OPEN CUT METHOD OPEN CUT METHOD


A A

GROUND LEVEL TARMAC LEVEL


TARMACADAM MATERIAL

75
220
EXCAVATED MATERIAL GRAVEL STONE MATERIAL

470

175
R.C SLAB R.C SLAB R.C SLAB R.C SLAB
POWER CABLE FIBRE OPTIC CABLE POWER CABLE FIBRE OPTIC CABLE

50

50
1,200

1,200
SAND BACK FILLING SAND BACK FILLING

300

300
1 x 100mm dia UPVC Class B Pipe 1 x 100mm dia UPVC Class B Pipe
3 x 150mm dia CORRUGATED PIPE ( 1 x 300MM ECC CABLE) 3 x 150mm dia CORRUGATED PIPE ( 1 x 300MM ECC CABLE)
(SINGLE CORE 132kV XLPE CABLE 400MMSQ) (SINGLE CORE 132kV XLPE CABLE 400MMSQ)

280

280
B

100

100
B

1 x 100mm dia UPVC Class B Pipe 1 x 100mm dia UPVC Class B Pipe
( 2 x 48C- FIBRE OPTIC CABLE) 275 325
( 2 x 48C- FIBRE OPTIC CABLE) 275 325

600 600

SINGLE CIRCUIT OPEN CUT METHOD


CABLE LAID IN CORRUGATED DOUBLE WALL PIPE
LAID IN BACK FILLING SOIL
SECTION A-A TARMAC LEVEL
TARMACADAM MATERIAL

75
C
C

220
GRAVEL STONE MATERIAL

175
50
1,200
180
SAND BACK FILLING
1 x 100mm dia UPVC Class B Pipe
3 x 150mm dia CORRUGATED PIPE ( 1 x 300MM ECC CABLE)
(SINGLE CORE 132kV XLPE CABLE 400MMSQ)

500
ENCASED IN CONCRETE
1 x 100mm dia UPVC Class B Pipe
( 2 x 48C- FIBRE OPTIC CABLE)
HDD METHOD 275 325
HDD METHOD
D 600 D

GROUND LEVEL TARMAC LEVEL


SINGLE CIRCUIT TARMACADAM MATERIAL
CABLE LAID IN ENCASED IN CONCRETE DOUBLE WALL PIPE GRAVEL STONE MATERIAL
SOIL MATERIAL CROSSING TARMACADAM ROAD
SECTION E-E
MIN 4 METER

MIN 4 METER
EXISTING SOIL

1 x 100mm dia UPVC Class B Pipe 1 x 100mm dia UPVC Class B Pipe
( 1 x 300MM ECC CABLE) 3 x 150mm dia SINGLE WALL PIPE PN10 ( 1 x 300MM ECC CABLE)
(SINGLE CORE 132kV XLPE CABLE 400MMSQ)

E
E

1 x 100mm dia SINGLE WALL PIPE PN10 1 x 100mm dia SINGLE WALL PIPE PN10
( 2 x 48C- FIBRE OPTIC CABLE) 600
( 2 x 48C- FIBRE OPTIC CABLE) 600
3 x 150mm dia SINGLE WALL PIPE PN10
(SINGLE CORE 132kV XLPE CABLE 400MMSQ)

SINGLE CIRCUIT SINGLE CIRCUIT


CABLE LAID IN PN10 PIPE CABLE LAID IN PN10 PIPE
USING HDD METHOD USING HDD METHOD
SECTION C-C SECTION D-D

F
F
OWNER/DEVELOPER: EPC: CONSULTANT: PROJECT: SCALE: NTS SIZE: A3
CONSULT
TRANSAFESDN CONTRACT NO: 64204 SHEET : 5 OF 16
QUANTUM SOLAR BHD
PARK SDN. BHD. HV SUB-CONTRACTOR: SUPPLIER/MANUFACTURER: TITLE : 132KV UNDERGROUND CABLE WORKS DWG. NO.: REV
-CROSS SECTION DRAWING (OPEN CUT & HDD CROSS SECTION) DTSB/SSO/6420/AASB/SVD 0