RINCIAN RENCANA ANGGARAN BIAYA

UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

13763
TOTAL HARGA
MATERIAL JASA
No J E N I S P E K E R JAAN KETERANGAN
(X Rp. 1.000) USD (X Rp. 1.000) USD

1 PEKERJAAN PERSIAPAN -

Total 1

2 ENGINEERING -

Total 2

3 PEKERJAAN SIPIL DAN STRUKTUR - -


1 PILE FOUNDATION
2 CIVIL WORKS
3 BUILDING/ SHELTER

Total 3

4 PEKERJAAN MEKANIKAL DAN PEMIPAAN - - -


A MEKANIKAL
B PEMIPAAN (Pipe, Fitting, Valve & acessories)

Total 4

5 PEKERJAAN ELEKTRIKAL - -

Total 5

6 PEKERJAAN INSTRUMENT - - -

Total 6

7 PEKERJAAN PROCESS SAFETY - -

Total 7

8 PEKERJAAN INSPEKSI, TESTING, CERTIFICATION -

Total 8

Jumlah I-VIII (x Rp. 1000) - - -


Jumlah Total Material + Jasa (x Rp. 1000) -
Jumlah Total Material + Jasa -
Keuntungan & Resiko -
Grand Total -
Akuivalane IDR - -
Keuntungan & Resiko - -
-
Terbilang: Dua Ratus Dua Puluh Tujuh Milyar Seratus Tiga Puluh Tiga Juta Rupiah

Jakarta, 6 September 2018


PT. Bangun Bejana Baja

Giandre Ottoneal Wijaya


Direktur Utama
1
UNTU

No JENIS PEKERJAAN

1 PEKERJAAN PERSIAPAN

A SITE OFFICE
Direksi Kit
1 Office Space c/w room a separator min.100 m2 during engineering and construction
C/W Working equipment furniture , electricity and water expenses ,information, telecommunication & Multimedia equipment, air
conditioning,stationary, safety material consumables & office consumables etc.
2 Warehouse c/w utilities 100 m2
Include electricity and water expenses.
3 Stock yard c/w fences & guard house min. for material & tank plate
4 Site preparation, soil fill, and site grading works
- Land clearing, Grubbing, and Stripping

(Clearing consists of felling, trimming, removing and disposing of trees, shrubs, vegetation and other objectionable materials above the ground level. Grubbing con
and disposal of all stumps, roots, snags and other vegetative matter below the ground level. Stumps and roots shall be removed to a depth of 0.3 meters below th
ground level, except that in areas of excavation, stumps and roots shall be removed to a depth of 0.3 meters below the depth of excavation.)

5 - Demolition work
(buillding demolished : Canteen, Warehouse, MCC Building, Mushola, bridge, post security, shelters, brickwall, waterpond, fence, etc approx. ± 2635m2)
6 MOBILIZATION AND DEMOBILIZATION (MANPOWER AND EQUIPMENT)
7 WORK PERMIT
8 OPERATIONAL CAR (2 UNIT) setara kijang Inova 2018 include BBM, Driver dan maintenance untuk operasional Pertamina di site dan di pusat
9 SOIL TEST

2
UNTU

No JENIS PEKERJAAN

- SPT 3 titik (2 tanki LPG dan 1 kantor) (include lab. Test)


- Sondir 3 titik (2 tanki LPG dan 1 kantor)

Total 1

2 ENGINEERING

A Detail Engineering
(Include design calculation, specification, equipment data sheet, drawing, prosedur, O&M Manual, HAZOP/HAZID, As Built Drawing)

B PROJECT MANAGEMENT

Total 2

3 PEKERJAAN SIPIL DAN STRUKTUR


I PILE FOUNDATION

1 LPG TANK FOUNDATION - 2 Tank @ 3000 MT


Pile Foundation dia 500 Spun
Pile specification:
- Minimum of compressive strength K600, min. allowable Axial load 181.7 ton, min. moment crack 12.5 tonm

2 WATER TANK FOUNDATION - 1 Tank 1500 KL


Pile Foundation dia 500 Spun

3
UNTU

No JENIS PEKERJAAN

Pile specification:
- Minimum of compressive strength K600, min. allowable Axial load 181.7 ton, min. moment crack 12.5 tonm

3 OFFICE DEPOT LPG & CONTROL ROOM Size: 2 x(10W x 30L), two story building
Pile Foundation dia 300 Spun
Pile specification:
- Minimum of compressive strength K600, min. allowable Axial load 70.75 ton, min. moment crack 3 tonm

4 WEIGHT BRIDGE SHELTER, Size: 2 x (7W x 12L) M


Pile Foundation dia 300 Spun
Pile specification:
- Minimum of compressive strength K600, min. allowable Axial load 70.75 ton, min. moment crack 3 tonm

5 SEA WATER PUMP SHELTER


Pile Foundation Steel Pipe D 711 thk 14.3
Pile specification:
- ASTM A252 grade 2 w/ epoxy coaltar coating include sacrificial anode type bracelet for 25 years design life

II CIVIL WORKS

1 - Soil fill (Compacted Condition) and site grading works


(Soil fill material required in loose condition in accordance with ASTM D2487 or ASTM D2488 with Compaction to 95 % maximum dry density in accordance with
- CBR test & modified proctor test w/ interval 1000 m2 (max.)

4
UNTU

No JENIS PEKERJAAN

2 LPG TANK FOUNDATION - 2 Tank @ 3000 MT


CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete 50 thick
- Sand bedding 50 thick

CONCRETE FOUNDATION
PILECAP
Pilecap, sizes: (4500W x 1300D) mm
f'c = 22.83 Mpa (K-275)
Rebar = D22-150
Formwork = Plywood 12 mm thickness (once used)
TIE BEAM
Pilecap, sizes: (1500W x600D) mm
f'c = 22.83 Mpa (K-275)
Rebar = D22-150
Formwork = Plywood 12 mm thickness (once used)
PEDESTAL
Pedestal: (2100W x 2100D x 450H) mm
f'c = 22.83 Mpa (K-275)
Rebar = Main bar 68-D22, 8P10-125 links

5
UNTU

No JENIS PEKERJAAN

Formwork = Plywood 12 mm thickness (once used)


DRAINAGE
Drainage (400Wx400D min.)x100 thick mm
f'c = 22.83 Mpa (K-275)
Rebar D13-200
Formwork = Plywood 12 mm thickness (once used)
CONC. FLOOR
Concrete floor 100 mm Thk (1-layers re-bar)
f'c = 22.83 Mpa (K-275)
Rebar = Wire mesh M8-150
Formwork = Plywood 12 mm thickness (once used)

3 WATER TANK FOUNDATION - 1 Tank 1500KL


CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Soil excavation
- Stone Gravel
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete 50 thick
- Sand bedding 50 thick

CONCRETE FOUNDATION

6
UNTU

No JENIS PEKERJAAN

f'c = 22.83 Mpa (K-275)


Rebar D19-150
Formwork = Plywood 12 mm thickness (once used)

4 WATER PIT (3m W x 3m L x 2.5m D)


CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete
- Sand bedding
Floor and Wall Finishes
- Concrete floor and wall waterproof coating 2mm – 3mm thickness
- Waterstop

CONCRETE FLOOR AND WALL


- Concrete floor 200 mm Thk (2-layers re-bar)
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = Plywood 12 mm thickness (once used)
- Cerucuk gelam diam. 100mm Lmin=4m
- Concrete wall 200 mm Thk (2-layers re-bar)
f'c = 22.83 Mpa (K-275)

7
UNTU

No JENIS PEKERJAAN

Rebar = D13-200
Formwork = Plywood 12 mm thickness (once used)

STEEL STRUCTURE C/W PAINT


- Hand rail pipe 2''
- Hand rail pipe 1''
Acces lader
- rebar D25

5 DIESEL OIL STORAGE TANK FOUNDATION


CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete
- Sand bedding

CONCRETE FOUNDATION
- Foot plate, sizes: (3250W x 2400L x 700D) mm
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = Plywood 12 mm thickness (once used)
- Cerucuk gelam diam. 100mm Lmin=4m

8
UNTU

No JENIS PEKERJAAN

- Pedestal: (1400W x 400D x 1450H) mm


f'c = 22.83 Mpa (K-275)
Rebar = 32-D13
Formwork = playwood 12 mm thickness (once used)
- Concrete floor 200 mm Thk (2-layers re-bar)
f'c = 22.83 Mpa (K-275)
Rebar = D10-200 one layer
Formwork = Plywood 12 mm thickness (once used)

6 PIPE SUPPORT
CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete
- Sand bedding

CONCRETE FOUNDATION
f'c = 18.6 Mpa (K-225)
Rebar = D13-200
Formwork = Plywood 12 mm thickness (once used)

STEEL STRUCTURE C/W ANCHOR BOLT & PAINT

9
UNTU

No JENIS PEKERJAAN

Material specification:
Steel structure material shall be used hot rolled structural steel shapes and plates for buildings and structures shall be mild carbon steel
ASTM A36

7 PIPE RACK ((SPAN 12M Total 2 unit, SPAN 8M total 2 unit)


CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete
- Sand bedding

CONCRETE FOUNDATION
Foot Plate, sizes: (1500W x 1500L x 300D) mm
f'c = 22.83 Mpa (K-275)
Rebar = D13-175
Formwork = playwood 12 mm thickness (once used)
Cerucuk gelam diam. 100mm Lmin=4m
Pedestal: (300W x 300D x 1000H) mm
f'c = 22.83 Mpa (K-275)
Rebar = 12-D16
Formwork = playwood 12 mm thickness (once used)

10
UNTU

No JENIS PEKERJAAN

STEEL STRUCTURE C/W ANCHOR BOLT & PAINT


Material specification:
Steel structure material shall be used hot rolled structural steel shapes and plates for buildings and structures shall be mild carbon steel
ASTM A36

8 BOX CULVERT
CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Soil excavation
- Sand fill and compaction 50 Thick
- Soil back fil & compaction

CONCRETE FOUNDATION
- Concrete Slab plate ( 3W x0.2th)m
f'c = 22.83 Mpa (K-275)
Rebar = D16-150 (two layer)
Formwork = Plywood 12 mm thickness (once used)
- Concrete wall plate (1H x0.3th)m
f'c = 22.83 Mpa (K-275)
Rebar = D16-150 (two layer)
Formwork = Plywood 12 mm thickness (once used)

9 CONCRETE ROAD
HEAVY DUTY ROAD :

11
UNTU

No JENIS PEKERJAAN

- Main road, Parking area, operation area


f'c = 24.9 Mpa (K-300), Concrete Slab plate ( 4.5W x 6Lx 0.2t)m
Rebar = Wiremesh M8-150 (two layer)
Dowel transversal joint D19-450. longitudinal joint D16-450
Basecourse 0.3mm thk compacted CBR 80%, subgrade well compacted 95% soil dry density CBR 6%.
Formwork = Plywood 12 mm thickness (once used)

LIGHT DUTY ROAD :


- Inspection road
f'c = 24.9 Mpa (K-300), Concrete Slab plate ( 5W x 6Lx 0.15t)m
Rebar = Wiremesh M8-150 (one layer)
Dowel transversal joint D16-450. longitudinal joint D16-450
Basecourse 0.2mm thk compacted CBR 80%, subgrade well compacted 95% soil dry density CBR 6%.
Formwork = Plywood 12 mm thickness (once used)

GRAVEL : 100mm thk


TURFING : area office
Cansteen :15.30.40

10 DRAINAGE
- Ditch ( 600W x400D min. x125 thick)mm
CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Soil excavation

12
UNTU

No JENIS PEKERJAAN

- Sand fill and compaction 50mm Thick


- Lean conc. 50mm Thick
- Soil back fil & compaction
CONCRETE FOUNDATION
f'c = 18,675 Mpa (K-225)
Rebar = D13-150 (1-layer)
Formwork = Plywood 12 mm thickness

- Ditch ( 400W X400D min.x100 thick)mm


CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Soil excavation
- Sand fill and compaction 50mm Thick
- Lean conc. 50mm Thick
- Soil back fil & compaction
CONCRETE FOUNDATION
f'c = 18,675 Mpa (K-225)
Rebar = D13-200 (1-layer)
Formwork = Plywood 12 mm thickness

11 PRECAST FENCE H=2.4M


CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Soil excavation

13
UNTU

No JENIS PEKERJAAN

- Sand fill and compaction 50 Thick


- Soil back fill & compaction
- Stone Masonry foundation 1:3
- Precast fence H=2.4m c/w barbed wire 5 layer

CONCRETE FOUNDATION
- Concrete tie beam ( 0.15W x0.20thk)m
f'c = 18.675 Mpa (K-225)
Rebar = 4P12
Formwork = Plywood 12 mm thickness (once used)

12 BRC FENCE H=2.0M


CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Soil excavation
- Sand fill and compaction 50 Thick
- Soil back fill & compaction
- Stone Masonry foundation 1:3
- BRC fence H=2.0m

13 GATE 2.0 M
Gate h=2.0m, material steel finish paint c/w barbed wire 5 layer and accessories

14 DIRECT BURRIED CABLE

14
UNTU

No JENIS PEKERJAAN

CIVIL WORKS
- Soil excavation
- Soil back fill & compaction
- Brick protection cover

15 DUCT BANK
CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Soil excavation
- Sand fill and compaction 50 Thick
- Lean conc. 50mm Thick
- Soil back fill & compaction
- PVC 4"

CONCRETE FOUNDATION
f'c = 18.675 Mpa (K-225)
Rebar = D10-200
Formwork = Plywood 12 mm thickness

16 LIGHTING FOUNDATION
CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Soil excavation
- Soil backfill and compaction

15
UNTU

No JENIS PEKERJAAN

Lean concrete & Sandbedding


- Lean Concrete
- Sand bedding

CONCRETE FOUNDATION
- Foot plate, sizes: (1200W x 1200L x 250D) mm
f'c = 18.675 Mpa (K-225)
Rebar = D13-250
Formwork = Plywood 12 mm thickness (once used)
- Pedestal: (500W x 500D x750H) mm
f'c = 18.675 Mpa (K-225)
Rebar = 12-D13
Formwork = playwood 12 mm thickness (once used)

MLA & GANGWAY


MLA & GANGWAY FOUNDATIONS
- CONCRETE FOUNDATION (include cheaping ext'g slab )
PEDESTAL (1600W x 1600L x300 H) mm
f'c = 35 Mpa (K-430)
Rebar = Hilty HY with rebar 42D20 main bar
Formwork = Plywood 12 mm thickness (once used)
- CHEMICAL ANCHOR HSA M20

III BUILDING / SHELTER

16
UNTU

No JENIS PEKERJAAN

1 OFFICE DEPOT LPG & CONTROL ROOM Size: 2 x(10W x 30L), two story building
Office, control room, canteen, lab, mushola
CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete 50 Thick
- Sand bedding 50 Thick
Concrete U ditch W=300, H=400, T=100 (one layer 10-200)

ARCHITECTURE & FINISHING WORK


Brickwall, Plastering & Smooth surface plastering ('acian')
- Brickwall and thin bed mortar, size: (4.5mtr H x150mm thk) .
- Plastering & smooth surface, 15mm thk
Glass wall panel
- Partition wall double gypsum
- Glass panel t=10mm tempered include sealer (weather rubber)
- Glass panel t=12 mm tempered include sealer (weather rubber), allumunium frame, wire sling, location canopy
Floor and Wall Finishes
- Supply and install glazed ceramic tiles (or equal approved) sizes (600x600)mm
- Supply and install un-glazed ceramic tiles sizes (400x400)mm, on toilet room
Wall Finishes ceramic tile fixed w/mortar and tile grout

17
UNTU

No JENIS PEKERJAAN

- Supply and install glazed ceramic tiles sizes (200x200) mm, hight: 2.1 m on wall rooms: toilet
Raised Floor
- UPS room, Panel room, Server room Height 300, panel 600x600 mm
Ceiling Finishes
Complete w/ metal suspension system, metal casing, ceiling joint and all necessary fixing
accessories as specified
- Acoustic Mineral Fiber Board size (600x600) mm or (600x1200) mm of 15mm th'k (min.)
- Moisture resistance mineral Fiber Board or 6mm th'k Glass Reinforced Concrete (GRC) board
Painting Works and Coating
- Prepare and apply one coat primer and two finishing coats of emulsion paint to interior surface
- Prepare and apply one coat primer and two finishing coats of watershield emulsion paint to exterior surface
- Prepare and apply waterproofing finishing coats to top of concrete roof surface
Doors and Windows c/w all necessary fixing accessories.
Glass door & hot-dipgalvanized aluminum frame matterial
- Tempered glass door, double leaf, swing opening, and size: 1.6 m W x 2.1m H
- Tempered glass door, single leaf, swing opening, and size: 0.8m W x 2.1m H
- Clear glass 6 mm thk (1,3 x 0,9) m
PVC panel door and frame c/w all necessary fixing accessories.
Exhaust fan

SANITARY FIXTURES
Supply and install sanitary Appliances complete including all necessary fitting accessories.
- Closet (seat type)
- Urinoir

18
UNTU

No JENIS PEKERJAAN

- Jet washer
- Shower
- Wastafel
Roof drain
- Downspout PVC pipe 4" dia. & fittings
- Strainer/ roof filter
Plumbing
- Conc. Septicktank and absorption system (3m L x 1.8m W x 2.150m H, Thickness : 150 mm)
- pipe 2" dia. & fittings
- pipe 4" dia. & fittings
- Water tank 4KL

REINFORCED CONCRETE
FOOTPLATE
- Pile Cap, sizes: (1200W x 1200L x 250D) mm
f'c = 22.83 Mpa (K-275)
Rebar D13-200
Formwork = Plywood 12 mm thickness (once used)
- Cerucuk gelam diam. 100mm Lmin=4m
PILECAP
- Pile Cap, sizes: (900W x 900L x 600D) mm
f'c = 22.83 Mpa (K-275)
Rebar D16-200
Formwork = Plywood 12 mm thickness (once used)

19
UNTU

No JENIS PEKERJAAN

PEDESTAL
- Pedestal : (400W x 400D x 300H) mm
f'c = 22.83 Mpa (K-275)
Rebar 16D16
Formwork = Plywood 12 mm thickness (once used)
COLUMN
- Pedestal : (400W x 400D x 9000H) mm
f'c = 22.83 Mpa (K-275)
Rebar 16D16
Formwork = Plywood 12 mm thickness (once used)
GROUND FLOOR & FOUNDATION
- Main beam (GB1) (300Wx600D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 8D19
Formwork = Plywood 12 mm thickness (once used)
- Main beam (GB2) 300Wx500D mm
f'c = 22.83 Mpa (K-275)
Rebar = 8D16
Formwork = Plywood 12 mm thickness (once used)
- Second beam (GB3) 250Wx500D mm
f'c = 22.83 Mpa (K-275)
Rebar = 6D16
Formwork = Plywood 12 mm thickness (once used)
- Second beam (GB4) 200Wx350D mm

20
UNTU

No JENIS PEKERJAAN

f'c = 22.83 Mpa (K-275)


Rebar = 5-D16
Formwork = Plywood 12 mm thickness (once used)
- Concrete floor 100 mm Thk (1-layers rebar)
f'c = 22.83 Mpa (K-275)
Rebar = M8-150
Formwork = Plywood 12 mm thickness (once used)
SECOND FLOOR
- Main beam (B1) (300Wx600D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 8D19
Formwork = Plywood 12 mm thickness (once used)
- Main beam (B2) 300Wx500D mm
f'c = 22.83 Mpa (K-275)
Rebar = 8D16
Formwork = Plywood 12 mm thickness (once used)
- Second beam (B3) 250Wx500D mm
f'c = 22.83 Mpa (K-275)
Rebar = 6D16
Formwork = Plywood 12 mm thickness (once used)
- Second beam (B4) 200Wx350D mm
f'c = 22.83 Mpa (K-275)
Rebar = 5-D16
Formwork = Plywood 12 mm thickness (once used)

21
UNTU

No JENIS PEKERJAAN

- Concrete floor 120 mm Thk (2-layers rebar)


f'c = 22.83 Mpa (K-275)
Rebar = 10-175
Formwork = playwood 12 mm thickness (one used)
ROOF ( TOC. EL. + 9.0)
- Main beam (RB1) (300Wx500D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 7D19
Formwork = Plywood 12 mm thickness (once used)
- Main beam (RB2) 300Wx450D mm
f'c = 22.83 Mpa (K-275)
Rebar = 7D16
Formwork = Plywood 12 mm thickness (once used)
- Second beam (RB3) 250Wx500D mm
f'c = 22.83 Mpa (K-275)
Rebar = 6D16
Formwork = Plywood 12 mm thickness (once used)
- Second beam (RB4) 200Wx350D mm
f'c = 22.83 Mpa (K-275)
Rebar = 5-D16
Formwork = Plywood 12 mm thickness (once used)
- Concrete Roof 100 mm Thk (1-layers re-bar)
f'c = 22.83 Mpa (K-275)
Rebar = P10-100

22
UNTU

No JENIS PEKERJAAN

Formwork = playwood 12 mm thickness (one used)


- Conc. parapet (80Thk x 600H) mm (1-layer bar)
f'c = 22.83 Mpa (K-275)
Rebar = P10-200
Formwork = playwood 12 mm thickness (one used)
STAIR CASE
- Staircase (1.5 m W x 0.15 m thk floor)
f'c = 22.83 Mpa (K-275)
Rebar = D13-150
Formwork = playwood 12 mm thickness (one used)

STRUCTURAL STEEL C/W PAINT


Material specification:
Steel structure material shall be used hot rolled structural steel shapes and plates for buildings and structures shall be mild carbon steel
ASTM A36
- Steel emergency w/ grating 25mm, plat, bolt, anchor, etc
- Water tower steel frame w/ grating 25mm, plat, bolt, anchor, etc

2 LPG PUMP SHELTER Size: (6W x 12L) M

CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Soil excavation
- Soil backfill and compaction

23
UNTU

No JENIS PEKERJAAN

Lean concrete & Sandbedding


- Lean Concrete
- Sand bedding
Concrete U ditch W=300, H=400, T=100 (one layer 10-200)

REINFORCED CONCRETE
Shelter foundation
- Foot Plate fnd size: (1.6W x 1.6L x 0.3Thk) M
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)
- Pedestal size: (0.3W x 0.3L x 1.0 Depth) M
f'c = 22.83 Mpa (K-275)
Rebar = 8D13
Formwork = playwood 12 mm thickness (one used)
- Grade beam (TB1) 250Wx400D mm
f'c = 22.83 Mpa (K-275)
Rebar = 6-D13
Formwork = playwood 12 mm thickness (one used)
- Conc. floor 150 mm Thk (2-layer bar)
f'c = 22.83 Mpa (K-275)
Rebar =10-100
Formwork = playwood 12 mm thickness (one used)
- Terrace Conc. floor 100 mm Thk (1-layer bar)

24
UNTU

No JENIS PEKERJAAN

f'c = 22.83 Mpa (K-275)


Rebar =10-200
Formwork = playwood 12 mm thickness (one used)
- Terrace Conc. floor 100 mm Thk (1-layer bar)
f'c = 22.83 Mpa (K-275)
Rebar = 10-200
Formwork = playwood 12 mm thickness (one used)
Concrete block foundation
- Pump Foundation (2.5m x1m x 0.6mThk)
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)
Cerucuk gelam diam. 100mm Lmin=4m
- Cable trench (L=12 m, w= 0.4 m, H=0.4 m, T= 0.1 m)
f'c = 22.83 Mpa (K-275)
Rebar = 10-200
Formwork = playwood 12 mm thickness (one used)

STRUCTURAL STEEL
Steel structure c/w paint
- Column H-200x200x8x12
- Lateral Beam SH-250x125x6x9
- Rafter WF-250x125x6x9
- Overhange Beam SH-200x100x5.5x8

25
UNTU

No JENIS PEKERJAAN

- Runway Girder SH-250x125x6x9


- Purlin Lip.Channel C-150x65x20x3.2
- Sagrod dia 10 mm
- Wind Brace dia 16 mm
- Fascia frame angle L50x50x4
Gutter frame plate bar 30x3
- Base plate 24 mm thk.
- End plate 14 mm thk
- Stiffener plate 8 mm thk
- Cleat Plate 135mmx120mm, 8 mm thk
- Anchor bolt Dia M16
- HTB Dia 16 mm A325
- BB Dia 12 mm A325

-Grating
Strip plat 5mmx25mm

Roof and wall


- Roof corrugated metal sheet, Galvalume 0.55 mm thk
efective wide 950 mm, heigth of wave 38 mm

Flashing, Gutter and Downspout, Fascia


- Ridge cap
- Gutter metal sheet

26
UNTU

No JENIS PEKERJAAN

- Down spout galv. St. pipe Ø 4" STD.& and fitting include clamps
- Roof drain galv. Stl. strainer
- Fascia (zincalume)

3 FILLING SHED SHELTER 3 Bay, Size: (18 W x 12L) M

CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete
- Sand bedding
Concrete U ditch W=300, H=400, T=100 (one layer 10-200)

REINFORCED CONCRETE
Shelter foundation, shelter size: (24 W x 12L) M
- Foot plate size: (1.5W x 1.5L x 0.3Thk) M
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)
- Pedestal size: (0.3W x 0.3L x 1.4 Depth) M
f'c = 22.83 Mpa (K-275)
Rebar = 8D13

27
UNTU

No JENIS PEKERJAAN

Formwork = playwood 12 mm thickness (one used)


- Grade beam (250Wx350D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 4-D13
Formwork = playwood 12 mm thickness (one used)
- Conc. Floor (4.5m x15m x 0.2m Thk)
f'c = 22.83 Mpa (K-300)
Rebar = M10-150 (two layers)
Formwork = playwood 12 mm thickness (one used)
- Conc. separator (1.5m x15m x 0.25 m thk)
f'c = 22.83 Mpa (K-275)
Rebar = D10-200
Formwork = playwood 12 mm thickness (one used)
BARRIER
- Barrier Wall
f'c = 22.83 Mpa (K-275)
Rebar = D10-200
Formwork = playwood 12 mm thickness (one used)
- Barrier Wall
f'c = 22.83 Mpa (K-275)
Rebar = D10-200
Formwork = playwood 12 mm thickness (one used)
- Barrier Slab
f'c = 22.83 Mpa (K-275)

28
UNTU

No JENIS PEKERJAAN

Rebar = D10-200
Formwork = playwood 12 mm thickness (one used)

STRUCTURAL STEEL
Steel structure c/w paint
- Column WF-250x250x9x14
- Column WF-250x250x9x14
- Truss
Beam 100x50x5x6
Angle L50x50x5
Angle L50x50x5
- Rafter WF-250x125x6x9
- Overhange Beam WF-150x75x5x7
- Purlin Lip.Channel C-150x65x20x2.3
- Sagrod dia 10 mm
- Wind Brace dia 16 mm
- Fascia frame angle C100x50x20x3.2
Gutter frame flat-bar 30x3
- Base plate 16 mm thk.
- End plate 14 mm thk
- End plate 14 mm thk
- Stiffener plate 9 mm thk
Stiffener plate 7 mm thk
- Cleat Plate 135mmx120mm, 8mm thk

29
UNTU

No JENIS PEKERJAAN

- Anchor bolt Dia 16


- HTB Dia 16 mm A325
- BB Dia 12 mm A325

-Grating
Strip plat 5mmx50mm

Roof and Wall


- Roof corrugated metal sheet, Galvalume 0.45 mm thk
efective wide 960 mm, heigth of wave 38 mm

Flashing, Gutter and Downspout


- Ridge cap
- Gutter metal sheet
- Down spout galv. St. pipe Ø 4" STD.& and fitting include clamps
- Roof drain galv. Stl. strainer
Fascia ACP 4mm thk

4 INSTRUMENT AIR SHELTER, Size: (5W x 6L) M

CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Soil excavation
- Soil backfill and compaction

30
UNTU

No JENIS PEKERJAAN

Lean concrete & Sandbedding


- Lean Concrete
- Sand bedding
Concrete U ditch W=300, H=400, T=100 (one layer 10-200)

REINFORCED CONCRETE
Shelter foundation, shelter size: (5W x 6L) M
- Foot plate size: (1.35 W x 1.35L x 0.3Thk) M
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)
- Pedestal size: (0.35W x 0.35L x 1.3Depth) M
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)
- Grade beam (250Wx300D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 8-D13
Formwork = playwood 12 mm thickness (one used)
- Grade beam (250Wx300D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 8-D13
Formwork = playwood 12 mm thickness (one used)
- Conc. floor 150 mm Thk (1-layer bar)

31
UNTU

No JENIS PEKERJAAN

f'c = 22.83 Mpa (K-275)


Rebar =M10-150
Formwork = playwood 12 mm thickness (once used)
- Terrace Conc. floor 100 mm Thk (1-layer bar)
f'c = 22.83 Mpa (K-275)
Rebar =10-150
Formwork = playwood 12 mm thickness (one used)
- Terrace Conc. floor 100 mm Thk (1-layer bar)
f'c = 22.83 Mpa (K-275)
Rebar = 10-150
Formwork = playwood 12 mm thickness (one used)
Concrete block foundation (compressor FDN)
- Conc. Block FDN (1.5m x1.5m x 0.65mThk)
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)
- Cerucuk gelam diam. 100mm Lmin=4m
Instrument air FDN
- Conc. Block FDN (2.5m x2.5m x 0.5mThk)
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)
- Pedestal size: (0.35W x 0.35L x 1.3Depth) M
f'c = 22.83 Mpa (K-275)

32
UNTU

No JENIS PEKERJAAN

Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)

STRUCTURAL STEEL
Steel structure c/w paint
- Column WF-200x200x8x12
- Lateral Beam
Beam 2L 50X50X5
Angle L50x50x5
Angle L50x50x5
- Rafter WF-200x100x5.5x8
- Overhange Beam WF-150x75X5x7
- Purlin Lip.Channel C-150x65x20x2.3
- Sagrod dia 10 mm
- Wind Brace dia 16 mm
- Fascia frame angle L50x50x4
- Gutter frame flat-bar 30x3
- Base plate 16 mm thk.
- End plate 14 mm thk
- End plate 14 mm thk
- Stiffener plate 8 mm thk
Stiffener plate 7 mm thk
- Cleat Plate 135mmx120mm, 8mm thk
- Anchor bolt Dia 16

33
UNTU

No JENIS PEKERJAAN

- HTB Dia 16 mm A325


- BB Dia 12 mm A325

- Roof corrugated metal sheet, Galvalume 0.55 mm thk


efective wide 950 mm, heigth of wave 38 mm

Flashing, Gutter and Downspout


- Ridge cap
- Gutter metal sheet
- Down spout galv. St. pipe Ø 4" STD.& and fitting include clamps
- Roof drain galv. Stl. strainer
- Fascia (zincalume)

5 WEIGHT BRIDGE SHELTER, Size: 2 x (7W x 12L) M

CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete
- Sand bedding

REINFORCED CONCRETE

34
UNTU

No JENIS PEKERJAAN

Shelter foundation, shelter size: 2*(7W x 12L) M


- Weight bridge Foundation
Pile cap, size (1.2w X 1.2L X 0.7D)m
f'c = 22.83 Mpa (K-275)
Rebar = D16-150
Formwork = playwood 12 mm thickness (one used)
- Side wall (1.6W x 10L x 0.2D)m
f'c = 22.83 Mpa (K-275)
Rebar = D13-150
Formwork = playwood 12 mm thickness (one used)
- Front and back wall (1.6W x 3.5L x 0.4D)m
f'c = 22.83 Mpa (K-275)
Rebar = D16-150
Formwork = playwood 12 mm thickness (one used)
- Slab Foundation (3.5W x 10L x 0.2D)m
f'c = 22.83 Mpa (K-275)
Rebar = D13-150
Formwork = playwood 12 mm thickness (one used)

STRUCTURAL STEEL
- Column WF-300x300x10x15
- Lateral Beam
Beam UNP100X50X5X7.5
Angle L50x50x5

35
UNTU

No JENIS PEKERJAAN

Angle L50x50x5
- Rafter SH-350x175x7x11
- Beam (RIDGE) UNP- 200x80x7.5x11
- Overhange Beam SH-200x100x5.5x8
- Purlin Lip.Channel C-150x65x20x2.3
- Sagrod dia 10 mm
- Wind Brace dia 16 mm
- Fascia frame angle C100x50x20x3.2
- Gutter frame flat-bar 30x3
- Base plate 16 mm thk.
- End plate 18 mm thk
- End plate 14 mm thk
- Stiffener plate 11 mm thk
- Stiffener plate 8 mm thk
- Cleat Plate 135mmx120mm, 8 mm thk
- Anchor bolt Dia 22
- HTB Dia 20 mm A325
- HTB Dia 16 mm A325
- BB Dia 12 mm A325

-Grating
Strip plat 5mmx50mm
Strip plat 5mmx25mm

36
UNTU

No JENIS PEKERJAAN

Roof and Wall


- Roof corrugated metal sheet, Galvalume 0.55 mm thk
efective wide 950 mm, heigth of wave 38 mm

Flashing, Gutter and Downspout


- Ridge cap
- Gutter metal sheet
- Down spout galv. St. pipe Ø 4" STD.& and fitting include clamps
- Roof drain galv. Stl. strainer
Fascia ACP 4mm thk

6 WEIGHT BRIDGE HOUSE KEEPER, Size: (4W x 4L) M

CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Site Clearing
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete
- Sand bedding
Concrete U ditch W=300, H=400, T=100 (one layer 10-200)

ARCHITECTURE & FINISHING WORK

37
UNTU

No JENIS PEKERJAAN

Brickwall, Plastering & Smooth surface plastering ('acian')


- Brickwall and thin bed mortar, size: (3.38 mtr H x150mm thk) .
- Plastering & smooth surface, 15mm thk
Floor and Wall Finishes
- Supply and install glazed ceramic tiles (or equal approved) sizes (400x400)mm
- Supply and install un-glazed ceramic tiles sizes (200x200)mm, on toilet room
Wall Finishes ceramic tile fixed w/mortar and tile grout
- Supply and install glazed ceramic tiles sizes (200x250) mm, hight: 2.1 m on wall rooms: toilet
Ceiling Finishes
Complete w/ metal suspension system, metal casing, ceiling joint and all necessary fixing
accessories as specified
- Acoustic Mineral Fiber Board size (600x600) mm or (600x1200) mm of 15mm th'k (min.)
- Moisture resistance mineral Fiber Board or 6mm th'k Glass Reinforced Concrete (GRC) board
Painting Works and Coating
- Prepare and apply one coat primer and two finishing coats of emulsion paint to interior surface
- Prepare and apply one coat primer and two finishing coats of watershield emulsion paint to exterior surface
- Prepare and apply waterproofing finishing coats to top of concrete roof surface
Doors and Windows...c/w all necessary fixing accessories.
Glass door & hot-dipgalvanized aluminum frame matterial
- Tempered glass door, single leaf, swing opening, and size: (0.7 m W) x 2.1 m H, location at Entrance
Glass windows& deep galvanized aluminium matterial
- Fixed glass fix thick 5mm include weather sealer rubber, and size: 1.35 m W x 3.5m H location at locket
- Fixed glass fix thick 5 mm include weather sealer rubber, and size: 1.2 m W x 1.35 m
PVC panel door and frame c/w all necessary fixing accessories.

38
UNTU

No JENIS PEKERJAAN

Exhaus fan

SANITARY FIXTURES
Supply and install sanitary Appliances complete including all necessary fitting accessories.
- Closet (seat type)
- Jet washer
Roof drain
- Downspout PVC pipe 4" dia. & fittings
- Strainer/ roof filter
Plumbing
- Conc. Septicktank and absorption system (1.2m L x 1.2m W x 1.2m H, Thickness : 125 mm)
- pipe 2" dia. & fittings
- pipe 4" dia. & fittings

REINFORCED CONCRETE
- Shallow fnd size: (1.2W x 1.2L x 0.3Thk) M
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)
Cerucuk gelam diam. 100mm Lmin=4m
- Pedestal size: (0.2W x 0.2L x 1.15) Depth) M
f'c = 22.83 Mpa (K-275)
Rebar = 8D13
Formwork = playwood 12 mm thickness (one used)

39
UNTU

No JENIS PEKERJAAN

- Grade beam (200Wx300D) mm


f'c = 22.83 Mpa (K-275)
Rebar = 8-D13
Formwork = playwood 12 mm thickness (one used)
- Column : (200W x 200D x 3500H) mm
f'c = 22.8 Mpa (K-275)
Rebar = 8D13
Formwork = playwood 12 mm thickness (one used)
- Main-beam (200Wx300D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 6-D13
Formwork = playwood 12 mm thickness (one used)
- cantilever-beam (200Wx250D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 4-D13
Formwork = playwood 12 mm thickness (one used)
- Concrete floor 100 mm Thk (1-layers re-bar)
f'c = 22.83 Mpa (K-275)
Rebar = M8-150
Formwork = playwood 12 mm thickness (one used)
- Concrete Roof 100 mm Thk (1-layers re-bar)
f'c = 22.83 Mpa (K-275)
Rebar = P10-150
Formwork = playwood 12 mm thickness (one used)

40
UNTU

No JENIS PEKERJAAN

7 ODORIZER SHELTER, Size: (4W x 5L) M

CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Site Clearing
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete
- Sand bedding

REINFORCED CONCRETE
Shelter foundation
- Shallow fnd size: (1.5W x 1.5L x 0.3Thk) M
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (once used)
- Pedestal size: (0.25W x 0.25L x 1.0 Depth) M
f'c = 22.83 Mpa (K-275)
Rebar = 8D13
Formwork = playwood 12 mm thickness (once used)
- Grade beam (250Wx300D) mm
f'c = 22.83 Mpa (K-275)

41
UNTU

No JENIS PEKERJAAN

Rebar = 6-D13
Formwork = playwood 12 mm thickness (once used)
- Conc. floor 150 mm Thk (2-layer bar)
f'c = 22.83 Mpa (K-275)
Rebar =D10-125 (2 layer)
Formwork = playwood 12 mm thickness (once used)

STRUCTURAL STEEL
Steel structure c/w paint
- Column WF-150x150x7x10
- Lateral Beam WF-150x75x5x7
- Rafter WF-150x75x5x7
- Purlin Lip.Channel C-150x65x20x2.3
- Sagrod dia 10 mm
- Wind Brace dia 16 mm
- Gutter frame flat-bar 30x3
- Base plate 16 mm thk.
- End plate 14 mm thk
- Stiffener plate 7 mm thk
- Cleat Plate 135mmx120mm
- Anchor bolt Dia 16
- HTB Dia 16 mm A325
- BB Dia 12 mm A325

42
UNTU

No JENIS PEKERJAAN

Roof and Wall


- Roof corrugated metal sheet, Galvalume 0.55 mm thk
efective wide 950 mm, heigth of wave 38 mm

Flashing, Gutter and Downspout


- Ridge cap
- Gutter metal sheet
- Down spout galv. St. pipe Ø 4" STD.& and fitting include clamps
- Roof drain galv. Stl. strainer

8 ELECTRICAL HOUSE & GENSET, Size: (10W x 18L) M

CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Site Clearing
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete
- Sand bedding
Concrete U ditch W=300, H=400, T=100 (one layer 10-200)

ARCHITECTURE & FINISHING WORK


Brickwall, Plastering & Smooth surface plastering ('acian')

43
UNTU

No JENIS PEKERJAAN

- Brickwall and thin bed mortar,


- Plastering & smooth surface, 15mm thk
Floor and Wall Finishes
- Supply and install glazed ceramic tiles (or equal approved) sizes (300x300)mm
Painting Works and Coating
- Prepare and apply one coat primer and two finishing coats of emulsion paint to interior surface
- Prepare and apply one coat primer and two finishing coats of watershield emulsion paint to exterior surface
- Prepare and apply waterproofing finishing coats to top of concrete roof surface
Doors and Windows. c/w all necessary fixing accessories.
steel door fnish paint
- Steel door, double leaf, swing opening, and size: (2m W) x 2.1 m H, location at: panel MCC room
- Steel door, double leaf, swing opening, and size: (1m W) x 2.1 m H, location at: genset room
- Steel shutter dor : (3m W) x 3 m H, location at: genset room

SANITARY FIXTURES
Roof drain
- Downspout PVC pipe 4" dia. & fittings
- Strainer/ roof filter

REINFORCED CONCRETE
FOOT PLATE
- Foot plate-1, sizes: (2300W x 2300L x 350D) mm
f'c = 22.83 Mpa (K-275)
Rebar = D13-150

44
UNTU

No JENIS PEKERJAAN

Formwork = Plywood 12 mm thickness (once used)


- Cerucuk gelam diam. 100mm Lmin=4m

PEDESTAL
- Pedestal : (400W x 400D x 1650H) mm
f'c = 22.83 Mpa (K-275)
Rebar =
Formwork = Plywood 12 mm thickness (once used)

COLUMN
- Column : (400W x 400D x 5000H) mm
f'c = 22.83 Mpa (K-275)
Rebar =
Formwork = Plywood 12 mm thickness (once used)

GROUND FLOOR
- Main T-beam (300Wx600D) mm
f'c = 22.83 Mpa (K-275)
Rebar =
Formwork = Plywood 12 mm thickness (once used)
- Main T-beam (300Wx400D) mm
f'c = 22.83 Mpa (K-275)
Rebar =
Formwork = Plywood 12 mm thickness (once used)

45
UNTU

No JENIS PEKERJAAN

- Concrete floor 100 mm Thk (1-layers rebar)


f'c = 22.83 Mpa (K-275)
Rebar = D10-100
Formwork = Plywood 12 mm thickness (once used)
- Terrace Conc. floor 100 mm Thk (1-layer bar)
f'c = 22.83 Mpa (K-275)
Rebar = D10-200
Formwork = playwood 12 mm thickness (once used)
- Terrace stiffener beam (150W x 200D)mm
f'c = 22.83 Mpa (K-275)
Rebar = 4-D10
ROOF ( TOC. EL. + 8.3)
- Main T-beam (300Wx500D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 8-D19
Formwork = playwood 12 mm thickness (one used)
- Secondary T-beam (250Wx400D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 8-D19
Formwork = playwood 12 mm thickness (one used)
- Concrete Roof 100 mm Thk (1-layers re-bar)
f'c = 22.83 Mpa (K-275)
Rebar = M8-100
Formwork = playwood 12 mm thickness (one used)

46
UNTU

No JENIS PEKERJAAN

- Conc. parapet (80Thk x 800H) mm (1-layer bar)


f'c = 22.83 Mpa (K-275)
Rebar = D10-200
Formwork = playwood 12 mm thickness (one used)
GENSET FOUNDATION ( 2 EA)
- Foot plate-1, sizes: (4500W x 2500L x 700D) mm
f'c = 22.83 Mpa (K-275)
Rebar = D16-100
Formwork = Plywood 12 mm thickness (once used)
- Cerucuk gelam diam. 100mm Lmin=4m

9 COOLING PUMP SHELTER (6W x12L) M


Civil works
Site preparation-install of bowplank and wood stiffener
- Site Clearing
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete
- Sand bedding
Concrete U ditch W=300, H=400, T=100 (one layer 10-200)
- Soil excavation
- Soil backfill and compaction
- Lean Concrete

47
UNTU

No JENIS PEKERJAAN

- Sand bedding

REINFORCED CONCRETE
- Shallow fnd size: (1.35W x 1.35L x 0.35Thk) M
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = Plywood 12 mm thickness (once used)
- Pedestal size: (0.25W x 0.35L x 1.5Depth) M
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = Plywood 12 mm thickness (once used)
- Tie beam (TB1) 250Wx400D mm
f'c = 22.83 Mpa (K-275)
Rebar = 6-D13
Formwork = Plywood 12 mm thickness (once used)
- Conc. floor 150 mm Thk (1-layer bar)
f'c = 22.83 Mpa (K-275)
Rebar =D13-150
Formwork = Plywood 12 mm thickness (once used)
- Terrace Conc. floor 100 mm Thk (1-layer bar)
f'c = 22.83 Mpa (K-275)
Rebar =Ø10-200
Formwork = Plywood 12 mm thickness (once used)
- Terrace Conc. floor 100 mm Thk (1-layer bar)

48
UNTU

No JENIS PEKERJAAN

f'c = 22.83 Mpa (K-275)


Rebar =Ø10-200
Formwork = Plywood 12 mm thickness (once used)
- Terrace stiffener beam (150W x 200D)mm
f'c = 22.83 Mpa (K-275)
Rebar = 4-D13
Formwork = Plywood 12 mm thickness (once used)
- Terrace stiffener beam (150W x 250D)mm
f'c = 22.83 Mpa (K-275)
Rebar = 4-D13
Formwork = Plywood 12 mm thickness (once used)
Fire Water Pump foundation
- Conc. Block FDN (2.5m x1m x 0.65mThk)
f'c = 22.83 Mpa (K-275)
Rebar = D16-175
Formwork = Plywood 12 mm thickness (once used)
- Cerucuk gelam diam. 100mm Lmin=4m
- Concrete U ditch W=300, H=400, T=100 (one layer 10-200)
f'c = 22.83 Mpa (K-275)
Rebar = Ø10-200
Formwork = Plywood 12 mm thickness (once used)
Jockey pump foundation
- Block Fdn, sizes: (800W x 800L x 650D) mm
f'c = 22.83 Mpa (K-275)

49
UNTU

No JENIS PEKERJAAN

Rebar = D13-125
Formwork = playwood 12 mm thickness (once used)
Steel structure c/w paint
- Column WF-250x125x6x9
- Lateral Beam WF-200x100x5.5x8
- Rafter WF-200x100x5.5x8
- Overhange Beam WF-200x100X5.5x8
- Purlin Lip.Channel C-150x65x20x3.2
- Sagrod dia 10 mm
- Wind Brace dia 16 mm
- Gutter frame flat-bar 30x3
- Base plate 16 mm thk.
- End plate 12 mm thk
- Stiffener plate 9 mm thk
- Cleat Plate 135mmx120mm
- Anchor bolt Dia 22
- HTB Dia 16 mm A325
- BB Dia 12 mm A325
- Grating t=25mm, width 400 mm, galvanized
Sliding Steel Door, Dim 2 x 1.5 m x 2 m, L 65 x 65, Plate thick 3 mm, Frame C 150, C/w Anchor Bolt, and accessories

Roof and Wall


- Roof corrugated metal sheet, Galvalume 0.55 mm thk
efective wide 950 mm, heigth of wave 38 mm

50
UNTU

No JENIS PEKERJAAN

Chainlink Wiremesh for Wall


Brickwall include Plester, 500 mm height

Flashing, Gutter and Downspout


- Ridge cap
- Gutter metal sheet
- Down spout galv. St. pipe Ø 4" STD.& and fitting include clamps
- Roof drain galv. Stl. strainer

10 METERING SHELTER, Size: (5W x 10L) M

CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Site Clearing
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete
- Sand bedding
Concrete U ditch W=300, H=400, T=100 (one layer 10-200)

REINFORCED CONCRETE
Shelter foundation
- Shallow fnd size: (1.5W x 1.5L x 0.3Thk) M

51
UNTU

No JENIS PEKERJAAN

f'c = 22.83 Mpa (K-275)


Rebar = D13-200
Formwork = playwood 12 mm thickness (once used)
- Pedestal size: (0.25W x 0.35L x 1.0 Depth) M
f'c = 22.83 Mpa (K-275)
Rebar = 8D13
Formwork = playwood 12 mm thickness (once used)
- Grade beam (250Wx400D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 4-D13
Formwork = playwood 12 mm thickness (once used)
- Conc. floor 120 mm Thk (2-layer bar)
f'c = 22.83 Mpa (K-275)
Rebar =D10-100
Formwork = playwood 12 mm thickness (once used)
- Terrace Conc. floor 100 mm Thk (1-layer bar)
f'c = 22.83 Mpa (K-275)
Rebar =M8-100
Formwork = playwood 12 mm thickness (once used)
- Terrace stiffener beam (150W x 200D)mm
f'c = 22.83 Mpa (K-275)
Rebar = 4-D10
Formwork = playwood 12 mm thickness (one used)
- Conc. Block FDN (3.0W x6.0L x 0.4D Thk)m

52
UNTU

No JENIS PEKERJAAN

f'c = 22.83 Mpa (K-275)


Rebar = D13-100
Formwork = Plywood 12 mm thickness (once used)

STRUCTURAL STEEL
Steel structure c/w paint
- Column WH-150x150x7x10
- Lateral Beam SH-200x100x5.5x8
- Rafter SH-150x75x5x7
- Overhange Beam SH-150x75x5x7
- Purlin Lip.Channel C-150x50x20x2.3
- Sagrod dia 10 mm
- Wind Brace dia 16 mm
- Gutter frame flat-bar 30x3
- Base plate 24 mm thk.
- End plate 12 mm thk
- Stiffener plate 6 mm thk
- Cleat Plate 135mmx120mm
- Anchor bolt Dia 22
- HTB Dia 14 mm A325
- HTB Dia 14 mm A325
- BB Dia 12 mm A325

Roof and Wall

53
UNTU

No JENIS PEKERJAAN

- Roof corrugated metal sheet, Galvalume 0.55 mm thk


efective wide 950 mm, heigth of wave 38 mm

Flashing, Gutter and Downspout


- Ridge cap
- Gutter metal sheet
- Down spout galv. St. pipe Ø 4" STD.& and fitting include clamps
- Roof drain galv. Stl. strainer
Harmonica wire fence + frame angle 50x50x5

11 SEA WATER PUMP SHELTER (6W x12L) M

CONCRETE FOUNDATION
CONCRETE PLATFORM
PILE CAP (1000W x 1000L x1000 H) mm
f'c = 35 Mpa (K-430)
Rebar = D25-100
Formwork = Plywood 12 mm thickness (once used)
BEAM
Beam type B1 (500W x 800D) mm
f'c = 35 Mpa (K-430)
Rebar = 14-D22
Formwork = Plywood 12 mm thickness (once used)
Beam type B2 (300Wx500D) mm

54
UNTU

No JENIS PEKERJAAN

f'c = 35 Mpa (K-430)


Rebar = 14-D13
Formwork = Plywood 12 mm thickness (once used)
SLAB
Concrete Slab 200 mm thk
f'c = 35 Mpa (K-430)
Rebar = D13-200
Formwork = Plywood 12 mm thickness (once used)
Infill concrete (length 1.6m)
f'c = 35 Mpa (K-430)
Rebar = 12D-22

STEEL STRUCTURE
- Walkway/ catwalk steel structure
- Column WF-150x150x7x10
- Lateral Beam
Bracing
Bracing

- Rafter WF-200x100x5.5x8
- Overhange Beam WF-200x100x5.5x8
- Purlin Lip.Channel C-150x65x20x2.3
- Sagrod dia 10 mm
- Wind Brace dia 16 mm

55
UNTU

No JENIS PEKERJAAN

- Base plate 16 mm thk.


- End plate 14 mm thk
- Stiffener plate 8 mm thk
- Cleat Plate 135mmx125mm, 8mm thk
- Anchor bolt Dia M16
- HTB Dia 16 mm A325
- BB Dia 12 mm A325

pile shoe (plate t=16)


Stopper plate (infill concrete t=6mm)

Roof and Wall


- Roof corrugated metal sheet, Galvalume 0.55 mm thk
efective wide 950 mm, heigth of wave 38 mm

Flashing, Gutter and Downspout


- Ridge cap
- Down spout galv. St. pipe Ø 4" STD.& and fitting include clamps
- Roof drain galv. Stl. strainer
Harmonica wire fence + frame angle 50x50x5
Brickwall

12 GATE IN-OUT, Size: (4W x 4L) M

56
UNTU

No JENIS PEKERJAAN

CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Site Clearing
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete
- Sand bedding
Concrete U ditch W=300, H=400, T=100 (one layer 10-200)

ARCHITECTURE & FINISHING WORK


Brickwall, Plastering & Smooth surface plastering ('acian')
- Brickwall and thin bed mortar, size: (3.38 mtr H x150mm thk) .
- Plastering & smooth surface, 15mm thk
Floor and Wall Finishes
- Supply and install glazed ceramic tiles (or equal approved) sizes (400x400)mm
- Supply and install un-glazed ceramic tiles sizes (200x200)mm, on toilet room
Wall Finishes ceramic tile fixed w/mortar and tile grout
- Supply and install glazed ceramic tiles sizes (200x250) mm, hight: 2.1 m on wall rooms: toilet
Ceiling Finishes
Complete w/ metal suspension system, metal casing, ceiling joint and all necessary fixing
accessories as specified
- Acoustic Mineral Fiber Board size (600x600) mm or (600x1200) mm of 15mm th'k (min.)
- Moisture resistance mineral Fiber Board or 6mm th'k Glass Reinforced Concrete (GRC) board

57
UNTU

No JENIS PEKERJAAN

Painting Works and Coating


- Prepare and apply one coat primer and two finishing coats of emulsion paint to interior surface
- Prepare and apply one coat primer and two finishing coats of watershield emulsion paint to exterior surface
- Prepare and apply waterproofing finishing coats to top of concrete roof surface
Doors and Windows c/w all necessary fixing accessories.
Glass door & hot-dipgalvanized aluminum frame matterial
- Tempered glass door, single leaf, swing opening, and size: (0.7 m W) x 2.1 m H, location at Entrance
Glass windows& deep galvanized aluminium matterial
- Clear glass fix thick 5mm include weather sealer rubber, and size: 1.35 m W x 3.5m H location at locket
- Clear glass fix thick 5 mm include weather sealer rubber, and size: 1.2 m W x 1.35 m
PVC panel door and frame c/w all necessary fixing accessories.
Exhaus fan

SANITARY FIXTURES
Supply and install sanitary Appliances complete including all necessary fitting accessories.
- Closet (jongkok)
Roof drain
- Downspout PVC pipe 4" dia. & fittings
- Strainer/ roof filter
Plumbing
- Conc. Septicktank and absorption system (1.2m L x 1.2m W x 1.2m H, Thickness : 125 mm)
- pipe 2" dia. & fittings
- pipe 4" dia. & fittings

58
UNTU

No JENIS PEKERJAAN

REINFORCED CONCRETE
- Shallow fnd size: (1.2W x 1.2L x 0.3Thk) M
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)
- Cerucuk gelam diam. 100mm Lmin=4m
- Pedestal size: (0.2W x 0.2L x 1.15) Depth) M
f'c = 22.83 Mpa (K-275)
Rebar = 8D13
Formwork = playwood 12 mm thickness (one used)
- Grade beam (200Wx300D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 8-D13
Formwork = playwood 12 mm thickness (one used)
Formwork = playwood 12 mm thickness (one used)
- Column : (200W x 200D x 3500H) mm
f'c = 22.8 Mpa (K-275)
Rebar = 8D13
Formwork = playwood 12 mm thickness (one used)
- Main-beam (200Wx300D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 6-D13
Formwork = playwood 12 mm thickness (one used)
- cantilever-beam (200Wx250D) mm

59
UNTU

No JENIS PEKERJAAN

f'c = 22.83 Mpa (K-275)


Rebar = 4-D13
Formwork = playwood 12 mm thickness (one used)
- Concrete floor 100 mm Thk (1-layers re-bar)
f'c = 22.83 Mpa (K-275)
Rebar = M8-150
Formwork = playwood 12 mm thickness (one used)
- Concrete Roof 100 mm Thk (1-layers re-bar)
f'c = 22.83 Mpa (K-275)
Rebar = P10-150
Formwork = playwood 12 mm thickness (one used)

STRUCTURAL STEEL PLATFORM


Material specification:
Steel structure material shall be used hot rolled structural steel shapes and plates for buildings and structures shall be mild carbon steel
ASTM A36
- Platform w/ grating 25mm, plat, bolt, anchor, etc

13 GUARD HOUSE, Size: (4W x 4L) M, TOTAL 2 UNIT

CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Site Clearing
- Soil excavation

60
UNTU

No JENIS PEKERJAAN

- Soil backfill and compaction


Lean concrete & Sandbedding
- Lean Concrete
- Sand bedding
Concrete U ditch W=300, H=400, T=100 (one layer 10-200)

ARCHITECTURE & FINISHING WORK


Brickwall, Plastering & Smooth surface plastering ('acian')
- Brickwall and thin bed mortar, size: (3.38 mtr H x150mm thk) .
- Plastering & smooth surface, 15mm thk
Floor and Wall Finishes
- Supply and install glazed ceramic tiles (or equal approved) sizes (400x400)mm
- Supply and install un-glazed ceramic tiles sizes (200x200)mm, on toilet room
Wall Finishes ceramic tile fixed w/mortar and tile grout
- Supply and install glazed ceramic tiles sizes (200x250) mm, hight: 2.1 m on wall rooms: toilet
Ceiling Finishes
Complete w/ metal suspension system, metal casing, ceiling joint and all necessary fixing
accessories as specified
- Acoustic Mineral Fiber Board size (600x600) mm or (600x1200) mm of 15mm th'k (min.)
- Moisture resistance mineral Fiber Board or 6mm th'k Glass Reinforced Concrete (GRC) board
Painting Works and Coating
- Prepare and apply one coat primer and two finishing coats of emulsion paint to interior surface
- Prepare and apply one coat primer and two finishing coats of watershield emulsion paint to exterior surface
- Prepare and apply waterproofing finishing coats to top of concrete roof surface

61
UNTU

No JENIS PEKERJAAN

Doors and Windows c/w all necessary fixing accessories.


Glass door & hot-dipgalvanized aluminum frame matterial
- Tempered glass door, single leaf, swing opening, and size: (0.7 m W) x 2.1 m H, location at Entrance
Glass windows& deep galvanized aluminium matterial
- Clear glass fix thick 5mm include weather sealer rubber, and size: 1.35 m W x 3.5m H location at locket
- Clear glass fix thick 5 mm include weather sealer rubber, and size: 1.2 m W x 1.35 m
PVC panel door and frame c/w all necessary fixing accessories.
Exhaus fan

SANITARY FIXTURES
Supply and install sanitary Appliances complete including all necessary fitting accessories.
- Closet (jongkok)
Roof drain
- Downspout PVC pipe 4" dia. & fittings
- Strainer/ roof filter
Plumbing
- Conc. Septicktank and absorption system (1.2m L x 1.2m W x 1.2m H, Thickness : 125 mm)
- pipe 2" dia. & fittings
- pipe 4" dia. & fittings

REINFORCED CONCRETE
- Shallow fnd size: (1.2W x 1.2L x 0.3Thk) M
f'c = 22.83 Mpa (K-275)
Rebar = D13-200

62
UNTU

No JENIS PEKERJAAN

Formwork = playwood 12 mm thickness (one used)


- Cerucuk gelam diam. 100mm Lmin=4m
- Pedestal size: (0.2W x 0.2L x 1.15) Depth) M
f'c = 22.83 Mpa (K-275)
Rebar = 8D13
Formwork = playwood 12 mm thickness (one used)
- Grade beam (200Wx300D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 8-D13
Formwork = playwood 12 mm thickness (one used)
- Column : (200W x 200D x 3500H) mm
f'c = 22.8 Mpa (K-275)
Rebar = 8D13
Formwork = playwood 12 mm thickness (one used)
- Main-beam (200Wx300D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 6-D13
Formwork = playwood 12 mm thickness (one used)
- cantilever-beam (200Wx250D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 4-D13
Formwork = playwood 12 mm thickness (one used)
- Concrete floor 100 mm Thk (1-layers re-bar)
f'c = 22.83 Mpa (K-275)

63
UNTU

No JENIS PEKERJAAN

Rebar = M8-150
Formwork = playwood 12 mm thickness (one used)
- Concrete Roof 100 mm Thk (1-layers re-bar)
f'c = 22.83 Mpa (K-275)
Rebar = P10-150
Formwork = playwood 12 mm thickness (one used)

14 WORKSHOP, Size: (5W x 10L) M

CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Site Clearing
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete
- Sand bedding
Concrete U ditch W=300, H=400, T=100 (one layer 10-200)

ARCHITECTURE & FINISHING WORK


Brickwall, Plastering & Smooth surface plastering ('acian')
- Brickwall and thin bed mortar, size: (3.38 mtr H x150mm thk) .
- Plastering & smooth surface, 15mm thk
Floor and Wall Finishes

64
UNTU

No JENIS PEKERJAAN

- Finishing floor hardener


Painting Works and Coating
- Prepare and apply one coat primer and two finishing coats of emulsion paint to interior surface
- Prepare and apply one coat primer and two finishing coats of watershield emulsion paint to exterior surface
- Prepare and apply waterproofing finishing coats to top of concrete roof surface
Doors and Windows \c/w all necessary fixing accessories.
Glass door & hot-dipgalvanized aluminum frame matterial
- Steel door, double leaf, swing opening, and size: (2.0 m W) x 2.1 m H, location at Entrance
Glass windows& deep galvanized aluminium matterial
- Clear glass fix thick 5 mm include weather sealer rubber, and size: 1.2 m W x 1.35 m
Exhaus fan

Roof drain
- Downspout PVC pipe 4" dia. & fittings
- Strainer/ roof filter

REINFORCED CONCRETE
- Shallow fnd size: (1.2W x 1.2L x 0.3Thk) M
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)
Cerucuk gelam diam. 100mm Lmin=4m
- Pedestal size: (0.3W x 0.3L x 1.15) Depth) M
f'c = 22.83 Mpa (K-275)

65
UNTU

No JENIS PEKERJAAN

Rebar = 8D16
Formwork = playwood 12 mm thickness (one used)
- Grade beam (200Wx300D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 8-D13
Formwork = playwood 12 mm thickness (one used)
- Column : (300W x 300D x 3500H) mm
f'c = 22.8 Mpa (K-275)
Rebar = 8D16
Formwork = playwood 12 mm thickness (one used)
- Main-beam (200Wx500D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 6-D16
Formwork = playwood 12 mm thickness (one used)
- cantilever-beam (200Wx250D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 4-D13
Formwork = playwood 12 mm thickness (one used)
- Concrete floor 100 mm Thk (1-layers re-bar)
f'c = 22.83 Mpa (K-275)
Rebar = M8-150
Formwork = playwood 12 mm thickness (one used)
- Concrete floor 100 mm Thk (1-layers re-bar)
f'c = 22.83 Mpa (K-275)

66
UNTU

No JENIS PEKERJAAN

Rebar = P10-150
Formwork = playwood 12 mm thickness (one used)

15 WAITING ROOM FOR DRIVER, Size: (4W x 6L) M

CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Site Clearing
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete
- Sand bedding
Concrete U ditch W=300, H=400, T=100 (one layer 10-200)

ARCHITECTURE & FINISHING WORK


Brickwall, Plastering & Smooth surface plastering ('acian')
- Brickwall and thin bed mortar, size: (3.38 mtr H x150mm thk) .
- Plastering & smooth surface, 15mm thk
Floor and Wall Finishes
- Supply and install glazed ceramic tiles (or equal approved) sizes (400x400)mm
- Supply and install un-glazed ceramic tiles sizes (200x200)mm, on toilet room
Wall Finishes ceramic tile fixed w/mortar and tile grout
- Supply and install glazed ceramic tiles sizes (200x250) mm, hight: 2.1 m on wall rooms: toilet

67
UNTU

No JENIS PEKERJAAN

Ceiling Finishes
Complete w/ metal suspension system, metal casing, ceiling joint and all necessary fixing
accessories as specified
- Acoustic Mineral Fiber Board size (600x600) mm or (600x1200) mm of 15mm th'k (min.)
- Moisture resistance mineral Fiber Board or 6mm th'k Glass Reinforced Concrete (GRC) board
Painting Works and Coating
- Prepare and apply one coat primer and two finishing coats of emulsion paint to interior surface
- Prepare and apply one coat primer and two finishing coats of watershield emulsion paint to exterior surface
- Prepare and apply waterproofing finishing coats to top of concrete roof surface
Doors and Windows c/w all necessary fixing accessories.
PVC panel door and frame c/w all necessary fixing accessories.
Exhaus fan

SANITARY FIXTURES
Supply and install sanitary ex….. Appliances complete including all necessary fitting accessories.
- Closet (jongkok)
Roof drain
- Downspout PVC pipe 4" dia. & fittings
- Strainer/ roof filter
Plumbing
- Conc. Septicktank and absorption system (1.2m L x 1.2m W x 1.2m H, Thickness : 125 mm)
- pipe 2" dia. & fittings
- pipe 4" dia. & fittings

68
UNTU

No JENIS PEKERJAAN

REINFORCED CONCRETE
- Shallow fnd size: (1.2W x 1.2L x 0.3Thk) M
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)
- Cerucuk gelam diam. 100mm Lmin=4m
- Pedestal size: (0.2W x 0.2L x 1.15) Depth) M
f'c = 22.83 Mpa (K-275)
Rebar = 8D13
Formwork = playwood 12 mm thickness (one used)
- Grade beam (200Wx300D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 8-D13
Formwork = playwood 12 mm thickness (one used)
- Column : (200W x 200D x 3500H) mm
f'c = 22.8 Mpa (K-275)
Rebar = 8D13
Formwork = playwood 12 mm thickness (one used)
- Main-beam (200Wx400D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 6-D13
Formwork = playwood 12 mm thickness (one used)
- cantilever-beam (200Wx250D) mm
f'c = 22.83 Mpa (K-275)

69
UNTU

No JENIS PEKERJAAN

Rebar = 4-D13
Formwork = playwood 12 mm thickness (one used)
- Concrete floor 100 mm Thk (1-layers re-bar)
f'c = 22.83 Mpa (K-275)
Rebar = M8-150
Formwork = playwood 12 mm thickness (one used)
- Concrete Roof 100 mm Thk (1-layers re-bar)
f'c = 22.83 Mpa (K-275)
Rebar = P10-150
Formwork = playwood 12 mm thickness (one used)

16 B3 SHELTER/BUILDING, Size: (4W x 5L) M

CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Site Clearing
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete
- Sand bedding

REINFORCED CONCRETE
Shelter foundation

70
UNTU

No JENIS PEKERJAAN

- Shallow fnd size: (1.5W x 1.5L x 0.3Thk) M


f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (once used)
Cerucuk gelam diam. 100mm Lmin=4m
- Pedestal size: (0.25W x 0.25L x 1.0 Depth) M
f'c = 22.83 Mpa (K-275)
Rebar = 8D13
Formwork = playwood 12 mm thickness (once used)
- Grade beam (250Wx300D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 6-D13
Formwork = playwood 12 mm thickness (once used)
- Conc. floor 150 mm Thk (2-layer bar)
f'c = 22.83 Mpa (K-275)
Rebar =D10-125 (2 layer)
Formwork = playwood 12 mm thickness (once used)

STRUCTURAL STEEL
Steel structure c/w paint
- Column WF-150x150x7x10
- Lateral Beam WF-150x75x5x7
- Rafter WF-150x75x5x7
- Purlin Lip.Channel C-150x65x20x2.3

71
UNTU

No JENIS PEKERJAAN

- Sagrod dia 10 mm
- Wind Brace dia 16 mm
- Gutter frame flat-bar 30x3
- Base plate 16 mm thk.
- End plate 14 mm thk
- Stiffener plate 7 mm thk
- Cleat Plate 135mmx120mm
- Anchor bolt Dia 16
- HTB Dia 16 mm A325
- BB Dia 12 mm A325

Roof
- Roof corrugated metal sheet, Galvalume 0.55 mm thk
efective wide 950 mm, heigth of wave 38 mm
Brickwall, Plastering & Smooth surface plastering ('acian')
- Brickwall and thin bed mortar, size: (3.38 mtr H x150mm thk) .
- Plastering & smooth surface, 15mm thk
Painting Works and Coating
- Prepare and apply one coat primer and two finishing coats of emulsion paint to interior surface
- Prepare and apply one coat primer and two finishing coats of watershield emulsion paint to exterior surface
Aluminium door...c/w all necessary fixing accessories.

Flashing, Gutter and Downspout


- Ridge cap

72
UNTU

No JENIS PEKERJAAN

- Gutter metal sheet


- Down spout galv. St. pipe Ø 4" STD.& and fitting include clamps
- Roof drain galv. Stl. strainer

Total 3

4 PEKERJAAN MEKANIKAL DAN PEMIPAAN

A MEKANIKAL
Equipment Name Tag Number
1 ODORIZER INJECTION PACKAGE (Automatic),(include tubing to main header) 100-D-01
2 LPG STORAGE TANK (Construction, Installation, painting & fire system) 200-T-04/05
3 LPG TRUCK FILLING PUMP 300-P-01/02/03
4 LPG TRUCK LOADING ARM LH-300-M-01/02/03
VAPOR LPG TRUCK LOADING ARM
5 AIR COMPRESSOR PACKAGE 400-K-01/02
6 INSTRUMENT AIR RECEIVER 400-V-02
7 UTILITY AIR RECEIVER 400-V-01
8 DIESEL OIL STORAGE TANK 600-T-07
9 JETTY DIESEL OIL STORAGE TANK 500-T-08
10 HSD/SOLAR UNLOADING PUMP 500-P-13/18
11 DIESEL OIL TRANSFER FILTER 500-F-07/500-F-08
12 FIRE WATER TANK 500-T-06
13 SEA WATER FIRE PUMP 500-P-04/05

73
UNTU

No JENIS PEKERJAAN

14 COOLING WATER PUMP 500-P-09/10


15 JOCKEY PUMP 500-P-012
16 WATER PIT PUMP 600-P-013
17 WEIGHING BRIDGE SYSTEM CAPACITY 60 MT(including tera Metrologi and installation, commissioning, training)
18 MARINE LOADING ARM (PIGGY BACK TYPE)(installation, commissioning, training) 100-MLA-001
19 GANGWAY (Installation. Commisioning, training)
20 SODIUM HYPOKLORITE PACKAGE 500-PK-05
21 DEEP WELL PUMP 500-P-08
Note:
1. To be confirmed by selected vendor (associated vendor) during detail design.

B PEMIPAAN (Pipe, Fitting, Valve & acessories)

B.1 Piping Class A2A - LPG and Vapor CLASS/SCH


1 Pipe Niple , A106 Gr B, PE/Thrd, SMLS, ASME B36.10, 100mm Length. 80
2 Pipe Niple , A106 Gr B, PE/Thrd, SMLS, ASME B36.10, 100mm Length. 80
3 Pipe, API 5L Gr. B, ERW, BE, Sch.80, ASME B36.10M 80
4 Pipe, API 5L Gr. B, ERW, BE, Sch.80, ASME B36.10M 80
5 Pipe, API 5L Gr. B, ERW, BE, Sch.80, ASME B36.10M 80
6 Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M 40
7 Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M 40
8 Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M 40
9 Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M 40
10 Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M STD

74
UNTU

No JENIS PEKERJAAN

11 Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M STD

12 Elbow 45 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. 40
13 Elbow 45 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. 40
14 Elbow 45 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. STD
15 Elbow 90 deg, ASTM A105, SMLS, SW, ASME B16.11 STD
16 Elbow 45 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. STD
17 Elbow 90 deg, ASTM A105, SMLS, SW, ASME B16.11 #3000
18 Elbow 90 deg, ASTM A105, SMLS, SW, ASME B16.11 #3000
19 Elbow 90 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. 80
20 Elbow 90 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. 40
21 Elbow 90 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. 40
22 Elbow 90 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. 40
23 Elbow 90 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. STD
24 Reducer Tee, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
25 Reducer Tee, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
26 Reducer Tee, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
27 Reducer Tee, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
28 Reducer Tee, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
29 Equal Tee, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 40
30 Equal Tee, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
31 Equal Tee, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
32 Ecc. Reducer, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
33 Co. Reducer, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD

75
UNTU

No JENIS PEKERJAAN

34 Co. Reducer, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
36 Co. Reducer, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
37 Co. Reducer, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
38 Co. Reducer, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD

39 Flange, ASTM A105, RFWN, BTMP, ASME B16.5 #300


40 Flange, ASTM A105, RFWN, BTMP, ASME B16.5 #300
41 Flange, ASTM A105, RFWN, BTMP, ASME B16.5 #300
42 Flange, ASTM A105, RFWN, BTMP, ASME B16.5 #300
43 Flange, ASTM A105, RFWN, BTMP, ASME B16.5 #300
44 Flange, ASTM A105, RFWN, BTMP, ASME B16.5 #300
45 Flange, ASTM A105, RFWN, BTMP, ASME B16.5 #300
46 Flange, ASTM A105, RFWN, BTMP, ASME B16.5 #300
47 Flange, ASTM A105, RFWN, BTMP, ASME B16.5 #300
48 Blind Flange, ASTM A105, RF, ASME B16.5 #300
49 Blind Flange, ASTM A105, RF, ASME B16.5 #300
50 Blind Flange, ASTM A105, RF, ASME B16.5 #300
51 Spectacle Blind, RF, ASME B16.48 #300
52 Spectacle Blind, RF, ASME B16.48 #300
53 Spectacle Blind, RF, ASME B16.48 #300

54 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #300
55 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #300
56 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #300

76
UNTU

No JENIS PEKERJAAN

57 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #300
58 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #300
59 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #300
60 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #300
61 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #300
62 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #300

ASTM A193 Gr B7 / A194 Gr 2H Heavy Hex, Fluorocarbon Plated;


63 5/8" X 75 Long #300
64 5/8" X 75 Long #300
65 5/8" X 90 Long #300
66 3/4" X 115 Long #300
67 3/4" X 120 Long #300
68 3/4" X 130 Long #300
69 7/8" X 150 Long #300
70 1" X 170 Long #300

71 Sockolet; ASTM A105; BW x SW; ASME B16.11 #3000


72 Sockolet; ASTM A105; BW x SW; ASME B16.11 #3000
73 Weldolet; ASTM A105; BW; ASME B16.11 #3000
74 Weldolet; ASTM A105; BW; ASME B16.11 #3000
75 Weldolet; ASTM A105; BW; ASME B16.11 #3000

76 Ball Valve; min. seat rating 1500# CWP; F-Bore; Floating ball; Scrd /SW / Scrd x SW; BB; Replaceable ball & seats; ASTM A105; ASTM A182 3 #800

77
UNTU

No JENIS PEKERJAAN

77 Ball Valve; min. seat rating 1500# CWP; F-Bore; Floating ball; Scrd /SW / Scrd x SW; BB; Replaceable ball & seats; ASTM A105; ASTM A182 3 #800
78 Ball Valve; min. seat rating 1500# CWP; F-Bore; Floating ball; Scrd /SW / Scrd x SW; BB; Replaceable ball & seats; ASTM A105; ASTM A182 3 #800
79 Ball Valve; RF; FE; BB; F-Bore; Side entry; Replaceable ball & seats; Soft seated; ASTM A216 WCB; ASTM A105 + 3 mils ENP ball & seat; AISI #300
80 Ball Valve; RF; FE; BB; F-Bore; Side entry; Replaceable ball & seats; Soft seated; ASTM A216 WCB; ASTM A105 + 3 mils ENP ball & seat; AISI #300
81 Ball Valve; RF; FE; BB; F-Bore; Side entry; Replaceable ball & seats; Soft seated; ASTM A216 WCB; BB; ASTM A105 + 3 mils ENP ball & seat; #300
82 Ball Valve; RF; FE; BB; F-Bore; Side entry; Replaceable ball & seats; Soft seated; ASTM A216 WCB; ASTM A105 + 3 mils ENP ball & seat; AI #300
83 Ball Valve; RF; FE; BB; F-Bore; Side entry; Replaceable ball & seats; Soft seated; ASTM A216 WCB; ASTM A105 + 3 mils ENP ball & seat; AI #300
84 Ball Valve; RF; FE; BB; F-Bore; Side entry; Replaceable ball & seats; Soft seated; ASTM A216 WCB; ASTM A105 + 3 mils ENP ball & seat; AI #300
85 Ball Valve; RF; FE; BB; F-Bore; Side entry; Replaceable ball & seats; Soft seated; ASTM A216 WCB; ASTM A105 + 3 mils ENP ball & seat; AI #300
86 Check Valve; RF: FE; Horizontal swing; BC; Replaceable disc & seat; ASTM A216 WCB body & cap; 11.5-13.5% Cr disc & seat; ASTM A182 #300
87 Check Valve; RF: FE; Horizontal swing; BC; Replaceable disc & seat; ASTM A216 WCB body & cap; 11.5-13.5% Cr disc & seat; ASTM A182 #300
88 Check Valve; RF: FE; Horizontal swing; BC; Replaceable disc & seat; ASTM A216 WCB body & cap; 11.5-13.5% Cr disc & seat; ASTM A182 F #300
89 Check Valve; RF: FE; Horizontal swing; BC; Replaceable disc & seat; ASTM A216 WCB body & cap; 11.5-13.5% Cr disc & seat; ASTM A182 F #300
90 Globe Valve; RF; FE; BB; OS & Y; Rising stem; Plug or semi-plug disc; Replaceable disc & seat; ASTM A216 WCB; 11.5-13.5% Cr Stem, disc & #300
91 Globe Valve; RF; FE; BB; OS & Y; Rising stem; Plug disc; Replaceable disc & seat; ASTM A216 WCB; 11.5-13.5% Cr Stem, disc & seat; Stell #300
92 Globe Valve; RF; FE; BB; OS & Y; Rising stem; Plug disc; Replaceable disc & seat; ASTM A216 WCB; 11.5-13.5% Cr Stem, disc & seat; Stell #300
93 Globe Valve; RF; FE; BB; OS & Y; Rising stem; Plug disc; Replaceable disc & seat; ASTM A216 WCB; 11.5-13.5% Cr Stem, disc & seat; Stell #300
94 Y-Strainer; RF; FE; BC; A216 WCB; Blind Flange with 3/4 Plug; SS Screen; Manufactured Standard. #300

95 Flexible Joint (EXPANSION JOINT) #300


96 Flexible Hose #300

B.2 Piping Class A1A - Fire Water & DIESEL OIL


1 Pipe Niple , A106 Gr B, PE/Thrd, SMLS, ASME B36.10, 100mm Length. 80

78
UNTU

No JENIS PEKERJAAN

2 Pipe, API 5L Gr. B, ERW, PE, Sch.80, ASME B36.10M 80


3 Pipe, API 5L Gr. B, ERW, PE, Sch.80, ASME B36.10M 80
4 Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M 80
5 Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M STD
6 Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M STD
7 Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M STD
8 Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M STD
9 Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M STD
10 Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M STD
11 Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M STD

4 12 Elbow 45 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. STD
13 Elbow 45 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. STD
14 Elbow 90 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. STD
15 Elbow 90 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. STD
16 Elbow 90 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. STD
17 Elbow 90 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. STD
18 Elbow 90 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. STD
19 Elbow 90 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. STD
20 Elbow 90 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. STD
21 Elbow 90 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. STD
22 Reducer Tee, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
23 Reducer Tee, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
24 Reducer Tee, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 40

79
UNTU

No JENIS PEKERJAAN

25 Equal Tee, #3000, SW; ASTM A105; ASME B16.11. #3000


26 Equal Tee, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
27 Equal Tee, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
28 Equal Tee, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
29 Con. Reducer, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD

30 Flange, ASTM A105, RFSW, BTMP, ASME B16.5 #150


31 Flange, ASTM A105, RFWN, BTMP, ASME B16.5 #150
32 Flange, ASTM A105, RFWN, BTMP, ASME B16.5 #150
33 Flange, ASTM A105, RFWN, BTMP, ASME B16.5 #150
34 Flange, ASTM A105, RFWN, BTMP, ASME B16.5 #150
35 Flange, ASTM A105, RFWN, BTMP, ASME B16.5 #150
36 Flange, ASTM A105, RFWN, BTMP, ASME B16.5 #150
37 Flange, ASTM A105, RFWN, BTMP, ASME B16.5 #150
38 Flange, ASTM A105, RFWN, BTMP, ASME B16.5 #150
39 Blind Flange, ASTM A105, RF, ASME B16.5 #150
40 Blind Flange, ASTM A105, RF, ASME B16.5 #150
41 Blind Flange, ASTM A105, RF, ASME B16.5 #150

42 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #150
43 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #150
44 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #150
45 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #150
46 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #150

80
UNTU

No JENIS PEKERJAAN

47 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #150
48 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #150

ASTM A193 Gr B7 / A194 Gr 2H Heavy Hex, Fluorocarbon Plated;


49 3/4" x 90 Long #150
50 5/8" x 85 Long #150
51 5/8" X 90 Long #150
52 5/8" X 90 Long #150
53 3/4" x 105 Long #150
54 3/4" x 115 Long #150
55 7/8" x 125 Long #150

56 Sockolet; ASTM A105; BW x SW; ASME B16.11 #3000


57 Sockolet; ASTM A105; BW x SW; ASME B16.11 #3000
58 Cap; ASTM A105; SW; ASME B16.11 #3000

59 Ball Valve; min. seat rating 1500# CWP; F-Bore; Floating ball; Scrd /SW; BB; Replaceable ball & seats; ASTM A105; ASTM A182 316SS ball #1500
60 Ball Valve; min. seat rating 1500# CWP; F-Bore; Floating ball; RF, FE; BB; Replaceable ball & seats; ASTM A105; ASTM A182 316SS ball & s #1500
61 Ball Valve; RF; FE; BB; F-Bore; Side entry; Replaceable ball & seats; Soft seated; ASTM A216 WCB; Reinforced Viton Seats; Floating ball; LO #150
62 Gate Valve; Scrd/SW ends; BB; OS & Y; Rising stem; Type solid wedge; HW operated; ASTM A105 ; 11.5 – 13.5% Cr stem, wedge & seat rin #800
63 Gate Valve; Scrd/SW ends; BB; OS & Y; Rising stem; Type solid wedge; HW operated; ASTM A105 ; 11.5 – 13.5% Cr stem, wedge & seat rin #800
64 Gate Valve ; Scrd/SW ends; BB; OS & Y; Rising stem; Type solid wedge; HW operated; ASTM A105 ; 11.5 – 13.5% Cr stem, wedge & seat ri #800
65 Gate Valve; RF; FE; BB; OS & Y; Rising stem; Type solid wedge; A216 WCB; 11.5-13.5% Cr stem, wedge & seat ring; Stellited wedge & sea #150
66 Gate Valve; RF; FE; BB; OS & Y; Rising stem; Type solid wedge; A216 WCB; 11.5-13.5% Cr stem, wedge & seat ring; Stellited wedge & sea #150

81
UNTU

No JENIS PEKERJAAN

67 Gate Valve; RF; FE; BB; OS & Y; Rising stem; Type solid wedge; A216 WCB; 11.5-13.5% Cr stem, wedge & seat ring; Stellited wedge & sea #150
68 Gate Valve; RF; FE; BB; OS & Y; Rising stem; Type solid wedge; A216 WCB; 11.5-13.5% Cr stem, wedge & seat ring; Stellited wedge & sea #150
69 Gate Valve; RF; FE; BB; OS & Y; Rising stem; Type solid wedge; A216 WCB; 11.5-13.5% Cr stem, wedge & seat ring; Stellited wedge & sea #150
70 Gate Valve; RF; FE; BB; OS & Y; Rising stem; Type solid wedge; A216 WCB; 11.5-13.5% Cr stem, wedge & seat ring; Stellited wedge & sea #150
71 Gate Valve; RF; FE; BB; OS & Y; Rising stem; Type solid wedge; A216 WCB; 11.5-13.5% Cr stem, wedge & seat ring; Stellited wedge & sea #150
72 Gate Valve; RF; FE; BB; OS & Y; Rising stem; Type solid wedge; A216 WCB; 11.5-13.5% Cr stem, wedge & seat ring; Stellited wedge & sea #150
73 Swing Check Valve; Scrd/SW ends; BC; Replaceable disc & seat; A105; 11.5 - 13.5% Cr disc & seat; Stellited disc & seat; API 602. #150
74 Swing Check Valve; Scrd/SW ends; BC; Replaceable disc & seat; A105; 11.5 - 13.5% Cr disc & seat; Stellited disc & seat; API 602. #150
75 Swing Check Valve; Scrd/SW ends; BC; Replaceable disc & seat; A105; 11.5 - 13.5% Cr disc & seat; Stellited disc & seat; API 602. #150
76 Swing Check Valve; Scrd/SW ends; BC; Replaceable disc & seat; A105; 11.5 - 13.5% Cr disc & seat; Stellited disc & seat; API 602. #150
77 Swing Check Valve; Scrd/SW ends; BC; Replaceable disc & seat; A105; 11.5 - 13.5% Cr disc & seat; Stellited disc & seat; API 602. #150
78 Y-Strainer; RF; FE; BC; A216 WCB; Blind Flange with 3/4 Plug; SS Screen; Manufactured Standard. #150
79 Y-Strainer; RF; FE; BC; A216 WCB; Blind Flange with 3/4 Plug; SS Screen; Manufactured Standard. #150
80 Basket-Strainer; RF; FE; BC; A216 WCB; Blind Flange with 3/4 Plug; SS Screen; Manufactured Standard. #150
81 FLEXIBLE HOSE DIESEL (4 METER) #150

B.3 Piping Class C1A - Instrument Air & utility air


1 Pipe Nipple, A106 Gr B, HD Galv, PE/Thrd, SMLS, ASME B36.10, 100L. 80
2 Pipe, SMLS, PE, ASTM A106 Gr B, HD Galv., SMLS, ASME B36.10, 80
3 Pipe, SMLS, PE, ASTM A106 Gr B, HD Galv., SMLS, ASME B36.10, 80
4 Pipe, API 5L Gr. B, HD Galv., ERW, BE, ASME B36.10M 80

5 Elbow 45 deg; BW; ASTM A105 HD Galv.; ASME B16.9. 40


6 Elbow 90 deg; SW; ASTM A105 HD Galv.; ASME B16.11. 40

82
UNTU

No JENIS PEKERJAAN

7 Elbow 90 deg; BW; ASTM A105 HD Galv.; ASME B16.9. 40


8 Equal Tee; SW; ASTM A105 HD Galv.; ASME B16.9. 40
9 Equal Tee; BW; ASTM A105 HD Galv.; ASME B16.9. 40
10 Reducer Tee, ASTM A105, HD Galv., SMLS, SW, ASME B16.11 #3000
11 Reducer Tee, ASTM A105, HD Galv., SMLS, SW, ASME B16.11 #3000
12 Cocentric Reducer; BW; ASTM A105 HD Galv.; ASME B16.9. 40

13 Flange, ASTM A105, HD Galv., RFSW, BTMP, ASME B16.5 #150


14 Flange, ASTM A105, HD Galv., RFWN, BTMP, ASME B16.5 #150
15 Blind Flange, ASTM A105, HD Galv., RF, ASME B16.5 #150
16 Blind Flange, ASTM A105, HD Galv., RF, ASME B16.5 #150

17 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #150
18 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #150

ASTM A193 Gr B7 / A194 Gr 2H Heavy Hex, Fluorocarbon Plated;


19 1/2" X 70 Long #150
20 5/8" X 85 Long #150
21 PLUG, HEX HEAD, MPT, ASME B16.11 #3000
22 Sockolet; ASTM A105; SW; HD Galv., ASME B16.11 #3000

23 Ball Valve; min. seat rating 1500# CWP; F-Bore; Floating ball; Scrd /SW; BB; Replaceable ball & seats; ASTM A105; HD Galv.; 316SS ball & #800
24 Ball Valve; RF; FE; BB; F-Bore; Side entry; Replaceable ball & seats; Soft seated; ASTM A216 WCB; Hot dipped galvanized; ASTM A105 + 3 mil #150
25 Ball Valve; RF; FE; BB; F-Bore; Side entry; Replaceable ball & seats; Soft seated; ASTM A216 WCB; Hot dipped galvanized; ASTM A105 + 3 mil #150

83
UNTU

No JENIS PEKERJAAN

26 Ball Valve; RF; FE; BB; F-Bore; Side entry; Replaceable ball & seats; Soft seated; ASTM A216 WCB; Hot dipped galvanized; ASTM A105 + 3 mil #150

B.3 U-bolt (I-rod or Equal)

1 U Bolt For Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M 80
2 U Bolt For Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M 80
3 U Bolt For Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M 80
4 U Bolt For Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M STD
5 U Bolt For Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M STD
6 U Bolt For Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M STD
7 U Bolt For Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M STD
8 U Bolt For Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M STD
9 U Bolt For Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M STD
10 U Bolt For Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M STD

Total 4

5 PEKERJAAN ELECTRICAL

1 MODIFIKASI LV SWITCHGEAR EKSISTING


- Outgoing ACB 1600 A
400 V, 3-phase, 4 wires, 50 Hz, 3200 A, 65 kA, Metal Clad, IP 42, withdrawable
motorized, complete set relay protection and accessories

84
UNTU

No JENIS PEKERJAAN

2 LV SWITCHGEAR/ MCC (LV SWGR-001A)


2.1 - Incoming ACB 1600 A (from transformer) (1ea)
400 V, 3-phase, 4 wires, 50 Hz, 1600 A, 45 kA, Metal Clad, IP 42, withdrawable
motorized, complete set relay protection and accessories
2.2 - Incoming ACB 1000 A (from DEG-01 & DEG - 02) (2 ea)
400 V, 3-phase, 4 wires, 50 Hz, 1600 A, 45 kA, Metal Clad, IP 42, withdrawable
motorized, complete set relay protection and accessories
2.3 - Outgoing
a. DOL starter (Jockey Pump, Water Pit Pump,HSD Pump , comprssor Pump)
Drawout Typ 0.4 kV, 3 Ph 3W, 50 Hz, IP 42, Indoor Type, complete with MCCB ,Voltmeter, Amperemeter, protection & accessories
b. Soft stater starter (cooling water Pump), 400 V,
Drawout Typ 0.4 kV, 3 Ph 3W, 50 Hz, IP 42, Indoor Type, complete with MCCB,Voltmeter, Amperemeter, protection & accessories
b. VSD starter (LPG Truck Filling Pump A/B/C,
Drawout Typ 0.4 kV, 3 Ph 3W, 50 Hz, IP 42, Indoor Type, complete with MCCB,Voltmeter, Amperemeter, protection & accessories
c. Feeder static Drawout Type Include MCCB Voltmeter, Amperemeter, protection & accessories
d. Feeder & DOL , Include MCCB Voltmeter, Amperemeter, protection & accessories (Spare)

3 DISTRIBUTION PANEL
3.2 PDB-01,PDB-07,400 V, 3Ph, 4 Wire, 50Hz, 25 kW, 16 KA
Indoor used (IP 31), Wall Mounting, Plug in Type MCCB for incoming
c/w HOA, Surge Arrester,Voltmeter, Amperemeter & Indicating Lights (for each phase) for Incoming,
Incoming
- 1ea - MCCB 100A
Outgoing

85
UNTU

No JENIS PEKERJAAN

- 20ea - MCB/ELCB 10A


3.2 PDB-02,PDB-06, 400 V, 3Ph, 4 Wire, 50Hz, 15 kW, 16 KA
Indoor used (IP 31), Wall Mounting, Plug in Type MCCB for incoming,
c/w HOA, switch Surge Arrester,Voltmeter, Amperemeter & Indicating Lights (for each phase) for Incoming,
Incoming
- 1ea - MCCB 63A
Outgoing
- 15ea - MCB/ELCB 10A
3.3 PDB-03, 400 V, 3Ph, 4 Wire, 50Hz, 15 kW, 16 KA
Outdoor used (IP 55), Wall Mounting, Plug in Type MCCB for incoming, c/w Photocell circuit and HOA,
c/w Surge Arrester,Voltmeter, Amperemeter & Indicating Lights (for each phase) for Incoming,
Incoming
- 1ea - MCCB 63 A
Outgoing
- 20ea - MCB/ELCB 10A
3.4 PDB-04 & PDB-05, 400 V, 3Ph, 4 Wire, 50Hz, 15 kW, 16 KA
Outdoor used (IP 55), Wall Mounting, Plug in Type MCCB for incoming, c/w Photocell circuit and HOA,
c/w Surge Arrester,Voltmeter, Amperemeter & Indicating Lights (for each phase) for Incoming,
Incoming
- 1ea - MCCB 63A
Outgoing
- 20ea - MCB/ELCB 10A
3.5 DBMOV-001, 400 V, 3Ph, 4 Wire, 50Hz, 15 kW, 16 KA
Outdoor used (IP 55), Wall Mounting, Plug in Type MCCB for incoming

86
UNTU

No JENIS PEKERJAAN

c/w Surge Arrester,Voltmeter, Amperemeter & Indicating Lights (for each phase) for Incoming,
Incoming
- 1ea - MCCB 50A
Outgoing
- 15ea - MCB 10A
3.6 DB-001B, (At Jetty) 400 V, 3Ph, 4 Wire, 50Hz, 16 KA
hazardous area Ex "d",Outdoor used (IP 55), Wall Mounting, Plug in Type MCCB for incoming
c/w Surge Arrester,Voltmeter, Amperemeter & Indicating Lights (for each phase) for Incoming,
Incoming
- 1ea - MCCB 150A
Outgoing
- 15ea - MCB 16A 3P & MCB/ELCB 10A 1P

4 UPS
4.1 UPS AC 20 kVA Uniterruptible Power Supply, Industrial type, UPS system single with By Pass System package,
400V, 3-phase, 50hz input voltage, 1-phase 220V, 50 hz output with, Rectifier type 12-wave thyristor Bridge
Type battery VRLA, 30 minute backup time 1 x 100%, including UPS Distribution Panel
UPS shall be indoor, IP 42 installed in air conditioned room, c/w accessories
4.2 UPS 110 DC, 5 kVA Uniterruptible Power Supply, Industrial type, UPS system single System package,
400V, 3-phase, 50hz input voltage, 1-phase 110V, 50 hz output with, Rectifier type 12-wave thyristor Bridge
Type battery VRLA, 30 minute backup time 1 x 100%, including UPS Distribution Panel
UPS shall be indoor, IP 42 installed in air conditioned room, c/w accessories

5 CAPACITOR BANK

87
UNTU

No JENIS PEKERJAAN

5.1 Capacitor Bank 250 kVAR, 1 step 25 kVAR (10 step) 400 V, 50 Hz, 3Ph, 3W indoor, IP 42, Natural Cooling, c/w power factor
regulator, Internal Fuse Element and accessories

6 LOCAL CONTROL SWITCH


6.1 Increased safety type Ex "e", Push Button (Start/Stop), (local-remote) Hand - Off - Auto selectors switch with pad-lockable
at Stop position, Indication, 1 Hub M25, Ammeter.
6.2 Weather proof, IP 55, Push Button (Start/Stop), Hand - Off - Auto selectors switch with pad-lockable
at Stop position, Indication, 1 Hub M25, Ammeter.

7 DIESEL ENGINE GENERATOR


7.1 Emergency Diesel Generator,silent type ,duty prime, sound proof, complete factory assembled, 0.4 kV, 3Ph, 50 Hz, 500 kVA, PF = 0.8. IP41,
complete with one (1) fuel tank for 8 hours Prime operation. c/w Generator unit Control Panel (synchronization module),
Local control panel , ATS and accessories.
As per indicate on DEG Data Sheet no. DMI-DSH-030-002-A4.

8 OUTDOOR LIGHTING
8.1 Floodlight LED Pole Mounted, min 100 watt, 220 VAC, 50 Hz, Stainless Steel
Lumen Fixture min 12000, front Glass Retaining ring with, high Power Ballast, Lamp, impact,
Resistant Temperature, front Glass
U-Shaped Mounting Bracket made of Pivots around Floodlight axis (infinitely adjustable).
Completed with lighting pole, 10000 mm Height, JB and accessories
8.2 Floodlight LED Pole Mounted, min 100 watt, 220 VAC, 50 Hz, Stainless Steel
Lumen Fixture min 12000, front Glass Retaining ring with, high Power Ballast, Lamp, impact,
Ex 'n' IP65 degree Reflector Broad-Beamed Outdoor, Resistant Temperature, front Glass

88
UNTU

No JENIS PEKERJAAN

U-Shaped Mounting Bracket made of Pivots around Floodlight axis (infinitely adjustable).
Completed with lighting pole, 10000 mm Height, JB and accessories (Ex'e', zone2)
8.3 Street Light LED Min 12000 Lumen, 1000mm Pole Mounted (4 inch), min 100 watt/HSE, 220 VAC, 50 Hz,
Lumen Per Fixture , with, high Power Ballast, (Without External Reflector)
Completed with lighting pole 9000 mm Height, JB and accessories.
8.4 Stanchion lighting, HPS 100 watt, 220 VAC, 50 Hz, pole mounted, 3000 mm Height.
(Ex'e', Zone 1)

9 INDOOR LIGHTING
9.1 Fluorescent Lighting LED Fixtures, min 4200 Lumen, 230 V, 50 Hz, IP41, 1Ph, General Type, with Clear Polycarbonate
Cover and Reflector, c/w M20 Plugged Cable Entry Lamp & control gear, Industrial type, Recessed ceilling
mounting
9.2 Fluorescent Lighting LED Fixtures,min 4200 Lumen, 230 V, 50 Hz, IP41, 1Ph, Increased safety, Zone 1, Ex'd',
General Type, with Clear Polycarbonate, Cover and Reflector, c/w M20 Plugged Cable Entry Lamp &
control gear, Industrial type, Pendant mounting
9.3 Fluorescent Lighting LED Fixtures,min 4200 Lumen, 230 V, 50 Hz, IP41,
General Type, with Clear Polycarbonate, Cover and Reflector, c/w M20 Plugged Cable Entry Lamp &
control gear, Industrial type, Pendant mounting
9.4 Down light LED (min 2600 lumen) 230 V, 50 Hz, Ceiling mounted
9.5 Exit Lamp, 230V, 50Hz, 2x8W, Recessed ceilling, complete with accessories such as cable gland, etc
9.6 Receptacle, Flush Mounted, General Purpuse indoor type, 230 V, 1 P, 20A, 400VA.
9.7 Socket outlet with plug , 2P+E, 230V, 50Hz, 16A, IP65, Industrial Type, Factory Sealed Enclosure. Flush Over,
Screw Type Modular Face Plate, with M32 Cable Gland Entry complete with accessories.
9.8 AC Receptacle, c/w on-off Switch, Flush Mounted, General Purpuse indoor type,

89
UNTU

No JENIS PEKERJAAN

230 V, 1P, 20 A, 400VA.


9.9 Switch one device 1 way, Flus Mounted.
9.10 Switch one device 2 way, Flus Mounted.
9.11 Switch one device 1 way, Flus Mounted (Ex'e', Zone 1)

10 AIR CONDITIONING & EX-HAUST


10.1 Exhaust Fan,40 W- 220 VAC, 1-ph, 50 Hz, 10 " Blade - Industrial Type
10.2 Split Air Conditioner 1 PK, 230V, 1 ph, 50 Hz, Inverter Compressor
10.3 Split Air Conditioner 2 PK, 230V, 1 ph, 50 Hz, Inverter Compressor

11 POWER CABLE
11.1 4c - 300 mm2, 0.6/1 kV, Type N2XRY, (XLPE/SWA/PVC/Cu).Flame retardant
11.2 4c - 240 mm2, 0.6/1 kV, Type N2XRY, (XLPE/SWA/PVC/Cu).Flame retardant
11.3 4c - 150 mm2, 0.6/1 kV, Type N2XRY, (XLPE/SWA/PVC/Cu).Flame retardant
11.4 4c - 70 mm2, 0.6/1 kV, Type N2XRY, (XLPE/SWA/PVC/Cu).Flame retardant
11.5 4c - 35 mm2, 0.6/1 kV, Type N2XRY, (XLPE/SWA/PVC/Cu).Flame retardant
11.6 4c - 25 mm2, 0.6/1 kV, Type N2XRY, (XLPE/SWA/PVC/Cu).Flame retardant
11.7 4c - 16 mm2, 0.6/1 kV, Type N2XRY, (XLPE/SWA/PVC/Cu).Flame retardant
11.8 4c - 10 mm2, 0.6/1 kV, Type N2XRY, (XLPE/SWA/PVC/Cu).Flame retardant
11.9 4c - 6 mm2, 0.6/1 kV, Type N2XRY, (XLPE/SWA/PVC/Cu).Flame retardant
11.10 3c - 95 mm2, 0.6/1 kV, Type N2XRY, (XLPE/SWA/PVC/Cu).Flame retardant
11.11 3c - 16 mm2, 0.6/1 kV, Type N2XRY, (XLPE/SWA/PVC/Cu).Flame retardant
11.12 3c - 10 mm2, 0.6/1 kV, Type N2XRY, (XLPE/SWA/PVC/Cu).Flame retardant
11.13 3c - 25 mm2, 0.6/1 kV, Type N2XRY, (XLPE/SWA/PVC/Cu).Flame retardant

90
UNTU

No JENIS PEKERJAAN

11.14 3c - 4 mm2, 0.6/1 kV, Type N2XRY, (XLPE/SWA/PVC/Cu).Flame retardant

12 CONTROL CABLE
12.1 10c - 1.5 mm2, Type N2XRY, 0.6/1 kV.
12.2 2c - 1.5 mm2, Type NYY, 0.6/1 kV.

13 LIGHTING & RECEPTACLE CABLE


INDOOR
13.1 3c - 2.5 mm2, Type NYY, 0.6/1 kV.
3c - 4 mm2, Type NYY, 0.6/1 kV.
OUTDOOR
13.2 3c - 2.5 mm2, Type N2XRY, 0.6/1 kV.
13.3 4c - 4 mm2, Type N2XRY, 0.6/1 kV.
13.4 4c - 6 mm2, Type N2XRY, 0.6/1 kV.

14 GROUNDING CABLE
(0.45/0.75 kV, Cu/PVC/SWA/PVC)
14.1 1C-16 mm²
14.2 1C-25 mm²
14.3 1C-50 mm²
14.4 1C-70 mm²

15 GROUND ROD
15.1 3/4" Dia, 3m Long Ground Rod Copper Clad Steel (for Grounding) include :

91
UNTU

No JENIS PEKERJAAN

Grounding Inspection Pit, Concrete c/w Concrete Cover & Maker Plate, Size 400 mm x 400 mm
Clamp, Solid Copper, 3/4" dia rod to double cable 35 mm2 - 35mm2 c/w U-bolt,nut
Clamp, Solid Copper, 3/4" dia rod to three cable 70 mm2 - 70mm2 - 70mm2, c/w U-Bolt,nut
Grounding Coupling, Solid Copper, 3/4" Dia
Driving Stud Head, 3/4 " Dia
Exothermic Welding Connection for cable 70 mm2
Compression "C" Connection type, Solid Copper

16 CABLE GLAND
Cable Gland Industrial Type made of Nickle & Plate brass.
Completed with heat shrink tube.
16.1 M20
16.2 M25
16.3 M32
16.4 M50
16.5 M63
16.6 M75
Cable Gland Industrial Type made of Nickle & Plate brass , Suitable for Hazardous area zone 2,
T3, Ex'e', Completed with heat shrink tube.
16.7 M20
16.8 M40
16.9 M50

17 BULK MATERIAL

92
UNTU

No JENIS PEKERJAAN

Cable Shoe (Spring Washer, Flat Washer and Blue Plastic Cap, with size as below)
17.1 1,5
17.2 2.5
17.3 4.0
17.4 6.0
17.5 10.0
17.6 16.0
17.7 35.0
17.8 50.0
17.9 70.0
17.10 120.0
17.11 240.0

18 LIGHTNING PROTECTION
18.1 Lightning Protection ESE (Early Streamer Emission) Air Terminal (Radius = 80 m, Level 1) Consist of :
Pole ESE Air Terminal, 30 m of Height c/w Adapter, Mast Bracket, and Clamp 50.0
Down Conductor, Stranded Copper, NYA 1C-95 mm2 120.0
Grounding Inspection Pit, Concrete, c/w Concrete Cover and Marker Plate, Size : 400 mm x 400 mm 2.0
Grounding Rod, Solid Copper, Threaded , 3/4 " Dia, 3000 mm of Length &accessories 2.0
Lightning Event Counter 2.0

18.2 Lightning Protection " Coventional" System Consist of :


Air Terminal Rod, Solid Copper, 1/2" dia, 600 mm 36.0
Downconductor, Stranded Bare Copper, Size : 50 mm2 930.0

93
UNTU

No JENIS PEKERJAAN

Horizontal Air Terminal Base, for Rod 1/2" dia, Hot Dipped Galvanized, c/w cable connector, dynabolt 200.0
Cable Holder / Cable Connector, Hot Dipped Galvanized Steel,Cable Splicer, for Cable size : 50 mm2 12.0
'Crimp Type Terminal Lug, Solid Copper, Size : 35 mm2 c/w Bolt& Nut, 1-Spring, 1-Flat Washer size : M8x25L 12.0
Test Terminal Box Testing Hot Dipped Galvanized Steel Enclosure, c/w all accessories. 24.0

19 CABLE TRAY C/W COVER


Thickness : 2 mm, Material : Sheet Steel, Finishing : Hot Dipped Galvanized
19.1 Perforated Galvanized Cable Tray 300W x 300H x 100D, 3000 m

20 HORIZONTAL TEE C/W COVER


Thickness : 2 mm, Material : Sheet Steel, Finishing : Hot Dipped Galvanized
20.1 Perforated Galvanized Cable Tray 300W x 300H x 100D,

21 HORIZONTAL ELBOW C/W COVER


Thickness : 2 mm, Material : Sheet Steel, Finishing : Hot Dipped Galvanized
21.1 Perforated Galvanized Cable Tray 300W x 300H x 100D,

22 JOINT SET
22.1 Joint set, Complete With 6ea Bolt, Nuts & Washers 316 SS.

23 SUPPORT
23.1 Steel angle 50 mm x 50 mm x 6thk, 6000 mm

24 STEEL CONDUIT

94
UNTU

No JENIS PEKERJAAN

All Steel Conduit & Accessories material, complie with ANSI 801/80.5
(IEC 60614/61084/61035) with Galvafroid Metalic Paint, Threaded Conduit Joint and screw covers
Shall be coated with an electrically conductive,.
24.1 3/4 " Diameter (Length 3200 mm) Rigid Steel Conduit,
Hot Dip Galvanized, Complies.
24.2 3/4 " Diameter (Length 3200 mm) PVC Conduit,

25 FLEXIBLE CONDUIT
25.1 3/4" Flexible Conduit, Liquit Tight Galvanized strong steel strip helically wound
with nylon sealing cord heavy duty flexible PVC covered, water tight seal, UL A2066
bonded liquit tight in size 3/4" IEC 529.

26 CONDUIT FITTING
26.1 3/4" PVC "TE"

27 ELECTRICAL CABLE TAPE


27.1 Electrical Vinyl Insulation Tape Red Colour.
27.2 Electrical Vinyl Insulation Tape Black Colour.
27.3 Electrical Vinyl Insulation Tape Blue Colour.
27.4 Electrical Vinyl Insulation Tape Yellow Colour.
27.5 Electrical Vinyl Insulation Tape Green Colour.

28 CABLE TIES
Fully Coated Stainless Steel 316 SS Cable Ties.

95
UNTU

No JENIS PEKERJAAN

28.1 4.6 mm (w) x 201 mm (L)


28.2 4.6 mm (w) x 362 mm (L)
28.3 4.6 mm (w) x 521 mm (L)
28.3 Sealing Compound.

Total 5

6 PEKERJAAN INSTRUMENT

1 CONTROL SYSTEM
1.1 Jetty Area
1.1.1 Remote Terminal Unit (RTU) System, Classified in Class 1 Div 2
RTU module, 33 MHz, 4 MB ROM, 16 MB RAM, 2 x serial port, 2 x ethernet port, 1 x USB A port, 1 x USB B port, I/O modules, 24 VDC Power Supply, battery for me
terminal wiring, terminal block, grounding etc, Fiber Optic (FO) Converter, Surge Arrester for each I/O, Enclosure for RTU, Panel Dimension (by vendor), outdoor, C
single front door, NEMA4X & 7, the RTU supplied shall meet minimum SIL 2 performance criteria as defined in IEC 61511, Material Cooper-Free Cast almunium (bo
316SS (bolt-nut-hinge), c/w mounting panel.
- Panel Dimension (as minimum): 1000 mm H x 1200 mm W x 300 mm D, include plinth. With plate thickness 2.5mm (top, side, back) and 3 mm (front and door).
- Rack consist of:
- CPU Controller 2.0 EA
- 24 VDC Power Supply 2.0 EA
- Communication Module 2.0 EA
- Analog Input (AI) Module, 24 Vdc, 4-20 mA, 8 Channels 1.0 EA
- Digital Input (DI) Module, 24 Vdc, 8 Channels 1.0 EA
- Digital Output (DO) Module, 24 Vdc, 8 Channels 1.0 EA

96
UNTU

No JENIS PEKERJAAN

- Complete with Fiber Optic (FO) Converter 2.0 EA


- Complete with all components for termination/wiring 1.0 LOT
- Surge Arrester for each I/O 1.0 LOT

1.2 Control Room


1.2.1 Industrial PC for Workstation
Latest version industrial type, Intel Processor Core-i7, 24" LCD, HDD 1 TB (minimum), RAM 16 GB , 16X DVD +/- RW Drive, GA NVIDIA Quadro K600 1GB, complete
Logic Developer Software, the latest windows based OS (which is compatible with DCS/PLC), MS Office (MS Office and Excell for OWS and EWS, Power Point for EW
Adobe Reader (for all PC's), anti virus, keyboard and mouse USB Port.
- Applicable for :
- Operator Workstation (OWS) 2.0 EA
- Engineering Workstation (EWS) 1.0 EA
- TAS Workstation 1.0 EA

1.2.2 PCS Cabinet (Complete System and Marshalling Cabinet)


The Process Control system shall perform all process control functions indicated on the applicable project P&ID's and related process control narrative documents.
The purpose of the PCS is to maintain the process within the operating envelope by the use of field sensors and control actuators. The offered system shall be
furnished with redundant CPU Controller, power supply and communication module.
- Panel Dimension (as minimum): 2100 mm H x 800 mm W x 800 mm D, include plinth. With plate thickness 2.5mm (top, side, back) and 3 mm (front and door).
- Consist of:
- Base Module or Chassis 2.0 EA
- Interface Module 2.0 EA
- Power Supply Module 2.0 EA
- CPU Controller 2.0 EA

97
UNTU

No JENIS PEKERJAAN

- Communication Module 2.0 EA


- Analog Input (AI) Module, 24 Vdc, 4-20 mA, 16 Channels 2.0 EA
- Analog Output (AO) Module, 24 Vdc, 4-20 mA, 8 Channels 1.0 EA
- Digital Input (DI) Module, 24 Vdc, 32 Channels 3.0 EA
- Digital Output (DO) Module, 24 Vdc, 32 Channels 2.0 EA
- Surge Arrester for each I/O 1.0 LOT
- Signal/System Cables 1.0 LOT
- Terminal Board For Analog 1.0 LOT
- Terminal Board For Digital 1.0 LOT
- Relay Board For Digital Output 1.0 LOT
- Wiring Check Adapter For Digital Input 1.0 LOT
- Panel Accessories: 1.0 LOT
- Fan
- Ventilation
- Light
- Door Switch
- Lifting Eye
- Cable Duck
- Terminal Block
- Rear and Front Door
- Grounding System

1.2.3 SIS Cabinet (Complete System and Marshalling Cabinet)


This system shall be in charge of all emergency and process shutdown actions. The purpose of the ESD & FGS systems are to monitor process safety parameters, ES

98
UNTU

No JENIS PEKERJAAN

buttons and signals received. The Safety Instrumented System shall be designed on a fail-safe basis so that its failure shall place the plant process in safe shutdown
conditions. The SIS supplied shall meet minimum SIL 2 performance criteria as defined in IEC 61511. The offered system shall be furnished with redundant CPU Co
power supply and communication module.
- Panel Dimension (as minimum): 2100 mm H x 800 mm W x 800 mm D, include plinth. With plate thickness 2.5mm (top, side, back) and 3 mm (front and door).
- Consist of:
- Base Module or Chassis 2.0 EA
- Interface Module 2.0 EA
- Power Supply Module 2.0 EA
- CPU Controller 2.0 EA
- Communication Module 2.0 EA
- Analog Input (AI) Module, 24 Vdc, 4-20 mA, 16 Channels 2.0 EA
- Analog Output (AO) Module, 24 Vdc, 4-20 mA, 8 Channels 0.0 EA
- Digital Input (DI) Module, 24 Vdc, 32 Channels 4.0 EA
- Digital Output (DO) Module, 24 Vdc, 32 Channels 2.0 EA
- Surge Arrester for each I/O 1.0 LOT
- Signal/System Cables 1.0 LOT
- Terminal Board For Analog 1.0 LOT
- Terminal Board For Digital 1.0 LOT
- Relay Board For Digital Output 1.0 LOT
- Wiring Check Adapter For Digital Input 1.0 LOT
- Panel Accessories: 1.0 LOT
- Fan
- Ventilation
- Light

99
UNTU

No JENIS PEKERJAAN

- Door Switch
- Lifting Eye
- Cable Duck
- Terminal Block
- Rear and Front Door
- Grounding System

1.2.4 Server Cabinet


Latest version industrial type, Intel Processor Core-i7, HDD 1 TB (minimum), RAM 16 GB, 16X DVD +/- RW Drive, GA NVIDIA Quadro K600 1GB, complete with
the latest widows based OS (which is compatible with DCS/PLC), MS Office, Adobe Reader.
- Panel Dimension (as minimum): 2100 mm H x 800 mm W x 800 mm D, include plinth. With plate thickness 2.5mm (top, side, back) and 3 mm (front and door).
- Consist of:
- Monitor (24 inch) 1.0 EA
- Keyboard 1.0 EA
- Mouse 1.0 EA
- TAS Server 2.0 EA
- Historian Server 2.0 EA
- Inventory Server 1.0 EA
- OPC Gateway Server 1.0 EA
- Network Switch 2.0 EA
- Dual Homing Switch 2.0 EA
- KVM (Keyboard, Video, Monitoring) Switch 1.0 EA
- Fiber Optic Converter 1.0 EA
- Router with Firewall 1.0 EA

100
UNTU

No JENIS PEKERJAAN

1.2.5 System Accessories


1.2.5.1 Large Screen Monitor 42 inch with bracket
1.2.5.2 Color Laser Printer
1.2.5.3 Dot Matrix Printer
1.2.5.4 Desk
1.2.5.5 Chair
1.2.5.6 Video Switcher

1.2.6 Tas Management System hardware & Software (Tas Ms Software Include Programming (International License))
- Consist of:
A. Main Activities or Services provided at the Terminal, including but not limited to:
- Truck Loading and Unloading
- Pipeline
- Tank to Tank Transfer
B. Main System Functionalities Required, including but not limited to:
- SAP/ERP interface
- Order Management
- Operation (Activity) Scheduling
- Operation (Job) Management
- Report Management
- Master Data Management
- Tank Inventory Management (by ATG)
C. Additional System Functionalities Required, including but not limited to:

101
UNTU

No JENIS PEKERJAAN

- Queue management (truck)


- Tank volume calculation
- Book inventory and Loss/ Gain
D. Report, including but not limited to:
- Order List for Truck
- Master data printout
- BOL for Truck of each owner
- Instruction sheet for Truck
- Result list per Truck of Terminal
- Result list per user of each owner
- Result list per customer of each owner
- Tank Inventory Report per Tank
- Actual Inventory Report per Product
- Book Inventory Report per Product with Loss/ Gain data

1.2.7 Safety System for Termnal Process Flow Sequence


Gate Barrier 4.0 meters Round Arms, including:
- Automatic re-hanging device with protecting arm and arm swing-off detection.
- Protecting arm in carbon fibre (polyurethene sheath and sleeve in marine variety fibre fabric).
- Protection switches in case off door and cover opening.
- Automatic release locking in case of power failure or emergency.
- Push bottom box in 3 bottoms, there are opening, closing and stop bottom.
- Inductive loop for detection car (2x1 meter) /connection 5 meter.
- Presense detector - DP double channel.

102
UNTU

No JENIS PEKERJAAN

- Control board for command and functional configuration to be connected to the client control room
- ASTM F2200-14 Automated Vehicular Gates - Building Design And Construction
- Protection Class IP 44
- Finger-print
- Proximity Card Reader
- Printer Filling Aadvice Note (for Gate-in)
- Printer Dot-Matriks (for Gate-out)

2 Tank Gauging Interface System


The tank gauging system shall be designed as a remote measuring and monitoring system, where all relevant information on Liquid Petroleum Gas tanks inventory
including level, density, spot temperature(for Liquid and Vapor) and vapor pressure are collected, stored, and displayed accordingly.
2.1 Software
- Type: Webserver Based, Tank Data Scanning and Calculation in One Unit
- Protection: Username and Password
- Reporting: Real-time + Historical
- Alarm priorities: High-High(HH), High(H), Low(L), Low-Low(LL)
- Volume Correction Methods: API/ASTM
- Number of users: 5
- Measured Data: Level, Temperature, Water Level, Density, Vapor temperature, Vapor pressure, and
Product Pressure.
- Calculated Data: Total Observed Volume, Water Volume, Gross Observed Volume,
Standard Density, Net Standard Volume, Mass, Available Volume, Mass, and Volume
Correction Factor (VCF).

2.2 Hardware

103
UNTU

No JENIS PEKERJAAN

Latest version industrial type, Intel Processor Core-i7, 24" LCD, HDD 1 TB (minimum), RAM 16 GB , 16X DVD +/- RW Drive, GA NVIDIA Quadro K600 1GB, complete
Logic Developer Software, the latest windows based OS (which is compatible with DCS/PLC), MS Office (MS Office and Excell for OWS and EWS, Power Point for EW
Adobe Reader (for all PC's), anti virus, keyboard and mouse USB Port.

3 MOV Master Station


MOV Master Station Panel (60 Channel), complete with:
The master station shall be of microprocessor type, suitable either for panel or 19” rack mounting. All signals from the master station to the field units shall be suit
transmission over a 2 wire twisted pair cable with overall screen and shall use a current loop serial data communication
It shall be suitable for the following operational conditions:
- Operating temperature: -10 to 50 oC.
- Storage temperature: -10 to 70 oC.
- Relative Humidity: 5% to 95% non-condensing.
- Power: 85-265 Vac, 47~63 Hz, 18-36 Vdc
The master station shall include a graphical colour LCD display panel and operator control keypad.
Host system communication shall be by RS232, RS485 or Ethernet. The host protocol shall be Modbus or Modbus TCP to minimise custom software and programm
be 4 host ports available, 2 serial ports, selectable as either RS232 or RS485 and 2 Ethernet ports.
The 2 wire loop shall use a 20 mA current for data transmission with a maximum applied voltage of 17V.

4 MOV & ATG Cabinet


- Panel Dimension (as minimum): 2100 mm H x 800 mm W x 800 mm D, include plinth. With plate thickness 2.5mm (top, side, back) and 3 mm (front and door).
- Panel Accessories:
- Fan

104
UNTU

No JENIS PEKERJAAN

- Ventilation
- Light
- Door Switch
- Lifting Eye
- Cable Duck
- Terminal Block
- Rear and Front Door
- Grounding System

5 Fire Alarm Control Panel (FACP) - Ref.: DMI-DSH-60-018-A4 F&G DEVICES REV 0
System Capacity:
- Indoor installation with IP 55 ingress protection as minimum.
- Type: Fire Alarm Panel with Display
- Intelligent Signaling Line Circuits: 1, expandable to 10.
- Intelligent Detectors: 159 per loop.
- Addressable Monitor/Control Modules: 159 per loop.
- Main power supply and battery charger: 220/240 VAC, 50/60 Hz, 1.5 A.
- Output Power: 24 V , 4.5 A (in Alarm)
- Supplied with Power Supply and Network Communication Module.
- Display: Large 16 line, 640 character LCD backlit display

6 CCTV System - Ref.: DMI-DSH-60-017-A4 CCTV REV 0


6.1 Big Screen for CCTV (LCD 60") 1.0 EA

105
UNTU

No JENIS PEKERJAAN

6.2 CPU with minimum 1TB Internal Hardisk, Software CCTV (Digital Video Manager (DVM)) & accessories 1.0 EA
6.3 DVR (Digital Video Recorder) 1.0 EA
6.4 Keyboard & Joystick 1.0 EA
6.5 CCTV Monitor LED 24 inch 1.0 EA
6.6 CCTV Server (Database and Camera Server) 1.0 EA
6.7 CCTV Panel, IP 54 (600mm (W) x 600mm (D) x 700 mm (H) x 2mm (Thk)) 1.0 EA
6.8 Fix CCTV Camera, Weather Proof, IP65 (Angle of View 48' - 2.8" (H)), Resolutions: 5-MP that provide a 180°. 2.0 EA
6.9 PTZ CCTV Camera, Weather Proof, IP65 (Angle of View 48' - 2.8" (H)), Resolution: min. 650TVL 2.0 EA
6.10 PTZ CCTV Camera, Explosion Proof, IP65 (Angle of View 48' - 2.8" (H)), Resolution: min. 650TVL 2.0 EA
6.11 Converter Coaxial to FO 1.0 EA
6.12 CCTV Cable :
- Power Cable 400.0 M
- Ethernet / Data Cable Cat 6 200.0 M
6.13 4" Stanchion Pipe Sch.40 for CCTV Camera Outdoor Support (1Ea = 5m) 6.0 EA

7 HOOK-UP - Ref.: DMI-DWG-060-001-A3 HOOK UP DRAWING


7.1 2-Way valve manifold 1/2" NPT-F x 1/2" NPT-F, 316SS
7.2 5-Way valve manifold 1/2" NPT-F x 1/2" NPT-F, 316SS
7.3 Ball valve 1/2" NPT-F, 316SS
7.4 Block & Bleed Valve 1/2" NPT, 316SS
7.5 Hex Head, plug, SMLS 1/2" NPT-M, A182, 316SS
7.6 Hex reducing nipple 3/4" NPT-M x 1/2" NPT-M, 316SS
7.7 Male Conn. (double fer1/2"ODx1/2" NPT-M, A182, 316SS
7.8 Male Conn. (double fer1/2"ODx1/4" NPT-M, A182, 316SS

106
UNTU

No JENIS PEKERJAAN

7.9 Male Conn. (double fer1/2"ODx3/4" NPT-M, A182, 316SS


7.10 Multiport gauge valve 1/2" NPT-F x 3/4" NPT-M, 316SS
7.11 Tube, smls 1/2" OD - 0.049" WT, ASTM A269, 316SS
7.12 Tube cap 1/2" OD, 316SS
7.13 Union Conn. (double fe1/2"OD, A182, 316SS
7.14 Union Conn. (double fe3/4"OD, A182, 316SS
7.15 Plug 1/2" NPT-M, 316SS
7.16 Hex long Nipple 1/2"OD x 3"LG, 316SS
7.17 Hex long Nipple 3/4"OD x 3"LG, 316SS

8 SUPPORT - Ref.: DMI-DWG-60-006-A3 INSTRUMENT STANDARD DWG


8.1 Support for Transmitter
8.1.1 2" Pipe Stanchion, Sch.40, CS Galvanized
8.1.2 2" Cap Pipe, Sch 40, CS Galvanized
8.1.3 Stiffener Plate 6" x 3" x 1/4", 1/4 " Thickness. CS
8.1.4 Base Plate 8" X 8" X 1/2" Thickness. CS.
8.1.5 3/8" x 1-1/2" Bolt C/W Nut & Washer.
8.1.6 Steel Chanel, (100Wx50Hx6THK)mm, CS GALVANIZED
8.1.7 Steel Angle, (50Wx50Hx5THK)mm, CS GALVANIZED
8.1.8 HEX HEAD SCREW c/w Nuts & Washers, M6x25mm LG, 316 SS
8.1.9 DYNA BOLT, M14x150mm LG, CS GALVANIZED
8.1.10 DYNA BOLT, M14x75mm LG, CS GALVANIZED

8.2 Support for F & G System

107
UNTU

No JENIS PEKERJAAN

8.2.1 2" Pipe Stanchion, Sch.40, CS Galvanized


8.2.2 2" Cap Pipe, Sch 40, CS Galvanized
8.2.3 Stiffener Plate 6" x 3" x 1/4", 1/4 " Thickness. CS
8.2.4 Base Plate 8" X 8" X 1/2" Thickness. CS.
8.2.5 3/8" x 1-1/2" Bolt C/W Nut & Washer.
8.2.6 Steel Chanel, (100Wx50Hx6THK)mm, CS GALVANIZED
8.2.7 Steel Angle, (50Wx50Hx5THK)mm, CS GALVANIZED
8.2.8 HEX HEAD SCREW c/w Nuts & Washers, M6x25mm LG, 316 SS
8.2.9 DYNA BOLT, M14x150mm LG, CS GALVANIZED
8.2.10 DYNA BOLT, M14x75mm LG, CS GALVANIZED

9 FIELD INSTRUMENT - LPG


9.1 Pressure Instrument
9.1.1 Pressure Gauge - Ref.: DMI-DSH-60-001-A4
9.1.2 Pressure Switch - Ref.: DMI-DSH-60-002-A4
9.1.3 Pressure Indicator Transmitter - Ref.: DMI-DSH-60-003-A4
9.1.4 Pressure Differential Transmitter - Ref.: DMI-DSH-60-005-A4

9.2 Level Instrument


9.2.1 Automatic Tank Gauging (ATG) Complete Package - datasheet no.: DMI-DSH-60-009-A4
Each tank include:
- Level Transmitter (SERVO Type) 1.0 EA
- Pressure Indicator Transmitter 2.0 EA
- Temperature Indicator Transmitter 2.0 EA

108
UNTU

No JENIS PEKERJAAN

- Tank Side Monitor 1.0 EA


- Power Switch 1.0 EA
9.2.2 Level Gauge - datasheet no.: DMI-DSH-60-007-A4
- Magnetic Type
- Glass Type
9.2.3 Level Switch - datasheet no.: DMI-DSH-60-008-A4
- Displacer type
- Floating type

9.3 Temperature Instrument


9.3.1 Temperature Gauge & Thermowell - datasheet no.: DMI-DSH-60-006-A4
9.3.2 Temperature Transmitter & Thermowell - datasheet no.: DMI-DSH-60-015-A4

9.4 Instrument Valve


9.4.1 Shutdown Valve (SDV) - datasheet no.: DMI-DSH-60-013-A4
Size : 6" - 300#
Size : 10" - 300#
Size : 12" - 300#
Size : 16" - 300#
9.4.2 Pressure Safety Valve - datasheet no.: DMI-DSH-60-011-A4
Size : 3/4"-300# RF X 1"-150# RF
Size : 6"-600# RF X 10"-150# RF
Size : 1"-150# RF X 2"-150# RF
9.4.3 Motor Operated Valve (MOV) - datasheet no.: DMI-DSH-60-012-A4

109
UNTU

No JENIS PEKERJAAN

Size : 6" - 300#


Size : 10" - 300#
Size : 12" - 300#
Size : 16" - 300#
9.4.4 Pressure Self Regulated Valve - datasheet no.: DMI-DSH-60-004-A4
Size : 1" - 150#
9.4.5 Process Shutdown Valve (XV) - datasheet no.: DMI-DSH-60-022-A4
Size : 8" - 150#
9.4.6 Control Valve - datasheet no.: DMI-DSH-60-010-A4
Size : 3" - 300# RF

9.5 Analyzer
9.5.1 Dew Point Analyzer - datasheet no.: DMI-DSH-060-014-A4

9.6 Flow Instrument


9.6.1 Flow Metering System - datasheet no.: DMI-DSH-60-016-A4
9.6.1.1 Jetty LPG Metering Package (M-200); Metering Skid, one skid for dual stream (liquid and vapor), consist of:
Liquid Meter
- Coriolis Mass Flowmeter 1.0 EA
- Pressure Control Valve 1.0 EA
- Pressure Transmitter 2.0 EA
- Temperature Transmitter, c/w thermowell 1.0 EA
- Differential Pressure Indicator 1.0 EA
- Pressure Indicator 1.0 EA

110
UNTU

No JENIS PEKERJAAN

- Basket Strainer, c/w air eliminator 1.0 EA

Vapour Meter
- Coriolis Mass Flowmeter 1.0 EA

Other
- Flow Computer, c/w accessories 1.0 EA
- Standing control panel, c/w accessories 1.0 EA

9.6.1.2 LPG Truck Loading Metering Package (300-M-01/02/03)


9.6.1.2.1 Truck Loading (300-M-01), consist of:
Liquid Meter
- Coriolis Mass Flowmeter 1.0 EA
- Digital Control Valve 1.0 EA
- Pressure Transmitter 1.0 EA
- Temperature Transmitter, c/w thermowell 1.0 EA
- Differential Pressure Indicator 1.0 EA
- Pressure Indicator 2.0 EA
- Basket Strainer, c/w air eliminator 1.0 EA
- Thermal Relief Valve 1.0 EA

Vapour Meter
- Coriolis Mass Flowmeter 1.0 EA

111
UNTU

No JENIS PEKERJAAN

Other
- Batch Control Unit, c/w accessories 1.0 EA
- Grounding System, c/w accessories 1.0 EA

9.6.1.2.2 Truck Loading (300-M-02), consist of:


Liquid Meter
- Coriolis Mass Flowmeter 1.0 EA
- Digital Control Valve 1.0 EA
- Pressure Transmitter 1.0 EA
- Temperature Transmitter, c/w thermowell 1.0 EA
- Differential Pressure Indicator 1.0 EA
- Pressure Indicator 2.0 EA
- Basket Strainer, c/w air eliminator 1.0 EA
- Thermal Relief Valve 1.0 EA

Vapour Meter
- Coriolis Mass Flowmeter 1.0 EA

Other
- Batch Control Unit, c/w accessories 1.0 EA
- Grounding System, c/w accessories 1.0 EA

9.6.1.2.3 Truck Loading (300-M-03), consist of:


Liquid Meter

112
UNTU

No JENIS PEKERJAAN

- Coriolis Mass Flowmeter 1.0 EA


- Digital Control Valve 1.0 EA
- Pressure Transmitter 1.0 EA
- Temperature Transmitter, c/w thermowell 1.0 EA
- Differential Pressure Indicator 1.0 EA
- Pressure Indicator 2.0 EA
- Basket Strainer, c/w air eliminator 1.0 EA
- Thermal Relief Valve 1.0 EA

Vapour Meter
- Coriolis Mass Flowmeter 1.0 EA

Other
- Batch Control Unit, c/w accessories 1.0 EA
- Grounding System, c/w accessories 1.0 EA

9.6.2 Orifice Plate and Flange - datasheet no.: DMI-DSH-60-019-A4


Size : 8"-150# RF
Size : 10"-150# RF
Size : 16"-150# RF

9.6.3 Restriction Orifice - datasheet no.: DMI-DSH-60-020-A4


Size : 2"-150# RF
Size : 3"-150# RF

113
UNTU

No JENIS PEKERJAAN

Size : 4"-150# RF
Size : 10"-150# RF
Size : 16"-150# RF
Size : 3"-300# RF

9.6.4 Flow Indicator (D/P Type)

9.7 Fire And Gas - datasheet no.: DMI-DSH-60-018-A4


9.7.1 Smoke Detector (Indoor Service)
Photoelectric type, Red led local display, electrical connection M20, 24 VDC Operating Voltage, IP 21 ingress protection, coverage 100 m2 (VTA),
nominal sensitivity 3.5 % m on grey smoke, capable with looping configuration (addressable type).

9.7.2 Heat Detector (Indoor Service)


Point Type Rate of Risen detector, Red led local display, electrical connection 1/2" NPTF, 2 wire with armour, 24 VDC (supply), IP 21 ingress protection,
Accuracy ± 0.25 % from span or better, Capable with looping configuration (addressable type).

9.7.3 Gas Detector (Outdoor Service)


Microprocessor based absorp IR radiation at specific wavelength by HC Gas & Vapor, Low alarm: 20% LEL: High alarm: 60%LEL suitable for Class I, Div 2, Gr. IIA, high
ATEX & FM approval

9.7.4 Flame Detector (Outdoor Service)


Multi spectrum design, capable detect fire at 50 m in less than 5 seconds suitable for Class I, Div 2, Gr. IIA, high reliability, ATEX & FM approval

9.7.5 Manual Call Point (Indoor Service)

114
UNTU

No JENIS PEKERJAAN

Break glass type, electrical connection 1/2" NPTF, Relay Contact (SPDT) output (dry contact), DC 125 V, 0.5 Amp as minimum, IP 21 ingress protection, Wall Mount
Capable with looping configuration.

9.7.6 Manual Call Point (Outdoor Service)


Location hazardous, Weather Proof, “Lift Flap” Type, 24VDC, loop powered, SPDT Free Contact Relay, Epoxy Coated Aluminium Housing Material,
IP 65, Wall Mounted or Steel Channel, 2-Wire, UL or FM Listed

9.7.7 Beacon (Indoor Service)


Flashing light type, glass material for lens & Red color, IP21 for case protection, 60/min flashing rate, twin replaceable tubes, 1200 Cd for luminous intensity,
c/w mounting bracket

9.7.8 Beacon (Outoor Service)


Flashing light type, glass material for lens & Red color, IP65 for case protection, 60/min flashing rate, twin replaceable tubes, 1200 Cd for luminous intensity,
c/w mounting bracket

9.7.9 Sirene / Audible Alarm (Indoor Service)


Glass Reinforced Polyester (GRP), c/w Swivel bracket, 24 VDC, 110db for Sound Output, location hazardous, Weather Proof, IP 21

9.7.10 Sirene / Audible Alarm (Outdoor Service)


Glass Reinforced Polyester (GRP), c/w Swivel bracket, 24 VDC, 110db for Sound Output, location hazardous, Weather Proof, IP 65

9.7.11 Emergency Push Button (PB)


Mushroom head, mounted on alumunium die cast/anti corrosion painted sheet steel box, complete with protective cover and lock, electrical connection 1/2" NPT,

115
UNTU

No JENIS PEKERJAAN

10 JUNCTION BOX - LPG


Tag No. See List Bellow
Signal Type Analog Signal, 4-20 mA, Two and Three Wire with Individual and Overall Screen
Digital Signal, 24 VDC, Two Wire with Overall Screen
Material 316 SS
Thickness Mfr. Std
Door Hinged, Removable, Front Open and Lockable
Hinge Material 316 SS
Gland Plate (Bottom) 316 SS Removable with Gasket and Screws, Drilled to suit the Cable Gland
Bottom Entries Drilled Holes suitable for Gland c/w Temporary and Permanent Plug (Hazardous area certification)
Terminal Block Screw Type Equipped with Sequence Number c/w Plate and End Bracket, Vertical Mounting Rail
Terminal Size Suitable with 1 - 2.5 mm2
No. of Terminal See List, Complete with Jumper Bar for Screen / Earth Wire
Body Earthing Yes
Instrument Earthing, B Yes
Enclosure Mounting Yes, Suitable for Horizontal
Accessories Mounting Yes (Vendor to Specify)
Certification Certified Eex (d) for use in Zone 1 Group IIA, T3
Suitable for Hazardous Area
Weather Proof IP 65 (Minimum)
Label Tag No. shall be Labelled on the Front Door (316 SS)
Cerification Number shall be Fixed as per Manufacturer Standard
Breather / Drain Plug To be Insttalled on Bottom of Junction Box, Certified for IP 56 (min) and Zone 1, Gr. IIA, T-3
Manufacture VTA

116
UNTU

No JENIS PEKERJAAN

Model VTA
No. of Cable Entries onVTA
Dimension See List Bellow

Terminal
Tag no. Dimension (VTA)
Strip Block
XXX-IJB-X-001 340W x 170H x 150 D mm 14 1
XXX-IJB-X-002 340W x 170H x 150 D mm 14 1
XXX-IJB-X-003 340W x 170H x 150 D mm 14 1
XXX-IJB-X-004 340W x 170H x 150 D mm 14 1
XXX-IJB-X-005 340W x 170H x 150 D mm 14 1
XXX-IJB-X-006 340W x 170H x 150 D mm 14 1
XXX-IJB-X-007 340W x 170H x 150 D mm 21 1
XXX-IJB-X-008 340W x 170H x 150 D mm 21 1
XXX-IJB-X-009 340W x 170H x 150 D mm 21 1
XXX-IJB-X-010 340W x 340H x 150 D mm 24 1
XXX-IJB-X-011 340W x 340H x 150 D mm 24 1
XXX-IJB-X-012 340W x 340H x 150 D mm 24 1
XXX-IJB-X-013 340W x 340H x 150 D mm 24 1
XXX-IJB-X-014 340W x 340H x 150 D mm 24 1
XXX-IJB-X-015 340W x 340H x 150 D mm 24 1
XXX-IJB-X-016 340W x 340H x 150 D mm 24 1
XXX-IJB-X-017 340W x 340H x 150 D mm 24 1
XXX-IJB-X-018 340W x 340H x 150 D mm 36 1

117
UNTU

No JENIS PEKERJAAN

XXX-IJB-X-019 340W x 340H x 150 D mm 36 1


XXX-IJB-X-020 600W x 400H x 150 D mm 38 1
XXX-IJB-X-021 600W x 400H x 150 D mm 38 1
XXX-IJB-X-022 600W x 400H x 150 D mm 38 1
XXX-IJB-X-023 600W x 400H x 150 D mm 57 1

11 CABLE - LPG
11.1 Instrument and Control Cable
Size : 1 Pr x 1.5 mm2
: 7 Pr x 1.5 mm2
: 12 Pr x 1.5 mm2
: 19 Pr x 1.5 mm2
: 1 Pr x 2.5 mm2
: 7 Pr x 2.5 mm2
: 12 Pr x 2.5 mm2
: 19 Pr x 2.5 mm2

Service Voltage : 24 VDC System


Insulation Grade : 300 V
Color Wire Cable : White - Black
Conductor Material
a) Cooper cable cores shall be made of circular stranded annealed bare cooper
b) Conductors shall be 7-stranded copper wire

118
UNTU

No JENIS PEKERJAAN

Conductor Insulation Material


a) Cross Linked Polyethylene (XLPE)
b) Suitable for direct buried installation
c) Flame Retardant as per IEC 60332
d) Clearly marked at each along its length
Screen/Shield
a) Individual screen/shield an overall screen/shield is required to prevent interferences
b) Individual screen/shield shall be 100% coverage of 1.77 mils of aluminum mylar tape and 7-stranded tinned copper drain wire.
c) Overall screen/shield shall be 100% coverage of 2.35 mils minimum of aluminum tape and 7-stranded tinned copper drain wire.
Outer Sheath
The outer sheath material shall be Polyvinyl Chloride (PVC) containing necessary additive to meet the following characteristics
such as:
a) Flame Retardant
b) Sunlight Resistant
c) Proofed against Aliphatic Hydrocarbons
d) Low smoke zero halogen
e) Gas and vapor tight
Armour : Armour shall be Steel Wire Armour (SWA) type and electrically continuous throughout the length of cable
Outer Sheath Colour : Grey

11.2 All Critical Safety System Cable ( F&G and ESD System)
Size : 1 PR x 1.5 mm2
: 7 PR x 1.5 mm2
: 12 PR x 1.5 mm2

119
UNTU

No JENIS PEKERJAAN

: 19 PR x 1.5 mm2
: 1 PR x 2.5 mm2
: 12 PR x 2.5 mm2
: 1 TR x 1.5 mm2
: 19 TR x 1.5 mm2

Service Voltage : 24 VDC System


Insulation Grade : 600 V
Color Wire Cable a) Pair : Black, white and number coded
b) Triad : Red,black,white and number coded
Conductor Material
a) Cooper cable cores shall be made of circular stranded annealed bare cooper
b) Conductors shall be 7-stranded copper wire
Conductor Insulation Material
a) Cross Linked Polyethylene (XLPE)
b) Suitable for direct buried installation
c) Fire Resistant as per IEC 60331
d) Clearly marked at each along its length
Screen/Shield
a) Individual screen/shield an overall screen/shield is required to prevent interferences.
b) Individual screen/shield shall be 100% coverage of 1.77 mils of aluminum mylar tape and 7-stranded tinned copper drain wire.
c) Overall screen/shield shall be 100% coverage of 2.35 mils minimum of aluminum tape and 7-stranded tinned copper drain wire.
Outer Sheath
The outer sheath material shall be Polyvinyl Chloride (PVC) containing necessary additive to meet the following characteristics

120
UNTU

No JENIS PEKERJAAN

such as:
a) Fire Resistant
b) Sunlight Resistant
c) Proofed against Aliphatic Hydrocarbons
d) Low smoke zero halogen
e) Gas and vapor tight

Armour : Armour shall be Steel Wire Armour (SWA) type and electrically continuous throughout the length of cable
Outer Sheath Colour : Red
Fire Resistant Layer : Mica Glass Type
Fire Resistant Characteristic
- IEC 60331-21 : 1999 (750°C-90 min fire alone).
- BSE 6387 category C.W.Z (950°C-3 Hours fire alone).
- SS 299 part 2 : 1998 (950°C-3 Hours).
Fillers & Binders : Solid,non hygroscopic type and a suitable binder tape

11.3 Serial Link Cable : Flame retardant as per IEC-60332 and Armoured cable,
Size : 2 x 0.35 mm2 (22 AWG)
Service Voltage : 24 VDC System
Insulation Grade : 250 V / 105 degC
Color Wire Cable a) Pair#1 : White/Blue Stripe & Blue/White Stripe
b) Pair#2 : White/Orange Stripe & Orange/White Stripe
Conductor Material a) Cooper cable cores shall be made of circular stranded annealed bare cooper

121
UNTU

No JENIS PEKERJAAN

b) Conductors shall be 7-stranded copper wire


Conductor Insulation Ma) Cross Linked Polyethylene (XLPE)
b) Suitable for direct buried installation
c) Flame Retardant as per IEC 60332
d) Clearly marked at each along its length
Screen/Shield : Wrapped with an overlapping synthetic polymer-backed aluminium tape
Outer Sheath : The outer sheath material shall be Polyvinyl Chloride (PVC) containing
necessary additive to meet the following characteristics such as:
a) Flame Retardant
b) Sunlight Resistant
c) Proofed against Aliphatic Hydrocarbons
d) Low smoke zero halogen
e) Gas and vapor tight
Armour f) Armour shall be Steel Wire Armour (SWA) type and electrically continuous throughout
the length of cable
Outer Sheath Colour : Black

11.4 Ethernet Cable


Category : Cat 6
Type : Twisted pair
Connection Standard :: Utilizes
Supports allGigabit
four pairs
Ethernet speeds up to
Data Transfer Speed 1 Gbps
Bandwidth : 250MHz.

122
UNTU

No JENIS PEKERJAAN

11.5 Grounding Cable : Single Core Grounding Cable


Conductor : Metal coated (tinned) anneealed copper conductor
Voltage Rating : 300 / 500 Vrms at 70 °C
Outer Sheath : Polyvinyl Chloride
Sheath Color : Green with Yellow Stripes
Size : 1Cx6mm2, Cu XLPE/ SWA/PVC /OS /IS (600V), Armour Type
: 1Cx16mm2, Cu XLPE/ SWA/PVC /OS /IS (600V), Armour Type
: 1Cx35mm2, Cu XLPE/ SWA/PVC /OS /IS (600V), Armour Type

11.6 Fiber Optic Cable : Single mode, Armoured, Flame Retardant, Black Outer sheath.
Number of Cores : 4 Cores
Core Diameter : 9 micron
Cladding diameter : 125 micron
Attenuation : 0.4 / 0.25 dB/km
Bandwith : ~ 100 TeraHz
Outer Sheath Colour : Black
Armour : Yes (Corrugated Steel Armor)

12 ACCESSORIES CABLE - LPG


12.1 Cable Gland
Material : Brass finished with chrome/nickle plate c/w lock nut, IP Washer
For Steel Wire Armour Cable, Sealing component
IP 65, Eex"d", Deluge Seal Type

123
UNTU

No JENIS PEKERJAAN

Suitable for hazardous area Zone 1, Gr. IIA, T-3


Size : : 1/2" NPT-M or M20
: 3/4" NPT-M or M25
: 1" NPT-M or M32
: 1-1/4" NPT-M or M40
: 1-1/2" NPT-M or M50
: 2" NPT-M or M50
12.2 Cable Lug with Insulation
For Field Instrument Fork Type w/ Insulator, 100 pcs/pack
Size : 1.5 mm2
2.5 mm2
For Junction Box & CabFerrule/Cord End Type w/ isolator , 100 pcs/pack
Size : 1.5 mm2
2.5 mm2
For Grounding Cable High Conductivity Cast Copper Finished by Lead Plate, 100 pcs/pack
Size : : 16 mm2 x M8 Hole Dia
Grounding Accessories: Grounding Rod Copper, Diameter 16 mm x 3000 mm L
: Cable Lug Compression Type for Earth Cable, 35 mm2, Stud Hole
: Cable Lug Compression Type for Earth Cable, 95 mm2, Stud Hole
: Grounding Clamp Double Type, Dia 70 mm x Dia 35 mm
: Cooper Grounding Bas Bar, 20 mm x 80 mm x 300 mm
12.3 Cable Ties
Weather Resistant, Color Black
Size : 100 mm L x 2.5 mm - 100 pcs/pack

124
UNTU

No JENIS PEKERJAAN

200 mm L x 2.5 mm - 100 pcs/pack


12. 4 Cable Marker
Embose Type, Material Stainless Steel
Size : 20 mm (W) x 100 mm (L)
12.5 PVC Tube Wire Marker
PVC Tube White Color for Hot Marker (100 m/RolI)
Size : 100 mm L
200 mm L
12.6 Cable Route Marker
Stainless Steel Route Marker
Size : 100 mm (L) x 100 mm (W)
Straight Point
90 deg Point
"T" Branch Point
12.7 Sealing Compound
Sealing Compound for Instrument Cable Seal, Outdoor Type (1Kg / Pack)
12.8 Concrete Tile
Pre Cast Block for Cable Marker
Size : 200 mm L x 150 mm L x 50 mm D
12.9 Warning Tape
Plastic, Yellow & Black Color
12.10 Rigid Steel Conduit
Material : Steel 3000 mm(L)
Size : 1" NPT-M

125
UNTU

No JENIS PEKERJAAN

2" NPT-M
12.11 Conduit Saddle/Clamp c/w Bolt & Nut
Material : Steel
Size : 1" NPT-M
2" NPT-M

12.12 Fiber Optic Splicing Accessories


12.12.1 FO Patch Panel
Alumunium, splice type, panel or wall mounted, 12 port complete with SC connector single mode, doorlock, mounting accessories, electrical connection 1/2" NPT.

12.12.2 Pig Tail


SC, Single mode

12.12.3 Patch Cord


SC, Single mode

13 CABLE TRAY & ACCESSORIES - LPG


Cable Tray
Material Hot Dip Galvanized
13.1 Straight tray complitly with cover
Size : 150mm (W) x 50 mm (D) x 3000mm (L) x 2 Thickness
13.2 Horisontal Tee Tray complitly with cover
Size : 150 mm (W) x 50 mm (D) x 2 Thickness
13.3 Radius Elbow 90° Tray complitly with cover

126
UNTU

No JENIS PEKERJAAN

Size : 150 mm (W) x 50 mm (D) x 2 Thickness


13.4 Vertical Riser Tray complitly with cover
- Vertical Inside Riser 90° Tray
Size : 150 mm (W) x 50 mm (D) x 2 Thickness
- Vertical Outside Riser 90° Tray
Size : 150 mm (W) x 50 mm (D) x 2 Thickness
13.5 Reducer Right Hand Tray complitly with cover
Size : 150 mm(W1) x 50 mm(W2) x 50 mm (D) x 2 Thickness
13.6 Cover Clamp c/w Bolt & Nut
Size : 150 mm (W) x 50 mm (D) x 2 Thickness
13.7 Splice Plate for Stand
Size : 150 mm(H) x 2 Thickness. c/w Bolt & Nut
13.8 Jointing Plate
Size : 150 mm(H) x 2 Thickness. c/w Bolt & Nut

Total 6

7 PEKERJAAN PROCESS SAFETY

FIRE PROTECTION

1 FIRE MONITOR
FLOW RATE CAPACITY : 500 gpm (1892 l/min)
SYSTEM MANUAL

127
UNTU

No JENIS PEKERJAAN

ELEVATION ANGLE : 360 degree

2 FIRE HYDRANT / HYDRANT PILAR


FLOW RATE PER HYDRANT : 250 gpm (946.4 l/min)
SYSTEM MANUAL
C/w House cabinet, water nozzel, fire hose

3 DELUGE SYSTEM
SYSTEM AUTOMATIC
DELUGE VALVES 8 inch, ANSI 150 RF (Spherical Tank)
DELUGE VALVES 6 inch, ANSI 150 RF (Filling Shed)
DELUGE VALVES 4 inch, ANSI 150 RF (Pump Shelter)

4 ALARM CHECK VALVE


ALARM CHECK VALVE 4 inch, ANSI 150 RF
Alarm Liner Stainer
Alarm Pressure Switch
Alarm Test Valve
Alarm Trim Pipe, Fitting and Valve
Pressure Gauge ( 0 - 12 Bar, Glycerine filled)
Main Drain Valve
Retard Chamber
Water Motor Alarm Valve
Location :

128
UNTU

No JENIS PEKERJAAN

- Office & Control Building

5 SPRINKLER
Sprinkler Head
Type : Pendant
Hazard Class : Light Hazard
Discharge Pattern : Flat
Auto Sprinkler System with a Sealing Plate as an accessories.
Location : Office & Building

6 WATER SPRAY HEAD


Type : Full Cone
Pipe Connection Size : ½"
Location : Pump and Filling Shed Shelter

7 CLEAN GASEOUS AGENT SYSTEM


Clean Agent Gas Extinguishing Package Contained As Follows :
Clean Gas Agent Cylinder Package Along With Accesories.
Clean Agent Release Valve
Clean Gas Agent Delivery Piping.
Clean Gas Agent Discharge Nozzles.
Fire Detection System (Wiring Control Panel, Actuating Signaling)
Manual Operating Box
Location : Control Room, UPS, MCC Room, PLC

129
UNTU

No JENIS PEKERJAAN

WARNING LAMPS WITH INSTRUCTION "CLEaN AGENT RELEaSE" AND "EVACUATE AREA IMMEDIATELY".
AUDIBLE ALARM/SIREN.
BEACON

8 DRY CHEMICAL
Powder Wheels 63 kg (include shelter)
Portable Powder 9 kg
Portable CO2 6 kg

Total 7

8 PEKERJAAN INSPEKSI DAN TESTING


1 INSPECTION (by Contractor)
2 TESTING
NDT TEST (UNTUK TANGKI & PIPING SYTEM)
HYDROSTATIC TEST (UNTUK TANGKI & PIPING SYTEM)
N2 PURGING (UNTUK TANGKI & PIPING SYSTEM)
3 PWHT UNTUK SPERICAL TANK
4 START-UP, PRE-COMMISIONING & COMMISSIONING
5 TRAINING
6 SKPP SKPI/ PERSETUJUAN LAYAK OPERASI (PLO) - PENYIAPAN DOKUMEN

Total 8

130
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

1.00 lot

1.00 lot

1.00 lot

30,211.00 m2

el. Grubbing consists of removal


meters below the original

1.00 lot
5m2)
1.00 Ls
1.00 Ls
1.00 Ls
1.00 Ls

131
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

1 ls

1 ls

4,200.00 m

750.00 m

132
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

784.00 m

336.00 m

228.00 m

22,658.25 m3
ccordance with ASTM D 1557)
1.00 ls

133
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

581.71 m
900.07 m3
245.77 m3

51.96 m3
51.96 m3

526.50 m3

27.00 m3

39.69 m3

134
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

32.78 m3

233.24 m3

50.29 m
18.78 m3
14.09 m3
4.70 m3

10.83 m3
10.83 m3

135.32 m3

135
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

20.80 m
95.63 m3
58.06 m3

0.58 m3
1.16 m3

39.00 m2
12.80 m'

2.56 m3

57.00 btg

8.96 m3

136
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

147.97 kg
27.65 kg

77.06 kg

46.60 m
23.97 m3
14.59 m3

0.90 m3
1.62 m3

6.24 m3

49.00 btg

137
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

3.25 m3

2.89 m3

329.13 m
626.71 m3
478.11 m3

23.86 m3
23.86 m3

194.42 m3

5,570.36 kg

138
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

32.00 m
77.62 m3
65.71 m3

1.80 m3
1.80 m3

10.80 m3

225.00 btg
1.44 m3

139
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
8,739.67 kg

12.00 m
81.00 m3
1.92 m3
43.08 m3

14.40 m3

7.20 m3

140
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

1,686.80 m3

374.55 m3

584.10 m3
2,500.00 m2
2,152.00 m'

434.00 m
364.56 m3

141
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
20.62 m3
20.62 m3
182.28 m3

97.65 m3

412.00 m
296.64 m3
14.42 m3
14.42 m3
148.32 m3

65.92 m3

696.00 m
417.60 m3

142
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
5.22 m3
342.20 m3
75.40 m3
696.00 m'

20.88 m3

375.00 m
157.00 m3
2.83 m3
135.81 m3
21.20 m3
375.00 m'

21.00 m'

143
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

576.00 m3
576.00 m3
1,200.00 m'

45.00 m
71.78 m3
1.91 m3
1.91 m3
48.83 m3
270.00 m'

19.13 m3

134.00 m
195.37 m3
150.72 m3

144
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

5.66 m3
5.66 m3

24.12 m3

12.56 m3

1.54 m3

32.00 EA

145
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

88.00 m
119.28 m3
81.98 m3

16.40 m3
16.40 m3
88.00 m

560.67 m2
1,121.34 m2

300.00 m2
246.00 m2
26.00 m2

575.00 m2
50.00 m2

146
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
67.20 m2

40.00 m2

609.00 m2
50.00 m2

1,318.00 m2
443.55 m2
384.00 m2

2.00 Unit
12.00 Unit
30.00 unit
5.00 Unit
1.00 Unit

5.00 Set.
3.00 Set.

147
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
5.00 Set.
3.00 Set.
4.00 Set.

140.00 m
14.00 Set.

1.00 Lot
89.00 m'
65.00 m'
1.00 ea

4.50 m3

72.00 btg

13.61 m3

148
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

1.34 m3

40.32 m3

21.60 m3

10.50 m3

6.00 m3

0.70 m3

149
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

38.40 m3

21.60 m3

10.50 m3

6.00 m3

0.70 m3

150
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
33.00 m3

18.00 m3

9.45 m3

6.00 m3

2.52 m3

38.40 m3

151
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

1.41 m3

6.60 m3

carbon steel

1,498.44 kg
2,623.01 kg

42.00 m
64.19 m3
46.65 m3

152
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

8.56 m3
17.13 m3
46.00 m

4.61 m3

1.10 m3

3.90 m3

7.50 m3

1.90 m3

153
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

1.22 m3

6.50 m3

63.00 btg
1.44 m3

1,444.61 kg
1,065.60 kg
426.24 kg
85.20 kg

154
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
710.40 kg
841.12 kg
22.19 kg
54.29 kg
227.36 kg
168.00 kg
98.91 kg
28.91 kg
17.60 kg
24.42 kg
24.00 Ea
168.00 Ea
96.00 Ea

90.00 kg

89.60 m2

14.00 m
28.00 m

155
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
30.00 m
6.00 Ea
84.00 m2

120.00 m
202.43 m3
149.56 m3

8.04 m3
8.04 m3
72.00 m

20.25 m3

3.78 m3

156
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

14.18 m3

81.00 m3

42.19 m3

2.25 m3

1.01 m3

1.69 m3

157
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

5,734.08 kg
10,599.36 kg

1,469.52 kg
475.02 kg
254.48 kg
4,077.70 kg
218.40 kg
4,321.25 kg
133.16 kg
392.03 kg
2,587.20 kg
54.80 kg
354.49 kg
161.74 kg
134.52 kg
46.42 kg
25.11 kg
146.50 kg

158
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
120.00 Ea
720.00 Ea
576.00 Ea

540.00 kg

534.30 m2

41.10 m
61.65 m
108.00 m
18.00 Ea
360.45 m2

30.00 m
30.55 m3
19.31 m3

159
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

5.59 m3
5.59 m3
32.00 m

2.19 m3

0.64 m3

0.75 m3

0.90 m3

3.84 m3

160
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

1.60 m3

1.00 m3

1.27 m3

15.00 btg

6.25 m3

1.05 m3

161
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

938.12 kg

172.80 kg
60.48 kg
36.00 kg
204.48 kg
56.00 kg
480.64 kg
13.32 kg
39.77 kg
145.66 kg
128.00 kg
26.58 kg
33.85 kg
11.21 kg
8.69 kg
2.09 kg
16.28 kg
16.00 Ea

162
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
100.00 Ea
64.00 Ea

59.20 m2

8.00 m
16.00 m
22.00 m
4.00 Ea
16.00 m2

102.00 m
633.42 m3
511.30 m3

23.73 m3
23.73 m3

163
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

16.13 m3

25.60 m3

17.92 m3

48.00 m3

3,102.00 kg

411.84 kg
162.86 kg

164
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
75.40 kg
982.08 kg
295.20 kg
127.80 kg
943.26 kg
22.19 kg
55.24 kg
862.40 kg
376.80 kg
82.07 kg
94.00 kg
25.39 kg
28.55 kg
6.52 kg
24.42 kg
32.00 ea
60.00 ea
60.00 ea
96.00 ea

46.40 kg
55.00 kg

165
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

122.46 m2

15.70 m
31.40 m
36.00 m
6.00 Ea
132.30 m2

24.00 m
33.00 m2
60.43 m3
59.73 m3

3.09 m3
3.09 m3
24.00 m

166
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

47.69 m2
95.37 m2

14.44 m2
1.56 m2

9.03 m2

14.44 m2
29.03 m2

47.69 m2
55.19 m2
36.00 m2

1.00 Unit

1.00 Unit
1.00 Unit
1.00 Unit

167
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1.00 Unit

1.00 Set.
1.00 Set.

12.00 m
2.00 Set.

1.00 Lot
6.00 m
4.00 m

2.02 m3

36.00 btg
0.18 m3

168
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1.44 m3

0.64 m3

1.44 m3

0.50 m3

3.60 m3

3.60 m3

169
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

26.00 m
20.00 m2
24.10 m3
19.22 m3

1.38 m3
1.38 m3

1.35 m3

0.13 m3

0.30 m3

170
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

3.00 m3

176.40 kg
56.00 kg
112.00 kg
225.30 kg
2.47 kg
27.15 kg
40.00 kg
8.14 kg
13.19 kg
2.09 kg
12.21 kg
8.00 Ea
40.00 Ea
48.00 Ea

171
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

20.00 m2

5.00 m
5.00 m
6.00 m
2.00 Ea

84.00 m
252.96 m2
156.82 m3
131.43 m3

16.10 m3
16.10 m3
65.60 m

172
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
314.90 m2
629.80 m2

180.00 m2

364.90 m2
264.90 m2
252.96 m2

1.00 Unit
1.00 Unit
1.00 Unit

56.00 m
8.00 Set.

22.22 m3

173
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

397.00 btg

3.17 m3

9.60 m3

16.92 m3

3.60 m3

174
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
21.60 m3

6.00 m3

1.80 m3

12.60 m3

3.00 m3

25.30 m3

175
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
4.20 m3

14.63 m3

141.00 btg

44.00 m'
112.00 m2
93.00 m3
78.42 m3

6.25 m3
8.67 m3
48.00 m'
19.08 m3
10.06 m3
1.33 m3

176
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1.33 m3

3.83 m3

0.79 m3

4.20 m3

11.48 m3

2.80 m3

1.20 m3

177
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

0.84 m3

0.60 m3

6.50 m3

63.00 btg
6.89 m3

0.42 m3

178
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

674.88 kg
511.20 kg
377.01 kg
153.36 kg
1,081.44 kg
26.63 kg
81.82 kg
172.80 kg
32.71 kg
110.67 kg
23.40 kg
30.52 kg
24.00 Ea
150.00 Ea
120.00 Ea
60.00 m
1.00 Ls

126.00 m

179
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
144.00 m2
18.00 m2

14.40 m
28.80 m
16.00 m
4.00 point

47.00 m
91.76 m2
31.75 m3
23.65 m3

4.59 m3
4.59 m3
39.60 m

4.05 m3

180
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

4.05 m3

3.00 m3

3.84 m3

3.80 m3

1.14 m3

7.20 m3

181
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

567.00 kg
426.00 kg
252.00 kg
100.80 kg
615.04 kg
14.80 kg
37.88 kg
56.52 kg
180.86 kg
128.58 kg
9.54 kg
13.73 kg
24.00 Ea
108.00 Ea
36.00 Ea
60.00 Ea

182
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
60.00 m2

12.40 m
24.80 m
36.00 m
6.00 Ea
60.00 m2

6.00 m3

16.00 m3

6.60 m3

183
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

15.56 m3

3.70 m3

1,498.44 kg
441.00 kg

158.40 kg
42.00 kg
24.00 kg
221.52 kg
85.20 kg
563.25 kg
9.86 kg
37.88 kg

184
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
16.28 kg
50.77 kg
8.69 kg
21.20 kg
16.00 Ea
100.00 Ea
80.00 Ea

4.00 Ea
4.00 Ea

60.00 m2

7.50 m
14.00 m
2.00 Ea
55.00 m2
27.00 m2

185
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

24.00 m
33.00 m2
60.43 m3
59.73 m3

3.09 m3
3.09 m3
24.00 m

47.69 m2
95.37 m2

14.44 m2
1.56 m2

9.03 m2

14.44 m2
29.03 m2

186
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

47.69 m2
55.19 m2
36.00 m2

1.00 Unit

1.00 Unit
1.00 Unit
1.00 Unit
1.00 Unit

1.00 Set.

12.00 m
2.00 Set.

1.00 Lot
6.00 m
4.00 m

187
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

2.59 m3

54.00 btg
0.18 m3

1.44 m3

0.64 m3

1.44 m3

0.50 m3

188
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

3.60 m3

3.60 m3

carbon steel

1,498.44 kg

48.00 m
66.00 m2
120.86 m3

189
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
119.46 m3

6.18 m3
6.18 m3
48.00 m

95.37 m2
190.74 m2

28.88 m2
3.13 m2

18.06 m2

28.88 m2
58.06 m2

95.37 m2
110.37 m2
72.00 m2

190
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

2.00 Unit

2.00 Unit
2.00 Unit
2.00 Unit
2.00 Unit

2.00 Set.

24.00 m
4.00 Set.

2.00 Lot
12.00 m
8.00 m

4.03 m3

191
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

72.00 btg
0.37 m3

2.88 m3

1.28 m3

2.88 m3

1.00 m3

7.20 m3

192
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

7.20 m3

38.00 m
103.13 m2
188.85 m3
186.66 m3

4.20 m3
4.20 m3
26.00 m

112.19 m2
224.37 m2

193
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
50.00 m2

196.19 m2
196.19 m2
84.00 m2

1.00 Unit

6.00 Unit
1.00 Unit

18.00 m
3.00 Set.

3.46 m3

72.00 btg
0.83 m3

194
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

2.40 m3

3.24 m3

4.00 m3

0.60 m3

8.40 m3

8.40 m3

195
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

28.00 m
33.00 m2
60.43 m3
59.73 m3

3.09 m3
3.09 m3
18.00 m

35.25 m2
70.50 m2

19.00 m2
5.00 m2

18.06 m2

196
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

19.00 m2
46.06 m2

35.25 m2
35.25 m2
48.00 m2

2.00 Unit
2.00 Unit

2.00 Set.

12.00 m
3.00 Set.

1.00 Lot
12.00 m
8.00 m

197
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

2.59 m3

54.00 btg
0.28 m3

1.44 m3

0.84 m3

1.92 m3

0.50 m3

198
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

4.80 m3

4.80 m3

26.00 m
20.00 m2
24.10 m3
19.22 m3

1.38 m3
1.38 m3

199
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1.35 m3

56.00 btg
0.13 m3

0.30 m3

3.00 m3

176.40 kg
56.00 kg
112.00 kg
225.30 kg

200
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
2.47 kg
27.15 kg
40.00 kg
8.14 kg
13.19 kg
2.09 kg
12.21 kg
8.00 Ea
40.00 Ea
48.00 Ea

20.00 m2

60.00 m2
120.00 m2

60.00 m2
60.00 m2
1.00 ea

5.00 m

201
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
5.00 m
6.00 m
2.00 Ea

Capacity
0.45 kg/37.9 m3 1 UNIT
3000 MT 2 UNIT
146 m3/hr (rated) 3 UNIT
50 MT/hr 3 UNIT
3.5 MT/hr
63 Nm3/hr 2 UNIT
13 m3 1 UNIT
1.8 m3 1 UNIT
2 m3 1 UNIT
5 m3 1 UNIT
2 m3/hr 2 UNIT
(Note 1) 2 UNIT
1500 KL 1 UNIT
568 m3/hr 2 UNIT

202
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
454 m3/hr 2 UNIT
12 m3/hr 1 UNIT
30 m3/hr 1 UNIT
60 MT 2 UNIT
350 MT/h 1 UNIT
1 UNIT
1 set
min 40 m3/hr 2 UNIT

DIA
1/2" 12.00 EA
3/4" 12.00 EA
3/4" 18.0 M
1" 18.0 M
2" 78.0 M
3" 20.0 M
4" 228.0 M
6" 930.0 M
8" 30.0 M
10" 40.0 M

203
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
12" 994.0 M

6" 23.0 EA
8" 7.0 EA
10" 5.0 EA
12" 33.0 EA
12" 30.0 EA
1" 9.0 EA
3/4" 9.0 EA
2" 12.0 EA
3" 7.0 EA
4" 39.0 EA
6" 63.0 EA
10" 5.0 EA
6"x4" 2.0 EA
6"x3" 2.00 EA
8"x4" 3.00 EA
12"x8" 3.0 EA
12"x10" 3.0 EA
4" 2.0 EA
6" 5.0 EA
12" 14.0 EA
6"x4" 4.00 EA
2"x1" 2.00 EA

204
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
3"x1" 2.00 EA
4"x3" 8.00 EA
10"x6" 4.00 EA
16" X 12" 2.0 EA

3/4" 30.0 EA
1" 30.0 EA
2" 64.0 EA
3" 16.0 EA
4" 46.0 EA
6" 75.0 EA
8" 16.0 EA
10" 18.0 EA
12" 40.0 EA
12" 19.0 EA
4" 10.0 EA
6" 6.0 EA
2" 2.0 EA
12" 6.0 EA
4" 8.0 EA

3/4" 45.00 EA
1" 45.00 EA
2" 96.00 EA

205
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
3" 24.00 EA
4" 69.00 EA
6" 112.50 EA
8" 24.00 EA
10" 27.00 EA
12" 80.00 EA

3/4" 45.00 set


1" 45.00 set
2" 96.00 set
3" 24.00 set
4" 69.00 set
6" 112.50 set
8" 24.00 set
10 - 12" 107.00 set

3/4" 10.0 EA
1" 4.0 EA
2" 6.0 EA
12"X6" 2.0 EA
12"X4" 16.0 EA

1/2" 27.0 EA

206
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
3/4" 41.0 EA
1" 10.0 EA
2" 35.0 EA
3" 3.0 EA
4" 24.0 EA
6" 22.0 EA
8" 5.0 EA
10" 3.0 EA
12" 18.0 EA
4" 2.00 EA
6" 1.0 EA
8" 3.0 EA
12" 3.0 EA
2" 1.00 EA
4" 8.0 EA
6" 1.00 EA
3" 2.0 EA
10" 3.0 EA

12" 4.0 EA
6" 2.0 EA

3/4" 32.00 EA

207
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1" 20.0 M
1 1/2" 700.00 M
2" 48.0 M
3" 60.0 M
4" 30.0 M
8" 90.0 M
6" 50.0 M
10" 94.0 M
12" 760.0 M
16" 520 M

10" 12.0 EA
12" 2.0 EA
3" 10.0 EA
2" 10.0 EA
6" 7.0 EA
4" 6.0 EA
8" 22.0 EA
10" 18.0 EA
12" 6.0 EA
16" 24.0 EA
16"x12" 4.0 EA
16"x10" 7.0 EA
10"x8" 5.0 EA

208
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1 1/2" 18.00 EA
3" 4.0 EA
10" 4.0 EA
16" 2.0 EA
3"x2" 4.00 EA

1 1/2" 60.00 EA
2" 20.0 EA
4" 5.0 EA
3" 18.0 EA
6" 12.0 EA
8" 20.0 EA
10" 29.0 EA
12" 18.0 EA
16" 16.0 EA
2" 6.0 EA
16" 8.0 EA
12" 3.00 EA

1 1/2" 60.00 EA
2" 20.00 EA
4" 5.00 EA
3" 18.00 EA
6" 12.00 EA

209
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
8" 20.00 EA
10 " -16" 63.00 EA

1 1/2" 60.00 set


2" 20.00 set
3" 5.00 set
4" 18.00 set
6" 12.00 set
8" 20.00 set
10 - 16" 63.00 set

2"x3/4" 6.00 EA
10"x3/4" 18.00 EA
3/4" 6.00 EA

3/4" 30.00 EA
1 1/2" 14.00 EA
2" 6.0 EA
1" 4.00 EA
1 1/2" 10.00 EA
3/4" 16.00 EA
2" 1.0 EA
4" 1.0 EA

210
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
3" 4.0 EA
6" 2.0 EA
8" 5.0 EA
10" 6.0 EA
12" 6.0 EA
16" 3.0 EA
2" 4.00 EA
3" 2.0 EA
6" 1.0 EA
12" 3.00 EA
10" 5.0 EA
3" 1.0 EA
12" 2.0 EA
6" 1.0 EA
4" 1.00 EA

3/4" 66.00 EA
1" 212.00 M
1 1/2" 2.00 M
2" 520.00 M

2" 8.00 EA
1" 24.00 EA

211
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
2" 80.00 EA
1" 4.00 EA
2" 22.00 EA
1"x3/4" 2.00 EA
2"x1 1/2" 2.00 EA
2"x1" 8.00 EA

1" 24.00 EA
2" 84.00 EA
1" 4.00 EA
2" 18.00 EA

1" 24.00 EA
2" 104.00 EA

1" 96.00 EA
2" 516.00 EA
3/4" 38.00 EA
2"x3/4" 66.00 EA

3/4" 66.00 EA
1" 16.00 EA
1 1/2" 2.00 EA

212
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
2" 30.00 EA

1" 42.00 EA
1 1/2" 117.00 EA
2" 108.00 EA
3" 14.00 EA
4" 43.00 EA
8" 20.00 EA
6" 164.00 EA
10" 23.00 EA
12" 193.00 EA
16" 87.00 EA

1.0 Unit

213
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1.0 Set
1.0 Unit

2.0 Unit

1.0 set
12.0 Unit

2.0 Unit

3.0 Unit

12.0 Unit
6.0 Unit

1.0 Unit

214
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

2.0 Unit

1.0 Unit

2.0 Unit

1.0 Unit

215
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

1.0 Unit

1.0 Unit

1.0 Unit

216
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1.0 Unit

6.0 Unit

10.0 Unit

2.0 Unit

12.0 Unit

10.0 Unit

217
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

45 Unit

6.0 Unit

82.0 Unit

42.0 Unit

48.0 Unit

34.0 Unit
24.0 Unit
40.0 Unit
12.0 Unit

31.0 Unit

218
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

36.0 Unit
12.0 Unit
8.0 Unit

8 Unit
24.0 Unit
18.0 Unit

920.0 Mtrs
144.0 Mtrs
980.0 Mtrs
468.0 Mtrs
540.0 Mtrs
492.0 Mtrs
156.0 Mtrs
132.0 Mtrs
108.0 Mtrs
1,992.0 Mtrs
312.0 Mtrs
2,688.0 Mtrs
1,176.0 Mtrs

219
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1,704.0 Mtrs

3,496.0 Mtrs
650.0 Mtrs

1,704.0 Mtrs
1,704.0 Mtrs

1,920.0 Mtrs
1,680.0 Mtrs
1,464.0 Mtrs

440.0 Mtrs
516.0 Mtrs
924.0 Mtrs
1,740.0 Mtrs

44.0 EA

220
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
44.0 EA
18.0 EA
16.0 EA
44.0 EA
44.0 EA
44.0 EA
44.0 EA

36.0 EA
12.0 EA
12.0 EA
8.0 EA
18.0 EA
4.0 EA

12.0 EA
26.0 EA
16.0 EA

221
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

96.0 EA
96.0 EA
43.0 EA
15.0 EA
17.0 EA
46.0 EA
14.0 EA
14.0 EA
34.0 EA
19.0 EA
19.0 EA

2.0 Unit
Mtr
Mtr
Pcs
Pcs
Pcs

36.0 Set
Ea
Mtr

222
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
Mtr
Pcs
Pcs
EA

324.0 m

6.0 EA

9.0 EA

231.0 EA

1,046.0 kg

223
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

192.0 m

1,053.0 m

192.0 m

42.0 EA

24.0 Roll
24.0 Roll
24.0 Roll
24.0 Roll
24.0 Roll

224
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
240.0 EA
240.0 EA
120.0 EA
18.0 Pack

1.00 LOT
, battery for memory backup,
dor), outdoor, Class 1 div 2,
st almunium (body)/

ont and door).

225
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

1.00 LOT
1GB, complete with
wer Point for EWS),

1.00 LOT
tive documents.
em shall be

nt and door).

226
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

1.00 LOT
y parameters, ESD push-

227
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
n safe shutdown
dundant CPU Controller,

nt and door).

228
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

1.00 LOT

nt and door).

229
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

2.00 EA
1.00 EA
1.00 EA
7.00 EA
5.00 EA
1.00 EA

1.00 LOT

230
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

2.00 Set

231
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

1.00 LOT
tanks inventory

232
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1GB, complete with
wer Point for EWS),

1.00 LOT

nits shall be suitable for

e and programming. There will

1.00 LOT
nt and door).

233
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

1.00 LOT

1.00 LOT

234
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

9.00 EA
10.00 EA
14.00 EA
35.00 EA
42.00 EA
5.00 EA
28.00 EA
1.00 EA

235
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
29.00 EA
35.00 EA
207.00 MTR
9.00 EA
23.00 EA

58.00 EA

35.00 M
23.00 EA
95.00 EA
30.00 EA
95.00 EA
25.00 EA
5.00 M
25.00 EA
25.00 EA
25.00 EA

236
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
78.00 M
35.00 EA
125.00 EA
25.00 EA
125.00 EA
35.00 EA
5.00 M
35.00 EA
35.00 EA
35.00 EA

27.00 EA
8.00 EA
9.00 EA
7.00 EA

2.00 UNIT

237
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

2.00 EA
5.00 EA

5.00 EA
2.00 EA

2.00 EA
1.00 EA

1.00 EA

7.00 EA

4.00 EA
4.00 EA
2.00 EA

238
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
6.00 EA

4.00 EA

1.00 EA

2.00 EA

1.00 EA

1.00 EA

1.00 Set

239
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

3.00 Set

240
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

241
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

2.00 EA

1.00 EA

1.00 EA
1.00 EA

242
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1.00 EA

1.00 EA
2.00 EA

3.00 EA

6.00 EA

6.00 EA

6.00 EA
iv 2, Gr. IIA, high reliability,

7.00 EA

2.00 EA

243
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
on, Wall Mounted,

5.00 EA

2.00 EA

3.00 EA

2.00 EA

3.00 EA

1.00 EA
ection 1/2" NPT, wall mounted

244
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

245
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA

246
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA

1,650.00 M
420.00 M
420.00 M
500.00 M
480.00 M
440.00 M
420.00 M
420.00 M

247
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

3,600.00 M
2,600.00 M
2,000.00 M

248
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1,000.00 M
800.00 M
600.00 M
1,200.00 M
900.00 M

249
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

2,000.00 M

250
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

600.00 M

251
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

100.00 M
10.00 M
10.00 M

4,000.00 M

252
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

168.00 EA
4.00 EA

6.00 EA
4.00 EA
16.00 EA

4.00 Pack
5.00 Pack

4.00 Pack
5.00 Pack

4.00 Pack
6.00 EA
9.00 EA
9.00 EA
9.00 EA
12.00 EA

8.00 Pack

253
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
8.00 Pack

624.00 EA

3.00 Roll
3.00 Roll

108.00 EA
15.00 EA
6.00 EA

4.00 Pack

129.00 EA

5.00 Roll

11.00 EA

254
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
5.00 EA

24.00 EA
24.00 EA

2.00 SET
ection 1/2" NPT.

20.00 EA

20.00 EA

120.00 EA

24.00 EA

255
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
24.00 EA

12.00 EA

12.00 EA

12.00 EA

120.00 EA

120.00 EA

30.00 EA

8.0 SET

256
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

4.0 SET

4.0 SET
1.0 SET
1.0 SET

1.0 SET

257
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

30.0 EA

30.0 EA

4.0 SET

258
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT

HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD

6.0 EA
8.0 EA
8.0 EA

1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot

259
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

260
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

261
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

262
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

263
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

264
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

265
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

266
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

267
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

268
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

269
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

270
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

271
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

272
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

273
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

274
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

275
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

276
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

277
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

278
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

279
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

280
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

281
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

282
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

283
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

284
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

285
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

286
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

287
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

288
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

289
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

290
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

291
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

292
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

293
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

294
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

295
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

296
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

297
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

298
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

299
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

300
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

301
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

302
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

303
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

304
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

305
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

306
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

307
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

308
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

309
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

310
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

311
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

312
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

313
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

314
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

315
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

316
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

317
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

318
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

319
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

320
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

321
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

322
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

323
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

324
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

325
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

326
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

327
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

328
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

329
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

330
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

331
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

332
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

333
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

334
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

335
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

336
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

337
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

338
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

339
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

340
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

341
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

342
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

343
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

344
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

345
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

346
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

347
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

348
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

349
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

350
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

351
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

352
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

353
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

354
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

355
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

356
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

357
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

358
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

359
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

360
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

361
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

362
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

363
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

364
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

365
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

366
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

367
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

368
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

369
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

370
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

371
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

372
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

373
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

374
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

375
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

376
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

377
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

378
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

379
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

380
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

381
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

382
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

383
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

384
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

385
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

386
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

387
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

388
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD

Jakarta, 6 September 2018


PT. Bangun Bejana Baja

Giandre Ottoneal Wijaya


Direktur Utama

389
Sudut 15 Derajat

Jarak Gording Horizontal 1.139 m


Jarak Miring Gording 1.1 m
Jarak Kuda Kuda 4m
Jumlah Bentang 3 Bh
Mutu Baja B37 m
Fu 370 mpa
Fy 240 mpa
Modulus Elastis Baja 200000 mpa
Atap
Berat Atap Sendiri 3.87 kg/m'
Lebar Atap 3.1 m
Lebar Atap Tritisan 0.734 m
Panjang Atap 4m
Panjang Atap Ujung 1.055 m
Panjang Kap Atap 4m
Panjang Kap Atap Ujung 1.055 m
Lebar Kap Atap 0.25 m
Berat Kap Atap Sendiri kg/m'

Beban Gording 150 x 65 x 20 x 3.2


Beban Mati Gording 6 m 40.56 kg
(q) 6.76 kg/m
Jumlah Gording 8M
Panjang Gording Tengah 12 m
Panjang Gording Ujung Depan 1.055 m
Panjang Gording Ujung Belakang 1.055 m
Jarak Gording 1.1 m

Perhitungan Gording
L 6m
Jarak C-D
Cos 15 x/r
x 3
r 3.11 M
Jarak D-F
tan 15 y/x
y 0.804 M
Jarak Gording yg direncanakan 1.1 m
3 Buah
Jarak Gording yg sebenernya 1.04 m
Q 11.45 kg/m
Px = q cos 15 11.05 kg/m
Py = q sin 15 2.95 kg/m
Akibat Beban Mati
Mmax1 = 1/8 x q x L2 x 0.8 ( Arah x) 17.67 kgm
Mmax2 = 1/8 x q x L2 x 0.8 ( Arah y) 4.73 kgm

Beban Hidup
P 100.00 kg
Px = P cos 15 96.50 kg 12.1
Py = p sin 15 25.80 kg

Momen Akibat Beban Hidup


Mx2 = 1/4 x Px x L x 0.8 77.20 kg m
My2 = 1/4 x Py x L x 0.8 20.64 kg m

Akibat Beban Angin


(W)Tekanan Tiup ≥ 25 kg/m 2
35 kg/m2
α 15
Koefisien Angin Tekan
C = (0.02 x α - 0.4) -0.10
Koefisien Angin Hisap 9 (C') -0.40

Angin Tekan ( WT = C x W1 x Jarak Gording) -3.63 kg/m


Angin Hisap ( WT = C' x W1 x Jarak Gording) -14.51 kg/m

Beban Merata Angin (qw1)


(Wtekan + W hisap) x Cos α1 -18.01 kg/m

W Max ( Nilai Tekan terbesar) -3.63 kg/m


Wx 0.00
Mx3= 1/8 x Wx X 0.8 X L2 0.00 kgm
Wy -3.63 kg/m
My3 =1/8 x Wy X 0.8 X L2 -37.14 kg/m

Akibat Beban Hujan


Kemiringan Atap (α1) 15 Derajat
Jarak Gording 1.04 m
Beban Air Hujan (qr Perlu)
= ( 40 - 0.8 α1) 28 kg/m2

Beban Air Hujan (qr1) 29.02 kg/m


Beban Air Hujan Arah X ( Qr1 x Cos α1) 28.00 kg/m
Beban Air Hujan Arah Y ( Qr1 x Sin α1) 7.49 kg/m

Pembebanan
Beban Mati Arah x ( Qx) 11.05 kg/m
Beban Mati Arah Y ( Qy) 2.95 kg/m
Beban Hidup Arah X ( PL x) 96.50 kg
Beban Hidup Arah Y ( PL y) 25.80 kg
Beban Hujan Arah X ( QRx) 28.00 kg/m
Beban Hujan Arah Y ( QRy) 7.49 kg/m
Beban Angin (qW) -18.01 kg/m

Beban Terbagi Merata


Beban Mati Gording (G1) Puncak
= (Qx x ((1/2 x Jarak Kuda-Kuda ) + Lebar Atap Tritisan))/2 16.87 kg
Beban Mati Gording (G2) Tengah
= (Qx +(( 1/2 x Jarak Kuda-Kuda)+ Lebar Atap Tritisan)x2 67.49 kg
Beban Mati Gording (G3)
= (Qx x ((1/2 x Jarak Kuda-Kuda ) + Lebar Atap Tritisan)) 33.74 kg
Beban Mati Gording (G4) Tritisan
= (Qx x ((1/2 x Jarak Kuda-Kuda ) + Lebar Atap Tritisan))/4 8.44 kg
Beban Mati Gording (G5) Tepi
= (Qx x Jarak Kuda-Kuda ) 44.18 kg
Beban Mati Gording (G6) Tengah
= (Qx x Jarak Kuda-Kuda)x 2 88.37 kg
Beban Mati Gording (G7)
= (Qx x Jarak Kuda-Kuda ) 44.18 kg
Beban Mati Gording (G8) Tritisan
= (Qx x Jarak Kuda-Kuda )/2 22.09 kg

Total Keseluruhan 650.73 kg


1301.4643155 Kg
2602.928631 Kg
2.602929
1 kg = 9.8 n sin 15 0.258 koefisien faktor 2.5
1 n = 0.1 kg cos 15 0.965 KG ITU BEBAN TITIK
tan 15 0.268 KG/M ITU TERBAGI MERATA
Kemiringan Atap 15 derajat

4 B1 B4

4 B2 B5
Kombinasi Pembebanan
Akibat Beban Tetap
M= M Beban Mati + M Beban Hidup 4 B3 B6
Mx = Mx1 + Mx2
Mx #REF! kgm 3 3
My = My1 + My2 6
My #REF! kgm

Akibat Beban Sementara


M= M Beban Mati + M Beban Hidup + M Beban Angin

Mx = Mx1 + Mx2 + Mx3


Mx #REF! kgm
My = My1 + My2 + My3
My #REF! kgm

Kontrol Tegangan
Akibat Beban Mati + Hidup

δ = (Mx/Wy ) + ( My + Wx) ≤ = 1600 kg/ cm2


Mx/ My #REF!
My/Wx

Kontrol Lendutan

Fx izin = 1/360 x L/2


Fx izin 0.0055555556 m
Metode Pembagian

14.11 m

BA 1

P1 3.165 Ton
P2 6 Ton
RA Ton

You might also like