You are on page 1of 1

S.

No Details Requested Date of issue Our comments Remarks


1 Send the detailed rate per Drawing
square meter communicated
to the
contracting
Roof sheeting for Amenities agency for
block 2nd floor 28.02.2018 execution.
2 Estimation Data is required.
sent on Detailed levels and
20.10.2017& structural drawings are
DEWATS drawings with drg. sent on needed
levels and bill of quantities 16.11.2017
3 Drawings for internal roads Road cross sections with
with levels and bill of Drg. issued on levels are required.
quantities 05.08.2017
4 Data is required.
Estimation Detailed levels and
sent on structural drawings are
Underground sump drawings 20.10.2017& needed. The capacity of
with levels and bill of drg. sent on sump may please be
quantities 16.11.2017 reviewed.
5 Detailed drawings for cup Drg. Issued on Send the detailed rate per
board shutters 23.02.2018 square meter
6 Data is required. Detailed
Estimation drawings with levels shall
sent on be furnished. Entrance arch
20.10.2017& details on south side duly
Compound wall drawings with drg. sent on correlating with under pass
levels and bill of quantities 16.11.2017 shall be furnished.
7 Estimation Revised levels shall be
sent on furnished. Drawing sent on
External drains and 20.10.2017& 16-11-2017 shall be resent
drain chambers drawings with drg. sent on for the execution.
levels and bill of quantities 16.11.2017
8 Underpass drawings with
levels and bill of quantities 05.03.18
9 Test for
moisture
content of
timber as per
IS:287 as
mentioned in
clause 11.0 in
Tests to be conducted the Technical
for imported sal wood specification
samples. of the tender