7.00 6.00 15.00 10.00 83.00 5,691.93
CANT./PUNT. 4.95 1.66 1.66 1.66 510.00 11.16
Luminaria En
Empalme
Tubo Pvc sap Piso Cable N2XH
Subterraneo
1" (m) Hermetica 6mm2 (m)
(und)
(und)
C6 - TGN 92.8 10 278.4 30
Cinta Aislante
(m)
0.30
0.24
0.09
0.09
0.24
0.12
0.00
0.00
0.03
0.24
0.21
0.21
0.30
0.27
0.18
0.36
0.03
0.18
0.18
0.27
0.15
0.18
4.06
HOJA DE SUSTENTO DE METRADO
Curvas pvc sap 3/4 Uniones pvc sap 3/4 Conectores pvc sap Caja rectangular pesada Tomacorriente Doble Con Cable NH 80 2.5mm2
Tubo Pvc sap 3/4 (m) Cable NH 80 4mm2 (m) Cinta Aislante (m)
(und) (und) 3/4(und) (und) Toma a Tierra (und) (m)
1° PISO
TGN 0.00
C-7 52.50 15.00 15.00 15.00 9.00 9.00 105.00 52.50 2.70
C-8 58.70 21.00 21.00 21.00 11.00 11.00 117.40 58.70 3.30
C-9 64.40 25.00 25.00 25.00 13.00 13.00 128.80 64.40 3.90
C-10 52.40 19.00 19.00 19.00 10.00 10.00 104.80 52.40 3.00
C-11 53.20 11.00 11.00 11.00 6.00 6.00 106.40 53.20 1.80
C-12 47.70 7.00 7.00 7.00 4.00 4.00 95.40 47.70 1.20
C-13 3.00 2.00 2.00 2.00 1.00 1.00 6.00 3.00 0.30
2° PISO
TDN 2 0.00 0.00
C-5 85.50 23.00 23.00 23.00 12.00 12.00 171.00 85.50 3.60
C-6 53.80 13.00 13.00 13.00 7.00 7.00 107.60 53.80 2.10
C-7 55.60 14.00 14.00 14.00 8.00 8.00 111.20 55.60 2.40
C-8 49.30 13.00 13.00 13.00 8.00 8.00 98.60 49.30 2.40
C-9 68.70 26.00 26.00 26.00 13.00 13.00 137.40 68.70 3.90
3° PISO
TDN 3 0.00
C-4 72.50 24.00 24.00 24.00 13.00 13.00 145.00 72.50 3.90
C-5 65.50 27.00 27.00 27.00 14.00 14.00 131.00 65.50 4.20
C-6 63.70 17.00 17.00 17.00 9.00 9.00 127.40 63.70 2.70
4° PISO
TDN 4
C-3 88.00 21.00 21.00 21.00 11.00 11.00 176.00 88.00 3.30
C-4 47.10 25.00 25.00 25.00 13.00 13.00 94.20 47.10 3.90
5° PISO
TDN 3 18.00 3.00 3.00 3.00 2.00 2.00 36.00 18.00 0.60
TOTAL 1,049.58 321.30 321.30 321.30 164.00 164.00 2,099.16 1,049.58 51.66
Curvas pvc sap 3/4 Uniones pvc sap 3/4 Conectores pvc sap Caja rectangular pesada Tomacorriente Doble Con Cable NH 80 2.5mm2
Tubo Pvc sap 3/4 (m) Cable NH 80 4mm2 (m) Cinta Aislante (m)
(und) (und) 3/4(und) (und) Toma a Tierra (und) (m)
1° PISO
TEST 1
C-1 40.45 19.00 19.00 19.00 10.00 10.00 80.90 40.45 3.00
C-2 63.80 18.00 18.00 18.00 8.00 8.00 127.60 63.80 2.40
C-3 47.60 20.00 20.00 20.00 11.00 11.00 95.20 47.60 3.30
C-4 45.50 23.00 23.00 23.00 13.00 13.00 91.00 45.50 3.90
C-5 53.90 9.00 9.00 9.00 5.00 5.00 107.80 53.90 1.50
C-6 20.30 3.00 3.00 3.00 2.00 2.00 40.60 20.30 0.60
2° PISO
TEST 2
C-1 34.10 5.00 5.00 5.00 3.00 3.00 68.20 34.10 0.90
C-2 84.50 23.00 23.00 23.00 12.00 12.00 169.00 84.50 3.60
C-3 55.30 13.00 13.00 13.00 7.00 7.00 110.60 55.30 2.10
C-4 62.60 23.00 23.00 23.00 15.00 15.00 125.20 62.60 4.50
C-5 51.82 15.00 15.00 15.00 8.00 8.00 103.64 51.82 2.40
3° PISO
TEST 3
C-1 47.50 12.00 12.00 12.00 7.00 7.00 95.00 47.50 2.10
C-2 72.50 24.00 24.00 24.00 12.00 12.00 145.00 72.50 3.60
C-3 52.00 22.00 22.00 22.00 12.00 12.00 104.00 52.00 3.60
TOTAL 768.46 240.45 240.45 240.45 125.00 125.00 1536.93 768.46 39.38
Curvas pvc sap 3/4 Uniones pvc sap 3/4 Conectores pvc sap Equipo Para Control de Cable NH 80 2.5mm2
Tubo Pvc sap 3/4 (m) Caja Tipo Gan (und)
(und) (und) 3/4(und) Acceso (und) (m)
1° PISO
TEST 1
C-7 10.40 2.00 2.00 2.00 1.00 1.00 31.20
C-8 15.20 2.00 2.00 2.00 1.00 1.00 45.60
3° PISO
TEST
C-1 3.10 2.00 2.00 2.00 1.00 1.00 9.30
C-2 4.30 2.00 2.00 2.00 1.00 1.00 12.90
Curvas pvc sap 3/4 Uniones pvc sap 3/4 Conectores pvc sap Caja rectangular pesada Tomacorriente Simple Cable NH 80 2.5mm2 Equipo de Luz De
Tubo Pvc sap 3/4 (m) Cinta Aislante (m)
(und) (und) 3/4(und) (und) Con toma a Tierra (und) (m) Emergencia (und)
1° PISO
TGE 75.20 13.00 13.00 13.00 7.00 7.00 225.60 7.00 2.10
2° PISO
TDE 2 74.40 12.00 12.00 12.00 7.00 7.00 223.20 7.00 2.10
3° PISO
TDE 3 37.55 9.00 9.00 9.00 5.00 5.00 112.65 5.00 1.50
4° PISO
TDE 4 38.50 9.00 9.00 9.00 5.00 5.00 115.50 5.00 1.50
5° PISO
TDE 3 15.40 5.00 5.00 5.00 3.00 3.00 46.20 3.00 0.90
TOTAL 253.10 50.40 50.40 50.40 27.00 27.00 759.31 27.00 8.51
Tubo Pvc sap 3/4 Curvas pvc sap 3/4 Uniones pvc sap 3/4 Conectores pvc sap Cable NH 80 4mm2 Cable NH 80
CajaTipo Gan (und) Electrobomba (und) Electronivel (und) Cinta Aislante (m)
(m) (und) (und) 3/4(und) (m) 2.5mm2 (m)
1° PISO
TGN-TALT 30.00 4.00 4.00 4.00 2.00 60.00 10.00 2.00 2.00 0.60
TOTAL 31.50 4.20 4.20 4.20 2.00 63.00 10.50 2.00 2.00
Tubo Pvc sap 1 1/4 Curvas pvc sap 1 Uniones pvc sap 1 Conectores pvc sap Placa de Voz y Data Cable Categoria 6A
Caja Tipo Gan (und) Placa de Data (und) Terminal RJ (und) Cinta Aislante (m)
(m) 1/4 (und) 1/4 (und) 1 1/4(und) (und) (m)
1° PISO
T1 19.60 10.00 10.00 10.00 6.00 6.00 0.00 6.00 364.75 1.80
T2 22.20 6.00 6.00 6.00 4.00 4.00 0.00 4.00 236.60 1.20
T3 11.00 10.00 10.00 10.00 6.00 6.00 0.00 6.00 330.30 1.80
T4 17.60 12.00 12.00 12.00 7.00 7.00 0.00 7.00 357.40 2.10
T5 26.70 6.00 6.00 6.00 4.00 4.00 0.00 4.00 212.57 1.20
T6 18.30 11.00 11.00 11.00 6.00 6.00 0.00 6.00 462.30 1.80
T7 11.70 11.00 11.00 11.00 6.00 6.00 0.00 6.00 433.60 1.80
T8 16.20 13.00 13.00 13.00 6.00 6.00 0.00 6.00 459.25 1.80
T9 14.30 12.00 12.00 12.00 7.00 7.00 0.00 7.00 479.30 2.10
2° PISO 0.00
Tramo 1 14.50 6.00 6.00 6.00 1.00 1.00 2.00 1.00 130.94 0.30
Tramo 2 27.90 12.00 12.00 12.00 6.00 6.00 0.00 6.00 417.50 1.80
Tramo 3 13.60 6.00 6.00 6.00 1.00 1.00 1.00 1.00 208.50 0.30
Tramo 4 27.10 11.00 11.00 11.00 6.00 6.00 0.00 6.00 470.50 1.80
Tramo 5 7.60 2.00 2.00 2.00 2.00 2.00 0.00 2.00 69.30 0.60
Tramo 6 23.90 11.00 11.00 11.00 6.00 6.00 0.00 6.00 484.65 1.80
Tramo 7 21.80 12.00 12.00 12.00 6.00 6.00 0.00 6.00 490.85 1.80
Tramo 8 21.80 13.00 13.00 13.00 6.00 6.00 0.00 6.00 526.25 1.80
Tramo 9 21.50 11.00 11.00 11.00 6.00 6.00 0.00 6.00 506.25 1.80
3° PISO 0.00
Tramo 1 15.70 12.00 12.00 12.00 4.00 4.00 1.00 4.00 255.70 1.20
Tramo 2 12.00 9.00 9.00 9.00 5.00 5.00 0.00 5.00 172.00 1.50
Tramo 3 145.20 13.00 13.00 13.00 7.00 7.00 0.00 7.00 312.05 2.10
Tramo 4 18.90 10.00 10.00 10.00 5.00 5.00 0.00 5.00 104.07 1.50
Tramo 5 10.50 6.00 6.00 6.00 3.00 3.00 0.00 3.00 33.30 0.90
Tramo 6 17.90 8.00 8.00 8.00 2.00 2.00 1.00 2.00 79.90 0.60
Tramo 7 27.00 12.00 12.00 12.00 4.00 4.00 1.00 4.00 138.80 1.20
4° PISO 0.00
Tramo 1 6.20 1.00 1.00 1.00 1.00 1.00 0.00 1.00 61.30 0.30
TOTAL 620.24 258.30 258.30 258.30 123.00 123.00 6.00 129.15 8187.83
129.00
CANT. / PUNT. 4.81 2.00 2.00 2.00 0.95 1.00 63.47
HOJA DE SUSTENTO DE METRADO
Curvas pvc sap 1 1/4 Uniones pvc sap 1 1/4 Conectores pvc sap 1
Tubo Pvc sap 1 1/4 (m) Caja Tipo Gan (und) Placa de TV (und) Conector (und) Cable Coaxial (m)
(und) (und) 1/4(und)
1° PISO
TV 27.90 9.00 9.00 9.00 5.00 5.00 10.00 341.50
2° PISO
TV 7.50 1.00 1.00 1.00 2.00 2.00 4.00 25.80
4° PISO
TV 0.60 1.00 1.00 1.00 1.00 1.00 2.00 55.50
Conector
Tubo Pvc sap 3/4 Tubo Conduit Curvas pvc sap Uniones pvc sap Conectores pvc Caja Tipo Gan Cable NH 80
Camara (und) Para Cable Cable Coaxial (m)
(m) Flexible 1/2 (m) 3/4 (und) 3/4 (und) sap 3/4(und) (und) 2.5mm2
Coaxial (und)
1° PISO
TEST 1
C9 106.06 3.60 22.00 22.00 22.00 24.00 12.00 24.00 318.18 350.76
2° PISO
TEST 2
C6 20.30 0.60 4.00 4.00 4.00 4.00 2.00 4.00 60.90 29.30
3° PISO
TEST 3
C4 20.30 0.60 4.00 4.00 4.00 4.00 2.00 4.00 60.90 29.30
4° PISO
TEST 4
C4 25.90 0.60 9.00 9.00 9.00 4.00 2.00 4.00 77.70 68.50
5° PISO
TEST 5
C2 6.50 0.30 2.00 2.00 2.00 2.00 1.00 2.00 19.50 68.50
TOTAL 188.01 5.99 43.05 43.05 43.05 38.00 19.00 39.90 564.04 573.68
CANT. / PUN 9.90 0.32 2.27 2.27 2.27 2 2.1 29.69 30.19
HOJA DE SUSTENTO DE METRADO
Tubo Pvc sap 3/4 Curvas pvc sap Uniones pvc sap Conectores pvc Caja Rectangular Caja Octogonal Cable NH 80
(m) 3/4 (und) 3/4 (und) sap 3/4(und) Pesada (und) Pesada (und) 2.5mm2
1° PISO
CACI
Tramo Hall 63.00 18.00 18.00 18.00 0.00 8.00 91.70
Tramo Pasadizo 11.85 14.00 14.00 14.00 1.00 4.00 38.05
Tramo Ofc. 30.00 12.00 12.00 12.00 0.00 5.00 56.20
Tramo Us. Inter. 1 13.30 0.00 1.00 1.00 1.00 0.00 33.50
Tramo Us. Inter. 2 18.60 7.00 7.00 7.00 0.00 3.00 37.90
Tramo Archivos 1 29.40 8.00 8.00 8.00 0.00 4.00 34.50
Tramo Archivos 2 18.70 1.00 1.00 1.00 1.00 0.00 22.90
Tramo Baño 11.00 2.00 2.00 2.00 0.00 1.00 16.50
Alarma 1 4.30 0.00 1.00 1.00 1.00 0.00 8.50
Alarma 2 4.30 0.00 1.00 1.00 1.00 0.00 31.00
Alarma 3 4.30 0.00 1.00 1.00 1.00 0.00 21.90
Avisador 6.90 0.00 1.00 1.00 1.00 0.00 35.20
Alarma 4 5.40 0.00 1.00 1.00 1.00 0.00 33.70
2° PISO
CACI
Tramo 1 8.15 4.00 4.00 4.00 0.00 2.00 42.25
Tramo 2 0.90 1.00 1.00 1.00 0.00 1.00 33.80
Tramo 3 27.00 8.00 12.00 12.00 0.00 4.00 64.00
Tramo 4 2.00 0.00 1.00 1.00 1.00 0.00 39.25
Tramo 5 2.00 0.00 1.00 1.00 1.00 0.00 40.00
Tramo 6 11.60 5.00 5.00 5.00 0.00 3.00 49.80
Tramo 7 5.60 4.00 4.00 4.00 0.00 4.00 44.20
Tramo 8 27.60 10.00 10.00 10.00 0.00 4.00 67.20
Tramo 9 19.80 4.00 4.00 4.00 0.00 2.00 66.77
Tramo 10 17.90 2.00 2.00 2.00 0.00 1.00 64.87
3° PISO
CACI
Tramo 1 24.60 8.00 8.00 8.00 0.00 3.00 61.20
Tramo 2 27.60 10.00 10.00 10.00 0.00 4.00 65.90
Tramo 3 2.00 0.00 1.00 1.00 1.00 0.00 42.40
Tramo 4 2.00 0.00 1.00 1.00 1.00 0.00 43.10
Tramo 5 5.60 4.00 4.00 4.00 0.00 4.00 44.20
Tramo 6 28.10 11.00 11.00 11.00 0.00 5.00 70.80
Tramo 7 16.90 1.00 1.00 1.00 0.00 1.00 67.40
Tramo 8 19.00 4.00 4.00 4.00 0.00 2.00 69.50
4° PISO
CACI
Tramo 1 29.10 11.00 11.00 11.00 0.00 6.00 68.50
Tramo 2 5.50 0.00 1.00 1.00 1.00 0.00 48.45
Tramo 3 4.50 0.00 1.00 1.00 1.00 0.00 47.50
Tramo 4 2.00 0.00 1.00 1.00 1.00 0.00 50.60
Tramo 5 2.00 0.00 1.00 1.00 1.00 0.00 50.80
Tramo 6 13.00 6.00 6.00 6.00 0.00 3.00 64.60
5° PISO
CACI
Tramo 1 2.20 1.00 1.00 1.00 0.00 1.00 58.90
Tramo 2 2.10 1.00 1.00 1.00 1.00 0.00 58.80
Tramo 3 1.90 1.00 1.00 1.00 1.00 0.00 58.60
Tubo Pvc sap 3/4 Curvas pvc sap Uniones pvc sap Conectores pvc Caja Tipo Gan Cable NH 80
(m) 3/4 (und) 3/4 (und) sap 3/4(und) (und) 2.5mm2
1° PISO
TEST 1
C 10 10.50 18.00 18.00 18.00 8.00 88.70
C 11 12.00 14.00 14.00 14.00 5.00 35.05
27.00 12.00 12.00 12.00 5.00 53.20