PROYECTO:
"REHABILITACION DE LA LINEA DE CONDUCCION DE DE LA CAPTACION RIO PORCON HASTA L
Total 1381.00
Diámetro de la Tubería
Altura de Compactación
Ancho Zanjas
Área Tubería
Área a Compactar
Coef. De compactacion.
Vol. Rell. / ml
1.2.2.4 RELLENO Y COMPACTACION ZANJA TUBERIA 355 mm, CON AFIRMADO E=0.30m
Altura de Compactación
Ancho Zanjas
Coef. De Compactacion
Vol. Rell. / ml
1.00
1.00
1.00
1381.00 m
1381.00 m
1104.80 M
276.20 m
1.08 m2
0.80 m
1381.00 m
1491.48 m3
0.10 m
110.48 m3
1601.96 m3
320.39 m3
1381.00 m
0.355 m
0.650 m
0.800 m
0.099 m2
0.4210 m2
0.7000
0.601 m3
1381.00 m
0.300 m
0.800 m
0.7000
0.343 m3
1601.96 m3
0.80 m
o, mas afirmado 1.05 m
1381.00 m
1160.04 m3
441.92 m3
1.25
0.7
0.571 m3
970.646 m3
1601.96 m3
2002.45 m3
b. PVC 355 mm, por ml. 0.571 m3
1381.00 m
789.14 m3
1213.307 m3
1381.00 m
1381.00 m
1381.00 m
1381.00 m
1381.00 m
3.00 und.
2.00 und.
5.00 und.
2.00 und.
3.00 und.
4.00 und.
1.00 und.
17.00 und.
22.00 und.
10.00 und.
90.00 und.
160.00 und.
2.00 und.
34.00 und.
20.00 und.
3.00
54.00
20.00 und.
20.00 und.
20.00 und.
1657.2 m2
VLOUMEN DE EXCAVACION= 1.16
Coeficiente de esponjamiento = 1.25
coeficiente de compactacion= 0.7
volumen de la cama de apoyo= 0.1143
vol. rell y comp (mat. Prest)= 0.6057
vol. rell y comp (mat. Propio)= 0.4571
vol. rell y comp (afirmado)= 0.3429
volumne a eliminar= 0.8786
0.079
m3/ml
m3/ml
m3/ml
m3/ml
m3/ml
m3/ml
“Ampliacion de Redes de Agua Potable, Alacantarillado y Sistema de Tratamiento de Aguas Residuales del
Sector Ajoscancha parte baja - Cajamarca- Cajamarca.”