Project Proposal Report submitted in the partial fulfillment
Of
Mechanical Engineering
By
HARDEYVEER SINGH
K053 – 70461016048
MR. K.T.WANI
(AWM/MTN, Training Officer)
Goals:
Identify and understand various parts of coaches.
Study maintenance procedure involved with various components such as
wheel, trolley, braking system, interiors of a coach, frame etc.
Study various testing process involved regarding coaches for corrosion,
brake, wheel etc.
Understand the coach design and analyze scope for future developments.
Understand rate fixing criteria of Indian Railway.
Study basic safety requirements involved during maintenance of ICR/RCF
coaches.
Proposed Methodology:
Plant visit
Assisting section engineers of various departments
Case study
Classroom Study
Schedule:
DATE Shop/Department
30thApril - 8th May Inspection
9thMay -17th May LUF (Lifting under Frame)
20thMay -25th May HCR (Heavy Corrosion Repair)
27thMay -1stJune Wheel
2ndJune -8thJune EMU Trolley (electrical multiple unit)
10thJune -13thJune ML Trolley (main line)
References:
Maintenance manual Indian Railway
https://rdso.indianrailways.gov.in/works/uploads/File/Maintenance%20Manual%20for%20BG
%20Coaches%20of%20ICF%20Design.pdf
http://www.indianrailways.gov.in/railwayboard/uploads/codesmanual/ACTraction-
III/AcTractionIIICh4_data.htm
Safety instructions manual MTN