DEL VALLE RIO APURIMAC Y ENE
H1
t1 0.20 m
H2
CONDICIONES GEOTECNICAS
g H2O 1.00 tn/m3
g (concreto) 2.40 tn/m3
qa 1.00 kg/cm2
f'c 175.00 kg/cm2
H3
f'y 4,200.00 kg/cm2
Ku = Mu/(0.9*f´c*A*d^2) 0.02437
w = (1+SQR(1-4*0.59*Ku))/(2*0.59) 0.02474
p = w*f´c/fy 0.00103
H1
H2
VERIFICACION Vu < 0.85*Vn OK
H3
PRESION DEL AGUA 1.45 TON/M2 b3
Qa
REACCION EN LA CARA DEL MURO (Q) 0.50 TON/M2
0.05 KG/CM2 h
Ku = Mu/(0.9*f´c*A*d^2) 0.00905
w = (1+SQR(1-4*0.59*Ku))/(2*0.59) 0.00910
p = w*f´c/fy 0.00038
B2 B1
2 CALCULOS:
2.1 DIMENSIONAMIENTO DE LA PANTALLA
Considerando
hp = 1.45 m (altura de presión)
t1 = 0.20 m
t1
h1
1.7 hp
1.45
1
P= γ a h 2
2 p
γ a hp
h
p2
Mu=1 .7 M =1. 7 γ a
6
Mu = 0.864 T-m
Además:
f y
w= ρ
f 'c
w= 0.096
d= 7.78 cm
t2 = 12.42 cm
Usar:
t2 = 20.0 cm 0.20 m
d= 15.37 cm 0.15 m
V du 1.48 Tn
=
φ
V c=0 .53∗√ f ' c∗b∗d
Vc = 10.77 Tn
Si As se traspala en la base:
hz = t2 + 5cm
hz = 25.0 cm
h = hp+hz+BL
h= 1.95 cm
Usar: B1 = 1.40 m
B2 f FSV B
≥ ∗ − 1
h 3 FSD 2∗h
B2 >= -0.13 m
Usar: B2 (mín) = hz
B2 = 0.25 m
2.4 VERIFICACION DE ESTABILIDAD:
0.20
t1
0.25
ht hp
P3
1.95 1.45 P2
P 1
1.20 P= γ a h 2
h/3
2 p
hz 0.25 P1
0.25 1.40
B2 B1
PESOS RESISTENTES
Pesos (P) Brazo de giro (X) P*X
Pi
Tn Mt (Tn*Mt)
P1 0.99 0.83 0.82
P2 0.82 0.35 0.29
P3 1.74 1.05 1.83
TOTAL N 3.546 M= 2.93
PESOS ACTUANTES
P = Ha 1.445 0.567 0.819
Hr f ∗N
FSD= =
Ha Ha
FSD = 1.5 > 1.5 CONFORME
Mr
FSV =
Ma
FSV = 3.58 > 1.75 CONFORME
Mr−Ma
XO=
N
Xo = 0.60 m
B/6 = 0.28 m
e= 0.23 m
q2
Como e < B/6 OK q1
CONFORME
Luego:
N 6∗e
q1 =
B (
1+
B )
q1 = 3.95 Tn/m2
N 6∗e
q 2=
B (
1−
B )
q2 = 0.35 Tn/m2
En la base:
Mu = 0.864 Tn-m
t2 = 0.20 m
d= 0.15 m 15.37 cm
f= 0.9
f´c = 175 Kg/Cm2
fy = 4200 Kg/Cm2
Mu A Sf y
A S= a=
φ f y ( d−a /2 ) 0. 85 f ' c b
a= 0.43 cm
As = 1.51 cm2
a= 0.43 cm CONFORME
AS
ρ=
bd
r= 0.00098 > r mínima
Refuerzo mínimo:
r= 0.0018
As mín = 2.77 cm2/m
Refuerzo Horizontal:
A st =ρt bt d
rt: 1) 0.0020 f <= 5/8" y fy > 4200 Kg/cm2
2) 0.0025 Otros casos
ZAPATA ANTERIOR
Conservadoramente:
l2
Mu=W u max∗ l= 0.25 m
2
Mu = 0.19 Tn-m
φ acero
(
d=hz − r +
2 ) hz =
r=
25
7.5
cm
cm
Ø acero = 1.27 cm Ø 1/2"
d= 16.87 cm
a = d/5 3.373 cm
As = 0.34 cm2
a= 0.09 cm
a= 0.09 cm
As = 0.30 cm2
a= 0.09 cm
As mín=0 . 0018∗b∗d
As mín = 3.04 cm2
qb = q2 + q'b
qb = 2.97 Tn/m
d= 16.87 cm Ø 1/2"
a = d/5 3.373 cm
As = 1.89 cm2
a= 0.53 cm
a= 0.49 cm
As = 1.73 cm2
a= 0.49 cm
As mín=0 . 0018∗b∗d
As mín = 3.04 cm2
Refuerzo transversal:
a)
As temp=0 . 0018∗b∗t
As temp =
b)
As montaje=36∗Ø