CRONOGRAMA DE ADQUISICION DE MATERIALES

PROYECTO: "MEJORAMIENTO DEL SERVICIO DE LOSA DEPORTIVA EN LA LOCALIDAD DE PALLANCHACRA, DISTRITO DE PALLANCHACRA PROVINCIA PASCO
DEPARTAMENTO PASCO"
FECHA: MAYO 2019
PRESUPUESTO MES 01-31 MAY MES 02-12 JUN
PRECIO
DESCRIPCION UND. S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT. PARCIAL

Err:509 Err:509 Err:509 Err:509 Err:509 15.00 315.15 17.52 368.08


Err:509 Err:509 Err:509 Err:509 Err:509 12.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 15.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 14.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 12.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 13.35 Err:509 4.45 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 70.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 700.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 182.69 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 84.05 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 1.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 1,207.13 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 38.12 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Página 1
CRONOGRAMA DE ADQUISICION DE MATERIALES
PROYECTO: "MEJORAMIENTO DEL SERVICIO DE LOSA DEPORTIVA EN LA LOCALIDAD DE PALLANCHACRA, DISTRITO DE PALLANCHACRA PROVINCIA PASCO
DEPARTAMENTO PASCO"
FECHA: MAYO 2019
PRESUPUESTO MES 01-31 MAY MES 02-12 JUN
PRECIO
DESCRIPCION UND. S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT. PARCIAL

Err:509 Err:509 Err:509 Err:509 Err:509 3.00 Err:509 Err:509 Err:509


Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 231.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 29.30 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 31.49 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 15.60 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 102.11 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 1.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 1.00 Err:509 Err:509 Err:509
0.00
COSTO DIRECTO: S/.129,542.12 S/.68,514.86
GASTOS GENERALES: 10.00% S/.12,954.21 S/.6,851.49
UTILIDAD: 10.00% S/.12,954.21 S/.6,851.49
SUB TOTAL: S/.155,450.55 S/.82,217.83
IGV: 18.00% S/.27,981.10 S/.14,799.21
COSTO DE OBRA: S/.183,431.64 S/.97,017.04

Página 2
OPERARIO
OFICIAL
PEON
TOPOGRAFO
ASFALTO RC-250
TRANSPORTE DE PLANTAS
FLETE TERRESTRE DE MATERIALES
ALAMBRE NEGRO RECOCIDO N° 8
ALAMBRE NEGRO N° 16
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60
BARRA DE ACERO LISO REDONDO
CLAVOS PARA MADERA CON CABEZA DE 2"
CLAVOS PARA MADERA CON CABEZA DE 2 1/2"
CLAVOS PARA MADERA CON CABEZA DE 3"
CLAVOS PARA MADERA CON CABEZA DE 4"
CLAVOS PARA MADERA CON CABEZA 1/2"
CLAVOS PARA CALAMINA
CALAMINA GALVANIZADA 0.30 mm x 0.83 x 3.60 m
CARTEL DE SEÑALIZACION PRVENTIVA
CARTEL DE SEÑALIZACION INFORMATIVA
ESCALERA DE GATO SEGUN DISEÑO
TUBERIA PVC SAP C-10 S/P DE 3/4"
TUBERIA PVC SAP C-10 S/P DE 1/2"
TUBERIA PVC SAP S/P DE 1 1/2"
CODO PVC SAP S/P 1/2" X 90°
CODO PVC SAP S/P 3/4" X 90°
CODO PVC SAL 4"x90°
CONO DE REBOSE DE 3"
TEE PVC-SAP S/P 1/2"
TEE PVC SAP S/P 3/4"
REDUCCION PVC SAP S/P 3/4" A 1/2"
ADAPTADOR PVC-SAP C/R 1/2"
ADAPTADOR PVC-SAP S/P 3/4"
TRAMPA PVC SAL DE 4"
YEE PVC SAL 4" x 4"
PIEDRA CHANCADA 3/4"
PIEDRA GRANDE DE 8"
GRAVILLA DE 1/2"
GRANALLA GRIS CLARO
ARENA FINA
ARENA GRUESA
HORMIGON
HUMUS BOLSA DE 50 KG
COMPOST BOLSA DE 50 KG
MATERIAL DE CANTERA SELECCIONADO PARA AFIRMADO
MATERIAL SARANDEADO
MATERIAL DE CANTERA CLASIFICADO PARA BASE
TIERRA DE CULTIVO
AGUA PUESTA EN OBRA
TAPA CON MARCO FIERRO FUNDIDO PARA DESAGUE 12" X 24"
TAPA CON MARCO FIERRO FUNDIDO 10" X 20"
MALLA CERCADORA NARANJA
CEMENTO PORTLAND TIPO I (42.5 kg)
CEMENTO BLANCO
YESO BOLSA 18 kg
LADRILLO DE ARCILLA K.K. DE 14x25x9cm
GRASS NACIONAL
PLANTAS ORNAMENTALES
ASPERSOR DE3/4" INC./ACCESORIOS
TUBERIA PVC SAL DE 4"
CAJA DE CONCRETO PREFABRICADA DE AGUA DE 10" X 20"
IMPERMEABILIZANTE
PEGAMENTO PARA PVC
COLA SINTETICA
DESMOLDANTE COLOR RELEASE PARA CONCRETO ESTAMPADO (9.08 kg)
MASILLA ELASTOMERIA DE POLIURETANO
CURADOR ANTISOL
CERAMICA TIPO PIEDRA LAJA DE 0.30X0.30 cm
MARMOLINA
CALAMINON TR4-PRECOR
MADERA NACIONAL PARA ENCOFRADOS INCLUYE CORTE
MADERA NACIONAL
ESTACAS DE MADERA
TRIPLAY DE 1.20X2.40 m X 4 mm
MADERA EUCALIPTO
ASTA DE BANDERA SEGUN DISEÑO
POSTE ORNAMENTAL SEGUN DISEÑO
PLACA RECORDATORIA DE BRONCE DE 60x 40cm
BALANCINES
PASAMANOS
RESBALADERA
CARRUSEL
BANCA DE MADERA SEGUN DISEÑO
BOQUILLA SURTIDOR VOLCAN 1"
LIJA PARA PARED
PINTURA LATEX VENCELATEX VENCEDOR
COLORANTE ENDURECEDOR PARA CONCRETO ESTAMPADO (27.2kg)
PINTURA ESMALTE ANTICORROSIVO SINTETICO TEKNO
PINTURA ESMALTE PARA TRAFICO
DISOLVENTE XILOL
IMPRIMANTE
SELLADOR ACRILICO PARA CONCRETO ESTAMPADO
CINTA TEFLON
CINTA SEÑALIZADORA COLOR AMARILLO B.T.
SUMIDERO DE BRONCE DE 4"
REGISTRO DE BRONCE DE 4"
ESTATUA SEGUN DISEÑO
TUBERIA DE FIERRO GALVANIZADO 3/4"
TUBERIA DE FIERRO GALVANIZADO DE 1 1/2"
CODO FIERRO GALVANIZADO DE 1/2" X 90°
NIPLE DE FIERRO GALVANIZADO DE 3/4" x 2"
NIPLE DE FIERRO GALVANIZADO DE 1/2" x 2"
UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1/2"
UNION UNIVERSAL DE FIERRO GALVANIZADO DE 3/4"
UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1"
VALVULA CHECK 3/4"
VALVULA CHECK 1"
VALVULA FLOTADORA DE 3/4"
VALVULA COMPUERTA DE 1/2"
VALVULA COMPUERTA DE 3/4"
VALVULA COMPUERTA DE 1"
SOLDADURA ELECTRICA CELLOCORD P 3/16"
ELECTROBOMBA INYECTORA 1 HP
CANASTILLA DE BRONCE DE 1 1/2"
INTERRUPTOR TERMOMAGNETICO 2 x 50 A
FILTRO PARA GASES
RESPIRADORES DESCARTABLES
RESPIRADOR DESCARTABLE CONTRA POLVO
CAPOTINES PARA LLUVIA
GUANTES DE CUERO
GUANTES DE JEBE
CHALECO REFLECTIVO
ZAPATAS DE SEGURIDAD C/ PUNTA DE ACERO
CASCOS DE SEGURIDAD
LENTES DE SEGURIDAD
EXTINTOR DE POLVO QUIMICO SECO (PQS)
BOTIQUIN PARA LA OBRA
COLLARINES CERVICALES (kit)
CAMILLA METALICA TIPO CANASTA DE RESCATE
CONO DE SEÑALIZACION NARANJA DE 28" DE ALTURA
BARANDA DE PROTECCION DE FIERRO GALVANIZADO SEGUN DISEÑO
PALETAS DE SEGURIDAD PARE Y SIGA
AUTOADESIVO CON SEÑALES DE SEGURIDAD
CINTA DE SEÑALIZACION
ESTUDIO DE IMPACTO AMBIENTAL
PLAN DE MANEJO ARQUEOLOGICO
CAJA DE PASE CUADRADA DE FIERRO GALVANIZADO DE 5" x 5" x 3"
CABLE THHW 3 X 6 MM2.
CABLE NYY 3-1X6 mm2
LUMINARIA TIPO GLOBO 70W LED
PRUEBAS ELECTRICAS
PRUEBAS DE CALIDAD DE CONCRETO ROTURA
ENSAYO DE DENSIDAD DE CAMPO
ENSAYO DE PROCTOR MODIFICADO
REFLECTOR LED CON EQUIPO 8W
CINTA BLACKER ROD
PERNO CON GANCHO Y TUERCA DE 1/4"
CABLE DE COBRE DESNUDO T/SUAVE 50 mm2
CONECTORES DE COBRE TIPO A/B
VARILLA DE COBRE DE 3/4" X 2.40 m
REGISTRO CON TAPA PARA POZO DE PUESTA A TIERRA
DOSIS ECOGEL 8KG.
CABLE ELECTRICO DE COBRE Nº14 THW AWG
CABLE DE COBRE DESNUDO TRIPLE N2XH 3-1x6MM2 + 1x6MM2
TERMINALES DE COMPRESION DE 6 mm2
TERMINALES DE COMPRESION DE 50 mm2
TABLERO GABINETE METAL BARRA BRONCE 12 POLOS
TABLERO DE DISTRIBUCION 50 KVA
TABLERO DE CONTROL ELECTROBOMBA
HOJA DE SIERRA
DISCO DE CORTE
ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO
CAPACITACION EN SEGURIDAD Y SALUD
COSTAL SINTETICO H=2.00 m
BANHER DE OBRA EN GIGANTOGRAFIA DE 2.40 x 3.60 m
LETRAS DE CAMBIO
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS A OBRA
CORDEL
NIVEL TOPOGRAFICO
ESTACION TOTAL INC. PRISMAS
HERRAMIENTAS MANUALES
MOLDE DE NEOPRENE PARA CONCRETO ESTAMPADO S/DISEÑO
REGLA DE ALUMINIO 1" X 4" X 8"
RODILLO LISO VIBRATORIO AUTOPROPULSADO 7- 9 ton
COMPACTADORA VIBRATORIA TIPO PLANCHA 5.8 HP
CORTADORA DE CONCRETO 14"
MARTILLO NEUMATICO (para compresora)
COMPRESORA NEUMATICA
CARGADOR SOBRE LLANTAS DE 125-135 HP 3 yd3
TRACTOR DE ORUGAS DE 190-240 HP
MOTONIVELADORA 130 - 135 HP
CAMION VOLQUETE DE 10 m3
CAMION CISTERNA
REGLA VIBRATORIA
PULIDORA
MAQUINA DE SOLDAR 295 A
VIBRADOR DE CONCRETO 4 HP 1.25"
MEZCLADORA DE CONCRETO 9 -11 P3
BALDE PRUEBA-TAPON -ABRAZ. Y ACCESORIOS
ANDAMIO METALICO
MOCHILA PULVERIZADORA CLIMAX M00P20
SC BASUREROS BASCULANTES METALICO
hh 861.45 1,034.84 530.11
hh 534.14 817.24 167.72
hh 1,896.86 1,943.25 784.69
hh 10.68 12.09 3.90
gal 8.74
glb 1
glb 0.93 0.08
kg 164.91 129.08 12.27
kg 396.73 28.19
kg 6,942.75 493.33
kg 179.76 15.26
kg 86.56
kg 2.89 77.47 7.55
kg 66.75 10.22 0.82
kg 96.62 3.26 0.99
kg 2.8
kg 2.8
pln 28.00
m2 5.25
m2 8.40
m. 0.70
m. 29.72
m. 77.32
m. 168.49
und 32
und 17
und 3
und 1
und 12.00
und 4
und 3
und 10
und 2
und 2
und 3
m3 122.29 69.02
m3 0.71
m3 2.59
kg 85.45
m3 2.03 14.94 0.32
m3 60.43 34.25
m3 26.06 78.4 7.95
bol 58.83
bol 117.67
m3 34.05 22.84 5.13
m3 6.17
m3 45.11
m3 3
m3 50.35 104.52 29.45
pza 6
pza 3
rll 20
bol 1,529.64 1,340.01 53.16
kg 30.77
bol 15.73 16.33 4.98
und 168.00
m2 139.89
und 35
und 17
m. 92.09
und 3
gal 2.17
gal 2.65
gal 5.63 0.65
bol 3.68
l 4.58 0.81
gal 17.46 54.14 19.32
m2 166.75
kg 78.60
m2 56.7
p2 1,871.16 1,693.01 158.13
p2 927.25 97.89
p2 11.95 12.41 3.78
und 14
p2 1,144.68
und 3
und 15
und 1
und 1
und 1
und 1
und 1
und 12
und 1.00
plg 0.2
gal 0.07
bol 31.21
gal 2.21 3.66
gal 2.17
gal 1.44
kg 2.4
gal 14.18
und 15.63
kg 137.47
und 2
und 2
und 0.75 2.25
m. 17.01
m. 1.89
und 7.21
und 2
und 10
und 10
und 6
und 26
und 2
und 8
und 1
und 5.15
und 1.03
und 5
kg 4.42 6.28
und 1
und 1
und 3
und 12
und 40
cja 60
und 40
par 72
par 12
und 40
par 50
und 40
und 72
und 0.57 0.78 0.66
sema 0.57 0.78 0.66
und 0.57 0.78 0.66
und 0.28 0.39 0.33
und 1.71 2.33 1.97
m. 44.21 62.82
und 1.71 2.33 1.97
und 8.53 11.63 9.84
rll 20
glb 0.27 0.39 0.34
glb 0.73 0.28
und 15
m. 39.87
m. 104.48
und 30
und 3
und 22 15 4
und 5
und 2
und 10
m. 180.77 32.03
und 216
m. 15.75
und 8
und 1
und 1
bol 2
m. 26
m. 8.4
und 1.2
und 2.25
und 1
und 1
und 1
und 5.04 0.43
und 0.29
glb 1
glb 1.14 1.55 1.31
m. 752.22
und 1
mll 22.75 31 26.25
glb 0.93 0.08
m. 314.61 326.73 99.58
hm 10.68 12.09 3.9
hm 10.68 12.09 3.9
%mo
hm 16.2
und 0.01 0.02
hm 0.3
hm 79.22 25.36 18.38
día. 0.58
hm 9.32
hm 4.65
hm 12.38 4.43 2.35
hm 6.3 2.27
hm 2.44
hm 49.52 17.86 6.32
hm 2.44
día. 0.78 5.42
hm 54.47
día. 1.1 1.57
hm 78.22 72.86 2.8
hm 89.56 74.85 2.87
hm 5.32
hm 42.38 18.36 3.47
und 0.73 2.26 0.81
und 9